Offshore Jacket Installation Guide

This document provides a revision log and procedure for installing the WHP-B jacket for the Su Tu Den Northeast Project. It outlines the definition of terms, scope of work, reference documents, subcontractors, reporting, installation schedule, and figures. The document details the loadout and transportation of the jacket and piles, as well as the marine equipment and materials used. It includes a table of contents and distribution list for the procedure.

Uploaded by

havuta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
701 views557 pages

Offshore Jacket Installation Guide

This document provides a revision log and procedure for installing the WHP-B jacket for the Su Tu Den Northeast Project. It outlines the definition of terms, scope of work, reference documents, subcontractors, reporting, installation schedule, and figures. The document details the loadout and transportation of the jacket and piles, as well as the marine equipment and materials used. It includes a table of contents and distribution list for the procedure.

Uploaded by

havuta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 557

WHP-B Jacket Installation Procedure PAGE : ii OF v

Su Tu Den Northeast Project REVISION : 0


J. Ray McDermott Far East, Inc. DATE : 29 May 09

REVISION LOG

Revision No. Section Revision Description

B Section 1.1 Reworded the general facilities description

B Section 1.2 Revised the contractor and fabricator definition

B Section 1.3 Removed the scope of subsea drilling template installation

B Section 2.4 Identified Eastern Cosmos as the pile and appurtenance barge

B Section 3.8 Revised the pile monitoring scope to be 2 legs (Row 1)


Removed the drilling template survey scope out of the Pre-install
B Section 4.2
Debris Survey
Section 6.5
B Reworded the note after item No.8
Item No. 8
Section 7.1
B Changed “may be” to be “shall be” in the note after item No. 4
Item No. 4
B Section 7.2 Revised P1 lifting to be optionally either by padeyes or ILT
Revised the number of conductor batch drive as only 2 conductors at
Section 8.5
B time following the latest analysis “Document No. 2005-4189-6J-0011
Item No. 2
Volume 3 “Jacket Miscellaneous Design”
B Section 10 Comment is noted.
Confirmed removing only reach rod support on EL (+)5000 based on
B Task sheet No.11
AFC drawing 2005-4189-63-0060
B Task sheet No. 15 Added caisson insertion as a task for WHP-B jacket installation.

0 Appendix E Included WHP-B jacket lifting and upending analysis

0 Appendix F Included DB30 mooring analysis during the installation


WHP-B Jacket Installation Procedure PAGE : iii OF v
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

DISTRIBUTION LIST
(Document No: 2005-4189-6P-8002)

No. Recipient Rev A Remarks

1 Sornchai Vudhikamraksa 1 Copy (Custodian)

2 PTSC 2 Original + Copy

3 Lee Taylor 1 Copy

4 Tony Brunet 1 Copy

5 David Foo 1 Copy

7 Martin Gibbens 1 Copy

8 S Macmillan/ M. Robinson 1 Copy

9 Marine Warranty Surveyor 1 Copy

10 DB26 Superintendent 1 Copy

11 DB26 Barge Foremen 1 Copy

12 DB26 Dive Superintendent 1 Copy

13 DB26 Welder Foremen 1 Copy

14 DB26 QA / QC Supervisor 1 Copy

15 DB26 Survey / ROV 1 Copy

16 DB26 Field Engineer 2 Copy

17 CLJOC CAR, DB26 1 Copy

Total Number of copies 18

Note:

(1) The Custodian is responsible for review and re-issue of this document and ensuring for its compliance
with the contents.
(2) It is the responsibility of all distributed persons to ensure the most current revision of this document is
available at the work place and that the documents referenced in it are applied to all aspects of the
project.
(3) This document will be subjected to regular review and will be updated to reflect any necessary changes.

The Recipient of this document is responsible to distribute the procedure to other parties working
under his / her supervision to ensure this procedure is implemented by all parties involved.
WHP-B Jacket Installation Procedure PAGE : iv OF v
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLES OF CONTENTS
1. INTRODUCTION ...................................................................................................................................1
1.1 General ..................................................................................................................................................1
1.2 Definition ................................................................................................................................................2
1.3 Scope/Sequence of Work ......................................................................................................................3
1.4 Reference Documentation .....................................................................................................................4
1.5 Sub-Contractors.....................................................................................................................................5
1.6 Reporting ...............................................................................................................................................5
1.7 Installation Schedule..............................................................................................................................5
1.8 Figures ...................................................................................................................................................5
2. LOADOUT AND TRANSPORTATION................................................................................................11
2.1 General ................................................................................................................................................11
2.2 Marine Spread .....................................................................................................................................11
2.3 Jacket Loadout Configuration ..............................................................................................................11
2.4 Jacket Piles and Appurtenances Loadout Configuration.....................................................................11
2.5 Loadout Checklist ................................................................................................................................11
2.6 Figures .................................................................................................................................................12
3. MARINE EQUIPMENT AND MATERIALS .........................................................................................22
3.1 General ................................................................................................................................................22
3.2 Derrick Barge 30 ..................................................................................................................................22
3.3 DB30 Support Vessels.........................................................................................................................22
3.4 SAT Diving System ..............................................................................................................................23
3.5 Air Diving System ................................................................................................................................23
3.6 Survey Equipment ...............................................................................................................................23
3.7 Jacket Installation Equipment, Installation Aids and Consumables ....................................................24
3.8 Pile Monitoring Equipment...................................................................................................................25
3.9 Figures .................................................................................................................................................26
4. SITE SPECIFIC SURVEY ...................................................................................................................29
4.1 Survey Positioning ...............................................................................................................................29
4.2 Pre-Installation Debris Survey .............................................................................................................29
4.3 Installation Survey ...............................................................................................................................29
4.4 Survey Tolerance.................................................................................................................................30
4.5 MSL Observation .................................................................................................................................30
4.6 As-Built Survey ....................................................................................................................................30
4.7 Figures .................................................................................................................................................30
5. JACKET, PILE AND APPURTENANCE PREPARATION WORKS ..................................................32
5.1 Pre-Loadout .........................................................................................................................................32
5.2 Post-Loadout........................................................................................................................................33
WHP-B Jacket Installation Procedure PAGE : v OF v
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

5.3 Figures .................................................................................................................................................33


6. JACKET INSTALLATION ...................................................................................................................42
6.1 General ................................................................................................................................................42
6.2 Barges Setup .......................................................................................................................................44
6.3 Jacket Lifting ........................................................................................................................................44
6.4 Jacket Upending Sequence.................................................................................................................48
6.5 WHP-B Jacket Flooding and Positioning .............................................................................................49
6.6 Jacket Post Setdown Activities ............................................................................................................50
6.7 Figures .................................................................................................................................................51
7. PILE INSTALLATION .........................................................................................................................65
7.1 Pre-Installation .....................................................................................................................................65
7.2 Pile Handling........................................................................................................................................66
7.3 Pile Penetration Acceptance and Tolerances......................................................................................67
7.4 Pile Driving Refusal Criteria.................................................................................................................67
7.5 Pile Installation Sequence ...................................................................................................................67
7.6 Jacket Leveling ....................................................................................................................................69
7.7 Figures .................................................................................................................................................70
8. CONDUCTOR INSTALLATION ..........................................................................................................81
8.1 General ................................................................................................................................................81
8.2 Conductor Driving Equipment..............................................................................................................81
8.3 Conductor Handling .............................................................................................................................82
8.4 Conductor Driving Refusal and Acceptance Criteria ...........................................................................82
8.5 Conductor Installation Sequence.........................................................................................................82
8.6 Figures .................................................................................................................................................84
9. JACKET APPURTENANCE INSTALLATION AND REMOVAL ITEMS............................................88
10. JACKET INSTALLATION COMPLETION WORKS ...........................................................................89
10.1 Blasting and Painting ...........................................................................................................................89
10.2 Post Installation ROV Survey ..............................................................................................................89
10.3 Figures .................................................................................................................................................89
APPENDIX A APPROVAL FORM & CHECKLIST OF CRITICAL OPERATION ......................................94
APPENDIX B PILE DRIVING RECORD FORMAT ..................................................................................105
APPENDIX C PILE DRIVABILITY REPORT EXTRACT..........................................................................108
APPENDIX D JACKET APPURTENANCE INSTALLATION TASK SHEETS ........................................127
APPENDIX E EXTRACTED WHP-B JACKET LIFTING AND UPENDING ANALYSIS .........................158
APPENDIX F DB30 MOORING ANALYSIS ............................................................................................166
WHP-B Jacket Installation Procedure PAGE : 1 OF 1
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

1. INTRODUCTION
1.1 General
The Su Tu Den Northeast (SDNE) development is located in Block 15-1 offshore Vietnam,
approximately 7km northeast of the Su Tu Den development. The development project
includes the installation of a wellhead platform (WHP-B), three infield pipelines and a
composite power / fiber optic submarine cable all tied in to the existing Su Tu Den and Su
Tu Vang facilities.

The facilities to be installed consist of:


• One 2-pile subsea wellhead template with removable pile guide.
• One 4-pile wellhead platform which shall include a 12-slot well bay. The jacket will be
installed in 2009 while installation of the deck and flare boom has been deferred to
2010.
• A 24-inch 3-phase production pipeline from WHP-B to the existing PLEM near WHP-A,
including tie-in spools and risers at WHP-B.
• A 10-inch gas lift pipeline from the Su Tu Vang CPP at the WHP-B tie-in point up to and
including the tie-in spools and risers at WHP-B. In addition to the pipeline a crossing
support at the existing WHP-A to FPSO umbilical FA-2 is to be installed.
• An extension to the 16-inch water injection pipeline from the WHP-A tie-in point to WHP-
B including the tie-in spools and riser at WHP-B. In addition, the pipeline from the Su Tu
Vang CPP up to the WHP-B tie-in point and crossing supports at the existing WHP-A to
FPSO pipelines will be installed; these were originally to be installed as part of the Su Tu
Vang development but were deferred to the Su Tu Den NE campaign.
• An extension to the composite power / fiber optic submarine cable from WHP-A to WHP-
B. In addition, the composite power / fiber optic submarine cable from CPP to WHP-A
will be installed as well; this was originally to be installed as part of the Su Tu Vang
development but was deferred to the Su Tu Den NE campaign.

A location plan and overall field layout is as shown in Figure 1.1-1 and 1.1-2 respectively.

J Ray McDermott (JRMFEI) has been contracted by PTSC to perform the engineering,
procurement, transportation and installation of the SDNE Field facilities as described in the
following section. This document will describe in some detail the work procedure and
sequence as well as equipment to be used for the installation of the WHP-B jacket with the
DB30.
WHP-B Jacket Installation Procedure PAGE : 2 OF 2
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

1.2 Definition
Throughout this procedure, the definitions in Table 1.2 will be used.

TABLE 1.2 - DEFINITIONS


Abbreviation Description

COMPANY Cuu Long Joint Operating Company (CLJOC)


MAIN
Petroleum Technical Services Corporation (PTSC)
CONTRACTOR
CONTRACTOR J. Ray McDermott Far East Inc. (JRMFEI)

FABRICATOR Vietsovpetro Joint Venture (VSP)


Refer to any company or person to whom JRMAP has subcontracted of any
SUB-CONTRACTOR
part of the work.

MWS Marine Warranty Surveyor

CAR Company Authorized Representative

AHT Anchor Handling Tug

CAB Capital Asset Barge

WHP-B Well Head Platform B

DB30 Derrick Barge 30

DGPS Differential Global Positioning System

EL Elevation

H Height

ID Inside Diameter

ILT Internal Lifting Tool

L Length

LMU Leg Mating Unit

MBL Minimum Breaking Load

MT Metric Tonne

MSL Mean Seawater Level

NDT Non Destructive Testing

OD Outside Diameter

QA Quality Assurance

QC Quality Control

ROV Remotely Operated Vehicle

ST Short Ton

SRD Soil Resistance to Driving

TBA To Be Advised
WHP-B Jacket Installation Procedure PAGE : 3 OF 3
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 1.2 - DEFINITIONS


Abbreviation Description

TBC To Be Confirmed

TOG Top Of Grating

TOS Top Of Steel

USBL Ultra Short Base Line

W Width

WT Wall Thickness

1.3 Scope/Sequence of Work


The scope or work associated with this procedure is listed in a chronological order as
follow:
1) Rig-up and loadout on Intermac 408, Eastern Planet and Eastern Cosmos for jacket,
piles and appurtenances.
2) DB30 set up at location
3) Jacket side lifting, upending and positioning
4) Install and drive to target penetration 4 leg piles, each made up of 4 pile sections.
5) Jacket Leveling (if required)
6) Install crown shims
7) Install transition piece. on top of P4 piles
8) Install and drive to target penetration 10 conductors, each made up of 5 conductor
sections.
9) Install drill deck.
10) Install 2 each Boatlandings and stairways.
11) Completion works: mainly derigging of scaffolding, removal of rigging platforms,
removal of positioning rigging, removal of riser temporary support clamp, handrail
installation, removal of camera and cables, removal of USBL at jacket and subsea
template and post installation ROV survey.
WHP-B Jacket Installation Procedure PAGE : 4 OF 4
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

1.4 Reference Documentation


Documents, which should be consulted in conjunction with this installation procedure, are
detailed in Tables 1.4-1, 1.4-2 and 1.4-3.

TABLE 1.4-1 - SPECIFICATIONS


Document No Description

2005-4191-6L-0003 Specification for Loadout, Transportation and Installation

TABLE 1.4-2 - ENGINEERING ANALYSES


Document No Description

2005-4189-6J-0012 WHP-B Jacket Weight Control Report

2005-4189-6J-0101 WHP-B Jacket Seafastening and Transportation Analysis

2005-4189-6J-0102 WHP-B Miscellaneous Structure Transportation Analysis

2005-4189-6J-0007 WHP-B Jacket Upending Analysis

2005-4189-6J-0009 WHP-B Jacket Pile Drivability Study

2005-4189-6J-0010 WHP-B Conductor Drivability Study

2005-4189-6J-0008 WHP-B Jacket on Bottom Stability Analysis Report

2005-4189-6J-0006 WHP-B Jacket Lift Analysis

TABLE 1.4-3 - INSTALLATION PROCEDURES


Document No Description

2005-4100-0R-8001 Offshore Installation Execution Plan

2005-4100-0P-0021 Emergency Response Plan and Medivac Procedure

2005-4100-0P-8002 Tropical Revolving Storm and Evacuation Procedure

2005-4100-0P-8006 Anchor Handling Procedure

2005-4100-0P-8007 Offshore Installation Survey Positioning Procedure

2005-4100-0P-8013 Offshore Installation ROV Operation Procedure

2005-4100-0P-8008 Air Diving Manual

2005-4100-0P-8009 Saturation Diving Manual

2005-4100-0P-8001 Structural Blasting and Painting Procedure

2005-4100-0P-0008 Structural Welding Procedure

2005-4100-0P-0024 Structural NDT Procedure

2005-4189-6P-8003 WHP-B Jacket and Appurtenance Loadout Coordination Manual

2005-4100-0R-0011 Inspection and Test Plan for – Jacket & Deck Installation
WHP-B Jacket Installation Procedure PAGE : 5 OF 5
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

1.5 Sub-Contractors
Under JRMFEI’s work scope the sub-contractors detailed in Table 1.5 have been engaged
for specialist tasks.

TABLE 1.6 - SUB-CONTRACTORS


Sub-Contractor Field

C&C Survey

Fugro ROV

NDT Oceaneering

Pile Driving Monitoring Somesha

OWS Weather Forecasting

1.6 Reporting
A daily report will be submitted to COMPANY’s Authorized Representative to record the
following:
• Progress of the work
• Look ahead activities
• Report of any difficulties / problems
• HSE issues
• Personnel and vessel movements
• Equipment on site

1.7 Installation Schedule


The installation schedule is as attached in Figure 1.7.

1.8 Figures

Figure No Title

Figure 1.1-1 Location of Su Tu Den Field

Figure 1.1-2 Overall Field Layout

Figure 1.7-1 to 1.7-3 Installation Schedule


WHP-B Jacket Installation Procedure PAGE : 6 OF 6
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 1.1-1 Location of Su Tu Den Field


WHP-B Jacket Installation Procedure PAGE : 7 OF 7
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 1.1-2 Overall Field Layout


WHP-B Jacket Installation Procedure PAGE : 8 OF 8
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 1.7-1 Installation Schedule


WHP-B Jacket Installation Procedure PAGE : 9 OF 9
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 1.7-2 Installation Schedule


WHP-B Jacket Installation Procedure PAGE : 10 OF 10
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 1.7-3 Installation Schedule


WHP-B Jacket Installation Procedure PAGE : 11 OF 11
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

2. LOADOUT AND TRANSPORTATION


2.1 General
The WHP-B jacket, piles and appurtenance will be fabricated at VSP Yard in Vung Tau,
Vietnam. The transportation barges will be delivered to fabrication yard for loading out the
above items, sea fastened and then transported to Su Tu Den Field. The jacket, pile and
appurtenance loadout will be inspected and certified by the MWS prior to departure.
2.2 Marine Spread
The WHP-B Jacket will be transported on one 290 feet long barge, towed by a suitable
tugboat. The piles, conductors and appurtenance will be also loaded on one 290 class
barge. The assigned spreads are shown in Table 2.2.

TABLE 2.2 - TRANSPORTATION SPREADS


Loadout No Cargo Barge Tug

WHP-B Piles,
Eastern Cosmos ENA Sumo
4 Conductors &
290’ x 90’ 3600 BHP / 52T BP
Appurtenances

Eastern Planet PW Omega


5 WHP-B Jacket
290’ x 90’ 3600 BHP / 45T BP

2.3 Jacket Loadout Configuration


The proposed position of WHP-B jacket on Eastern Planet is approximately 70m from the
bow of barge to the middle of jacket row A and row B. The WHP-B jacket will be sea
fastened to Eastern Planet deck by welded the sea fastening pipes to the jacket leg/brace
and barge deck. The jacket loadout configuration is as shown in Figure 2.3-1 through to
2.3-8.
2.4 Jacket Piles and Appurtenances Loadout Configuration
As mentioned above in Section 2.2 the jacket piles and appurtenance will be loaded out on
one 290 class barge which is Eastern Cosmos. The placement of piles and appurtenance
on the barge are shown in Figure 2.4-1 through to 2.4-8.
2.5 Loadout Checklist
The following items are to be checked prior to the sail away of WHP-B jacket, piles and
appurtenance:
• Ensure sea fastenings are in accordance with drawings.
• Ensure all pre-rigging listed in Section 5.1 and 5.2 is installed in accordance with
drawings.
• Relevant fabrication yard checklist has been completed. Refer to document no. 2005-
4189-6P-8003 “WHP-B Jacket and Appurtenances Loadout Coordination Manual”.
• Ensure captain of the towing tug is aware of the draft reading at PTMI yard.
• Check all navigational towing lights are on the cargo barge and operational.
WHP-B Jacket Installation Procedure PAGE : 12 OF 12
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

• Check favorable weather forecast from towing to commencement of installation.


• Check tug has radio communication with other vessels and is equipped with radar.
• Check emergency towline is in place.
• Check certification of tow rigging.
• Ensure all required ship loose items have been loaded onto material barges.
• Ensure Customs’ documentation and Marine Warranty Surveyor’s Certificates are in
order.
• Ensure as built drawings have been issued and in possession of Field Engineer/Boat
Captain for transfer to derrick barge.
• Note fore/aft and port/starboard draft of barge and notify DB30 to check upon arrival.
CONTRACTOR’s representative will also take delivery of one copy (in hard copy or
electronic form) of the loadout manifests for delivery to the DB30
2.6 Figures

Figure No. Title

Figure 2.3-1 Jacket Tie Down Arrangement

Figure 2.3-2 Jacket Tiedown Sections and Details Sheet-1

Figure 2.3-3 Jacket Tiedown Sections and Details Sheet-2

Figure 2.3-4 Jacket Tiedown Sections and Details Sheet-3

Figure 2.3-5 Jacket Tiedown Sections and Details Sheet-4

Figure 2.3-6 Jacket Tiedown Sections and Details Sheet-5

Figure 2.3-7 Jacket Tiedown Sections and Details Sheet-6

Figure 2.3-8 Jacket Tiedown Sections and Details Sheet-7

Figure 2.4-1 Jacket Piles and Appurtenances Layout Arrangement


WHP-B Jacket Installation Procedure PAGE : 13 OF 13
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-1 Jacket Tie-Down Arrangement


WHP-B Jacket Installation Procedure PAGE : 14 OF 14
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-2 Jacket Tie-Down Sections & Details, Sheet 1


WHP-B Jacket Installation Procedure PAGE : 15 OF 15
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-3 Jacket Tie-Down Sections & Details, Sheet 2


WHP-B Jacket Installation Procedure PAGE : 16 OF 16
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-4 Jacket Tie-Down Sections & Details, Sheet 3


WHP-B Jacket Installation Procedure PAGE : 17 OF 17
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-5 Jacket Tie-Down Sections & Details, Sheet 4


WHP-B Jacket Installation Procedure PAGE : 18 OF 18
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-6 Jacket Tie-Down Sections & Details, Sheet 5


WHP-B Jacket Installation Procedure PAGE : 19 OF 19
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-7 Jacket Tie-Down Sections & Details, Sheet 6


WHP-B Jacket Installation Procedure PAGE : 20 OF 20
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.3-8 Jacket Tie-Down Sections & Details, Sheet 7


WHP-B Jacket Installation Procedure PAGE : 21 OF 21
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 2.4-1 Jacket Piles and Appurtenances Layout Arrangement


WHP-B Jacket Installation Procedure PAGE : 22 OF 22
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

3. MARINE EQUIPMENT AND MATERIALS


3.1 General
The major work barge assigned to perform the installation is the DB30. This barge and her
spread of equipment and support vessels are described on the following details.
3.2 Derrick Barge 30
The DB30 is a combination-revolving derrick and center slot pipe lay barge. DB30 has
principal dimensions of 128m x 48.2m x 8.68m and is built under “ABS” A1 classification for
unrestricted service.

The DB30 is equipped with a twelve (12) point mooring system, each with 1650m of 63.5
mm Ø, 6 x 25 IWRC wire rope on an American 3000A single drum anchor hoist. The
anchor control tower is located at midship above deck, and contains the winch and tension
machine controls.

The barge comprises of port and starboard sponsons with a transom stern and a raked
bow. On the upper deck at the stern is a diesel driven Clyde model 76 revolving derrick
crane. An additional two American 203 Revolver Cranes mounted on railed gantries are
installed on either sides of the main deck.

The barge is also equipped with pipelay equipment.

Accommodation facilities are located below deck and additional accommodation module is
located below the helideck at the bow. Total accommodation capacity is 296 men, inclusive
of a 2 man hospital.

An overall DB30 general arrangement is as shown at Figure 3.2-1


3.3 DB30 Support Vessels
The vessels listed in Table 3.3 will support the DB30:

TABLE 3.3 - DB30 SUPPORT VESSELS


Vessel Service

Armada Tuah 101


Primary Anchor Handler / Tow Tug for DB30
10,000 BHP / 120 T BP

Britoil 62 Secondary Anchor Handler / Tow Tug for Capital


5,400 BHP / 75 T BP Asset Barge #2

Intermac 408 Capital Assets Barge #1

ENA Presidemt
Tow Tug for Capital Asset Barge #1
3,200 BHP / 42.6 T BP

Eastern Stellar Capital Assets Barge #2


WHP-B Jacket Installation Procedure PAGE : 23 OF 23
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 3.3 - DB30 SUPPORT VESSELS


Vessel Service

Supply / Crew Vessel, also used to support remote


Red Gold
work activities.

The Capital Asset Barge layout is depicted in Figure 3.3-1


3.4 SAT Diving System
A SAT system will be used to support the SAT diving activities required during the pipelay
work. More details can be found in document number 2005-4100-0P-8011 “Saturation
System Manual and Certification Records (DB30)”.
3.5 Air Diving System
There will be an air diving system available on board with a requisite team of divers. They
will assist the subsea structural works on the air dive depth range such as rigging platform
removal, reach rods stub removal, etc. More details can be found in document number
2005-4100-0P-8008 “Air Diving Manual”.
3.6 Survey Equipment
The following survey equipment will be employed to support survey task:
• ROV (Remotely Operated Vehicle). The free swimming work class type of ROV, 100hp.
Able to carry a variety of commercial sensors and video television cameras.
• Surface Positioning Systems. The employed surface positioning system will be Fugro’s
Starfix DGPS system.
• Acoustic Tracking Systems. The employed acoustic tracking system will be a
Sonardyne Ultra Short Baseline Acoustic System (USBL) complete with tracking
beacon.
• Barge Orientation. The employed barge orientation system will be a SG Brown 1000
gyro compass. The gyro has digital display of the bearing to 0.1 of a degree.
• Seafloor Plan View Image. The employed plan view images of seafloor will be Edgetech
model 260 side scan sonar system complete with tow fish.
• Jacket Level and Pile Cut Off Survey Equipment. The employed equipment to
determine the jacket level and pile cut off will be a theodolite with tripod. One leg will be
shot by theodolite and then transferred to other pile legs using water level. Surveyor will
reconfirm the mark up level with theodolite to ensure they are within acceptable
tolerance.
• Tide Measurement Equipment. The tide measurement equipment on jacket will be a
Valeport 740 self recording tide gauge. The tide gauge will be fitted on a pole and
deployed from the jacket and the radio transmission antenna will be installed at a high
point on the jacket. The receiver will be installed at the barge.
• Current Measurement Equipment. The employed equipment to observe current speed
and direction will be an Aanderra DCS 3900 current meter.
WHP-B Jacket Installation Procedure PAGE : 24 OF 24
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

3.7 Jacket Installation Equipment, Installation Aids and Consumables


See Tables 3.7-1, 3.7-2 and 3.7-3 for lists of installation equipment, installation aids and
consumables required for the work.

TABLE 3.7-1 - INSTALLATION EQUIPMENT


ITEM DESCRIPTION QTY

ILT OTC 30” – 54”


1 1
set to ID=1322mm(52”) , ID=1252mm(49.25”) & ID=1272mm(50”)

ILT MCS 30” – 54”


2 1
set to ID=864mm(34”)

3 V540 Hammer 2

4 MHU800S Hammer 2

5 MRBS3000 Hammer 2

6 Jacket Leveling Hydraulic Jack 4

7 Air Lift String (contingency jetting equipment) 1

8 Monitor screen for underwater camera 2

TABLE 3.7-2 - INSTALLATION AIDS


ITEM DESCRIPTION QTY

1 Gangway from barge to jacket top 1

2 Side Lift Rigging:

2.1 Gator laid Sling Ø10” x 130 ft - 2 inch 1

2.2 Gator laid Sling Ø10” x 129 ft - 5 inch 1

2.3 Gator laid Sling Ø9.45” x 127 ft - 4 inch 1

2.4 Gator laid Sling Ø9.45” x 127 ft - 2 inch 1

3 Upending and Positioning Rigging

3.1 Green Pin shackle P6036 – 400 Ton 6

3.2 Grommet Sling Ø6.6” x 37 ft - 9 inch 1

3.3 Grommet Sling Ø6.9” x 37 ft - 10 inch 1

3.4 Cable laid Sling Ø7.75” x 129 ft - 2 inch 1

3.5 Cable laid Sling Ø7.75” x 130 ft - 3 inch 1

3.6 Cable laid Sling Ø7.5” x 182 ft - 5 inch 1

3.7 Cable laid Sling Ø6.5” x 92 ft - 10 inch 1

4 Jacket tugboat handling rigging

4.1 Standard shackle 35 Ton 4


WHP-B Jacket Installation Procedure PAGE : 25 OF 25
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 3.7-2 - INSTALLATION AIDS


ITEM DESCRIPTION QTY

4.2 Standard shackle 55 Ton 2

4.3 Standard shackle 85 Ton 1

4.4 Wirerope Ø1.5” x 20 ft 4

4.5 Wirerope Ø3” x 40 ft 2

4.6 Polyrope Circ. 12” x 200 m 3

4.7 Manilarope Ø1/2” x 150 ft 3

5 Jacket Control tugger line rigging

5.1 Standard shackle 25 Ton 2

5.2 Wirerope Ø1.5” x 20 ft 2

6 Pile lifting rigging

6.1 Pile lifting sling Ø3” x 40 ft 2

6.2 Pile choker for crane tugger Ø1” x 65 ft 1

7 Drill deck lift rigging Ø1.5” x 40 ft c/w standard shackle 12 Ton 4

8 Boatlanding lift rigging Ø3” x 53 ft c/w Crosby G2140 shackle 120 Ton 4

TABLE 3.7-3 - CONSUMABLES


ITEM DESCRIPTION QTY

1 Oxygen quads 400 bottles

2 Acetylene quads 144 bottles

3 LPG 30 bottles

4 Welding consumables 1 lot

5 V540 Hammer Packing 50

6 MRBS3000 Hammer Packing 15

3.8 Pile Monitoring Equipment


The pile monitoring system comprises a strain and acceleration gauges that will be
mounted near the top of the pile sections. The gauges are to assess energy transmitted
from the hammer to the pile, driving stresses, soil resistance and to assess the capacity of
the pile from a platform foundation point of view. Strain and acceleration gauges shall be
fitted to the piles on the cargo barge, before they are lifted and stabbed. The following
equipment will be brought offshore for pile monitoring work:
WHP-B Jacket Installation Procedure PAGE : 26 OF 26
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 3.8 - PILE MONITORING EQUIPMENT


ITEM DESCRIPTION QTY

1 Pile Driving Analyzer (PDA) 2 sets

2 Computer 2

3 Main Cables 1 lot

4 Strain Gauge 8

5 Acceleration Gauge 8

Pile monitoring will be carried out on the P2, P3 and P4 on one leg with expected highest
soil skin friction, either A1 or B1.
The other pile on Row 1 (the remaining A1 or B1) will be monitored on section P3 and P4
only.

To give flexibility for any leg to be monitored, all of the P2, P3 & P4 piles will be tap drilled
ready to accept the pile monitoring equipment.
3.9 Figures

Figure No. Title

Figure 3.2-1 DB30 Mooring System General Arrangement

Figure 3.3-1 Capital Asset Barge Layout (Spool Barge)


WHP-B Jacket Installation Procedure PAGE : 27 OF 27
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 3.2-1 DB30 Mooring System General Arrangement


WHP-B Jacket Installation Procedure PAGE : 28 OF 28
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 3.3-1 Capital Asset Barge Layout (Spool Barge)


WHP-B Jacket Installation Procedure PAGE : 29 OF 29
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

4. SITE SPECIFIC SURVEY


4.1 Survey Positioning
The primary survey system used for barge positioning and vessel tracking throughout the
installation program is DGPS. A computerized barge management system will be utilized
to graphically display the current location and heading of the barge and her anchors in
relation to the permanent structures and pipelines in the vicinity. The position and heading
of the anchor handling tugs will also be displayed. The tugs will also have a similar system
on board, which is interfaced with the barge navigation computer.
4.2 Pre-Installation Debris Survey
Prior to the installation of the WHP-B Jacket, the pre-installation debris survey is to carry
out an analogue survey of a 2km square over the jacket site, using a side scan sonar
system to collect seabed features data.

