Sepakat Setia Perunding Sdn. BHD.: Title Bar Bending Schedule To Bs 4466:1989

This bar bending schedule provides details for reinforcing bars used in the piers of the Seremban Air - Hitam River Bridges project. It lists 38 different bar markings with information like bar type and size, number of bars, bending dimensions, total bar length, and total bar weight. The schedule references British standard BS 4466:1989 and provides bending length formulas for each bar type.

Uploaded by

Afiq Syahmi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
175 views2 pages

Sepakat Setia Perunding Sdn. BHD.: Title Bar Bending Schedule To Bs 4466:1989

This bar bending schedule provides details for reinforcing bars used in the piers of the Seremban Air - Hitam River Bridges project. It lists 38 different bar markings with information like bar type and size, number of bars, bending dimensions, total bar length, and total bar weight. The schedule references British standard BS 4466:1989 and provides bending length formulas for each bar type.

Uploaded by

Afiq Syahmi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

SEPAKAT SETIA PERUNDING SDN. BHD. (14142-M) Job No.

:
Bar schedule ref :
TITLE : BAR BENDING SCHEDULE TO BS 4466:1989
PROJECT : SEREMBAN AIR - HITAM RIVER BRIDGES
PIERS Date prepared : 11/1/2020 Date revised :
SITE REF. : BRIDGE OVER SG. REMBAU AT CH 32+368 Prepared by : LTC Checked by :
Written by T.C. Lim on October 2001
Type, size No. No. of Total Length Shape Bending Dimensions Total Total
and of bars no. of each code Length weight
Member Bar-mark mbrs. in bar A B C D E/R of bar Remarks
each
mm mm mm mm mm mm m kg
PIERS T 16 - 01 1 2 2 2000 20 2000 4.0 6.3 L=A
T 16 - 02 1 2 2 2180 32 2000 4.4 6.9 L=A+h
T 20 - 03 1 2 2 2440 33 2000 4.9 12.0 L = A + 2h
T 20 - 04 1 2 2 2110 34 2000 4.2 10.4 L=A+n
T 25 - 05 1 2 2 2360 35 2000 4.7 18.2 L = A + 2n
T 12 - 06 1 2 2 5245 36 500 2000 2000 2000 500 10.5 9.3 L = A+C+E+0.57(B+D)-3.1416d
T 12 - 07 1 2 2 3970 37 2000 2000 7.9 7.0 L = A+B - 0.5r - d
T 25 - 08 1 2 2 5850 38 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 12 - 09 1 2 2 5125 39 2000 2000 2000 10.3 9.1 L =A+0.57B+C-1.57d & B>=2r+2d
T 20 - 10 1 2 2 6000 41 2000 2000 2000 500 12.0 29.6 L = A+B+C for ß<=45° & D>=2d
T 20 - 11 1 2 2 6110 42 2000 2000 2000 500 12.2 30.1 L=A+B+C+n
T 12 - 12 1 2 2 8000 43 2000 2000 1000 1000 1000 16.0 14.2 L =A+2B+C+E for ß<=45° & D>=2d
T 25 - 13 1 2 2 5925 45 2000 2000 2000 500 11.9 45.7 L = A+B+C - 0.5r - d
T 25 - 14 1 2 2 6000 48 2000 2000 2000 500 12.0 46.2 L = A+B+C
T 25 - 15 1 2 2 6000 49 2000 2000 2000 500 500 12.0 46.2 L = A+B+C for ß <=45°
T 32 - 16 1 2 2 3870 51 2000 2000 200 7.7 48.9 L = A+B - 0.5R - d
T 12 - 17 1 2 2 7910 52 2000 2000 2000 2000 15.8 14.0 L = A+B+C+D - 1.5r - 3d
T 16 - 18 1 2 2 9840 53 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 19 1 2 2 5850 54 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 16 - 20 1 2 2 9840 55 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 21 1 2 2 9700 58 2000 2000 2000 2000 2000 19.4 74.8 L = A+B+C+D+E - 2r - 4d
T 25 - 22 1 2 2 8500 60 2000 2000 17.0 65.5 L = 2(A+B)+20d
T 25 - 23 1 2 2 8300 61 2000 2000 16.6 64.0 L = 2(A+B)+12d
T 25 - 24 1 2 2 4000 62 2000 500 2000 8.0 30.8 L = A+C - 0.5r - d
T 20 - 25 1 2 2 2000 65 2000 3000 4.0 9.9 L=A
T 25 - 26 1 2 2 6625 72 2000 2000 13.3 51.1 L = 2A+B+25d
T 25 - 27 1 2 2 8250 73 2000 2000 2000 16.5 63.6 L = 2A+B+C+10d
T 25 - 28 1 2 2 10500 74 2000 2000 2000 21.0 80.9 L = 2A+3B+20d
T 25 - 29 1 2 2 11250 75 2000 2000 2000 2000 1000 22.5 86.7 L = A+B+C+2D+E+10d
T 25 - 30 1 2 2 6500 77 2000 2000 13.0 50.1 L = 2A+B+20d
T 25 - 31 1 2 2 8075 78 2000 2000 2000 16.2 62.2 L = 2A+B+C+3d
T 25 - 32 1 2 2 10250 79 2000 2000 20.5 79.0 L = 2A+3B+10d
T 25 - 33 1 2 2 10550 81 2000 2000 21.1 81.3 L = 2A + 3B + 22d
T 25 - 34 1 2 2 10450 82 2000 2000 20.9 80.5 L = 2A+3B+18d & B>=2r+2d
T 25 - 35 1 2 2 9700 83 2000 2000 2000 2000 19.4 74.8 L = A+2B+C+D - 2r - 4d
T 25 - 36 1 2 2 7030 85 2000 2000 2000 2000 14.1 54.2 L =A+B+.57C+D-r/2-2.57d & C>2r+2d
R 6 - 37 1 2 2 10730 86 300 90 1000 21.5 4.8 L = 3.1416C(A+d)/B + 8d
R 6 - 38 1 2 2 24635 87 300 75 2000 49.3 10.9 L = 3.1416C(A-d)/B L>12m !
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
Grand Total 547.3 1531.5

