1
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DRAFTING
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD
ISSUE TRANSMITTED
DRAWING DATE 50% 90% 100% WBS SCHEDULE ID DELIVERABLE TYPE PROGRESS MILESTONE % COMPLT BUDGET EARNED REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size SHEET NO. New-N / Revise-R DRAWING TITLES REMARKS
NUMBER
START FINISH 30 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE
2. VIPS 0% 0
3. RAPID MATRIX X 0% 0
7. PROCUREMENT
8. SCHEDULING
9. ESTIMATING
11. QUALITY
2
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DRAFTING
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD
ISSUE TRANSMITTED
DRAWING DATE 50% 90% 100% WBS SCHEDULE ID DELIVERABLE TYPE PROGRESS MILESTONE % COMPLT BUDGET EARNED REMAINING PERCENT COMPLETE DATE*
HOURS REVISION
TO FIELD
Size SHEET NO. New-N / Revise-R DRAWING TITLES REMARKS
NUMBER
START FINISH 30 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE
LEGEND: NOTES:
THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION
REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
3
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE Progress WEIGHTAGE
TO END OF THIS PERIOD
PR-A10002.001 A N CRUDE CHARGE PUMP X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
PR-A10003.001 A N CRUDE TRIM HEAT EXCHANGER E- XXX9 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
PR-A10004.001 A N PUMP CONTROL (011-G-XXX1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
PR-A10008.001 A N CRUDE TRIM HEAT EXCHANGER E- XX10 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
PR-A10009.001 A N CRUDE TRIM HEAT EXCHANGER E- XX11 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
PR-A10010.001 A N CRUDE TRIM HEAT EXCHANGER E- XX12 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
PR-A20011.001 A N AUXILIARY BOILER PACKAGE X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371039.001 A R WET / DRY CRUDE EXCHANGERS (1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371039.002 A R WET / DRY CRUDE EXCHANGERS (2) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371040.001 A R LOW PRESSURE DEGASSING TANK TRAIN 1 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371041.001 A R LOW PRESSURE DEGASSING TANK TRAIN 2 X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371043.001 A R CRUDE CHARGE PUMP (1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371043.011 A R CRUDE TRIM HEAT EXCHANGER (1) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371043.012 A R CRUDE TRIM HEAT EXCHANGER (2) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371043.013 A R CRUDE TRIM HEAT EXCHANGER (3) X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371049.002 A R OIL AND GAS SAMPLE CONNECTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371049.003 A R TYPIAL FOR SMART ZV VALVES X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371049.004 A R TYPICAL FOR MOV DETAILS X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371051.003 A R UTILITY WATER DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371053.001 A R STEAM /CONDENSATE DISTRIBUTION AREA X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371054.002 A R 300# PRESSURE SEWER X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-377628.001 A R BULK CHEMICAL DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-377915.010 A R UTILITY WATER DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-377918.003 A R COOLING WATER DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-377921.001 A R DEAERATOR AND BFW PUMPS X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-377951.001 A R FUEL GAS SUPERHEATERS X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-3779952.008 A R INSTRUMENT AIR DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-377952.025 A R UTILITY AIR DISTRIBUTION X X X 02. Start drafting 10% 0.66% 0.07% 12 1 11 . .
RA-371039.001 A R DEMOLITION WET / DRY CRUDE EXCHANGERS (1) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371039.002 A R DEMOLITION WET / DRY CRUDE EXCHANGERS (2) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371040.001 A R DEMOLITION LOW PRESSURE DEGASSING TANK TRAIN 1 X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing
RA-371041.001 A R DEMOLITION LOW PRESSURE DEGASSING TANK TRAIN 2 X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing
RA-371043.001 A R DEMOLITION CRUDE CHARGE PUMP (1) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371043.011 A R DEMOLITION CRUDE TRIM HEAT EXCHANGER (1) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371043.012 A R DEMOLITION CRUDE TRIM HEAT EXCHANGER (2) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371043.013 A R DEMOLITION CRUDE TRIM HEAT EXCHANGER (3) X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371044.001 A R DEMOLITION DEHYDRATOR X X X 00. Blank 0% 0.44% 0.00% 8 0 8
RA-371049.002 A R DEMOLITION OIL AND GAS SAMPLE CONNECTION X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing
RA-371049.003 A R DEMOLITION TYPIAL FOR SMART ZV VALVES X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing
RA-371049.004 A R DEMOLITION TYPICAL FOR MOV DETAILS X X X 00. Blank 0% 0.00% 0.00% 0 0 No demolition scope in this drawing
4
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE Progress WEIGHTAGE
TO END OF THIS PERIOD
Deliverable Reports X X X
E FEED VERIFICATION REPORT X X X 100% 5.36% 5.36% 98 98 0 . . . . . . . . . . . . . . . . . . . .