Once the barge is anchored up over the proposed location a jacket foot print survey will be
carried out. This survey can be done using the ROV system of the barge. The ROV can
be tracked by the USBL acoustic positioning system during the seabed visual inspection
and sonar scan to confirm the seabed is free of debris. The ROV will fly a 10m grid over
the length and breadth of jacket foot print plus 10m corridor. The ROV survey grid line is
shown in Figure 4.2-1.

NOTE: At the jacket proposed location, the ROV operator should mind the existing
subsea drilling template when run the ROV during jacket foot print survey.

4.3 Installation Survey


During the course of the installation, the main survey activities will consist of barge track
control, anchor running and ROV tracking. All these activities are run from the control
tower using the barge navigation system.

A remote monitor is installed for the anchor winch operators in the control tower, showing
the location of existing pipelines and structures with the image of the barge and her
anchors overlaid. The barge position is updated in real time, allowing the winch operators
to move the barge on line and heading.

The anchor handling tugs will also have a similar navigation system on board. The
helmsman will have a monitor which shows the tug in relation to the surrounding pipelines
and structures. The barge surveyor can also send a target “bulls eye” to the tug’s monitor
to guide the tug to an anchor drop location.

As the ROV, divers or other underwater apparatus is deployed, the USBL beacons
attached will also show up on the barge navigation system monitor. This image will also be
WHP-B Jacket Installation Procedure PAGE : 30 OF 30
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

fed to the ROV control shack, allowing accurate positioning of the vehicle, diver, or
accurate positioning of existing structures underwater, where the ROV is located.

To display the subsea wellhead template location, ROV will be deployed to install USBL
beacon at the subsea wellhead template. This activity should be preformed before jacket
lift.

After jacket upending the DGPS receiver and gyro compass will be installed on jacket. The
data from DGPS and gyro will be telemetered to the navigation computer on barge and
jacket position and heading can be seen moving in real time during positioning into
location.
4.4 Survey Tolerance
The DGPS system has an overall accuracy of +/- 5m based on any absolute global
location. The repeatability of the system however is better than +/-3m where the on board
system is used to re-position the ROV or barge on a previously visited location. The
accuracy of the USBL depends upon the water depth, but is also of a similar order of
magnitude, i.e. +/- 5m.
4.5 MSL Observation
Once the jacket is set on seabed a temporary reference point will be established and a
MSL will be derived at the reference point by 39 hours tidal observation. All subsequent
levels and heights will refer to MSL at reference point. Tide gauge installation is described
in section 9.3.
4.6 As-Built Survey
Subsequent to completion of each major installation, a level and dimensional survey (where
applicable) will be undertaken by the surveyors. The final measurements, dimensions,
levels will be presented to the client in the as-built dossier. Examples of as-built surveys
are as follows:
• Jacket Level
• Jacket Position (centre co-ordinates)
• Jacket Orientation
• Mean Sea Level (MSL) Observation
• Elevation of Boatlanding relative to measure MSL
• Elevation of transition piece
• Mudmat, clamp bolts and anode survey by ROV. Refer to section 9.13
• Seabed debris survey by ROV at the jacket and drill rig foot print area.
4.7 Figures

Figure No. Title

Figure 4.2-1 ROV Seabed Survey Area at WHP-B Jacket Location


WHP-B Jacket Installation Procedure PAGE : 31 OF 31
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 4.2-1 ROV Seabed Survey Area at WHP-B Jacket Location


WHP-B Jacket Installation Procedure PAGE : 32 OF 32
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

5. JACKET, PILE AND APPURTENANCE PREPARATION WORKS


5.1 Pre-Loadout
The WHP-B jacket installation will involve the preparation work when the jacket is still in the
yard. The following equipment and installation aids will be installed prior to jacket, pile and
appurtenance loadout.
5.1.1 Rigging Platform
The rigging platform is used to accommodate the ends of jacket lifting slings and upending
slings for hooking up to the barge crane. The rigging platform is located on jacket row 2 at
EL (+) 5m. The lift rigging for this platform will be kept on the platform and secured
properly with manila ropes. Detail of the rigging platform is shown in Figure’s 5.1.1-1 and
5.1.1-2.
5.1.2 Jacket Side Lift Rigging
The jacket side lift rigging will be shielded by gunny sacks prior to pre-rig on the jacket.
The rigging will be routed and secured on top of jacket braces with manila rope. Note that
manila rope should not be tied off to anode support. The end of lifting slings will be laid and
secured on the side lift rigging platform for offshore hook up. The layout of jacket
positioning rigging is depicted in Figure no. 5.1.2-1.
5.1.3 Jacket Upending & Positioning Rigging
The jacket upending rigging will be shielded by gunny sacks prior to pre-rig on the jacket.
The rigging will be routed and secured on top of jacket braces with manila rope. Note that
manila rope should not be tied off to anode support. The end of jacket upending slings will
be laid and secured on jacket upending rigging platform for offshore hook up. The layout of
jacket positioning rigging is depicted in Figure no. 5.1.3-1.
5.1.4 Jacket Tugboat Handling Rigging
The jacket tugboat handling rigging is used for rotating the jacket 90° after lifting the jacket
and lowering it into water. This rigging will be connected to the bollards on the jacket. The
rigging will be secured to the jacket legs and the polyrope handling lines will be coiled on
the jacket barge deck. The detail of jacket tugboat handling rigging is depicted in Figure
no. 6.3.3-1.
5.1.5 Jacket Control Tugger and Orientation Rigging
The jacket Control Tugger and orientation rigging is used for the jacket orientation during
jacket positioning activity. This rigging will be installed at EL (+)5000 and (-)45600. The
pre-installed rigging will be wire rope Ø1.5” x 20ft lg. connected to the bollards on the jacket
for both locations. The end of the rigging will be left hanging for connecting to the tugger
line. The detail of jacket orientation rigging is depicted in Figure no. 6.3.3-2.
5.1.6 USBL Bucket
The USBL bucket will be installed on the jacket as depicted in Figure 5.1.6-1.
5.1.7 Tap Drill on Pile
The tap drill on pile will be required for pile monitoring strain and acceleration gauges
mounting. The tap drill is required on top of all P3 & P4 pile sections. This will give
WHP-B Jacket Installation Procedure PAGE : 33 OF 33
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

flexibility to pick nominated legs to be monitored. This activity will be carried out in VSP
Fabrication Yard.

NOTE: All tap holes shall be fully filled with grease to prevent corrosion.

5.1.8 Boatlanding Lifting and Control Rigging


The boatlanding lifting and control rigging will be installed for loadout and offshore
installation purposed. The main lift rigging will be rigged up, laid and secured on the deck
at one location for offshore hook up. The web slings to be choked at the two corners of
boatlanding and 1ӯ x 30 ft lg. sling connected to this web sling. These lines will be
offshore hook up to the tugger lines.
5.1.9 Underwater Camera
The under water cameras and its brackets will be installed at the middle of both docking
guide locations. The cables will be run along the jacket braces and leg and secured at
jacket walkway. Refer to figure no. 5.1.9-1 and 5.1.9-2 for layout of underwater camera at
WHP-B jacket.
5.2 Post-Loadout
The following activities will be performed after the jacket, piles and appurtenance loadout
• Attach the jacket handling line for a tug boat to maneuver the jacket turn around. Then
secure and store the excess length on the stern barge deck.
• Jacket, pile and appurtenance tie downs installation
• Secure boatlanding lift and control rigging ends on barge deck
5.3 Figures
Figure No. Title

Figure 5.1.1-1 Rigging Platform for WHP-B Jacket – General Arrangement

Figure 5.1.1-2 Rigging Platform for WHP-B Jacket - Details

Figure 5.1.2-1 WHP-B Jacket Lifting Sling Layout

Figure 5.1.2-2 WHP-B Jacket Lifting Sling Arrangement

Figure 5.1.3-1 WHP-B Jacket Upending Sling Layout

Figure 5.1.3-2 WHP-B Jacket Upending Sling Arrangement

Figure 5.1.6 WHP-B Jacket Tugger Bollard & USBL Bucket Detail

Figure 5.1.9 Underwater Camera Cable & Clamp Detail


WHP-B Jacket Installation Procedure PAGE : 34 OF 34
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.1-1 Rigging Platform for WHP-B Jacket – General Arrangement


WHP-B Jacket Installation Procedure PAGE : 35 OF 35
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.1-2 Rigging Platform for WHP-B Jacket – Details


WHP-B Jacket Installation Procedure PAGE : 36 OF 36
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.2-1 WHP-B Jacket Lifting Sling Layout


WHP-B Jacket Installation Procedure PAGE : 37 OF 37
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.2-2 WHP-B Jacket Lifting Sling Arrangement


WHP-B Jacket Installation Procedure PAGE : 38 OF 38
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.3-1 WHP-B Jacket Upending Sling Layout


WHP-B Jacket Installation Procedure PAGE : 39 OF 39
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.3-2 WHP-B Jacket Upending Sling Arrangement


WHP-B Jacket Installation Procedure PAGE : 40 OF 40
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.6 WHP-B Jacket Tugger Bollard & USBL Bucket Detail
WHP-B Jacket Installation Procedure PAGE : 41 OF 41
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 5.1.9 Underwater Camera Cable & Clamp Detail


WHP-B Jacket Installation Procedure PAGE : 42 OF 42
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

6. JACKET INSTALLATION
6.1 General
This section presents the CONTRACTOR’s installation methods to be employed for the
WHP-B Jacket Installation. The WHP-B jacket installation activities comprise of DB30
positioning set up, jacket lift, upending, positioning and setting down on the sea bed.

TABLE 6.1-1 - JACKET GENERAL GEOMETRY


Item Description

Type Four Leg

Jacket Location (proposed) N 1 159 403 E 876 417


0
Jacket Heading (True North) 316.0

Water Depth 45.6 m

Dimension at mud brace EL. 28.9m x 23.5m

Jacket Total Height 53.6m

Leg True Batter 1 : 10 (row 1)


1 : 7.071 (row 2)

Dry Weight (Installation) 1135 MT (1305 MT with 15% DAF)

Submerged Weight (Installation) 590MT (649 MT with 10% DAF)

Top of Transition (cut-off) EL (+) 11750

Top of Jacket EL (+) 6500

Jacket Leg OD at EL(+) 6.5m 1568mm

Jacket Leg Closure OD 1540mm

Installation Method Side Lift, Upending, positioning then set down to seabed.

TABLE 6.1-2 - JACKET INSTALLATION TOLERANCES


Item Tolerance

Position and Orientation Fixed over existing sub sea wellhead template.
Jacket will be positioned by stabbing jacket docking guide
through docking piles.
WHP-B Jacket Installation Procedure PAGE : 43 OF 43
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 6.1-2 - JACKET INSTALLATION TOLERANCES


Item Tolerance

Jacket Level After jacket set down, maximum 0.5% across the highest and
lowest points of jacket.

At EL(+)5.0m:
o Row A to Row B: + 94mm
o Row 1 to Row 2: + 92mm
o Diagonal: + 131.5mm

After pile installation, maximum 0.35% across the highest and


lowest points of jacket.

At EL(+)5.0m:
o Row A to Row B: + 65.8mm
o Row 1 to Row 2: + 64.4mm
o Diagonal: + 92mm
P4 Pile Cut Off Levelness + 2 mm

NOTE: CLJOC/MWS approval is to be obtained prior to proceeding with the jacket


seafastening removal, jacket lift, flooding of the jacket legs and setting down
at final location. CLJOC approval also to be obtained prior to final cut off of
the P4 piles.

TABLE 6.1-3 - DB30 INSTALLATION LIMITS


Weather Limit

Significant wave (Hs) 2 m (6.5 feet)

Wind 25 knot

Current 2.5 knot

The DB30 is a flat bottom derrick/pipelay barge and the values in the table above represent
the limits of her capability to hold station without unduly affecting safe operations.

The workability of the DB30 will depend on many factors of which will affect the movement
and response of the crane, which includes wave magnitude, wave direction, wind
magnitude, wind direction, swell height, swell period, swell direction, current magnitude and
direction. It is therefore up to the discretion of the barge superintendent to define the final
limits of the barge operating condition based on prevailing site condition to ensure a safe
working condition.
WHP-B Jacket Installation Procedure PAGE : 44 OF 44
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

6.2 Barges Setup


On the arrival of DB30 on site, the DB30 will set up the position and mooring anchors as
depicted in Figure 6.2-1. The mooring line is then tensioned up to check the anchor has
dug into seabed.
6.3 Jacket Lifting
6.3.1 Jacket Pre-Lift
The jacket lift shall not take place until the following items have been checked and found
acceptable.

TABLE 6.3.1 - JACKET PRE-LIFT CHECKLIST


Item Checklist Remarks

1 Derrick Barge Position Set up DB30 as per anchor pattern in section 6.2. Refer to Anchor
Handling Procedure for anchor catenaries at various tensions.

2. Pre-Emplacement Survey After DB30 position set up, ROV pre-emplacement seabed survey will
be conducted to ensure that the proposed footprint location is clear of
debris. Refer to section 4.2 for the ROV seabed survey grid line.

3. Pre-installation Briefing Ensure that all relevant personnel and tug boat captains involved in the
jacket lift and upending have been briefed on the procedures to be
followed and aware of the appropriate safety requirements.

4. Survey Equipment Ensure that all survey equipment required for jacket installation is fully
operational. Refer to ‘Offshore Installation Survey Positioning
Procedure’, Document No. 2005-4100-0P-8007.

5 ROV System Ensure that ROV system is fully operational. Refer to ‘Offshore
Installation ROV Operation Procedure’, Document No. 2005-4100-0P-
8013.

6 Jacket Barge Freeboard Check the jacket barge freeboard is complied with jacket lift study.
Ballast down the barge if required.
WHP-B Jacket Installation Procedure PAGE : 45 OF 45
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 6.3.1 - JACKET PRE-LIFT CHECKLIST


Item Checklist Remarks

7 WHP-B Jacket Review the general condition of the jacket and examine for damage to
or loss of below water components with particular attention given to the
following:
o Riser clamps
o Joints in the vicinity of sea fastenings
o Paint coating below the top of the splash zone in the vicinity of
loose items
o Structural areas in way of slings that have been installed by
FABRICATOR
o Rigging and control line are not fouled
o Top of jacket grating is secure
o Anodes attached to jacket are secure
o Jacket leg diaphragms are not damage
o Check ship loose items
o Visually ensure jacket leg diaphragms are fully inflated and in
good condition. The pressure on jacket leg to be checked by
visual on the diaphragm condition at bottom legs. The concave
shape shall indicate the pressure is remaining on the jacket legs.
This activity will be performed from the boat & barge. Observe
the pressure gauge on each leg as well.

8 Welding/Cutting Check that the welding machines and cutting equipments are
operational.

9 Jacket Lift Rigging Confirmed that lift riggings and trunnions are intact and there will not be
any sling clash to any part of structure during lifting.

10 Upending Rigging Confirmed that upending riggings, control lines and handling ropes are
intact and there will not be any sling clash to any part of structure during
upending.

11 Pile Installation Equipment Bring CAB along starboard side of DB30 with bow to bow configuration.
Transfer ILT 30-60 & 30-54, 2 nos. of MHU800S, 1 no. of V540 hammer
and 1 no. of MRBS3000 from CAB to DB30, Menck’s technician with
assistance from DB30 crew to prepare and get them ready for
operation. Ensure that pile installation can proceed immediately
following jacket positioning and docking. The first Hammer will be used
is V540 steam hammer. Refer to figure no. 6.3.1-1 for equipment layout
on DB30.

12 Weather Forecast Review the prevailing and forecast weather condition. The barge
Superintendent will make the final decision for the jacket lift to proceed
after consultation with the CAR and MWS with due consideration given
to the following:
o Actual derrick barge and jacket barge motions
o Suitable current direction for the relative barge positions
WHP-B Jacket Installation Procedure PAGE : 46 OF 46
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 6.3.1 - JACKET PRE-LIFT CHECKLIST


Item Checklist Remarks

13 Jacket Familiarity The ROV and Diving Supervisor’s are to review the jacket structure to
gain familiarity with the overall configuration. This activity can be
carried out when the jacket is still in Batam prior to sailaway or on site
prior to lifting.

14 Subsea Wellhead Install the 2 x mini USBL tansponder at subsea wellhead template by
Template USBL ROV or diver. Refer to Figure 6.3.1-2
Installation

15 USBL on Jacket Install 2 x USBL transponder on jacket mudbrace EL. (-)45.6m. The
Mudbrace USBL buckets are pre-installed at the fabrication yard. Refer to Figure
6.3.1-3

16 Strobe Light on Wellhead Subsea strobe light may be placed on top of two piles with the ROV to
Template Pile give sufficient mark for the camera on the jacket as a lead point.

6.3.2 Jacket Lift and Upending Location


The WHP-B jacket will be lifted and upended at the following location:

Location : Approximately 150m North East of final jacket location


Water depth: 45.6 m wrt MSL

Refer to Figure 6.2-1 for details of the WHP-B jacket lift and upending location.

The lift and upending location will be decided on site by the Barge Superintendent in
consultation with CAR and MWS based on the actual prevailing weather. High tide will be
the preferable time to perform jacket upending considering the clearance between structure
and seabed during upending.
6.3.3 Jacket Lift Sequence
Upon completion of subsea drilling template installation and pre-lift checks, the following
activities will be undertaken:

1) Setup DB30 at the jacket lift location. Bring in the jacket barge to the stern of DB30
as shown in Fig.6.2-1
2) Transfer rigging crews to the upending rigging platform. Transfer welders/fitters to the
jacket barge and prepare cutting torches and hoses at each location of jacket
seafastening.
3) If necessary, ballast the jacket barge down to get the required free board for jacket
lift.
4) Obtain CAR and MWS approval to cut the jacket seafastening.
5) Commence cutting jacket seafastening.
6) Boom the derrick crane down and get the auxiliary hook lowered down to upending
rigging.
WHP-B Jacket Installation Procedure PAGE : 47 OF 47
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

7) Connect 4 upending slings to the auxiliary prong follow the upending sling
arrangement, refer to Fig. 5.1.4-2
8) Transfer the jacket handling rope to the attending tug boat No. 1 and No. 2 as shown
in Figure 6.3.3-1. Connect control tugger lines to the jacket as shown in Figure 6.3.3-
2.
9) Slew the crane to position the main hook to be above the side lift rigging eyes.
10) Lower the main block and connect the four side lift rigging to the main hook. Refer to
Fig. 6.3.3-3 to 6.3.3-5.
11) Transfer the riggers from rigging platform back to DB30.
12) Take up slack on side lift rigging and slew the crane to the middle of the jacket.

NOTE: Keep slacking the auxiliary hook during crane movement to prevent tension
in the upending slings and out of plane force to the crane.

13) Obtain CAR and MWS approval to lift off the jacket.
14) Commence cutting the final seafastening.
15) Once all seafastening are cut off, slowly increase the hook load and lift the jacket
clear off the material barge.

NOTE: Once the jacket load is fully taken by DB30 crane, material barge is expected
to float up 1200mm and DB30 is expected to dive down 810mm.

NOTE: Maximum lift weight with 15% DAF is 1305 MT ( 52.5% crane capacity)

16) Once the jacket is well clear of the material barge deck, the tug boat shall tow the
material barge away.
17) Slowly lower the jacket into the water, until the lift riggings are slightly slack.
18) The last tug boat handling line from jacket leg 2A will be handed over to tugboat No.3

NOTE: The end of handling line can be either kept on DB30 and hand over to
tubboat No.3 or kept it secured on the jacket and the rigger to pick it up with
a dive boat once the leg 2A is at water level.

19) The tug boat with the handling polypropylene rope will assist to slew the jacket 90°
counter clockwise.

NOTE: Slowly take up slack on upending slings during jacket re-orientation.


WHP-B Jacket Installation Procedure PAGE : 48 OF 48
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

20) Secure the jacket to the stern of DB30.


21) Connect control tugger lines to jacket leg A2&B2 for jacket upending stage.
6.4 Jacket Upending Sequence
The WHP-B jacket will be upended after completion of jacket re-orientation. The following
details shall be followed for the upending;
1) Take up slack on upending slings and slightly slack down the side lift slings.
2) Deploy the ROV to survey the upending riggings to ensure that no interferences exist
which may damage the rigging or jacket. Once confirm to proceed, ROV may remain
in the water and monitor the mudline clearance and clearance between jacket and
DB30.
3) The option for the attending tug boat to release or hold the handling polypropylene
rope will be decided at the discretion of Barge Superintendent.

NOTE: ROV will cut off the wire rope connecting to padeyes on leg closure to
release the attending tug boat. Refer to rigging arrangement in Fig. 6.3.3-2.

4) If necessary, send rigging crews to the jacket and attach further tugger control lines
to the jacket with nylon / polypropylene ropes.
5) Transfer rigging crews back to the barge via personnel basket or dive boat.
6) Commence upending procedure as detailed in the table below and illustrated in Fig.
6.4-1 to 6.4-3

TABLE 6.4 - WHP-B JACKET UPENDING LOADS & CLEARANCES


Stage Main Auxiliary Auxiliary Main Main Pitch Roll Mudline
Hook Hook Hook Hook Hook Angle Angle Clearance
Radius Height Load Height Load

(m) (m) (MT) (m) (MT) (degrees) (degrees) (m)

1 57.35 9.78 3 34.02 552 2.33 0.78 20.60

2 57.35 10.35 190 29.03 237 -8.74 0.73 17.61

3 57.35 14.70 186 32.55 355 -10.37 0.9 20.60

4 57.35 20.54 237 30.30 230 -22.47 1.54 16.36

5 57.35 23.01 241 32.32 294 -23.43 1.24 18.23

6 57.35 29.72 254 23.29 175 -45.22 2.72 8.60

7 52.75 35.31 305 27.9 251 -46.91 1.65 13.42

8 52.75 34.81 269 22.18 203 -54.59 2.55 8.39

9 52.75 39.38 312 26.61 255 -54.86 2.07 12.96

10 52.75 41.35 274 19.26 238 -70.07 3.46 8.63


WHP-B Jacket Installation Procedure PAGE : 49 OF 49
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 6.4 - WHP-B JACKET UPENDING LOADS & CLEARANCES


Stage Main Auxiliary Auxiliary Main Main Pitch Roll Mudline
Hook Hook Hook Hook Hook Angle Angle Clearance
Radius Height Load Height Load

(m) (m) (MT) (m) (MT) (degrees) (degrees) (m)

11 42.52 49.57 315 26.28 308 -72.34 2.73 16.35

12 42.52 49.31 320 24.23 284 -75.86 3.43 15.33

13 42.52 47.48 473 18.70 85 -86.57 6.94 13.55

14 42.52 43.63 427 15.01 85 -85.99 7.66 9.61

15 42.52 43.56 427 14.95 105 -85.98 -0.03 9.65

16 42.52 43.59 531 13.00 0 -89.37 -0.01 10.16

6.5 WHP-B Jacket Flooding and Positioning


The following activities will be undertaken upon completion of jacket upending:

1) Slew the jacket from Stern to Port side of DB30 as shown in Fig. 6.5-1.
2) Transfer riggers to the jacket walkway via personnel basket.

NOTE: Optionally rigger can access to the top of jacket via dive boat and then climb
up the temporary sea ladder attached to reach rod support.

3) Transfer crane tugger line to jacket and connect it to the “pre-rigged jacket orientation
rigging”.
4) Transfer the camera cable from jacket walkway to DB-30 deck and connect it to the
display monitor.
5) Meanwhile the Surveyor will check whether the USBL transponders at subsea
template are operational. Otherwise ROV can replace the transponders as a mean
while activity.
6) Hold the jacket and maintain the hook position.
7) Riggers on jacket walkway will turn the reach rods to open the jacket leg flooding
valves on leg A1 and A2. Start to flood the jacket legs.

NOTE: The ballast scheme may be varied slightly to maintain maximum allowable
hook load and also to keep the jacket level for stabbing over the pile on the
template.

8) Expect to flood leg A1 = 6.0 MT and A2 = 14.61 MT to get the jacket 89.37° pitch.
WHP-B Jacket Installation Procedure PAGE : 50 OF 50
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

NOTE: Flooding water may be more or less than above expected quantity,
depending on actual jacket character at the site. The other legs may need to
be flooded as well to get a proper jacket pitch and roll angle for jacket set
down.
9) Walk the DB30 toward jacket design location and align the position of docking pile on
the subsea template with pile guide on the jacket frame assisted by USBL beacons,
ROV and camera on the jacket. Expected clearance between bottom of mudmat and
top of docking pile is approximately 5m (16.5 ft). Note that the docking guides on the
jacket are approximately 4.1 m above the bottom of mudmat.
10) Start lowering down (by approx. 4.5m) the jacket as directed by Superintendent until
the clearance is 0.5m between bottom of jacket and top of docking pile.
11) Confirm the orientation and position of jacket by camera screen together with ROV
monitor.
12) Lower down the jacket by 5m and slotting both template piles into the guides on the
jacket

NOTE: The ROV and cameras on the jacket will monitor the insertion of docking pile
into pile guide on the jacket. Superintendent will direct crane operator
during the slotting and lowering process until jacket rest on the seabed.
Piles are different in height by 1m.

NOTE: Obtain approval from CLJOC prior to set down jacket to seabed.

13) Check jacket position and orientation. The intended jacket position and orientation is:
Jacket position (Center) = N 1 159 403 E 876 417
Jacket Orientation/Heading = 3160

NOTE: The jacket position and orientation are dictated by subsea well template.
Any deviation from the above design position and orientation will be noted
and reported to CAR as part of as built information.

14) Continue lower the jacket/hook position until the crane hook load is 37MT (rigging
weight).
15) Simultaneously open the flooding valves on the legs until all legs are fully flooded.
16) Surveyor to record jacket position, orientation and initial jacket level post jacket
positioning and docking operations
6.6 Jacket Post Setdown Activities
Following set down of WHP-B jacket and acceptance of final position by CAR, the following
activities will take place:
WHP-B Jacket Installation Procedure PAGE : 51 OF 51
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

1) Air diver will remove the sling stopper on each lifting trunnion and derig the side lift
rigging.
2) Derig upending rigging from the jacket padeye.
3) ROV to cut the sacrificial wire rope on each control line bollard.
4) De-rig crane tugger line from jacket.
5) Set up gangway between WHP-B jacket and DB30.
6) Closed all the flooding valves properly.
7) Erect scaffolding on the jacket legs circumference.
8) Setup the cable leads for welding and lighting on the jacket.
9) Setup air hose and manifold to supply air pressure from DB30 to the jacket.
10) Remove jacket leg extension can.
11) ROV to survey subsea template post docking and set down operation to check
annulus of pile guides (gaps) and check the camera condition.
6.7 Figures
Figure No. Title

Figure 6.2-1 DB30 Anchor Pattern and Barge Setup for Jacket Installation

Figure 6.3.1-1 DB30 Equipment Layout (Jacket Installation Mode)

Figure 6.3.1-2 Subsea Wellhead USBL Bucket Detail

Figure 6.3.3-1 Tugboat Handling Line Rigging Arrangement

Figure 6.3.3-2 Control Tugger Line Rigging Arrangement

Figure 6.3.3-3 WHP-B Jacket Lifting Sequence – Sheet 1

Figure 6.3.3-4 WHP-B Jacket Lifting Sequence – Sheet 2

Figure 6.3.3-5 WHP-B Jacket Lifting Sequence – Sheet 3

Figure 6.4-1 WHP-B Jacket Upending Sequence – Sheet 1

Figure 6.4-2 WHP-B Jacket Upending Sequence – Sheet 2

Figure 6.4-3 WHP-B Jacket Upending Sequence – Sheet 3

Figure 6.5-1 WHP-B Jacket Slew for Positioning

Figure 6.6-1 WHP-B Jacket Positioning and Docking Sequence


WHP-B Jacket Installation Procedure PAGE : 52 OF 52
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.2-1 DB30 Anchor Pattern and Barge Setup for Jacket Installation
WHP-B Jacket Installation Procedure PAGE : 53 OF 53
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.3.1-1 DB30 Equipment Layout (Jacket Installation Mode)


WHP-B Jacket Installation Procedure PAGE : 54 OF 54
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.3.1-2 Subsea Wellhead USBL Bucket Detail


WHP-B Jacket Installation Procedure PAGE : 55 OF 55
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.3.3-1 Tugboat Handling Line Rigging Arrangement


WHP-B Jacket Installation Procedure PAGE : 56 OF 56
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.3.3-2 Control Tugger Line Rigging Arrangement


WHP-B Jacket Installation Procedure PAGE : 57 OF 57
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.3.3-3 WHP-B Jacket Lifting Sequence – Sheet 1


WHP-B Jacket Installation Procedure PAGE : 58 OF 58
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.3.3-4 WHP-B Jacket Lifting Sequence – Sheet 2


WHP-B Jacket Installation Procedure PAGE : 59 OF 59
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.3.3-5 WHP-B Jacket Lifting Sequence – Sheet 3


WHP-B Jacket Installation Procedure PAGE : 60 OF 60
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.4-1 WHP-B Jacket Upending Sequence – Sheet 1


WHP-B Jacket Installation Procedure PAGE : 61 OF 61
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.4-2 WHP-B Jacket Upending Sequence – Sheet 2


WHP-B Jacket Installation Procedure PAGE : 62 OF 62
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.4-3 WHP-B Jacket Upending Sequence – Sheet 3


WHP-B Jacket Installation Procedure PAGE : 63 OF 63
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.5-1 WHP-B Jacket Slew for Positioning


WHP-B Jacket Installation Procedure PAGE : 64 OF 64
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 6.6-1 WHP-B Jacket Positioning and Docking Sequence


WHP-B Jacket Installation Procedure PAGE : 65 OF 65
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

7. PILE INSTALLATION

7.1 Pre-Installation
Upon completion of jacket set down and post set down activities, the following activities will
be undertaken:
1) Get ready the ILT and hammers for pile installation.
2) Bring pile barge alongside DB30 starboard side. Refer to figure no. 7.1-1 for details of
barge set up during pile installation activities.
3) Set up gangway between DB30 starboard side and pile barge (if weather is
permitted).
4) Run cutting torch and hoses to pile barge for sea fastening cut off purpose.

