No Material Unit Rate

The document provides a list of item codes, materials, units, and rates for various construction works. It includes rates for excavation at different depths, bed preparation, earthwork support, backfilling, formwork, reinforcement, concrete of different grades, plastering, quarry dust, hume pipes, collars, PVC pipes, and other works. At the end, it provides an example calculation for the construction of a manhole with internal dimensions of 450mm x 450mm and invert depth of 1m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views

No Material Unit Rate

The document provides a list of item codes, materials, units, and rates for various construction works. It includes rates for excavation at different depths, bed preparation, earthwork support, backfilling, formwork, reinforcement, concrete of different grades, plastering, quarry dust, hume pipes, collars, PVC pipes, and other works. At the end, it provides an example calculation for the construction of a manhole with internal dimensions of 450mm x 450mm and invert depth of 1m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Item Code No Material Unit Rate

B-04 1 Excavation depth 0-1.5m ( with back filling) m3 1,218.00


B-05 2 Excavation depth 1.5-3.0m m3 1,857.00
B-06 3 Excavation depth above 3.0m m3 2,424.00
B-01 4 Bed Preparation m2 176.50
B-10 5 Earth work support 0-1.5m m2 1,721.60
B-11 6 Earth work support 1.5-2.0m m2 2,582.40
B-12 7 Earth work support above 2.0m m2 8,135.00
B-16 8 Backfilling m3 863.09
D-02 9 Form Work m2 1,440.00
E-04 10 Reinforcement Kg 204.00
C-04 11 Concrete 1:3:6 (40mm) m3 13,206.00
C-05 12 Concrete 1:2:4 (20mm) m3 15,928.00
12a Concrete 1:1 1/2:3 (20mm) m4 16,249.00
K-01 13 Plastering 1:3 cement motar m2 651.00
B -21 14 Quarry Dust 4.5mm m3 4,310.00
14 600mm DI cover Nos 21,475.00
15 Steps Nos 1,000.00
15 Transporting fixing and placing DI cover Nos 2,000.00
16 Hume Pipe NP2 - 225mm diameter Lm 2,800.00
16 Hume Pipe NP2 - 300mm diameter Lm 3,200.00
17 Hume Pipe NP2 - 375mm diameter Lm 4,000.00
17 Hume Pipe NP2 - 450mm diameter Lm 4,550.00
18 Hume Pipe NP2 - 600mm diameter Lm 5,750.00
18 Hume Pipe NP2 - 750mm diameter Lm 7,000.00
19 Hume Pipe NP2 - 900mm diameter Lm 9,000.00
19 Hume Pipe NP3 - 300mm diameter Lm 10,000.00
20 Hume Pipe NP3 - 450mm diameter Lm 16,000.00
20 Hume Pipe NP3 - 600mm diameter Lm 22,000.00
21 Hume Pipe NP3 - 900mm diameter Lm 40,000.00
21 Hume Pipe NP3 - 1000mm diameter Lm 50,000.00
22 Coller NP2 - 225mm diameter Nos 500.00
22 Coller NP2 - 300mm diameter Nos 700.00
23 Coller NP2 - 375mm diameter Nos 780.00
23 Coller NP2 - 450mm diameter Nos 950.00
24 Coller NP2 - 600mm diameter Nos 1,050.00
24 Coller NP2 - 750mm diameter Nos 1,200.00
25 Coller NP2 - 900mm diameter Nos 1,400.00
25 Allow for connections Item 1,000.00
26 P.V.C.Pipe - 110 mm Diameter Lm 1,844.00
27 P.V.C.Pipe - 160 mm Diameter Lm 3,770.00
28 P.V.C.Pipe - 225 mm Diameter Lm 7,845.90
29 P.V.C.Pipe - 300 mm Diameter Lm 13,110.00
30 Excavation only m3 354.91
31 Back filling imported soil m3 2,123.00
32 disposal m3 196
Construction of Manhole 450mm x 450mm internal and Invert depth 1.0m- Gully

Assumptions : working space 300mm for each side


Backfilling including working space.

Item Description Unit Qty


Code

B-4 Excavation 0- 1.5m m3 0.648


3
B-16 Backfilling m 0.198
Disposal m3 0.45
2
B-1 Bed Preparation m 0.5625
3
C-1 Concrete 1:3:6(40mm) 50mm screed m 0.03
C-5 Concrete 1:11/2:3(20mm) base & wall m3 0.300375
D-2 Form work m2 1.44
E-4 Reinforcement Kg 0
K-1
Plastering for hunching 1:3 cement :sand including cement floating. m2 0
DI Nos 1
Galvernazed steps Nos
Allow for connection of pipes ends Item

Construction of Manhole 450mm x 450mm internal and Invert depth 1.0m- Gully

Assumptions : working space 300mm for each side


Backfilling including working space.

Item CoDescription Unit Qty

B-4 Excavation 0- 1.5m m3 0.648


B-16 Backfilling m3 0.198
Disposal m3 0.45
B-1 Bed Preparation m2 0.5625
C-1 Concrete 1:3:6(40mm) 50mm screed m3 0.028125
C-5 Concrete 1:11/2:3(20mm) base & wall m3 0.300375
D-2 Form work m2 1.44
E-4 Reinforcement Kg 0
K-1 Plastering for hunching 1:3 cement :sand including cement floating. m2 1
RCC Nos 1
Galvernazed steps Nos
Allow for connection of pipes ends Item 1

rcc cover slab

con 0.03125 16249 507.7813


f/w 0.5 557.62 278.81
steel 2.07312 204 422.9165
epth 1.0m- Gully

Rate Amount

1,218.00 789.26
863.09 170.89
196.00 88.20
176.50 99.28
13,206.00 371.42
16,249.00 4,880.79
1,440.00 2,073.60
204.00 -

651.00 -
12,500.00 12,500.00

1,000.00 1,000.00
21,973.45

Say 21,973.00

Rate Amount

1,218.00 789.26
863.09 170.89
196.00 88.20
176.50 99.28
13,206.00 371.42
16,249.00 4,880.79
1,440.00 2,073.60
204.00 -
651.00 651.00
1,210.00 1,210.00
-
1,000.00 1,000.00 2.8
11,334.45
Say 11,340.00

557.62
1,209.51
CALCULATION SHEET

Excavation 0.9 0.9 0.8


Backfilling
Disposal 0.75 0.75 0.8
Bed Preparation 0.75 0.75
Concrete 1:3:6(40mm)50mm screed 0.75 0.75 0.05
Concrete 1:11/2:3(20mm) base & wall Base 0.75 0.75 0.15
Wall 2 0.45 0.15 0.6
2 0.75 0.15 0.6

Form work Inner 0.45 0.6 2


Outer 0.75 0.6 2

Reinforcement

Plastering for hunching 1:3 cement :sand


including cement floating.
rcc cover slab
Allow for connection of pipes ends

rcc cover slab

Concrete 1:11/2:3(20mm) base & wall 0.052813 858.15


r/f 2.91224 594.10
f/w 0.325 468.00 3.933333
1,920.25
Cement sand Metal
6.9 0.533333 0.933333
0.648
0.198
0.45
0.5625
0.03 0.194063 0.015 0.02625
0.084375
0.081
0.135
0.300375 2.072588 0.1602 0.28035
0.54
0.9
1.44
2.26665 0.1752 0.3066