This progress report provides an update on the debottlenecking of the Abu Safah GOSP water separation project in Qatif, Saudi Arabia. Overall project progress is reported at 10.57% completed. The piping and instrumentation scopes of work are the furthest along at 32.51% and 19.58% completed respectively. General engineering management, VIPS planning, rapid matrix development, and SAEP/engineering studies are all reported as 0% completed. The report includes a breakdown of progress by work breakdown structure activity and identifies open action items.

Uploaded by

Chirag Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
326 views24 pages

Engineering Progress Overview

This progress report provides an update on the debottlenecking of the Abu Safah GOSP water separation project in Qatif, Saudi Arabia. Overall project progress is reported at 10.57% completed. The piping and instrumentation scopes of work are the furthest along at 32.51% and 19.58% completed respectively. General engineering management, VIPS planning, rapid matrix development, and SAEP/engineering studies are all reported as 0% completed. The report includes a breakdown of progress by work breakdown structure activity and identifies open action items.

Uploaded by

Chirag Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF

Detail Design Engineering

Submission Date: 30-Oct-20

PROGRESS REPORT
ENGINEERING

DCL WBS Activity ID Description Wtg Earned (Gated) Prog (Gated)

A 0 PROCESS INDEX "A" 8.83% 9.32% 0.82%


P&B&X 0 ELECTRICAL INDEX "P" & "B" & "X" 16.62% 8.46% 1.41%
A&L 0 PIPING INDEX"A" & "L" 32.51% 5.68% 1.85%
K&G&D&E&U 0 MECHANICAL INDEX "K" & "G" & "D" & "E" & "U" MECHANICAL EQUIPMENTS 9.35% 20.57% 1.92%
Q&R&S&M 0 CIVIL/STRUCTURAL INDEX "Q" & "R" & "S" & "M" 9.26% 8.43% 0.78%
J&Z 0 INSTRUMENTATION INDEX "J" & "Z" INSTRUMENTATION 19.58% 15.16% 2.97%
S&R 3.85% 21.49% 0.83%
CMP 0.66% 30.00% 0.20%
Overall Progress 100.00% 10.57%

1
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DRAFTING
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD

CONTROL 30-Oct-20 SCHED. DESIGN ENG.


DRAWING IS CONSIDERED 65% COMPLETE
WHEN READY FOR CHECKING

ISSUE TRANSMITTED
DRAWING DATE 50% 90% 100% WBS SCHEDULE ID DELIVERABLE TYPE PROGRESS MILESTONE % COMPLT BUDGET EARNED REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size SHEET NO. New-N / Revise-R DRAWING TITLES REMARKS
NUMBER
START FINISH 30 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

GENERAL #DIV/0! 0 0 0 ############################################################

1. GENERAL ENGINEERING MANAGEMENT 0

2. VIPS 0% 0

3. RAPID MATRIX X 0% 0

4. SAEP / ENG STUDY X 0% 0

5. SUB-CONTRACTS - FIELD WORK X X

7. PROCUREMENT

8. SCHEDULING

9. ESTIMATING

10. COST CONTROL

11. QUALITY

2
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DRAFTING
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD

CONTROL 30-Oct-20 SCHED. DESIGN ENG.


DRAWING IS CONSIDERED 65% COMPLETE
WHEN READY FOR CHECKING

ISSUE TRANSMITTED
DRAWING DATE 50% 90% 100% WBS SCHEDULE ID DELIVERABLE TYPE PROGRESS MILESTONE % COMPLT BUDGET EARNED REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size SHEET NO. New-N / Revise-R DRAWING TITLES REMARKS
NUMBER
START FINISH 30 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

12. WP- SME 0

LEGEND: NOTES:

SAUDI ARABIAN OIL COMPANY

THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION
REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED A 001 A


AND DATED

3
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE Progress WEIGHTAGE
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

New-N / Early Early WEIGHTAG EARNED ISSUE TRANSMITTED


DRAWING SHEET 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
Size Revise- DRAWING TITLES IFC-1 IFC-2 E DATE* TO FIELD REMARKS
NUMBER NO.
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

PROCESS 9.32% 100.00% 9.32% 1828 170 1658

PROCESS FLOW DIAGRAM


RA-380287.001 A R CONDENSATE & BFW X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-380289.001 A R AUX STEAM BOILER X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-380290.001 A R BOILER CONDENSATE BLOW DOWN X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-380291.001 A R STEAM CONDENSATE DISTRIBUTION X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-377910.001 A R GOSP-1 FUEL GAS SYSTEM X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-A20001.001 A N AUX STEAM BOILER X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-371033.001 A R LOW PRESSURE PROD TRAPS X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-371033.002 A R LOW PRESSURE PROD TRAPS - TABLE X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-371034.001 A R LOW PRESSURE DEGASSING TANKS X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-371035.001 A R WET CRUDE HANDLING X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10
RA-371035.002 A R WET CRUDE HANDLING - TABLE X X X 01. Data and information co 5% 0.55% 0.03% 10 1 10

PIPING & INSTRUMENTATION DIAGRAM


PR-A10001.001 A N WET / DRY CRUDE EXCHANGERS X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10002.001 A N CRUDE CHARGE PUMP X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10003.001 A N CRUDE TRIM HEAT EXCHANGER E- XXX9 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10004.001 A N PUMP CONTROL (011-G-XXX1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10005.001 A N PRE-TREATER (011-D-XXX1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10006.001 A N PRE-TREATER TRANSACTOR X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10007.001 A N PRE-TREATER (011-D-XXX2) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10008.001 A N CRUDE TRIM HEAT EXCHANGER E- XX10 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10009.001 A N CRUDE TRIM HEAT EXCHANGER E- XX11 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A10010.001 A N CRUDE TRIM HEAT EXCHANGER E- XX12 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A20011.001 A N AUXILIARY BOILER PACKAGE X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

PR-A20012.001 A N AM DEMULSIFIER (PUMP) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371039.001 A R WET / DRY CRUDE EXCHANGERS (1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371039.002 A R WET / DRY CRUDE EXCHANGERS (2) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371040.001 A R LOW PRESSURE DEGASSING TANK TRAIN 1 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371041.001 A R LOW PRESSURE DEGASSING TANK TRAIN 2 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371043.001 A R CRUDE CHARGE PUMP (1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371043.011 A R CRUDE TRIM HEAT EXCHANGER (1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371043.012 A R CRUDE TRIM HEAT EXCHANGER (2) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371043.013 A R CRUDE TRIM HEAT EXCHANGER (3) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371044.001 A R DEHYDRATOR X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371049.002 A R OIL AND GAS SAMPLE CONNECTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371049.003 A R TYPIAL FOR SMART ZV VALVES X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371049.004 A R TYPICAL FOR MOV DETAILS X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371051.003 A R UTILITY WATER DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371053.001 A R STEAM /CONDENSATE DISTRIBUTION AREA X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371054.001 A R 150-PRESSURE SEWER X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371054.002 A R 300# PRESSURE SEWER X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371701.001 A R CRUDE STABILIZER X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377628.001 A R BULK CHEMICAL DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377628.017 A R AM DEMULSIFIER X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377915.010 A R UTILITY WATER DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377918.003 A R COOLING WATER DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377921.001 A R DEAERATOR AND BFW PUMPS X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377929.001 A R STEAM DISTRUBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377951.001 A R FUEL GAS SUPERHEATERS X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-3779952.008 A R INSTRUMENT AIR DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377952.025 A R UTILITY AIR DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-377953.005 A R NITROGEN DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .

RA-371039.001 A R DEMOLITION WET / DRY CRUDE EXCHANGERS (1) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371039.002 A R DEMOLITION WET / DRY CRUDE EXCHANGERS (2) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371040.001 A R DEMOLITION LOW PRESSURE DEGASSING TANK TRAIN 1 X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing

RA-371041.001 A R DEMOLITION LOW PRESSURE DEGASSING TANK TRAIN 2 X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing

RA-371043.001 A R DEMOLITION CRUDE CHARGE PUMP (1) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371043.011 A R DEMOLITION CRUDE TRIM HEAT EXCHANGER (1) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371043.012 A R DEMOLITION CRUDE TRIM HEAT EXCHANGER (2) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371043.013 A R DEMOLITION CRUDE TRIM HEAT EXCHANGER (3) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371044.001 A R DEMOLITION DEHYDRATOR X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371049.002 A R DEMOLITION OIL AND GAS SAMPLE CONNECTION X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing

RA-371049.003 A R DEMOLITION TYPIAL FOR SMART ZV VALVES X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing

RA-371049.004 A R DEMOLITION TYPICAL FOR MOV DETAILS X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing

RA-371051.003 A R DEMOLITION UTILITY WATER DISTRIBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8


RA-371053.001 A R DEMOLITION STEAM /CONDENSATE DISTRIBUTION AREA X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371054.001 A R DEMOLITION 150-PRESSURE SEWER X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371054.002 A R DEMOLITION 300# PRESSURE SEWER X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371701.001 A R DEMOLITION CRUDE STABILIZER X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing

RA-377628.001 A R DEMOLITION BULK CHEMICAL DISTRIBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8


Parimal D. Deshpande:
RA-377628.017 A
Mark up for demolition
R DEMOLITION AM DEMULSIFIER X X X 00. Blank 0% 0.44% 0.00% 8 0 8
considered from GID

4
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE Progress WEIGHTAGE
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

New-N / Early Early WEIGHTAG EARNED ISSUE TRANSMITTED


DRAWING SHEET 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
Size Revise- DRAWING TITLES IFC-1 IFC-2 E DATE* TO FIELD REMARKS
NUMBER
Parimal D. Deshpande:NO. R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE
Mark up for demolition
considered from GID
RA-377915.010 A R DEMOLITION UTILITY WATER DISTRIBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-377918.003 A R DEMOLITION COOLING WATER DISTRIBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-377921.001 A R DEMOLITION DEAERATOR AND BFW PUMPS X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-377929.001 A R DEMOLITION STEAM DISTRUBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-377951.002 A R DEMOLITION FUEL GAS SUPERHEATERS X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-3779952.008 A R DEMOLITION INSTRUMENT AIR DISTRIBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-377952.025 A R DEMOLITIONUTILITY AIR DISTRIBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-377953.005 A R DEMOLITIONNITROGEN DISTRIBUTION X X X 00. Blank 0% 0.44% 0.00% 8 0 8

Deliverable Reports X X X
E FEED VERIFICATION REPORT X X X 100% 5.36% 5.36% 98 98 0 . . . . . . . . . . . . . . . . . . . .
E PROCESS BASIS OF DESIGN X X X 00. Blank 0% 1.09% 0.00% 20 0 20
E SIMULATION REPORT X X X 00. Blank 0% 1.64% 0.00% 30 0 30
E UTILITY SUMMARY REPORT X X X 00. Blank 0% 2.74% 0.00% 50 0 50
E PROCESS CONTROL PHILOSOPHY X X X 00. Blank 0% 1.37% 0.00% 25 0 25
E PROCESS EQUIPMENT LIST X X X 00. Blank 0% 0.82% 0.00% 15 0 15
E HYDRAULIC CALCULATION REPORT (SINGLE PHASE) X X X 02. Start drafting 10% 4.10% 0.41% 75 8 68 . .

E SIMULATION MODEL X X X 00. Blank 0% 4.10% 0.00% 75 0 75


E HEAT AND MASS BALANCE X X X 00. Blank 0% 1.64% 0.00% 30 0 30
E RELIEF LOAD SUMMARY X X X 00. Blank 0% 1.09% 0.00% 20 0 20
E SIZING CALCULATION FOR EQUIPMENT X X X 00. Blank 0% 1.64% 0.00% 30 0 30
E ENERGY OPTIMIZATION STUDY X X X 00. Blank 0% 1.09% 0.00% 20 0 20
E OPERATING PROCEDURE & MANUAL X X X 00. Blank 0% 1.64% 0.00% 30 0 30
E TECHNOLOGY LICENSOR SELECTION REPORT X X X 00. Blank 0% 0.82% 0.00% 15 0 15
E CATALYSTS AND CHEMICALS SUMMARY X X X 00. Blank 0% 0.82% 0.00% 15 0 15
E UTILITY ADEQUACY REPORT STEAM & CONDENSATE, BFW, FUEL GAS, CLOSED DRAIN SYSTEM ETC X X X 00. Blank 0% 1.64% 0.00% 30 0 30
E EXISTING EQUIPMENT ADEQUACY REPORT X X X 00. Blank 0% 0.00% 0.00% 0 0 Not part of scope in detailed engineering
E LINE DESIGNNATION TABLE X X X 00. Blank 0% 1.64% 0.00% 30 0 30
A HAZOP CLOSE OUT REPORT X X 00. Blank 0% 1.64% 0.00% 30 0 30

Non Deliverable (input to Other Discipline)


E PROESS DATA FOR INSTRUMENT 5% 2.74% 0.14% 50 3 48
E PROCESS DATA FOR CONTROL VALVE 2.74% 0.00% 50 0 50
E PROCESS DATA FOR SAFETY VALVE 2.74% 0.00% 50 0 50
E PROCESS DATA FOR EQUIPMENT 10% 3.01% 0.30% 55 6 50 . .