NOTE: The blind flange on top of the 16” Water Injection riser (Su Tu Nau – Future)
on jacket row B next to leg B2 shall need to be removed at this stage to
prevent damaging it during pile installation (2” bleed valve is close to jacket
leg and higher than top of jacket leg can). If removed, a temporary wooden
cover with rubber backing attached is to be secured over the open end of
the riser during piling. The blind flange will be re-installed after completion
of pile installation.

TABLE 7.1-1 - LEG A1 & B1 PILE PROPERTIES


Section Total Outside Section Weight Cut-Off Allowance
Length Diameter WT x Length

(m) (mm) (mm x mm) (MT) (mm)

50 X 18288
P1 53.340 1372 40 X 12192 65 0
25 X 22860

25 X 3048
P2 36.576 1372 40 X 22860 53.5 1524
60 X 10668

60 X 3048
P3 47.244 1372 75 X 33528 107 4572
60 X 10668

60 X 9144
P4 44.196 1372 75 7830
50 X 35052
WHP-B Jacket Installation Procedure PAGE : 66 OF 66
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

TABLE 7.1-2 - LEG A2 & B2 PILE PROPERTIES


Section Total Outside Section Weight Cut-Off Allowance
Length Diameter WT X Length

(m) (mm) (mm x mm) (MT) (mm)

40 X 1524
P1 53.340 1372 45 0
25 X 51816

25 X 3048
P2 35.052 1372 40 X 9144 59 1524
60 X 22860

60 X 3048
70 X 21336
P3 42.672 1372 87 4572
50 X 9144
60 X 9144

60 X 6096
P4 38.100 1372 64 8445
50 X 32004

NOTE: Pile total length is included driving shoe and cut-off allowance, but excludes
stabbing guide length. Wall thickness is reading from the leading end of
each pile section.

7.2 Pile Handling


For P2 to P4 piles, the piles will be lifted from material barge by using the ILT OTC 30-60 or
ILT MCS 30-54. However P1 piles can be optionally lifted by either using lifting padeyes or
using ILT. The sequence of activities for the pile handling with ILT is as follow:

1) Rig-up the pile orientation rigging to the pile on the material barge.
2) Rig-up the ILT to auxiliary block crane.
3) By using the crane, transfer crane tugger line end to the pile orientation rigging
4) The riggers will then connect the crane tugger line to the pile orientation rigging
5) Slide the ILT into the pile.
6) Expand the ILT wedge to grip the pile
7) Upend the pile slowly by lift up the crane boom and hook position
8) Swing the crane boom slowly and continue to lift up the crane boom and hook
position until the pile is in the straight position
9) Lift up the pile clear over the barge and swing to the proposed jacket leg location.
The crane tugger will control the pile orientation during pile stagger and as a hold
back line.

Refer to figure no. 7.2-1 for arrangement of pile rigging.


WHP-B Jacket Installation Procedure PAGE : 67 OF 67
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

7.3 Pile Penetration Acceptance and Tolerances


Pile acceptance may occur when the pile is driven to its design true length penetration
depth of 114.1m for A1&B1 legs and 101m for A2 & B2 leg for pile make up as specified
in Figure no. 7.3-1 to 7.3-2. It is to be noted that the piles have been design for 3m under
drive and 3m for overdrive with respect to lateral loads.

Should the design penetration not be reached and the CAR deems that the penetration is
unacceptable, Contractor in consultation with CAR shall decide on remedial action to be
taken. Possible remedial action includes but is not limited to the following;

• Jetting/airlifting and re-driving

A jetting/airlifting string will be available on board capital asset barge.


7.4 Pile Driving Refusal Criteria
JRMAP shall drive piles to design penetration or refusal based on the hammer
manufacturers refusal criteria below and hammer selection as per pile drivability study:
Pile driving refusal with a properly operating hammer is defined as the point where the pile
driving resistance under continuous driving conditions exceeds:
• 125 or more blows over six successive 0.25m increments, or
• 125 blows/ 0.25m increasing to 205 blows/ 0.25m over four successive 0.25m
increments
• 250 blows/ 0.25m over one 0.25m increment.

In the event hard driving is experienced, Barge Superintendent in consultation with CAR
has the right to stop driving the piles. The above criteria should consider the usage of
proposed hammer in conjunction with drivability analysis.
7.5 Pile Installation Sequence
The sequence described below is considered to be the Contractor’s primary installation
sequence, but the actual installation sequence will depend upon jacket level and the actual
driving encountered.

NOTES:
1) Longitudinal seam weld location should be staggered minimum 90 degree
each other.
2) Refer to Section 7.6 for dog plate details. Each dog plate has 80 MT
capacity.
3) OTC 30-60 has SWL of 500 Tons and MCS 30-54 ILT has SWL of 350 Tons.
4) Pile stoppers to be removed and remaining stopper material on the pile to be
ground smooth with 3 mm maximum height from pile surface.
WHP-B Jacket Installation Procedure PAGE : 68 OF 68
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

5) Pile to pile welding NDT will be 100% Visual and UT. Pile welds can be
cooled by compressed air right upon the completion of welding.
6) MHU 800S hammer weight of 148.8 ST allows use of the whip block. Derrick
Barge movement should not be required.
7) Pile to be monitored: 3 sections of P2, P3 and P4 on one Row 1 leg and 2
sections of P3 and P4 on the other Row 1 leg
8) Expected self penetration: P1+P2 = 11.39m
9) Expected self penetration: P1+P2+MHU800S = 12.73m
10) Pile securing dog to be flame cut and remaining dog material on the pile to
be ground smooth.
11) To maintain good levelness that has been achieved, securing dog will only
be removed prior to the pertinent pile to be driven. Hence while one pile
being driven, the other side will remain dogged.

Refer to Figure 7.5-1 to 7.5-3 for the piling installation sequence.

1) Determine the lowest and highest corner of the diagonally opposite outer jacket legs
and commence venting and removal of jacket closures, working from highest to
lowest corner.
2) Pick up and stab two P1 sections into the highest jacket leg and lower until it rests on
the pile stopper, working from highest to lowest corner diagonally. For example;
assumed the leg A2 is the highest level then install the P1 pile to leg A2 then B1
subsequently.
3) Pick up and stab P2 section onto the P1 section on leg A2 and weld.
4) Release the ILT after welding is 30% completed. Then work as the same sequence
as P1 section, lift and stab P2 onto P1 on leg B1 and same to the remaining legs.
5) Once welding and NDT are completed, P1 and P2 sections will be lifted with an ILT
until stoppers are clear off TOJ leg, and remove pile stoppers and lower to self
penetration (11.39m expected self penetration). Continue the same on all legs.

NOTE: A total hook load of 242 ST (including ILT and rigging) allows use of the
auxiliary block (Auxiliary Hook Capacity = 750 ST @ 160’ lifting radius).

6) Drive P2 section on the lowest leg (B1) with the V540 hammer with efficiency
adjusted to low energy rate for assessing the soil characteristic. Further 1.34m self
penetration is expected during hammer placement on top of pile.
7) Drive P2 section on the highest leg (A2) with the V540 hammer with efficiency
adjusted to low energy rate for assessing the soil characteristic.
WHP-B Jacket Installation Procedure PAGE : 69 OF 69
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

8) If jacket leveling is required, Barge Superintendent will decide whether the jacket
leveling will be conducted at this stage or after P4 sections driven. Jacket leveling
procedure is described in Section 7.6.
9) Drive P2 section on the remaining legs with the V540 hammer with efficiency
adjusted to low energy rate for assessing the soil characteristic.
10) Cut off all P2 piles at pile cut off marking. Lamination check at the cut line on P2
sections.
11) Stab and weld two P3 sections onto P2 sections of the first two driven piles.

NOTE: If soft driving is anticipated, P3 sections may be installed 4 legs at the same
time. Pile clash check has been illustrated in Fig. 7.5-4.

12) Meanwhile connect the pre-attach pile monitoring cable from the P3 pile to the pile
monitoring cable from the pile monitoring container. A1 or B1 is nominated for pile
monitoring as expected highest Soil Resistance Driving.
13) Drive two P3 sections with the MRSB 3000 working from the lowest corner.
14) Cut off all P3 piles at pile cut off marking. Lamination check at the cut line on P3
sections.
15) Stab and weld two P4 sections onto P3 sections of the previous driven legs.
16) Meanwhile connect the pre-attach pile monitoring cable from the P4 pile to the pile
monitoring cable from the pile monitoring container. A1 or B1 is nominated for pile
monitoring as expected highest Soil Resistance Driving.
17) Drive two P4 sections with the MHU800 working from the lowest corner.
18) If required, level the jacket using either one or a combination of the methods
described in Section 7.6. Dog off the jacket to the piles.
19) Continue P3 and P4 pile sections on the remaining legs following the above step 11
to step 14.
20) If required, level the jacket using either one or a combination of the methods
described in Section 7.6. Dog off jacket to the piles.
21) Once the jacket level is in tolerance, mark and cut-off all P4 pile sections.
22) Lamination check at the cut line on P4 sections. Prepare for transition piece and
crown shim installation.
7.6 Jacket Leveling
In the event that the jacket level is out of tolerance, despite efforts to maintain it by
selective driving, it may be necessary to level the jacket using one or a combination of the
methods outlined below.
WHP-B Jacket Installation Procedure PAGE : 70 OF 70
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

7.6.1 Direct Uplift (Lifting with Jacket Positioning Padeye)


A primary option to bring the jacket to within level tolerance is to lift the lowest side of the
jacket using the upending padeye and subsequently dog off the jacket to the piles on that
side. Refer to Figure 7.6-2 for details of jacket to pile dog off plate.

The high side of the jacket will have stops welded to the driven piles, which will prevent the
high side of the jacket moving upward but will allow for downward movement. Stoppers
may also be welded to the low side jacket piles to stop the jacket at the desired height to
obtain levelness.

The derrick crane main block will be rigged to the upending sling. The maximum uplift force
is limited to 400 MT, which is the SWL of each jacket upending padeye.

The above methods will be repeated until the desired jacket level is achieved.
7.6.2 Portable Hydraulic Jacks
The use of jacking frame and hydraulic jacks allows for the jacket to be jacked up or down.
Refer to figure no. 7.6-1 for arrangement of hydraulic jack.
7.7 Figures
Figure No. Title

Figure 7.1-1 Barge Setup for Pile Installation

Figure 7.2-1 Pile Rigging Arrangement

Figure 7.3-1 Jacket Pile Make Up & Details – Sheet 1

Figure 7.3-2 Jacket Pile Make Up & Details – Sheet 2

Figure 7.5-1 Pile Upending & Stabbing

Figure 7.5-2 WHP-B Jacket Row 1 Piling Sequence

Figure 7.5-3 WHP-B Jacket Row 2 Piling Sequence

Figure 7.5-4 Pile Clash Check

Figure 7.6-1 Hydraulic Jack Arrangement to Move Jacket Up

Figure 7.6-2 Jacket Securing Dog Plate Details


WHP-B Jacket Installation Procedure PAGE : 71 OF 71
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.1-1 Barge Setup for Pile Installation


WHP-B Jacket Installation Procedure PAGE : 72 OF 72
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.2-1 Pile Rigging Arrangement


WHP-B Jacket Installation Procedure PAGE : 73 OF 73
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.3-1 Jacket Pile Make Up & Details – Sheet 1


WHP-B Jacket Installation Procedure PAGE : 74 OF 74
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.3-2 Jacket Pile Make Up & Details – Sheet 2


WHP-B Jacket Installation Procedure PAGE : 75 OF 75
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.5-1 Pile Upending & Stabbing


WHP-B Jacket Installation Procedure PAGE : 76 OF 76
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.5-2 WHP-B Jacket Row 1 Piling Sequence


WHP-B Jacket Installation Procedure PAGE : 77 OF 77
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.5-3 WHP-B Jacket Row 2 Piling Sequence


WHP-B Jacket Installation Procedure PAGE : 78 OF 78
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.5-4 Pile Clash Check


WHP-B Jacket Installation Procedure PAGE : 79 OF 79
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.6-1 Hydraulic Jack Arrangement to Raise Jacket


WHP-B Jacket Installation Procedure PAGE : 80 OF 80
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 7.6-2 Jacket Securing Dog Plate Details


WHP-B Jacket Installation Procedure PAGE : 81 OF 81
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

8. CONDUCTOR INSTALLATION
8.1 General
This section describes the details of the installation of conductors. The total of 10 slots of
Ø36” straight conductors will be installed through the top of jacket.

The conductors consist of 5 sections as detailed in Figure 8.1-1. Conductor guides on the
WHP-B jacket are numbered as shown in Figure 8.1-2. Table 8.1 summarizes the
conductor make up.

TABLE 8.1 - CONDUCTOR MAKEUP


Section Diameter Wall Thk Length Weight Cutoff Remark
Allowance

(mm) (mm) (mm) (MT) (mm)

C1 Ø 914 25 49,378 27.06 0

C2 Ø 914 25 48,158 26.40 1,524

C3 Ø 914 25 35,676 19.55 1,524

Included 3028mm overdrive


C4 Ø 914 25 19,812 10.86 7,843
allowance

Included 500mm jacket set


C5 Ø 914 25 11,719 6.42 691
low allowance

NOTE: C5 will be installed post drill deck installation.

8.2 Conductor Driving Equipment

TABLE 8.2 - CONDUCTOR DRIVING EQUIPMENT


Item Details

Hammer Type V530 V540

Number Available 1 1

Striking Energy:
o Ram Weight (Kg) 13,608 18,552
o Max. Stroke (m) 1.524 1.524
o Rated Energy (KJ) 204 270

1000
Rated Operating Pressure (KPa) 896.3 (130 psi)
(150 psi)

Max. Blow Rate at Max. Stroke (Blow/min) 42 48

38 77
Total assembled Weight (MT)
(41.93 ST) (84.74 ST)
WHP-B Jacket Installation Procedure PAGE : 82 OF 82
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

8.3 Conductor Handling


All conductors will be lifted from material barge by using the ILT MCS 30-54.

The sequence of activities for the conductor handling is as follow:


1) Rig-up the conductor orientation rigging to the pile on the material barge.
2) Rig-up the ILT to auxiliary block crane.
3) By using the crane, transfer crane tugger line end to the conductor orientation rigging
4) The riggers will then connect the crane tugger line to the conductor orientation rigging
5) Slide the ILT into the conductor.
6) Expand the ILT wedge to grip the conductor
7) Upend the pile slowly by lift up the crane boom and hook position
8) Swing the crane boom slowly and continue to lift up the crane boom and hook
position until the pile is in the straight position

NOTE : C1 & C2 will be lifted off with the assistance of crawler crane to pick up the
belly at a constant load 10 ST.

9) Lift up the pile clear over the barge and swing to the proposed jacket leg location.
The crane tugger will control the pile orientation during pile stagger and as a hold
back line.
8.4 Conductor Driving Refusal and Acceptance Criteria
With the design conductor penetration depth 90m from the reference mudline, the
acceptance and refusal criteria is complied with the pile driving acceptance and refusal
criteria described in above section 7.2 and 7.3.
8.5 Conductor Installation Sequence
The sequence described below is primary installation sequence. However, the actual
installation sequence will be dependent on site conditions and can be varied accordingly.
Sequence may change during installation by the Barge Superintendent and Field
Engineer’s consultation with the CAR.

NOTES:
1) Longitudinal seam weld location should be staggered minimum 90 degree
each other.
2) ILT MCS 30-54 has SWL of 350 Tons.
3) Conductor stoppers to be removed and remaining stopper material on the
pile to be ground smooth with 3 mm maximum height from pile surface.
WHP-B Jacket Installation Procedure PAGE : 83 OF 83
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

4) Splice welding NDT will be 100% Visual and UT. Conductor welds can be
cooled by compressed air right upon the completion of welding.
5) All conductor sections and driving hammer can be handled using the whip
block.
6) Drive conductors from the middle of the bay towards the outer perimeter to
reduce soil packing.
7) Expected self penetration: C1+C2 = 11.02m
8) Expected self penetration: C1+C2+V540 hammer = 12.04m

1) Ensure all of the piles installed and the jacket level are within the tolerance.
2) The conductors P1 and P2 section will be installed in batches as only 2 slots are
allow for hang-off on conductor guide at a time. Refer to the Document No. 2005-
4189-6J-0011 Volume 3 “Jacket Miscellaneous Design”
3) If necessary, Deploy ROV to monitor the conductor stabbing and lowering through
the jacket and subsea drilling template.
4) Lift off and stab first batch of C1 sections (3 slots). The stoppers on C1 will sit on the
conductor stabbing guide.
5) Install bear clamps on top of C1 sections
6) Lift off and stab C2 sections (3 slots) through bear clamps. Weld out the splice and
conduct NDT.
7) Lift up the C1+C2 section and remove the stoppers in such way that the excess
material will not be more than 3mm above C1 surface.
8) Lower down C1+C2 section for self penetration.
9) Resume the above step 4 to step 8 with the remaining batches (3 slots, 2 slots and 2
slots).
10) Drive all C1+C2 conductors with V540.
11) Cut off the top of C2 and install bear clamp on the top of C2.
12) Lift off and stab C3 sections through bear clamps. Weld out the splice and conduct
NDT.
13) Drive all C3 conductors with V540.
14) Cut off the top of C3 and install bear clamp on the top of C3.
15) Lift off and stab C4 sections through bear clamps. Weld out the splice and conduct
NDT.
16) Repeat the above steps for the rest of conductors following above mentioned
batches.
17) Cut off the top of C4 and install bear clamp on the top of C4.
18) Centralize the conductors and install the conductor lateral support plates as shown in
Figure 8.5-2.
WHP-B Jacket Installation Procedure PAGE : 84 OF 84
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

19) Put temporary cover plate on top of each conductor to prevent foreign objects falling
in.
20) C5 sections will be installed at later stage after drill deck installation.
21) Lift off and stab C5 sections through bear clamps. Weld out the splice and conduct
NDT.
22) Surveyor will transfer the MSL into conductor cut-off elevation EL(+)18.461m.
23) Cut off the top of C5 as per the marked cut-off elevation.
24) Put temporary cover plate on top of each conductor to prevent foreign objects falling
in.
8.6 Figures
Figure No. Title

Figure 8.1-1 Conductor Makeup

Figure 8.1-2 Conductor Guide Arrangement

Figure 8.5-2 Conductor Guide Sections & Details


WHP-B Jacket Installation Procedure PAGE : 85 OF 85
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 8.1-1 Conductor Makeup


WHP-B Jacket Installation Procedure PAGE : 86 OF 86
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 8.1-2 Conductor Guide Arrangement


WHP-B Jacket Installation Procedure PAGE : 87 OF 87
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 8.5-2 Conductor Guide Sections & Details


WHP-B Jacket Installation Procedure PAGE : 88 OF 88
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

9. JACKET APPURTENANCE INSTALLATION AND REMOVAL ITEMS


The following tasks in Table 9 are parts of WHP-B jacket installation scope of work and will
be completed prior to DB30 departure from Su Tu Den Northeast Field. The Task Sheets
referred to in Table 9 can be found in Appendix D.

TABLE 9. - JACKET APPURTENANCE INSTALLATION TASK SHEETS


Item Task Sheet No. Topic / Subject Drawing No.

1 STDNE-WHPB-01 Crown Shim Installation 2005-4189-62-0015

2 STDNE-WHPB-02 Transition Piece Installation 2005-4189-62-0016

3 STDNE-WHPB-03 Deployment of Tide Gauge N/A

4 STDNE-WHPB-04 Drill Deck Installation R2891-BO-JKT-1023

5 STDNE-WHPB-05 Boatlanding Installation R2891-BO-JKT-1022

2005-4189-63-0039.01
6 STDNE-WHPB-06 Boatlanding Stairway Installation
2005-4191-61-0004.02

7 STDNE-WHPB-07 Temporary Riser Clamp Removal 2005-4189-63-0046.05

8 STDNE-WHPB-08 WHP-B Jacket Upending Rigging Removal R2891-BO-JKT-1026

9 STDNE-WHPB-09 Upending Rigging Platform Removal 2005-4189-66-0005

Removal of Jacket Positioning USBL and 2005-4189-66-0003


10 STDNE-WHPB-10
Underwater Camera 2005-4189-66-0004

11 STDNE-WHPB-11 Removal Flooding Valve Reach Rods 2005-4189-63-0060

12 STDNE-WHPB-12 Deck Docking Guide Installation 2005-4189-62-XXXX

13 STDNE-WHPB-13 Grating & Handrails Installation N/A

14 STDNE-WHPB-14 Navigation Light Installation N/A


WHP-B Jacket Installation Procedure PAGE : 89 OF 89
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

10. JACKET INSTALLATION COMPLETION WORKS


10.1 Blasting and Painting
The offshore welding and damaged areas on the jacket will be blasted and painted upon
completion of welding and NDT activities on the pertinent location. This activity shall also
be considered as a completion work where no other works carried out on the area. The
blasting and painting details are covered in document no. 2004-4000-6P-8001,”Structural
Blasting and Painting Procedure”.
10.2 Post Installation ROV Survey
This section describes the ROV activities required after jacket installation.
1) Deploy the ROV.
2) Perform survey of the jacket under water condition by flying around the jacket and
record the jacket anode and riser clamp bolt condition. See Figures 10.2-1 to 10.2-3
for jacket anode locations and Figure 10.2-4 for the riser clamp locations.
3) Survey seabed at the perimeter of the jacket foot print area
4) Survey seabed at the drill rig foot print area (spud can holes)
5) Re-check the template slots for any debris, gap between pile and guide, well slot
covers.
6) Recover ROV.

Meanwhile:
• Transfer painting and blasting spread back to DB30.
• Derig scaffolding.
• Derig all cable leads and hoses.
• Derig west-east walkway.
• Derig DB30 gangway.

The post installation survey will be performed just before the DB30 demobilizes.
10.3 Figures
Figure No. Title

Figure 10.2-1 WHP-B Jacket Anode Arrangement – Sheet 1

Figure 10.2-2 WHP-B Jacket Anode Arrangement – Sheet 2

Figure 10.2-3 WHP-B Jacket Anode Arrangement – Sheet 3

Figure 10.2-4 WHP-B Jacket Riser Clamp Arrangement


WHP-B Jacket Installation Procedure PAGE : 90 OF 90
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 10.2-1 WHP-B Jacket Anode Arrangement – Sheet 1


WHP-B Jacket Installation Procedure PAGE : 91 OF 91
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 10.2-2 WHP-B Jacket Anode Arrangement – Sheet 2


WHP-B Jacket Installation Procedure PAGE : 92 OF 92
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 10.2-3 WHP-B Jacket Anode Arrangement – Sheet 3


WHP-B Jacket Installation Procedure PAGE : 93 OF 93
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Figure 10.2-4 WHP-B Jacket Riser Clamp Arrangement


WHP-B Jacket Installation Procedure PAGE : 94 OF 94
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

APPENDIX A Approval Form & Checklist of Critical Operation


WHP-B Jacket Installation Procedure PAGE : 95 OF 95
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 96 OF 96
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 97 OF 97
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 98 OF 98
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 99 OF 99
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 100 OF 100
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 101 OF 101
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 102 OF 102
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 103 OF 103
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 104 OF 104
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 105 OF 105
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

APPENDIX B Pile Driving Record Format


WHP-B Jacket Installation Procedure PAGE : 106 OF 106
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 107 OF 107
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 108 OF 108
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

APPENDIX C Pile Drivability Report Extract


WHP-B Jacket Installation Procedure PAGE : 109 OF 109
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 110 OF 110
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 111 OF 111
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 112 OF 112
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 113 OF 113
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 114 OF 114
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 115 OF 115
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 116 OF 116
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 117 OF 117
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 118 OF 118
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 119 OF 119
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 120 OF 120
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 121 OF 121
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 122 OF 122
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 123 OF 123
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 124 OF 124
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 125 OF 125
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 126 OF 126
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 127 OF 127
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

APPENDIX D Jacket Appurtenance Installation Task Sheets


WHP-B Jacket Installation Procedure PAGE : 128 OF 128
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-01

Title Crown Shim Installation


Location WHP-B jacket pile P4 section
Drawing Reference 2005-4189-62-0015

Item No Description / Location

This section describes the activities required for the installation of crown shim
plates.

1) Ensure all of the piles are installed and the jacket level is within tolerance.
2) Drive the steel plate wedges into the small gap between the jacket leg and
the pile to relocate the pile position in accordance with the as-built spacing
of the deck leg.

NOTE: If as-built deck leg spacing is not available, the design deck legs
spacing (a square 18m) will be used as reference.

3) Pick up one section of shim plate using the crane and placed in the
appropriate location.
4) Weld the crown shim to top of jacket and pile.
5) Repeat (3) and (4) for the rest of the crown shim segments and remove
the spacing wedges.
6) Perform NDT on the welds.
7) Repeat the procedure for the other jacket legs.

Meanwhile during the crown shim plate installation, the following activities can
be performed:

- Transfer hammers to the material barge.


- Install walkway handrails.
- Boatlanding installation after the actual MSL is obtained (refer to Section
8.5).
- Cut off the piles at the design elevation based on the actual MSL (refer to
Section 7.5).
- Transition Piece installation (refer to Section 9.2).
- Temporary riser clamp removal (refer to Section 8.7).
- Jacket positioning USBL and underwater camera removal (refer to Section
8.11).
- Jacket rigging platform removal (refer to Section 8.10).
- Riser flooding (refer to Section 8.12).

Schedule To be carried out after pile driving and jacket is in verticality tolerance
NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 129 OF 129
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 130 OF 130
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-02

Title Transition Piece Installation


Location WHP-B jacket on top of pile P4 section
Drawing Reference 2005-4189-62-0016

Item No Description / Location


Once the piles are cut-off and beveled, the transition piece can be installed as
following steps;

1) Lift off the transition piece from the material barge. If required, weld
lifting padeye on the top of transition can.
2) Stab the transition piece into its relative leg with the correct orientation.
NOTE: The “low point” and “high point” shall be marked on both
transition piece and pile P4 for stabbing alignment.
3) Welder foreman will check the weld gap and check the transition vertical
angle with sprit level.
4) Once the weld gap and verticality are accepted, tack weld the transition
piece to pile.
5) Continue transition piece stabbing on the other legs following above
steps.
6) Field Engineer and Welder foreman will check the leg spacing and
compare to the as-built deck leg spacing (if not applicable, design deck
leg spacing will be used).
7) Once the leg spacing is confirmed, commence weld out and NDT on
transition piece.
8) Meanwhile; Surveyor shall transfer the recorded MSL and evaluate the
cut-off elevation on the transition piece. Field engineer will witness and
confirm the cut-off elevation.
9) Upon the completion of welding and NDT, the top of transition piece will
be cut-off as per the marked elevation.

Schedule To be carried out after pile P4 sections are cut off.


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 131 OF 131
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 132 OF 132
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-03

Title Deployment of Tide Gauge


Location T.O.S. WHP-B jacket EL. (+)5000
Drawing Reference N/A
Item No Description / Location

This section describes the activities required for the installation of tide gauge.
Tide gauge can be installed at any time when the level of jacket is within
acceptance criteria. However, should there be a jacket leveling after the tide
gauge has been installed. The tide record period of 39 hours will re-start again
after the completion of jacket leveling.

Tide Gauge Installation

1) Install two of the scaffolding pipe horizontally at the jacket walkway


handrail on WHP-B Platform. The scaffolding pipe will stick outside from
the handrail approximately 0.6m long.
2) Secure the tide gauge probe on the bottom of 50mm dia. X 9m lg. tide
pole pipe.
3) Install 50mm tide pole pipe approximately 9m long at the scaffolding pipe
downward to the sea.
4) The tide gauge logger will then secured at the walkway

Schedule To be carried out anytime that jacket is within verticality tolerance


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 133 OF 133
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-04

Title Drill Deck Installation


Location WHP-B jacket EL. (+)5000
Drawing Reference R2891-BO-JKT-1023

Item No Description / Location

This section describes the activities required for the installation of Boatlanding.

1) Transfer rigger to the top of drill deck by personnel basket.


2) Send the crane tugger line to boatlanding and connect it to boatlanding
control rigging.
3) Rig up drill deck lifting sling to the whip block of DB30.
4) If required, cut off seafastening to get the drill deck free to lift.
5) Lift up drill deck clear from the material barge and bring it to the
designated location.
6) Lower down the drill deck and stab the relative leg over the longest
stabbing guide.
7) After one of the leg is secured to the stabbing guide then slide in
another leg to the lower stabbing guide. Crane tugger line will be used to
control the boatlanding position.
8) Once two legs are secured to the stabbing guide, lower down the drill
deck until it fully sits on the support.
9) Weld out the leg to the support.
10) Derig the drill deck lifting sling.
11) Derig the temporary leg bracing sling.
12) Cut off and grind flush all lifting padeyes.

Schedule To be carried out after all C4 conductors have been installed


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 134 OF 134
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 135 OF 135
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-05

Title Boatlanding Installation


Location WHP-B jacket Row A and Row B
Drawing Reference R2891-BO-JKT-1022

Item No Description / Location

This section describes the activities required for the installation of Boatlanding.

1) Get the actual MSL elevation from the surveyor after 39 hours MSL survey
completed.
2) Cut off the boatlanding king post according to actual MSL measurement.
3) Pre-rig the hold-back rigging with come-along on the jacket brace or leg to
secure boatlanding when it rest on the supports.
4) Send the crane tugger line to boatlanding and connect it to boatlanding
control rigging.
5) Rig-up boatlanding rigging to crane whip block.
6) Lift up boatlanding clear from the material barge and bring it to the
designated boatlanding position at jacket (on row A and row B).
7) Slide in one of boatlanding king post to the higher boatlanding stabbing
guide.
8) After one of the boatlanding king post is secured to the stabbing guide
then slide in another king post to the lower stabbing guide. Crane tugger
line will be used to control the boatlanding position.
9) After both of boatlanding king posts are secured to the stabbing guide,
then lowered down boatlanding until the weight is taken by boatlanding
supports.
10) Lean the boatlanding to doublers plate at EL (+) 5.4m and secure with
hold back rigging to the jacket brace or legs.
11) De-rig boatlanding rigging and crane tugger line.
12) Weld the boatlanding king post to the doublers plate and perform NDT.
13) Install the chain lines from the barge bumper to the padeyes on the
transition pieces.

To be carried out as a meanwhile activity during crown shim and transition


Schedule
piece installation
NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 136 OF 136
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 137 OF 137
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-06

Title Boatlanding Stairway Installation


Location WHP-B jacket Row A and Row B
2005-4189-63-0039.01
Drawing Reference 2005-4191-61-0004.02
Item No Description / Location

1) Lift off the stairway from the material barge with web slings wrapped
around the main chord.
2) Lower down the stairway to align the hinge holes to the stair landing
platform.
3) Insert the bolts Ø25 x 200 long through the hinge hole.
4) Slowly lower down the stairway to until the lower end sits on the support
base plates.
5) Fitter foreman will adjust / cut the extra length of stairway. Tack weld the
stairway to the base plates.
6) Fully slack the lifting slings and derig them.
7) Weld out the stairway and the base plate. Then conduct NDT.

