Structural Design Guide for Students
Structural Design Guide for Students
Presented to
In Partial Fulfillment
CLAIREMAY A. DETOYATO
July 2020
p-1
PREFACE
load safely. With the application of structural design we can obtain required size,
This manual also provides the plans, drawings along with the materials and
specifications that are all based from the Natural Structural Code of the Philippines
2015. Thus, this laboratory manual will serve as a guide for the future engineering
students who will be taking Structural Taking Structural Design 1. This will be an
effective tool for betting understanding and for the betterment in solving for steel
problems.
I hope that this laboratory manual will help to improve better understanding
for the engineering students about the different principles in Structural Design 1
and I also hope that this will help them in relating this to real life situation especially
in Engineering Projects.
-CAD
p-2
ACKNOWLEDGEMENT
This activity is impossible without the help and guidance of these people who
had extended their generosity and valuable contributions in the completion of this
module.
and for all the love and care that you have given to me during those busy times.
To my friends, Dinah Mae Baitus, Alliah Icao, Petreya Udtat, Arvey Larano ,
Lyster Brix Besas, John Michael Inoferio, Lawrence Magno, John Anthony
Malatuba,Kenneth Ruiz, Roby Jean Barniego and to all my classmates in this subject
Palmes and Engineer Marc Mones who guided , evaluated and checked this activity.
I am very thankful that you were always guiding us to finish this activity well
although it may be difficult because we were conducting this online but I am very
Above all, to our Almighty God for His manifold blessings of wisdom,
knowledge , strength and guidance that I may able to survive this activity although I
have so many sleepless nights, without Him this compilation would have not been
possible,
-CAD
p-3
TABLE OF CONTENTS
TITLE PAGE
Preface 2
Acknowledgement 3
Architectural Plans 5
Seismic Analysis 14
Slab Analysis 23
Transfer of Loads 62
Beam Design 85
References 149
p-4
ARCHITECTURAL
PLANS
p-5
Y
x A B C D x'
15000
5000
W1
D2
D2
02
C.R 1 C.R 2
D2
W1
D3
5000
5000
D3
12
13
10
11
LANDING
9
8
7
1
3
4
5
6
2
03
20000
20000
D2
5000
5000
W1 W1
04
D2
W1
5000
5000
W1
D
D1
Y'
GROUND FLOOR PLAN
SCALE 1:100
p-6
Y
x A B C D x'
15000
5000
W1
D2
02
C.R 1 C.R 2
D2
W1
5000
5000
D3 D3
12
13
10
11
LANDING
9
8
7
1
3
4
5
6
2
03
20000
20000
D2
D2
5000
5000
W1
W2
04
D2
D2
W1 W2
5000
5000
Y'
SECOND FLOOR PLAN
SCALE 1:100
p-7
Y
A B C D
x 15000
x'
5000 5000 5000
01
5000
5000
02
5000
5000
03
20000
20000
5000
5000
04
5000
5000
Y'
ROOF DECK PLAN
SCALE 1:100
p-8
PERSPECTIVE
p-9
A B C D
FRONT ELEVATION
1:100
SCALE
p-10
A B C D
BACK ELEVATION
1:100
SCALE
p-11
`
LEFT ELEVATION
1:100
SCALE
p-12
CHB WALL WITH SUSPENDED
A B C D METAL LATH AND CEMENT E
PLASTER
5m x 1.5m 0.2m
WALL WITH SUSPENDED METAL
LATH AND CEMENT PLASTER
METAL CASEMENT 5m x 5m x 0.2m
WINDOW
2m x 1m
RIGHT ELEVATION
1:100
SCALE
p-13
SEISMIC
ANALYSIS
p-14
STANDARD AND SPECIFICATIONS
LOADINGS:
DEAD LOAD:
DEAD LOAD:
p-15
COMPUTATION OF LOADINGS
ROOFDECK
Column
W = 73.104 KN
Beam
W = 218.959 KN
Slab
W = 882.9 KN
W = 37.082 KN ÷ 2
W = 18.541 KN
Parapet
W = (4’’chb+plastering)(height)(length)(no.of pcs)
W = 189.875 KN
Liquid Proofing
p-16
W = 15 KN
CHB Wall
W = (4’’chb+plastering)(height)(length)(no.of pcs)
W = 439.425 KN
W = Density (Area)
W = 172.50 KN
W = Density ( Area)
W = 144 KN
W = 2154.304 KN
SECOND FLOOR
Column
W = 146.208 KN
Beam
W = 227.718 KN
Slab
W = 882.9 KN
p-17
CHB Wall
W = (4’’chb+plastering)(height)(length)(no.of pcs)
W = 471.975 KN
Floor Finish
W = Density (Area)
W = 172.50 KN
W = Density ( Area)
W = 144 KN
Stairs
1 1
W = (Stairs on the 1st floor)+ (Stairs on the 2nd floor)
2 2
W = 18.541 KN + 18.541 KN
W = 37.082 KN
W = 2082.383 KN
W = 4236.687 KN
I = 1.00
p-18
Seismic Zone Factor, Z
Z = 0.40
R = 8.50
When the soil properties are not known in sufficient detail to determine the soil
profile type, Type Sd shall be used.
Seismic Coefficient
3
T = 0.0731(6.3 m) 4
T = 0.291
Base Shear, V
CvI
V= W
RT
0.64 (1.0)
V= (4236.687 KN )
8.50( 0.291)
V =1096.212 KN
Not exceeding
2.5CaI
V< W
R
2.5(0.44)(1.0)
V< (4236.687 KN )
8.50
V <548.277 KN
V >0.11CaI W
V >0.11 (0.44)(1.0)(4236.687 KN )
V >205.0556 KN
p-19
0.852 NvI
V> W
R
0.852(1.0)(1.0)
V> (4236.687 KN )
8.50
V > 424.666 KN
(V −Ft )(Wnhn)
Fx= , When T ≤ 0.7 seconds, Ft = 0
∑ Wxhx
Roof Deck,
Fx=363.984 KN
Second Floor,
Fx=184.293 KN
The total values obtain for each level is the total lateral force acting on the whole
structure
North-South Direction
363.984 KN
Roof Deck = = 90.996 KN
4
184.293 KN
2nd Floor = = 46.073 KN
4
East-West Direction
363.984 KN
Roof Deck = = 60.664 KN
6
p-20
184.293 KN
2nd Floor = = 30.716 KN
6
p-21
SHORT SPAN
A B C D
5.460kN 7.278 kN 40.696 kN
13.65kN-m
13.65kN-m 18.195kN-m 18.195kN-m 13.65kN-m 13.65kN-m
60.664 kN 51.564 kN 30.334kN 9.104 kN
3.00
9.1 kN 21.23 kN 21.23 kN 9.1 kN
3.3
19.968 kN 6.649 kN 19.968 kN
6.649 kN
p-22
LONG SPAN
1 2 3 4 5
6.825 kN 6.825 kN 6.825 kN 6.825 kN
17.063 kN-m 17.063 kN-m 17.063 kN-m 17.063 kN-m 17.063 kN-m 17.063 kN-m 17.063 kN-m 17.063 kN-m
90.996 kN 79.261 kN 34.126 kN 34.126 kN 11.375 kN
17.063 kN-m 34.126 kN-m 34.126 kN-m 6.825 kN 34.126 kN-m 6.825 kN 17.063 kN-m
6.825 kN 6.825 kN
3m
0 kN 0 kN
6.825 kN 0 kN 6.825 kN
3.3m
11.308 kN 0 kN 0 kN
0 kN 11.308 kN
28.27 kN-m 56.54 kN-m 56.54 kN-m 56.54 kN-m 28.27 kN-m
5m 5m 5m 5m
p-23
SLAB
ANALYSIS
p-24
ROOF DECK DEADLOADS
Suspended Metal Lath and Gypsum Plaster 0.482 Kpa
Liquid Proofing 0.050 Kpa
Slab (125 mm thick) 2.943 Kpa
Total 2.993 Kpa
p-25
A B C D
15000
SLAB 1
5000
5000
SLAB 1 SLAB 2
02
5000
03
20000
20000
SLAB 2 SLAB 4 SLAB 2
5000
5000
04
SLAB 1 SLAB 1
5000
SLAB 2
5000
p-26
A B C D
15000
SLAB 1
5000
5000
SLAB 1 SLAB 2
02
5000
03
20000
20000
SLAB 2 SLAB 4 SLAB 2
5000
5000
04
SLAB 1 SLAB 1
5000
5000
SLAB 2
p-27
DESIGN FOR TWO-WAY SLAB (S1) For 2nd and Roofdeck
S=5m L=5m
S 5m
m := m= = 1 m>0.50 m (Therefore two-way slab)
L 5m
Adopt 125 mm
LOADINGS
KN N
Slab := (23544 · )(0.125m) Slab = 2943 ·