E UTILITY BALANCE 2.19% 0.00% 40 0 40


PRE & POST ORDER VENDOR DOCUMENT REVIEW FOR AUX BOILER 2.19% 0.00% 40 0 40
PRE AND POST ORDER REVIEW FOR PUMPS 1.37% 0.00% 25 0 25
POST ORDER VENDOR DOCUMENT REVIEW FOR HEAT EXCHANGERS 1.37% 0.00% 25 0 25
PRE AND POST ORDER REVIEW FOR PRETREATERS 2.19% 0.00% 40 0 40
HAZOP AND SIL SESSION 2.19% 0.00% 40 0 40
EQUIPMENT LIST 0.77% 0.00% 14 0 14
DRAWING / DOCUMENT CONTROL LIST 30% 0.82% 0.25% 15 5 11 . . . . . .

5
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

Early Early WEIGHTAG EARNED ISSUE TRANSMITTED


DRAWING SHEET New-N / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size DRAWING TITLES IFC-1 IFC-2 E REMARKS
NUMBER NO. Revise-R
10% 20% 30% 40% 50% 60% 70% 80% 90% 100% SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

ELECTRICAL 8.46% 100.00% 8.46% 3440 291 3149

GENERAL
E 15 N ELECTRICAL DESIGN BASIS X X X 03. Issued for Discipline/Internal C 15% 0.59% 0.09% 20 3 17 . . .
E 100 N SITE SURVEY & REPORTS ( 8 DAYS) X 60% 3.95% 2.37% 136 82 54 . . . . . . . . . . . .
E 25 N CONSTRUCTION SCOPE OF WORK - ELECTRICAL INPUT X X X 0% 0.99% 0.00% 34 0 34
E 20 N ELECTRICAL LOAD LIST & EQUIPMENT ADEQUACY CALCULATIONS AT SS # 4 & 5 X X X 03. Issued for Discipline/Internal C 15% 0.79% 0.12% 27 4 23 . . .
E 14 N EXISTING AC UPS & BATTERY ADEQUACY CALCULATIONS AT PIB # 2 & 3 X X X 02. Start drafting 10% 0.51% 0.05% 18 2 16 . .

E 8 N EXISTING DC BATTERY CHARGER ADEQUACY CALCULATIONS AT SS # 5 X X X 00. Blank 0% 0.37% 0.00% 13 0 13


A 2 N MV & LV CABLE SIZING CALCULATIONS X X 00. Blank 0% 0.99% 0.00% 34 0 34
E 20 N CABLE TRAY SIZING CALCULATIONS X X 00. Blank 0% 0.79% 0.00% 27 0 27
E 20 N PIPERACK LIGHTING CALCULATIONS X X 00. Blank 0% 0.79% 0.00% 27 0 27
E 20 N AREA LIGHTING CALCULATIONS 00. Blank 0% 0.79% 0.00% 27 0 27
D 3 N DRAWING CONTROL LIST X X X 02. Start drafting 10% 0.37% 0.04% 13 1 11 . .

E 30 N CUT OVER PLAN X X 00. Blank 0% 1.19% 0.00% 41 0 41


A 1 N GENERAL NOTES,LEGENDS & ABBREVIATIONS X X X 00. Blank 0% 0.29% 0.00% 10 0 10
E 10 N TECHNICAL SPECS FOR MODIFICATION OF 13.8 KV SG AT SS#5 X X X 04. Complete drafting 35% 0.40% 0.14% 14 5 9 . . . . . . .
E 10 N TECHNICAL SPECS FOR MODIFICATION OF 4.16 KV SG AT SS#5 X X X 03. Issued for Discipline/Internal C 15% 0.40% 0.06% 14 2 12 . . .
E 5 N ELECTRICAL TIE-IN LIST X X 00. Blank 0% 0.20% 0.00% 7 0 7

E 250 N ETAP SYSTEM STUDIES (LOAD FLOW, SHORT CIRCUIT , MOTOR STARTING,ARC FLASH & X X X 00. Blank 0% 9.88% 0.00% 340 0 340
PROTECTIVE RELAY COORDINATION STUDIES)
E 8 N DATA SHEET - POWER PANELBOARDS X X X 02. Start drafting 10% 0.32% 0.03% 11 1 10 . .

E 4 N DATA SHEET - DRY TYPE TRANSFORMERS X X X 02. Start drafting 10% 0.16% 0.02% 5 1 5 . .

E 8 N DATA SHEET - 13.8 KV CRUDE DISCHARGE PUMP MOTOR X X X 02. Start drafting 10% 0.32% 0.03% 11 1 10 . .

E 8 N DATA SHEET - 4.16 KV FORCED DRAFT FAN MOTOR X X X 02. Start drafting 10% 0.32% 0.03% 11 1 10 . .

E 69 N ELECTRICAL "MTO" - POWER,GROUNDING & LIGHTING (SS#5,4 & PIB#2,3 & UTILITIES AND X X 00. Blank 0% 2.73% 0.00% 94 0 94
CRUDE HANDLING AREA)

SUBSTATION # 5 BUILDING # 212


A 1 N SUBSTATION # 5 ELECTRICAL LAYOUT X X X 04. Complete drafting 35% 0.47% 0.16% 16 6 10 . . . . . . .
A 1 N UPDATE PMS BLOCK DIAGRAM X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N SUBSTATION # 5 CABLE TRAY LAYOUT X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 4 N ELECTRICAL ONE LINE DIAGRAM WITH METERING & PROTECTION X X X 04. Complete drafting 35% 1.86% 0.65% 64 22 42 . . . . . . .
A 1 N SUBSTATION # 5 CABLE TRAY LAYOUTS & ELEVATIONS X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N MCC GA DRAWINGS # Q11-005-MCC-003 X X 04. Complete drafting 35% 0.47% 0.16% 16 6 10 . . . . . . .
A 1 N 125 V DC BATTERY CHARGER ONE LINE DIAGRAM X X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N SUBSTATION # 5 GROUNDING LAYOUT X X X 00. Blank 0% 0.47% 0.00% 16 0 16
D 1 N ELECTRICAL CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.12% 0.00% 4 0 4
B 1 N PANEL BOARD SCHEDULES X X X 00. Blank 0% 0.25% 0.00% 9 0 9
A 1 N SPACE HEATER PANEL SCHEMATIC DRAWING X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N INTERPOSING RELAY PANEL INTERCONNECTION DRAWING X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N CRUDE DISCHARGE PUMP MV MOTOR ELEMENTARY DRAWING X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N CABLE TRENCH & DUCT BANK SECTIONS X X 00. Blank 0% 0.47% 0.00% 16 0 16

SUBSTATION # 4 BUILDING # 210


A 1 N SUBSTATION # 4 ELECTRICAL LAYOUT X X X 03. Issued for Discipline/Internal C 15% 0.47% 0.07% 16 2 14 . . .
A 1 N SUBSTATION # 4 CABLE TRAY LAYOUT X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 3 N ELECTRICAL ONE LINE DIAGRAM WITH METERING & PROTECTION X X X 04. Complete drafting 35% 1.40% 0.49% 48 17 31 . . . . . . .
A 1 N SUBSTATION # 4 CABLE TRAY LAYOUTS & ELEVATIONS X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N SUBSTATION # 4 GROUNDING LAYOUT X X X 00. Blank 0% 0.47% 0.00% 16 0 16
D 1 N ELECTRICAL CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.12% 0.00% 4 0 4
B 1 N PANEL BOARD SCHEDULES X X X 00. Blank 0% 0.25% 0.00% 9 0 9
A 1 N SPACE HEATER PANEL SCHEMATIC DRAWING X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N INTERPOSING RELAY PANEL INTERCONNECTION DRAWING X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N FD FAN MV MOTOR ELEMENTARY DRAWING X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N CABLE TRENCH & DUCT BANK SECTIONS X X 00. Blank 0% 0.47% 0.00% 16 0 16

PIB#2 BUILDING#208
A 1 N AC UPS ELECTRICAL ONE LINE DIAGRAM X X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N ELECTRICAL CABLE TRAY/PLAN/LAYOUT X X X 03. Issued for Discipline/Internal C 15% 0.47% 0.07% 16 2 14 . . .
A 1 N INSTRUMENT CABLE LAYOUT/PLAN X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 4 N ELECTRICAL WIRING DIAGRAM OF UPS FEEDERS X X X 04. Complete drafting 35% 1.86% 0.65% 64 22 42 . . . . . . .
A 1 N ELECTRICAL WIRING DIAGRAM OF NON UPS FEEDERS X X X 02. Start drafting 10% 0.47% 0.05% 16 2 14 . .

A 1 N GROUNDING LAYOUT - PIB#2 X X X 00. Blank 0% 0.47% 0.00% 16 0 16


D 1 N CABLE & CONDUIT SCHEDULE- PIB#2 X X X 00. Blank 0% 0.12% 0.00% 4 0 4
A 1 N INSTALLATION DETAILS CABLE ENTRY X X 00. Blank 0% 0.47% 0.00% 16 0 16

PIB#3 BUILDING#207
A 1 N AC UPS ELECTRICAL ONE LINE DIAGRAM X X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N ELECTRICAL CABLE TRAY/PLAN/LAYOUT X X X 03. Issued for Discipline/Internal C 15% 0.47% 0.07% 16 2 14 . . .
A 1 N INSTRUMENT CABLE LAYOUT/PLAN X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 2 N ELECTRICAL WIRING DIAGRAM OF UPS FEEDERS X X X 03. Issued for Discipline/Internal C 15% 0.93% 0.14% 32 5 27 . . .
A 1 N ELECTRICAL WIRING DIAGRAM OF NON UPS FEEDERS X X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N GROUNDING LAYOUT - PIB#3 X X X 00. Blank 0% 0.47% 0.00% 16 0 16
D 1 N CABLE & CONDUIT SCHEDULE- PIB#3 X X X 00. Blank 0% 0.12% 0.00% 4 0 4
A 1 N INSTALLATION DETAILS CABLE ENTRY X X 00. Blank 0% 0.47% 0.00% 16 0 16

COGEN & UTILITIES AREA


A 2 N CABLE ROUTING/ TRAY LAYOUT X X X X 00. Blank 0% 0.93% 0.00% 32 0 32

6
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

Early Early WEIGHTAG EARNED ISSUE TRANSMITTED


DRAWING SHEET New-N / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size DRAWING TITLES IFC-1 IFC-2 E REMARKS
NUMBER NO. Revise-R
10% 20% 30% 40% 50% 60% 70% 80% 90% 100% SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

A 1 N PIPERACK LIGHTING LAYOUT X X 00. Blank 0% 0.47% 0.00% 16 0 16


A 1 N AREA LIGHTING LAYOUT X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 2 N GROUNDING LAYOUT X X X X 00. Blank 0% 0.93% 0.00% 32 0 32
A 2 N ELECTRICAL/INSTRUMENT CABLE TRAY SECTION/ELEVATION DETAILS X X 00. Blank 0% 0.93% 0.00% 32 0 32
A 2 N CABLE TRENCH & DUCT BANK SECTIONS X X X 00. Blank 0% 0.93% 0.00% 32 0 32
A 1 N INSTRUMENT CABLE ROUTING LAYOUT X X X X 00. Blank 0% 0.47% 0.00% 16 0 16

CRUDE HANDLING PLANT


A 4 N CABLE ROUTING/ TRAY LAYOUT X X X X 00. Blank 0% 1.86% 0.00% 64 0 64
A 1 N PIPERACK LIGHTING LAYOUT X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N AREA LIGHTING LAYOUT X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 3 N GROUNDING LAYOUT X X X X 00. Blank 0% 1.40% 0.00% 48 0 48
A 3 N TYPICAL GROUNDING INSTALLATION DETAILS X X X 00. Blank 0% 1.40% 0.00% 48 0 48
A 3 N TYPICAL POWER INSTALLATION DETAILS X X 00. Blank 0% 1.40% 0.00% 48 0 48
A 2 N TYPICAL LIGHTING INSTALLATION DETAILS X X X 00. Blank 0% 0.93% 0.00% 32 0 32
A 2 N ELECTRICAL/INSTRUMENT CABLE TRAY SECTION/ELEVATION DETAILS X X 00. Blank 0% 0.93% 0.00% 32 0 32
A 2 N CABLE TRENCH & DUCT BANK SECTIONS X X X 00. Blank 0% 0.93% 0.00% 32 0 32
A 2 N INSTRUMENT CABLE ROUTING LAYOUT X X X X 00. Blank 0% 0.93% 0.00% 32 0 32