Schedule To be carried out after boatlanding installation


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 138 OF 138
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 139 OF 139
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 140 OF 140
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-07

Title Temporary Riser Clamp Removal


Location WHP-B jacket Row 2 EL.(-) 38.75
Drawing
2005-4189-63-0046.05
Reference
Item No Description / Location

There will be one temporary riser clamp which required to be removed offshore.
The clamp is designed to support the riser on the installation stage only. The detail
of the temporary riser clamp is below:

Preferred
No. Riser Location Bolts on Clamp Bolts on Flange
shackle size
24” Production 8 nos. 25Øx200 12 nos. 25Øx130
1 Row 2 1” (8.5 T)
line Lg. Lg.

The following sequence describes the activities required for the removal of
temporary riser clamp.

1) Send the SAT diver down to the location of temporary riser clamp supports at
EL (-) 45.6m. The diver should be equipped with the hydraulic impact gun,
hammer wrench, sockets and rigging as a minimum. These tools should be
stored in the diver work basket.
2) After the diver reach the temporary riser clamp support, open the clamp bolt
that attached to the riser first
3) Send the rigging down to the riser clamp support
4) Attach the rigging to the temporary support clamp padeye
5) Send the SAT diver down to the location of temporary riser clamp supports at
EL (-) 45.6m. The diver should be equipped with the hydraulic impact gun,
hammer wrench, sockets and rigging as a minimum. These tools should be
stored on the diver work basket.
6) After the diver reach the temporary riser clamp support, open the clamp bolt
that attached to the riser first
7) Send the rigging down to the riser clamp support
8) Attach the rigging to the temporary support clamp padeye
9) Open the clamp bolt that attached to the jacket brace
10) After the clamps are opened and the riser support clamp separated from the
riser, diver will inform the diver supervisor on deck and barge foremen to pick
up the riser clamp support.
11) Pick up the riser support clamp and bring it to material barge
12) De-rig the rigging from the crane hook.

Schedule To be carried out as a meanwhile activity anytime after piling


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 141 OF 141
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 142 OF 142
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-08

Title WHP-B Jacket Upending Rigging Removal


Location Jacket Upending Padeye EL.(+)5000
Drawing
R2891-BO-JKT-1026
Reference
Item No Description / Location

This section describes the activities required for the removal of jacket positioning
rigging.

1) Rig-up one of jacket upending rigging to the crane whip block


2) Disconnect the jacket upending rigging from the temporary hang off rigging.
3) Send rigger to the jacket padeye location. The rigger will be equipped with
chain block, tweezer, hammer and manila ropes as a minimum.
4) The crane will then pick up the rigging until the weight of shackle is taken by
the crane
5) Remove the safety pin from the shackle pin
6) Secure the shackle pin handle to the sling eye with the rope.
7) Secure the shackle body to the sling eye with the rope.
NOTE: Point 7 and 8 above will prevent the shackle and pin dropped once
they disconnected from the padeye
8) Pull out the shackle pin from the padeye
9) Put the jacket upending rigging on material barge
10) De-rig jacket upending rigging from the crane hook
11) Repeat the same procedure to the next remaining rigging.

Schedule To be carried out as a meanwhile activity anytime after piling


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 143 OF 143
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 144 OF 144
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-09

Title Upending Rigging Platform Removal


Location WHP-B jacket Row 2 - EL.(+)5000
Drawing
2005-4189-66-0005
Reference
Item No Description / Location

This section describes the activities required for the removal of jacket rigging
platform.

1) Connect the lift rigging from the hook to the pre-rigged rigging at the rigging
platform
2) Send the diver to rigging platform. The diver should be equipped with the
hydraulic impact gun, hammer wrench, sockets and chain block as a minimum
3) The diver will then swim to the under water clamp location (2 Nos.)
4) Open the clamp bolts and keep only one bolt remain at the clamp
5) Connect chain block to the clamp flange plate and rigging platform brace
6) Tension up the chain block until the half clamp weight is taken by the chain
block
7) Open the last clamp bolt and remove it from the clamp
8) Release the bottom part of clamp by lowering the chain block tension gently.
9) Once the bottom part of clamp weight is taken by the clamp’s chain then
release the chain block from the clamp
10) Repeat the same procedure for the remaining clamp.
11) Rigger to unbolt the above water clamps (2 Nos.) with similar method to above
steps.
12) Rigger to cut the rigging lashing on the platform as much as he can.
13) Lift up the rigging platform off the water
14) Put the rigging platform on the material barge
15) De-rig rigging platform rigging from the crane hook

Schedule To be carried out as a meanwhile activity anytime after piling


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 145 OF 145
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 146 OF 146
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-10

Title Removal of Jacket Positioning USBL and Underwater Camera


Location WHP-B jacket EL. (-)45600
Drawing 2005-4189-66-0003
Reference 2005-4189-66-0004

Item No Description / Location

This section describes the activities required for the removal of USBL. This activity
can be performed after the temporary riser clamp support removal.

1) Send the diver to USBL location at jacket and subsea wellhead template EL (-)
53 m. Diver should be equipped with the hydraulic impact gun, hammer
wrench, sockets as a minimum
2) Diver will then remove the USBL at the subsea wellhead template location
3) Store the USBL in dive basket
4) Diver will then remove the jacket positioning underwater camera
5) Store the camera in dive basket
6) Diver will then move to the USBL at jacket location EL (-) 51m
7) Remove the USBL from the bracket
8) Store the USBL in dive basket
9) Pick up the dive basket and diver over the sea
10) Offload the USBL and cameras from the basket on barge deck

Schedule To be carried out as a meanwhile activity anytime after piling


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 147 OF 147
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 148 OF 148
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 149 OF 149
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-11

Title Removal Flooding Valve Reach Rods


Location WHP-B jacket EL. (+)5000
Drawing
2005-4189-63-0060
Reference
Item No Description / Location

After completion of jacket installation, the flooding valve reach rods and the top
supports are to be removed following to the below steps;

1) Ensure that flooding valves are at closed position prior to removing reach rods.
2) Connect shackles 8.5T to the lifting padeye on the reach rod.
3) Connect the lifting slings from the reach rod to whip hook.
4) Cut the reach rod top support EL (+)5000 and grind smooth the excess
material on the jacket top brace.
5) Lift up the reach rod until it is free from all support sleeve.
6) Put the reach rod on the material barge and derig the lifting slings.

Schedule To be carried out as a meanwhile activity anytime after piling


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 150 OF 150
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 151 OF 151
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-12

Title Deck Docking Guide Installation


Location WHP-B jacket EL. (+)11800
Drawing
2005-4189-63-0040.02
Reference
Item No Description / Location

Deck docking guides will be install on top of transition piece once the cut off
elevation (+)11800 has been confirmed, marked and cut-off.

1) Rig up the deck docking guide with lifting sling Ø1” x 70ft through the lifting lug
on top of each docking guide.
Note: The lifting sling configuration is basket lift and 2 eyes connecting to whip
hook.
2) Lift up the deck docking guide and stab into top of transition piece at the
respective leg.
3) Centralize the deck docking guide.
4) Continue the same with the remaining legs.
5) Measure the deck leg spacing and compare to the design spacing.
6) Once the spacing is confirmed correct, weld out the deck docking guide to the
transition piece.
7) Carry out NDT.

Schedule To be installed after transition piece cut-off at EL (+)11800


NDT / Special
100% UT
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 152 OF 152
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 153 OF 153
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-13

Title Grating & Handrails Installation


Location WHP-B jacket EL. (+)5000
Drawing
N/A
Reference
Item No Description / Location

Gratings and handrails, which have been removed for the installation purpose,
shall be re-instated as the following;

1) 4 gratings above the upending padeyes to be installed. Refer to drawings No.


2005-4189-63-0020.02
2) Where it is applicable, Handrails are to be installed as per the drawing
No.2005-4191-61-0006.

Schedule To be carried out as a meanwhile activity anytime after piling


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 154 OF 154
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-14

Title Navigation Light Installation


Location T.O.G. WHP-B jacket EL. (+)5000
Drawing
N/A
Reference
Item No Description / Location

Before DB 30 leave the work site, navigation light(s) shall be installed and turned
on.

1) Lift off the navigation light and place it at the location where CAR will be
decided.
2) Turn on the navigation light unit and test whether it is operating properly.
3) Secure the navigation light from the strong wind.

Schedule To be carried out prior to DB30 departure from WHP-B jacket


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 155 OF 155
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

Task Sheet No. STDNE-WHPB-15

Title Diaphragm pump and pipe insertion in caisson


Location Top of Caisson on WHP-B jacket EL. (+)5000
Drawing 2005-4189-63-0050.02
Reference 20080701-02
Item No Description / Location

Diaphragm pump with piping and steel support are to be inserted into the open drain
caisson as shown in the referred drawings. The installation sequence is described
below;
1. On top of the Ø36” open drain caisson, remove the temporary Ø18” cover
flange if there is a temporary one installed. Keep the bolts for tightening the
pump flange later.
2. Vertically Lift off the diaphragm pump, piping and steel support and insert
them into the Ø18” flange.
Note: Temporary lifting padeyes may be required on top of 18” flange.
This is to be decided at site when the pump and its assembly are
delivered to the barge.
3. Lower down the 18” flange and align the bolts holes to the 18” flange on the
open drain caisson.
4. Fully rest the 18” flange on caisson and re-install the bolts from temporary
flange.
Note: The permanent bolts may be sent together with the pump, piping
and flange. CLJOC shall advise the manifest.
5. Tighten up all bolts with impact gun.

Schedule To be carried out as a meanwhile activity anytime after piling


NDT / Special
None
Requirements
Job Completion Acknowledged by JRMAP Acknowledged by CLJOC
Accepted
WHP-B Jacket Installation Procedure PAGE : 156 OF 156
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 157 OF 157
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 158 OF 158
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

APPENDIX E EXTRACTED WHP-B JACKET LIFTING AND UPENDING ANALYSIS


WHP-B Jacket Installation Procedure PAGE : 159 OF 159
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 160 OF 160
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 161 OF 161
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 162 OF 162
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 163 OF 163
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 164 OF 164
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 165 OF 165
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09
WHP-B Jacket Installation Procedure PAGE : 166 OF 166
Su Tu Den Northeast Project REVISION : 0
J. Ray McDermott Far East, Inc. DATE : 29 May 09

APPENDIX F DB30 MOORING ANALYSIS


DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 1 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

SU TU DEVELOPMENT
SU TU DEN NORTHEAST

DB-30 MOORING ANALYSIS FOR WHP-B JACKET


INSTALLATION
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 2 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

1.0 INTRODUCTION

1.1 General

The Su Tu Den Northeast field, in Block 15-1 offshore Vietnam, is located approximately
7 kilometers to the Northeast of the existing Su Tu Den South West field facilities (WHP-
A and MV9 FPSO) and approximately 15 kilometers from the Su Tu Vang Central
Processing Platform (CPP). The field is part of the overall Su Tu Complex of reservoir
structures which include Su Tu Den South West and Su Tu Vang which are operated by
the Cuu Long Joint Operating Company (CLJOC).

The development of Su Tu Den Northeast comprises the design, fabrication and


installation of an unmanned, jacketed 4-pile wellhead platform supporting an integrated
topsides including wellhead, utility equipment, helideck, flare and Switchgear/CCR
building along with pipelines and power / fiber optic cable for interconnect and interface
with the Su Tu Complex facilities infrastructure.

WHP-B is a minimum facilities structure with the capability to support up to 22 wells


(both production and water injection) via a 12 slot well template carrying 10 dual
conductor slots and 2 single conductor slots (for the SD-4X and SD-5X pre-drilled wells
which are mudline suspended and will require re-completion).

1.2 Site Location

Figure 1.1 Site Location


DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 3 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

2.0 SCOPE

This report presents the engineering analysis to confirm the adequacy of the mooring system of
DB-30 during WHP-B Jacket installation. For this purpose a mooring pattern with 8-point is
selected for the analysis.

The following engineering aspects are included in this report:


a. Evaluation of mooring system adequacy, i.e. line tensions and anchor loads due to
environmental forces
b. Investigation of damaged effect on one the mooring lines
c. Evaluation of barge excursion due to environmental forces
d. Sensitivity study for wave period variation

The analysis based on references and design criteria highlighted in the subsequent sections of
this document.

3.0 REFERENCES

3.1 Codes and Standards:

API RP 2SK : Design and Analysis of Stationkeeping Systems for


Floating Structures
API RP 2P : Analysis of Spread Mooring Systems for Floating
Drilling Units
DNV-OS-E301 : Position Mooring

3.2 Company Documents:

2005-4100-6H-0001 : Wellhead Platform B Structural Basis of Design

2005-4189-6P-8002 : WHP-B Jacket Installation Procedure

4.0 UNITS

Units in this report are in SI, unless specified.

5.0 SOFTWARE DESCRIPTION

MOSES is an acronym for Multi-Operational Structural Engineering Simulator. This is a


combined marine and structural package designed to describe a system and perform a
simulation including stress analysis at different phases of simulation arising from marine
situation. In essence, MOSES accepts a 3-dimensional model of a vessel and/or a tubular
structure. The user can combine the two or more structures in various ways and perform either
static, frequency or time domain analyses. The program computes hydrostatics, stability,
mooring, launching, lifting and upending by using the same basic input.
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 4 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

6.0 DERRICK BARGE DETAILS

6.1 General Particulars:

Type of Barge : Derrick Crane and Pipe Laying Barge


Class : American Bureau of Shipping
Class Notation : ABS A1 Class Derrick Barge
Flag : Panama

6.2 Main Dimensions

Length O.A : 128.02 m


Breadth (mld) : 48.16 m
Depth (mld) : 8.53 m
Working Draft : Min. 3.66 m, Max. 5.79 m

6.3 Barge Condition

The following is assumed barge floatation condition for WHP-B jacket installation that
considered for the analysis:
Fwd Draft : 4.20 m
Mean Draft : 4.70 m
Aft Draft : 5.21 m
Trim : 1.01 m (0.45 deg.) by stern
Displacement : 25,856 MT

6.4 Winches, Anchors and Mooring Lines

The DB-30 mooring system consists of 12 single drum mooring winches, American
Hoist Model 3000, each driven by a Cummins KTA-19 engine through torque
converters. The maximum lifting force of the winch in stalling condition is 136 MT (300
kips) and the brake holding capacity is 272 MT (600 kips) on drum. Each winch is
provided with dedicated control equipment and spooling mechanism.

Properties of mooring line and anchor type are provided below:


Anchor Wires : 63 mm x 1670 m
Anchor Type : 10 MT and 12 MT Delta Flippers
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 5 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

7.0 ASSESMENT OF MOORING SYSTEM

7.1 Analysis Methodology

A hydrodynamic model of the moored barge DB-30 is created to perform the mooring
analysis to identify the optimum mooring configuration using Ultramarine’s Multi-
Operational Structural Engineering Simulator (MOSES). The software considers steady
state loading from current, wind and wave drift and oscillatory loading from direct waves
and low frequency components of wave/wind drift. The required hydrodynamic database
is generated using the strip theory.

The analysis is performed in the time domain. The expected peak values of the line
tension and barge excursions are derived from a computer simulation time of 1000
seconds using JONSWAP spectra.

Spectra formulation : JONSWAP


Peakness factor (g) : 3.3
Heading : Stern/Head Sea (0 and 180 deg.)
: Quarter Sea (45, 135, 225 and 315 deg.)
: Beam Sea (90 and 270 deg.)
Significant wave height (Hs) : 2.40 m
Peak period (Tp) : 5.59 sec., 6.30 sec., 7.04 sec. and 8.49 sec.
Mean period (Tm) : 4.31 sec., 4.86 sec., 5.43 sec. and 6.55 sec.

The mooring systems are verified for:


• Minimum factor of safety as outlined in API RP 2SK “Recommended Practice for
Design and Analysis of Stationkeeping Systems for Floating Structures” with respect
to the mooring lines and anchor holding capacity.
• The length of mooring line is checked to ascertain adequacy to prevent any anchor
uplift for the expected line tension.
• Vessel excursion in terms of steady and oscillatory motions.

For the temporary/mobile mooring system, vessel steady movements are adjusted by
paying in/out of the mooring system.

7.2 Design Criteria

The mooring system is verified based on design criteria outlined in the API RP 2SK
“Recommended Practice for Design and Analysis of Stationkeeping Systems for
Floating Structures”. In accordance with the requirement of API RP 2SK, the following
safety factors are considered applicable for dynamic analysis method and
temporary/mobile moorings.

Table 7.1 Safety Factor


Anchor Line Tension Limit Safety Factor on Anchor
Condition
% of MBL (Min. Breaking Load) Holding Capacity
Intact 60 0.8
Damaged 80 Not Required
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 6 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

7.3 Mooring System

DB-30 is equipped with the mooring system as shown in Table 7.2 and the details are
provided in Appendix A.
Table 7.2 DB-30 Mooring System
Mooring Lines Anchor
Mooring Total Holding Capacity
Dia. MBL Weight Remarks
Points Length Type (MT)
(mm) (m) (MT) (MT) In Soft Clay
BM1P 63.5 1670 223.8 Delta Flippers 10 187 Not Deployed
BM2P 63.5 1670 267.7 Delta Flippers 10 187
BM3P 63.5 1670 265.1 Delta Flippers 10 187
BM4P 63.5 1670 276.8 Delta Flippers 10 187
BM5P 63.5 1670 262.9 Delta Flippers 10 187
BM6P 63.5 1670 310.8 Delta Flippers 10 187 Not Deployed
BM1S 63.5 1670 281.7 Delta Flippers 10 187 Not Deployed
BM2S 63.5 1670 271.5 Delta Flippers 10 187
BM3S 63.5 1670 261.3 Delta Flippers 10 187
BM4S 63.5 1670 263.9 Delta Flippers 10 187
BM5S 63.5 1670 275.3 Delta Flippers 10 187
BM6S 63.5 1670 227.8 Delta Flippers 10 187 Not Deployed

Notes:
1. MBL data are extracted from Test Certificates provided in Appendix A
2. Anchor holding capacity is extracted form API diagram (Appendix A) and include safety factor as described in Table
7.1

7.4 Environmental Parameters

The environmental parameters for the mooring analysis is extracted from Su Tu Den
meta-ocean criteria as described at Doc. No. 2005-4100-6H-0001. The data based on
the 1-year return period of extreme wave, wind and current are most likely to occur at
the Su Tu Den field. The maximum data for the month of June and July have been used
for the analysis.

Table 7.3 Environmental Parameters


Significant Peak Mean
Wind Speed Current Water Depth
Wave Height Period Period
(knots) (m/s) (m)
(m) (sec.) (sec.)
5.59 4.31 Surface 1.0
6.30 4.86 Mid-Depth 0.6
2.40 27.21 45.60
7.04 5.43 Near-Bottom 0.2
8.49 6.55
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 7 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

7.5 Mooring Pattern

The 8-point mooring pattern as shown in Figure 7.1 has been considered for WHP-B
Jacket installation. Table 7.4 describes the initial conditions of the mooring lines.

BM4P BM3P
(-60 °) (-121 °)

10
BM5P
00

m
m
(-38 °)

00
10
10
00 BM2P
m (-161 °)
0m
100

DB-30

m 1000
1000 m

BM2S
BM5S (163 °)
m

(14 °) 10
00

00
10

BM4S BM3S
(60 °) (120 °)

Figure 7.1 Mooring Pattern for WHP-B Jacket Installation

Table 7.4 Initial Mooring Configuration

Portside Starboard
Horizontal Horizontal
Spread Pre-Tension Spread Pre-Tension
Lines Distance Lines Distance
(deg) (MT) (deg) (MT)
(m) (m)

BM2P -161 33.7 1002 BM2S 163 36.1 1002


BM3P -121 32.3 1002 BM3S 120 39.1 1002
BM4P -60 33.5 1002 BM4S 60 40.6 1002
BM5P -38 35.1 1001 BM5S 14 38.8 1001
Notes:
1. Refer to Appendix A for mooring and anchor drawings
2. Mooring angle is measured from the stern, positive anti-clockwise
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 8 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

8.0 ANALYSIS RESULTS

The results of analysis are summarized in Table 8.1 to Table 8.6.

Table 8.1 Summary of Barge Excursion (Intact Condition)


Barge Excursion
Peak Mean
Hs Vwind Vcurrent Heading (Slow Drift Movements)
Period Period
Surge Sway Heave
(m) (knots) (m/s) (deg.) (sec.) (sec.) (m) (m) (m)
5.59 4.31 0.97 0.47 0.55
6.30 4.86 1.51 0.09 0.29
0
7.04 5.43 1.54 0.12 0.56
8.49 6.55 1.71 0.13 0.82
5.59 4.31 1.10 0.49 0.13
6.30 4.86 1.12 0.59 0.12
45
7.04 5.43 1.24 0.83 0.49
8.49 6.55 1.40 1.17 0.40
5.59 4.31 0.11 1.13 0.20
6.30 4.86 0.23 1.46 0.51
90
7.04 5.43 0.15 2.12 0.90
8.49 6.55 0.15 2.63 1.52
5.59 4.31 1.55 0.54 0.17
6.30 4.86 1.41 0.62 0.25
135
Surface = 1.0 7.04 5.43 1.39 0.82 0.72
Mid-Depth = 0.6 8.49 6.55 1.44 1.16 0.74
2.40 27.21
Near-Bottom = 0.2 5.59 4.31 1.43 0.50 0.61
6.30 4.86 1.68 0.04 0.46
180
7.04 5.43 1.79 0.04 0.77
8.49 6.55 1.62 0.05 1.28
5.59 4.31 1.81 0.49 0.16
6.30 4.86 1.52 0.66 0.24
225
7.04 5.43 1.57 0.88 0.72
8.49 6.55 1.57 1.24 0.73
5.59 4.31 0.22 1.05 0.20
6.30 4.86 0.18 1.31 0.53
270
7.04 5.43 0.19 1.96 0.86
8.49 6.55 0.22 2.41 1.51
5.59 4.31 1.35 0.44 0.13
6.30 4.86 1.22 0.57 0.13
315
7.04 5.43 1.29 0.73 0.49
8.49 6.55 1.20 1.03 0.40

Notes:
1. Headings: Stern Sea (0 deg.), Stern Quarter Sea (45 and 315 deg.), Beam Sea (90 and 270 deg.), Bow Quarter Sea (135 and
225 deg.) and Bow/Head Sea (180 deg.).
2. Barge Slow Drift Movements are for single amplitude.
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 9 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Table 8.2 Summary of Mooring Tension (Intact Condition)


Mooring Tension (Intact)
Peak Mean
Hs Vwind Vcurrent Heading Portside Starboard
Period Period
BM2P BM3P BM4P BM5P BM2S BM3S BM4S BM5S
(m) (knots) (m/s) (deg.) (sec.) (sec.) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT)
5.59 4.31 30 30 44 56 33 38 60 71
6.30 4.86 32 31 51 67 35 39 64 84
0
7.04 5.43 30 30 52 70 33 38 67 89
8.49 6.55 30 30 53 71 33 38 68 91
5.59 4.31 25 17 25 38 42 68 96 82
6.30 4.86 25 16 25 38 42 69 98 84
45
7.04 5.43 25 18 24 39 40 70 107 89
8.49 6.55 24 18 24 39 44 75 115 97
5.59 4.31 24 14 15 20 53 106 113 59
6.30 4.86 26 15 16 21 55 111 116 61
90
7.04 5.43 27 17 21 25 55 112 116 61
8.49 6.55 27 18 20 25 56 122 129 61
5.59 4.31 53 25 20 25 85 97 75 52
6.30 4.86 52 25 19 24 82 97 74 49
135
Surface = 1.0 7.04 5.43 53 24 21 25 87 106 75 47
Mid-Depth = 0.6 8.49 6.55 51 23 21 25 86 111 73 45
2.40 27.21
Near-Bottom = 0.2 5.59 4.31 69 47 36 36 73 61 40 40
6.30 4.86 78 54 34 36 81 61 40 39
180
7.04 5.43 82 56 33 34 85 62 39 37
8.49 6.55 78 55 32 32 81 61 38 35
5.59 4.31 89 91 66 60 64 32 24 36
6.30 4.86 86 92 64 56 60 31 22 34
225
7.04 5.43 91 99 64 54 61 29 24 34
8.49 6.55 88 103 62 51 58 28 26 33
5.59 4.31 57 93 92 73 31 19 18 31
6.30 4.86 59 98 96 76 30 19 20 32
270
7.04 5.43 60 101 97 77 31 21 25 34
8.49 6.55 61 109 108 83 32 23 24 33
5.59 4.31 46 59 81 84 32 24 32 62
6.30 4.86 44 59 83 84 31 22 31 59
315
7.04 5.43 42 59 88 89 31 24 31 62
8.49 6.55 43 63 94 95 29 24 30 61
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 10 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Table 8.3 Summary of Barge Excursion (Damaged Condition)


Peak Mean Intact to Damaged Condition (1) Slow Drift Movements Total
Hs Vwind Vcurrent Heading Damaged
Period Period Surge Sway Heave Surge Sway Heave Surge Sway Heave
Lines
(m) (knots) (m/s) (deg.) (sec.) (sec.) (m) (m) (m) (m) (m) (m) (m) (m) (m)
5.59 4.31 1.84 0.66 0.00 1.16 0.58 0.56 3.00 1.24 0.56
6.30 4.86 2.11 0.76 0.00 3.03 0.49 0.28 5.14 1.25 0.28
0 BM5S
7.04 5.43 2.28 0.82 0.00 3.36 0.56 0.56 5.64 1.38 0.56
8.49 6.55 2.40 0.87 0.00 3.61 0.68 0.80 6.01 1.55 0.80
5.59 4.31 1.58 3.03 0.00 0.94 1.20 0.13 2.52 4.23 0.13
6.30 4.86 1.70 3.24 0.00 1.23 1.18 0.13 2.93 4.42 0.13
45 BM4S
7.04 5.43 1.73 3.31 0.00 1.62 1.41 0.50 3.35 4.72 0.50
8.49 6.55 1.97 3.75 0.00 1.98 1.79 0.41 3.95 5.54 0.41
5.59 4.31 2.01 4.09 0.00 0.46 1.47 0.19 2.47 5.56 0.19
6.30 4.86 2.10 4.43 0.00 0.60 1.73 0.53 2.70 6.16 0.53
90 BM4S
7.04 5.43 2.11 4.46 0.00 0.97 2.57 0.88 3.08 7.03 0.88
8.49 6.55 2.16 4.59 0.00 1.14 3.27 1.51 3.30 7.86 1.51
5.59 4.31 1.43 3.24 0.00 1.13 0.70 0.17 2.56 3.94 0.17
6.30 4.86 1.47 3.35 0.00 1.29 0.88 0.25 2.76 4.23 0.25
135 BM3S
Surface = 1.0 7.04 5.43 1.57 3.57 0.00 1.58 1.36 0.74 3.15 4.93 0.74
Mid-Depth = 0.6 8.49 6.55 1.67 3.83 0.01 1.61 1.88 0.73 3.28 5.71 0.74
2.40 27.21
Near-Bottom = 0.2 5.59 4.31 1.40 0.51 0.00 1.11 0.55 0.60 2.51 1.06 0.60
6.30 4.86 1.54 0.56 0.00 1.97 0.21 0.43 3.51 0.77 0.43
180 BM2S
7.04 5.43 1.63 0.60 0.00 2.53 0.28 0.77 4.16 0.88 0.77
8.49 6.55 1.70 0.63 0.00 2.51 0.28 1.30 4.21 0.91 1.30
5.59 4.31 1.10 2.09 0.00 1.44 1.01 0.16 2.54 3.10 0.16
6.30 4.86 1.18 2.24 0.00 1.37 0.94 0.25 2.55 3.18 0.25
225 BM3P
7.04 5.43 1.24 2.38 0.00 1.56 1.40 0.74 2.80 3.78 0.74
8.49 6.55 1.28 2.47 0.01 1.74 1.88 0.72 3.02 4.35 0.73
5.59 4.31 1.57 3.09 0.00 0.58 1.30 0.20 2.15 4.39 0.20
6.30 4.86 1.62 3.04 0.00 0.71 1.58 0.55 2.33 4.62 0.55
270 BM3P
7.04 5.43 1.64 3.08 0.00 0.82 2.29 0.91 2.46 5.37 0.91
8.49 6.55 1.72 3.20 0.00 0.86 3.00 1.53 2.58 6.20 1.53
5.59 4.31 1.44 1.26 0.00 1.10 0.58 0.12 2.54 1.84 0.12
6.30 4.86 1.50 1.32 0.00 1.35 0.75 0.13 2.85 2.07 0.13
315 BM5P
7.04 5.43 1.58 1.38 0.00 1.76 1.04 0.48 3.34 2.42 0.48
8.49 6.55 1.69 1.47 0.00 2.05 1.42 0.40 3.74 2.89 0.40
Notes:
1. Barge position is at equilibrium condition after damaged
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 11 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Table 8.4 Summary of Mooring Tension (Damaged Condition)


Mooring Tension (Damaged)
Peak Mean
Hs Vwind Vcurrent Heading Portside Starboard
Period Period
BM2P BM3P BM4P BM5P BM2S BM3S BM4S BM5S
(m) (knots) (m/s) (deg.) (sec.) (sec.) (MT) (MT) (MT) (MT) (MT) (MT) (MT) (MT)
5.59 4.31 16 18 51 75 20 35 88
6.30 4.86 23 22 66 107 29 43 111
0 DAMAGED
7.04 5.43 23 23 71 115 29 43 119
8.49 6.55 22 23 65 110 28 42 123
5.59 4.31 10 7 13 30 32 110 132
6.30 4.86 10 6 12 30 34 116 142
45 DAMAGED
7.04 5.43 10 6 12 32 34 123 157
8.49 6.55 9 6 12 34 38 135 172
5.59 4.31 9 5 7 14 44 167 126
6.30 4.86 10 5 8 15 44 170 124
90 DAMAGED
7.04 5.43 13 6 9 18 46 172 126
8.49 6.55 12 6 9 16 47 184 132
5.59 4.31 53 13 7 8 123 114 38
6.30 4.86 55 13 7 9 127 117 39
135 DAMAGED
Surface = 1.0 7.04 5.43 56 12 7 9 140 125 40
Mid-Depth = 0.6 8.49 6.55 59 12 7 9 147 130 38
2.40 27.21
Near-Bottom = 0.2 5.59 4.31 83 50 24 21 77 36 24
6.30 4.86 106 60 24 23 86 38 27
180 DAMAGED
7.04 5.43 118 65 25 24 94 39 28
8.49 6.55 116 64 24 22 95 38 26
5.59 4.31 126 93 64 67 18 9 17
6.30 4.86 129 95 63 67 18 9 16
225 DAMAGED
7.04 5.43 141 101 64 69 17 9 16
8.49 6.55 148 104 62 73 17 10 16
5.59 4.31 109 131 85 39 11 7 15
6.30 4.86 113 135 87 40 11 8 16
270 DAMAGED
7.04 5.43 115 135 87 41 12 10 18
8.49 6.55 119 146 92 40 13 9 18
5.59 4.31 30 61 113 17 13 27 78
6.30 4.86 33 65 122 17 13 28 82
315 DAMAGED
7.04 5.43 33 66 133 17 14 28 89
8.49 6.55 37 72 145 18 14 28 90
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : 12 OF 12
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Table 8.5 Factor of Safety Mooring Tension against MBL


Intact Condition Damaged Condition
Mooring MBL Mooring Mooring
(1) (2) Remarks
Lines Tension SF(3) Tension SF
(3)

(MT) (MT) (MT)


BM2P 268 91 2.96 148 1.80
BM3P 265 109 2.44 72 3.67
BM4P 277 108 2.57 146 1.89
BM5P 263 95 2.78 115 2.28
OK !
BM2S 272 87 3.14 147 1.84
BM3S 261 122 2.15 184 1.42
BM4S 264 129 2.04 130 2.03
BM5S 275 97 2.84 172 1.60
Notes:
1. Mooring tension for intact condition is derived from Table 8.2
2. Mooring tension for damaged condition is derived from Table 8.4
3. Based on API recommendation, the minimum safety factor for mobile/temporary mooring and using dynamic analysis is 1.67
(60% MBL) for intact condition and 1.25 (80% MBL) for damaged condition.