m3 m2
N
Floor + Ceiling Finish FFCF = 5425 ·
m2
N
DL := Slab + FFCF DL = 8368 ·
m2
N
Occupancy Load OL = 2900 ·
m2
N
LL := OL LL = 2900 ·
m2
W U = [1.2 · DL + 1.6 · LL] (1 m)
N N
W U = [1.2 · 8368 · 2 ) + 1.6 · (2900 · )] (1 m)
m m2
N
W U =14681.6·
m
N N N
W U =14681.6· DL = 8368 · LL = 2900 ·
m m2 m2
p-28
M aneg:= C aneg· W U · S2 M aneg= 18352 N·m
1
M anegdisc:= · M apos M aneg disc= 3496.693 N·m
3
1
M bnegdisc:= · M bpos M bnegdisc= 3496.693 N·m
3
d := 125 mm – 20 mm – 6mm = 99 mm
mm
ρactual . :=
0.85 ·
f'c
fy (
1 − 1−
√ 2 · M aneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00535
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.00535
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 213.714 mm
p-29
18352 (1000 ¿ N·mm = 0.90 · 21MPa · 1000mm · (99 mm)2 · ω · (1-0.59 ω)
ω = 0.1057
ω·f ' c
ρactual .=
fy
(0.1057)(21) MPa
ρactual .= = 0.00535
415 MPa
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.00535
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 213.714 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M apos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00297
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 384.646 mm
p-30
M U := M apos M apos =¿10490.1 N·m
ω = 0.0587
ω·f ' c
ρactual .=
fy
(0.0587)(21) MPa
ρactual .= = 0.00297
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 384.646 mm
mm
ρactual . :=
0.85 ·
f'c
fy( √
1 − 1−
2 · M anegdisc ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00097
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 634.665 mm
p-31
M U := M anegdisc M anegdisc = 3496.69 N·m
ω = 0.0191
ω·f ' c
ρactual .=
fy
(0.0191)(21)MPa
ρactual .= = 0.00097
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 634.665 mm
d = 87 mm
M U := M bneg M bneg= 18352 N·m
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2 · M bneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00707
ρmin =0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 183.787 mm
p-32
Adopted Spacing = 100 mm
ω =0.140
ω·f ' c
ρactual .=
fy
(0.140)(21) MPa
ρactual .= = 0.00707
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 183.787 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M apos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00389
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 334.508 mm
p-33
Adopted Spacing = 300 mm
ω = 0.0768
ω·f ' c
ρac tual .=
fy
(0.0768)(21) MPa
ρactual .= = 0.00389
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 334.508 mm
mm
ρactual . :=
0.85 ·
f'c
fy( √
1 − 1−
2 · M bnegdisc · 1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00126
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 722.205 mm
p-34
Adopted Spacing = 700 mm
ω =0.0248
ω·f ' c
ρactual .=
fy
(0.0248)(21) MPa
ρactual .= = 0.00126
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 722.205 mm
5 PCS RSB
207 mm SPA O.C
3 PCS RSB
3 PCS RSB
5 PCS RSB 339 mm SPA
339 mm SPA
240mm SPA O.C
3 PCS RSB
335 mm SPA O.C
3 PCS RSB 5m
386 mm SPA O.C
5m
p-35
DESIGN FOR TWO-WAY SLAB (S2) FOR 2ND FLOOR AND ROOF DECK
p-36
S=5m L=5m
S 5m
m := m= = 1 m>0.50 m (Therefore two-way slab)
L 5m
Adopt 125 mm
LOADINGS
KN N
Slab := (23544 · )(0.125m) Slab = 2943 ·
m3 m2
N
Floor + Ceiling Finish FFCF = 5425 ·
m2
N
DL := Slab + FFCF DL = 8368 ·
m2
N
Occupancy Load OL = 2900 ·
m2
N
LL := OL LL = 2900 ·
m2
W U = [1.2 · DL + 1.6 · LL] (1 m)
N N
W U = [1.2 · 8368 · 2 ) + 1.6 · (2900 · )] (1 m)
m m2
N
W U =14681.6·
m
p-37
N N N
W U =14681.6· DL = 8368 · LL = 2900·
m m2 m2
1
M anegdisc:= · M apos M anegdisc= 2756.2667 N·m
3
φ := 0.90 fy := 415MPa
d := 125 mm – 20 mm – 6mm = 99 mm
mm
ρactual . :=
0.85 ·
f'c
fy
1 − 1− ( √ 2 · M aneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00345
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 331.13 mm
p-38
12112.3 (1000 ¿ N·mm = 0.90 · 21MPa · 1000mm · (99 mm)2 · ω · (1-0.59 ω)
ω = 0.068
ω·f ' c
ρactual .=
fy
(0.068)(21) MPa
ρactual .= = 0.00345
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 331.13 mm
mm
ρactual . :=
0.85 ·
f'c
fy
1 − 1− ( √ 2· M apos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual 0.00232
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 492.413 mm
p-39
M U = φ · fc’ · b · d 2 · w · (1- 0.59w)
ω = 0.046
ω·f ' c
ρactual .=
fy
(0.046)(21) MPa
ρactual .= = 0.00232
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 492.413 mm
d = 87 mm
M U := M bneg M bneg= 22389.4 N·m
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2 · M bneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00883
ρmin = 0.0018
ρmax = 0.01621
p-40
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 147.22 mm
ω = 0.174
ω·f ' c
ρactual .=
fy
(0.174)(21) MPa
ρactual .= =0.00883
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 147.22 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M bpos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.0034
ρmin = 0.0018
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 382 mm
p-41
Adopted Spacing = 300 mm
ω = 0.067
w·f 'c
ρactual .=
fy
(0.067)(21) MPa
ρactual .= = 0.0034
415 MPa
ρmin = 0.0018
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 382 mm
p-42
3 PCS RSB 5 PCS RSB
5 PCS RSB 3 PCS RSB 339 mm SPA 207 mm SPA O.C
240 mm SPA O.C 339 mm SPA
3 PCS RSB
382 mm SPA O.C
3 PCS RSB 5m
386 mm SPA O.C
5m
p-43
DESIGN FOR TWO-WAY SLAB (S3) FOR 2ND FLOOR AND ROOF DECK
S=5m L=5m
S 5m
m := m= = 1 m>0.50 m (Therefore two-way slab)
L 5m
Adopt 125 mm
LOADINGS
KN N
Slab := (23544 · )(0.125m) Slab = 2943 ·
m3 m2
N
Floor + Ceiling Finish FFCF = 5425 ·
m2
N
Stairs S = 1481.28
m2
N
Wall Partition WP = 1910 ·
m2
N
DL := Slab + FFCF + S + WP DL = 11759.28 ·
m2
N
Occupancy Load OL = 2900 ·
m2
N
LL := OL LL = 2900 ·
m2
W U = [1.2 · DL + 1.6 · LL] (1 m)
N N
W U = [1.2 · 11759.28 · 2 ) + 1.6 · (2900 · )] (1 m)
m m2
N
W U =18751.136·
m
p-44
N N N
W U =18751.136· DL = 11759.28 · 2 LL = 2900·
m m m2
1
M anegdisc := · M apos M anegdisc = 3434.5227 N·m
3
φ := 0.90 fy := 415MPa
d := 125 mm – 20 mm – 6mm = 99 mm
mm
ρactual . :=
0.85 ·
f'c
fy
1 − 1− ( √ 2 · M aneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00446
