Notice Inviting Tender: Airports Authority of India
Notice Inviting Tender: Airports Authority of India
TIRUPATI AIRPORT
E-Tender Only
Last Date for Sale of Tender Online 07/10/2020 Till 1100 Hrs
TABLE OF CONTENTS
SL. PARTICULARS
No. PAGE
1 3-8
Notice Inviting Tender
2 9-15
General Condition of Contract
3 16
Special Condition of Contract
4 17-18
Annexure-1
5 19
Annexure-2
6 20
Annexure-3
7 21
Annexure-4
8 22
BOQ & Contact Details
E-Tenders from eligible bidders are invited by ASST GENERAL MANAGER (OPERATIONS),
TIRUPATI AIRPORT on behalf of Chairman, and Airports Authority of India for the work as
detailed below:
1 Name of Work:
“Job contract for provision of manpower for ESS Up keeping of Terminal and Ancillary
buildings at Tirupati Airport”
2 Period of Contract:
This contract is initially for a period of SIX months or till finalization of the regular MESS
(Mechanized Environmental Support Services) contract or Whichever is earlier. The Contract
may be renewed on the expiry for a further period (up to six months), subject to satisfactory
service rendered by the Contractor during the six months of the Contractor or depends upon
the requirement.
3 Estimated Cost:
Rs. 55,03,544 (Rupees Fifty Five Lakh Three Thousand Five hundred and Forty Four only)
excluding GST, Bonus, EPF & ESI.
4 Cost of Tender: Rs. 1180.00( Rs.1000+GST@18%)
4.1 Tender documents shall be obtained from Airports Authority of India through Central Public
Procurement Portal (URL http://etenders.gov.in/eprocure/app) only, Bidders are required
to enroll on the e-Procurement module of the Central Public Procurement Portal (URL:
http://etenders.gov.in) by using valid Digital Signature Certificates on the CPP portal up to
07/10/2020 (1100 Hrs), Bidders, who have positive intent to participate, can create a bid
response only through CPP portal (e-Procurement), after offline payment of non-refundable
tender fee. Duly complete e-bid response shall be submitted on the CPP e- procurement
tender portal only along with the EMD. Any amendment or corrigendum to the tender
document shall be posted only on CPP portal (e-Procurement) URL
(https://etenders.gov.in/eprocure/app).
4.2 Exemption from paying tender fees & Earnest Money Deposit. Micro and small
Enterprises (MSEs) registered with District Industries Centre’s or khadi and village Industries
Commission or Khadi Village Industries Board or Coir Board or National Small Industries
Corporation or Directorate of Handicraft and Handloom or any other body specified by the
Ministry of Micro, Small and Medium Enterprises as MSMED Act. 2006 for goods produced
and services rendered shall be issued tender documents free of cost and shall be exempted
from paying earnest money deposit (EMD).
Bidders may please note, the schedule of quantities is attached in the portal. The same
(BOQ) shall be downloaded and be filled in the editable (un-protected) cells only and they
should necessarily submit their financial bids in the format provided after entering the
financial quotes, name of the bidder etc.
Bidders are requested to note that they should necessarily submit their financial bids in
the format provided and no other format is acceptable. If the price bid has been given as
a standard BOQ format with the tender document, then the same is to be downloaded
and to be filled by all the bidders. Bidders are required to download the BOQ file, open it
and complete the blue colored (unprotected) cells with their respective financial quotes
and other details (such as name of the bidder). No other cells should be changed. Once
the details have been completed, the bidder should save it and submit it online, without
changing the filename. If the BOQ file is found to be modified by the bidder, the bid will
be rejected.
5 Eligibility Criteria:
5.1 The firm/contractor should have valid License issued by Regional Labour Commissioner
as per prevalent Govt. rules (If applicable for this tender).
5.2 Agency Should have valid registration on the date of issue of tender in appropriate class of
CPWD/ MES/ P&T/ RAILWAYS/ STATE PWD/ PSUs/ Municipal Corporations &
Development Authorities of Delhi, Mumbai, Chennai and Kolkata
OR
Agency specialized in the similar nature of work and Registered with Registrar of
Companies/Firms/Central Govt. /State Govt. and Should have satisfactorily completed.
(Phase/part completion of the scope of work in a contract shall not be considered), however
pre-determined phasing of the work will be accepted) three works, each of Rs.
