PROCESS CONTROL AND ELECTRICAL EQUIPMENT
TABLE OF CONTENTS:
2
Venezuela INVECEM
4.7 Control Desks (E50-2Z) 17
List of Engineering Units to be applied 17
5. GROUP E60: INSTRUMENTATION, SENSORS AND SUBCONTROLS 19
5.1 General Requirements 19
5.2 Basic Design Criteria 19
5.3 Field Control Devices for Safety and Maintenance 19
5.3.1 Rope Switches (Emergency Pull Cord) 19
5.3.2 Panic Stop Push Buttons 19
5.3.3 Local Start and Stop Push Buttons 19
5.3.4 Start-up Notice (Start-up Warning) 19
5.4 Field Control Devices for Machine Protection 20
5.4.1 Proximity Switches 20
5.4.2 Limit Switches 20
5.4.3 Belt Drift Switches (Misalignment Switches) 20
5.4.4 Temperature Sensors PT100 20
5.4.5 Vibration Sensors 20
5.5 Process Instrumentation 20
5.5.1 Level Sensors 20
5.5.2 Load Cells 21
5.5.3 Control Valves and Actuators 21
5.5.4 Solenoid Valves 21
5.6 Sub-Control Systems (E60-2C) 21
5.6.1 General 21
5.6.2 Specification of Sub-Control System (SCS) 21
5.6.3 Definition of Input and Output Circuits 22
5.6.4 Installation 23
5.7 Special Instruments 23
5.7.1 Pyrometers and Special Temperature Measurement 23
5.7.2 Pyrometer and Camera Systems (E60-2V) 24
5.7.3 Kiln Shell and Refractory Monitoring (E60-2I.T) 24
5.7.4 Gas Analyzer (E60-2K) 24
5.7.5 Emission and Dust Monitoring Equipment (E60-2N) 24
6. GROUP E70: BUILDING AUTOMATION / COMMUNICATION SYSTEM 25
6.1 Fire Detection 25
6.1.1 General 25
3
Venezuela INVECEM
6.1.2 Fire Detection and Alarming (2F) Design 25
6.2 Telephone System 25
6.2.1 General 25
6.2.2 Telephone System (2T) 25
6.3 General Plant View Cameras 25
7. GROUP E80: MOTORS AND DRIVE SYSTEMS 26
7.1 General Design Requirements for Motors 26
7.2 Specific Requirements for Medium Voltage Motors (1X) 26
7.2.1 General Motor Requirements 26
7.2.2 Liquid Rheostat for Slip Ring Motors 26
7.3 General Requirements for Power Cables (1H, 1L) 26
7.3.1 Loading and Spare Capacity 26
7.3.2 High-voltage (HV) - & Medium-voltage (MV) Cables (1H) 27
7.3.3 Low-voltage (LV) - Cables (1L) 27
7.4 Control and Communication Cables 27
7.5 Cable Installation 28
7.5.1 Loading and Spare Capacity 28
7.6 Grounding 28
7.7 Lightning Protection 29
4
Venezuela INVECEM
0.1.1 Standards
All instruments shall be calibrated in the metric system.
Equipment shall generally be designed for a maximum altitude of <= 1000m above sea level, unless
otherwise s i C tated P I n( ontract
P D art a II S Owner’s
a t d roject
t e
S1, continuous operation, 8,000 service hours per year.
0.1.2 Standardization
The s ame m s ake, s a tandard
c f a izes
r end Eapacities e orf t ll equir
following:
High voltage, medium- and low voltage Equipment, e.g. circuit breakers and transformers
Control monitoring and metering Equipment, e.g. PLCs and electronic circuits
Instruments, field control devices, valves, control switches and lamps, etc.
Motors, including power electronics, starters and contactors
Cables, cable color, cable numbering
1
Venezuela INVECEM
Sub-control p ( e anels c i.e.
s lectrical
s f s ontrol
s a r ystem b fi upplied
a i r c o n d i ti o n e r s , c r a n e s , e t c . ) s h o u l d b e a v o i d e d w h e n e v e r p o s s i b l e . R e q u i r e d
realized in the process control system. If this is not possible for reasons of guaran
hardware used has to be of the same make and type as used for the process control system.
