4-Which kind of labour force is required in case of Jobbing Production?
(A) Highly Skilled
(B) Semi skilled
(C) Unskilled
(D) Any of the above
Objective of Work Study is to improve _______
(A) Cycle time
(B) Productivity
(C) Production
(D) All of the above
10-Which of the following are activities of corrective maintenance?
(A) Overhauling
(B) Emergency repairs
(C) Modifications and improvements
(D) All of the above
Inadequate production capacity ultimately leads to
(A) Poor quality
(B) Poor Customer Service
(C) Poor inventory control
(D) All of the above
Fixed position layout is adopted when
(A) Products are of different variety
(B) Product is very heavy involving assembly of large number of parts
(C) Products are in large numbers
(D) All of the above
Which of the following are the objectives of a good maintenance system?
(A) Minimisation of wear and tear of machines
(B) Ensuring maximum plant availability
(C) Both (A) and (B)
(D) None of the above
Which of the following is not atype of layout
Process layout
Factor layout
Product layout
Combination Layout
Is Statement is ‘Mass production is generally used to dole out huge volumes of the product’
True
False
Primary Objective of PPC is
To determine the requirements for men, materials and equipment
To find best Location
To create suitable layout
To improve productivity
This type of strategy allows for a placement of a stocking point
Assemble To Order
Make To Stock
Make to order
Is not a part of MPS
BOM
Invntory
Demand Forecast
Supply chain
Which is not a type of maintenance management system
Preventive Maintenance
Condition Based maintenance
Collateral Mainteance
Corrective maintenance.
Which is the objective of purchasing
To pay reasonably high prices for the best values obtainable, negotiating and
executing all company commitments
To pay reasonably low prices for the best values obtainable, negotiating and
executing all company commitments
Both of above
None of Above
Which of the below is not Technique of Inventory Control
ABC analysis
Economic order quantity model
TQM
VED Analysis
Productivity is
Productivity = Output/Input
Productivity = Input /Output
Productivity = Sales/Output
None of above
Productivity can be increased by:
Generating more outputs by increasing level of inputs
Generating more outputs from same level of inputs
A combination of both.
None of the Above