SUMMARY :-
High Tensile Bars T6 T8 T10 T12 T16 T20 T25 T32 T40 T50 GRAND TOTAL
Total Length (m) - - - 60.5 47.7 37.3 323.3 7.7 - - 476.61
Total Weight (kg) - - - 53.7 75.3 92.0 1245.9 48.9 - - 1515.84

Mild Steel Bars R6 R8 R10 R12 R16 R20 R25 R32 R40 R50 GRAND TOTAL
Total Length (m) 70.7 - - - - - - - - - 70.73
Total Weight (kg) 15.7 - - - - - - - - - 15.70

NOTE: All bending dimensions are in accordance with BS4466:1989 and are specified to nearest 5mm. APPROVED BY:
Bar diameters are in millimetres. T = High yield deformed bars and R = Mild steel round bars.
SEPAKAT SETIA PERUNDING SDN. BHD. (14142-M) Job No. :
Bar schedule ref :
TITLE : BAR BENDING SCHEDULE TO BS 4466:1989
PROJECT : SEREMBAN AIR - HITAM RIVER BRIDGES
PIERS Date prepared : 11/1/2020 Date revised :
SITE REF. : BRIDGE OVER SG. REMBAU AT CH 32+368 Prepared by : LTC Checked by :
Written by T.C. Lim on October 2001
Type, size No. No. of Total Length Shape Bending Dimensions Total Total
and of bars no. of each code Length weight
Member Bar-mark mbrs. in bar A (Min.) A (Max.) B (Min.) B (Max.) C D E/R of bar Remarks
each
mm mm mm mm mm mm mm mm m kg
PIERS T 16 - 01 1 2 2 2000 20 2000 4.0 6.3 L=A
T 16 - 02 1 2 2 2180 32 2000 4.4 6.9 L=A+h
T 20 - 03 1 2 2 2440 33 2000 4.9 12.0 L = A + 2h
T 20 - 04 1 2 2 2110 34 2000 4.2 10.4 L=A+n
T 25 - 05 1 2 2 2360 35 2000 4.7 18.2 L = A + 2n
T 12 - 06 1 2 2 5245 36 500 2000 2000 2000 500 10.5 9.3 L = A+C+E+0.57(B+D)-3.1416d
T 12 - 07 1 2 2 3970 37 2000 2000 7.9 7.0 L = A+B - 0.5r - d
T 25 - 08 1 2 2 5850 38 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 12 - 09 1 2 2 5125 39 2000 2000 2000 10.3 9.1 L =A+0.57B+C-1.57d & B>=2r+2d
T 20 - 10 1 2 2 6000 41 2000 2000 2000 500 12.0 29.6 L = A+B+C for ß<=45° & D>=2d
T 20 - 11 1 2 2 6110 42 2000 2000 2000 500 12.2 30.1 L=A+B+C+n
T 12 - 12 1 2 2 8000 43 2000 2000 1000 1000 1000 16.0 14.2 L =A+2B+C+E for ß<=45° & D>=2d
T 25 - 13 1 2 2 5925 45 2000 2000 2000 500 11.9 45.7 L = A+B+C - 0.5r - d
T 25 - 14 1 2 2 6000 48 2000 2000 2000 500 12.0 46.2 L = A+B+C
T 25 - 15 1 2 2 6000 49 2000 2000 2000 500 500 12.0 46.2 L = A+B+C for ß <=45°
T 32 - 16 1 2 2 3870 51 2000 2000 200 7.7 48.9 L = A+B - 0.5R - d
T 12 - 17 1 2 2 7910 52 2000 2000 2000 2000 15.8 14.0 L = A+B+C+D - 1.5r - 3d