PDS ELECTRICAL
N PDS LIGHTING MODELLING AT UTILITIES, CRUDE HANDLING AREA & PIPERACK X X X 00. Blank 0% 1.25% 0.00% 43 0 43
N ELECTRICAL UG CABLE TRENCH MODELLING X X X 00. Blank 0% 1.25% 0.00% 43 0 43
N CABLE TRAY MODELLING ON PIPERACKS X X 00. Blank 0% 1.25% 0.00% 43 0 43
N PDS MODELLING - CLASH CHECKING / BACKDRAFTING/MODEL REVIEWS X X 00. Blank 0% 0.61% 0.00% 21 0 21
N PDS MODELLING - FINALISE / ISSUE OUTPUTS X X 00. Blank 0% 0.61% 0.00% 21 0 21

PDS INSTRUMENTATION & CONTROL CABLE ROUTING


N INSTRUMENT UG CABLE TRENCH MODELLING X X X 00. Blank 0% 1.25% 0.00% 43 0 43
N INSTRUMENT CABLE TRAY MODELLING ON PIPERACK X X 00. Blank 0% 1.25% 0.00% 43 0 43
N PDS MODELLING - CLASH CHECKING / BACKDRAFTING/MODEL REVIEWS X X 00. Blank 0% 0.61% 0.00% 21 0 21
N PDS MODELLING - FINALISE / ISSUE OUTPUTS X X 00. Blank 0% 0.61% 0.00% 21 0 21

MR,TBE & NMR'S


N MR,TBE & NMR FOR 13.8 KV SG MODIFICATION X X X 00. Blank 0% 1.31% 0.00% 45 0 45
N MR,TBE & NMR FOR 4.16 KV SG MODIFICATION X X X 00. Blank 0% 1.31% 0.00% 45 0 45
N MR,TBE & NMR FOR LV MCC MODIFICATION X X X 00. Blank 0% 1.31% 0.00% 45 0 45
N MR,TBE & NMR FOR PMS MODIFICATIONS X X X 00. Blank 0% 0.99% 0.00% 34 0 34
N MR,TBE & NMR FOR SPACE HEATER PANEL X X 00. Blank 0% 0.73% 0.00% 25 0 25
N MR,TBE & NMR FOR POWER PANELS X X X 00. Blank 0% 0.81% 0.00% 28 0 28
N MR,TBE & NMR FOR MV CABLES X X 00. Blank 0% 0.49% 0.00% 17 0 17
N MR,TBE & NMR FOR LV & CONTROL CABLES X X 00. Blank 0% 0.70% 0.00% 24 0 24
N MR,TBE & NMR FOR ELECTRICAL BULK MATERIALS X X 00. Blank 0% 1.51% 0.00% 52 0 52
N MR,TBE & NMR FOR GROUNDING MATERIALS X X 00. Blank 0% 1.51% 0.00% 52 0 52
N MR,TBE & NMR FOR MV TERMINATION KITS & SPLICE JOINTS X X 00. Blank 0% 1.51% 0.00% 52 0 52
N MR,TBE & NMR FOR CABLE TRAYS X X 00. Blank 0% 1.51% 0.00% 52 0 52

SUPPORT TO MECHANICAL MR,TBE & NMR'S


N MR,TBE & NMR FOR CRUDE DISCHARGE PUMP MOTOR X X X 00. Blank 0% 0.67% 0.00% 23 0 23
N MR,TBE & NMR FOR FD FAN MOTOR X X X 00. Blank 0% 0.67% 0.00% 23 0 23
N MR,TBE & NMR FOR PREHEATERS X X X 00. Blank 0% 0.64% 0.00% 22 0 22
SUPPORT TO I&C MR,TBE & NMR'S

N MR,TBE & NMR FOR BMS/DCS/ESD CABINETS POWERING REQUIREMENTS X X 00. Blank 0% 0.61% 0.00% 21 0 21

NON-DELIVERABLES
N KICK OFF/MOBILIZATION/STAFFING PLAN/START UP CHECK LIST REQUIREMENTS X X X 90% 0.29% 0.26% 10 9 1 . . . . . . . . . . . . . . . . . .
N INPUTS TO PFD AND P&ID'S & REVIEWS X X X 0.58% 0.00% 20 0 20
N INPUT TO DTDP / DDM / SEAL/ APPROVED CHECKER X X X 25% 0.29% 0.07% 10 3 8 . . . . .
N FEED VERIFICATION X X X 100% 1.31% 1.31% 45 45 0 . . . . . . . . . . . . . . . . . . . .

N DATA / DRAWINGS REQUEST AND ACQUISITION/RETRIEVAL X X X 75% 0.99% 0.74% 34 26 9 . . . . . . . . . . . . . . .


N TIE IN & SPACE RESERVATION X X 0.49% 0.00% 17 0 17
N PROJECT MEETINGS & PROGRESS UPDATE X X X 30% 1.31% 0.39% 45 14 32 . . . . . .
N PLOT PLAN REVIEWS X X X 10% 0.67% 0.07% 23 2 21 . .

N GPRS SURVEY REPORTS REVIEW X X X 10% 0.73% 0.07% 25 3 23 . .

N INTERFACE WITH OTHER DISCIPLINES X X X 0.61% 0.00% 21 0 21


N SQUAD CHECKS X X X 0.99% 0.00% 34 0 34
N ATTEND QUALITY AUDIT X X X 0.23% 0.00% 8 0 8
N TPR REVIEW AND ACTIONS X X 0.23% 0.00% 8 0 8
N CONSTRUCTABILITY SESSION X X 0.23% 0.00% 8 0 8
N 60,90% E-REVIEW SESSIONS X X 1.22% 0.00% 42 0 42
N VALUE ENGINEERING SESSION X X 0.23% 0.00% 8 0 8
N LLC & LLI SESSION X X X 25% 0.23% 0.06% 8 2 6 . . . . .

7
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING TO END OF THIS PERIOD
PROGRESS WEIGHTAGE
CONTROL 19-Feb-20 DRAWING IS CONSIDERED 65% COMPLETE
DESIGN ENG.
WHEN READY FOR CHECKING

EARNED
DRAWING SHEET New-N / WEIGHTAG ISSUE TRANSMITTED
Size DOCUMENT/DRAWING TITLES % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION REMARKS
NUMBER NO. Revise-R E DATE* TO FIELD

E 1-30 SAFETY INSTRUCTION SHEETS 0% 0.89% 0.00% 60 0 60


E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS1P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS1P, SIZE 2" TO 18" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS1P, SIZE 20" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 1CS1P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 1CS1P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-BALL VALVE - PIPE SPEC. 1CS1P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS2P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS1P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS1P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS1P, SIZE 2" TO 12" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS1P, SIZE 14" TO 24" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 3CS1P, SIZE 10" TO 16" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 3CS1P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 3CS1P, SIZE 2" TO 18" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-BUTTERFLY VALVE - PIPE SPEC. 3CS1P, SIZE 4" TO 18" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS2P06, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS2P06, SIZE 2" TO 18" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS2P06, SIZE 20" TO 24" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CS2P06, SIZE 26" TO 36" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS2P06, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS2P06, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS2P06, SIZE 2" TO 12" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS2P06, SIZE 14" TO 24" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS2P06, SIZE 26" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 3CS2P06, SIZE 2" TO 8" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 3CS2P06, SIZE 2" TO 20" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1LE0P06, SIZE 2" TO 18" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 1LE0P06, SIZE 2" TO 24" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3LE0P06, SIZE 2" TO 12" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3LE0P06, SIZE 14" TO 24" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 3LE0P06, SIZE 2" TO 8" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 3LE0P06, SIZE 10" TO 24" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 3LE0P06, SIZE 2" TO 12" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS2P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3CS2P, SIZE 2" TO 12" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 3CS2P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 3CS2P, SIZE 2" TO 8" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-BALL VALVE - PIPE SPEC. 3CS2P, SIZE 2" TO 3" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3LE0P, SIZE 2" TO 12" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 6SD0P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 6SD0P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 6SD0P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1BD0U, SIZE 1/2" TO 2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-CHECK VALVE - PIPE SPEC. 1BD0U, SIZE 1/2" TO 2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-BALL VALVE - PIPE SPEC. 1BD0U, SIZE 1/2" TO 2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1CG0U, SIZE 1/2" TO 2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 1SV0P06, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3SV0P06, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GLOBE VALVE - PIPE SPEC. 3SV0P06, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATASHEET-GATE VALVE - PIPE SPEC. 3SD0P, SIZE 1/2" TO 1-1/2" 0% 0.04% 0.00% 3 0 3
E 1 DATASHEET FOR STEAM TRAP - PIPING SPECIALITY ITEM 0% 0.04% 0.00% 3 0 3
E 1 DATASHEET FOR CHEMICAL INJECTION FITTING - PIPING SPECIALITY ITEM 0% 0.04% 0.00% 3 0 3
E 1 DATASHEET FOR NON-SLAM CHECK VALVE - PIPING SPECIALITY ITEM - SP-XX20 0% 0.04% 0.00% 3 0 3
E 1 DATASHEET FOR SIGHT GLASS - PIPING SPECIALITY ITEM - FG-0006/0006A 0% 0.04% 0.00% 3 0 3
E 1 DATASHEET FOR Y-TYPE STRAINER - PIPING SPECIALITY ITEM 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATA SHEET -MOV-0001 - PIPE SPEC. 3LE0P06 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATA SHEET - MOV-0002 - PIPE SPEC. 3LE0P06 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATA SHEET - XV-0001/0002/0003- PIPE SPEC. 3LE0P06 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATA SHEET - ZV-0005/0005A-PIPE SPEC. 3LE0P06 0% 0.04% 0.00% 3 0 3
E 1 VALVE DATA SHEET-HV-0006/0006A-PIPE SPEC. 3LE0P06 0% 0.04% 0.00% 3 0 3
E 1-70 PIPING MATERIAL SPECIFICATION 0% 0.74% 0.00% 50 0 50
E 1-10 STRESS ANALYSIS SPECIFICATIONS 0% 0.22% 0.00% 15 0 815
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRA PROGRESS
WING TO END OF THIS PERIOD
DD PACKAGE PROGRESS WEIGHTAGE
CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE
DESIGN ENG.
ROL WHEN READY FOR CHECKING

DRAW New-N Early Early WEIGHTAG EARNED ISSUE TRANSMITTED


ING SHEET / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size DRAWING TITLES IFC-1 IFC-2 E REMARKS
Numbe NO Revise
r -R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

MECHANICAL 20.57% 100.00% 20.57% 1935 398 1537 . . . . . A4020


INDEX A ###
E MECHANICAL BASIS OF DESIGN X X X 07. Complete Squad Check 55% 2.07% 1.14% 40 22 18 . . . . . . . . . . . ###
D MECHANICAL EQUIPMENT LIST X X X 00. Blank 0% 1.03% 0.00% 20 0 20 ###
E MECHANICAL SCOPE OF WORK X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E TECHNICAL SPECIFICATION FOR PRE-TREATERS X X X 07. Complete Squad Check 55% 1.81% 0.99% 35 19 16 . . . . . . . . . . . ###
E TECHNICAL SPECIFICATION FOR CONDENSATE POTS X X X 07. Complete Squad Check 55% 1.03% 0.57% 20 11 9 . . . . . . . . . . . ###
E TECHNICAL SPECIFICATION FOR SHELL & TUBE HEAT EXCHANGERS X X X 00. Blank 0% 1.29% 0.00% 25 0 25 ###
E TECHNICAL SPECIFICATION FOR WATER TUBE BOILERS X X X 04. Complete drafting 35% 1.81% 0.63% 35 12 23 . . . . . . . ###
E TECHNICAL SPECIFICATION FOR API CHARGE PUMP X X X 07. Complete Squad Check 55% 1.03% 0.57% 20 11 9 . . . . . . . . . . . ###