2
Venezuela INVECEM
Description Unit Value
Digital Inputs And Outputs VDC 24VDC
0.2.4 Power Factor Correction / Total Harmonic Distortion (THD) / Filters (1C)
The Plant power factor may be corrected on MV and/or LV level in order to achieve the specifi
overall Plant power factor. The following possibilities shall be considered:
Low v oltage
p d ower - c istribution
L s ompensation:
b c t V-Equ
a u t o m a ti c a l l y r e g u l a t e d r e a c ti v e p o w e r c o m p e n s a ti o n E q u i p m e n t s i t u a t
power d istribution,
T h h he
c igher
p b armonics
n E ontent
s b ro
eliminated at the source to guarantee a trouble free operati on of all Equipment within
ranges given by standards and the requirements of the Equipment.
For large variable speed drives and MV fixed speed drives: variable speed drive systems and
fi x e d s p e e d d r i v e s s u p p l i e d f r o m t h e M V - b u s b a r s s h a l l b e c o m p e n
r e a c ti v e p o w e r c o m p e n s a ti o n E q u i p m e n t c o r r e c ti n g t h e p o w e r f a
harmonics generated by the various kinds of converters.
The level of harmonic distorti ons at the point of common coupling with the uti lity company
shall be maintained during all operating conditions of the Plant and shall be in line with good
e n g i n e e r i n g a n d c o n s t r u c ti o n p r a c ti c e s a n d c o
standards.
3
Venezuela INVECEM
0.2.5 Basic Power Distribution Design Philosophy
The e ntire
p d ower s istribution
( M a L s bystem
d t gHV, sV nd
f V)
i s o l a ti o n , i s o l a ti n g a f a u l t y c i r c u i t f r o m t h e r e m a i n d e r o f t h e e
eliminating unnecessary power outages.
4
Venezuela INVECEM
1.2 Equipment Selection
5
Venezuela INVECEM
Surge a rrestors
a s g nd/or
s b a park
a i apsl a hall a s e pplied
b a t nco
specifications. Arrestors shall include standard features for supervision and control.
6
Venezuela INVECEM
1.11 Medium Voltage Power Distribution (1S)
The following basic requirements shall be met:
All MV-switchgear shall be of the metal enclosed / metal clad
switchgear and controlgear.
IEC b usbar
l s ine-up
c t I hall
F a Aonform
b l os ACb a rLR nd
t NSI
2B respectively
All busbars shall be made of copper.
Anti-condensation heating maybe used as required by local climatic conditions.
All Equipment shall be readily accessible for maintenance and for easy replacement
8
Venezuela INVECEM
separate r A oom. c utomatic
E ( fl harging
a r c quipment
i ac e for oat
shall be included for each MV-switchgear room. Alarming shall be provided for loss of AC su
charger fault and low DC voltage.
9
Venezuela INVECEM
A MCC shall comprise one or several process groups of a cost center. Process groups shall no
subdivided i d nto
M eifferent n O CCs, w xceptions
a T f eed o awner’s
process group shall form a block arrangement within the MCC.
An overload device shall protect every motor. Large motors 75 kW and specifically loaded motors
(heavy start, high torque) shall use electronic type of motor protecti on. Overload devices sha
designed to prevent single phasing. The overload device shall have automatic reset (self-reset type).
Reversible motor feeders shall be provided with internal interlocks to prevent short-circuiting.
Each motor control module shall contain all elements for the control and monitoring of one motor
and for the protection of its circuitry.
Internal wiring shall be coded by numbering. Color-coded wires shall be app
between different voltage levels.
10
Venezuela INVECEM
Complete with protective devices and contactors
11
Venezuela INVECEM
3.2 Indoor Lighting (1F)
In P lanta o nd
a d ffice t flreas laylights b u ypet uorescent
e i h b amps
areas (height > 5m). High bay areas shall be illuminated with high effi ciency lamps; however, suc
circuits shall contain a certain number of instantly restarting lamps.
When fluorescent fixtures are used the lighting tubes shall be secured to prevent them from falling
and injuring personnel.
Lighting s switches
b a ahall
am e b rranged e r e s d ainimum
fl a a esides
well as on all fl oor levels of staircases. Further additi onal arrangements depend on the room siz
L i g h ti n g s w i t c h c i r c u i t s s h a l l g e n e r a l l y b e o p e r a t e d t h r o u g h p u l s e r e l a y c o n t r o
simple arrangement where one only switch is needed and no further switch may be re
future. Fixtures with separate covers to attain dust tightness shall not be used.
