Installation: Instrument Hook Up Diagram

The document provides details on instrument hook up diagrams, including: - They specify the scope of work between mechanical and instrumentation departments and show the typical installation of instruments. - They include tag numbers, component layout and routing drawings, elevations, tubing slopes, and material take offs for fittings. - Examples are given for hooking up a pressure gauge, differential pressure transmitter, and level gauge with diagrams and required parts.

Uploaded by

Kissme Fuckme
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views5 pages

Installation: Instrument Hook Up Diagram

The document provides details on instrument hook up diagrams, including: - They specify the scope of work between mechanical and instrumentation departments and show the typical installation of instruments. - They include tag numbers, component layout and routing drawings, elevations, tubing slopes, and material take offs for fittings. - Examples are given for hooking up a pressure gauge, differential pressure transmitter, and level gauge with diagrams and required parts.

Uploaded by

Kissme Fuckme
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

INSTRUMENT HOOK UP DIAGRAM

Instrument Hook Up Diagram is also called Installation drawing, specifies the


scope of work between Mechanical and Instrumentation departments.

It is a detailed drawing showing typical installation of an instrument in a correct


manner so that the instrument operates properly and prevents issues which could
potentially affect the measurement such as liquid trap in gas impulse.

Instrumentation Construction Engineer has to review and verify certain important


points before going for an Instrument erection.

Check Tag No of particular instrument or list of instruments.


Scope of work between mechanical and instrumentation.
Bill of material such as SS fittings, Tubing, Isolation valves, plugs, manifold
block, Transmitter bracket mounting type (Vertical or Horizontal) mounting
bracket type,
Check for bulk material for each installation
Type of material to use to measure based on fluid and its parameters.
Position of instrument in reference to process tapping point.
The tubing slopes need to be paid attention.

Instrument Hook Up Diagram

Instrument Hook Up Diagrams detail the accessory and tubing hookup for both
process and field instruments based on the tag number.

It should include standard specifications for the welding of hook-up piping, heat
tracing & insulation and pressure testing & painting requirements.

Generally included are;

Tag number

Numbers of the loop drawing.

Layout & routing drawing and isometric piping drawing containing the particular
control loop component.
Elevations of both the primary control loop component and process connection.

Tagging of mechanical (piping or equipment) to instrumentation interface


Tagging of all elements/fittings & valves with item numbers.
Direction of slopes in hook-up lines.
Elevation of Instrument.
Maximum allowable lengths of hook-up lines.
Accessories often detailed include Mono-flanges, Double Block and Bleed
Valves and Fittings etc.
Material take off with part numbers, number of particular fittings, size,
connection, material type, mounting type.
weather shield and tubing specification.

Hook-up for Pressure Gauge

The below diagram shows the required components and tubing for installation of
a pressure gauge. The required parts are shown in the below table.

Hook-up for Differential Pressure Transmitter

The below diagram shows the required components and tubing for installation of
a differential pressure transmitter (installed below the tapping point). The
required parts are shown in the below table.
Hook-up diagram for Level gauge