T 16 - 18 1 2 2 9840 53 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 19 1 2 2 5850 54 2000 2000 2000 11.7 45.1 L = A+B+C - r - 2d
T 16 - 20 1 2 2 9840 55 2000 2000 2000 2000 2000 19.7 31.1 L = A+B+C+D+E - 2r - 4d
T 25 - 21 1 2 2 9700 58 2000 2000 2000 2000 2000 19.4 74.8 L = A+B+C+D+E - 2r - 4d
T 25 - 22 1 2 2 8500 60 2000 2000 17.0 65.5 L = 2(A+B)+20d
T 25 - 23 1 2 2 8300 61 2000 2000 16.6 64.0 L = 2(A+B)+12d
T 25 - 24 1 2 2 4000 62 2000 500 2000 8.0 30.8 L = A+C - 0.5r - d
T 20 - 25 1 2 2 2000 65 2000 3000 4.0 9.9 L=A
T 25 - 26 1 2 2 6625 72 2000 2000 13.3 51.1 L = 2A+B+25d
T 25 - 27 1 2 2 8250 73 2000 2000 2000 16.5 63.6 L = 2A+B+C+10d
T 25 - 28 1 2 2 10500 74 2000 2000 2000 21.0 80.9 L = 2A+3B+20d
T 25 - 29 1 2 2 11250 75 2000 2000 2000 2000 1000 22.5 86.7 L = A+B+C+2D+E+10d
T 25 - 30 1 2 2 6500 77 2000 2000 13.0 50.1 L = 2A+B+20d
T 25 - 31 1 2 2 8075 78 2000 2000 2000 16.2 62.2 L = 2A+B+C+3d
T 25 - 32 1 2 2 10250 79 2000 2000 20.5 79.0 L = 2A+3B+10d
T 25 - 33 1 2 2 10550 81 2000 2000 21.1 81.3 L = 2A + 3B + 22d
T 25 - 34 1 2 2 10450 82 2000 2000 20.9 80.5 L = 2A+3B+18d & B>=2r+2d
T 25 - 35 1 2 2 9700 83 2000 2000 2000 2000 19.4 74.8 L = A+2B+C+D - 2r - 4d
T 25 - 36 1 2 2 7030 85 2000 2000 2000 2000 14.1 54.2 L =A+B+.57C+D-r/2-2.57d & C>2r+2d
R 6 - 37 1 2 2 10730 86 300 90 1000 21.5 4.8 L = 3.1416C(A+d)/B + 8d
R 6 - 38 1 2 2 24635 87 300 75 2000 49.3 10.9 L = 3.1416C(A-d)/B L>12m !
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
- 0 0 0.0 0.0
Grand Total 547.3 1531.5

SUMMARY :-
High Tensile Bars T6 T8 T10 T12 T16 T20 T25 T32 T40 T50 GRAND TOTAL
Total Length (m) - - - 60.5 47.7 37.3 323.3 7.7 - - 476.61
Total Weight (kg) - - - 53.7 75.3 92.0 1245.9 48.9 - - 1515.84

Mild Steel Bars R6 R8 R10 R12 R16 R20 R25 R32 R40 R50 GRAND TOTAL
Total Length (m) 70.7 - - - - - - - - - 70.73
Total Weight (kg) 15.7 - - - - - - - - - 15.70

NOTE: All bending dimensions are in accordance with BS4466:1989 and are specified to nearest 5mm. APPROVED BY:
Bar diameters are in millimetres. T = High yield deformed bars and R = Mild steel round bars.
A(Max.) and B(Max.) are only listed for bars that vary uniformly in length - The bar length shown is