E TECHNICAL SPECIFICATION FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING X X X 00. Blank 0% 1.03% 0.00% 20 0 20
DEMULSFIER SKID
E SIS FOR PRE-TREATERS X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR CONDENSATE POTS X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR WET/DRY CRUDE HEAT EXCHANGER X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR CRUDE TRIM HEAT EXCHANGER X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR AUXILIARY BOILER (Not included in the SOW) X X 00. Blank 0% 0.00% 0.00% 0 0 ###
E SIS FOR API CHARGE PUMP X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X X 00. Blank 0% 0.52% 0.00% 10 0 10
INDEX D ###
D MDS FOR PRE-TREATERS X X X 00. Blank 0% 1.03% 0.00% 20 0 20 ###
D MDS FOR CONDENSATE POTS X X X 00. Blank 0% 0.78% 0.00% 15 0 15 ###
D MDS FOR BOILER STEAM DRUM (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 1.03% 0.00% 20 0 20
D MDS FOR BOILER WATER DRUM (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 1.03% 0.00% 20 0 20
INDEX E ###
D MDS FOR WET/DRY CRUDE HEAT EXCHANGER X X X 00. Blank 0% 1.03% 0.00% 20 0 20 ###
D MDS FOR CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 1.03% 0.00% 20 0 20
INDEX F
D MDS FOR AUXILIARY BOILER (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 1.03% 0.00% 20 0 20
INDEX G
E MDS FOR API CHARGE PUMP X X X 00. Blank 0% 1.03% 0.00% 20 0 20
E NOISE DATA SHEET FOR API CHARGE PUMP X X 00. Blank 0% 0.52% 0.00% 10 0 10
E MDS FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X X X 00. Blank 0% 1.03% 0.00% 20 0 20 ###

E NOISE DATA SHEET FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER X X 00. Blank 0% 0.52% 0.00% 10 0 10
SKID ###

INDEX K
E MDS FOR FORCED DRAFT FAN (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 0.52% 0.00% 10 0 10
E NOIS DATA SHEET FOR FORCED DRAFT FAN X X 00. Blank 0% 0.52% 0.00% 10 0 10
INDEX U ###
E MDS AUXILIARY BOILER PACKAGE X X X 00. Blank 0% 1.03% 0.00% 20 20 ###
MR (INPUT AND REVIEW) ###
MR FOR PRE-TREATERS X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR CONDENSATE POTS X 10. Complete Discipline Check 80% 1.81% 1.45% 35 28 7
MR FOR WET/DRY CRUDE HEAT EXCHANGER X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR CRUDE TRIM HEAT EXCHANGER X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR AUXILIARY BOILER X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR API CHARGE PUMP X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X 10. Complete Discipline Check 80% 1.55% 1.24% 30 24 6
TBE (3 BIDDERS, 2 REVIEW CYCLES FOR EACH) ###
TBE FOR PRE-TREATERS X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR CONDENSATE POTS X 00. Blank 0% 3.10% 0.00% 60 0 60
TBE FOR WET/DRY CRUDE HEAT EXCHANGER X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR CRUDE TRIM HEAT EXCHANGER X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR AUXILIARY BOILER X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR API CHARGE PUMP X 00. Blank 0% 2.33% 0.00% 45 0 45
TBE FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X 00. Blank 0% 2.33% 0.00% 45 0 45
NMR 601 & 602 ( 2 REVIEW CYCLES)
NMR FOR PRE-TREATERS X 00. Blank 0% 3.62% 0.00% 70 0 70
NMR FOR CONDENSATE POTS X 00. Blank 0% 2.58% 0.00% 50 0 50
NMR FOR WET/DRY CRUDE HEAT EXCHANGER X 00. Blank 0% 3.10% 0.00% 60 0 60
NMR FOR CRUDE TRIM HEAT EXCHANGER X 00. Blank 0% 3.10% 0.00% 60 0 60
NMR FOR AUXILIARY BOILER X 00. Blank 0% 4.13% 0.00% 80 0 80
NMR FOR API CHARGE PUMP X 00. Blank 0% 2.07% 0.00% 40 0 40
NMR FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X 00. Blank 0% 2.07% 0.00% 40 0 40
Non Deliverables
WEEKLY REPORTS & PROGRESS UPDATE MEETINGS WITH CLIENT 55% 1.81% 0.99% 35 19 16
INTERNAL COORDINATION MEETINGS 45% 1.29% 0.58% 25 11 14
SITE VISITS (INCLUDING THE REPORT) 100% 0.78% 0.78% 15 15 0
FEED VERIFICATION 100% 1.55% 1.55% 30 30 0
INTERNAL COORDINATION FOR DELIVERING DOCUMENTS 10% 2.33% 0.23% 45 5 41

9
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRA PROGRESS
WING TO END OF THIS PERIOD
DD PACKAGE PROGRESS WEIGHTAGE
CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE
DESIGN ENG.
ROL WHEN READY FOR CHECKING

DRAW New-N Early Early WEIGHTAG EARNED ISSUE TRANSMITTED


ING SHEET / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size DRAWING TITLES IFC-1 IFC-2 E REMARKS
Numbe NO Revise
r -R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

PROJECT SET-UP / DTDP / DDM / SEAL 30% 0.78% 0.23% 15 5 11


SQUAD CHECK TO REVIEW OTHER DISCIPLINE DELIVRERABLES 0.78% 0.00% 15 0 15
CONSTRUCTABILITY STUDY 0.78% 0.00% 15 0 15

10
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRA PROGRESS
WING TO END OF THIS PERIOD
DD PACKAGE PROGRESS WEIGHTAGE
CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE
DESIGN ENG.
ROL WHEN READY FOR CHECKING

DRAW New-N Early Early WEIGHTAG EARNED ISSUE TRANSMITTED


ING SHEET / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size DRAWING TITLES IFC-1 IFC-2 E REMARKS
Numbe NO Revise
r -R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

RISK ASSESMENT STUDY 20% 0.78% 0.16% 15 3 12


LESSON LEARN STUDY 20% 0.78% 0.16% 15 3 12
HAZOP STUDY 0.78% 0.00% 15 0 15
HAZOP PARTICIPATION FOR BOILER PACKAGE 0.52% 0.00% 10 0 10
PRELIMINARY THICKNESS CALCULATION FOR STATIC EQUIPMENT 0.26% 0.00% 5 0 5 ###
LEGEND: NOTES:
1) CMP deliverables and non-deliverables are not included yet.
2) MRs review and input will be done twice. For LLIs and after DD.
3) TBE will be for three bidders, two review cycles for each.
SAUDI ARABIAN OIL COMPANY
4) NMR 601 & 602 will be 2 review cycles.

THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION
REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL A 001 A


CERTIFIED AND DATED

11
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

EARNED
New- Early Early WEIGHTAG ISSUE TRANSMITTED
SHE 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
DRAWING N/ IFC-1 IFC-2 E DATE* TO FIELD
Size ET DRAWING TITLES REMARKS
NUMBER Revise-
NO.
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

CIVIL 8.43% 100.00% 8.43% 1916 162 1755

CI-XXXXXX FEED VERIFICATION X 80% 2.61% 2.09% 50 40 10 . . . . . . . . . . . . . . . .

1. GENERAL ENGINEERING (COMMINDEX "A"


CI-XXXXXX D N CONSTRUCTION SCOPE OF WORK (DISCIPLINE INPUT) X 04. Complete drafting 35% 0.52% 0.18% 10 4 7 . . . . . . .
CI-000001 D E BASIS OF DETAILED DESIGN - CIVIL / STRUCTURAL X X 06. Issued for Squad Check 45% 1.04% 0.47% 20 9 11 . . . . . . . . .
CI-000002 D N SCOPE OF WORK - TOPOGRAPHIC SURVEY X 06. Issued for Squad Check 45% 1.04% 0.47% 20 9 11 . . . . . . . . .
CI-000003 D N SCOPE OF WORK - UNDERGROUND UTILITIES MAPPING X 06. Issued for Squad Check 45% 1.04% 0.47% 20 9 11 . . . . . . . . .
CI-000004 D N SCOPE OF WORK - GEOTECHNICAL INVESTIGATION X 06. Issued for Squad Check 45% 1.04% 0.47% 20 9 11 . . . . . . . . .
CI-000005 D N SCOPE OF WORK - EXPLORATORY TRENCHING X 00. Blank 0% 0.52% 0.00% 10 0 10
CI-000006 D N EARLY WORKS CONSTRUCTION SCOPE OF WORK X 00. Blank 0% 1.04% 0.00% 20 0 20
CI-000007 A N TOPOGRAPHY SURVEY PLAN -( Attachment To Sow) X 06. Issued for Squad Check 45% 0.26% 0.12% 5 2 3 . . . . . . . . .
CI-000007 A N TOPOGRAPHY SURVEY PLAN -( Attachment To Sow) X 07. Complete Squad Check 55% 0.26% 0.14% 5 3 2 . . . . . . . . . . .
CI-000008 A N GPR MAPPING LAYOUT ( Attachment To Sow) X 06. Issued for Squad Check 45% 0.26% 0.12% 5 2 3 . . . . . . . . .
CI-000008 A N GPR MAPPING LAYOUT ( Attachment To Sow) X 06. Issued for Squad Check 45% 0.26% 0.12% 5 2 3 . . . . . . . . .
CI-000009 A N BORE HOLE AND TEST LOCATION LAYOUT ( Attachment To Sow GEOTECHNICAL INVESTIGATION) X 06. Issued for Squad Check 45% 0.52% 0.23% 10 5 6 . . . . . . . . .
CI-000009 A N BORE HOLE AND TEST LOCATION LAYOUT ( Attachment To Sow GEOTECHNICAL INVESTIGATION) X 06. Issued for Squad Check 45% 0.26% 0.12% 5 2 3 . . . . . . . . .

STANDARD DRAWINGS - COMMONINDEX "M"


CI-000011 A E GENERAL NOTES - STEEL STRUCTURES X X X 00. Blank 0% 0.26% 0.00% 5 0 5
CI-000012 A E GENERAL NOTES & ABBREVIATIONS - STEEL STRUCTURES X X X 00. Blank 0% 0.26% 0.00% 5 0 5
CI-000013 A E STRUCTURAL DETAILS - PIPE SUPPORT X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000014 A E STRUCTURAL MISC DETAILS - PLATFORMS CONNECTION TYPICAL DETAILS X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000015 A E STRUCTURAL MISC DETAILS - PLATFORMS HAND RAIL, GRATING X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000016 A E STRUCTURAL MISC DETAILS - PLATFORMS LADDER, STAIR X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000017 A E STRUCTURAL MISC DETAILS -MISC 0.10% 0.00% 2 0 2
STANDARD DRAWINGS - COMMONINDEX "Q"
CI-00021 A E GENERAL NOTES - CONCRETE STRUCTURES X X X X 00. Blank 0% 0.31% 0.00% 6 0 6
CI-00022 A E GENERAL NOTES & ABBREVIATIONS - CONCRETE STRUCTURES X X X 00. Blank 0% 0.26% 0.00% 5 0 5
CI-00023 A E FOUNDATION PLN/LAYOUT/SECT/DET - LIGHT POLE FOUNDATION DETAILS X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-00024 A E FOUNDATION PLN/LAYOUT/SECT/DET - CAMERA POLE FOUNDATION DETAILS X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-00025 A E FOUNDATION PLAN /SECTION - LADDER / STAIR FOUNDATION DETAILS X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-00026 A E FOUNDATION PLN/LAYOUT/SECT/DET - MISC. PIPE SUPPORT FOUNDATION DETAILS X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-00027 A E FOUNDATION PLN/LAYOUT/SECT/DET - E&I CABLE TRAY FOUNDATION DETAILS X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-00028 A E FOUNDATION PLN/LAYOUT/SECT/DET -INSTRUMENTATION SUPPORT X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-00029 A E Miscell -1 X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-00030 A E Miscell -2 X X X 00. Blank 0% 0.10% 0.00% 2 0 2
X X 00. Blank 0%
STANDARD DRAWINGS - COMMONINDEX "S"
CI-000031 A E GENERAL NOTES - CIVIL UNDERGROUND X X X X 00. Blank 0% 0.16% 0.00% 3 0 3
CI-000032 A E GENERAL CIVIL - ROAD & PAVING SECTIONAL DETAILS (ASPHALT, CONCRETE) X X X X 00. Blank 0% 0.16% 0.00% 3 0 3
CI-000033 A E GENERAL CIVIL - GUARD RAIL STRUCTURAL DETAILS sh-1 X X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000034 A E GENERAL CIVIL - GUARD RAIL FOUNDATION DETAILS Sh-2 X X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000035 A E GENERAL CIVIL - DETAILS FOR OILY WATER (OWS & SW) MANHOLES X X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000036 A E GENERAL CIVIL - DETAILS FOR OILY WATER (OWS) CATCH BASINS X X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000037 A E GENERAL CIVIL - DETAILS FOR OILY WATER (OWS) CLEAN OUT X X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000038 A E GENERAL CIVIL - DETAILS FOR SURFACE WATER (SW) DRAIN CHANNELS X X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000039 A E GENERAL CIVIL - DETAILS FOR SURFACE WATER (SW) PIPE CULVERTS X X X X 00. Blank 0% 0.10% 0.00% 2 0 2
CI-000040 A E GENERAL CIVIL - DETAILS FOR NEW OWS LINE CONNECTION WITH EXISTING MANHOLE/SUMP X X X X 00. Blank 0% 0.10% 0.00% 2 0 2