22,01,418/- (40% of estimated cost) or two works each of Rs. 27,51,772/- (50% of
estimated cost) or one work of Rs. 44,02,836/- (80% of estimated cost) in single Job
contract of un-skilled/semi-skilled/skilled manpower during last 07 (Seven) years ending
on 31/03/2020 in India.
(Firms showing work experience certificate from Non-Government/ Non PSU organizations
should submit ‘Tax Deduction at Source certificate’ in support of their claim for having
experience of stipulated value of works.)
5.3 ANNUALIZED AVERAGE FINANCIAL TURNOVER: The bidder firm shall have Annualized
Average Financial Turnover of at least INR 16,51,064 (30% of estimated cost) or more
during last three financial years, ending 31st March of previous year. As a proof of financial
turnover for the last THREE YEARS, a certificate from Chartered Accountant shall be
submitted by bidder. Copy of abridged Balance Sheet along with Profit & Loss account of
the firm (bidder) for last THREE YEARS shall also be submitted.
6 No two or more concerns in which an individual is interested, as Proprietor and/or partner
shall tender for the execution of the same works. If they do so, all such Tenders shall be
liable to be rejected.
7 Airport Director, Airports Authority of India, Tirupati Airport - 517520 shall be the accepting
Authority herein after, referred to as such for the purpose of this contract.
9.1 Each tender shall accompany the EARNEST MONEY DEPOSIT of the value of Rs.
1,10,075.00 (2% of estimated cost) only, shall be accepted ONLINE ONLY. in the form of
NEFT/RTGS only. Account Name: Senior Manager (ATC), Revenue, AAI. Account Type :
Current, Account No: 75520200000085, Bank Name: Vijaya Bank (Now Bank of Baroda),
Branch Name: Tirupati and IFSC code: BARB0VJTIPA. Scanned copy of EMD and Tender
fee paid receipt shall be uploaded in CPP Portal.
9.2 No interest or any other expenses, whatsoever, will be payable by AAI on the EMD in any
manner.
9.3 The EMD of those tenderers whose technical bids were found not suitable and rejected by
competent authority will be refunded after the completion of the technical evaluation
process.
9.4 The EMD of the bidders other than the lowest bidder will be refunded.
9.5 The EMD of the successful bidder will be treated and converted as part of the security
deposit.
9.6 The EMD amount shall be forfeited in the following events.
a. After issue of work order, failure to execute the work as on stipulated date will entail
for forfeiture of EMD.
b. If any tenderer withdraws his tender during the period of validity, his EMD shall be
forfeited.
10 Security Deposit:
The contractor shall deposit 10% of the contract value towards security deposit in the form
of NEFT/RTGS only. Account Name: Senior Manager (ATC), Revenue, AAI. Account Type :
Current, Account No: 75520200000085, Bank Name: Vijaya Bank (Now Bank of Baroda),
Branch Name: Tirupati and IFSC code: BARB0VJTIPA
10.1 After completion of work, Asst General Manager (Operations) shall, on demand from the
Contractor, refund to him the security deposit, provided that, the Asst General Manager
(Operations) is satisfied that there is no demand outstanding against the Contractor.
11 Important Dates :
17.1
THE OTHERS DOCUMENTS TO BE UPLOADED IN CPP PORTAL ARE LISTED AS
UNDER:
17.1.1 The firm/contractor should have valid License issued by Regional Labor Commissioner as
per Govt. prevalent rule (if applicable).
20 Notification of Award:
Notification of Award of contract will be made in writing to the successful Bidder. The
contract will normally be awarded to the qualified and responsive Bidder offering lowest
evaluated bid in conformity with the requirements of the contract documents and the
Accepting Authority shall be the sole judge in this regard. The Accepting Authority does
not bind himself to accept the lowest or, any tender or to give any reason for his
decision.
3 Definitions:
3.1 AAI shall mean Airports Authority of India having its headquarters at New Delhi
and includes a duly authorized representative of AAI or any other person empowered
in this behalf by AAI to discharge all or any of its functions.
3.2 The “Accepting Authority” shall mean the Airport Director, Tirupati
Airport, Airports Authority of India.
3.3 The “Contract” shall mean the notice inviting the tender, the tender and acceptance
thereof and the formal agreement, if any, executed between AAI and the Contractor
together with the documents referred to therein including these Conditions with
appendices and any special Conditions, the specifications, designs, drawings,
schedule of quantities with rates and amounts and schedule of rates. All these
documents taken together shall be deemed to form one Contract and shall be
complementary to one another.