E PROCESS BASIS OF DESIGN X X X 00. Blank 0% 1.09% 0.00% 20 0 20
E SIMULATION REPORT X X X 00. Blank 0% 1.64% 0.00% 30 0 30
E UTILITY SUMMARY REPORT X X X 00. Blank 0% 2.74% 0.00% 50 0 50
E PROCESS CONTROL PHILOSOPHY X X X 00. Blank 0% 1.37% 0.00% 25 0 25
E PROCESS EQUIPMENT LIST X X X 00. Blank 0% 0.82% 0.00% 15 0 15
E HYDRAULIC CALCULATION REPORT (SINGLE PHASE) X X X 02. Start drafting 10% 4.10% 0.41% 75 8 68 . .
5
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD
GENERAL
E 15 N ELECTRICAL DESIGN BASIS X X X 03. Issued for Discipline/Internal C 15% 0.59% 0.09% 20 3 17 . . .
E 100 N SITE SURVEY & REPORTS ( 8 DAYS) X 60% 3.95% 2.37% 136 82 54 . . . . . . . . . . . .
E 25 N CONSTRUCTION SCOPE OF WORK - ELECTRICAL INPUT X X X 0% 0.99% 0.00% 34 0 34
E 20 N ELECTRICAL LOAD LIST & EQUIPMENT ADEQUACY CALCULATIONS AT SS # 4 & 5 X X X 03. Issued for Discipline/Internal C 15% 0.79% 0.12% 27 4 23 . . .
E 14 N EXISTING AC UPS & BATTERY ADEQUACY CALCULATIONS AT PIB # 2 & 3 X X X 02. Start drafting 10% 0.51% 0.05% 18 2 16 . .
E 250 N ETAP SYSTEM STUDIES (LOAD FLOW, SHORT CIRCUIT , MOTOR STARTING,ARC FLASH & X X X 00. Blank 0% 9.88% 0.00% 340 0 340
PROTECTIVE RELAY COORDINATION STUDIES)
E 8 N DATA SHEET - POWER PANELBOARDS X X X 02. Start drafting 10% 0.32% 0.03% 11 1 10 . .
E 4 N DATA SHEET - DRY TYPE TRANSFORMERS X X X 02. Start drafting 10% 0.16% 0.02% 5 1 5 . .
E 8 N DATA SHEET - 13.8 KV CRUDE DISCHARGE PUMP MOTOR X X X 02. Start drafting 10% 0.32% 0.03% 11 1 10 . .
E 8 N DATA SHEET - 4.16 KV FORCED DRAFT FAN MOTOR X X X 02. Start drafting 10% 0.32% 0.03% 11 1 10 . .
E 69 N ELECTRICAL "MTO" - POWER,GROUNDING & LIGHTING (SS#5,4 & PIB#2,3 & UTILITIES AND X X 00. Blank 0% 2.73% 0.00% 94 0 94
CRUDE HANDLING AREA)
PIB#2 BUILDING#208
A 1 N AC UPS ELECTRICAL ONE LINE DIAGRAM X X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N ELECTRICAL CABLE TRAY/PLAN/LAYOUT X X X 03. Issued for Discipline/Internal C 15% 0.47% 0.07% 16 2 14 . . .
A 1 N INSTRUMENT CABLE LAYOUT/PLAN X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 4 N ELECTRICAL WIRING DIAGRAM OF UPS FEEDERS X X X 04. Complete drafting 35% 1.86% 0.65% 64 22 42 . . . . . . .
A 1 N ELECTRICAL WIRING DIAGRAM OF NON UPS FEEDERS X X X 02. Start drafting 10% 0.47% 0.05% 16 2 14 . .
PIB#3 BUILDING#207
A 1 N AC UPS ELECTRICAL ONE LINE DIAGRAM X X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N ELECTRICAL CABLE TRAY/PLAN/LAYOUT X X X 03. Issued for Discipline/Internal C 15% 0.47% 0.07% 16 2 14 . . .
A 1 N INSTRUMENT CABLE LAYOUT/PLAN X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 2 N ELECTRICAL WIRING DIAGRAM OF UPS FEEDERS X X X 03. Issued for Discipline/Internal C 15% 0.93% 0.14% 32 5 27 . . .