Table 8.6 Anchor Uplift Check (Intact Condition)

Mooring Tension at Max. Allowable Tension


Mooring Fairlead
(1)
to Prevent Uplift
(2)
Remarks
Lines
(MT) (MT)
BM2P 91 140
BM3P 109 139
BM4P 108 145
BM5P 95 138
OK !
BM2S 87 142
BM3S 122 137
BM4S 129 138
BM5S 97 144

Notes:
1. Mooring tension at fairlead is derived from Table 8.2
2. Maximum allowable tension to prevent anchor up-lift is derived from Appendix B
3. As per API RP 2SK, anchor up-lift check for damaged condition is not required

9.0 CONCLUSION
Based on the analysis results and criteria used, it can be concluded that:
1. The maximum mooring tension for intact condition is found to be 129 MT at BM4S line
which is within the allowable limits.
2. The maximum mooring tension for damaged condition is found to be 184 MT at BM3S line
for BM4S damaged which is within the allowable limits.
3. The maximum barge excursion is 2.63 m (Sway) for intact condition and 7.86 m (Sway) for
mooring line BM4S damaged.
4. Anchor pull-out is within the allowable of anchor holding capacity (there is no anchor up-lift
observed).
5. The proposed mooring arrangement is suitable for WHP-B Jacket installation for a 1-year
return period sea-state (2.40 m Hs) from any heading direction and wave period variation.
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX A
REFERENCES

A-1 Detail of Mooring System (Test Certificate)


A-2 Anchor Holding Capacity
A-3 Environmental Data
A-4 Mooring Pattern for WHP-B Jacket Installation
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX A-1
Detail of Mooring System (Test Certificate)
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX A-2
Anchor Holding Capacity
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX A-3
Environmental Data
Su Tu Field Development
Su Tu Den Northeast EPCI Project
Detailed Engineering
Cuu Long Joint Operating Company
Document No. : 2005-4100-6H-0001
Wellhead Platform B Structural Basis of Design
Revision : L

2005-4100-6H-0001 Rev L - WHP-B Structural Basis of Design.doc Page 108 of 141


Su Tu Field Development
Su Tu Den Northeast EPCI Project
Detailed Engineering
Cuu Long Joint Operating Company
Document No. : 2005-4100-6H-0001
Wellhead Platform B Structural Basis of Design
Revision : L

2005-4100-6H-0001 Rev L - WHP-B Structural Basis of Design.doc Page 109 of 141


DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX A-4
Mooring Pattern for WHP-B Jacket Installation
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX B
MOORING LINES PROPERTIES
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 8 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM2P *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 2 P +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIREP2 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

955.43 0.01 0.00 0.69 0.003 267.70 1 0.00 0.00 952.19 0.00 0.00
974.98 0.32 0.04 1.00 0.004 267.70 1 0.00 0.00 933.87 0.00 0.00
985.93 1.27 0.19 1.96 0.007 267.70 1 0.00 0.00 895.72 0.00 0.00
990.79 2.86 0.56 3.55 0.013 267.70 1 0.00 0.00 852.47 0.00 0.00
993.50 5.09 1.23 5.78 0.022 267.70 1 0.00 0.00 807.55 0.00 0.00
995.28 7.96 2.21 8.64 0.032 267.70 1 0.00 1.53 761.93 0.00 0.00
996.52 11.46 3.53 12.14 0.045 267.70 1 0.00 5.43 715.88 0.00 0.00
997.49 15.60 5.11 16.28 0.061 267.70 1 0.00 9.95 669.62 0.00 0.00
998.30 20.37 6.83 21.06 0.079 267.70 1 0.00 15.12 623.23 0.00 0.00
999.00 25.78 8.60 26.47 0.099 267.70 1 0.00 20.93 576.75 0.00 0.00
999.64 31.83 10.32 32.52 0.121 267.70 1 0.00 27.37 530.21 0.00 0.00
1000.24 38.52 11.91 39.20 0.146 267.70 1 0.00 34.44 483.64 0.00 0.00
1000.82 45.84 13.35 46.52 0.174 267.70 1 0.00 42.16 437.03 0.00 0.00
1001.39 53.79 14.61 54.48 0.204 267.70 1 0.00 50.51 390.40 0.00 0.00
1001.96 62.39 15.69 63.07 0.236 267.70 1 0.00 59.50 343.74 0.00 0.00
1002.53 71.62 16.62 72.30 0.270 267.70 1 0.00 69.12 297.07 0.00 0.00
1003.11 81.49 17.40 82.17 0.307 267.70 1 0.00 79.38 250.38 0.00 0.00
1003.70 91.99 18.06 92.67 0.346 267.70 1 0.00 90.28 203.67 0.00 0.00
1004.31 103.13 18.61 103.82 0.388 267.70 1 0.00 101.82 156.96 0.00 0.00
1004.93 114.91 19.07 115.59 0.432 267.70 1 0.00 113.99 110.24 0.00 0.00
1005.58 127.32 19.45 128.01 0.478 267.70 1 0.00 126.79 63.47 0.00 0.00
1006.25 140.38 19.77 141.06 0.527 267.70 1 0.00 140.24 16.70 0.00 0.00
1006.93 154.06 20.21 154.74 0.578 267.70 1 0.43 154.06 0.00 0.00 0.00
1007.63 168.39 20.62 169.07 0.632 267.70 1 1.11 168.39 0.00 0.00 0.00
1008.35 183.35 20.93 184.04 0.687 267.70 1 1.83 183.35 0.00 0.00 0.00
1009.09 198.94 21.16 199.64 0.746 267.70 1 2.58 198.94 0.00 0.00 0.00
1009.86 215.18 21.33 215.88 0.806 267.70 1 3.35 215.18 0.00 0.00 0.00
1010.65 232.05 21.45 232.76 0.869 267.70 1 4.16 232.05 0.00 0.00 0.00
1011.46 249.56 21.54 250.28 0.935 267.70 1 4.99 249.56 0.00 0.00 0.00
1012.30 267.70 21.60 268.44 1.003 267.70 1 5.86 267.70 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 9 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM2P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 2 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 -940.90 -344.86 -45.60


10.02 10.03 -931.42 -341.59 -45.60
20.03 20.06 -921.93 -338.33 -45.60
30.05 30.09 -912.45 -335.07 -45.60
40.06 40.12 -902.96 -331.80 -45.60
50.08 50.15 -893.48 -328.54 -45.60
60.09 60.18 -883.99 -325.28 -45.60
70.11 70.21 -874.51 -322.02 -45.60
80.13 80.24 -865.03 -318.75 -45.60
90.14 90.27 -855.54 -315.49 -45.60
100.16 100.30 -846.06 -312.23 -45.60
110.17 110.33 -836.57 -308.96 -45.60
120.19 120.37 -827.09 -305.70 -45.60
130.21 130.40 -817.60 -302.44 -45.60
140.22 140.43 -808.12 -299.18 -45.60
150.24 150.46 -798.63 -295.91 -45.60
160.25 160.49 -789.15 -292.65 -45.60
170.27 170.52 -779.66 -289.39 -45.60
180.28 180.55 -770.18 -286.12 -45.60
190.30 190.58 -760.69 -282.86 -45.60
200.32 200.61 -751.21 -279.60 -45.60
210.33 210.64 -741.72 -276.34 -45.60
220.35 220.67 -732.24 -273.07 -45.60
230.36 230.70 -722.75 -269.81 -45.60
240.38 240.73 -713.27 -266.55 -45.60
250.40 250.76 -703.78 -263.28 -45.60
260.41 260.79 -694.30 -260.02 -45.60
270.43 270.82 -684.81 -256.76 -45.60
280.44 280.85 -675.33 -253.50 -45.60
290.46 290.88 -665.84 -250.23 -45.60
300.47 300.91 -656.36 -246.97 -45.60
310.49 310.94 -646.87 -243.71 -45.60
320.51 320.97 -637.39 -240.44 -45.60
330.52 331.00 -627.90 -237.18 -45.60
340.54 341.04 -618.42 -233.92 -45.60
350.55 351.07 -608.93 -230.65 -45.60
360.57 361.10 -599.45 -227.39 -45.60
370.59 371.13 -589.96 -224.13 -45.60
380.60 381.16 -580.48 -220.87 -45.60
390.62 391.19 -570.99 -217.60 -45.60
400.63 401.22 -561.51 -214.34 -45.60
410.65 411.25 -552.02 -211.08 -45.60
420.66 421.28 -542.54 -207.81 -45.60
430.68 431.31 -533.05 -204.55 -45.60
440.70 441.34 -523.57 -201.29 -45.60
450.71 451.37 -514.08 -198.03 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 10 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM2P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 2 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.73 461.40 -504.60 -194.76 -45.60


470.74 471.43 -495.11 -191.50 -45.60
480.76 481.46 -485.63 -188.24 -45.60
490.78 491.49 -476.14 -184.97 -45.60
500.79 501.52 -466.66 -181.71 -45.60
510.81 511.55 -457.17 -178.45 -45.60
520.82 521.58 -447.69 -175.19 -45.60
530.84 531.61 -438.20 -171.92 -45.58
540.85 541.64 -428.72 -168.66 -45.51
550.87 551.67 -419.23 -165.40 -45.41
560.89 561.70 -409.75 -162.14 -45.26
570.90 571.73 -400.27 -158.87 -45.07
580.92 581.76 -390.79 -155.61 -44.83
590.93 591.79 -381.30 -152.35 -44.55
600.95 601.81 -371.82 -149.09 -44.23
610.97 611.84 -362.35 -145.83 -43.87
620.98 621.86 -352.87 -142.57 -43.46
631.00 631.88 -343.39 -139.31 -43.02
641.01 641.90 -333.92 -136.05 -42.52
651.03 651.91 -324.45 -132.79 -41.99
661.04 661.93 -314.98 -129.53 -41.42
671.06 671.94 -305.51 -126.28 -40.80
681.08 681.95 -296.05 -123.02 -40.14
691.09 691.95 -286.59 -119.77 -39.43
701.11 701.96 -277.13 -116.51 -38.69
711.12 711.96 -267.67 -113.26 -37.90
721.14 721.95 -258.22 -110.01 -37.07
731.16 731.94 -248.77 -106.76 -36.19
741.17 741.93 -239.32 -103.51 -35.28
751.19 751.92 -229.88 -100.26 -34.32
761.20 761.90 -220.45 -97.01 -33.32
771.22 771.87 -211.01 -93.77 -32.28
781.23 781.85 -201.58 -90.52 -31.20
791.25 791.81 -192.16 -87.28 -30.07
801.27 801.78 -182.74 -84.04 -28.90
811.28 811.73 -173.32 -80.80 -27.69
821.30 821.68 -163.91 -77.56 -26.44
831.31 831.63 -154.50 -74.33 -25.15
841.33 841.57 -145.10 -71.09 -23.81
851.35 851.51 -135.71 -67.86 -22.44
861.36 861.44 -126.32 -64.63 -21.02
871.38 871.36 -116.93 -61.40 -19.56
881.39 881.28 -107.56 -58.18 -18.06
891.41 891.19 -98.18 -54.95 -16.52
901.42 901.10 -88.82 -51.73 -14.93
911.44 910.99 -79.46 -48.51 -13.31
921.46 920.89 -70.10 -45.29 -11.64
931.47 930.77 -60.76 -42.08 -9.94
941.49 940.65 -51.42 -38.87 -8.19
951.50 950.52 -42.08 -35.65 -6.40
961.52 960.38 -32.76 -32.45 -4.57
971.54 970.24 -23.44 -29.24 -2.71
981.55 980.08 -14.13 -26.04 -0.80
991.57 989.92 -4.82 -22.84 1.15
1001.58 999.75 4.47 -19.64 3.15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 12 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM2S *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 2 S +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIRES2 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

955.43 0.01 0.00 0.69 0.003 271.50 1 0.00 0.00 952.19 0.00 0.00
975.10 0.32 0.04 1.01 0.004 271.50 1 0.00 0.00 933.64 0.00 0.00
986.03 1.29 0.19 1.98 0.007 271.50 1 0.00 0.00 895.13 0.00 0.00
990.86 2.91 0.57 3.59 0.013 271.50 1 0.00 0.00 851.53 0.00 0.00
993.56 5.17 1.25 5.85 0.022 271.50 1 0.00 0.00 806.27 0.00 0.00
995.33 8.07 2.25 8.76 0.032 271.50 1 0.00 1.66 760.30 0.00 0.00
996.57 11.62 3.59 12.31 0.045 271.50 1 0.00 5.60 713.92 0.00 0.00
997.54 15.82 5.19 16.50 0.061 271.50 1 0.00 10.20 667.33 0.00 0.00
998.34 20.66 6.93 21.35 0.079 271.50 1 0.00 15.43 620.60 0.00 0.00
999.04 26.15 8.71 26.83 0.099 271.50 1 0.00 21.32 573.79 0.00 0.00
999.68 32.28 10.44 32.97 0.121 271.50 1 0.00 27.85 526.92 0.00 0.00
1000.29 39.06 12.03 39.75 0.146 271.50 1 0.00 35.02 480.01 0.00 0.00
1000.87 46.49 13.46 47.17 0.174 271.50 1 0.00 42.84 433.07 0.00 0.00
1001.44 54.56 14.71 55.24 0.203 271.50 1 0.00 51.31 386.11 0.00 0.00
1002.01 63.27 15.79 63.96 0.236 271.50 1 0.00 60.42 339.13 0.00 0.00
1002.59 72.64 16.71 73.32 0.270 271.50 1 0.00 70.18 292.11 0.00 0.00
1003.17 82.64 17.48 83.33 0.307 271.50 1 0.00 80.59 245.10 0.00 0.00
1003.77 93.30 18.13 93.98 0.346 271.50 1 0.00 91.63 198.06 0.00 0.00
1004.39 104.60 18.67 105.28 0.388 271.50 1 0.00 103.33 151.01 0.00 0.00
1005.02 116.54 19.13 117.22 0.432 271.50 1 0.00 115.67 103.95 0.00 0.00
1005.67 129.13 19.50 129.81 0.478 271.50 1 0.00 128.66 56.85 0.00 0.00
1006.35 142.37 19.81 143.05 0.527 271.50 1 0.00 142.29 9.75 0.00 0.00
1007.04 156.25 20.28 156.93 0.578 271.50 1 0.53 156.25 0.00 0.00 0.00
1007.75 170.78 20.68 171.46 0.632 271.50 1 1.23 170.78 0.00 0.00 0.00
1008.48 185.95 20.98 186.64 0.687 271.50 1 1.96 185.95 0.00 0.00 0.00
1009.23 201.77 21.20 202.47 0.746 271.50 1 2.71 201.77 0.00 0.00 0.00
1010.00 218.23 21.36 218.94 0.806 271.50 1 3.50 218.23 0.00 0.00 0.00
1010.80 235.34 21.47 236.06 0.869 271.50 1 4.32 235.34 0.00 0.00 0.00
1011.62 253.10 21.55 253.83 0.935 271.50 1 5.16 253.10 0.00 0.00 0.00
1012.48 271.50 21.61 272.24 1.003 271.50 1 6.04 271.50 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 13 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM2S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 2 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 -951.69 311.66 -45.60


10.02 10.03 -942.10 308.72 -45.60
20.03 20.06 -932.51 305.79 -45.60
30.05 30.09 -922.91 302.85 -45.60
40.06 40.13 -913.32 299.91 -45.60
50.08 50.16 -903.73 296.98 -45.60
60.09 60.19 -894.14 294.04 -45.60
70.11 70.22 -884.55 291.10 -45.60
80.13 80.25 -874.95 288.17 -45.60
90.14 90.28 -865.36 285.23 -45.60
100.16 100.31 -855.77 282.29 -45.60
110.17 110.35 -846.18 279.36 -45.60
120.19 120.38 -836.59 276.42 -45.60
130.21 130.41 -826.99 273.48 -45.60
140.22 140.44 -817.40 270.55 -45.60
150.24 150.47 -807.81 267.61 -45.60
160.25 160.50 -798.22 264.67 -45.60
170.27 170.54 -788.63 261.74 -45.60
180.28 180.57 -779.03 258.80 -45.60
190.30 190.60 -769.44 255.87 -45.60
200.32 200.63 -759.85 252.93 -45.60
210.33 210.66 -750.26 249.99 -45.60
220.35 220.69 -740.67 247.06 -45.60
230.36 230.72 -731.07 244.12 -45.60
240.38 240.76 -721.48 241.18 -45.60
250.40 250.79 -711.89 238.25 -45.60
260.41 260.82 -702.30 235.31 -45.60
270.43 270.85 -692.71 232.37 -45.60
280.44 280.88 -683.11 229.44 -45.60
290.46 290.91 -673.52 226.50 -45.60
300.47 300.94 -663.93 223.56 -45.60
310.49 310.98 -654.34 220.63 -45.60
320.51 321.01 -644.74 217.69 -45.60
330.52 331.04 -635.15 214.75 -45.60
340.54 341.07 -625.56 211.82 -45.60
350.55 351.10 -615.97 208.88 -45.60
360.57 361.13 -606.38 205.94 -45.60
370.59 371.16 -596.78 203.01 -45.60
380.60 381.20 -587.19 200.07 -45.60
390.62 391.23 -577.60 197.13 -45.60
400.63 401.26 -568.01 194.20 -45.60
410.65 411.29 -558.42 191.26 -45.60
420.66 421.32 -548.82 188.32 -45.60
430.68 431.35 -539.23 185.39 -45.60
440.70 441.38 -529.64 182.45 -45.60
450.71 451.42 -520.05 179.51 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 14 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM2S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 2 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.73 461.45 -510.46 176.58 -45.60


470.74 471.48 -500.86 173.64 -45.60
480.76 481.51 -491.27 170.71 -45.60
490.78 491.54 -481.68 167.77 -45.60
500.79 501.57 -472.09 164.83 -45.60
510.81 511.61 -462.50 161.90 -45.59
520.82 521.64 -452.90 158.96 -45.55
530.84 531.67 -443.31 156.02 -45.46
540.85 541.70 -433.72 153.09 -45.34
550.87 551.73 -424.13 150.15 -45.17
560.89 561.76 -414.54 147.21 -44.97
570.90 571.79 -404.95 144.28 -44.72
580.92 581.81 -395.36 141.34 -44.44
590.93 591.84 -385.78 138.41 -44.11
600.95 601.87 -376.19 135.47 -43.75
610.97 611.89 -366.61 132.54 -43.34
620.98 621.91 -357.02 129.61 -42.90
631.00 631.93 -347.44 126.67 -42.41
641.01 641.95 -337.86 123.74 -41.89
651.03 651.96 -328.29 120.81 -41.32
661.04 661.98 -318.71 117.88 -40.72
671.06 671.99 -309.14 114.95 -40.08
681.08 682.00 -299.57 112.02 -39.39
691.09 692.00 -290.00 109.09 -38.67
701.11 702.00 -280.44 106.16 -37.91
711.12 712.00 -270.88 103.23 -37.11
721.14 722.00 -261.32 100.31 -36.27
731.16 731.99 -251.76 97.38 -35.39
741.17 741.98 -242.21 94.46 -34.47
751.19 751.97 -232.66 91.53 -33.51
761.20 761.95 -223.12 88.61 -32.51
771.22 771.93 -213.58 85.69 -31.47
781.23 781.90 -204.04 82.77 -30.39
791.25 791.87 -194.51 79.85 -29.27
801.27 801.83 -184.98 76.94 -28.12
811.28 811.79 -175.46 74.02 -26.92
821.30 821.75 -165.94 71.11 -25.69
831.31 831.70 -156.42 68.19 -24.41
841.33 841.65 -146.91 65.28 -23.10
851.35 851.59 -137.41 62.37 -21.75
861.36 861.52 -127.91 59.46 -20.36
871.38 871.45 -118.42 56.56 -18.93
881.39 881.37 -108.93 53.65 -17.46
891.41 891.29 -99.44 50.75 -15.96
901.42 901.20 -89.96 47.85 -14.41
911.44 911.11 -80.49 44.95 -12.83
921.46 921.01 -71.03 42.05 -11.21
931.47 930.90 -61.57 39.15 -9.55
941.49 940.79 -52.11 36.26 -7.85
951.50 950.67 -42.67 33.37 -6.11
961.52 960.54 -33.22 30.48 -4.34
971.54 970.41 -23.79 27.59 -2.52
981.55 980.27 -14.36 24.70 -0.67
991.57 990.12 -4.94 21.82 1.22
1001.58 999.97 4.47 18.94 3.14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 16 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM3P *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 3 P +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIREP3 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

955.63 0.01 0.00 0.69 0.003 265.10 1 0.00 0.00 952.39 0.00 0.00
975.04 0.32 0.04 1.00 0.004 265.10 1 0.00 0.00 934.24 0.00 0.00
985.95 1.26 0.19 1.94 0.007 265.10 1 0.00 0.00 896.39 0.00 0.00
990.79 2.84 0.55 3.52 0.013 265.10 1 0.00 0.00 853.46 0.00 0.00
993.50 5.04 1.22 5.73 0.022 265.10 1 0.00 0.00 808.87 0.00 0.00
995.28 7.88 2.19 8.56 0.032 265.10 1 0.00 1.44 763.57 0.00 0.00
996.52 11.35 3.51 12.03 0.045 265.10 1 0.00 5.30 717.85 0.00 0.00
997.48 15.45 5.07 16.13 0.061 265.10 1 0.00 9.78 671.92 0.00 0.00
998.28 20.17 6.79 20.86 0.079 265.10 1 0.00 14.90 625.85 0.00 0.00
998.98 25.53 8.56 26.21 0.099 265.10 1 0.00 20.65 579.70 0.00 0.00
999.62 31.52 10.27 32.20 0.121 265.10 1 0.00 27.03 533.50 0.00 0.00
1000.22 38.14 11.87 38.82 0.146 265.10 1 0.00 34.04 487.25 0.00 0.00
1000.79 45.39 13.30 46.07 0.174 265.10 1 0.00 41.68 440.97 0.00 0.00
1001.36 53.27 14.57 53.95 0.204 265.10 1 0.00 49.95 394.67 0.00 0.00
1001.92 61.78 15.65 62.46 0.236 265.10 1 0.00 58.85 348.33 0.00 0.00
1002.49 70.92 16.58 71.60 0.270 265.10 1 0.00 68.39 301.99 0.00 0.00
1003.06 80.70 17.37 81.38 0.307 265.10 1 0.00 78.55 255.64 0.00 0.00
1003.65 91.10 18.03 91.78 0.346 265.10 1 0.00 89.34 209.26 0.00 0.00
1004.25 102.13 18.59 102.81 0.388 265.10 1 0.00 100.76 162.87 0.00 0.00
1004.87 113.79 19.05 114.47 0.432 265.10 1 0.00 112.82 116.46 0.00 0.00
1005.51 126.09 19.44 126.77 0.478 265.10 1 0.00 125.50 70.04 0.00 0.00
1006.18 139.01 19.76 139.69 0.527 265.10 1 0.00 138.81 23.61 0.00 0.00
1006.86 152.57 20.16 153.24 0.578 265.10 1 0.32 152.57 0.00 0.00 0.00
1007.55 166.75 20.58 167.43 0.632 265.10 1 1.00 166.75 0.00 0.00 0.00
1008.27 181.57 20.90 182.25 0.687 265.10 1 1.71 181.57 0.00 0.00 0.00
1009.00 197.01 21.14 197.70 0.746 265.10 1 2.44 197.01 0.00 0.00 0.00
1009.76 213.09 21.31 213.79 0.806 265.10 1 3.21 213.09 0.00 0.00 0.00
1010.54 229.80 21.44 230.51 0.870 265.10 1 4.00 229.80 0.00 0.00 0.00
1011.35 247.13 21.53 247.85 0.935 265.10 1 4.83 247.13 0.00 0.00 0.00
1012.18 265.10 21.59 265.84 1.003 265.10 1 5.68 265.10 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 17 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM3P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 3 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 -508.13 -876.46 -45.60


10.02 10.03 -502.96 -867.86 -45.60
20.03 20.06 -497.80 -859.26 -45.60
30.05 30.09 -492.63 -850.66 -45.60
40.06 40.12 -487.46 -842.07 -45.60
50.08 50.15 -482.30 -833.47 -45.60
60.09 60.18 -477.13 -824.87 -45.60
70.11 70.21 -471.96 -816.28 -45.60
80.13 80.24 -466.80 -807.68 -45.60
90.14 90.27 -461.63 -799.08 -45.60
100.16 100.30 -456.47 -790.49 -45.60
110.17 110.33 -451.30 -781.89 -45.60
120.19 120.36 -446.13 -773.29 -45.60
130.20 130.39 -440.97 -764.70 -45.60
140.22 140.42 -435.80 -756.10 -45.60
150.24 150.45 -430.63 -747.50 -45.60
160.25 160.48 -425.47 -738.91 -45.60
170.27 170.51 -420.30 -730.31 -45.60
180.28 180.54 -415.14 -721.71 -45.60
190.30 190.56 -409.97 -713.12 -45.60
200.31 200.59 -404.80 -704.52 -45.60
210.33 210.62 -399.64 -695.92 -45.60
220.35 220.65 -394.47 -687.33 -45.60
230.36 230.68 -389.30 -678.73 -45.60
240.38 240.71 -384.14 -670.13 -45.60
250.39 250.74 -378.97 -661.54 -45.60
260.41 260.77 -373.80 -652.94 -45.60
270.42 270.80 -368.64 -644.34 -45.60
280.44 280.83 -363.47 -635.74 -45.60
290.46 290.86 -358.31 -627.15 -45.60
300.47 300.89 -353.14 -618.55 -45.60
310.49 310.92 -347.97 -609.95 -45.60
320.50 320.95 -342.81 -601.36 -45.60
330.52 330.98 -337.64 -592.76 -45.60
340.53 341.01 -332.47 -584.16 -45.60
350.55 351.04 -327.31 -575.57 -45.60
360.57 361.07 -322.14 -566.97 -45.60
370.58 371.10 -316.98 -558.37 -45.60
380.60 381.13 -311.81 -549.78 -45.60
390.61 391.16 -306.64 -541.18 -45.60
400.63 401.19 -301.48 -532.58 -45.60
410.64 411.22 -296.31 -523.99 -45.60
420.66 421.25 -291.14 -515.39 -45.60
430.68 431.28 -285.98 -506.79 -45.60
440.69 441.31 -280.81 -498.20 -45.60
450.71 451.34 -275.65 -489.60 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 18 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM3P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 3 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.72 461.37 -270.48 -481.00 -45.60


470.74 471.40 -265.31 -472.41 -45.60
480.75 481.43 -260.15 -463.81 -45.60
490.77 491.46 -254.98 -455.21 -45.60
500.79 501.49 -249.81 -446.62 -45.60
510.80 511.52 -244.65 -438.02 -45.60
520.82 521.55 -239.48 -429.42 -45.60
530.83 531.58 -234.31 -420.82 -45.60
540.85 541.61 -229.15 -412.23 -45.58
550.86 551.64 -223.98 -403.63 -45.52
560.88 561.66 -218.82 -395.03 -45.41
570.90 571.69 -213.65 -386.44 -45.26
580.91 581.72 -208.49 -377.84 -45.06
590.93 591.75 -203.32 -369.25 -44.82
600.94 601.77 -198.16 -360.66 -44.54
610.96 611.80 -192.99 -352.06 -44.21
620.97 621.82 -187.83 -343.47 -43.83
630.99 631.84 -182.67 -334.88 -43.41
641.01 641.86 -177.51 -326.30 -42.95
651.02 651.88 -172.35 -317.71 -42.44
661.04 661.89 -167.19 -309.13 -41.89
671.05 671.90 -162.03 -300.55 -41.29
681.07 681.91 -156.88 -291.97 -40.65
691.08 691.92 -151.72 -283.39 -39.97
701.10 701.92 -146.57 -274.81 -39.24
711.12 711.92 -141.42 -266.24 -38.46
721.13 721.92 -136.27 -257.68 -37.65
731.15 731.91 -131.12 -249.11 -36.78
741.16 741.90 -125.98 -240.55 -35.88
751.18 751.89 -120.83 -231.99 -34.93
761.19 761.87 -115.69 -223.44 -33.93
771.21 771.84 -110.55 -214.89 -32.89
781.23 781.81 -105.42 -206.34 -31.81
791.24 791.78 -100.28 -197.80 -30.69
801.26 801.74 -95.15 -189.26 -29.52
811.27 811.70 -90.02 -180.72 -28.30
821.29 821.65 -84.90 -172.19 -27.05
831.30 831.59 -79.78 -163.67 -25.75
841.32 841.53 -74.66 -155.15 -24.40
851.34 851.47 -69.54 -146.64 -23.02
861.35 861.39 -64.43 -138.13 -21.59
871.37 871.31 -59.32 -129.62 -20.11
881.38 881.23 -54.21 -121.13 -18.60
891.40 891.14 -49.11 -112.63 -17.04
901.41 901.04 -44.01 -104.15 -15.43
911.43 910.93 -38.91 -95.67 -13.79
921.45 920.82 -33.82 -87.19 -12.10
931.46 930.70 -28.73 -78.72 -10.37
941.48 940.57 -23.64 -70.26 -8.59
951.49 950.43 -18.56 -61.81 -6.78
961.51 960.29 -13.48 -53.36 -4.92
971.52 970.14 -8.41 -44.92 -3.02
981.54 979.98 -3.34 -36.48 -1.08
991.56 989.81 1.72 -28.06 0.91
1001.57 999.63 6.78 -19.64 2.94
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 20 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM3S *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 3 S +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIRES3 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

