0% found this document useful (0 votes)
3K views10 pages

FORMWORKS & SCAFFOLDINGS Estimates

The document is a construction estimate for forms and scaffolding. It provides estimates for the materials needed for constructing the forms for beams, columns, slabs and scaffolding structures. The estimates include quantities of materials like plywood, lumber and nails. The total estimated cost for materials for forms and scaffolding is provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views10 pages

FORMWORKS & SCAFFOLDINGS Estimates

The document is a construction estimate for forms and scaffolding. It provides estimates for the materials needed for constructing the forms for beams, columns, slabs and scaffolding structures. The estimates include quantities of materials like plywood, lumber and nails. The total estimated cost for materials for forms and scaffolding is provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

DONE!

C O N S T R U C T I O N E S T I M A T
25-01-12

D I S C L A I M E R

THE FOLLOWING COMPUTATIONS ARE OF AUTHOR'S


OWN APPROACH AND UNDERSTANDING OF CONSTRUCTION
ESTIMATES. THE AUTHOR DOES NOT CLAIM THIS WORK TO
BE PERFECT. FROM THE WORD ITSELF, ESTIMATES, THE
VALUATION IS STILL AN OPINION BUT DERIVED FROM
SCIENTIFIC AND MATHEMATICAL BASES.
ZAE

S U M M A R Y
FORMS AND SCAFFOLDINGS

ACTIVITY UNIT QTY UNIT COST

10 FORMS AND FRAMES


1/2" x 4' x 8' Form Plywood 162 pcs 99.20
2" x 2" x 12' Coco Lumber 1014 pcs
2" x 3" x 12' Coco Lumber 1206
2" x 4" x 12' Coco Lumber 294 pcs
4" CWN #REF! kgs
3" CWN #REF! kgs
2" CWN #REF! kgs

T O T A L :

FORMS AND FRAME


MATERIALS RECOVERY FACILITY

BEAMS

I T E M NUMBER LENGTH
1 B-1 1.00 60.45
Perimeter(m):
1a FORMS AND FRAMES Plywood Thickness: 0.50
Area of Plywood(sq.m): 2.88
1/2" x 4' x 8' Plywood 27 pcs
2" x 2" x 12' Coco Lumber 127 pcs

T O T A L :

I T E M NUMBER LENGTH
2 B-2 1.00 20.00

Perimeter(m):
1a FORMS AND FRAMES Plywood Thickness: 0.50
Area of Plywood(sq.m): 2.88
1/2" x 4' x 8' Plywood 10 pcs
2" x 2" x 12' Coco Lumber 45 pcs

T O T A L :

I T E M NUMBER LENGTH
3 RB-1 1.00 70.00

Perimeter(m):
1a FORMS AND FRAMES Plywood Thickness: 0.50
Area of Plywood(sq.m): 2.88
1/2" x 4' x 8' Plywood 32 pcs
2" x 2" x 12' Coco Lumber 147 pcs

T O T A L :

COLUMNS

I T E M NUMBER HEIGHT
1 C-1 17.00 7.20
Perimeter(m):
1a FORMS AND FRAMES Plywood Thickness: 0.25
Area of Plywood(sq.m): 2.88
1/4" x 4' x 8' Plywood 94 pcs
2" x 2" x 12' Coco Lumber 694 pcs

T O T A L :

SCAFFOLDINGS
COLUMNS

I T E M NUMBER HEIGHT
1 C-1 17.00 7.20

Perimeter(m):
Multiplier for Vertical 9.35
1a FORMS AND FRAMES
Multiplier for Horizontal 31.67
Multiplier for Brace 17.50
Vertical(2" x 4" x 12') 143 pcs
Horizontal(2" x 3" x 12') 646 pcs
Braces(2" x 3" x 12') 357 pcs

T O T A L :

BEAMS
I T E M NUMBER LENGTH
1 B-1 1.00 60.45

Perimeter(m):
1a FORMS AND FRAMES Multiplier for Vertical 8.00
Multiplier for Horizontal 7.00
Vertical(2" x 4" x 12') 60 pcs
Horizontal(2" x 3" x 12') 71 pcs