A 1 N ELECTRICAL WIRING DIAGRAM OF NON UPS FEEDERS X X X 00. Blank 0% 0.47% 0.00% 16 0 16
A 1 N GROUNDING LAYOUT - PIB#3 X X X 00. Blank 0% 0.47% 0.00% 16 0 16
D 1 N CABLE & CONDUIT SCHEDULE- PIB#3 X X X 00. Blank 0% 0.12% 0.00% 4 0 4
A 1 N INSTALLATION DETAILS CABLE ENTRY X X 00. Blank 0% 0.47% 0.00% 16 0 16
6
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD
PDS ELECTRICAL
N PDS LIGHTING MODELLING AT UTILITIES, CRUDE HANDLING AREA & PIPERACK X X X 00. Blank 0% 1.25% 0.00% 43 0 43
N ELECTRICAL UG CABLE TRENCH MODELLING X X X 00. Blank 0% 1.25% 0.00% 43 0 43
N CABLE TRAY MODELLING ON PIPERACKS X X 00. Blank 0% 1.25% 0.00% 43 0 43
N PDS MODELLING - CLASH CHECKING / BACKDRAFTING/MODEL REVIEWS X X 00. Blank 0% 0.61% 0.00% 21 0 21
N PDS MODELLING - FINALISE / ISSUE OUTPUTS X X 00. Blank 0% 0.61% 0.00% 21 0 21
N MR,TBE & NMR FOR BMS/DCS/ESD CABINETS POWERING REQUIREMENTS X X 00. Blank 0% 0.61% 0.00% 21 0 21
NON-DELIVERABLES
N KICK OFF/MOBILIZATION/STAFFING PLAN/START UP CHECK LIST REQUIREMENTS X X X 90% 0.29% 0.26% 10 9 1 . . . . . . . . . . . . . . . . . .
N INPUTS TO PFD AND P&ID'S & REVIEWS X X X 0.58% 0.00% 20 0 20
N INPUT TO DTDP / DDM / SEAL/ APPROVED CHECKER X X X 25% 0.29% 0.07% 10 3 8 . . . . .
N FEED VERIFICATION X X X 100% 1.31% 1.31% 45 45 0 . . . . . . . . . . . . . . . . . . . .
7
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING TO END OF THIS PERIOD
PROGRESS WEIGHTAGE
CONTROL 19-Feb-20 DRAWING IS CONSIDERED 65% COMPLETE
DESIGN ENG.
WHEN READY FOR CHECKING
EARNED
DRAWING SHEET New-N / WEIGHTAG ISSUE TRANSMITTED
Size DOCUMENT/DRAWING TITLES % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION REMARKS
NUMBER NO. Revise-R E DATE* TO FIELD
E TECHNICAL SPECIFICATION FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING X X X 00. Blank 0% 1.03% 0.00% 20 0 20
DEMULSFIER SKID
E SIS FOR PRE-TREATERS X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR CONDENSATE POTS X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR WET/DRY CRUDE HEAT EXCHANGER X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR CRUDE TRIM HEAT EXCHANGER X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR AUXILIARY BOILER (Not included in the SOW) X X 00. Blank 0% 0.00% 0.00% 0 0 ###
E SIS FOR API CHARGE PUMP X X 00. Blank 0% 0.52% 0.00% 10 0 10 ###
E SIS FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X X 00. Blank 0% 0.52% 0.00% 10 0 10
INDEX D ###
D MDS FOR PRE-TREATERS X X X 00. Blank 0% 1.03% 0.00% 20 0 20 ###
D MDS FOR CONDENSATE POTS X X X 00. Blank 0% 0.78% 0.00% 15 0 15 ###
D MDS FOR BOILER STEAM DRUM (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 1.03% 0.00% 20 0 20
D MDS FOR BOILER WATER DRUM (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 1.03% 0.00% 20 0 20
INDEX E ###
D MDS FOR WET/DRY CRUDE HEAT EXCHANGER X X X 00. Blank 0% 1.03% 0.00% 20 0 20 ###
D MDS FOR CRUDE TRIM HEAT EXCHANGER X X X 00. Blank 0% 1.03% 0.00% 20 0 20
INDEX F
D MDS FOR AUXILIARY BOILER (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 1.03% 0.00% 20 0 20
INDEX G
E MDS FOR API CHARGE PUMP X X X 00. Blank 0% 1.03% 0.00% 20 0 20
E NOISE DATA SHEET FOR API CHARGE PUMP X X 00. Blank 0% 0.52% 0.00% 10 0 10
E MDS FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X X X 00. Blank 0% 1.03% 0.00% 20 0 20 ###
E NOISE DATA SHEET FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER X X 00. Blank 0% 0.52% 0.00% 10 0 10
SKID ###
INDEX K