955.63 0.01 0.00 0.69 0.003 261.30 1 0.00 0.00 952.39 0.00 0.00
974.92 0.31 0.04 0.99 0.004 261.30 1 0.00 0.00 934.47 0.00 0.00
985.85 1.24 0.18 1.93 0.007 261.30 1 0.00 0.00 896.98 0.00 0.00
990.72 2.80 0.54 3.48 0.013 261.30 1 0.00 0.00 854.41 0.00 0.00
993.44 4.97 1.19 5.65 0.022 261.30 1 0.00 0.00 810.16 0.00 0.00
995.22 7.77 2.15 8.45 0.032 261.30 1 0.00 1.32 765.21 0.00 0.00
996.47 11.19 3.44 11.87 0.045 261.30 1 0.00 5.12 719.83 0.00 0.00
997.44 15.22 4.99 15.91 0.061 261.30 1 0.00 9.54 674.23 0.00 0.00
998.24 19.88 6.69 20.57 0.079 261.30 1 0.00 14.59 628.51 0.00 0.00
998.94 25.17 8.45 25.85 0.099 261.30 1 0.00 20.26 582.69 0.00 0.00
999.57 31.07 10.15 31.75 0.122 261.30 1 0.00 26.55 536.82 0.00 0.00
1000.17 37.59 11.75 38.28 0.146 261.30 1 0.00 33.46 490.91 0.00 0.00
1000.74 44.74 13.19 45.42 0.174 261.30 1 0.00 41.00 444.96 0.00 0.00
1001.30 52.51 14.46 53.19 0.204 261.30 1 0.00 49.15 399.00 0.00 0.00
1001.86 60.90 15.55 61.58 0.236 261.30 1 0.00 57.93 353.00 0.00 0.00
1002.43 69.91 16.49 70.59 0.270 261.30 1 0.00 67.33 306.99 0.00 0.00
1003.00 79.54 17.29 80.22 0.307 261.30 1 0.00 77.35 260.98 0.00 0.00
1003.58 89.79 17.96 90.47 0.346 261.30 1 0.00 87.99 214.93 0.00 0.00
1004.18 100.67 18.52 101.35 0.388 261.30 1 0.00 99.25 168.88 0.00 0.00
1004.79 112.16 18.99 112.84 0.432 261.30 1 0.00 111.13 122.80 0.00 0.00
1005.42 124.28 19.38 124.96 0.478 261.30 1 0.00 123.64 76.72 0.00 0.00
1006.07 137.02 19.71 137.70 0.527 261.30 1 0.00 136.76 30.63 0.00 0.00
1006.75 150.38 20.08 151.06 0.578 261.30 1 0.22 150.38 0.00 0.00 0.00
1007.44 164.36 20.52 165.04 0.632 261.30 1 0.89 164.36 0.00 0.00 0.00
1008.14 178.96 20.85 179.65 0.688 261.30 1 1.58 178.96 0.00 0.00 0.00
1008.87 194.19 21.10 194.88 0.746 261.30 1 2.31 194.19 0.00 0.00 0.00
1009.61 210.03 21.28 210.73 0.806 261.30 1 3.06 210.03 0.00 0.00 0.00
1010.39 226.50 21.42 227.21 0.870 261.30 1 3.85 226.50 0.00 0.00 0.00
1011.18 243.59 21.52 244.31 0.935 261.30 1 4.66 243.59 0.00 0.00 0.00
1012.00 261.30 21.58 262.03 1.003 261.30 1 5.50 261.30 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 21 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM3S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 3 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 -493.09 885.31 -45.60


10.02 10.03 -488.08 876.62 -45.60
20.03 20.07 -483.06 867.93 -45.60
30.05 30.10 -478.05 859.24 -45.60
40.06 40.13 -473.04 850.55 -45.60
50.08 50.16 -468.02 841.86 -45.60
60.09 60.20 -463.01 833.17 -45.60
70.11 70.23 -457.99 824.48 -45.60
80.13 80.26 -452.98 815.79 -45.60
90.14 90.29 -447.97 807.10 -45.60
100.16 100.33 -442.95 798.41 -45.60
110.17 110.36 -437.94 789.72 -45.60
120.19 120.39 -432.92 781.03 -45.60
130.20 130.43 -427.91 772.34 -45.60
140.22 140.46 -422.90 763.65 -45.60
150.24 150.49 -417.88 754.96 -45.60
160.25 160.52 -412.87 746.27 -45.60
170.27 170.56 -407.86 737.58 -45.60
180.28 180.59 -402.84 728.89 -45.60
190.30 190.62 -397.83 720.20 -45.60
200.31 200.65 -392.81 711.51 -45.60
210.33 210.69 -387.80 702.82 -45.60
220.35 220.72 -382.79 694.13 -45.60
230.36 230.75 -377.77 685.44 -45.60
240.38 240.79 -372.76 676.75 -45.60
250.39 250.82 -367.74 668.06 -45.60
260.41 260.85 -362.73 659.37 -45.60
270.42 270.88 -357.72 650.68 -45.60
280.44 280.92 -352.70 641.99 -45.60
290.46 290.95 -347.69 633.30 -45.60
300.47 300.98 -342.67 624.61 -45.60
310.49 311.01 -337.66 615.92 -45.60
320.50 321.05 -332.65 607.23 -45.60
330.52 331.08 -327.63 598.54 -45.60
340.53 341.11 -322.62 589.85 -45.60
350.55 351.15 -317.61 581.16 -45.60
360.57 361.18 -312.59 572.47 -45.60
370.58 371.21 -307.58 563.78 -45.60
380.60 381.24 -302.56 555.09 -45.60
390.61 391.28 -297.55 546.40 -45.60
400.63 401.31 -292.54 537.71 -45.60
410.64 411.34 -287.52 529.02 -45.60
420.66 421.37 -282.51 520.33 -45.60
430.68 431.41 -277.49 511.64 -45.60
440.69 441.44 -272.48 502.95 -45.60
450.71 451.47 -267.47 494.26 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 22 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM3S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 3 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.72 461.51 -262.45 485.57 -45.60


470.74 471.54 -257.44 476.88 -45.60
480.75 481.57 -252.43 468.19 -45.60
490.77 491.60 -247.41 459.50 -45.59
500.79 501.64 -242.40 450.81 -45.55
510.80 511.67 -237.38 442.12 -45.48
520.82 521.70 -232.37 433.43 -45.36
530.83 531.73 -227.36 424.74 -45.21
540.85 541.76 -222.34 416.05 -45.02
550.86 551.79 -217.33 407.37 -44.80
560.88 561.82 -212.32 398.68 -44.54
570.90 571.85 -207.31 389.99 -44.24
580.91 581.88 -202.30 381.31 -43.90
590.93 591.90 -197.29 372.62 -43.53
600.94 601.93 -192.28 363.94 -43.12
610.96 611.95 -187.27 355.26 -42.68
620.97 621.97 -182.26 346.58 -42.20
630.99 631.99 -177.25 337.90 -41.68
641.01 642.01 -172.25 329.22 -41.13
651.02 652.03 -167.24 320.55 -40.53
661.04 662.04 -162.24 311.88 -39.91
671.05 672.05 -157.23 303.20 -39.24
681.07 682.06 -152.23 294.54 -38.54
691.08 692.06 -147.23 285.87 -37.80
701.10 702.07 -142.23 277.21 -37.03
711.12 712.07 -137.24 268.54 -36.22
721.13 722.06 -132.24 259.88 -35.37
731.15 732.06 -127.24 251.23 -34.49
741.16 742.05 -122.25 242.57 -33.57
751.18 752.03 -117.26 233.92 -32.62
761.19 762.02 -112.27 225.28 -31.62
771.21 772.00 -107.28 216.63 -30.60
781.23 781.97 -102.30 207.99 -29.53
791.24 791.95 -97.31 199.35 -28.43
801.26 801.92 -92.33 190.72 -27.30
811.27 811.88 -87.35 182.09 -26.12
821.29 821.84 -82.38 173.46 -24.91
831.30 831.79 -77.40 164.84 -23.67
841.32 841.75 -72.43 156.22 -22.39
851.34 851.69 -67.46 147.60 -21.07
861.35 861.63 -62.49 138.99 -19.72
871.37 871.57 -57.52 130.39 -18.33
881.38 881.50 -52.56 121.78 -16.91
891.40 891.43 -47.60 113.19 -15.45
901.41 901.35 -42.64 104.59 -13.96
911.43 911.26 -37.69 96.00 -12.43
921.45 921.17 -32.73 87.42 -10.86
931.46 931.08 -27.78 78.84 -9.26
941.48 940.98 -22.84 70.27 -7.62
951.49 950.87 -17.89 61.70 -5.95
961.51 960.76 -12.95 53.14 -4.25
971.52 970.64 -8.01 44.58 -2.50
981.54 980.51 -3.08 36.02 -0.73
991.56 990.38 1.85 27.48 1.09
1001.57 1000.24 6.78 18.94 2.93
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 24 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM4P *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 4 P +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIREP4 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

956.27 0.01 0.00 0.68 0.002 276.80 1 0.00 0.00 953.04 0.00 0.00
975.85 0.33 0.04 1.00 0.004 276.80 1 0.00 0.00 934.22 0.00 0.00
986.50 1.32 0.20 1.99 0.007 276.80 1 0.00 0.00 895.47 0.00 0.00
991.17 2.96 0.60 3.63 0.013 276.80 1 0.00 0.00 851.75 0.00 0.00
993.79 5.27 1.32 5.94 0.021 276.80 1 0.00 0.00 806.43 0.00 0.00
995.50 8.23 2.37 8.90 0.032 276.80 1 0.00 1.82 760.42 0.00 0.00
996.70 11.85 3.77 12.52 0.045 276.80 1 0.00 5.83 714.01 0.00 0.00
997.64 16.13 5.42 16.80 0.061 276.80 1 0.00 10.50 667.40 0.00 0.00
998.43 21.06 7.21 21.74 0.079 276.80 1 0.00 15.84 620.66 0.00 0.00
999.12 26.66 9.02 27.33 0.099 276.80 1 0.00 21.83 573.84 0.00 0.00
999.75 32.91 10.76 33.58 0.121 276.80 1 0.00 28.48 526.97 0.00 0.00
1000.35 39.82 12.36 40.50 0.146 276.80 1 0.00 35.78 480.05 0.00 0.00
1000.93 47.40 13.77 48.07 0.174 276.80 1 0.00 43.75 433.11 0.00 0.00
1001.50 55.62 15.01 56.29 0.203 276.80 1 0.00 52.37 386.15 0.00 0.00
1002.07 64.51 16.06 65.18 0.235 276.80 1 0.00 61.66 339.17 0.00 0.00
1002.65 74.05 16.95 74.72 0.270 276.80 1 0.00 71.60 292.15 0.00 0.00
1003.24 84.26 17.70 84.93 0.307 276.80 1 0.00 82.20 245.14 0.00 0.00
1003.84 95.12 18.33 95.79 0.346 276.80 1 0.00 93.46 198.10 0.00 0.00
1004.46 106.64 18.85 107.31 0.388 276.80 1 0.00 105.37 151.05 0.00 0.00
1005.10 118.82 19.28 119.49 0.432 276.80 1 0.00 117.94 104.00 0.00 0.00
1005.76 131.65 19.64 132.32 0.478 276.80 1 0.00 131.18 56.90 0.00 0.00
1006.44 145.15 19.94 145.81 0.527 276.80 1 0.00 145.07 9.81 0.00 0.00
1007.15 159.30 20.38 159.97 0.578 276.80 1 0.53 159.30 0.00 0.00 0.00
1007.87 174.11 20.76 174.78 0.631 276.80 1 1.23 174.11 0.00 0.00 0.00
1008.61 189.58 21.04 190.26 0.687 276.80 1 1.95 189.58 0.00 0.00 0.00
1009.37 205.71 21.24 206.39 0.746 276.80 1 2.71 205.71 0.00 0.00 0.00
1010.16 222.49 21.39 223.19 0.806 276.80 1 3.50 222.49 0.00 0.00 0.00
1010.97 239.94 21.50 240.64 0.869 276.80 1 4.31 239.94 0.00 0.00 0.00
1011.81 258.04 21.58 258.76 0.935 276.80 1 5.16 258.04 0.00 0.00 0.00
1012.68 276.80 21.63 277.53 1.003 276.80 1 6.04 276.80 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 25 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM4P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 4 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 622.04 -889.89 -45.60


10.01 10.03 617.03 -881.20 -45.60
20.03 20.06 612.01 -872.52 -45.60
30.04 30.09 606.99 -863.83 -45.60
40.06 40.12 601.98 -855.15 -45.60
50.07 50.15 596.96 -846.46 -45.60
60.09 60.18 591.94 -837.78 -45.60
70.10 70.21 586.93 -829.09 -45.60
80.12 80.24 581.91 -820.41 -45.60
90.13 90.27 576.89 -811.72 -45.60
100.15 100.30 571.87 -803.04 -45.60
110.16 110.32 566.86 -794.36 -45.60
120.18 120.35 561.84 -785.67 -45.60
130.19 130.38 556.82 -776.99 -45.60
140.21 140.41 551.81 -768.30 -45.60
150.22 150.44 546.79 -759.62 -45.60
160.24 160.47 541.77 -750.93 -45.60
170.25 170.50 536.76 -742.25 -45.60
180.27 180.53 531.74 -733.56 -45.60
190.28 190.56 526.72 -724.88 -45.60
200.30 200.59 521.70 -716.20 -45.60
210.31 210.62 516.69 -707.51 -45.60
220.33 220.65 511.67 -698.83 -45.60
230.34 230.68 506.65 -690.14 -45.60
240.36 240.71 501.64 -681.46 -45.60
250.37 250.74 496.62 -672.77 -45.60
260.39 260.77 491.60 -664.09 -45.60
270.40 270.80 486.59 -655.40 -45.60
280.42 280.83 481.57 -646.72 -45.60
290.43 290.86 476.55 -638.03 -45.60
300.45 300.89 471.53 -629.35 -45.60
310.46 310.91 466.52 -620.67 -45.60
320.48 320.94 461.50 -611.98 -45.60
330.49 330.97 456.48 -603.30 -45.60
340.51 341.00 451.47 -594.61 -45.60
350.52 351.03 446.45 -585.93 -45.60
360.54 361.06 441.43 -577.24 -45.60
370.55 371.09 436.42 -568.56 -45.60
380.57 381.12 431.40 -559.87 -45.60
390.58 391.15 426.38 -551.19 -45.60
400.60 401.18 421.36 -542.51 -45.60
410.61 411.21 416.35 -533.82 -45.60
420.63 421.24 411.33 -525.14 -45.60
430.64 431.27 406.31 -516.45 -45.60
440.66 441.30 401.30 -507.77 -45.60
450.67 451.33 396.28 -499.08 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 26 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM4P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 4 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.69 461.36 391.26 -490.40 -45.60


470.70 471.39 386.25 -481.71 -45.60
480.72 481.42 381.23 -473.03 -45.60
490.73 491.45 376.21 -464.35 -45.60
500.75 501.47 371.19 -455.66 -45.60
510.76 511.50 366.18 -446.98 -45.60
520.78 521.53 361.16 -438.29 -45.60
530.79 531.56 356.14 -429.61 -45.60
540.81 541.59 351.13 -420.92 -45.56
550.82 551.62 346.11 -412.24 -45.47
560.84 561.65 341.09 -403.55 -45.35
570.85 571.68 336.08 -394.87 -45.18
580.87 581.71 331.06 -386.19 -44.97
590.88 591.73 326.04 -377.51 -44.72
600.90 601.76 321.03 -368.83 -44.42
610.91 611.78 316.02 -360.15 -44.08
620.93 621.80 311.00 -351.47 -43.70
630.94 631.82 305.99 -342.79 -43.27
640.96 641.84 300.98 -334.12 -42.80
650.97 651.86 295.97 -325.44 -42.29
660.99 661.87 290.96 -316.77 -41.74
671.00 671.88 285.95 -308.10 -41.14
681.02 681.89 280.94 -299.44 -40.50
691.03 691.90 275.94 -290.77 -39.82
701.05 701.90 270.93 -282.11 -39.09
711.06 711.90 265.93 -273.45 -38.33
721.08 721.90 260.93 -264.80 -37.52
731.09 731.89 255.93 -256.14 -36.66
741.11 741.88 250.94 -247.49 -35.77
751.12 751.87 245.94 -238.85 -34.83
761.14 761.85 240.95 -230.20 -33.85
771.15 771.83 235.96 -221.56 -32.83
781.17 781.80 230.97 -212.93 -31.76
791.18 791.77 225.98 -204.30 -30.66
801.20 801.73 221.00 -195.67 -29.51
811.21 811.69 216.02 -187.05 -28.32
821.23 821.64 211.04 -178.43 -27.08
831.24 831.59 206.06 -169.81 -25.81
841.26 841.54 201.09 -161.20 -24.49
851.27 851.47 196.12 -152.60 -23.13
861.29 861.40 191.15 -144.00 -21.73
871.30 871.33 186.18 -135.41 -20.29
881.32 881.25 181.22 -126.82 -18.81
891.33 891.16 176.26 -118.23 -17.28
901.35 901.07 171.31 -109.65 -15.72
911.36 910.97 166.35 -101.08 -14.11
921.38 920.86 161.41 -92.52 -12.46
931.39 930.75 156.46 -83.96 -10.77
941.41 940.63 151.52 -75.40 -9.04
951.42 950.50 146.58 -66.85 -7.26
961.43 960.36 141.65 -58.31 -5.45
971.45 970.22 136.72 -49.78 -3.60
981.46 980.07 131.79 -41.25 -1.70
991.48 989.91 126.87 -32.73 0.23
1001.49 999.74 121.95 -24.21 2.21
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 28 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM4S *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 4 S +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIRES4 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

956.27 0.01 0.00 0.68 0.003 263.90 1 0.00 0.00 953.04 0.00 0.00
975.45 0.31 0.04 0.99 0.004 263.90 1 0.00 0.00 935.00 0.00 0.00
986.18 1.26 0.19 1.93 0.007 263.90 1 0.00 0.00 897.45 0.00 0.00
990.93 2.82 0.56 3.50 0.013 263.90 1 0.00 0.00 854.91 0.00 0.00
993.59 5.02 1.24 5.69 0.022 263.90 1 0.00 0.00 810.73 0.00 0.00
995.33 7.84 2.23 8.52 0.032 263.90 1 0.00 1.39 765.87 0.00 0.00
996.55 11.30 3.55 11.97 0.045 263.90 1 0.00 5.22 720.59 0.00 0.00
997.50 15.38 5.14 16.05 0.061 263.90 1 0.00 9.69 675.10 0.00 0.00
998.29 20.08 6.87 20.75 0.079 263.90 1 0.00 14.78 629.48 0.00 0.00
998.98 25.42 8.64 26.09 0.099 263.90 1 0.00 20.50 583.78 0.00 0.00
999.60 31.38 10.36 32.05 0.121 263.90 1 0.00 26.85 538.02 0.00 0.00
1000.19 37.97 11.96 38.64 0.146 263.90 1 0.00 33.83 492.23 0.00 0.00
1000.76 45.19 13.39 45.86 0.174 263.90 1 0.00 41.43 446.40 0.00 0.00
1001.32 53.03 14.65 53.70 0.203 263.90 1 0.00 49.66 400.55 0.00 0.00
1001.88 61.50 15.73 62.17 0.236 263.90 1 0.00 58.52 354.67 0.00 0.00
1002.44 70.60 16.65 71.27 0.270 263.90 1 0.00 68.01 308.78 0.00 0.00
1003.01 80.33 17.43 81.00 0.307 263.90 1 0.00 78.12 262.89 0.00 0.00
1003.60 90.69 18.09 91.36 0.346 263.90 1 0.00 88.86 216.96 0.00 0.00
1004.20 101.67 18.64 102.34 0.388 263.90 1 0.00 100.23 171.03 0.00 0.00
1004.81 113.28 19.10 113.95 0.432 263.90 1 0.00 112.23 125.07 0.00 0.00
1005.45 125.52 19.48 126.19 0.478 263.90 1 0.00 124.85 79.11 0.00 0.00
1006.10 138.38 19.80 139.05 0.527 263.90 1 0.00 138.11 33.14 0.00 0.00
1006.78 151.88 20.14 152.54 0.578 263.90 1 0.18 151.88 0.00 0.00 0.00
1007.47 166.00 20.57 166.67 0.632 263.90 1 0.85 166.00 0.00 0.00 0.00
1008.19 180.74 20.89 181.42 0.687 263.90 1 1.54 180.74 0.00 0.00 0.00
1008.92 196.12 21.13 196.80 0.746 263.90 1 2.26 196.12 0.00 0.00 0.00
1009.67 212.12 21.31 212.81 0.806 263.90 1 3.01 212.12 0.00 0.00 0.00
1010.45 228.76 21.44 229.45 0.869 263.90 1 3.79 228.76 0.00 0.00 0.00
1011.25 246.01 21.53 246.72 0.935 263.90 1 4.60 246.01 0.00 0.00 0.00
1012.08 263.90 21.59 264.62 1.003 263.90 1 5.43 263.90 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 29 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM4S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 4 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 622.04 889.89 -45.60


10.01 10.03 617.03 881.20 -45.60
20.03 20.07 612.01 872.51 -45.60
30.04 30.10 607.00 863.82 -45.60
40.06 40.13 601.98 855.13 -45.60
50.07 50.16 596.97 846.44 -45.60
60.09 60.20 591.95 837.75 -45.60
70.10 70.23 586.94 829.06 -45.60
80.12 80.26 581.92 820.37 -45.60
90.13 90.29 576.91 811.68 -45.60
100.15 100.33 571.89 803.00 -45.60
110.16 110.36 566.87 794.31 -45.60
120.18 120.39 561.86 785.62 -45.60
130.19 130.42 556.84 776.93 -45.60
140.21 140.46 551.83 768.24 -45.60
150.22 150.49 546.81 759.55 -45.60
160.24 160.52 541.80 750.86 -45.60
170.25 170.55 536.78 742.17 -45.60
180.27 180.59 531.77 733.48 -45.60
190.28 190.62 526.75 724.79 -45.60
200.30 200.65 521.73 716.11 -45.60
210.31 210.69 516.72 707.42 -45.60
220.33 220.72 511.70 698.73 -45.60
230.34 230.75 506.69 690.04 -45.60
240.36 240.78 501.67 681.35 -45.60
250.37 250.82 496.66 672.66 -45.60
260.39 260.85 491.64 663.97 -45.60
270.40 270.88 486.63 655.28 -45.60
280.42 280.91 481.61 646.59 -45.60
290.43 290.95 476.59 637.91 -45.60
300.45 300.98 471.58 629.22 -45.60
310.46 311.01 466.56 620.53 -45.60
320.48 321.04 461.55 611.84 -45.60
330.49 331.08 456.53 603.15 -45.60
340.51 341.11 451.52 594.46 -45.60
350.52 351.14 446.50 585.77 -45.60
360.54 361.17 441.49 577.08 -45.60
370.55 371.21 436.47 568.39 -45.60
380.57 381.24 431.45 559.70 -45.60
390.58 391.27 426.44 551.02 -45.60
400.60 401.30 421.42 542.33 -45.60
410.61 411.34 416.41 533.64 -45.60
420.63 421.37 411.39 524.95 -45.60
430.64 431.40 406.38 516.26 -45.60
440.66 441.44 401.36 507.57 -45.60
450.67 451.47 396.35 498.88 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 30 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM4S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 4 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.69 461.50 391.33 490.19 -45.60


470.70 471.53 386.32 481.50 -45.60
480.72 481.57 381.30 472.82 -45.60
490.73 491.60 376.28 464.13 -45.57
500.75 501.63 371.27 455.44 -45.51
510.76 511.66 366.25 446.75 -45.42
520.78 521.69 361.24 438.06 -45.29
530.79 531.73 356.22 429.37 -45.12
540.81 541.76 351.21 420.69 -44.92
550.82 551.79 346.19 412.00 -44.68
560.84 561.82 341.18 403.31 -44.41
570.85 571.84 336.17 394.63 -44.10
580.87 581.87 331.16 385.94 -43.76
590.88 591.90 326.14 377.26 -43.38
600.90 601.92 321.13 368.58 -42.97
610.91 611.94 316.12 359.90 -42.52
620.93 621.96 311.11 351.22 -42.04
630.94 631.98 306.10 342.54 -41.52
640.96 642.00 301.10 333.87 -40.96
650.97 652.02 296.09 325.19 -40.37
660.99 662.03 291.08 316.52 -39.75
671.00 672.04 286.08 307.85 -39.09
681.02 682.05 281.07 299.18 -38.39
691.03 692.05 276.07 290.52 -37.66
701.05 702.06 271.07 281.85 -36.89
711.06 712.06 266.07 273.19 -36.09
721.08 722.06 261.07 264.53 -35.26
731.09 732.05 256.08 255.88 -34.39
741.11 742.04 251.08 247.22 -33.48
751.12 752.03 246.09 238.57 -32.54
761.14 762.02 241.10 229.93 -31.57
771.15 772.00 236.11 221.28 -30.56
781.17 781.98 231.12 212.64 -29.51
791.18 791.95 226.13 204.00 -28.43
801.20 801.92 221.15 195.37 -27.32
811.21 811.89 216.16 186.73 -26.17
821.23 821.85 211.18 178.10 -24.98
831.24 831.81 206.21 169.48 -23.76
841.26 841.76 201.23 160.86 -22.51
851.27 851.71 196.26 152.24 -21.22
861.29 861.66 191.28 143.63 -19.90
871.30 871.60 186.31 135.02 -18.54
881.32 881.53 181.35 126.41 -17.15
891.33 891.47 176.38 117.81 -15.73
901.35 901.39 171.42 109.22 -14.27
911.36 911.31 166.46 100.62 -12.77
921.38 921.23 161.50 92.04 -11.24
931.39 931.14 156.55 83.45 -9.68
941.41 941.04 151.60 74.88 -8.08
951.42 950.94 146.65 66.30 -6.45
961.43 960.84 141.70 57.73 -4.79
971.45 970.72 136.76 49.17 -3.09
981.46 980.61 131.82 40.61 -1.36
991.48 990.48 126.88 32.06 0.41
1001.49 1000.35 121.95 23.51 2.21
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 32 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM5P *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 5 P +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIREP5 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

956.19 0.01 0.00 0.68 0.003 262.90 1 0.00 0.00 952.96 0.00 0.00
975.35 0.31 0.04 0.99 0.004 262.90 1 0.00 0.00 934.98 0.00 0.00
986.11 1.25 0.19 1.92 0.007 262.90 1 0.00 0.00 897.51 0.00 0.00
990.87 2.81 0.56 3.49 0.013 262.90 1 0.00 0.00 855.04 0.00 0.00
993.53 5.00 1.23 5.67 0.022 262.90 1 0.00 0.00 810.93 0.00 0.00
995.29 7.82 2.21 8.49 0.032 262.90 1 0.00 1.36 766.13 0.00 0.00
996.51 11.25 3.53 11.93 0.045 262.90 1 0.00 5.18 720.91 0.00 0.00
997.46 15.32 5.11 15.99 0.061 262.90 1 0.00 9.63 675.48 0.00 0.00
998.25 20.01 6.83 20.68 0.079 262.90 1 0.00 14.70 629.93 0.00 0.00
998.94 25.32 8.60 25.99 0.099 262.90 1 0.00 20.40 584.28 0.00 0.00
999.57 31.26 10.32 31.93 0.121 262.90 1 0.00 26.72 538.59 0.00 0.00
1000.16 37.83 11.92 38.50 0.146 262.90 1 0.00 33.68 492.85 0.00 0.00
1000.73 45.01 13.35 45.69 0.174 262.90 1 0.00 41.25 447.08 0.00 0.00
1001.28 52.83 14.61 53.50 0.204 262.90 1 0.00 49.45 401.29 0.00 0.00
1001.84 61.27 15.70 61.94 0.236 262.90 1 0.00 58.28 355.47 0.00 0.00
1002.40 70.34 16.62 71.01 0.270 262.90 1 0.00 67.73 309.64 0.00 0.00
1002.97 80.03 17.41 80.70 0.307 262.90 1 0.00 77.81 263.81 0.00 0.00
1003.55 90.34 18.06 91.01 0.346 262.90 1 0.00 88.51 217.94 0.00 0.00
1004.15 101.28 18.62 101.95 0.388 262.90 1 0.00 99.84 172.07 0.00 0.00
1004.76 112.85 19.08 113.52 0.432 262.90 1 0.00 111.79 126.17 0.00 0.00
1005.40 125.04 19.46 125.71 0.478 262.90 1 0.00 124.37 80.27 0.00 0.00
1006.05 137.86 19.78 138.53 0.527 262.90 1 0.00 137.57 34.36 0.00 0.00
1006.73 151.30 20.11 151.97 0.578 262.90 1 0.16 151.30 0.00 0.00 0.00
1007.42 165.37 20.55 166.04 0.632 262.90 1 0.83 165.37 0.00 0.00 0.00
1008.13 180.06 20.88 180.73 0.687 262.90 1 1.52 180.06 0.00 0.00 0.00
1008.86 195.38 21.12 196.06 0.746 262.90 1 2.24 195.38 0.00 0.00 0.00
1009.61 211.32 21.30 212.01 0.806 262.90 1 2.99 211.32 0.00 0.00 0.00
1010.38 227.89 21.43 228.59 0.869 262.90 1 3.76 227.89 0.00 0.00 0.00
1011.19 245.08 21.53 245.79 0.935 262.90 1 4.57 245.08 0.00 0.00 0.00
1012.01 262.90 21.59 263.62 1.003 262.90 1 5.40 262.90 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 33 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM5P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 5 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 912.36 -639.52 -45.60


