> ASST Lattice Towers
Modular Towers & Columns
STANDARD PTZ MOUNTING
PLATE WITH 8 No. Ø8.5 HOLES
EQUI-SPACED ON A Ø101.6 PCD
ASST Towers 15m - 25m
A range of heavy duty lattice towers suitable
for more demanding applications than those 25m
covered by our ACT range, including heavy
load and high wind areas.
Supplied with or without ladder and fall
arrest.
20m
FALL ARREST
LADDER
CONNECTION
TESTED IN
ACCORDANCE
WITH BS EN 795
15m
BS4211 CLASS
‘A’ LADDER
The tower range shown on these pages
is indicative of tower arrangements for
mounting CCTV cameras with and
without ladders and fall arrest.We can
4400mm PARALLEL
TOWER SECTION
also provide towers for telecoms,
datacoms, annonometers, small wind
turbines, microwave, telemetry, lighting
and towers incorporating working
platforms, service platforms, ladder cages
etc. Please contact us for further details.
TAPERED JOINING PIECE
535mm TYPICAL
HINGED ANTI-CLIMB MESH
LADDER PANELS
GUARD
PADLOCKABLE
Features
o Modular construction - Longest tower length = 4.4m for ease of
transportation and installation.
o Ladders & fall arrest tested to comply with ISO standards.
o Comprehensive range of accessories.
o Service platforms available.
o Versatile and adaptable design due to interchangeable modules and our
specialist in house software. Optimum tower solutions can be proposed,
depending on level of equipment fitted, headload and location.
For design and contruction standards see page 107.
19 www.altron.co.uk Due to our policy of continuous product improvement specifications may change without notice
ASST Foundation <
& Installation Methods
Modular Towers & Columns
ASST
SHUTTERING (REMOVE & BACKFILL
ONCE CONCRETE HAS CURED) CONCRETE
SURFACE LEVEL
TOWER LEG
ANCHOR LEG BLEED PLATE
BLANKING PLATE
150
‘D’
EARTH TAPE
CONNECTING
LUG
ENLARGED VIEW OF
ANCHOR LEG DETAIL
TYPICAL INSTALLATION METHOD
6IJIVXSMRWXEPPEXMSRHEXEWLIIXVIPEXMRKXSWTIGM½GXS[IVTEVXRYQFIV
‘W’ 1/ EXCAVATE FOUNDATION PIT AS PER SIZE STATED.
2/ SHUTTER OFF TOP EDGE OF FOUNDATION PIT.
3/ SET TOWER ANCHOR FRAME INTO PIT - SUPPORTED BY 2 No.
4"(101.3) WOODEN BEARERS SPANNING THE PIT AND LEVEL.
4/ TOP OF FRAME TO BE LEVEL WITHIN 2mm.
1 1/4"(32) 5/ ADD STEEL REINFORCING BARS AS PER SPECIFIC
INSTALLATION DATA SHEET
6/ POSITION CABLE DUCTS IF APPLICABLE.
7/ CHECK TOWER ANCHOR LEGS FOR LEVEL DURING
‘W’
AND AFTER POURING CONCRETE.ANCHOR LEGS BEING
LEVEL IS IMPERATIVE FOR THE CORRECT INSTALLATION
OF THE TOWER.
2 NO.
150X150
WOODEN NOTES
BEARERS 1/ SAFETY FACTOR ON FOUNDATION TO RESIST OVERTURNING
OF >2.
2/ FOUNDATION SHALL BE FOUNDED ON NATURAL GROUND
WITH MINIMUM SAFE BEARING CAPACITY OF 100kN/m2
OR BETTER.
3/ ALLOW A MINIMUM OF 7 DAYS AFTER POURING CONCRETE
BEFORE INSTALLING TOWER.
4/ CONCRETE GRADE C28/35.
25
D
ABERDEEN
Camera equipment weight = 40KGS
FOUNDATION SIZES FOR THE UK TOWER HEAD LOAD [ Camera equipment surface area = 0.25m2
25
GLASGOW
TOWER PART TOWER COUNTRY LOCATION TOWN LOCATION C
NUMBER HEIGHT M AREA AREA AREA AREA AREA AREA
NEWCASTLE
25 BELFAST
TOWERS WITH23 LADDER A B C A B C
AND FALL ARREST 24
ASST/15 15 1.8x1.8x1 2x2x1 2x2x1 1.x1.x0. 1.x1.x0. 1.x1.x0.9 MANCHESTER B
DUBLIN
ASST/20 20 2x2x1 2.1x2.1x1 2.2x2.2x1.2 1.8x1.8x1 2x2x1 2x2x1
ASST/25 25 2.2x2.2x1.2 2.4x2.4x1.2 2.5x2.5x1.2 2x2x1.2 2.2x2.2x1.2 2.x2.x1.2 22
BIRMINGHAM
TOWERS ;-8, LADDER 24
AND FALL ARREST CARDIFF A
22 LONDON
ASST/15/HD 15 2x2x1 2x2x1.2 2.x2.x1.2 1.8x1.8x1 2x2x1 2x2x1.2
ASST/20/HD 20 2.3x2.3x1.2 2.5x2.5x1.2 2.7x2.7x1.2 2.2x2.2x1.2 2.x2.x1.2 2.x2.x1.2
ASST/25/HD 25 2.7x2.7x1.2 2.8x2.8x1.2 3x3x1.2 2.5x2.5x1.2 2.7x2.7x1.2 2.x2.x1.2 24
Foundations sizes are W x W x D - Dimensions in metres
FOR FOUNDATION SIZES:- A MINIMUM SOIL BEARING PRESSURE OF kN/m2 IS ASSUMED WIND SPEED AREAS 22m/s, 24/s, 25m/s
TAKEN FROM FIG 6 BS6399 - BASIC WINDSPEEDS Vb.
Minimum concrete Grade C35
SITE MEAN WINDSPEEDS (Vs) FOR AREAS A, B & C ARE:-
Allow 72 hours after pouring concrete before installing pole or tower *D
A= 24.2m/s(100m ASL) B=26.4m/s(100m ASL) C=28.8m/s(150m ASL)
Please note that foundation sizes shown in the table above are in accordance with
W ACTUAL WIND VELOCITY FOR THESE WINDSPEEDS (Ve) ARE:-
recommended headload andwindload capacities shown in technical specification tables.
W A= 41.8m/s(93mQI) B=45.6m/s(102mQI) C=50m/s(111mQI)
For increased headloads – foundations may need to increase in size – please contact
us for revised foundation sizes for specific installations. FOR AREA ‘D’ - PLEASE CONTACT ALTRON FOR FOUNDATION
SPECIFICATION
Due to our policy of continuous product improvement specifications may change without notice www.altron.co.uk 20