E MDS FOR FORCED DRAFT FAN (A PART OF THE BOILER PACKAGE) X X X 00. Blank 0% 0.52% 0.00% 10 0 10
E NOIS DATA SHEET FOR FORCED DRAFT FAN X X 00. Blank 0% 0.52% 0.00% 10 0 10
INDEX U ###
E MDS AUXILIARY BOILER PACKAGE X X X 00. Blank 0% 1.03% 0.00% 20 20 ###
MR (INPUT AND REVIEW) ###
MR FOR PRE-TREATERS X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR CONDENSATE POTS X 10. Complete Discipline Check 80% 1.81% 1.45% 35 28 7
MR FOR WET/DRY CRUDE HEAT EXCHANGER X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR CRUDE TRIM HEAT EXCHANGER X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR AUXILIARY BOILER X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR API CHARGE PUMP X 10. Complete Discipline Check 80% 2.33% 1.86% 45 36 9 ###
MR FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X 10. Complete Discipline Check 80% 1.55% 1.24% 30 24 6
TBE (3 BIDDERS, 2 REVIEW CYCLES FOR EACH) ###
TBE FOR PRE-TREATERS X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR CONDENSATE POTS X 00. Blank 0% 3.10% 0.00% 60 0 60
TBE FOR WET/DRY CRUDE HEAT EXCHANGER X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR CRUDE TRIM HEAT EXCHANGER X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR AUXILIARY BOILER X 00. Blank 0% 4.13% 0.00% 80 0 80
TBE FOR API CHARGE PUMP X 00. Blank 0% 2.33% 0.00% 45 0 45
TBE FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X 00. Blank 0% 2.33% 0.00% 45 0 45
NMR 601 & 602 ( 2 REVIEW CYCLES)
NMR FOR PRE-TREATERS X 00. Blank 0% 3.62% 0.00% 70 0 70
NMR FOR CONDENSATE POTS X 00. Blank 0% 2.58% 0.00% 50 0 50
NMR FOR WET/DRY CRUDE HEAT EXCHANGER X 00. Blank 0% 3.10% 0.00% 60 0 60
NMR FOR CRUDE TRIM HEAT EXCHANGER X 00. Blank 0% 3.10% 0.00% 60 0 60
NMR FOR AUXILIARY BOILER X 00. Blank 0% 4.13% 0.00% 80 0 80
NMR FOR API CHARGE PUMP X 00. Blank 0% 2.07% 0.00% 40 0 40
NMR FOR AM DE-EMULSIFIER DOSING PUMP FOR THE EXISTING DEMULSFIER SKID X 00. Blank 0% 2.07% 0.00% 40 0 40
Non Deliverables
WEEKLY REPORTS & PROGRESS UPDATE MEETINGS WITH CLIENT 55% 1.81% 0.99% 35 19 16
INTERNAL COORDINATION MEETINGS 45% 1.29% 0.58% 25 11 14
SITE VISITS (INCLUDING THE REPORT) 100% 0.78% 0.78% 15 15 0
FEED VERIFICATION 100% 1.55% 1.55% 30 30 0
INTERNAL COORDINATION FOR DELIVERING DOCUMENTS 10% 2.33% 0.23% 45 5 41
9
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRA PROGRESS
WING TO END OF THIS PERIOD
DD PACKAGE PROGRESS WEIGHTAGE
CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE
DESIGN ENG.
ROL WHEN READY FOR CHECKING
10
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
DRA PROGRESS
WING TO END OF THIS PERIOD
DD PACKAGE PROGRESS WEIGHTAGE
CONT 30-Oct-20 DRAWING IS CONSIDERED 65% COMPLETE
DESIGN ENG.
ROL WHEN READY FOR CHECKING
THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION
REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
11
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD
EARNED
New- Early Early WEIGHTAG ISSUE TRANSMITTED
SHE 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
DRAWING N/ IFC-1 IFC-2 E DATE* TO FIELD
Size ET DRAWING TITLES REMARKS
NUMBER Revise-
NO.
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE
12
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING DD PACKAGE PROGRESS WEIGHTAGE
TO END OF THIS PERIOD
EARNED
New- Early Early WEIGHTAG ISSUE TRANSMITTED
SHE 60% 90% IFC PROGRESS MILESTONE % COMPLT EARNED HOURS REMAINING PERCENT COMPLETE HOURS REVISION
DRAWING N/ IFC-1 IFC-2 E DATE* TO FIELD
Size ET DRAWING TITLES REMARKS
NUMBER Revise-
NO.