3.4 The “Contractor” shall mean the individual or firm or company whether incorporated
or not, Joint Venture/Consortium undertaking the works and shall include legal
representative of such individual or persons composing such firm or incorporated
company, or successors of such firm or company as the case may be and permitted
assigns of such individual or firm or company.
3.5 The Contract Sum shall mean the cost of the Works arrived at after extension of the
quantities shown in Schedule of Quantities by the item rates quoted by the tenderer
for the various items.
3.6 A “Day” shall mean a day of 24 hours from midnight to midnight irrespective of the
number of hours worked in that day.
3.7 “Asst General Manager (Operations)” shall mean the Officer or Officer’s appointed
by the Accepting Authority or his duly authorized representative who shall direct,
supervise and be in charge of the works for purpose of this contract.
3.8 “Excepted Risks” are risk due to riots (otherwise than among Contractor’s employees)
and civil commotion (in so far as both these are uninsurable), war (whether declared
or not), invasion, act of foreign hostilities, civil war, rebellion, revolution, insurrection,
military or unsorted power, any acts of Government, damage from aircraft, acts of
God, such as earthquake, lightning and unprecedented floods and other causes over
which the Contractor has no control and accepted as such by the Accepting Authority.
3.10 A “Week” shall mean seven days without regard to the number of hours worked in
any day in that week.
3.11 “Tendered Value” means the value of the entire work as stipulated in the letter of
award.
4 Work to be carried out:
4.1 The work to be carried out under the Contract shall, except as otherwise provided in
these conditions, include all labour, which may be required in preparation of that and
in the full and entire execution and completion of the Works.
5 Inspection of work:
5.1 The Contractor shall satisfy himself before submitting his tender as to the form and
nature of the work, the quantities and materials necessary for the completion of the
Work, he may require and in general shall himself obtain all necessary information as
to risks, contingencies and other circumstances which may influence or affect his
tender. No extra charges consequent on any misunderstanding or otherwise shall be
allowed.
6 Sufficiency of Tender:
6.1 The Contractor shall be deemed to have satisfied himself before tendering as to the
correctness and sufficiency of his tender for the Works and of the rates and prices
quoted in the Schedule of Quantities, which rates and prices shall, except as otherwise
provided, cover all his obligations under the Contract and all matters and things
necessary for the proper completion of the Works.
7 Discrepancies and Adjustment of Errors:
7.1 The several documents forming the, Contract are to be taken as mutually
explanatory of one another, Special Conditions in preference to General Conditions.
7.2 In the case of discrepancies between Schedule of Quantities, the Specifications, the
following order of preference shall be observed
(a) Description in Schedule of Quantities.
(b) Particular Specification and Special Conditions if any.
7.3 If there are varying or conflicting provision made in anyone document forming part of
the Contract, the Accepting Authority shall be deciding authority with regard to the
intention of the document.
8 If on check there are found to be differences between the rates given by the
contractor in words and figures, the rates whichever is lower will be taken as correct.
9 The rates once approved shall be final and no escalation/ deviation shall be
accepted under any circumstances.
10 Time: This contract is initially for a period of six months commencing from “Service
Commencing Date” as indicated in the contract document. The Contract may be
renewed at expiry for a further period of six months subject to satisfactory service
rendered by the Contractor during the first year of the Contract.
14.2 The contractor shall discharge obligations as provided under various applicable
statutory enactments including the Employees provident Fund & Miscellaneous
Provisions Act, 1952, the Employees State Insurance (ESI) Act, 1948, the Contract
labour (Regularization & Abolition) Act 1970, the Inter-State Migrant workman
(Regulation of Employment & Conditions of Service)Act 1979, the minimum Wages Act
1948, the payment of Wages Act 1936 the Workman’s Compensation Act 1923 and
the other relevant Act, Rules and Regulations, Instructions etc. issued/ enforced from
time to time.
14.3 The employee to be paid daily wages (As applicable & amended from time to time) as
per their categories like one, along with P.F contribution @ of 13.36% of daily wages
and E. S. I. C contribution @ of 3.25% of daily wages. The contractor is required to
pay bonus @ 8.33% of full wage payment on monthly basis to their workman employed
to execute this work. Minimum wages shall be as per O/o Chief labour commissioner
©, New Delhi circulars issued and amended from time to time.
14.4 The contractor shall provide a list of contract Workers engaged for this contract work
along with their PF Account No. & ESI Registration No.