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 256.143 mm
p-45
M U = φ · fc’ · b · d 2 · w · (1- 0.59w)
ω = 0.088
ω·f ' c
ρactual .=
fy
(0.088)(21) MPa
ρactual .= = 0.00446
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 256.14 mm
mm
ρactual . :=
0.85 ·
f'c
fy
1 − 1− ( √ 2· M apos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual =¿ 0.00291
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 392.576 mm
p-46
M U := M apos M apos= 10303.6 N·m
ω = 0.058
ω·f ' c
ρactual .=
fy
(0.058)(21) MPa
ρactual .= = 0.00291
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 392.576 mm
d = 87 mm
M U := M bneg M bneg= 3864.63 N·m
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2 · M bneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00139
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
p-47
Spacing = 722.205 mm
ω = 0.027
ω·f ' c
ρactual .=
fy
(0.027)(21) MPa
ρactual .= =0.00139
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 722.205 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M bpos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00432
ρmin = 0.0018
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 300.92 mm
p-48
Adopted Spacing = 300 mm
ω = 0.085
ω·f ' c
ρactua l .=
fy
(0.085)(21) MPa
ρactual .= = 0.00432
415 MPa
ρmin = 0.0018
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 300.92 mm
5 PCS RSB
5 PCS RSB 3 PCS RSB 3 PCS RSB 207 mm SPA O.C
240 mm SPA O.C 339 mm SPA 339 mm SPA
3 PCS RSB
382 mm SPA O.C
3 PCS RSB 5m
386 mm SPA O.C
5m
p-49
DESIGN FOR TWO-WAY SLAB (S3) FOR 2ND
S=5m L=5m
S 5m
m := m= = 1 m>0.50 m (Therefore two-way slab)
L 5m
Adopt 125 mm
LOADINGS
KN N
Slab := (23544 · )(0.125m) Slab = 2943 ·
m3 m2
N
Floor + Ceiling Finish FFCF = 5425 ·
m2
p-50
N
DL := Slab + FFCF DL = 8368 ·
m2
N
Occupancy Load OL = 2900 ·
m2
N
LL := OL LL = 2900 ·
m2
W U = [1.2 · DL + 1.6 · LL] (1 m)
N N
W U = [1.2 · 8368· 2 ) + 1.6 · (2900 · )] (1 m)
m m2
N
W U =14681.6·
m
N N N
W U =14681.6· DL = 8368· LL = 2900·
m m2 m2
1
M anegdisc:= · M apos M anegdisc= 2756.27 N·m
3
p-51
MATERIAL PROPERTIES AND OTHER DATA
φ := 0.90 fy := 415MPa
d := 125 mm – 20 mm – 6mm = 99 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2 · M aneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00345
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 331.13 mm
ω = 0.068
ω·f ' c
ρactual .=
fy
(0.068)(21) MPa
ρactual .= = 0.00345
415 MPa
ρmin = 0.0018
ρmax = 0.01621
p-52
A S :=¿ ρ actual . ·b·d ¿
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 331.13 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M apos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual =¿ 0.00232
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 492.413 mm
ω = 0.046
ω·f ' c
ρactual .=
fy
(0.046)(21) MPa
ρactual .= = 0.00232
415 MPa
ρmin = 0.0018
ρmax = 0.01621
p-53
ρmin < ρact ual. < ρmax
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 492.413 mm
d = 87 mm
M U := M bneg M bneg= 3084.64 N·m
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2 · M bneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00111
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 722.205 mm
ω = 0.022
ω·f ' c
ρactual .=
fy
(0.022)(21)MPa
ρactual .= =0.00111
415 MPa
p-54
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 722.205 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M bpos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00341
ρmin = 0.0018
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 385.75 mm
ω = 0.067
ω·f ' c
ρactual .=
fy
(0.067)(21) MPa
ρactual .= = 0.00341
415 MPa
ρmin = 0.0018
p-55
A S :=¿ ¿ 0.00341 · 1000 mm·87 mm = 293.49 m m2
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 385.75 mm
7 PCS RSB
3 PCS RSB 148 mm SPA O.C
3 PCS RSB
4 PCS RSB 339 mm SPA 339 mm SPA
332 mm SPA O.C
3 PCS RSB
382 mm SPA O.C
3 PCS RSB 5m
386 mm SPA O.C
5m
p-56
DESIGN FOR TWO-WAY SLAB (S4) FOR 2nd FLOOR and ROOF DECK
p-57
S=5m L=5m
S 5m
m := m= = 1 m>0.50 m (Therefore two-way slab)
L 5m
Adopt 125 mm
LOADINGS
KN N
Slab := (23544 · )(0.125m) Slab = 2943 ·
m3 m2
N
Floor + Ceiling Finish FFCF = 5425 ·
m2
N
DL := Slab + FFCF DL = 8368 ·
m2
N
Occupancy Load OL = 2900 ·
m2
N
LL := OL LL = 2900 ·
m2
W U = [1.2 · DL + 1.6 · LL] (1 m)
N N
W U = [1.2 · 8368· 2 ) + 1.6 · (2900 · )] (1 m)
m m2
N
W U =14681.6·
m
N N N
W U =14681.6· DL = 8368· LL = 2900·
m m2 m2
p-58
M bneg:= C bneg· W U · L2 M bneg= 16516.8 N·m
1
M anegdisc := · M apos M anegdisc = 2550.24 N·m
3
φ := 0.90 fy := 415MPa
d := 125 mm – 20 mm – 6mm = 99 mm
mm
ρactual . :=
0.85 ·
f'c
fy
1 − 1−( √ 2 · M aneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00478
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 238.99 mm
ω = 0.094
p-59
ω·f ' c
ρactual .=
fy
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 238.99 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M apos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual =¿ 0.00214
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 533.830mm
p-60
ω = 0.042
ω·f ' c
ρa ctual .=
fy
(0.042)(21)MPa
ρactual .= = 0.00214
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 533.830mm
d = 87 mm
M U := M bneg M bneg= 16516.8 N·m
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2 · M bneg ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.00630
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 206.34 mm
p-61
M U := M bneg M bneg= 16516.8 N·m
ω = 0.125
ω·f ' c
ρactual .=
fy
(0.125)(21) MPa
ρactual .= =0.00630
415 MPa
ρmin = 0.0018
ρmax = 0.01621
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 206.34 mm
mm
ρactual . :=
0.85 ·
f'c
fy ( √
1 − 1−
2· M bpos ·1000
m
0.85 · 0.90 · f ' c·b· d 2
)
ρactual := 0.0028
ρmin = 0.0018
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 464.27 mm
p-62
M U := M bpos M bpos= 7650.72 N·m
ω = 0.055
ω·f ' c
ρactual .=
fy
(0.055)(21) MPa
ρactual .= = 0.0028
415 MPa
ρmin = 0.0018
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 464.27 mm
3 PCS RSB
386 mm SPA O.C
3 PCS RSB 5m
386 mm SPA O.C
5m
p-63
TRANSFER
p-64
OF
LOADS
Equivalent Uniform Load transfer to long and short beam using Yield Line Theory
p-65
w¿ S
Triangle: WLL=
3
w DL S