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "A"


CI-000050 D E CSA - MTO FOR DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF (Index M, O, Q, S) 00. Blank 0% 2.09% 0.00% 40 0 40

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "M"


CI-000051 A E PIPERACK I- CONGENERATION AND UTILITIES (4 SHEETS) (7 BAYS) X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000052 A E PIPERACK II- CONGENERATION AND UTILITIES (2 SHEETS) (3-BAYS) X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000053 A E PLATFORM -GOSP AND CRUDE HANDLING 4 SHEETS X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000054 A E PIPERACK PR-1 - GOSP AND CRUDE HANDLING 3 SHEETS X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000055 A E PIPERACK PR-3 - GOSP AND CRUDE HANDLING 2 SHEETS X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000056 A E PIPERACK PR-4 - GOSP AND CRUDE HANDLING 3 SHEETS X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000057 A E PIPERACK PR-5 - GOSP AND CRUDE HANDLING 3 SHEETS X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000058 A E PIPERACK PR-6 - GOSP AND CRUDE HANDLING 2 SHEETS X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000059 A E PIPE SUPPORTS - CONGENERATION AND UTILITIES X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000060 A E PIPE SUPPORTS - GOSP AND CRUDE HANDLING X X 00. Blank 0% 0.52% 0.00% 10 0 10
CI-000061 D N STRUCTURAL CALCULATIONS - CONGENERATION AND UTILITIES (75 HRS) X X 00. Blank 0% 3.91% 0.00% 75 0 75
CI-000062 D N STRUCTURAL CALCULATIONS - CONGENERATION AND UTILITIES (225 HRS) X X 00. Blank 0% 10.44% 0.00% 200 0 200
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "Q"
CI-000071 A E OVERALL FOUNDATION LAYOUT -CONGENERATION AND UTILITIES X X 00. Blank 0% 1.04% 0.00% 20 0 20
CI-000072 A E PIPERACK I- CONGENERATION AND UTILITIES (4 SHEETS) (7 BAYS) X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000073 A E PIPERACK II- CONGENERATION AND UTILITIES (2 SHEETS) (3-BAYS) X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000074 A E OVERALL FOUNDATION LAYOUT -GOSP AND CRUDE AREA X X 00. Blank 0% 1.04% 0.00% 20 0 20
CI-000075 A E PLATFORM -GOSP AND CRUDE HANDLING 1 SHEETS X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000076 A E PIPERACK PR-1 - GOSP AND CRUDE HANDLING 1 SHEETS X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000077 A E PIPERACK PR-3 - GOSP AND CRUDE HANDLING 1 SHEETS X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000078 A E PIPERACK PR-4 - GOSP AND CRUDE HANDLING 1 SHEETS X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000079 A E PIPERACK PR-5 - GOSP AND CRUDE HANDLING 1 SHEETS X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000080 A E PIPERACK PR-6 - GOSP AND CRUDE HANDLING 1 SHEETS X X 00. Blank 0% 0.42% 0.00% 8 0 8
CI-000081 A E CRUDE CHARGE PUMP FOUNDATION DETAILS X X 00. Blank 0% 1.30% 0.00% 25 0 25
CI-000082 A E WET AND DRY EXCHANGE FOUNADTION DETAILS X X 00. Blank 0% 0.42% 0.00% 8 0 8

12
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

EARNED
New- Early Early WEIGHTAG ISSUE TRANSMITTED
SHE 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
DRAWING N/ IFC-1 IFC-2 E DATE* TO FIELD
Size ET DRAWING TITLES REMARKS
NUMBER Revise-
NO.
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

CI-000083 A E PRETREATER FOUNDATION DETAILS X X 00. Blank 0% 0.37% 0.00% 7 0 7


CI-000084 A E BOILER FOUNADTION DETAILS X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000085 A E INSTRUMENT BOX SUPPORT STRUCTURE AND FOUNDATION DETAILS X X 00. Blank 0% 0.26% 0.00% 5 0 5
CI-000086 A E ELECTRICAL CA CABLE TRAY SUPORT DETAILS X X 00. Blank 0% 0.26% 0.00% 5 0 5
CI-000087 D E CALCULATIONS FOR CRUDE PUMP FDN X X 00. Blank 0% 2.35% 0.00% 45 0 45
CI-000088 D E CALCULATIONS FOR EQUIPMENT FDN (BOILER, PRETREATER, WET AND DRY EXCHANGER ) X X 00. Blank 0% 3.39% 0.00% 65 0 65
CI-000089 D E CALCULATIONS FOR PIPERACK FOUNDATIONS--CONGENERATION AND UTILITIES X X 00. Blank 0% 2.09% 0.00% 40 0 40
CI-000090 D E CALCULATIONS FOR PIPERACK& PLATFORM FOUNDATIONS GOSP AND CRUDE HANDLING X X 00. Blank 0% 4.44% 0.00% 85 0 85
CI-000091 D E INDIVIDUAL PIPE SUPPORT FDN DETAILS AND SCHEDULE X X 00. Blank 0% 0.78% 0.00% 15 0 15
CI-000092 D E CALCULATIONS FOR ELECTRICAL SUPPORTS, INSTRUMENT SUPPORTS AND MISCL SKID FDN X X 00. Blank 0% 0.78% 0.00% 15 0 15
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "S'
CI-000101 D E SITE DEMOLITION - COGENERATION AND UTILITIES X X X 00. Blank 0% 0.26% 0.00% 5 0 5
CI-000102 D E SITE DEMOLITION - GOSP AND CRUDE HANDLING X X X 00. Blank 0% 0.26% 0.00% 5 0 5

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "S' SITE DEMOLITION SUBJECT TO AVAILABILITY OF DATA
CI-000103 D E SITE DEVELOPMENT-CO GENERATION AND UTILITIES X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000104 D E SITE DEVELOPMENT-GOSP AND CRUDE HANDLING X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000105 D E SITE DEVELOPMENT-CO GENERATION AND UTILITIES X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000106 D E SITE DEVELOPMENT-GOSP AND CRUDE HANDLING X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000107 D E SITE GRADING & STORM DRAINAGE PLAN---CO GENERATION AND UTILITIES X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000108 D E SITE GRADING & STORM DRAINAGE PLAN---GOSP AND CRUDE HANDLING X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000109 D E NON-ELECTRICAL UTILITIES PLAN - CO GEN UTILITIES OVERALL LAYOUT X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000110 D E NON-ELECTRICAL UTILITIES PLAN - CO GEN UTILITIES ENLARGED LAYOUT SH 1 &2 X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000111 D E NON-ELECTRICAL UTILITIES PLAN - GOSP AND CRUDE HANDLING OVERALL LAYOUT X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000112 D E NON-ELECTRICAL UTILITIES PLAN - CO GEN UTILITIES ENLARGED LAYOUT SH 1 2 3 & 4 X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000113 D E GENERAL CIVIL - OILY WATER (OWS) MANHOLES - SCHEDULE X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000114 D E GENERAL CIVIL - OILY WATER (OWS) CATCHBASINS - SCHEDULE X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000115 D E PIT DETAILS - OILY WATER HOLDING PIT TK-1 TO TK-4 (SHT 1/2) X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000116 D E PIT DETAILS - OILY WATER HOLDING PIT TK-1 TO TK-4 (SHT 2/2) X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000117 D E GENERAL CIVIL CALCULATIONS - OILY WATER NETWORK-I X X X 00. Blank 0% 1.30% 0.00% 25 0 25 SUBJECT TO AVAILABILITY OF DATA
SUBJECT TO AVAILABILITY OF DATA
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "A"
CI-000121 3 D MODELLING X X X 00. Blank 0% 9.13% 0.00% 175 0 175

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -GENERAL JOB CO_ORDINATION AND PREPARATION
CLIENT COORDINATION MEETINGS 5% 3.91% 0.20% 75 4 71
INTERNAL COORDINATION MEETINGS 5% 2.61% 0.13% 50 3 48
DRAWING CONTROL LIST PREPARATION UPDATE / PROGRESS 60% 1.57% 0.94% 30 18 12 . . . . . . . . . . . .
SITE VISITS / MARK-UPS / REPORTS (4site visit)* 60% 3.39% 2.04% 65 39 26 . . . . . . . . . . . .
INTER-DISCIPLINE SQUAD CHECK / TDU1 REVIEW & RESOLUTION 5% 2.61% 0.13% 50 3 48
RESOLUTION / RESPONSE ON E-REVIEW COMMENTS 1.57% 0.00% 30 0 30
DATA ACQUISITION / DRAWING SEARCH 1.04% 0.00% 20 0 20
PROJECT SET-UP / DTDP / DDM / SEAL 0.52% 0.00% 10 0 10
COST ESTIMATE (±10%) - SUPPORT 1.57% 0.00% 30 0 30
INPUT TO PEP 0.52% 0.00% 10 0 10
TECHNICAL PEER REVIEW AND NMR REVIEW 3.39% 0.00% 65 0 65

LEGEND: NOTES:

SAUDI ARABIAN OIL COMPANY


THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION


REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED A 001 A


AND DATED

13
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering

DRA DRAFTING OFFICE PERIOD ENDING


PROGRESS
END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.

WING DD PACKAGE PROGRESS WEIGHTAGE


TO END OF THIS PERIOD

CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.

ROL WHEN READY FOR CHECKING

DRAWIN Early IFC- Early IFC- WEIGHTAG EARNED ISSUE TRANSMITTED


New-N / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED BUDGET REMAINING PERCENT COMPLETE HOURS REVISION
G SHEET 1 2 E DATE* TO FIELD
SIZE Revise- DRAWING TITLES REMARKS
NUMBE NO.
R
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

INSTRUMENTATION 15.16% 100.00% 15.16% 4052 657 3395 . . .

NON-DELIVERABLES
KICK OFF/MOBILIZATION/STAFFING PLAN/START UP CHECK LIST REQUIREMENTS 100% 0.30% 0.30% 12 12 0 . . . . . . . . . . . . . . . . . . . .
HAZOP Review Meeting 0.49% 0.00% 20 0 20
SIL Coordination 0.74% 0.00% 30 0 30
SITE SURVEY & REPORTS ( 8 DAYS) 65% 2.22% 1.44% 90 59 32 . . . . . . . . . . . . .
INPUTS TO PFD AND P&ID'S & REVIEWS 70% 1.48% 1.04% 60 42 18 . . . . . . . . . . . . . .
INPUT TO DTDP / DDM / SEAL/ APPROVED CHECKER 100% 0.49% 0.49% 20 20 0 . . . . . . . . . . . . . . . . . . . .
FEED VERIFICATION 90% 1.48% 1.33% 60 54 6 . . . . . . . . . . . . . . . . . .
Drawing Search and Retrieval 70% 0.74% 0.52% 30 21 9 . . . . . . . . . . . . . .
TIE IN & SPACE RESERVATION 20% 0.49% 0.10% 20 4 16 . . . .
PROJECT MEETINGS 22% 2.67% 0.59% 108 24 84 . . . . .
DISCIPLINE MEETINGSE 32% 1.78% 0.57% 72 23 49 . . . . . . .
PROGRESS REPORTING 30% 1.78% 0.53% 72 22 50 . . . . . .
PLOT PLAN REVIEWS 0.12% 0.00% 5 0 5
INTERFACE WITH OTHER DISCIPLINES 28% 0.89% 0.25% 36 10 26 . . . . .
SQUAD CHECKS 20% 1.23% 0.25% 50 10 40 . . . .
ATTEND QUALITY AUDIT 0.12% 0.00% 5 0 5
TPR REVIEW AND ACTIONS 0.12% 0.00% 5 0 5
CONSTRUCTABILITY SESSION 0.25% 0.00% 10 0 10
60,90% E-REVIEW SESSIONS 0.99% 0.00% 40 0 40
Risk Assessment Input 100% 0.12% 0.12% 5 5 0 . . . . . . . . . . . . . . . . . . . .
LLC & LLI SESSION 70% 0.25% 0.17% 10 7 3 . . . . . . . . . . . . . .
MR: MATERIAL REQUISTION 90% 0.99% 0.89% 40 36 4 . . . . . . . . . . . . . . . . . .
NMR: 601 REVIEW 3.46% 0.00% 140 0 140
NMR: 602 REVIEW 1.97% 0.00% 80 0 80
VENDOR DRAWING REVIEW 0.49% 0.00% 20 0 20
VENDOR DRAWING INCORPORATION 1.33% 0.00% 54 0 54
INPUT TO ELECTRICAL LOAD LIST 0.25% 0.00% 10 0 10
INPUT TO SCHEDULE 60% 0.39% 0.24% 16 10 6 . . . . . . . . . . . .
SPI ADMIN SETUP 2.96% 0.00% 120 0 120