R 10% 20% 30% 40% 50% 60% 70% 80% 90%### SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "S' SITE DEMOLITION SUBJECT TO AVAILABILITY OF DATA
CI-000103 D E SITE DEVELOPMENT-CO GENERATION AND UTILITIES X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000104 D E SITE DEVELOPMENT-GOSP AND CRUDE HANDLING X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000105 D E SITE DEVELOPMENT-CO GENERATION AND UTILITIES X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000106 D E SITE DEVELOPMENT-GOSP AND CRUDE HANDLING X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000107 D E SITE GRADING & STORM DRAINAGE PLAN---CO GENERATION AND UTILITIES X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000108 D E SITE GRADING & STORM DRAINAGE PLAN---GOSP AND CRUDE HANDLING X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000109 D E NON-ELECTRICAL UTILITIES PLAN - CO GEN UTILITIES OVERALL LAYOUT X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000110 D E NON-ELECTRICAL UTILITIES PLAN - CO GEN UTILITIES ENLARGED LAYOUT SH 1 &2 X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000111 D E NON-ELECTRICAL UTILITIES PLAN - GOSP AND CRUDE HANDLING OVERALL LAYOUT X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000112 D E NON-ELECTRICAL UTILITIES PLAN - CO GEN UTILITIES ENLARGED LAYOUT SH 1 2 3 & 4 X X X X 00. Blank 0% 0.78% 0.00% 15 0 15 SUBJECT TO AVAILABILITY OF DATA
CI-000113 D E GENERAL CIVIL - OILY WATER (OWS) MANHOLES - SCHEDULE X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000114 D E GENERAL CIVIL - OILY WATER (OWS) CATCHBASINS - SCHEDULE X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000115 D E PIT DETAILS - OILY WATER HOLDING PIT TK-1 TO TK-4 (SHT 1/2) X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000116 D E PIT DETAILS - OILY WATER HOLDING PIT TK-1 TO TK-4 (SHT 2/2) X X X X 00. Blank 0% 0.26% 0.00% 5 0 5 SUBJECT TO AVAILABILITY OF DATA
CI-000117 D E GENERAL CIVIL CALCULATIONS - OILY WATER NETWORK-I X X X 00. Blank 0% 1.30% 0.00% 25 0 25 SUBJECT TO AVAILABILITY OF DATA
SUBJECT TO AVAILABILITY OF DATA
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -INDEX "A"
CI-000121 3 D MODELLING X X X 00. Blank 0% 9.13% 0.00% 175 0 175
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPARATION - QATIF -GENERAL JOB CO_ORDINATION AND PREPARATION
CLIENT COORDINATION MEETINGS 5% 3.91% 0.20% 75 4 71
INTERNAL COORDINATION MEETINGS 5% 2.61% 0.13% 50 3 48
DRAWING CONTROL LIST PREPARATION UPDATE / PROGRESS 60% 1.57% 0.94% 30 18 12 . . . . . . . . . . . .
SITE VISITS / MARK-UPS / REPORTS (4site visit)* 60% 3.39% 2.04% 65 39 26 . . . . . . . . . . . .
INTER-DISCIPLINE SQUAD CHECK / TDU1 REVIEW & RESOLUTION 5% 2.61% 0.13% 50 3 48
RESOLUTION / RESPONSE ON E-REVIEW COMMENTS 1.57% 0.00% 30 0 30
DATA ACQUISITION / DRAWING SEARCH 1.04% 0.00% 20 0 20
PROJECT SET-UP / DTDP / DDM / SEAL 0.52% 0.00% 10 0 10
COST ESTIMATE (±10%) - SUPPORT 1.57% 0.00% 30 0 30
INPUT TO PEP 0.52% 0.00% 10 0 10
TECHNICAL PEER REVIEW AND NMR REVIEW 3.39% 0.00% 65 0 65
LEGEND: NOTES:
CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
13
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
NON-DELIVERABLES
KICK OFF/MOBILIZATION/STAFFING PLAN/START UP CHECK LIST REQUIREMENTS 100% 0.30% 0.30% 12 12 0 . . . . . . . . . . . . . . . . . . . .
HAZOP Review Meeting 0.49% 0.00% 20 0 20
SIL Coordination 0.74% 0.00% 30 0 30
SITE SURVEY & REPORTS ( 8 DAYS) 65% 2.22% 1.44% 90 59 32 . . . . . . . . . . . . .
INPUTS TO PFD AND P&ID'S & REVIEWS 70% 1.48% 1.04% 60 42 18 . . . . . . . . . . . . . .
INPUT TO DTDP / DDM / SEAL/ APPROVED CHECKER 100% 0.49% 0.49% 20 20 0 . . . . . . . . . . . . . . . . . . . .
FEED VERIFICATION 90% 1.48% 1.33% 60 54 6 . . . . . . . . . . . . . . . . . .
Drawing Search and Retrieval 70% 0.74% 0.52% 30 21 9 . . . . . . . . . . . . . .
TIE IN & SPACE RESERVATION 20% 0.49% 0.10% 20 4 16 . . . .
PROJECT MEETINGS 22% 2.67% 0.59% 108 24 84 . . . . .
DISCIPLINE MEETINGSE 32% 1.78% 0.57% 72 23 49 . . . . . . .
PROGRESS REPORTING 30% 1.78% 0.53% 72 22 50 . . . . . .
PLOT PLAN REVIEWS 0.12% 0.00% 5 0 5
INTERFACE WITH OTHER DISCIPLINES 28% 0.89% 0.25% 36 10 26 . . . . .