A n e m e r g e n c y l i g h ti n g s y s t e m c o m p r i s i n g a n a d e q u a t e n u m b e r o f fi x e d i n s t a l l e d , f u l l y a
lamps with their own battery and charger as well as exit markings shall be used for safe evacuation
of all buildings, electrical rooms and parts of the Plant in the event of the complete loss of electric
power supply.
A ti g h t e r d i s t r i b u ti o n o f s u i t a b l e e m e r g e n c y l i g h ti n g s h a l l b e u s e d i n t h e
generation a w a s s ell
a m s p tandby- d t and f sain w ower
c wistribution
restoring the permanent power feed.
Furthermore, a n o m umber
b f e obile l attery-operated
w a c s merg
b e i n s t a l l e d a t m a i n a c c e s s r o u t e s a n d o n e a c h m a i n fl o o r w i t h a h i g h c o n c e n t r a ti o
Equipment.
The design of the lighting distribution shall be in such a way that the lighting distribution panels of
each main electrical room is fed from the standby power generating unit so as to guarantee supply
also in the event of a main power failure.
T y p e s o f s u b s u r f a c e m o u n t e d l u m i n a r i e s f o r o ffi c e s , c o n t r o l r o o m s , s o c i a l b u i l d i n g s , e
selected in accordance with the architectural design and the individual room requirement. Control
rooms a o ndr ther
s p ooms P erving s r redominantly
i l w a C-work
dimming. L c ighting w t o ircuitsm s sith b wwo o rt pore r pwitches o ha
with “intelligent” lighting control systems.
12
Venezuela INVECEM
Warning lights for aircraft on high structures shall be used in accordance with applicable la
applicable codes and standards.
13
Venezuela INVECEM
Process stations (PS):using industrial controllers (processors) with their software, assuring the safe
o p e r a ti o n o f m a c h i n e s , o f t h e p r o d u c ti o n p r o c e s s a n d p r o v i d
interfaces.
Operator s ( tations
u sings tandard
OS):
I E a T c quipment i s nd aorresponding
a simple and efficient human machine interface (HMI) for the remote operation of the Plant.
S e r v e r us :s i n g s t a n d a r d I T E q u i p m e n t a n d c o r r e s p o n d i n g i n d u s t r i a l s o ft w a r e ,
efficient data storage.
Screen: Is the displayed content (text and picture/graphic) on a HMI monitor.
Screen area: is a p art of th e t ot al disp la yed con ten t, show in g e .g. proce ss (dep artme nt or gr
information or standardized navigating information.
14
Venezuela INVECEM
4.4 Communication Networks (E50-2S)
F i b e r o p ti c c o m m u n i c a ti o n n e t w o r k s ( g l a s s t y p e ) s h a l l b e i n s t a l l e d b e t w e e n b u i l d i n g
boxes and process control systems installed outside of buildings for transport systems.
The communication networks for the PCS (plant-control-bus and plant-field-bus) have to be strictly
s e p a r a t e d f r o m t h e o ffi c e n e t w o r k . I n t e r n e t a n d e m a i l a c c e s s f r o m t h e P C S a u t o m
p r o h i b i t e d . T h e P C S c o m m u n i c a ti o n n e t w o r k s s h o u l d c o n s i s t o f s e p
i n f r a s t r u c t u r e ( s w i t c h e s , fi b e r o p ti c s e t c . ) a n d b e m a n a g e d
appropriate security measures with a firewall connection to the office network.
4.5.1 General
P r o c e s s S t a ti o n s ( P S ) s h a l l b e a r r a n g e d p e r d e p a r t m e n t , a l l
supervision of each distinct department. Small departments may be controlled by a common PS as
shown on the PCS layout.
4.5.2 Hardware
T h e p r oc e ss s t a ti o n c o n t ro l le r sh a l l b e lo c a t e d i n t h e c om p u t e r r o om n e a r t h e r e sp e c ti v e
control building.
4.5.3 Software
The software shall be structured as follows:
System software
Standard software
Application software (based on functional description)
The system and standard software is understood to be equal on all process station (PS).
4.6.1 General
The PC based Operator Stati ons provide high-performance human-machine communicati on to th
process.
All main operator commands shall be possible with mouse only.
The mouse (keyboard) Equipment and the displays shall be arranged to allow the operator an easy
control from a sitting or a standing position.
The PCs and servers shall be installed in the computer room in a panel.