COMMON DRAWINGS/ DCOUMENTS


IN-A10007 A 001 R EQUIPMENT LAYOUT,PROCESS INTERFACE BUILDING 2 X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
IN-A10007 A 002 R EQUIPMENT LAYOUT,PROCESS INTERFACE BUILDING 3 X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001-060 DOC: CONSTRUCTION SOW 04. Complete drafting 35% 1.48% 0.52% 60 21 39 . . . . . . .
E 001-040 DOC: BASIS OF DESIGN 05. Complete discipline check 40% 0.99% 0.39% 40 16 24 . . . . . . . .
INE10030 E 001-054 N SAFETY REQUIREMENT SPECIFICATION,EMERGENCY SHUTDOWN SYSTEM (ESD) X X 01. Data and information collect 5% 1.33% 0.07% 54 3 51
A 001 INSTRUMENT BLOCK DIAGRAM,OVERALL SYSTEM ARCHITECTURE-Q04 UNIT X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 002 INSTRUMENT BLOCK DIAGRAM, OVERALL SYSTEM ARCHITECTURE-Q11 UNIT X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001-024 FUNCTIONAL SPECIFICATION DOCUMENT DCS (PIB-3) X X X 07. Complete Squad Check 55% 0.59% 0.33% 24 13 11 . . . . . . . . . . .
E 001-032 FUNCTIONAL SPECIFICATION DOCUMENT ESD (PIB-3) X X X 07. Complete Squad Check 55% 0.79% 0.43% 32 18 14 . . . . . . . . . . .
E 001-018 FUNCTIONAL SPECIFICATION DOCUMENT VMS (PIB-3) X X X 07. Complete Squad Check 55% 0.37% 0.20% 15 8 7 . . . . . . . . . . .
E 001-012 SCH: INPUT-OUTPUT LIST , DISTRIBUTED CONTROL SYSTEM X X X 07. Complete Squad Check 55% 0.30% 0.16% 12 7 5 . . . . . . . . . . .
E 001-006 SCH: INPUT OUTPUT LIST,EMERGENCY SHUTDOWN SYSTEM X X X 07. Complete Squad Check 55% 0.15% 0.08% 6 3 3 . . . . . . . . . . .
E 001-003 SCH: INPUT-OUTPUT LIST,VIBRATION MONITORING SYSTEM X X X 07. Complete Squad Check 55% 0.07% 0.04% 3 2 1 . . . . . . . . . . .
E 001-018 FUNCTIONAL SPECIFICATION DOCUMENT DCS (PIB-2) X X X 07. Complete Squad Check 55% 0.44% 0.24% 18 10 8 . . . . . . . . . . .
E 001-024 FUNCTIONAL SPECIFICATION DOCUMENT VMS (PIB-2) X X X 07. Complete Squad Check 55% 0.59% 0.33% 24 13 11 . . . . . . . . . . .
E 001-038 FUNCTIONAL SPECIFICATION DOCUMENT BMS (PIB-2) X X X 07. Complete Squad Check 55% 0.94% 0.52% 38 21 17 . . . . . . . . . . .
E 001-008 SCH: INPUT-OTPUT LIST,DISTRIBUTED CONTROL SYSTEM (DCS) X X X 07. Complete Squad Check 55% 0.20% 0.11% 8 4 4 . . . . . . . . . . .
E 001-003 SCH:
MTO:INPUT-OUTPUT
MATERIALS FORLIST, VIBRATION MONITORING
DEBOTTLENECKING SYSTEM
ABU SAFAH GOSP(VMS)
WATER SEPARATION X X X 07. Complete Squad Check 55% 0.07% 0.04% 3 2 1 . . . . . . . . . . .
E 001-003 - QATIF,UA-24 (PCS SYSTEM) X X 00. Blank 0% 0.07% 0.00% 3 0 3
A 001-005 IPD: INSTRUMENT PIPING/INSTALLATION DETAIL X X X 07. Complete Squad Check 55% 0.99% 0.54% 40 22 18 . . . . . . . . . . .
A 001-004 IDT: INSTRUMENT MOUNTING DETAILS X X X 07. Complete Squad Check 55% 0.79% 0.43% 32 18 14 . . . . . . . . . . .
A 001-003 PNL: INSTRUMENT PANEL LAYOUT X X 01. Data and information collect 5% 0.59% 0.03% 24 1 23
A 001-003 RAK: INSTRUMENT RACK LAYOUT/DETAIL X X 01. Data and information collect 5% 0.59% 0.03% 24 1 23
A 001 CBL: CABLE ROUTING PLAN,OVERALL X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 002 CBL: CABLE ROUTING PLAN,ABUSAFAH GOSP & STABILISATION X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 003 CBL: CABLE ROUTING PLAN,COGEN. & UTILITIES AREA X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 001-008 LOG: LOGIC DIAGRAM X X 01. Data and information collect 5% 1.58% 0.08% 64 3 61

PRE-TREATER
A 001 N SCM: INSTRUMENT BLOCK DIAGRAM, PRE-TREATER X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 002 N SCM: INSTRUMENT BLOCK DIAGRAM, PRE-TREATER X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 003 N SCM: INSTRUMENT BLOCK DIAGRAM, PRE-TREATER X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001-002 N ISS FOR 42-AIT-0067A/B X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-003 N ISS FOR 42-AIT-0049/0050/0051 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-003 N ISS FOR 42-AIT-0053/0054/0055 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-002 N ISS FOR 42-AIT-0052/0056 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-AL-0058//0064, LEL BEACON X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-AA-0057/0063,GAS DETECTION HORNS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N ISS FOR 42-FE-0005,WATER FROM PRETREAER Q11-D-XXX1 TO WOSEP X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-FE-0005A,WATER FROM PRETREAER Q11-D-XXX2 TO WOSEP X X X 00. Blank 0% 0.02% 0.00% 1 0 1

14
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering

DRA DRAFTING OFFICE PERIOD ENDING


PROGRESS
END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.

WING DD PACKAGE PROGRESS WEIGHTAGE


TO END OF THIS PERIOD

CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.

ROL WHEN READY FOR CHECKING

DRAWIN Early IFC- Early IFC- WEIGHTAG EARNED ISSUE TRANSMITTED


New-N / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED BUDGET REMAINING PERCENT COMPLETE HOURS REVISION
G SHEET 1 2 E DATE* TO FIELD
SIZE Revise- DRAWING TITLES REMARKS
NUMBE NO.
R
R SIZING CALCULATION FOR 42-FE-0005,WATER FROM PRETREAER Q11-D-XXX1 TO 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

E 001 N WOSEP
SIZING CALCULATION FOR 42-FE-0005A,WATER FROM PRETREAER Q11-D-XXX2 TO X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N WOSEP
ISS FOR 42-FIT-0005A/0005B/0005AA/0005BA, PRODUCE WATER AT PRETREATER X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-004 N O/L X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001 N ISS FOR 42-FE-0008A,WET CRUDE TO Q11-D-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-FE-0008B,WET CRUDE TO Q11-D-XXX2 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-002 N ISS FOR 42-FIT-0008A/B,WET CRUDE TO Q11-D-XXX1/XXX2 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-FG-0006/0006A,PRE-TREATOR X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-004 N ISS FOR 42-LG-0009/0009A/0004/0004A,PRE-TREATOR X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 42-LG-0010/0010A/0011/0011A,PRE-TREATOR X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001 N ISS FOR 42-LIT-0012,PRE-TREATER D-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-LIT-0012A,PRE-TREATER D-XXX2 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-002 N ISS FOR 42-LIT-0014/0015,PRE-TREATOR X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-HV-0066A,WET CRUDE TO Q11-D-XXX1 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-HV-0066B,WET CRUDE TO Q11-D-XXX2 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012A,WATER FROM PRETREATER D-XXX1 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012B,WATER FROM PRETREATER D-XXX1 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012C,WATER FROM PRETREATER D-XXX2 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012D,WATER FROM PRETREATER D-XXX2 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-PIT-0023/0023A,PRE-TREATER (Q11-D-XXX1) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-003 N ISS FOR 42-PI-0029/0030/0022,PRE-TREATER Q11-D-XXX1 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-003 N ISS FOR 42-PI-0029A/0030A/0022A,PRE-TREATER Q11-D-XXX2 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001 N ISS FOR 42-LCP-0005,PRETREAER Q11-D-XXX1 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-ZV-0005,PRETREAER Q11-D-XXX1 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-012 N ISS FOR 42-PZV-0005/0006/0005A/0006A,PRE-TREATER X X X 00. Blank 0% 0.30% 0.00% 12 0 12
E 001 N ISS FOR 42-LCP-0005A,PRETREAER Q11-D-XXX2 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-ZV-0005A,PRETREAER Q11-D-XXX2 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-003 N SCH: IO LIST X X X 06. Issued for Squad Check 45% 0.07% 0.03% 3 1 2 . . . . . . . . .
D 001 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 002 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 003 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 004 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,TEMPERATURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE (FLOW INSTRUMENTS) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,RELIEF VALVES X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,LEVEL INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
B 001-032 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 3.16% 0.00% 128 0 128
A 001-006 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 1.18% 0.00% 48 0 48
A 001-004 ISD: Instrument Segment Diagram X X X 00. Blank 0% 0.79% 0.00% 32 0 32
A 001 N IPL: INSTRUMENT POINTS & LINES,PRE-TREATER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 002 N IPL:
MTO: INSTRUMENT POINTS
MATERIALS FOR & LINES, GAS DETECTOR
DEBOTTLENECKING LAYOUT
ABU SAFAH GOSP WATER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-008 N SEPARATION - QATIF,UA-11(DEHYDRATOR, PRETREATER) X X 00. Blank 0% 0.20% 0.00% 8 0 8
A 001 N LOG: CAUSE & EFFECT DIAGRAM,PRE-TREATER X X X 01. Data and information collect 5% 0.22% 0.01% 9 0 9
A 001-008 N LOG: LOGIC DIAGRAM X X 01. Data and information collect 5% 1.58% 0.08% 64 3 61

INSTRUMENT BLOCK DIAGRAM, CRUDE CHARGE PUMP


A 001 N SCM: INSTRUMENT BLOCK DIAGRAM, CRUDE CHARGE PUMP X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 002 N SCM: INSTRUMENT BLOCK DIAGRAM, CRUDE CHARGE PUMP X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 003 N SCM: INSTRUMENT BLOCK DIAGRAM,CRUDE CHARGE PUMPS-VMS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001 N ISS FOR 42-FE-0003,CRUDE CHARGE PUMP Q11-G-XXX1 OUTLET X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N SIZING CALCULATION FOR 42-FE-0003,CRUDE CHARGE PUMP Q11-G-XXX1 OUTLET X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N ISS FOR 42-FIT-0003,CRUDE CHARGE PUMP Q11-G-XXX1 OUTLET X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-FV-0003,CRUDE CHARGE PUMP Q11-G-XXX1 OUTLET X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-003 N ISS FOR 42-AIT-0029/0030/0031,CRUDE CHARGE PUMP Q11-G-XXX1 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001 N ISS FOR 42-AIT-0032,CRUDE CHARGE PUMP Q11-G-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 41-AL-0034, LEL BEACON X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 41-AA-0033,GAS DETECTION HORNS X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-MOV-0001,CRUDE CHARGE PUMP Q11-G-XXX1 SUCTION X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N ISS FOR 42-MOV-0002,CRUDE CHARGE PUMP Q11-G-XXX1 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-XV-0001,DRAIN FROM CRUDE CHARGE PUMP Q11-G-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N ISS FOR 42-XV-0002,UTILITY WATER TO CRUDE CHARGE PUMP Q11-G-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 003 N ISS FOR 42-XV-0003,UTILITY WATER TO CRUDE CHARGE PUMP Q11-G-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-002 N ISS FOR 42-PIT-0015/0017,CRUDE CHARGE PUMP G-XXX1 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N ISS FOR 42-TW-0016, CRUDE CHARGE PUMP X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-TI-0016 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-PDIT-0013 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-003 N SCH: IO LIST X X X 07. Complete Squad Check 55% 0.07% 0.04% 3 2 1 . . . . . . . . . . .
D 001-004 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.20% 0.00% 8 0 8
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,TEMPERATURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE (FLOW INSTRUMENTS) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE (MOV/AOV/HOV/GOV) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2

15
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering

DRA DRAFTING OFFICE PERIOD ENDING


PROGRESS
END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.

WING DD PACKAGE PROGRESS WEIGHTAGE


TO END OF THIS PERIOD

CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.