T O T A L :

I T E M NUMBER LENGTH
2 B-2 1.00 20.00

Perimeter(m):
1a FORMS AND FRAMES Multiplier for Vertical 8.00
Multiplier for Horizontal 7.00
Vertical(2" x 4" x 12') 20 pcs
Horizontal(2" x 3" x 12') 23 pcs

T O T A L :

I T E M NUMBER LENGTH
3 RB - 1 1.00 70.00

Perimeter(m):
1a FORMS AND FRAMES Multiplier for Vertical 8.00
Multiplier for Horizontal 7.00
Vertical(2" x 4" x 12') 70 pcs
Horizontal(2" x 3" x 12') 82 pcs

T O T A L :

FORMS & SCAFFOLDINGS


I T E M NUMBER
AREAS
1 2ND FLOOR SLAB 1.00

Plywood Thickness: 0.50


Area of Plywood(sq.m): 2.88
1/2" x 4' x 8' Plywood 2 pcs
2" x 3" x 12' Coco Lumber 27 pcs

T O T A L :
N E S T I M A T E S
LEGEND:
FILL THIS UP!!

UPDATE PRICES
Laborer 200
Mixer Operator 250
Carpenter 300
Painter 300
Mason 300
Steelman 300
*as of 25-April-2008

A R Y
FFOLDINGS
MATERIAL
LABOR COST TOTAL
COST

6,745.47 2,023.64 8,769.11

D FRAMES
OVERY FACILITY

MS

DEPTH WIDTH VOLUME


0.50 0.20 6.05
1.30 Area(sq.m): 78.59
in Size of Frame: 2" x 2"
sq.m Length of Frame(ft): 12.00
- Multiplier 18.66
- Bd. Ft. 509.17

DEPTH WIDTH VOLUME


0.50 0.30 3.00

1.40 Area(sq.m): 28.00


in Size of Frame: 2" x 2"
sq.m Length of Frame(ft): 12.00
- Multiplier 18.66
- Bd. Ft. 181.42

DEPTH WIDTH VOLUME


0.50 0.20 7.00

1.30 Area(sq.m): 91.00


in Size of Frame: 2" x 2"
sq.m Length of Frame(ft): 12.00
- Multiplier 18.66
- Bd. Ft. 589.60

MNS

DEPTH WIDTH VOLUME


0.40 0.60 29.38
2.20 Area(sq.m): 269.280
in Size of Frame: 2" x 2"
sq.m Length of Frame(ft): 12.00
- Multiplier 29.67
- Bd. Ft. 2774.15
.

LDINGS
MNS

DEPTH WIDTH TOTAL HEIGHT


0.60 0.60 122.40

2.60 Area(sq.m): 318.240


Width of Frame(inches) 2.00
D-1 of Frame(inches) 3.00
D-2 of Frame(inches) 4.00
- Length of Frame(ft): 12.00
- Bd. Ft. 7162.85
-

MS
DEPTH WIDTH TOTAL LENGTH
0.50 0.20 60.45

1.30 Width of Frame(inches) 2.00


D-1 of Frame(inches) 3.00
D-2 of Frame(inches) 4.00
- Length of Frame(ft): 12.00
- Bd. Ft. 906.75

DEPTH WIDTH TOTAL LENGTH


0.50 0.30 20.00

1.40 Width of Frame(inches) 2.00


D-1 of Frame(inches) 3.00
D-2 of Frame(inches) 4.00
- Length of Frame(ft): 12.00
- Bd. Ft. 300.00

DEPTH WIDTH TOTAL LENGTH


0.50 0.20 70.00

1.30 Width of Frame(inches) 2.00


D-1 of Frame(inches) 3.00
D-2 of Frame(inches) 4.00
- Length of Frame(ft): 12.00
- Bd. Ft. 1050.00

OLDINGS (SLAB)
FORMS STAGING
5.10 18.00

in Size of Frame: 2" x 3"


sq.m Length of Frame(ft): 12.00
- Multiplier 9.10
- Bd. Ft. 163.80