SQUAD CHECKS 20% 1.23% 0.25% 50 10 40 . . . .
ATTEND QUALITY AUDIT 0.12% 0.00% 5 0 5
TPR REVIEW AND ACTIONS 0.12% 0.00% 5 0 5
CONSTRUCTABILITY SESSION 0.25% 0.00% 10 0 10
60,90% E-REVIEW SESSIONS 0.99% 0.00% 40 0 40
Risk Assessment Input 100% 0.12% 0.12% 5 5 0 . . . . . . . . . . . . . . . . . . . .
LLC & LLI SESSION 70% 0.25% 0.17% 10 7 3 . . . . . . . . . . . . . .
MR: MATERIAL REQUISTION 90% 0.99% 0.89% 40 36 4 . . . . . . . . . . . . . . . . . .
NMR: 601 REVIEW 3.46% 0.00% 140 0 140
NMR: 602 REVIEW 1.97% 0.00% 80 0 80
VENDOR DRAWING REVIEW 0.49% 0.00% 20 0 20
VENDOR DRAWING INCORPORATION 1.33% 0.00% 54 0 54
INPUT TO ELECTRICAL LOAD LIST 0.25% 0.00% 10 0 10
INPUT TO SCHEDULE 60% 0.39% 0.24% 16 10 6 . . . . . . . . . . . .
SPI ADMIN SETUP 2.96% 0.00% 120 0 120
PRE-TREATER
A 001 N SCM: INSTRUMENT BLOCK DIAGRAM, PRE-TREATER X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 002 N SCM: INSTRUMENT BLOCK DIAGRAM, PRE-TREATER X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 003 N SCM: INSTRUMENT BLOCK DIAGRAM, PRE-TREATER X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001-002 N ISS FOR 42-AIT-0067A/B X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-003 N ISS FOR 42-AIT-0049/0050/0051 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-003 N ISS FOR 42-AIT-0053/0054/0055 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-002 N ISS FOR 42-AIT-0052/0056 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-AL-0058//0064, LEL BEACON X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-AA-0057/0063,GAS DETECTION HORNS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N ISS FOR 42-FE-0005,WATER FROM PRETREAER Q11-D-XXX1 TO WOSEP X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-FE-0005A,WATER FROM PRETREAER Q11-D-XXX2 TO WOSEP X X X 00. Blank 0% 0.02% 0.00% 1 0 1
14
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
E 001 N WOSEP
SIZING CALCULATION FOR 42-FE-0005A,WATER FROM PRETREAER Q11-D-XXX2 TO X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N WOSEP
ISS FOR 42-FIT-0005A/0005B/0005AA/0005BA, PRODUCE WATER AT PRETREATER X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-004 N O/L X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001 N ISS FOR 42-FE-0008A,WET CRUDE TO Q11-D-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-FE-0008B,WET CRUDE TO Q11-D-XXX2 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-002 N ISS FOR 42-FIT-0008A/B,WET CRUDE TO Q11-D-XXX1/XXX2 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-FG-0006/0006A,PRE-TREATOR X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-004 N ISS FOR 42-LG-0009/0009A/0004/0004A,PRE-TREATOR X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001-004 N ISS FOR 42-LG-0010/0010A/0011/0011A,PRE-TREATOR X X X 00. Blank 0% 0.10% 0.00% 4 0 4
E 001 N ISS FOR 42-LIT-0012,PRE-TREATER D-XXX1 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-LIT-0012A,PRE-TREATER D-XXX2 X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-002 N ISS FOR 42-LIT-0014/0015,PRE-TREATOR X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-HV-0066A,WET CRUDE TO Q11-D-XXX1 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-HV-0066B,WET CRUDE TO Q11-D-XXX2 X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012A,WATER FROM PRETREATER D-XXX1 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012B,WATER FROM PRETREATER D-XXX1 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012C,WATER FROM PRETREATER D-XXX2 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-LV-0012D,WATER FROM PRETREATER D-XXX2 TO WOSEP X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-002 N ISS FOR 42-PIT-0023/0023A,PRE-TREATER (Q11-D-XXX1) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001-003 N ISS FOR 42-PI-0029/0030/0022,PRE-TREATER Q11-D-XXX1 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001-003 N ISS FOR 42-PI-0029A/0030A/0022A,PRE-TREATER Q11-D-XXX2 X X X 00. Blank 0% 0.07% 0.00% 3 0 3
E 001 N ISS FOR 42-LCP-0005,PRETREAER Q11-D-XXX1 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-ZV-0005,PRETREAER Q11-D-XXX1 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-012 N ISS FOR 42-PZV-0005/0006/0005A/0006A,PRE-TREATER X X X 00. Blank 0% 0.30% 0.00% 12 0 12
E 001 N ISS FOR 42-LCP-0005A,PRETREAER Q11-D-XXX2 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 42-ZV-0005A,PRETREAER Q11-D-XXX2 DISCHARGE X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001-003 N SCH: IO LIST X X X 06. Issued for Squad Check 45% 0.07% 0.03% 3 1 2 . . . . . . . . .