One-way: WDL= WBEAM + + CHB (KPa) x Height
3
w¿ S
One-way: WLL=
3
p-66
AA BB CC D
D
15000
15000
5000
5000 5000
5000 5000
5000
0101 B-4
B-3 B-4
B-3 B-4
B-3
5000
5000
5000
5000
B-1
B-1 B-8
B-2 B-9
B-2 B-1
B-1
5000
5000 20000 5000
B-2
5000
B-1
B-1 B-8
B-2 B-6
B-2 B-1
20000
20000
20000
0303 B-9 B-5 B-7
B-4 B-4 B-4
5000
5000
5000
5000
5000
5000
p-67
p-68
ROOFDECK
LONG DIRECTION
B-1
B-3 B-1
B-3 B-1
B-3
5m 5m 5m
A B C D
(S₁ = 5m L₁ = 5m )
DEADLOAD:
w S₁
W DL =W BEAM + + CHB (kPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ + 2.17
m 3
KN/m³(1.25m)
kN
W DL = 23.533
m
LIVELOAD:
w S₁
W ¿ =¿
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( )
3
kN
W ¿ = 4.83
m
p-69
LONG DIRECTION
B-2
B-4 B-2
B-4 B-2
B-4
5m 5m 5m
A B C D
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)
m 3
kN
W DL = 29.305
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
p-70
SHORT DIRECTION
5m 5m 5m 5m
A B C D E
(S₁ = 5m L₁ = 5m )
DEADLOAD:
w S₁
W DL =W BEAM + + CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ + 2.17
m 3
KN/m³(1.25m)
kN
W DL = 23.533
m
LIVELOAD:
w S₁
W ¿ =¿
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( )
3
p-71
kN
W ¿ = 4.83
m
5m 5m 5m 5m
C D E D E
SHORT DIRECTION
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S1
W DL =W BEAM + (2)
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)
m 3
kN
W DL = 29.305
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
p-72
w = LL
w = 2.9 KPa
5m 5m 5m 5m
A B C D E
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
SHORT DIRECTION
(S₁ = 5m L₁ = 5m )
DEADLOAD:
w S₁
W DL =W BEAM + + CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ + 2.17
m 3
KN/m³(1.25m)
kN
W DL = 18.072
m
LIVELOAD:
p-73
w S₁
W ¿ =¿
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( )
3
kN
W ¿ = 4.83
m
p-74
LONG DIRECTION
(S₁ = 5m L₁ = 5m )
5m 5m 5m
A B C D
DEADLOAD:
w S₁
W DL =W BEAM + + CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
B-4 B-4 B-4
LIVELOAD:
w S₁
W ¿ =¿
3
w = LL
w = 2.9 Kpa
(2.9 kPa)(5 m)
W ¿ =( )
3
kN
W ¿ = 4.83
m
p-75
LONG DIRECTION
B-2
B-9 B-2
B-5 B-2
B-9
5m 5m 5m
A B C D
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17 KN/m³(3)
m 3
kN
W DL = 21.869
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
p-76
Span ABCD Section 4
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)
m 3
kN
W DL = 29.306
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
p-77
LONG DIRECTION
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17 KN/m³(3)
m 3
kN
W DL = 21.869
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
p-78
kN
W ¿ = 9.66
m
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17 KN/m³(3)
m 3
kN
W DL = 21.869
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
p-79
LONG DIRECTION
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17 KN/m³(3)
m 3
kN
W DL = 21.869
m
LIVELOAD:
p-80
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)
m 3
kN
W DL = 29.306
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
p-81
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17 KN/m³(3)
m 3
kN
W DL = 21.869
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
p-82
SHORT DIRECTION
5m 5m 5m 5m
A B C D E
(S₁ = 5m L₁ = 5m )
DEADLOAD:
w S₁
W DL =W BEAM + + CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 8.368 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ + 2.17 KN/m³(3m)
m 3
kN
W DL = 21.869
m
LIVELOAD:
w S₁
W ¿ =¿
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( )
3
kN
W ¿ = 4.83
m
p-83
Span 12345 Section D
5m 5m 5m 5m
A B C D E
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (8.816 kPa)
m3
w ₁ = 11.759 KPa
kN 11.759 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ + 2.17 KN/m³(3m)
m 3
kN
W DL = 27.521
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W¿ = ( )
3
kN
W ¿ = 4.83
m
p-84
DL = 8.368 kPa DL = 8.368 kPa DL = 8.368 kPa DL = 8.368 kPa
LL = 2.900 kPa LL = 2.900 kPa LL = 2.900 kPa LL = 2.900 kPa
5m 5m 5m 5m
C D E D E
SHORT DIRECTION
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
B-8 W DL =W BEAM + B-8 (2)+ CHB (KPa) x Height
B-8 B-8
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 11.759 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17
m 3
KN/m³(3m)
kN
W DL = 47.119
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
p-85
kN
W ¿ = 9.66
m
SHORT DIRECTION
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
B-9 3B-6 B-8 B-8
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
p-86
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 11.759 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17
m 3
KN/m³(3m)
kN
W DL = 47.119
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
p-87
w ₁ = 8.368 KPa
kN 11.759 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ (2)+ 2.17
m 3
5m 5m 5m 5m
C D E D E
KN/m³(3m)
kN
W DL = 47.119
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
SHORT DIRECTION
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S ₁ B-2
B-1
W DL =W BEAM + (2)+ CHB (KPa) x Height
B-1 B-1
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
p-88
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 11.759 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ + 2.17 KN/m³(3m)
m 3
kN
W DL = 27.521
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
(S₁ = 5m L₁ = 5m)
DEADLOAD:
w S₁
W DL =W BEAM + (2)+ CHB (KPa) x Height
3
w = ( Thickness of Slab) ( Unit Weight of Concrete) + DL
kN
w ₁ = (0.125m) ( 23.544 ) + (5.425 kPa)
m3
w ₁ = 8.368 KPa
kN 11.759 kPa(5 m)
W DL = (0.30mx0.20m) ( 23.544 3 )+ + 2.17 KN/m³(3m)
m 3
kN
W DL = 27.521
m
LIVELOAD:
w S₁
W ¿ =¿ (2)
3
p-89
w = LL
w = 2.9 KPa
(2.9 kPa)(5 m)
W ¿ =( ) (2)
3
kN
W ¿ = 9.66
m
p-90
BEAM
ANALYSIS
p-91
A B C D
15000
5000 5000 5000
01 B-3 B-3 B-3
DL = 23.533 kPa DL = 23.533 kPa DL = 23.533 kPa
5000
B-1 B-2 B-2 B-1
DL = 18.072 kPa DL = 29.305 kPa DL = 29.305 kPa DL = 18.072 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa LL = 4.83 kPa
02 B-4 B-4
B-4
DL = 29.305 kPa DL = 29.305 kPa DL = 29.305 kPa
LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
5000
5000
B-1 B-2 B-2 B-1
DL = 18.072 kPa DL = 29.305 kPa DL = 29.305 kPa
LL = 9.66 kPa DL = 18.072 kPa
LL = 4.83 kPa LL = 9.66 kPa