ROL WHEN READY FOR CHECKING

DRAWIN Early IFC- Early IFC- WEIGHTAG EARNED ISSUE TRANSMITTED


New-N / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED BUDGET REMAINING PERCENT COMPLETE HOURS REVISION
G SHEET 1 2 E DATE* TO FIELD
SIZE Revise- DRAWING TITLES REMARKS
NUMBE NO.
R
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
B 001-018 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 1.78% 0.00% 72 0 72
A 001-008 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 1.58% 0.00% 64 0 64
A 001-004 ISD: Instrument Segment Diagram X X X 00. Blank 0% 0.79% 0.00% 32 0 32
A 001 N IPL: INSTRUMENT POINTS & LINES, GAS DETECTOR LAYOUT X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 001 N IPL: INSTRUMENT POINTS & LINES, CRUDE CHARGE PUMP X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 002 N IPL: INSTRUMENT
MTO: POINTS
MATERIALS FOR & LINES, CRUDE CHARGE
DEBOTTLENECKING PUMP
ABU SAFAH GOSP WATER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-008 N SEPARATION - QATIF, UA-9(CRUDE CHARGE PUMPS) X X 00. Blank 0% 0.20% 0.00% 8 0 8
RA-381121 A 002 R LOG: CAUSE&EFFECT DIAGRAM,41-ZC-420 LPPT & LPDT X X X 00. Blank 0% 0.22% 0.00% 9 0 9
RA-381121 A 005 R LOG: CAUSE & EFFECT DIAGRAM, 41-ZC-423 CRUDE CHARGE PUMPS X X X 01. Data and information collect 5% 0.22% 0.01% 9 0 9
A 001-008 N LOG: LOGIC DIAGRAM X X 01. Data and information collect 5% 1.58% 0.08% 64 3 61

WET / DRY ECXCHANGER


A 001 N SCM: INSTRUMENT BLOCK DIAGRAM X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001-004 N ISS FOR 41-PI-0001/0002/0003/0004,PRESSURE AT WET/DRY EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 005-008 N ISS FOR 41-PI-0005/0006/0007/0008,PRESSURE AT WET/DRY EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 009 N ISS FOR 41-PI-0009,PRESSURE AT WET/DRY EXCHANGER X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 010-013 N ISS FOR 41-PI-0010/0011/0012/0014,PRESSURE AT WET/DRY EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 41-PDIT-0032/0033/0034/0035,WET/DRY CRUDE HEAT EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-002 N ISS FOR 41-FI-0001/0002,DRY CRUDE FROM Q11-E-XXX1/2/3/4 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N SIZING CALCULATION FOR 41-FE-0001,DRY CRUDE FROM Q11-E-XXX1/2/3/4 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 41-FE-0001,DRY CRUDE FROM Q11-E-XXX1/2/3/4 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N SIZING CALCULATION FOR 41-FE-0002,DRY CRUDE FROM Q11-E-XXX5/6/7/8 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N ISS FOR 41-FE-0002,DRY CRUDE FROM Q11-E-XXX5/6/7/8 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-002 N ISS FOR 41-TW-0001/0008,WET / DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 003-008 N ISS FOR 41-TW-0003/0004/0009/0010/0002/0011, DRY CRUDE FROM EXCHANGER X X X 00. Blank 0% 0.15% 0.00% 6 0 6
E 009-012 N ISS FOR 41-TW-0005/0012/0014/0021,WET CRUDE TO EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 013-016 N ISS FOR 41-TW-0006/0007/0013/0015,WET CRUDE TO EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-005 N ISS FOR 41-TI-0001/0002/0003/0004/0005 X X X 00. Blank 0% 0.12% 0.00% 5 0 5
E 006-010 N ISS FOR 41-TI-0006/0007/0008/0009/0010, X X X 00. Blank 0% 0.12% 0.00% 5 0 5
E 011-015 N ISS FOR 41-TI-0011/0012/0013/0014/0015, X X X 00. Blank 0% 0.12% 0.00% 5 0 5
E 001-003 N ISS FOR 41-AIT-0009/0010/0011,WET/DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 004-006 N ISS FOR 41-AIT-0012/0013/0014,WET/DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 007-009 N ISS FOR 41-AIT-0015/0016/0017,WET/DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 010-012 N ISS FOR 41-AIT-0018/0019/0020,WET/DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 013-015 N ISS FOR 41-AIT-0021/0022/0023,WET/DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 016-018 N ISS FOR 41-AIT-0024/0025/0026,WET/DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-002 N ISS FOR 41-AL-0028A/0060A,H2S BEACON X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 41-AL-0028B//0060B, LEL BEACON X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 41-AA-0027/0059,GAS DETECTION HORNS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-004 N SCH: IO LIST X X X 07. Complete Squad Check 55% 0.10% 0.05% 4 2 2 . . . . . . . . . . .
D 001-002 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.10% 0.00% 4 0 4
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE (FLOW INSTRUMENTS) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,LEVEL INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
B 001-024 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 2.37% 0.00% 96 0 96
A 001-004 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 0.79% 0.00% 32 0 32
A 001-003 ISD: Instrument Segment Diagram X X X 00. Blank 0% 0.59% 0.00% 24 0 24
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,TEMPERATURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE (FLOW INSTRUMENTS) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
A 001 N IPL: INSTRUMENT POINTS & LINES, GAS DETECTOR LAYOUT X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 002 N IPL: INSTRUMENT POINTS & LINES,WET/DRY CRUDE EXCHANGER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-008 N MTO: LIST OF MATERIALS X X 00. Blank 0% 0.20% 0.00% 8 0 8

CRUDE TRIM HEAT EXCHANGER AND TRIM CONDENSATE POT


A 001-002 N SCM: INSTRUMENT BLOCK DIAGRAM, CRUDE TRIM HEAT EXCHANGER X X X 07. Complete Squad Check 55% 0.44% 0.24% 18 10 8 . . . . . . . . . . .
E 001-003 N ISS FOR 42-AIT-0035/0036/0037,CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 004-006 N ISS FOR 42-AIT-0038/0039/0040, CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 007-009 N ISS FOR 42-AIT-0041/0042/0043,CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 010-012 N ISS FOR 42-AIT-0044/0045/0046,CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-002 N ISS FOR 42-AL-0048/0062, LEL BEACON X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-AA-0047,42-AA-0061, GAS DETECTION HORNS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N ISS FOR 42-FE-0007,STEAM TO CRUDE TRIM HEAT EXCHANGER Q11-E-XXX9 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N ISS FOR 42-FE-0007A,STEAM TO CRUDE TRIM HEAT EXCHANGER Q11-E-XX10 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 003 N ISS FOR 42-FE-0007B,STEAM TO CRUDE TRIM HEAT EXCHANGER Q11-E-XX11 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 004 N ISS FOR 42-FE-0007B,STEAM TO CRUDE TRIM HEAT EXCHANGER Q11-E-XX11 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-008 N ISS FOR 42-TW-0017/0017A/0017B/0017C,CONDENSATE WATER X X X 00. Blank 0% 0.20% 0.00% 8 0 8
E 009-024 N ISS FOR 42-TW-0018/0019/0018A/B/C/0019A/B/C,WET CRUDE TO EXCHANGER X X X 00. Blank 0% 0.39% 0.00% 16 0 16

16
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering

DRA DRAFTING OFFICE PERIOD ENDING


PROGRESS
END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.

WING DD PACKAGE PROGRESS WEIGHTAGE


TO END OF THIS PERIOD

CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.

ROL WHEN READY FOR CHECKING

DRAWIN Early IFC- Early IFC- WEIGHTAG EARNED ISSUE TRANSMITTED


New-N / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED BUDGET REMAINING PERCENT COMPLETE HOURS REVISION
G SHEET 1 2 E DATE* TO FIELD
SIZE Revise- DRAWING TITLES REMARKS
NUMBE NO.
R
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

E 025-028 N ISS FOR 42-TW-0026/0026A,CONDENSATE WATER X X X 00. Blank 0% 0.10% 0.00% 4 0 4


E 029-032 N ISS FOR 42-TW-0025/0025A,WET CRUDE X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 42-TE-0017/0017A/0017B/0017C, CONDENSATE POT X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 42-TIT-0017/0017A/0017B/0017C,CONDENSATE POT X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 005-008 N ISS FOR 42-TE-0018/0018A/0018B/0018C,CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 005-008 N ISS FOR
ISS FOR 42-TI-0016/0019/0025/0026/41-TI-0021,CRUDE
42-TIT-0018/0018A/0018B/0018C,CRUDE TRIM HEAT EXCHANGER
FRM CRUDE TRIM HEAT X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-005 N EXCHANGER
ISS FOR 42-TI-0019A/0019B/0019C/0025A/0026A,CRUDE FRM CRUDE TRIM HEAT X X X 00. Blank 0% 0.12% 0.00% 5 0 5
E 006-010 N EXCHANGER
SIZING CALCULATION FOR 42-FE-0007,STEAM TO CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.12% 0.00% 5 0 5
E 001 N Q11-E-XXX9
SIZING CALCULATION FOR 42-FE-0007A,STEAM TO CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N Q11-E-XX10
SIZING CALCULATION FOR 42-FE-0007B,STEAM TO CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 003 N Q11-E-XX11
SIZING CALCULATION FOR 42-FE-0007C,STEAM TO CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 004 N Q11-E-XX12
ISS FOR 42-FIT-0007/0007A/0007B/0007C,STEAM TO CRUDE TRIM HEAT X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-004 N EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001 N ISS FOR 42-FV-0007,STEAM TO CRUDE TRIM HEAT EXCH. Q11-E-XXX9 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N ISS FOR 42-FV-0007A,STEAM TO CRUDE TRIM HEAT EXCH. Q11-E-XX10 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 003 N ISS FOR 42-FV-0007B,STEAM TO CRUDE TRIM HEAT EXCH. Q11-E-XX11 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 004 N ISS FOR 42-FV-0007C,STEAM TO CRUDE TRIM HEAT EXCH. Q11-E-XX12 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-LV-0001,TRIM HEATER CONDENSATE POT Q11-D-XXX3 DISC X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 002 N ISS FOR 42-LV-0001A,TRIM HEATER CONDENSATE POT Q11-D-XXX4 DISC. X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 003 N ISS FOR 42-LV-0001B,TRIM HEATER CONDENSATE POT Q11-D-XXX5 DISC X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 004 N ISS FOR 42-LV-0001C,TRIM HEATER CONDENSATE POT Q11-D-XXX6 DISC. X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-004 N ISS FOR 42-LG-0002/0002A/0002B/0002C X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 005-008 N ISS FOR 42-LG-0003/0003A/0003B/0003C X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 42-LIT-0001/0001A/0001B/0001C,TRIM HEATER CONDENSATE POT X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 42-PIT-0019/0019A/XX19B/XX19C,TRIM HEATER CONDENSATE POT X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 42-PZV-0001/0001A/0001B/0001C,CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 005-008 N ISS FOR 42-PZV-0002/0002A/0002B/0002C,CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 41-PI-0016/0018/0020/0021,PRESSURE AT TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 005-008 N ISS FOR 41-PI-0018A/0020A/0021A/0018B,PRESSURE AT TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 009-012 N ISS FOR 41-PI-0020B/0021B/0018C/0020C,PRESSURE AT TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 013 N ISS FOR 41-PI-0021C,PRESSURE AT TRIM HEAT EXCHANGER X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-004 N SCH: IO LIST X X X 07. Complete Squad Check 55% 0.10% 0.05% 4 2 2 . . . . . . . . . . .
D 001-002 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.10% 0.00% 4 0 4
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE (FLOW INSTRUMENTS) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,RELIEF VALVES X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,LEVEL INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,TEMPERATURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
B 001-044 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 4.34% 0.00% 176 0 176
A 001-006 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 1.18% 0.00% 48 0 48
A 001-004 ISD: Instrument Segment Diagram X X X 00. Blank 0% 0.79% 0.00% 32 0 32
A 001 N IPL: INSTRUMENT POINTS & LINES, GAS DETECTOR LAYOUT X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 002 N IPL: INSTRUMENT POINTS & LINES,CRUDE TRIM HEAT EXGR.& COND.POT X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 003 N IPL: INSTRUMENT
MTO: MATERIALS POINTS & LINES,CRUDE TRIM
FOR DEBOTTLENECKING ABUHEAT EXGR.&
SAFAH GOSPCOND.POT
WATER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-016 N SEPARATION - QATIF,UA-7(CRUDE HEATING SYSTEM X X 00. Blank 0% 0.39% 0.00% 16 0 16

BOILER PACKAGE
A 001 N SCM: INSTRUMENT BLOCK DIAGRAM,H2S & LEL GAS DETECTORS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 002 N SCM: INSTRUMENT BLOCK DIAGRAM,AUXILIARY BOILER PACKAGE-DCS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 003 N SCM: INSTRUMENT BLOCK DIAGRAM,AUXILIARY BOILER PACKAGE-BMS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 004 N SCM: INSTRUMENT BLOCK DIAGRAM,AUXILIARY BOILER PACKAGE-VMS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001-002 N ISS FOR 99-AIT-0090/0091, AUXILIARY STEAM BOILER X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N ISS FOR 99-AA-0092, GAS DETECTION HORNS X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 99-AL-0093,H2S BEACON X X X 00. Blank 0% 0.02% 0.00% 1 0 1
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,TEMPERATURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
A 001-016 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 3.16% 0.00% 128 0 128
A 001-014 ISD: Instrument Segment Diagram X X X 00. Blank 0% 2.76% 0.00% 112 0 112
B 001-096 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 9.48% 0.00% 384 0 384
A 001 N IPL:
MTO: INSTRUMENT POINTS
MATERIALS FOR & LINES,
QATIF GOSP-1GAS DETECTOR LAYOUT
COGENERATION & UTILITIES, UA- X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-004 N 21(AUXILLIARY BOILER) X X 00. Blank 0% 0.10% 0.00% 4 0 4

LEGEND: NOTES:

SAUDI ARABIAN OIL COMPANY


THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION

17
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering

DRA DRAFTING OFFICE


LEGEND: NOTES:
PERIOD ENDING
PROGRESS
END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.