D 001 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 002 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 003 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 004 N CCS: CABLE & CONDUIT SCHEDULE X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,TEMPERATURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE (FLOW INSTRUMENTS) X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,RELIEF VALVES X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,LEVEL INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
B 001-032 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 3.16% 0.00% 128 0 128
A 001-006 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 1.18% 0.00% 48 0 48
A 001-004 ISD: Instrument Segment Diagram X X X 00. Blank 0% 0.79% 0.00% 32 0 32
A 001 N IPL: INSTRUMENT POINTS & LINES,PRE-TREATER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 002 N IPL:
MTO: INSTRUMENT POINTS
MATERIALS FOR & LINES, GAS DETECTOR
DEBOTTLENECKING LAYOUT
ABU SAFAH GOSP WATER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-008 N SEPARATION - QATIF,UA-11(DEHYDRATOR, PRETREATER) X X 00. Blank 0% 0.20% 0.00% 8 0 8
A 001 N LOG: CAUSE & EFFECT DIAGRAM,PRE-TREATER X X X 01. Data and information collect 5% 0.22% 0.01% 9 0 9
A 001-008 N LOG: LOGIC DIAGRAM X X 01. Data and information collect 5% 1.58% 0.08% 64 3 61
15
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
B 001-018 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 1.78% 0.00% 72 0 72
A 001-008 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 1.58% 0.00% 64 0 64
A 001-004 ISD: Instrument Segment Diagram X X X 00. Blank 0% 0.79% 0.00% 32 0 32
A 001 N IPL: INSTRUMENT POINTS & LINES, GAS DETECTOR LAYOUT X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 001 N IPL: INSTRUMENT POINTS & LINES, CRUDE CHARGE PUMP X X X 00. Blank 0% 0.22% 0.00% 9 0 9
A 002 N IPL: INSTRUMENT
MTO: POINTS
MATERIALS FOR & LINES, CRUDE CHARGE
DEBOTTLENECKING PUMP
ABU SAFAH GOSP WATER X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-008 N SEPARATION - QATIF, UA-9(CRUDE CHARGE PUMPS) X X 00. Blank 0% 0.20% 0.00% 8 0 8
RA-381121 A 002 R LOG: CAUSE&EFFECT DIAGRAM,41-ZC-420 LPPT & LPDT X X X 00. Blank 0% 0.22% 0.00% 9 0 9
RA-381121 A 005 R LOG: CAUSE & EFFECT DIAGRAM, 41-ZC-423 CRUDE CHARGE PUMPS X X X 01. Data and information collect 5% 0.22% 0.01% 9 0 9
A 001-008 N LOG: LOGIC DIAGRAM X X 01. Data and information collect 5% 1.58% 0.08% 64 3 61
16
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
BOILER PACKAGE
A 001 N SCM: INSTRUMENT BLOCK DIAGRAM,H2S & LEL GAS DETECTORS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 002 N SCM: INSTRUMENT BLOCK DIAGRAM,AUXILIARY BOILER PACKAGE-DCS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 003 N SCM: INSTRUMENT BLOCK DIAGRAM,AUXILIARY BOILER PACKAGE-BMS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
A 004 N SCM: INSTRUMENT BLOCK DIAGRAM,AUXILIARY BOILER PACKAGE-VMS X X X 07. Complete Squad Check 55% 0.22% 0.12% 9 5 4 . . . . . . . . . . .