15
Venezuela INVECEM
The servers shall be applied for data storage of the confi gurati on and for intermediate storag
process data. All data of process values and of all events shall be stored and be on-line available on
the o perator
s f a l tation1 w eeks.Hor t ardware
a east
s s gnd oftware
b o s t a hall e
m a k e a s t h e O S b u t w i t h a d d i ti o n a l h a r d a n d s o ft w a r e t o c o p e w i t h t h e s p e c i
regarding data security and redundancy.
Communication to OS and PS shall be with standard Ethernet TCP/IP.
16
Venezuela INVECEM
The status of a group shall be presented in a standardized form, showing th
machine and measurement status (or function).
The same features that are available on the group view shall be available on these displays.
17
Venezuela INVECEM
Variable: Description of Use: Unit Description: Abbreviation:
M i l l i g r a m p e r N o r m a l c3 u b i c
CO gas composition mg/Nm CO
meter CO
m o t o r s & e l e c t r i c a l
Energy kilowatt-hours kWh
consumers
Flow oil, water, etc. cubic meter, Iiter per hour m3/h; l/h
M i l l i g r a m p e r N o r m a l c3 u b i c
Nitrous Oxide gas composition mg/Nm NO
meter NO
v o l t , a m p , c o s p h i ,
V, A, cosφ, THDI,
Electric power power distribution harmonic distortion current, -
THDU
voltage
18
Venezuela INVECEM
5. GROUP E60: INSTRUMENTATION, SENSORS AND SUBCONTROLS
19
Venezuela INVECEM
5.4 Field Control Devices for Machine Protection
All sensors shall be individually wired to the field I/O box for individual signaling. Protection sensors
m o u n t e d a t l o c a ti o n s w i t h d i ffi c u l t a c c e s s o r p r o n e t o w e a r s h a l l b e d o u b l e d ( e . g .
winding temperature or filter inlet temperature).
20
Venezuela INVECEM
Inspection openings shall be provided close to the location of the sensor (for visual checking of the
level).
5.6.1 General
Electrical control systems supplied as a complete standard pre-tested system for certain Equipment
shall be considered as "Sub-Control Systems" (SCS).
For example, such systems may contain control Equipment for:
Electrostatic precipitators (excluding rapping and transport system)
Bag filters
Stackers, reclaimers
Packing machine
21
Venezuela INVECEM
The " failsafe"
p s brinciple
a t a c hall c e T pplied
m t c o b ll ontrol
a w ircu
as loss of voltage shall be detected and treated as a fault.
U n l e s s o t h e r w i s e s p e c i fi e d t h e S C S s h a l l b e d e l
d o c u m e n t a ti o n ) w i t h a l l r e q u i r e d e l e m e n t s a n d d e v i c e s s u c h a s c o n t r o l E q u i p m e n
etc.), motors, sensors, control panel, cable connectors, cables and installation material.
Protection of the drives as well as the provision of the internal control voltage is part of the SCS.
S C S o p e r a ti n g t o l e r a n c e s s h a l l b e a s s p e c i fi e d i n 0p a(Gr ar og ur appEh0 0 : G e n e) raanl d s h a l l n o t
need any “reset” feature after a power failure.
Control v f oltage
t S o s or w
he a CSs r b ystems,
s p A o hich
s b f ref upplied
the UPS-supply.
The following signals shall be included, as required by the specific control application:
Signal: W
22
Venezuela INVECEM
The "warning" signal is a pre-alarm which does not (or not yet) stop the normal "run" of the
SCS. The warning contact shall open as long as the warning condition prevails.
Signal: F
The "fault" signal is an alarm which causes the SCS to stop automati cally. The fault con
shall open until the fault has been locally rectified.
Signal: xx.SP
The " setpoint(s)"
w b r i fill o ae 2 eceived
4 m s no b orm
ac f t t -wire
Plant-field-bus s T s ystem. s b c he g ignal i hall ( e g ompletely
a
possible power supply) in the SCS unit.
Signals: xx.PV
The "actual values" shall be a 2-wire 4-20 mA signal or by a connection of the Plant-field-bus
system. The signal shall be galvanically isolated (against ground and possible power supply).
All signals shall preferably be transmitted over the Plant-field-bus or with OPC through Ethernet, if
more complex data transfer is required.
5.6.4 Installation
T h e C o n t r a c t o r s h a l l i n c l u d e a l l r e q u i r e d c a b l e s a n d i n s t a l l a ti o n m a t e r i a l f o
sensors a m nd v otors,
e c falves t S tc. a w aontrolled
s f c rom( h he CS,
duty trailing cables for stackers and reclaimers).