LL = 4.83 kPa
20000
20000
03
B-4 B-4
DL = 29.305 kPa
B-4
DL = 29.305 kPa
DL = 29.305 kPa
5000
5000
LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
04
B-4 B-4 DL = 29.305 kPa
B-4
DL = 29.305 kPa DL = 29.305 kPa
5000
5000
LL = 9.66 kPa DL = 29.305 kPa LL = 9.66 kPa DL = 29.305 kPa LL = 9.66 kPa
DL = 18.072 kPa LL = 9.66 kPa LL = 9.66 kPa DL = 18.072 kPa
LL = 4.83 kPa B-2 LL = 4.83 kPa
B-1
DL = 23.533 kPa B-2DL = 23.533 kPa DL = 23.533 kPa
LL = 4.83 kPa LL = 4.83 kPa LL = 4.83 kPa B-1
B-3 B-3 B-3
05
5000 5000 5000
15000
p-92
A B C D
15000
5000 5000 5000
01 B-4 B-4 B-4
DL = 21.869 kPa DL = 21.869 kPa DL = 21.869 kPa
LL = 4.83 kPa LL = 4.83 kPa LL = 4.83 kPa
5000
5000
B-1 B-8 B-9 B-1
DL = 21.869 kPa DL = 47.119 kPa DL = 47.119 kPa DL = 27.521 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
02 B-9 B-7
B-9
DL = 21.869 kPa DL = 21.869 kPa DL = 21.869 kPa
LL = 9.66 kPa LL = 9.66 kPa
5000
LL = 9.66 kPa
5000
B-1 B-8 B-6 B-2
DL = 47.119 kPa
DL = 21.869 kPa DL = 47.119 kPa DL = 27.521 kPa
LL = 9.66 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa
20000
20000
03
B-9 B-5 B-7
DL = 21.869 kPa DL = 29.306 kPa DL = 21.869 kPa
5000
5000
LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
04
B-9 B-5
DL = 29.306 kPa
B-9
DL = 21.869 kPa DL = 21.869 kPa
5000
5000
LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
DL = 21.869 kPa DL = 47.119 kPa DL = 47.119 kPa DL = 27.521 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
ROOF DECK
p-93
Beam Deatails:
Diameter of Stirrups = 10 mm
F’c = 21 MPa
fy = 415 MPa
Concrete Cover = 40 mm
p-94
Design of Beam 1 Span 12345 at Section A and D
DF 12,23.34 .45 = 0
DF 21,32.43 .54 = 0
Span 12
(18.072)(5) ²
FEM 12,23,34,45 = - = - 37.65
12
(18.072)(5) ²
FEM 21,32,43,54 = = 37.65
12
DF 12,23.34 .45 = 0
DF 21,32.43 .54 = 0
Span AB
(4.83)(5) ²
FEM 12,23,34,45 = - = - 10.06
12
(4.83)(5) ²
FEM 21,32,43,54 = = 10.06
12
When x = 2.5 m
2.5
M maxDL= 18.072 (2.5)( ) – 37.65
2
M maxDL=18.825 kN-m
When x = 2.5 m
2.5
M maxLL= 4.83 (2.5)( ) – 10.06
2
M maxLL=5.033 kN-m
p-95
Shear and Moment Diagram (Dead Load and Live Load)
DL = 18.072 kPa
LL = 4.83 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 67.274 kN – m
Design at Support
ϖ = 0.406
ϖ fc '
ρactual .=
fy
(0.406)( 21)
ρactual .= = 0.020
415
ρmin = 0.0018
ρmax = 0.01621
p-96
ρact = 0.20
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(18.825)+1.6(5.031)
M U =¿ 30.64 kN-m
ϖ = 0.155
ϖ fc '
ρactual .=
fy
(0.155)(21)
ρactual .= = 0.0078
415
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.0078
p-97
n = 1.197 pcs 2-20 mm Bars
V U =¿ 68.12 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 90.827
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4 () 2
(10 ) ( 2 ) ( 415 ) (240)
= 172.252 mm
90.827(1000)
Beam Deatails:
Diameter of Stirrups = 10 mm
F’c = 21 MPa
fy = 415 MPa
p-98
Design of Beam 2 and Span ABCD at Section 1234
DF 12,23.34 .45 = 0
DF 21,32.43 .54 = 0
Span 12
(29.305)(5) ²
FEM 12,23.34 .45 = - = - 61.05
12
(29.305)(5) ²
FEM 21,32.43 .54 = = 61.05
12
DF 12 = 0
DF 21 = 0
Span AB
(9.66)(5)²
FEM 12 = - = - 20.125
12
(9.66)(5)²
FEM 21 = = 20.125
12
When x = 2.5 m
2.5
M maxDL= 29.305 (2.5)( ) – 61.05
2
M maxDL=30.53 Kn-m
When x = 2.5 m
2.5
M maxLL= 9.66 (2.5)( ) – 20.125
2
M maxLL=10.063 Kn-m
p-99
Shear and Moment Diagram (Dead Load and Live Load)
DL = 29.305 kPa
LL = 9.66 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 100.38 kN – m
Design at Support
ϖ = 0.168
ϖ fc '
ρactual .=
fy
( 0.168)( 21)
ρactual .= = 0.0085
415
ρmin = 0.0018
p-100
ρmax = 0.75 ρbal
ρmax = 0.01621
ρact = 0.0085
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 277.20 mm
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(30.526)+1.6(10.062)
M U =¿ 52.730 Kn-m
ϖ = 1.501
ϖ fc '
ρactual .=
fy
(1.501)(21)
ρactual .= = 0.076
415
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.076
p-101
A S :=¿ 0.076· 1000mm·99 mm ¿ = 529.65 m m2
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 213.714 mm
V U =¿ 107.45 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 143.26
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4)
( 2
(10 ) ( 2 ) ( 415 ) (240)
= 109.208 mm
143.26(1000)
p-102
BEAM DETAILS SECOND FLOOR
p-103
Design of Beam 3 and Span 15 at Section ABCD
DF AB , BC ,CD = 0
DF AB , BC ,CD = 0
Span 12
(23.533)(5) ²
FEM AB , BC ,CD = - = - 49.027
12
(23.533)(5) ²
FEM AB , BC ,CD = = 49.027
12
DF AB , BC ,CD = 0
DF AB , BC ,CD = 0
Span AB
(4.83)(5)²
FEM AB , BC ,CD = = 10.063
12
When x = 2.5 m
2.5
M maxDL= 23.533(2.5)( ) – 49.027
2
M maxDL=24.514 Kn-m
When x = 2.5 m
2.5
M maxLL=4.83(2.5)( ) – 10.063
2
M maxLL=5.031 Kn-m
p-104
Shear and Moment Diagram (Dead Load and Live Load)
DL = 23.533 kPa
LL = 4.83 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 80.926 kN – m
Design at Support
ϖ = 0.144
ϖ fc '
ρactual .=
fy
( 0.144)(21)
ρactual .= = 0.0072
415
p-105
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.0072
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 327.249 mm
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(24.514)+1.6 (5.031)
M U =¿ 37.466 Kn-m
ϖ = 1.501
ϖ fc '
ρactual .=
fy
(1.501)(21)
ρactual .= = 0.075
415
ρmin = 0.0018
ρmax = 0.01621
p-106
ρmin < ρactual . < ρmax
ρact = 0.075
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 152.319 mm
V U =1.2(58.832)+0.5(12.075)+(17.063)−0.240¿))
V U =¿ 86.342 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 115.123
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4)
( 2
(10 ) ( 2 ) ( 415 ) (240)
= 135.90 mm
115.123 (1000)
p-107
p-108
Design of Beam 4 and Span ABCD at Section 234
DF 12,23.34 .45 = 0
DF 21,32.43 .54 = 0
Span 12
(29.305)(5) ²
FEM 12,23.34 .45 = - = - 61.05
12
(29.305)(5) ²
FEM 21,32.43 .54 = = 61.05
12
DF 12 = 0
DF 21 = 0
Span AB
(9.66)(5)²
FEM 12 = - = - 20.125
12
(9.66)(5)²
FEM 21 = = 20.125
12
When x = 2.5 m
2.5
M maxDL= 29.305 (2.5)( ) – 61.05
2
M maxDL=30.53 Kn-m
When x = 2.5 m
2.5
M maxLL= 9.66 (2.5)( ) – 20.125
2
M maxLL=10.063 Kn-m
p-109
Shear and Moment Diagram (Dead Load and Live Load)
DL = 29.305 kPa
LL = 9.66 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 100.38 kN – m