14.5 The payment of daily wages to the employee to be paid monthly through account
NEFT/RTGS only but not later than 7th of every month by the contractor and
necessary document of payments of wages and bonus must be submitted to this office
up to 15th of every month failing which recovery/ withheld@ 10% (RA bill amount)
against bonus from their R/A Bill shall be made.
14.6 On commencement of the contract, the contractor shall continue to have valid PF and
ESI code No. till completion of the contract. AAI reserve the right to withhold any
payment if ESI and PF contributions are not paid by the contractor and proof to that
effect have not been produced regularly by the contractor. Non-production of PF
and ESI challans of monthly contributions before its due date but not later than 21stof
every month by the contractor, shall be liable for action against
the contractor and recovery/ withheld @ 10% RA bill amount) against PF & ESI
respectively from their R/A Bills shall be made. PF number, ESIC number and
deductions thereof has to be mentioned in employee’s monthly salary slip.
17.2 All instructions, notices and communications, etc. under the Contract shall be given
in by email, FAX or in writing by registered post to the last known address of the
Contractor.
18 Foreclosure of Contract in Full or in Part due to Abandonment or Reduction in
Scope of Work:
If at any time after acceptance of the tender AAI shall decide to abandon or reduce the
scope of the Works for any reason whatsoever and hence not require the whole or any
part of the Works to be carried out, the Asst General Manager (Operations) shall give
notice in writing to that effect to the Contractor and the Contractor shall have no claim
to any payment of compensation or otherwise whatsoever, on account of any profit or
advantage which he might have derived from the execution of the works in full but
which he did not derive in consequence of the foreclosure of the whole or part of the
Works.
21 Changes in constitution:
Where the Contractor is a partnership firm, prior approval in writing of the Accepting
Authority shall be obtained before any change is made in the constitution of the firm.
Where the Contractor is an individual or a Hindu Undivided Family business-concern
such approval as aforesaid shall likewise be obtained before the Contractor enters in
to any partnership agreement where under the partnership firm would have the right
to carry out the work hereby undertaken by the Contractor. If prior approval as
aforesaid is not obtained, the Contract shall be cancelled after a notice in writing of 7
days from the Asst General Manager (Operations).
22 Payment
22.1 No mobilization advance shall be paid for any activity.
22.2 The payment shall be made on monthly basis. The 100% of the charges minus the
recoveries if any shall be paid after successful completion of each month and on
satisfactory performance certification from the Asst General Manager (Operations) of
AAI.
The contractor has to submit the following documentary evidence for claiming the
payment.
a) Copy of wage register/salary slip duly signed by individual workman.
b) Copy of PF challan with the details of amount deposited against each worker
deployed.
c) Copy of ESI challan with the details of amount deposited against each worker
deployed.
d) Copy of attendance duly signed.
e) Proof of Payments made on account of wages to workers
22.3 The proof of EPF& ESIC deposit of the staff deployed for this work must be submitted
along with the monthly bill. The bill will not be processed without the current
documents of EPF & ESIC.
22.4 In case of non-payment of wages or any other dues of any workman engaged by
contractor, AAI reserves the right to make payment and to recover the amount of such
payment from bill of contractor or any other amount payable to him under any
contract or as debt payable by contractor.
22.5 Payment shall be made to contractor after deduction of security deposit and taxes as
per statuary requirements prevailing at the time of payment. The Final bill shall be
paid to the agency after disbursement of all the payment to the workers including
bonus. No dues certificate duly signed by each worker need to be submitted in this
regard.
23 Income Tax and work contract tax Recovery:
Before releasing payment to the Contractor, income tax and work contract tax recovery
shall be made from the contractor’s bill at the rate as applicable during that time.
24.3 If as a result of such audit and technical examination any overpayment is discovered
in respect of any work done by the Contractor or alleged to have been done by him
under the contract, it shall be recovered by AAI from the Contractor by any or all of
the methods prescribed above or if any underpayment is discovered the amount shall
be duly paid to the Contractor by AAI.
25 Contract Agreement
25.1 The contract agreement shall be executed on a non-judicial stamp paper of value
Rs. 100/- and cost of the stamp paper shall be borne by the Contractor.
25.2 Contractor's tender including the letters of clarifications between the contractor and
the AAI prior to the award of contract shall form a part of the Contract Agreement to
the extent they have been accepted by AAI.