24
Venezuela INVECEM
6. GROUP E70: BUILDING AUTOMATION / COMMUNICATION SYSTEM
6.1.1 General
The fi d re etection
s s b d ystemi c hall o te fi esigned
z d n b tonsideration
fi
barrier system.
T h e s y s t e m s h a l l c o n s i s t o f fi r e d e t e c t o r s a n d m a n u a l fi r e a l a r m p u s h - b u tt o n s a r e a s , a
alarm annunciation panel.
6.2.1 General
The proposed telephone system shall be in accordance with Applic
Standards and Contractor shall arrange for all necessary approvals with Authorities.
25
Venezuela INVECEM
7. GROUP E80: MOTORS AND DRIVE SYSTEMS
The following motors and drive systems shall be applied:
Medium voltage motors (Note that such motors operate at voltages between
3 kV and 10 kV, i.e. in the medium voltage range)
Low voltage motors (Voltage <= 1000V)
Variable speed drive systems (Voltages between 440 V and up to 6.3 kV)
Hydraulic drives (for special applications only)
26
Venezuela INVECEM
All cables shall be dimensioned according to the uncompensated load (installe
n o m i n a l l o a d o f S C S ) o f t h e E q u i p m e n t c o n n e c t e d a n d t h e s h o r t c i r c u i t c o n d i ti o n s o f t
network. Connections to and from transformers shall be able to carry its full rated capacity.
Cable cross sections shall be sized for loading according PVC insulation.
The v oltage
d e u rop, h sven c nders n eavy
e 1 %tart
o t n onditions
v a hall
the terminals of the motors.
The voltage drop under normal operating conditions shall not exceed 2% of the nominal voltage at
the terminals of the motors.
27
Venezuela INVECEM
The n umber
o fi p cf sbers b s er able
t 2 o 3 t hall w aem tandardized
o 6 fi p o
cable for secondary connections (e.g. to field I/O box).
All fibers of a cable (including spare) shall be terminated at a fiber optic panel.
Ethernet and Plant-field-bus cabling may be copper within an individual building only.
7.6 Grounding
As a guideline the grounding system shall correspond to the followin
Standards:
IEC 60364
Equivalent latest IEEE and NEC standards are also admissible.
Authority requirements.
Grounding of all Equipment shall be provided using an integrated
E n g i n e e r i n g a n d e x e c u ti o n o f t h e g r o u n d i n g n e t w o r k s h a l l b e c l o s e l y c o o r d i n a t e
Works. Refer to Contract Part IV-1-4 (Civil and Structural Works).
" F o u n d a ti o n G r o u n d i n g " w i t h e m p h a s i s o n p o t e n ti a l e q u a l i z a ti o n s h a l l b e a p p
g r o u n d i n g n e t w o r k . R e f e r t o " P o t e n ti a l E q u a l i z a ti o n a n d F o u n d a ti o n G r o
18014" or IEEE Std. 80.
A l l g r o u n d i n g c o n d u c t o r s s h a l l b e b a r e , s t r a n d e d , s o ft - d r a w n c o p p e r a n d a l l e
connections shall be made by thermo-welding or by type tested connection material.
A i m i n g a t a n i n t e g r a l s y s t e m f o r c o m m o n p o t e n ti a l e q u
e q u a l i z a ti o n r e s p e c ti v e l y t h e f o l l o w i n g E q u i p m e n t s h a l l b e c o n n e c t e d t o t
building:
All motor, generator and other electrical Equipment frames and/or bases
A l l m e t a l l i c e l e c t r i c a l p a n e l s , E q u i p m e n t e
installations.
28
Venezuela INVECEM
7.7 Lightning Protection
As a guideline the lightning protecti on system shall correspond to the following Applicable
and Standards:
IEC 62305-3
A comprehensive lightning protection system shall be installed to cover all buildings and structures
i n a c c o r d a n c e w i t h A p p l i c a b l e C o d e s a n d S t a n d a r d s . L i g h t n i n g p r o t e c ti o n f a
terminals ( rlightning
a d dods) c nd t s edicatedl g own e onductor
to divert the lightning current path to ground through circuits
r e s i s t a n c e . T h e l i g h t n i n g p r o t e c ti o n s y s t e m s h a l l b e b o n d e d t o t h e P l a n t g
separate tapping points. Such connections shall be at the outside of the building walls, and shall be
individually, directly connected to the common below grade Plant ground electrode system.
Overhead power lines shall be furnished at both ends by overvoltage arrestors.
29