Design at Support
ϖ = 0.168
ϖ fc '
ρactual .=
fy
( 0.168)( 21)
ρactual .= = 0.0085
415
ρmin = 0.0018
p-110
ρmax = 0.75 ρbal
ρmax = 0.01621
ρact = 0.0085
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 277.20 mm
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(30.526)+1.6(10.062)
M U =¿ 52.730 Kn-m
ϖ = 1.501
ϖ fc '
ρactual .=
fy
(1.501)(21)
ρactual .= = 0.076
415
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.076
p-111
A S :=¿ 0.076· 1000mm·99 mm ¿ = 529.65 m m2
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 213.714 mm
V U =¿ 107.45 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 143.26
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4)
( 2
(10 ) ( 2 ) ( 415 ) (240)
= 109.208 mm
143.26(1000)
p-112
SECOND FLOOR
Beam Deatails:
Diameter of Stirrups = 10 mm
F’c = 21 MPa
fy = 415 MPa
Concrete Cover = 40 mm
p-113
Design of Beam 5 and Span 34 at Section BC
DF BC = 0
DF BC = 0
Span 12
(29.306)(5)²
FEM BC = - = - 61.05
12
(29.306)(5)²
FEM BC = = 61.05
12
DF 12 = 0
DF 21 = 0
Span AB
(9.66)(5)²
FEM BC = - = - 20.125
12
(9.66)(5)²
FEM BC = = 20.125
12
When x = 2.5 m
2.5
M maxDL= 29.306 (2.5)( ) – 61.05
2
M maxDL=30.53 Kn-m
When x = 2.5 m
2.5
M maxLL= 9.66 (2.5)( ) – 20.125
2
M maxLL=10.063 Kn-m
p-114
Shear and Moment Diagram (Dead Load and Live Load)
DL = 29.306 kPa
LL = 9.66 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 100.38 kN – m
Design at Support
ϖ = 0.168
ϖ fc '
ρactual .=
fy
( 0.168)( 21)
ρactual .= = 0.0085
415
p-115
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.0085
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 277.20 mm
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(30.526)+1.6(10.062)
M U =¿ 52.730 Kn-m
ϖ = 1.501
ϖ fc '
ρactual .=
fy
(1.501)(21)
ρactual .= = 0.076
415
ρmin = 0.0018
ρmax = 0.01621
p-116
ρmin < ρactual . < ρmax
ρact = 0.076
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 213.714 mm
V U =¿ 107.45 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 143.26
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4)
( 2
(10 ) ( 2 ) ( 415 ) (240)
= 109.208 mm
143.26(1000)
p-117
p-118
Design of Beam 6 and Span 23at Section C
DF BC = 0
DF BC = 0
Span 12
(47.119)(5)²
FEM BC = - = - 98.165
12
(47.119)(5)²
FEM BC = = 98.165
12
DF 12 = 0
DF 21 = 0
Span AB
(9.66)(5)²
FEM BC = - = - 20.125
12
(9.66)(5)²
FEM BC = = 20.125
12
When x = 2.5 m
2.5
M maxDL= 47.119 (2.5)( ) – 98.165
2
M maxDL=49.08 Kn-m
When x = 2.5 m
2.5
M maxLL= 9.66 (2.5)( ) – 20.125
2
M maxLL=10.063 Kn-m
p-119
Shear and Moment Diagram (Dead Load and Live Load)
DL = 47.119 kPa
LL = 9.66 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 144.924 kN – m
Design at Support
ϖ = 0.63
ϖ fc '
ρactual .=
fy
p-120
(0.63)(21)
ρactual .= = 0.0319
415
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.0319
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 277.20 mm
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(30.526)+1.6(10.062)
M U =¿ 52.730 Kn-m
ϖ = 1.501
ϖ fc '
ρactual .=
fy
(1.501)(21)
ρactual .= = 0.076
415
ρmin = 0.0018
p-121
ρmax = 0.01621
ρact = 0.076
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 213.714 mm
V U =¿ 107.45 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 143.26
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4 () 2
(10 ) ( 2 ) ( 415 ) (240)
= 109.208 mm
143.26(1000)
p-122
Adopt : 60 mm spacing of stirrups
p-123
Design of Beam 7and9 and Span ABCD at Section 24
DF ABCD = 0
DF ABCD = 0
Span 12
(21.869)(5) ²
FEM ABCD = - = - 45.56
12
(21.869)(5) ²
FEM ABCD = = 45.56
12
DF ABCD = 0
DF ABCD = 0
Span AB
(9.66)(5)²
FEM ABCD = - = - 20.125
12
(9.66)(5)²
FEM ABCD = = 20.125
12
When x = 2.5 m
2.5
M maxDL= 21.869 (2.5)( ) – 45.56
2
M maxDL=22.78 Kn-m
When x = 2.5 m
2.5
M maxLL= 9.66 (2.5)( ) – 20.125
2
M maxLL=10.063 Kn-m
p-124
Shear and Moment Diagram (Dead Load and Live Load)
DL = 21.869kPa
LL = 9.66 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 81.80 kN – m
Design at Support
ϖ = 0.562
ϖ fc '
ρactual .=
fy
( 0.562)(21)
ρactual .= = 0.028
415
p-125
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.028
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 84.150 mm
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(22.780)+1.6(10.062)
M U =¿ 43.435 Kn-m
ϖ = 1.464
ϖ fc '
ρactual .=
fy
(1.464 )(21)
ρactual .= = 0.074
415
ρmin = 0.0018
ρmax = 0.01621
p-126
ρmin < ρactual . < ρmax
ρact = 0.074
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 154.38 mm
V U =¿ 87.287 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 116.383
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4)
( 2
(10 ) ( 2 ) ( 415 ) (240)
= 109.208 mm
16.383(1000)
p-127
p-128
Design of Beam 8and Span BC at Section 12345
DF BC = 0
DF BC = 0
Span 12
(47.119)(5)²
FEM BC = - = - 98.165
12
(47.119)(5)²
FEM BC = = 98.165
12
DF 12 = 0
DF 21 = 0
Span AB
(9.66)(5)²
FEM BC = - = - 20.125
12
(9.66)(5)²
FEM BC = = 20.125
12
When x = 2.5 m
2.5
M maxDL= 47.119 (2.5)( ) – 98.165
2
M maxDL=49.08 Kn-m
When x = 2.5 m
2.5
M maxLL= 9.66 (2.5)( ) – 20.125
2
M maxLL=10.063 Kn-m
p-129
Shear and Moment Diagram (Dead Load and Live Load)
DL = 47.119 kPa
LL = 9.66 kPa
5m
M U =1.2 DL+0.5≪+1.0 EL
M U = 144.924 kN – m
Design at Support
ϖ = 0.63
ϖ fc '
ρactual .=
fy
p-130
(0.63)(21)
ρactual .= = 0.0319
415
ρmin = 0.0018
ρmax = 0.01621
ρact = 0.0319
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 277.20 mm
Design at Midspan
M U =1.2 DL+1.6≪¿
M U =1.2(30.526)+1.6(10.062)
M U =¿ 52.730 Kn-m
ϖ = 1.501
ϖ fc '
ρactual .=
fy
(1.501)(21)
ρactual .= = 0.076
415
ρmin = 0.0018
p-131
ρmax = 0.01621
ρact = 0.076
π
(12)2 mm2 ·1000 · mm
Spacing := 4
AS
Spacing = 213.714 mm
V U =¿ 107.45 kN
V U = ø(V C +V S )
Assume Vc = 0 ; ø = 0.75
Vu
Vs = = 143.26
ø
Spacing of Stirrups
Avfyd
S=
Vs
π
S= 4 () 2
(10 ) ( 2 ) ( 415 ) (240)
= 109.208 mm
143.26(1000)
p-132
Adopt : 60 mm spacing of stirrups
p-133
DESIGN
OF
COLUMN
П
Ast = ( D¿¿ 2) ¿
4
i. Clear distance between longitudinal bars shall be not less than 1.5d b (db =
longitudinal bar diameter) nor 40mm.
ii. Use 10mm diameter ties for 32mm bars or smaller and at least 12mm in size for
36mm and bundled longitudinal bars.