WING DD PACKAGE PROGRESS WEIGHTAGE


TO END OF THIS PERIOD

CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.

ROL WHEN READY FOR CHECKING

DRAWIN Early IFC- Early IFC- WEIGHTAG EARNED ISSUE TRANSMITTED


New-N / 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED BUDGET REMAINING PERCENT COMPLETE HOURS REVISION
G SHEET 1 2 E DATE* TO FIELD
SIZE Revise- DRAWING TITLES REMARKS
NUMBE NO.
R
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATEDEBOTTLENECKING
LETTER ABU
DATE SAFAH GOSP WATER SEPERATION
REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED A 001 A


AND DATED

18
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING START COMPL
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

Early Early DELIVERABL PROGRESS ISSUE TRANSMITTED


DATE 60% 90% IFC WBS SCHEDULE ID % COMPLT BUDGET EARNED REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
IFC-1 IFC-2 E TYPE MILESTONE
SHEET
DRAWING NUMBER SIZE New-N / Revise-R DRAWING TITLES REMARKS
NO.
START FINISH 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

COMMUNICATION #DIV/0! 0 0 0 ############################################################

1. DATA NETWORK

2. INPLANT VOICE PAGING SYSTEMS

3. SECURITY

4. OTHER DELIEVARABLES

5. OTHERS (NON-DELIVERABLES)

LEGEND: NOTES:
SAUDI ARABIAN OIL COMPANY
THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS
10-12862-0001-001
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION
REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED A 001 A


AND DATED

19
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING START COMPL
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD

CONTROL 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.
WHEN READY FOR CHECKING

Early Early DELIVERABL PROGRESS ISSUE TRANSMITTED


DATE 60% 90% IFC WBS SCHEDULE ID % COMPLT BUDGET EARNED REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
IFC-1 IFC-2 E TYPE MILESTONE
SHEET
DRAWING NUMBER SIZE New-N / Revise-R DRAWING TITLES REMARKS
NO.
START FINISH 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

COMMUNICATION #DIV/0! 0 0 0 ############################################################

20
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering

DRAWI DRAFTING OFFICE PERIOD ENDING


PROGRESS
END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.

NG DD PACKAGE PROGRESS WEIGHTAGE


TO END OF THIS PERIOD

CONTR 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.

OL WHEN READY FOR CHECKING

Early IFC- Early IFC- PROGRESS WEIGHTAG EARNED ISSUE TRANSMITTED


DRAWING SHEET New-N / 60% 90% IFC % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
SIZE DRAWING TITLES 1 2 MILESTONE E DATE* TO FIELD REMARKS
NUMBER NO. Revise-R
10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

Safety & Risk 21.49% 100.00% 21.49% 794 171 623 . . . . .

GENERAL ENGINEERING (COMMON)


50 FIRE PROTECTION PHILOSOPHY X X X 02. Start drafting 10% 3.78% 0.38% 30 3 27 . .

5 FIRE PROTECTION DATASHEETS X X X 00. Blank 0% 0.00% 0.00%


20 ELECTRICAL AREA CLASSIFICATION REPORT AND SCHEDULE X X X 00. Blank 0% 0.00% 0.00%
20 FIREFIGHTING EQUIPMENT TECHNICAL SPECIFICATION X X X 00. Blank 0% 2.64% 0.00% 21 0 21
1 LINE DESIGNATION TABLE (LDT) FW-X001 THROUGH FW-X025 X X X 00. Blank 0% 1.26% 0.00% 10 0 10
1 LINE DESIGNATION TABLE (LDT) FW-X001 THROUGH FW-X025 X X X 00. Blank 0% 1.26% 0.00% 10 0 10
300 FIREWATER HYDRAULIC CALCULATION (STEADY STATE) X X X 00. Blank 0% 7.56% 0.00% 60 0 60
50 FIRE AND GAS DETECTION SPECIFICATION X X X 00. Blank 0% 3.78% 0.00% 30 0 30
10 FIRE AND GAS CAUSE AND EFFECT DIAGRAM X X X 00. Blank 0% 3.15% 0.00% 25 0 25
FIRE PROTECTION NMR (NON-MATERIAL REQUISITION) X X X 00. Blank 0% 3.15% 0.00% 25 0 25
FIRE PROTECTION TECHNICAL BID EVALUATION AND CLARIFICATIONS 00. Blank 0% 3.15% 0.00% 25 0 25

LAYOUT ###
1 LEGENDS, ABBREVIATIONS AND GENERAL NOTES - FIRE PROTECTION SYSTEM X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER NETWORK LAYOUT - (Q04) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER NETWORK LAYOUT - (Q011) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER NETWORK DEMOLITION LAYOUT (Q04) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER NETWORK DEMOLITION LAYOUT (Q110 X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER P&ID (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER P&ID (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER P&ID DEMOLITION (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER P&ID DEMOLITION (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER MONITOR COVERAGE LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER MONITOR COVERAGE LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 LIVE HOSE REEL COVERAGE LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 LIVE HOSE REEL COVERAGE LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE RISK AREA LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE RISK AREA LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
2 FIRE PROTECTION MISCELLANEOUS DETAILS X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE AND GAS DETECTOR LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE AND GAS DETECTOR LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 ELECTRICAL AREA CLASSIFICATION DRAWING (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 ELECTRICAL AREA CLASSIFICATION DRAWING (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE HAZARDOUS AREA DRAWING / FIREPROOFING LAYOUT (Q04) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIRE HAZARDOUS AREA DRAWING / FIREPROOFING LAYOUT (Q11) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER TIE-IN INDEX X X X 00. Blank 0% 1.51% 0.00% 12 0 12

OTHERS (NON-DELIVERABLES)
FEED VERIFICATION 100% 10.58% 10.58% 84 84 0 . . . . . . . . . . . . . . . . . . . .
PE FIRE PROTECTION SCOPE OF WORK/TBE/ PE COMMENT RESOLUTION 15% 5.04% 0.76% 40 6 34 . . .

HAZOP ATTENDANCE 2.52% 0.00% 20 0 20


LOPA ATTENDANCE 2.52% 0.00% 20 0 20
CLIENT COORDINATION MEETINGS 40% 3.78% 1.51% 30 12 18 . . . . . . . .
INTERNAL COORDINATION MEETINGS 42% 3.78% 1.59% 30 13 17 . . . . . . . . .
SITE VISITS / MARKUPS / REPORTS 90% 3.78% 3.40% 30 27 3 . . . . . . . . . . . . . . . . . .

DRAWINGS SEARCH AND RETRIEVAL 80% 2.52% 2.02% 20 16 4 . . . . . . . . . . . . . . . .

INTERDISCIPLINE SQUAD CHECK 1.26% 0.00% 10 0 10


PROJECT SETUP / DTDP / DDM / SEAL 100% 1.26% 1.26% 10 10 0 . . . . . . . . . . . . . . . . . . . .

TECHNICAL PEER REVIEW AND NMR REVIEW 2.52% 0.00% 20 0 20


INPUT TO 3D MODEL 1.26% 0.00% 10 0 10
3D MODEL REVIEW 1.26% 0.00% 10 0 10
VENDOR DRAWING REVIEW 1.26% 0.00% 10 0 10
VENDOR DRAWING INCORPORATION 1.26% 0.00% 10 0 10
LEGEND: NOTES:

SAUDI ARABIAN OIL COMPANY


THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION


REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED A 001 A


AND DATED

21
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering

DRAWI DRAFTING OFFICE PERIOD ENDING


PROGRESS
END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.

NG DD PACKAGE PROGRESS WEIGHTAGE


TO END OF THIS PERIOD

CONTR 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE


DESIGN ENG.

OL WHEN READY FOR CHECKING

Early IFC- Early IFC- PROGRESS WEIGHTAG EARNED ISSUE TRANSMITTED


DRAWING SHEET New-N / 60% 90% IFC % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
SIZE DRAWING TITLES 1 2 MILESTONE E DATE* TO FIELD REMARKS
NUMBER NO. Revise-R
10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

CMP 30.00% 100.00% 30.00% 136 41 95 . . . . . .

GENERAL ENGINEERING (COMMON)


Detailed Process Description 30% 5.88% 1.76% 8 2 6 . . . . . .
Materials Selection Philosophy 30% 5.88% 1.76% 8 2 6 . . . . . .
Material Selection Diagrams (MSDs) 30% 5.88% 1.76% 8 2 6 . . . . . .
Material Selection Tables (MSTs) 30% 5.88% 1.76% 8 2 6 . . . . . .
Corrosion Loops (CLs) & Damage Mechanisms (DMs) 30% 5.88% 1.76% 8 2 6 . . . . . .

Corrosion Loop Diagrams (CLD) 30% 5.88% 1.76% 8 2 6 . . . . . .

Corrosion Risk Assessment 30% 5.88% 1.76% 8 2 6 . . . . . .


Chemical Inhibition & Water Wash 30% 5.88% 1.76% 8 2 6 . . . . . .
Coatings Selection Plan (stand-alone input in index H) 30% 5.88% 1.76% 8 2 6 . . . . . .

On-Stream Inspection (OSI) Plan 30% 5.88% 1.76% 8 2 6 . . . . . .

Intrusive Corrosion Monitoring 30% 5.88% 1.76% 8 2 6 . . . . . .

Process Fluid Sampling 30% 5.88% 1.76% 8 2 6 . . . . . .

Integrity Operating Windows (IOW) 30% 5.88% 1.76% 8 2 6 . . . . . .


CMP Dashboards & KPIs 30% 5.88% 1.76% 8 2 6 . . . . . .
CMP Strategies during construction 30% 5.88% 1.76% 8 2 6 . . . . . .

CMP Strategies before, during and subsequent to commissioning 30% 5.88% 1.76% 8 2 6 . . . . . .

Damage Mechanism Narratives 30% 5.88% 1.76% 8 2 6 . . . . . .


0.00% 0.00% 0 0

LEGEND: NOTES:

SAUDI ARABIAN OIL COMPANY


THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS

DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION


REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED A 001 A


AND DATED

22
00. Blank 0% 0%
1 01. Data and information collection 5% 5%
2 02. Start drafting 5% 10%
3 03. Issued for Discipline/Internal Check 5% 15%
4 04. Complete drafting 20% 35%
5 05. Complete discipline check 5% 40%
6 06. Issued for Squad Check 5% 45%
7 07. Complete Squad Check 10% 55%
8 08. Issue for Client Review 5% 60%
09. Comments and Vendor Information
9 15% 75%
Incorporation
10 10. Complete Discipline Check 5% 80%
11 11. Complete Squad Checking 5% 85%
12 12. Issue for Client Approval 5% 90%
13 13. Issue for Construction (IFC) 10% 100%

Procurement Support
00. Blank 0% 0%
01. MR prepared and reviewed by owner 10% 10%
discipline
02. Issued for Squad Check 5% 15%
03. Complete Squad Check 5% 20%
04. Issued for Client Review 10% 30%
05. Comments Incorporation 10% 40%
06. Issued for Client Use 15% 55%
07. TBE issued for Client 15% 70%
08. Vendor Drawing Reviews 1 and 2 20% 90%
09. Vendor Drawing Approval 10% 100%