10.01 10.03 904.45 -633.35 -45.60
20.03 20.06 896.55 -627.18 -45.60
30.04 30.09 888.64 -621.00 -45.60
40.06 40.12 880.73 -614.83 -45.60
50.07 50.15 872.83 -608.66 -45.60
60.09 60.18 864.92 -602.49 -45.60
70.10 70.21 857.02 -596.31 -45.60
80.12 80.24 849.11 -590.14 -45.60
90.13 90.27 841.21 -583.97 -45.60
100.15 100.30 833.30 -577.80 -45.60
110.16 110.33 825.39 -571.62 -45.60
120.18 120.36 817.49 -565.45 -45.60
130.19 130.39 809.58 -559.28 -45.60
140.21 140.42 801.68 -553.11 -45.60
150.22 150.45 793.77 -546.93 -45.60
160.24 160.48 785.87 -540.76 -45.60
170.25 170.51 777.96 -534.59 -45.60
180.27 180.54 770.05 -528.42 -45.60
190.28 190.57 762.15 -522.25 -45.60
200.29 200.60 754.24 -516.07 -45.60
210.31 210.63 746.34 -509.90 -45.60
220.32 220.66 738.43 -503.73 -45.60
230.34 230.69 730.53 -497.56 -45.60
240.35 240.72 722.62 -491.38 -45.60
250.37 250.75 714.71 -485.21 -45.60
260.38 260.78 706.81 -479.04 -45.60
270.40 270.81 698.90 -472.87 -45.60
280.41 280.84 691.00 -466.69 -45.60
290.43 290.87 683.09 -460.52 -45.60
300.44 300.90 675.18 -454.35 -45.60
310.46 310.93 667.28 -448.18 -45.60
320.47 320.96 659.37 -442.00 -45.60
330.49 330.99 651.47 -435.83 -45.60
340.50 341.02 643.56 -429.66 -45.60
350.52 351.05 635.66 -423.49 -45.60
360.53 361.08 627.75 -417.31 -45.60
370.55 371.11 619.84 -411.14 -45.60
380.56 381.14 611.94 -404.97 -45.60
390.58 391.17 604.03 -398.80 -45.60
400.59 401.20 596.13 -392.62 -45.60
410.60 411.23 588.22 -386.45 -45.60
420.62 421.26 580.32 -380.28 -45.60
430.63 431.29 572.41 -374.11 -45.60
440.65 441.32 564.50 -367.93 -45.60
450.66 451.35 556.60 -361.76 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 34 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM5P *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 5 P +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.68 461.38 548.69 -355.59 -45.60


470.69 471.41 540.79 -349.42 -45.60
480.71 481.44 532.88 -343.24 -45.60
490.72 491.47 524.98 -337.07 -45.60
500.74 501.50 517.07 -330.90 -45.60
510.75 511.53 509.16 -324.73 -45.60
520.77 521.56 501.26 -318.55 -45.59
530.78 531.59 493.35 -312.38 -45.55
540.80 541.62 485.45 -306.21 -45.47
550.81 551.65 477.54 -300.04 -45.35
560.83 561.67 469.64 -293.87 -45.18
570.84 571.70 461.73 -287.70 -44.98
580.86 581.73 453.83 -281.53 -44.73
590.87 591.76 445.93 -275.36 -44.44
600.88 601.78 438.03 -269.19 -44.12
610.90 611.80 430.12 -263.02 -43.75
620.91 621.82 422.23 -256.85 -43.34
630.93 631.84 414.33 -250.68 -42.88
640.94 641.86 406.43 -244.52 -42.39
650.96 651.88 398.54 -238.36 -41.86
660.97 661.89 390.64 -232.19 -41.28
670.99 671.90 382.75 -226.03 -40.67
681.00 681.91 374.86 -219.87 -40.01
691.02 691.92 366.98 -213.72 -39.32
701.03 701.92 359.09 -207.56 -38.58
711.05 711.92 351.21 -201.41 -37.80
721.06 721.92 343.33 -195.25 -36.98
731.08 731.91 335.46 -189.10 -36.12
741.09 741.90 327.58 -182.96 -35.22
751.11 751.88 319.71 -176.81 -34.28
761.12 761.87 311.84 -170.67 -33.30
771.14 771.84 303.98 -164.53 -32.27
781.15 781.82 296.12 -158.39 -31.21
791.16 791.79 288.26 -152.26 -30.11
801.18 801.75 280.40 -146.12 -28.97
811.19 811.71 272.55 -139.99 -27.78
821.21 821.67 264.71 -133.87 -26.56
831.22 831.62 256.86 -127.74 -25.29
841.24 841.56 249.03 -121.62 -23.99
851.25 851.50 241.19 -115.51 -22.65
861.27 861.44 233.36 -109.39 -21.26
871.28 871.36 225.53 -103.28 -19.84
881.30 881.29 217.71 -97.18 -18.38
891.31 891.20 209.90 -91.07 -16.87
901.33 901.11 202.09 -84.98 -15.33
911.34 911.02 194.28 -78.88 -13.75
921.36 920.92 186.48 -72.79 -12.12
931.37 930.81 178.68 -66.70 -10.46
941.39 940.69 170.89 -60.62 -8.76
951.40 950.57 163.10 -54.54 -7.02
961.42 960.44 155.32 -48.47 -5.24
971.43 970.31 147.55 -42.39 -3.42
981.44 980.16 139.78 -36.33 -1.56
991.46 990.01 132.01 -30.27 0.33
1001.47 999.85 124.26 -24.21 2.27
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 36 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM5S *
* *
***************************************************************************************************************

+++ P R O P E R T I E S O F L I N E B M 5 S +++
=====================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Line Class = ~WIRES5 Water Depth = 46 Length of First Segment = 1002

/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

956.18 0.01 0.00 0.68 0.002 275.30 1 0.00 0.00 952.95 0.00 0.00
975.73 0.33 0.04 1.00 0.004 275.30 1 0.00 0.00 934.22 0.00 0.00
986.40 1.31 0.20 1.98 0.007 275.30 1 0.00 0.00 895.59 0.00 0.00
991.09 2.95 0.59 3.62 0.013 275.30 1 0.00 0.00 851.98 0.00 0.00
993.72 5.24 1.30 5.91 0.021 275.30 1 0.00 0.00 806.76 0.00 0.00
995.43 8.18 2.35 8.86 0.032 275.30 1 0.00 1.77 760.86 0.00 0.00
996.64 11.78 3.74 12.46 0.045 275.30 1 0.00 5.76 714.55 0.00 0.00
997.58 16.04 5.38 16.71 0.061 275.30 1 0.00 10.41 668.04 0.00 0.00
998.37 20.95 7.16 21.62 0.079 275.30 1 0.00 15.71 621.41 0.00 0.00
999.06 26.52 8.97 27.19 0.099 275.30 1 0.00 21.67 574.69 0.00 0.00
999.69 32.73 10.71 33.41 0.121 275.30 1 0.00 28.29 527.91 0.00 0.00
1000.29 39.61 12.30 40.28 0.146 275.30 1 0.00 35.56 481.10 0.00 0.00
1000.87 47.14 13.72 47.81 0.174 275.30 1 0.00 43.48 434.26 0.00 0.00
1001.44 55.32 14.96 55.99 0.203 275.30 1 0.00 52.06 387.39 0.00 0.00
1002.01 64.16 16.02 64.83 0.235 275.30 1 0.00 61.30 340.51 0.00 0.00
1002.59 73.65 16.91 74.32 0.270 275.30 1 0.00 71.19 293.60 0.00 0.00
1003.17 83.80 17.67 84.47 0.307 275.30 1 0.00 81.73 246.69 0.00 0.00
1003.77 94.60 18.30 95.27 0.346 275.30 1 0.00 92.93 199.74 0.00 0.00
1004.39 106.06 18.82 106.73 0.388 275.30 1 0.00 104.78 152.80 0.00 0.00
1005.03 118.17 19.26 118.84 0.432 275.30 1 0.00 117.28 105.84 0.00 0.00
1005.69 130.94 19.62 131.61 0.478 275.30 1 0.00 130.45 58.85 0.00 0.00
1006.37 144.36 19.92 145.03 0.527 275.30 1 0.00 144.26 11.85 0.00 0.00
1007.07 158.44 20.35 159.11 0.578 275.30 1 0.50 158.44 0.00 0.00 0.00
1007.78 173.17 20.74 173.84 0.631 275.30 1 1.19 173.17 0.00 0.00 0.00
1008.52 188.55 21.02 189.23 0.687 275.30 1 1.92 188.55 0.00 0.00 0.00
1009.28 204.59 21.23 205.28 0.746 275.30 1 2.67 204.59 0.00 0.00 0.00
1010.06 221.29 21.39 221.98 0.806 275.30 1 3.45 221.29 0.00 0.00 0.00
1010.87 238.64 21.49 239.34 0.869 275.30 1 4.27 238.64 0.00 0.00 0.00
1011.71 256.64 21.57 257.36 0.935 275.30 1 5.11 256.64 0.00 0.00 0.00
1012.57 275.30 21.62 276.03 1.003 275.30 1 5.98 275.30 0.00 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 37 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM5S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 5 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

0.00 0.00 1094.64 265.78 -45.60


10.01 10.03 1084.90 263.35 -45.60
20.03 20.06 1075.17 260.92 -45.60
30.04 30.09 1065.44 258.49 -45.60
40.06 40.13 1055.71 256.06 -45.60
50.07 50.16 1045.97 253.63 -45.60
60.09 60.19 1036.24 251.20 -45.60
70.10 70.22 1026.51 248.77 -45.60
80.12 80.25 1016.78 246.34 -45.60
90.13 90.28 1007.04 243.91 -45.60
100.15 100.31 997.31 241.48 -45.60
110.16 110.35 987.58 239.05 -45.60
120.18 120.38 977.84 236.62 -45.60
130.19 130.41 968.11 234.19 -45.60
140.20 140.44 958.38 231.76 -45.60
150.22 150.47 948.65 229.33 -45.60
160.23 160.50 938.91 226.90 -45.60
170.25 170.54 929.18 224.47 -45.60
180.26 180.57 919.45 222.04 -45.60
190.28 190.60 909.72 219.61 -45.60
200.29 200.63 899.98 217.18 -45.60
210.31 210.66 890.25 214.75 -45.60
220.32 220.69 880.52 212.32 -45.60
230.34 230.72 870.78 209.89 -45.60
240.35 240.76 861.05 207.46 -45.60
250.37 250.79 851.32 205.03 -45.60
260.38 260.82 841.59 202.60 -45.60
270.39 270.85 831.85 200.17 -45.60
280.41 280.88 822.12 197.74 -45.60
290.42 290.91 812.39 195.31 -45.60
300.44 300.94 802.66 192.88 -45.60
310.45 310.98 792.92 190.45 -45.60
320.47 321.01 783.19 188.02 -45.60
330.48 331.04 773.46 185.59 -45.60
340.50 341.07 763.72 183.16 -45.60
350.51 351.10 753.99 180.73 -45.60
360.53 361.13 744.26 178.30 -45.60
370.54 371.17 734.53 175.87 -45.60
380.56 381.20 724.79 173.44 -45.60
390.57 391.23 715.06 171.01 -45.60
400.58 401.26 705.33 168.58 -45.60
410.60 411.29 695.60 166.15 -45.60
420.61 421.32 685.86 163.72 -45.60
430.63 431.35 676.13 161.29 -45.60
440.64 441.39 666.40 158.86 -45.60
450.66 451.42 656.66 156.43 -45.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 38 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 18 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* MOORING PROPERTIES FOR BM5S *
* *
***************************************************************************************************************

+++ G E O M E T R Y O F C O N N E C T O R B M 5 S +++
===========================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Coordinates In Global System

Distance is from Second End

Dist. H. Dist X Y Z
---------- --------- --------- --------- ---------

460.67 461.45 646.93 154.00 -45.60


470.69 471.48 637.20 151.57 -45.60
480.70 481.51 627.47 149.14 -45.60
490.72 491.54 617.73 146.71 -45.60
500.73 501.57 608.00 144.28 -45.58
510.75 511.61 598.27 141.85 -45.52
520.76 521.64 588.54 139.42 -45.43
530.77 531.67 578.80 136.99 -45.29
540.79 541.70 569.07 134.56 -45.13
550.80 551.73 559.34 132.13 -44.92
560.82 561.76 549.61 129.71 -44.68
570.83 571.78 539.88 127.28 -44.40
580.85 581.81 530.15 124.85 -44.08
590.86 591.84 520.43 122.42 -43.73
600.88 601.86 510.70 119.99 -43.33
610.89 611.88 500.98 117.56 -42.91
620.91 621.90 491.26 115.14 -42.44
630.92 631.92 481.54 112.71 -41.94
640.94 641.94 471.82 110.28 -41.40
650.95 651.95 462.10 107.86 -40.83
660.97 661.97 452.39 105.43 -40.21
670.98 671.98 442.67 103.01 -39.56
680.99 681.99 432.96 100.58 -38.88
691.01 691.99 423.26 98.16 -38.16
701.02 701.99 413.55 95.74 -37.40
711.04 711.99 403.85 93.31 -36.60
721.05 721.99 394.15 90.89 -35.77
731.07 731.98 384.45 88.47 -34.90
741.08 741.97 374.76 86.05 -33.99
751.10 751.96 365.07 83.63 -33.05
761.11 761.95 355.38 81.21 -32.07
771.13 771.93 345.70 78.80 -31.05
781.14 781.90 336.02 76.38 -30.00
791.16 791.87 326.35 73.96 -28.91
801.17 801.84 316.67 71.55 -27.79
811.18 811.81 307.01 69.13 -26.63
821.20 821.77 297.34 66.72 -25.43
831.21 831.72 287.68 64.31 -24.20
841.23 841.67 278.03 61.90 -22.93
851.24 851.62 268.38 59.49 -21.62
861.26 861.56 258.73 57.08 -20.28
871.27 871.50 249.09 54.68 -18.90
881.29 881.43 239.46 52.27 -17.49
891.30 891.36 229.83 49.87 -16.04
901.32 901.28 220.20 47.46 -14.55
911.33 911.19 210.58 45.06 -13.03
921.35 921.10 200.97 42.66 -11.47
931.36 931.01 191.36 40.26 -9.88
941.38 940.91 181.75 37.86 -8.25
951.39 950.80 172.16 35.47 -6.59
961.40 960.69 162.56 33.07 -4.89
971.42 970.57 152.98 30.68 -3.15
981.43 980.44 143.40 28.29 -1.38
991.45 990.31 133.82 25.90 0.43
1001.46 1000.17 124.26 23.51 2.27
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX C
MOSES OUTPUTS (INTACT CONDITION)
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 1 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DB30 MOORING ANALYSIS *
* *
***************************************************************************************************************

+++ B U O Y A N C Y A N D W E I G H T F O R D B 3 0 +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Draft = 4.20 Roll Angle = 0.00 Pitch Angle = 0.45

Wet Radii Of Gyration About CG

K-X = 13.41 K-Y = 42.49 K-Z = 43.88

/-- Center of Gravity ---/ Sounding % Full


Name Weight ---X--- ---Y--- ---Z--- -------- --------

---------------- Part DB30 ------------


ELEMENTS 5.90 132.84 0.00 60.89
LOAD_GRO 24735.33 67.16 0.00 8.98
======== ======== ======= ======= =======
Total 24741.23 67.18 0.00 8.99
Buoyancy 25855.49 70.79 0.00 2.59

Page 2 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DB30 MOORING ANALYSIS *
* *
***************************************************************************************************************

+++ B U O Y A N C Y A N D W E I G H T F O R W H P B J K T +++
=====================================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Draft = -21.94 Roll Angle = 0.00 Pitch Angle = 0.00

Wet Radii Of Gyration About CG

K-X = 19.54 K-Y = 13.32 K-Z = 20.14

/-- Center of Gravity ---/ Sounding % Full


Name Weight ---X--- ---Y--- ---Z--- -------- --------

---------------- Part WHPBJKT ------------


ELEMENTS 821.41 149.06 0.10 1.55
LOAD_GRO 292.87 149.70 -0.29 2.44
======== ======== ======= ======= =======
Total 1114.28 149.23 0.00 1.78
Buoyancy 0.00 0.00 0.00 0.00

Page 3 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DB30 MOORING ANALYSIS *
* *
***************************************************************************************************************

+++ D R A F T M A R K R E A D I N G S +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Name Draft Name Draft Name Draft Name Draft Name Draft Name Draft
-------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- --------

AFT(P) 5.20 AFT(S) 5.20 FWD(P) 4.20 FWD(S) 4.20 MID(P) 4.70 MID(S) 4.70
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 5 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DB30 MOORING ANALYSIS *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E C L A S S E S +++
===============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Type Water Slope of Clump /---------- Segment Data ----------/


Name Depth Bottom Weight Length W/L AE Break
-------- ------- -------- -------- -------- -------- -------- ---------

~&SLING 45.6 0.0000 0.0 1001.46 0.0141 2.26E+04 275.30

~BO 0.0 0.0000 0.0 30.63 0.0000 8.73E+05 4189.60

~SL115A 0.0 0.0000 0.0 30.90 0.0000 8.05E+05 3859.42

~SL115B 0.0 0.0000 0.0 30.52 0.0000 8.05E+05 3859.42

~SL280A 0.0 0.0000 0.0 30.07 0.0000 8.05E+05 3859.42

~SL280B 0.0 0.0000 0.0 29.63 0.0000 8.05E+05 3859.42

~WIREP1 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 223.80

~WIREP2 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 267.70

~WIREP3 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 265.10

~WIREP4 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 276.80

~WIREP5 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 262.90

~WIREP6 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 310.80

~WIRES1 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 281.70

~WIRES2 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 271.50

~WIRES3 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 261.30

~WIRES4 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 263.90

~WIRES5 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 275.30

~WIRES6 45.6 0.0000 0.0 1100.00 0.0141 2.26E+04 227.80

Page 6 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DB30 MOORING ANALYSIS *
* *
***************************************************************************************************************

+++ M O O R I N G S P R E A D +++
===================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Tension Tension / Length of /----- Heading ----/


Name Break St. First Seg. Body Local Global
-------- ---------- ---------- ---------- -------- --------- ----------

BM2P 33.74 0.12608 1001.58 DB30 198.98 198.98


BM2S 36.14 0.13317 1001.58 DB30 162.98 162.98
BM3P 32.34 0.12202 1001.57 DB30 239.00 239.00
BM3S 39.13 0.14980 1001.57 DB30 119.98 119.98
BM4P 33.52 0.12114 1001.50 DB30 300.01 300.01
BM4S 40.64 0.15406 1001.50 DB30 60.01 60.01
BM5P 35.13 0.13365 1001.47 DB30 322.02 322.02
BM5S 38.84 0.14112 1001.46 DB30 14.02 14.02
MAINLN 1114.00 0.26590 29.55 DB30 0.00 0.00
SL115A 306.53 0.07942 30.90 WHPBJKT 0.00 0.00
SL115B 329.40 0.08535 30.52 WHPBJKT 0.00 0.00
SL280A 296.78 0.07690 30.07 WHPBJKT 0.00 0.00
SL280B 323.80 0.08390 29.63 WHPBJKT 0.00 0.00
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -20 -6 -5 0 0 0 23


BM2S DB30 -23 7 -5 0 0 0 25
BM3P DB30 -12 -21 -5 0 0 0 26
BM3S DB30 -15 28 -6 0 0 0 33
BM4P DB30 20 -33 -6 0 0 0 40
BM4S DB30 24 42 -7 0 0 0 49
BM5P DB30 36 -27 -7 0 0 0 46
BM5S DB30 52 13 -7 0 0 0 54
MAINLN DB30 3 0 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 198.4 2.2 -24740.4 -19 1663791 147


Buoyancy -206.0 -2.3 25696.9 107 -1821805 -159
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.2 0.0 -4.8 0 53 0
Wave -16.7 0.0 218.0 -35 -12589 14
Flex. Connectors 60.7 0.1 -1170.3 -52 171008 -1165
======= ======= ======= ======= ======= =======
Total 0.2 0.0 -0.5 0 106 -1199

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 6.0 0.0 -1114.3 0 166286 7


Wind -7.0 -0.1 0.0 0 -14 8
Flex. Connectors -0.1 0.0 1114.8 0 -166349 0
======= ======= ======= ======= ======= =======
Total -1.0 0.0 0.5 0 -78 15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.61 1001.58 602.81 23.47 0.0875 17.67 0.00


BM2S 998.86 1001.58 586.07 25.43 0.0935 19.77 0.00
BM3P 998.96 1001.57 581.50 26.05 0.0981 20.43 0.00
BM3S 999.72 1001.57 525.88 33.35 0.1275 28.20 0.00
BM4P 1000.27 1001.50 486.17 39.62 0.1430 34.83 0.00
BM4S 1001.01 1001.50 425.90 49.38 0.1871 45.11 0.00
BM5P 1000.74 1001.47 445.90 45.91 0.1745 41.46 0.00
BM5S 1001.33 1001.46 396.05 54.50 0.1979 50.48 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.48 -0.43 -4.16 -0.01 0.46 0.00


N Force 0.22 0.00 -0.47 0 106 -1199

WHPBJKT Location -1.08 -1.29 22.76 0.00 0.31 0.33


N Force -0.98 -0.01 0.46 0 -78 15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 22.83 25.13 25.61 33.26 38.91 51.44 46.03 55.90


Variance 5.91 7.32 2.38 3.54 4.52 7.29 13.51 25.76
Root Mean Square 22.96 25.28 25.66 33.31 38.97 51.51 46.17 56.13
Std. Deviation 2.43 2.71 1.54 1.88 2.13 2.70 3.68 5.08
Skewness 0.09 0.13 0.07 -0.05 -0.11 0.35 0.06 0.15
Kurtosis -0.90 -0.77 -0.69 -0.83 -0.59 -0.66 -0.78 -0.83

Number of Peaks 165 183 194 193 261 171 207 139

Av Of 1/3 Highest 26.88 29.67 28.04 36.22 42.32 55.85 51.88 63.80
Av Of 1/3 Lowest 19.00 20.97 23.15 30.30 35.50 47.63 40.23 47.71
Av Of 1/100 Highest 28.48 31.88 29.13 37.45 43.51 58.43 54.44 68.08
Av Of 1/100 Lowest 17.69 19.49 22.13 29.01 33.32 45.75 37.65 45.48
Av Of 1/1000 Highest 28.48 31.88 29.13 37.45 43.53 58.43 54.54 68.08
Av Of 1/1000 Lowest 17.69 19.49 22.13 29.01 33.29 45.75 37.47 45.48
Maximum 28.48 31.88 29.13 37.45 43.53 58.43 54.54 68.08
Minimum 17.69 19.49 22.13 29.01 33.29 45.75 37.47 45.48
Pred. Max 29.66 33.27 29.85 38.30 44.43 59.90 56.26 70.72
Pred. Min 16.60 18.33 21.42 28.14 32.19 44.55 35.74 43.21

Av Of 1/3 H-Mean 4.05 4.54 2.43 2.96 3.40 4.41 5.85 7.90
Av Of 1/3 L-Mean -3.83 -4.16 -2.46 -2.96 -3.41 -3.81 -5.80 -8.18
Av Of 1/100 H-Mean 5.64 6.75 3.52 4.19 4.60 6.99 8.41 12.18
Av Of 1/100 L-Mean -5.15 -5.64 -3.48 -4.25 -5.59 -5.69 -8.37 -10.42
Av Of 1/1000 H-Mean 5.64 6.75 3.52 4.19 4.61 6.99 8.51 12.18
Av Of 1/1000 L-Mean -5.15 -5.64 -3.48 -4.25 -5.63 -5.69 -8.55 -10.42
Maximum - Mean 5.64 6.75 3.52 4.19 4.61 6.99 8.51 12.18
Minimum - Mean -5.15 -5.64 -3.48 -4.25 -5.63 -5.69 -8.55 -10.42
Pred. Max-Mean 6.83 8.14 4.24 5.04 5.51 8.46 10.23 14.82
Pred. Min-Mean -6.23 -6.80 -4.19 -5.12 -6.72 -6.89 -10.29 -12.69

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.56 -0.44 -4.16


Variance 0.12 0.01 0.00
Root Mean Square 1.60 0.45 4.16
Std. Deviation 0.35 0.09 0.04
Skewness -0.08 -0.45 0.14
Kurtosis -0.84 0.43 0.00

Number of Peaks 117 291 301

Av Of 1/3 Highest -0.97 -0.27 -4.08


Av Of 1/3 Lowest -2.10 -0.63 -4.24
Av Of 1/100 Highest -0.81 -0.21 -4.02
Av Of 1/100 Lowest -2.35 -0.81 -4.29
Av Of 1/1000 Highest -0.81 -0.20 -4.02
Av Of 1/1000 Lowest -2.35 -0.84 -4.30
Maximum -0.81 -0.20 -4.02
Minimum -2.35 -0.84 -4.30
Pred. Max -0.65 -0.16 -3.99
Pred. Min -2.53 -0.92 -4.33

Av Of 1/3 H-Mean 0.59 0.17 0.08


Av Of 1/3 L-Mean -0.54 -0.19 -0.08
Av Of 1/100 H-Mean 0.75 0.23 0.14
Av Of 1/100 L-Mean -0.79 -0.37 -0.13
Av Of 1/1000 H-Mean 0.75 0.24 0.15
Av Of 1/1000 L-Mean -0.79 -0.40 -0.14
Maximum - Mean 0.75 0.24 0.15
Minimum - Mean -0.79 -0.40 -0.14
Pred. Max-Mean 0.91 0.29 0.18
Pred. Min-Mean -0.97 -0.47 -0.17
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.56 -0.44 -4.16 -1.49 -0.44 4.37 62.45 -0.51 -4.67 62.52 -0.51
Variance 0.12 0.01 0.00 0.12 0.00 0.00 0.12 0.01 0.01 0.12 0.00
Root Mean Square 1.60 0.45 4.16 1.53 0.45 4.37 62.45 0.52 4.68 62.52 0.51
Std. Deviation 0.35 0.09 0.04 0.35 0.06 0.04 0.35 0.09 0.07 0.35 0.05
Skewness -0.08 -0.45 0.14 -0.07 -0.70 0.14 -0.08 -0.61 0.10 -0.07 -1.16
Kurtosis -0.84 0.43 0.00 -0.84 0.98 0.00 -0.84 0.37 -0.08 -0.84 1.47

Number of Peaks 117 291 301 145 222 305 117 291 323 143 217

Av Of 1/3 Highest -0.97 -0.27 -4.08 -0.92 -0.36 4.45 63.03 -0.36 -4.52 63.09 -0.44
Av Of 1/3 Lowest -2.10 -0.63 -4.24 -2.06 -0.54 4.29 61.90 -0.70 -4.82 61.96 -0.59
Av Of 1/100 Highest -0.81 -0.21 -4.02 -0.73 -0.32 4.51 63.19 -0.30 -4.45 63.27 -0.43
Av Of 1/100 Lowest -2.35 -0.81 -4.29 -2.28 -0.66 4.24 61.66 -0.86 -4.89 61.72 -0.70
Av Of 1/1000 Highest -0.81 -0.20 -4.02 -0.73 -0.31 4.52 63.19 -0.30 -4.45 63.27 -0.43
Av Of 1/1000 Lowest -2.35 -0.84 -4.30 -2.28 -0.68 4.23 61.66 -0.87 -4.90 61.72 -0.71
Maximum -0.81 -0.20 -4.02 -0.73 -0.31 4.52 63.19 -0.30 -4.45 63.27 -0.43
Minimum -2.35 -0.84 -4.30 -2.28 -0.68 4.23 61.66 -0.87 -4.90 61.72 -0.71
Pred. Max -0.65 -0.16 -3.99 -0.57 -0.29 4.55 63.36 -0.26 -4.40 63.44 -0.41
Pred. Min -2.53 -0.92 -4.33 -2.45 -0.73 4.21 61.48 -0.94 -4.95 61.55 -0.75

Av Of 1/3 H-Mean 0.59 0.17 0.08 0.57 0.08 0.08 0.59 0.15 0.16 0.58 0.06
Av Of 1/3 L-Mean -0.54 -0.19 -0.08 -0.57 -0.09 -0.08 -0.54 -0.19 -0.15 -0.56 -0.08
Av Of 1/100 H-Mean 0.75 0.23 0.14 0.76 0.13 0.14 0.75 0.21 0.23 0.76 0.08
Av Of 1/100 L-Mean -0.79 -0.37 -0.13 -0.79 -0.21 -0.13 -0.79 -0.35 -0.22 -0.79 -0.20
Av Of 1/1000 H-Mean 0.75 0.24 0.15 0.76 0.13 0.15 0.75 0.21 0.23 0.76 0.08
Av Of 1/1000 L-Mean -0.79 -0.40 -0.14 -0.79 -0.24 -0.14 -0.79 -0.36 -0.23 -0.79 -0.20
Maximum - Mean 0.75 0.24 0.15 0.76 0.13 0.15 0.75 0.21 0.23 0.76 0.08
Minimum - Mean -0.79 -0.40 -0.14 -0.79 -0.24 -0.14 -0.79 -0.36 -0.23 -0.79 -0.20
Pred. Max-Mean 0.91 0.29 0.18 0.92 0.15 0.18 0.91 0.25 0.27 0.92 0.09
Pred. Min-Mean -0.97 -0.47 -0.17 -0.96 -0.28 -0.17 -0.97 -0.43 -0.27 -0.96 -0.24

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.86 126.45 -0.57 -5.19 126.52 -0.57 3.35


Variance 0.01 0.12 0.01 0.02 0.12 0.01 0.02
Root Mean Square 3.86 126.45 0.58 5.19 126.52 0.57 3.35
Std. Deviation 0.07 0.35 0.10 0.14 0.35 0.07 0.14
Skewness 0.10 -0.08 -0.35 0.07 -0.07 -0.14 0.07
Kurtosis -0.09 -0.84 -0.18 -0.18 -0.84 -0.45 -0.18

Number of Peaks 325 115 291 317 143 193 317

Av Of 1/3 Highest 4.01 127.04 -0.40 -4.88 127.10 -0.46 3.66


Av Of 1/3 Lowest 3.71 125.91 -0.78 -5.48 125.96 -0.68 3.05
Av Of 1/100 Highest 4.08 127.20 -0.33 -4.73 127.28 -0.43 3.80
Av Of 1/100 Lowest 3.64 125.66 -0.90 -5.60 125.73 -0.77 2.94
Av Of 1/1000 Highest 4.09 127.20 -0.33 -4.73 127.28 -0.43 3.80
Av Of 1/1000 Lowest 3.63 125.66 -0.91 -5.61 125.73 -0.77 2.92
Maximum 4.09 127.20 -0.33 -4.73 127.28 -0.43 3.80
Minimum 3.63 125.66 -0.91 -5.61 125.73 -0.77 2.92
Pred. Max 4.13 127.37 -0.28 -4.64 127.44 -0.40 3.89
Pred. Min 3.59 125.48 -0.97 -5.69 125.56 -0.81 2.84