E 001-002 N ISS FOR 99-AIT-0090/0091, AUXILIARY STEAM BOILER X X X 00. Blank 0% 0.05% 0.00% 2 0 2
E 001 N ISS FOR 99-AA-0092, GAS DETECTION HORNS X X X 00. Blank 0% 0.02% 0.00% 1 0 1
E 001 N ISS FOR 99-AL-0093,H2S BEACON X X X 00. Blank 0% 0.02% 0.00% 1 0 1
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,MISCELLANEOUS INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,TEMPERATURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
D 001 N IIS: INSTRUMENT INSTALLATION SCHEDULE,PRESSURE INSTRUMENTS X X X 00. Blank 0% 0.05% 0.00% 2 0 2
A 001-016 N ECD: INSTRUMENT INTERCONNECTION DIAGRAM X X X 00. Blank 0% 3.16% 0.00% 128 0 128
A 001-014 ISD: Instrument Segment Diagram X X X 00. Blank 0% 2.76% 0.00% 112 0 112
B 001-096 N ILD: INSTRUMENT LOOP DIAGRAM X X 00. Blank 0% 9.48% 0.00% 384 0 384
A 001 N IPL:
MTO: INSTRUMENT POINTS
MATERIALS FOR & LINES,
QATIF GOSP-1GAS DETECTOR LAYOUT
COGENERATION & UTILITIES, UA- X X X 00. Blank 0% 0.22% 0.00% 9 0 9
E 001-004 N 21(AUXILLIARY BOILER) X X 00. Blank 0% 0.10% 0.00% 4 0 4
LEGEND: NOTES:
17
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
18
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING START COMPL
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD
1. DATA NETWORK
3. SECURITY
4. OTHER DELIEVARABLES
5. OTHERS (NON-DELIVERABLES)
LEGEND: NOTES:
SAUDI ARABIAN OIL COMPANY
THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION DRAWING TYPE
DRAWING CONTROL SHEET
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DCS
10-12862-0001-001
DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION
REVIEW FOR KEY DRAWINGS
OTHER
REQUIRED (SAUDI ARAMCO)
QATIF
CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
19
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
PROGRESS
DRAWING START COMPL
DD PACKAGE SCHEDULE SYSTEM PROGRESS HOURS
TO END OF THIS PERIOD
20
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
LAYOUT ###
1 LEGENDS, ABBREVIATIONS AND GENERAL NOTES - FIRE PROTECTION SYSTEM X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER NETWORK LAYOUT - (Q04) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER NETWORK LAYOUT - (Q011) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER NETWORK DEMOLITION LAYOUT (Q04) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER NETWORK DEMOLITION LAYOUT (Q110 X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER P&ID (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER P&ID (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER P&ID DEMOLITION (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER P&ID DEMOLITION (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER MONITOR COVERAGE LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIREWATER MONITOR COVERAGE LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 LIVE HOSE REEL COVERAGE LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 LIVE HOSE REEL COVERAGE LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE RISK AREA LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE RISK AREA LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
2 FIRE PROTECTION MISCELLANEOUS DETAILS X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE AND GAS DETECTOR LAYOUT (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE AND GAS DETECTOR LAYOUT (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 ELECTRICAL AREA CLASSIFICATION DRAWING (Q04) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 ELECTRICAL AREA CLASSIFICATION DRAWING (Q11) X X X 00. Blank 0% 1.51% 0.00% 12 0 12
1 FIRE HAZARDOUS AREA DRAWING / FIREPROOFING LAYOUT (Q04) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIRE HAZARDOUS AREA DRAWING / FIREPROOFING LAYOUT (Q11) X X X 00. Blank 0% 0.00% 0.00% 0 0
1 FIREWATER TIE-IN INDEX X X X 00. Blank 0% 1.51% 0.00% 12 0 12
OTHERS (NON-DELIVERABLES)
FEED VERIFICATION 100% 10.58% 10.58% 84 84 0 . . . . . . . . . . . . . . . . . . . .
PE FIRE PROTECTION SCOPE OF WORK/TBE/ PE COMMENT RESOLUTION 15% 5.04% 0.76% 40 6 34 . . .
CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
21
BI-10-07809: DEBOTTLENECKING ABU SAFAH GOSP WATER SEPERATION - QATIF
Detail Design Engineering
CMP Strategies before, during and subsequent to commissioning 30% 5.88% 1.76% 8 2 6 . . . . . .
LEGEND: NOTES:
CIB
QATIF SAUDI ARABIA
DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO. SHEET NO. REV NO.
22
00. Blank 0% 0%
1 01. Data and information collection 5% 5%
2 02. Start drafting 5% 10%
3 03. Issued for Discipline/Internal Check 5% 15%
4 04. Complete drafting 20% 35%
5 05. Complete discipline check 5% 40%
6 06. Issued for Squad Check 5% 45%
7 07. Complete Squad Check 10% 55%
8 08. Issue for Client Review 5% 60%
09. Comments and Vendor Information
9 15% 75%
Incorporation
10 10. Complete Discipline Check 5% 80%
11 11. Complete Squad Checking 5% 85%
12 12. Issue for Client Approval 5% 90%
13 13. Issue for Construction (IFC) 10% 100%
Procurement Support
00. Blank 0% 0%
01. MR prepared and reviewed by owner 10% 10%
discipline
02. Issued for Squad Check 5% 15%
03. Complete Squad Check 5% 20%
04. Issued for Client Review 10% 30%
05. Comments Incorporation 10% 40%
06. Issued for Client Use 15% 55%
07. TBE issued for Client 15% 70%
08. Vendor Drawing Reviews 1 and 2 20% 90%
09. Vendor Drawing Approval 10% 100%