iii. Vertical spacing of ties shall be the smallest of the following:
1. 16 x longitudinal bar diameter
2. 48 x tie bar diameter
3. least dimension of the column
5000
B-1 B-2 B-2 B-1 FOR COLUMN SUBJECTED
DL = 18.072 kPa DL = 29.305 kPa DL = 29.305 kPa DL = 18.072 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa LL = 4.83 kPa TO PURE-AXIAL
02 C1F1 C1F1
B-4
C1F1
B-4
C1F1
B-4
DL = 29.305 kPa DL = 29.305 kPa DL = 29.305 kPa
LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
5000
5000
B-1 B-2 B-2 B-1
DL = 18.072 kPa DL = 29.305 kPa DL = 29.305 kPa
LL = 9.66 kPa DL = 18.072 kPa
LL = 4.83 kPa LL = 9.66 kPa
LL = 4.83 kPa
20000
03 C1F1
B-4
C1F1
B-4
C1F1
B-4
C1F1
20000
DL = 29.305 kPa DL = 29.305 kPa DL = 29.305 kPa
LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
5000
5000
5000
B-1
DL = 23.533 kPa
B-2
DL = 23.533 kPa DL = 23.533 kPa
LL = 4.83 kPa LL = 4.83 kPa LL = 4.83 kPa B-1
B-3 B-3 B-3
05
C1F1 C1F1 C1F1 C1F1
M n= 34.126 kN-m
SEE TYPICAL DESIGN
Total unfactored loads FOR COLUMN SUBJECTED B-2
TO PURE-AXIAL DL = 29.305 kPa
LL = 9.66 kPa
Pn = Ʃ R DL + ƩR¿ + R EL
W E
B-4 B-4
Pn = 293.052kN + 96.6kN + 1.818 kN DL = 29.305 kPa DL = 29.305 kPa
LL = 9.66 kPa LL = 9.66 kPa
Pn = 391.47 kN B-2
DL = 29.305 kPa
LL = 9.66 kPa
Total factored Pu
Pu = 1.2 DL + 0.5 LL + 1 E
S
Pu = 1.2(293.052kN) + 0.5(96.6kN) + 1(1.818 kN)
Pu = 401.708 kN
Ultimate Moment
Mu: = Mn
Mu = 34.126
Eccentricity, e:
Mu
e=
Pu
34.126(1000)(1000)
e=
401.708 kN (1000)
e = 84.95 mm
As = 3600mm²
Allowable Pu:
Pu=¿Ø Pn
Ag = 300mm x 300mm
Ag = 90000 mm²
Pn = 2428992 N
Pu = 0.9 (2428992 N)
Pu = 2186.0928 kN
1. 16(30mm) = 480mm
2. 48(10mm) = 480 mm
3. 300mm
Use 10mm diameter column ties spaced at 300 mm O.C at 3rd Floor Column C1
V U =V E
Vu = 22.75 kN
Vc = 0
22.75 kN
V S=
0.75
Vs = 30.33 kN
A S fyd
S=
VS
π
( 102 ) ( 2 ) (415 mPa)(287.50)
4
S=
30.33 kN (1000)
S=617.922mm ≈ 600 mm
When Vs ≤
√ fc ' bwd, S = d or 600mm (whichever is smaller)
3 2
When Vs >
√ fc ' bwd, S = d or 300mm (whichever is smaller)
3 4
30.33 kN <
√ fc ' (300)(287.50)
3
30.33 kN < 131.75 kN
d
Therefore, use S = or 600mm
2
d 287.50
S= =
2 2
S = 143.75 mm ≈ 140 mm
M n= 17.063 kN-m
W E
B-3 B-3
Total unfactored loads DL = 23.533 kPa
LL = 4.83 kPa
DL = 23.533 kPa
LL = 4.83 kPa
B-2
Pn = Ʃ R DL + ƩR¿ + R EL DL = 29.305 kPa
LL = 9.66 kPa
Pn = 246.054 kN S
Total factored Pu
Pu = 260.0898 kN
Mu = Mn
M u = 17.063 kN-m
Eccentricity, e:
Mu
e=
Pu
17.063 kN−m(1000) ²
e=
260.0898 kN (1000)
e = 65.604 mm
As
0.04 =
(300 mm x 300 mm)
As = 3600 mm²
π
3600 mm² = ( 25 mm ) ²(n)
4
600(d−c)
fs =
c
600(287.5 mm−c)
400 MPa =
c
c = 172.50 mm
a = 146.625 mm
600(d−c)
fs =
c
600(c−d ')
fs' =
c
d’ = 62.50
600(172.50 mm−62.50)
fs' =
c
Compression Block:
C c = 0.85fc’ab
C c = 785.177 kN
Compression Steel:
Cs = As f s '
π
Cs = (25 mm)2(3) (382.609 MPa)
4
Cs = 563.438 kN
Tension Steel:
T s = As f y
T s 1 = 407.425 kN
π
T s2 = (25mm)2(3)(415 MPa)
4
T s 2 = 611.137 kN
∑FV = 0 +↑
Pn – C c – C s + T s 1 + T s 2= 0
Pn = 330.053 kN
M n = Pne
M n = 330.053 kN (0.146 m)
M n = 48.188 kN –m
M u = 0.9Mn
M u = 0.9(48.188 kN –m)
M u = 43.369 kN-m
V U =V E
Vu = 21.23 kN
Vc = 0
21.23 kN
V S=
0.75
Vs = 28.307 kN
A S fyd
S=
VS
When Vs ≤
√ fc ' bwd, S = d or 600mm (whichever is smaller)
3 2
When Vs >
√ fc ' bwd, S = d or 300mm (whichever is smaller)
3 4
28.307 kN <
√ fc ' (300)(287.50)
3
28.307 kN < 131.75 kN
d
Therefore, use S = or 600mm
2
d 287.50
S= =
2 2
S = 143.75 mm ≈ 140 mm
c . S o as calculated by:
300−h x
So =100+ ( 3 )
h x =300−2 ( 40 )−10 = 210
So =100+ ( 300−260
3 )
So = 113.33
The value of So from Eq. (418.7.5.3) shall not exceed 150 mm and need not be taken less than
100 mm.
BEAM DIMENSION 5 5
Total factored Pu
S
Pu = 1.2 DL + 0.5 LL + 1.0 EL
Pu = 143.716kN
Mu = Mn
M u = 17.063 kN-m
Eccentricity, e:
Mu
e=
Pu
17.063 kN−m(1000) ²
e=
143.716 kN (1000)
e = 118.727 mm
As
0.04=
(300 mm x 300 mm)
As = 3600 mm²
600(d−c)
fs =
c
600(287.5 mm−c)
400 MPa =
c
c = 172.50 mm
a = 146.625 mm
600(d−c)
fs =
c
600(c−d ')
fs' =
c
d’ = 62.50
600(172.50 mm−62.50)
fs' =
c
Compression Block:
C c = 0.85fc’ab
C c = 785.177 kN
Compression Steel:
Cs = As f s '
π
Cs = (25 mm)2(3) (382.609 MPa)
4
Cs = 563.438 kN
T s = As f y
π
Ts = (25mm)2(2)(415 MPa)
4
T s 1 = 407.425 kN
π
T s2 = (25mm)2(3)(415 MPa)
4
T s 2 = 611.138 kN
∑FV = 0 +↑
Pn – C c – C s + T s 1 + T s 2= 0
Pn = 330.052 kN
M n = Pne
M n = 330.052 (0.381 m)
M n = 125.750 kN –m
M u = 0.9Mn
M u = 0.9(125.750 kN –m)
M u = 113.175 kN-m
V U =V E
Vu = 11.375 kN
Vc = 0
11.375 kN
V S=
0.75
Vs = 15.167 kN
π
( 102 ) ( 2 ) (415 mPa)(287.50)
4
S=
15.167 kN (1000)
S=1235.68mm ≈ 1200 mm
When Vs ≤
√ fc ' bwd, S = d or 600mm (whichever is smaller)
3 2
When Vs >
√ fc ' bwd, S = d or 300mm (whichever is smaller)
3 4
15.167kN <
√ fc ' (300)(287.50)
3
15.167kN < 131.749 kN
d
Therefore, use S = or 600mm
2
d 287.50
S= =
2 2
S = 143.75 mm ≈ 140 mm
c . S o as calculated by:
So =100+ ( 300−h
3 )
x
So =100+ ( 300−260
3 )
So = 113.33
The value of So from Eq. (418.7.5.3) shall not exceed 150 mm and need not be taken less than
100 mm.