25.3 The contract shall submit an affidavit on a non-judicial stamp paper of value Rs.
100/- (as per annexure-3) and cost of the stamp paper shall be borne by the
Contractor.
26 The contractor shall also be responsible for any damage to other public utility
services/private property during the execution of the work and shall have to make
good the loss for such damage, in accordance with the provisions for the recovery of
losses by various departments/or imposition of penalty by any court of law.
29 If AAI is not satisfied with the conduct, behavior etc. of any the staff, the contractor
shall replace the person concern as per advice of AAI.
30 Records:
30.1 The contractor shall keep and maintain all records as are required to be maintained
by the contractor under the Contract labour (Regularization & Abolition) Act,
1970/The factory act/The payment of wages act/ or any other applicable law, rules,
regulations and shall furnish to the concerned officers/authorities in this behalf of
any and all information, reports and return as are required to be furnished by the
contractor under any such laws, rules or regulations.
30.2 The AAI shall entitle at all times to carry out any check or inspection of the
contractors’ facilities, records and accounts to ensure that the provisions of the
labour laws and regulations are being observed by the contractors and that the
workman are not denied the right and benefits to which they are entitled under
provisions. Any violation shall, without prejudice to any other right or remedies
available to AAI, constitute a ground for termination of the contract as though
specifically set under clauses of GCC thereof.
Sr. CONDITIONS
No.
1 Lowest rate will be decided based on overall total amount.
2 Only one party will be decided based on lowest rate.
3 Rates quoted shall be inclusive of minimum wages, contractor profit etc. if the
increase in minimum wages of the existing minimum wages rate during contract
period, same shall be reimbursed to contractor on production of documentary
evidence.
No additional payment such as contractor profit will be reimbursed due to increased
wages. As per the Govt of India, Ministry of labour and employment, Office of the
Chief Labour Commissioner order dated 08/05/2020 & File no.1/VDA(1)/2020-LS-
II, The minimum wages of the employees to be deployed are
1) Skilled – Rs 593/day
2) Semi-skilled – Rs 492/day
3) Unskilled – Rs 420/day
UNCONDITIONAL ACCEPTANCE
To
The Airport Director
Airports Authority of India
Tirupati Airport
Andhra Pradesh-517520
Sir,
ACCEPTANCE OF AAI’S TENDER CONDITIONS
1. The tender documents for the work “Job Contract for provision of
manpower for ESS Up-Keeping of Terminal and Ancillary Buildings
at Tirupati Airport” have been sold to me/us by Airports Authority of
India and I/we hereby certify that I/we have inspected the site and read
the entire terms and conditions of the tender documents made available
to me/us on CPP portal: https://etenders.gov.in/eprocure/app ,Which
shall form part of the contract agreement and I/We shall abide by the
conditions/clauses contained therein.
6. The required earnest money for this work has been submitted and the
scanned copy of Tender Processing Fees* &EMD* is attached along with
duly filled and signed annexure 3.
7. I/We agree that “If at any stage, any information / documents submitted
by us are found to be false, we shall be liable for debarment from
tendering in AAI, apart from any other appropriate / Legal action”.
Yours Faithfully
DECLARATION
Date:
Place:
AFFIDAVIT
DEPONENT
Place:
Date:
Note: This affidavit is to be attested by a First Class Magistrate / Notary Public on non-
judicial stamp paper of Rs. 100/-.
a. Rs. b. Rs.
or
(Yes / No) 3. One work of the amount of Rs.
17.1.3 (Yes/No) A. PAN No.:
(Yes/No) B. IT Return of F.Y.2017-18
(Yes/No) C. IT Return of F.Y.2016-17
(Yes/No) D. IT Return of F.Y.2015-16
17.1.4 (Yes / No) Unconditional acceptance as per Annexure-1.
17.1.5 (Yes / No) Declaration As per Annexure-2.
17.1.6 (Yes / No) Goods & Service Tax Registration No. document :
17.1.12 (Yes/ No) (a) Details of firm bank account along with scanned
copy of cancelled cheque.
(b) Details of contact No., address and e-mail.
17.1.13 (Yes/ No) Check list As per Annexure-4
17.1.14 (Yes/ No) Scanned copy of tender document. Digitally signed
17.1.15 (Yes/ No) Registration copy of NSIC/MSME if applicable.
For any query related to the inspection of the site & premises, prospective bidders may contact:-
AGM(Operations)
Airports Authority of India,
Tirupati Airport - 517520.
Tel: +91 9493173121, e-mail: [email protected]