5000
B-1 B-8 B-9 B-1 FOR COLUMN SUBJECTED
DL = 21.869 kPa DL = 47.119 kPa DL = 47.119 kPa DL = 27.521 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa TO PURE-AXIAL
02 C1F1 C1F1
B-9
C1F1
B-7
C1F1
B-9
DL = 21.869 kPa DL = 21.869 kPa DL = 21.869 kPa
LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
5000
5000
B-1 B-8 B-6 B-2
DL = 47.119 kPa
DL = 21.869 kPa DL = 47.119 kPa DL = 27.521 kPa
LL = 9.66 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa
20000
20000
03 C1F1 C1F1 C1F1 C1F1
B-9 B-5 B-7
DL = 21.869 kPa DL = 29.306 kPa DL = 21.869 kPa
LL = 9.66 kPa LL = 9.66 kPa
5000
LL = 9.66 kPa
5000
B-1 B-8 B-8 B-1
DL = 21.869 kPa DL = 47.119 kPa DL = 47.119 kPa DL = 27.521 kPa
LL = 4.83 kPa LL = 9.66 kPa LL = 9.66 kPa LL = 9.66 kPa
B-9 B-5
DL = 29.306 kPa
B-9
DL = 21.869 kPa DL = 21.869 kPa
5000
5000
Pu (2nd) = 401.708 kN W E
B-9 B-9
DL = 21.869 kPa DL = 21.869 kPa
LL = 9.66 kPa
Total unfactored loads LL = 9.66 kPa
B-8
Pn = Ʃ R DL + ƩR¿ + R EL + W COLUMN + Pn (2nd) DL = 47.119 kPa
LL = 9.66 kPa
Pn = 841.191 kN
Total factored Pu
Pu = 865.761 kN
Ultimate Moment
Mu: = Mn
Mu = 34.126 kN-m
Eccentricity, e:
Mu
e=
Pu
34.126 kN−m(1000)(1000)
e=
865.761 kN (1000)
e = 39.417 mm
Allowable Pu:
Pu=¿Ø Pn
Ag = 300mm x 300mm
Ag = 90000 mm²
Pn = 2428992N
Pu = 0.9 (2428992 N)
Pu = 2186.093 kN
1. 16(30mm) = 480mm
2. 48(10mm) = 480 mm
3. 350mm
Use 10mm diameter column ties spaced at 350 mm O.C at 3rd Floor Column C1
V U =V E
Vu = 22.75 kN
Vc = 0
22.75 kN
V S=
0.75
Vs = 30.33 kN
A S fyd
S=
VS
π
( 102 ) ( 2 ) (415 mPa)(287.50)
4
S=
30.33 kN (1000)
S=617.922mm ≈ 600 mm
When Vs ≤
√ fc ' bwd, S = d or 600mm (whichever is smaller)
3 2
When Vs >
√ fc ' bwd, S = d or 300mm (whichever is smaller)
3 4
30.33 kN <
√ fc ' (300)(287.50)
3
30.33 kN < 131.75 kN
d
Therefore, use S = or 600mm
2
d 287.50
S= =
2 2
S = 143.75 mm ≈ 140 mm
Spacing of Transverse reinforcement:
Spacing of transverse reinforcement shall not exceed the smallest of (a) through (c):
a. One fourth of the minimum column dimension:
1
( 300 mm )=75 mm
4
c . S o as calculated by:
300−h x
So =100+ ( 3 )
h x =300−2 ( 40 )−10 = 210
So =100+ ( 300−260
3 )
So = 113.33
The value of So from Eq. (418.7.5.3) shall not exceed 150 mm and need not be taken less than
100 mm.
W E
B-4 B-4
DL = 21.869 kPa DL = 21.869 kPa
LL = 4.83 kPa LL = 4.83 kPa
Pn(2nd) = 246.054 kN
Pu(2nd) = 260.0898 kN
KN
(
Pn = 227.144kN + 48.3kN + 6.825 kN + 23.544
m3 )
(0.30m x 0.30m)(3m) + 246.054 kN
Pn = 534.680 kN
Total factored Pu
Pu = 563.638 kN
Mu = Mn
M u = 17.063 kN-m
Eccentricity, e:
Mu
e=
Pu
e = 30.273 mm
As
0.04 =
(300 mm x 300 mm)
As = 3000 mm²
π
3000 mm² = ( 25 mm ) ²(n)
4
600(d−c)
fs =
c
600(287.5 mm−c)
400 MPa =
c
c = 172.50 mm
a = 146.625 mm
600(d−c)
fs =
c
600(c−d ')
fs' =
c
d’ = 62.50
600(172.50 mm−62.50)
fs' =
c
Compression Block:
C c = 0.85fc’ab
C c = 785.177 kN
Compression Steel:
Cs = As f s '
π
Cs = (25 mm)2(3) (382.609 MPa)
4
Cs = 563.438 kN
Tension Steel:
T s = As f y
π
Ts = (25mm)2(2)(415MPa)
4
T s 1 = 407.425 Kn
π
T s2 = (25mm)2(3)(415 MPa)
4
T s 2 = 611.138 kN
∑FV = 0 +↑
Pn – C c – C s + T s 1 + T s 2= 0
Pn = 330.052 kN
M n = Pne
M n = 330.052 kN (0.107 m)
M n = 35.316kN –m
M u = 0.9Mn
M u = 0.9(35.316 kN –m)
M u = 31.784 kN-m
Lateral Ties:
V U =V E
Vu = 21.23 kN
Vc = 0
21.23 kN
V S=
0.75
Vs = 28.307 kN
A S fyd
S=
VS
π
( 102 ) ( 2 ) (415 mPa)(287.50)
4
S=
28.307 kN (1000)
S=662.082mm ≈ 600 mm
When Vs ≤
√ fc ' bwd, S = d or 600mm (whichever is smaller)
3 2
When Vs >
√ fc ' bwd, S = d or 300mm (whichever is smaller)
3 4
28.307 kN <
√ fc ' (300)(287.50)
3
28.307 kN < 131.749 kN
d
Therefore, use S = or 600mm
2
d 287.50
S= =
2 2
S = 143.75 mm ≈ 140 mm
c . S o as calculated by:
So =100+ ( 00−h
3 )
x
So =100+ ( 300−260
3 )
So = 113.33
The value of So from Eq. (418.7.5.3) shall not exceed 150 mm and need not be taken less than
100 mm.
BEAM DIMENSION 5 5
Pn 2nd =134.988 kN E
B-4
DL = 21.869 kPa
Pu 2nd = 143.716 kN LL = 4.83 kPa
B-1
Total unfactored loads DL = 21.869 kPa
LL = 4.83 kPa
KN
( 23.544
m3 )
(0.30m x 0.30m)(3m) + 134.988 kN
Pn = 281.666 kN
Total factored Pu
Pu = 293.831 kN
Mu = Mn
M u = 17.063 kN-m
Eccentricity, e:
Mu
e=
Pu
17.063 kN−m(1000) ²
e=
293.831 kN (1000)
e = 58.071 mm
As
0.04=
(300 mm x 300 mm)
As = 3600 mm²
π
3600 mm² = ( 25 mm ) ²(n)
4
600(d−c)
fs =
c
600(287.5 mm−c)
400 MPa =
c
c = 172.50 mm
a = 146.625 mm
600(d−c)
fs =
c
600(c−d ')
fs' =
c
d’ = 62.50
600(172.50 mm−62.50)
fs' =
c
Compression Block:
C c = 0.85fc’ab
C c = 785.177 kN
Compression Steel:
π
Cs = (25 mm)2(3) (382.609 MPa)
4
Cs = 563.438 kN
Tension Steel:
T s = As f y
π
Ts = (25mm)2(2)(415 MPa)
4
T s 1 = 407.425 kN
π
T s2 = (25mm)2(3)(415 MPa)
4
T s 2 = 611.138 kN
∑FV = 0 +↑
Pn – C c – C s + T s 1 + T s 2= 0
Pn = 330.052 kN
M n = Pne
M n = 330.052 (0.381 m)
M n = 125.750 kN –m
M u = 0.9Mn
M u = 0.9(125.750 kN –m)
M u = 113.175 kN-m
V U =V E
Vu = 11.375 kN
11.375 kN
V S=
0.75
Vs = 15.167 kN
A S fyd
S=
VS
π
( 102 ) ( 2 ) (415 mPa)(287.50)
4
S=
15.167 kN (1000)
S=1235.68mm ≈ 1200 mm
When Vs ≤
√ fc ' bwd, S = d or 600mm (whichever is smaller)
3 2
When Vs >
√ fc ' bwd, S = d or 300mm (whichever is smaller)
3 4
15.167kN <
√ fc ' (300)(287.50)
3
15.167kN < 131.749 kN
d
Therefore, use S = or 600mm
2
d 287.50
S= =
2 2
S = 143.75 mm ≈ 140 mm
c . S o as calculated by:
300−h x
So =100+ ( 3 )
h x =300−2 ( 40 )−10 = 210
So =100+ ( 300−260
3 )
So = 113.33
The value of So from Eq. (418.7.5.3) shall not exceed 150 mm and need not be taken less than
100 mm.
DETOYATO, CLAIREMAY A. p-162
100 mm< So <150 mm
Personal Information
Educational Background
Elementary: Perfecto B. Salada Elementary School
2005-2011
Secondary: Polomolok National High School
2011-2015
College: Ramon Magsaysay Memorial Colleges
Pioneer Avenue, General Santos City
(Bachelor of Science in Civil Engineering)
2015-Present
Affiliations:
Member, Junior Philippine Institute of Civil Engineering
2018 - Present