Av Of 1/3 H-Mean 0.15 0.59 0.17 0.31 0.58 0.11 0.31


Av Of 1/3 L-Mean -0.15 -0.54 -0.20 -0.29 -0.56 -0.11 -0.29
Av Of 1/100 H-Mean 0.23 0.75 0.24 0.46 0.76 0.14 0.46
Av Of 1/100 L-Mean -0.22 -0.79 -0.33 -0.41 -0.79 -0.20 -0.41
Av Of 1/1000 H-Mean 0.23 0.75 0.24 0.46 0.76 0.14 0.46
Av Of 1/1000 L-Mean -0.23 -0.79 -0.34 -0.42 -0.79 -0.20 -0.42
Maximum - Mean 0.23 0.75 0.24 0.46 0.76 0.14 0.46
Minimum - Mean -0.23 -0.79 -0.34 -0.42 -0.79 -0.20 -0.42
Pred. Max-Mean 0.27 0.91 0.29 0.55 0.92 0.17 0.54
Pred. Min-Mean -0.27 -0.97 -0.40 -0.50 -0.96 -0.24 -0.50
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -18 -6 -4 0 0 0 21


BM2S DB30 -20 7 -5 0 0 0 23
BM3P DB30 -11 -19 -5 0 0 0 25
BM3S DB30 -14 27 -6 0 0 0 32
BM4P DB30 20 -34 -6 0 0 0 41
BM4S DB30 26 44 -7 0 0 0 52
BM5P DB30 38 -29 -7 0 0 0 49
BM5S DB30 57 14 -7 0 0 0 59
MAINLN DB30 3 0 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.9 1.9 -24740.5 -17 1663745 131


Buoyancy -200.7 -2.0 25745.4 96 -1823278 -142
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.2 0.0 -4.8 0 51 0
Wave -31.7 0.0 169.5 -23 -11272 -5
Flex. Connectors 75.9 0.1 -1170.2 -55 171216 -1236
======= ======= ======= ======= ======= =======
Total 0.3 0.0 -0.5 0 110 -1287

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 6.0 0.0 -1114.3 0 166286 7


Wind -7.0 -0.1 0.0 0 -14 8
Flex. Connectors -0.1 0.0 1114.8 0 -166351 0
======= ======= ======= ======= ======= =======
Total -1.0 0.0 0.5 0 -80 15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.29 1001.58 623.46 21.05 0.0786 15.09 0.00


BM2S 998.56 1001.58 605.97 23.07 0.0849 17.27 0.00
BM3P 998.77 1001.57 593.96 24.58 0.0926 18.87 0.00
BM3S 999.58 1001.57 536.36 31.83 0.1218 26.62 0.00
BM4P 1000.41 1001.50 475.28 41.29 0.1491 36.59 0.00
BM4S 1001.20 1001.50 410.74 51.98 0.1969 47.83 0.00
BM5P 1000.98 1001.47 426.56 49.22 0.1871 44.93 0.00
BM5S 1001.65 1001.46 369.92 59.31 0.2154 55.51 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.80 -0.46 -4.18 0.00 0.45 0.00


N Force 0.27 -0.02 -0.49 0 110 -1287

WHPBJKT Location -1.42 -1.33 22.77 0.00 0.31 0.34


N Force -0.97 -0.01 0.47 0 -80 15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 20.88 22.75 24.26 31.62 41.87 52.73 50.24 60.79


Variance 10.45 12.66 4.43 6.25 9.91 14.42 31.09 58.68
Root Mean Square 21.13 23.03 24.36 31.72 41.98 52.87 50.55 61.27
Std. Deviation 3.23 3.56 2.10 2.50 3.15 3.80 5.58 7.66
Skewness 0.36 0.37 0.13 0.23 0.06 0.12 0.10 0.12
Kurtosis -0.41 -0.42 -0.43 -0.52 -0.58 -0.47 -0.53 -0.51

Number of Peaks 153 149 157 153 163 167 151 151

Av Of 1/3 Highest 26.90 29.50 27.91 36.12 47.09 58.76 59.12 72.87
Av Of 1/3 Lowest 16.13 17.87 21.03 27.89 36.60 46.46 41.03 48.32
Av Of 1/100 Highest 30.15 32.79 29.86 38.10 49.32 62.06 63.77 79.65
Av Of 1/100 Lowest 14.53 15.74 19.68 26.28 34.48 43.93 37.46 43.36
Av Of 1/1000 Highest 30.15 32.79 29.86 38.10 49.32 62.06 63.77 79.65
Av Of 1/1000 Lowest 14.53 15.74 19.68 26.28 34.48 43.93 37.46 43.36
Maximum 30.15 32.79 29.86 38.10 49.32 62.06 63.77 79.65
Minimum 14.53 15.74 19.68 26.28 34.48 43.93 37.46 43.36
Pred. Max 32.13 34.94 31.05 39.49 50.90 64.03 66.66 83.70
Pred. Min 13.18 14.24 18.70 25.14 32.92 42.07 34.72 39.62

Av Of 1/3 H-Mean 6.02 6.75 3.64 4.50 5.22 6.03 8.88 12.08
Av Of 1/3 L-Mean -4.76 -4.89 -3.24 -3.73 -5.27 -6.27 -9.21 -12.46
Av Of 1/100 H-Mean 9.27 10.04 5.60 6.48 7.45 9.33 13.53 18.87
Av Of 1/100 L-Mean -6.35 -7.01 -4.58 -5.34 -7.39 -8.80 -12.78 -17.43
Av Of 1/1000 H-Mean 9.27 10.04 5.60 6.48 7.45 9.33 13.53 18.87
Av Of 1/1000 L-Mean -6.35 -7.01 -4.58 -5.34 -7.39 -8.80 -12.78 -17.43
Maximum - Mean 9.27 10.04 5.60 6.48 7.45 9.33 13.53 18.87
Minimum - Mean -6.35 -7.01 -4.58 -5.34 -7.39 -8.80 -12.78 -17.43
Pred. Max-Mean 11.25 12.19 6.79 7.87 9.03 11.30 16.42 22.91
Pred. Min-Mean -7.70 -8.52 -5.56 -6.48 -8.95 -10.66 -15.52 -21.16

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.88 -0.46 -4.19


Variance 0.26 0.00 0.00
Root Mean Square 1.95 0.46 4.19
Std. Deviation 0.51 0.03 0.03
Skewness 0.01 -0.04 0.08
Kurtosis -0.53 -0.26 0.07

Number of Peaks 143 137 287

Av Of 1/3 Highest -0.99 -0.41 -4.12


Av Of 1/3 Lowest -2.64 -0.50 -4.25
Av Of 1/100 Highest -0.64 -0.39 -4.08
Av Of 1/100 Lowest -3.07 -0.53 -4.29
Av Of 1/1000 Highest -0.64 -0.39 -4.08
Av Of 1/1000 Lowest -3.07 -0.53 -4.30
Maximum -0.64 -0.39 -4.08
Minimum -3.07 -0.53 -4.30
Pred. Max -0.37 -0.38 -4.06
Pred. Min -3.33 -0.55 -4.32

Av Of 1/3 H-Mean 0.89 0.05 0.07


Av Of 1/3 L-Mean -0.76 -0.04 -0.06
Av Of 1/100 H-Mean 1.24 0.07 0.11
Av Of 1/100 L-Mean -1.19 -0.07 -0.10
Av Of 1/1000 H-Mean 1.24 0.07 0.11
Av Of 1/1000 L-Mean -1.19 -0.07 -0.11
Maximum - Mean 1.24 0.07 0.11
Minimum - Mean -1.19 -0.07 -0.11
Pred. Max-Mean 1.51 0.09 0.13
Pred. Min-Mean -1.44 -0.09 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.88 -0.46 -4.19 -1.82 -0.46 4.35 62.12 -0.46 -4.68 62.19 -0.46
Variance 0.26 0.00 0.00 0.26 0.00 0.00 0.26 0.00 0.00 0.26 0.00
Root Mean Square 1.95 0.46 4.19 1.89 0.46 4.35 62.12 0.47 4.68 62.19 0.46
Std. Deviation 0.51 0.03 0.03 0.51 0.03 0.03 0.51 0.03 0.03 0.51 0.03
Skewness 0.01 -0.04 0.08 0.01 -0.02 0.08 0.01 -0.04 -0.02 0.01 -0.02
Kurtosis -0.53 -0.26 0.07 -0.53 -0.24 0.07 -0.53 -0.24 -0.01 -0.53 -0.23

Number of Peaks 143 137 287 151 85 287 143 139 289 150 87

Av Of 1/3 Highest -0.99 -0.41 -4.12 -0.95 -0.42 4.41 63.01 -0.41 -4.63 63.07 -0.42
Av Of 1/3 Lowest -2.64 -0.50 -4.25 -2.64 -0.51 4.28 61.37 -0.51 -4.74 61.36 -0.51
Av Of 1/100 Highest -0.64 -0.39 -4.08 -0.57 -0.40 4.45 63.36 -0.39 -4.60 63.43 -0.40
Av Of 1/100 Lowest -3.07 -0.53 -4.29 -3.01 -0.53 4.24 60.94 -0.53 -4.77 61.00 -0.53
Av Of 1/1000 Highest -0.64 -0.39 -4.08 -0.57 -0.40 4.46 63.36 -0.39 -4.60 63.43 -0.40
Av Of 1/1000 Lowest -3.07 -0.53 -4.30 -3.01 -0.53 4.24 60.94 -0.53 -4.77 61.00 -0.53
Maximum -0.64 -0.39 -4.08 -0.57 -0.40 4.46 63.36 -0.39 -4.60 63.43 -0.40
Minimum -3.07 -0.53 -4.30 -3.01 -0.53 4.24 60.94 -0.53 -4.77 61.00 -0.53
Pred. Max -0.37 -0.38 -4.06 -0.31 -0.38 4.48 63.63 -0.38 -4.58 63.70 -0.38
Pred. Min -3.33 -0.55 -4.32 -3.26 -0.55 4.21 60.68 -0.55 -4.79 60.74 -0.55

Av Of 1/3 H-Mean 0.89 0.05 0.07 0.87 0.04 0.07 0.89 0.05 0.05 0.88 0.04
Av Of 1/3 L-Mean -0.76 -0.04 -0.06 -0.82 -0.05 -0.06 -0.76 -0.04 -0.05 -0.83 -0.05
Av Of 1/100 H-Mean 1.24 0.07 0.11 1.24 0.07 0.11 1.24 0.07 0.08 1.24 0.07
Av Of 1/100 L-Mean -1.19 -0.07 -0.10 -1.19 -0.07 -0.10 -1.19 -0.07 -0.09 -1.19 -0.07
Av Of 1/1000 H-Mean 1.24 0.07 0.11 1.24 0.07 0.11 1.24 0.07 0.08 1.24 0.07
Av Of 1/1000 L-Mean -1.19 -0.07 -0.11 -1.19 -0.07 -0.11 -1.19 -0.07 -0.09 -1.19 -0.07
Maximum - Mean 1.24 0.07 0.11 1.24 0.07 0.11 1.24 0.07 0.08 1.24 0.07
Minimum - Mean -1.19 -0.07 -0.11 -1.19 -0.07 -0.11 -1.19 -0.07 -0.09 -1.19 -0.07
Pred. Max-Mean 1.51 0.09 0.13 1.51 0.08 0.13 1.51 0.09 0.10 1.51 0.08
Pred. Min-Mean -1.44 -0.09 -0.13 -1.45 -0.09 -0.13 -1.44 -0.09 -0.11 -1.45 -0.09

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.85 126.13 -0.47 -5.18 126.20 -0.46 3.35


Variance 0.00 0.26 0.00 0.01 0.26 0.00 0.01
Root Mean Square 3.85 126.13 0.47 5.18 126.20 0.47 3.35
Std. Deviation 0.03 0.51 0.03 0.08 0.51 0.03 0.08
Skewness -0.02 0.01 -0.03 -0.04 0.01 -0.02 -0.04
Kurtosis -0.01 -0.53 -0.23 -0.16 -0.53 -0.21 -0.16

Number of Peaks 289 143 139 286 151 86 286

Av Of 1/3 Highest 3.90 127.02 -0.41 -5.03 127.07 -0.42 3.51


Av Of 1/3 Lowest 3.80 125.37 -0.51 -5.34 125.38 -0.51 3.19
Av Of 1/100 Highest 3.93 127.37 -0.39 -4.95 127.44 -0.40 3.58
Av Of 1/100 Lowest 3.76 124.94 -0.54 -5.42 125.00 -0.53 3.11
Av Of 1/1000 Highest 3.93 127.37 -0.39 -4.94 127.44 -0.40 3.59
Av Of 1/1000 Lowest 3.76 124.94 -0.54 -5.43 125.00 -0.53 3.11
Maximum 3.93 127.37 -0.39 -4.94 127.44 -0.40 3.59
Minimum 3.76 124.94 -0.54 -5.43 125.00 -0.53 3.11
Pred. Max 3.95 127.64 -0.38 -4.90 127.70 -0.38 3.64
Pred. Min 3.74 124.69 -0.55 -5.47 124.75 -0.55 3.06

Av Of 1/3 H-Mean 0.05 0.89 0.05 0.15 0.87 0.04 0.15


Av Of 1/3 L-Mean -0.05 -0.76 -0.04 -0.16 -0.82 -0.05 -0.16
Av Of 1/100 H-Mean 0.08 1.24 0.07 0.23 1.24 0.07 0.23
Av Of 1/100 L-Mean -0.09 -1.19 -0.07 -0.24 -1.19 -0.07 -0.24
Av Of 1/1000 H-Mean 0.08 1.24 0.07 0.24 1.24 0.07 0.24
Av Of 1/1000 L-Mean -0.09 -1.19 -0.07 -0.24 -1.19 -0.07 -0.24
Maximum - Mean 0.08 1.24 0.07 0.24 1.24 0.07 0.24
Minimum - Mean -0.09 -1.19 -0.07 -0.24 -1.19 -0.07 -0.24
Pred. Max-Mean 0.10 1.51 0.09 0.29 1.51 0.08 0.29
Pred. Min-Mean -0.11 -1.44 -0.09 -0.29 -1.45 -0.09 -0.29
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -17 -5 -4 0 0 0 20


BM2S DB30 -19 6 -5 0 0 0 22
BM3P DB30 -11 -19 -5 0 0 0 24
BM3S DB30 -14 26 -6 0 0 0 31
BM4P DB30 21 -35 -6 0 0 0 42
BM4S DB30 27 46 -7 0 0 0 53
BM5P DB30 40 -30 -7 0 0 0 51
BM5S DB30 60 15 -8 0 0 0 62
MAINLN DB30 3 0 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.0 1.5 -24740.5 -13 1663745 101


Buoyancy -201.2 -1.6 25800.2 74 -1826931 -110
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.2 0.0 -4.8 0 51 0
Wave -40.3 0.0 114.7 -6 -7748 -3
Flex. Connectors 84.8 0.0 -1170.3 -55 171395 -1287
======= ======= ======= ======= ======= =======
Total 0.1 -0.1 -0.6 -1 161 -1334

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 5.7 0.1 -1114.3 0 166286 8


Wind -7.0 -0.1 0.0 0 -14 7
Flex. Connectors -0.1 0.0 1114.9 0 -166378 0
======= ======= ======= ======= ======= =======
Total -1.3 0.0 0.6 0 -107 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.11 1001.58 633.73 19.98 0.0746 13.95 0.00


BM2S 998.39 1001.58 617.31 21.74 0.0800 15.85 0.00
BM3P 998.66 1001.57 601.06 23.74 0.0895 17.99 0.00
BM3S 999.50 1001.57 541.99 31.09 0.1190 25.84 0.00
BM4P 1000.48 1001.50 468.95 42.30 0.1528 37.67 0.00
BM4S 1001.30 1001.50 402.11 53.45 0.2025 49.38 0.00
BM5P 1001.11 1001.47 415.52 51.09 0.1943 46.91 0.00
BM5S 1001.83 1001.46 355.02 62.11 0.2256 58.44 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.98 -0.47 -4.19 0.00 0.45 0.00


N Force 0.15 -0.06 -0.61 -1 161 -1334

WHPBJKT Location -1.58 -1.24 22.72 0.00 0.30 0.29


N Force -1.32 -0.01 0.64 0 -107 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 19.86 21.66 23.53 30.88 42.78 54.14 52.02 63.41


Variance 10.95 13.08 5.12 6.51 11.08 18.17 36.34 71.15
Root Mean Square 20.13 21.96 23.63 30.99 42.91 54.31 52.36 63.97
Std. Deviation 3.31 3.62 2.26 2.55 3.33 4.26 6.03 8.44
Skewness 0.40 0.40 0.19 0.21 0.05 0.09 0.10 0.11
Kurtosis -0.45 -0.45 -0.56 -0.56 -0.66 -0.57 -0.60 -0.58

Number of Peaks 186 188 170 174 192 191 196 197

Av Of 1/3 Highest 25.88 28.15 27.46 35.41 48.30 61.09 62.03 77.36
Av Of 1/3 Lowest 15.03 16.35 20.00 26.85 37.44 47.21 42.49 49.80
Av Of 1/100 Highest 28.39 30.95 28.94 37.04 50.72 64.79 66.81 84.30
Av Of 1/100 Lowest 13.42 14.70 18.71 25.44 35.66 45.08 39.35 45.76
Av Of 1/1000 Highest 28.39 30.95 28.94 37.04 50.72 64.79 66.81 84.30
Av Of 1/1000 Lowest 13.42 14.70 18.71 25.44 35.66 45.08 39.35 45.76
Maximum 28.39 30.95 28.94 37.04 50.72 64.79 66.81 84.30
Minimum 13.42 14.70 18.71 25.44 35.66 45.08 39.35 45.76
Pred. Max 30.15 32.87 30.08 38.33 52.35 66.98 69.83 88.56
Pred. Min 12.09 13.26 17.70 24.30 34.20 43.22 36.75 42.15

Av Of 1/3 H-Mean 6.02 6.49 3.94 4.53 5.52 6.95 10.01 13.95
Av Of 1/3 L-Mean -4.82 -5.31 -3.52 -4.03 -5.34 -6.93 -9.53 -13.61
Av Of 1/100 H-Mean 8.53 9.29 5.42 6.16 7.94 10.66 14.79 20.88
Av Of 1/100 L-Mean -6.44 -6.96 -4.82 -5.44 -7.12 -9.06 -12.67 -17.65
Av Of 1/1000 H-Mean 8.53 9.29 5.42 6.16 7.94 10.66 14.79 20.88
Av Of 1/1000 L-Mean -6.44 -6.96 -4.82 -5.44 -7.12 -9.06 -12.67 -17.65
Maximum - Mean 8.53 9.29 5.42 6.16 7.94 10.66 14.79 20.88
Minimum - Mean -6.44 -6.96 -4.82 -5.44 -7.12 -9.06 -12.67 -17.65
Pred. Max-Mean 10.30 11.21 6.55 7.45 9.57 12.84 17.81 25.15
Pred. Min-Mean -7.77 -8.40 -5.83 -6.58 -8.58 -10.92 -15.26 -21.26

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.05 -0.47 -4.19


Variance 0.30 0.00 0.01
Root Mean Square 2.12 0.48 4.20
Std. Deviation 0.55 0.04 0.09
Skewness 0.02 0.09 -0.03
Kurtosis -0.57 -0.40 -0.28

Number of Peaks 222 121 273

Av Of 1/3 Highest -1.15 -0.41 -4.02


Av Of 1/3 Lowest -2.92 -0.53 -4.38
Av Of 1/100 Highest -0.81 -0.38 -3.96
Av Of 1/100 Lowest -3.32 -0.56 -4.45
Av Of 1/1000 Highest -0.81 -0.38 -3.95
Av Of 1/1000 Lowest -3.34 -0.56 -4.46
Maximum -0.81 -0.38 -3.95
Minimum -3.34 -0.56 -4.46
Pred. Max -0.56 -0.36 -3.91
Pred. Min -3.59 -0.57 -4.51

Av Of 1/3 H-Mean 0.90 0.07 0.18


Av Of 1/3 L-Mean -0.87 -0.06 -0.18
Av Of 1/100 H-Mean 1.24 0.09 0.24
Av Of 1/100 L-Mean -1.26 -0.08 -0.26
Av Of 1/1000 H-Mean 1.24 0.09 0.24
Av Of 1/1000 L-Mean -1.28 -0.08 -0.26
Maximum - Mean 1.24 0.09 0.24
Minimum - Mean -1.28 -0.08 -0.26
Pred. Max-Mean 1.49 0.11 0.29
Pred. Min-Mean -1.54 -0.10 -0.31
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.05 -0.47 -4.19 -1.99 -0.47 4.34 61.95 -0.48 -4.69 62.02 -0.48
Variance 0.30 0.00 0.01 0.30 0.00 0.01 0.30 0.00 0.00 0.30 0.00
Root Mean Square 2.12 0.48 4.20 2.06 0.48 4.34 61.96 0.48 4.69 62.02 0.48
Std. Deviation 0.55 0.04 0.09 0.55 0.04 0.09 0.55 0.04 0.05 0.55 0.04
Skewness 0.02 0.09 -0.03 0.02 0.10 -0.03 0.02 0.10 0.01 0.02 0.12
Kurtosis -0.57 -0.40 -0.28 -0.58 -0.37 -0.28 -0.56 -0.37 0.02 -0.58 -0.34

Number of Peaks 222 121 273 208 58 273 222 121 259 208 59

Av Of 1/3 Highest -1.15 -0.41 -4.02 -1.08 -0.41 4.52 62.85 -0.41 -4.60 62.93 -0.41
Av Of 1/3 Lowest -2.92 -0.53 -4.38 -2.86 -0.53 4.16 61.08 -0.54 -4.79 61.15 -0.53
Av Of 1/100 Highest -0.81 -0.38 -3.96 -0.76 -0.38 4.58 63.20 -0.38 -4.55 63.24 -0.38
Av Of 1/100 Lowest -3.32 -0.56 -4.45 -3.24 -0.55 4.08 60.69 -0.56 -4.86 60.76 -0.56
Av Of 1/1000 Highest -0.81 -0.38 -3.95 -0.76 -0.38 4.58 63.20 -0.38 -4.54 63.25 -0.38
Av Of 1/1000 Lowest -3.34 -0.56 -4.46 -3.27 -0.55 4.08 60.67 -0.56 -4.86 60.74 -0.56
Maximum -0.81 -0.38 -3.95 -0.76 -0.38 4.58 63.20 -0.38 -4.54 63.25 -0.38
Minimum -3.34 -0.56 -4.46 -3.27 -0.55 4.08 60.67 -0.56 -4.86 60.74 -0.56
Pred. Max -0.56 -0.36 -3.91 -0.51 -0.36 4.63 63.45 -0.36 -4.52 63.49 -0.36
Pred. Min -3.59 -0.57 -4.51 -3.53 -0.57 4.03 60.41 -0.58 -4.89 60.48 -0.58

Av Of 1/3 H-Mean 0.90 0.07 0.18 0.91 0.06 0.18 0.90 0.07 0.10 0.91 0.07
Av Of 1/3 L-Mean -0.87 -0.06 -0.18 -0.87 -0.05 -0.18 -0.87 -0.06 -0.10 -0.87 -0.05
Av Of 1/100 H-Mean 1.24 0.09 0.24 1.22 0.09 0.24 1.24 0.09 0.15 1.23 0.09
Av Of 1/100 L-Mean -1.26 -0.08 -0.26 -1.26 -0.08 -0.26 -1.26 -0.08 -0.16 -1.26 -0.08
Av Of 1/1000 H-Mean 1.24 0.09 0.24 1.22 0.09 0.24 1.25 0.09 0.15 1.23 0.09
Av Of 1/1000 L-Mean -1.28 -0.08 -0.26 -1.28 -0.08 -0.26 -1.28 -0.08 -0.16 -1.28 -0.08
Maximum - Mean 1.24 0.09 0.24 1.22 0.09 0.24 1.25 0.09 0.15 1.23 0.09
Minimum - Mean -1.28 -0.08 -0.26 -1.28 -0.08 -0.26 -1.28 -0.08 -0.16 -1.28 -0.08
Pred. Max-Mean 1.49 0.11 0.29 1.47 0.11 0.29 1.49 0.11 0.18 1.47 0.12
Pred. Min-Mean -1.54 -0.10 -0.31 -1.54 -0.10 -0.31 -1.54 -0.10 -0.20 -1.54 -0.10

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.84 125.96 -0.48 -5.19 126.03 -0.48 3.34


Variance 0.00 0.30 0.00 0.02 0.30 0.00 0.02
Root Mean Square 3.84 125.96 0.48 5.19 126.03 0.48 3.35
Std. Deviation 0.05 0.55 0.04 0.15 0.55 0.04 0.15
Skewness 0.01 0.02 0.12 0.02 0.02 0.13 0.02
Kurtosis 0.02 -0.56 -0.33 -0.12 -0.58 -0.31 -0.12

Number of Peaks 259 224 121 261 208 59 261

Av Of 1/3 Highest 3.94 126.85 -0.41 -4.90 126.93 -0.41 3.64


Av Of 1/3 Lowest 3.74 125.09 -0.54 -5.49 125.16 -0.53 3.05
Av Of 1/100 Highest 3.99 127.20 -0.38 -4.75 127.25 -0.38 3.78
Av Of 1/100 Lowest 3.68 124.69 -0.56 -5.64 124.77 -0.56 2.89
Av Of 1/1000 Highest 3.99 127.21 -0.38 -4.75 127.25 -0.38 3.78
Av Of 1/1000 Lowest 3.68 124.67 -0.56 -5.66 124.74 -0.56 2.88
Maximum 3.99 127.21 -0.38 -4.75 127.25 -0.38 3.78
Minimum 3.68 124.67 -0.56 -5.66 124.74 -0.56 2.88
Pred. Max 4.02 127.45 -0.36 -4.66 127.50 -0.36 3.87
Pred. Min 3.64 124.42 -0.58 -5.75 124.48 -0.58 2.79

Av Of 1/3 H-Mean 0.10 0.89 0.07 0.30 0.91 0.07 0.30


Av Of 1/3 L-Mean -0.10 -0.86 -0.06 -0.29 -0.87 -0.05 -0.29
Av Of 1/100 H-Mean 0.15 1.24 0.10 0.44 1.23 0.09 0.44
Av Of 1/100 L-Mean -0.16 -1.26 -0.08 -0.45 -1.26 -0.08 -0.45
Av Of 1/1000 H-Mean 0.15 1.25 0.10 0.44 1.23 0.09 0.44
Av Of 1/1000 L-Mean -0.16 -1.28 -0.08 -0.46 -1.28 -0.08 -0.46
Maximum - Mean 0.15 1.25 0.10 0.44 1.23 0.09 0.44
Minimum - Mean -0.16 -1.28 -0.08 -0.46 -1.28 -0.08 -0.46
Pred. Max-Mean 0.18 1.50 0.12 0.53 1.48 0.12 0.53
Pred. Min-Mean -0.20 -1.54 -0.10 -0.55 -1.54 -0.10 -0.56
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -16 -5 -4 0 0 0 19


BM2S DB30 -18 6 -4 0 0 0 21
BM3P DB30 -10 -18 -5 0 0 0 23
BM3S DB30 -14 26 -5 0 0 0 30
BM4P DB30 21 -36 -6 0 0 0 43
BM4S DB30 27 47 -7 0 0 0 55
BM5P DB30 41 -31 -7 0 0 0 53
BM5S DB30 62 16 -8 0 0 0 65
MAINLN DB30 3 0 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.2 1.4 -24740.5 -12 1663747 94


Buoyancy -202.0 -1.5 25874.2 68 -1831923 -102
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.3 0.0 -4.8 0 51 0
Wave -47.7 0.0 40.6 0 -2865 -1
Flex. Connectors 92.9 0.1 -1170.2 -57 171466 -1325
======= ======= ======= ======= ======= =======
Total 0.2 0.0 -0.6 -1 125 -1369

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 6.0 0.0 -1114.3 0 166286 7


Wind -7.0 -0.1 0.0 0 -14 8
Flex. Connectors -0.1 0.0 1114.8 0 -166359 0
======= ======= ======= ======= ======= =======
Total -1.0 0.0 0.5 0 -88 15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 997.94 1001.58 644.01 18.91 0.0707 12.81 0.00


BM2S 998.22 1001.58 627.64 20.61 0.0759 14.64 0.00
BM3P 998.55 1001.57 608.13 22.91 0.0864 17.11 0.00
BM3S 999.43 1001.57 547.60 30.36 0.1162 25.07 0.00
BM4P 1000.56 1001.50 462.60 43.31 0.1565 38.75 0.00
BM4S 1001.41 1001.50 393.47 55.00 0.2084 51.03 0.00
BM5P 1001.24 1001.47 404.48 52.96 0.2014 48.88 0.00
BM5S 1002.01 1001.46 340.13 64.90 0.2358 61.38 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.17 -0.49 -4.20 0.00 0.45 0.00


N Force 0.15 0.03 -0.56 -1 125 -1369

WHPBJKT Location -1.78 -1.36 22.74 0.00 0.31 0.34


N Force -1.00 -0.01 0.53 0 -88 15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 18.76 20.50 22.75 30.10 43.73 55.58 53.84 66.10


Variance 8.17 9.62 4.22 4.86 8.87 16.24 30.40 61.64
Root Mean Square 18.98 20.73 22.85 30.18 43.83 55.73 54.12 66.57
Std. Deviation 2.86 3.10 2.05 2.20 2.98 4.03 5.51 7.85
Skewness 0.50 0.48 0.27 0.25 0.02 0.05 0.08 0.08
Kurtosis 0.07 0.07 -0.27 -0.06 -0.29 -0.32 -0.29 -0.31

Number of Peaks 184 183 164 174 182 185 190 194

Av Of 1/3 Highest 23.86 26.04 25.99 33.92 48.53 61.89 62.92 78.87
Av Of 1/3 Lowest 14.83 16.13 19.73 26.68 38.78 49.14 45.09 53.83
Av Of 1/100 Highest 28.34 30.88 28.86 36.85 51.14 66.20 67.96 86.46
Av Of 1/100 Lowest 12.85 14.19 18.14 25.13 35.71 45.10 39.35 45.76
Av Of 1/1000 Highest 28.34 30.88 28.86 36.85 51.14 66.20 67.96 86.46
Av Of 1/1000 Lowest 12.85 14.19 18.14 25.13 35.71 45.10 39.35 45.76
Maximum 28.34 30.88 28.86 36.85 51.14 66.20 67.96 86.46
Minimum 12.85 14.19 18.14 25.13 35.71 45.10 39.35 45.76
Pred. Max 30.32 33.02 30.15 38.27 52.68 68.39 70.86 90.63
Pred. Min 11.63 12.89 17.17 24.09 34.05 42.93 36.37 41.59

Av Of 1/3 H-Mean 5.10 5.54 3.23 3.83 4.80 6.30 9.08 12.76
Av Of 1/3 L-Mean -3.93 -4.38 -3.03 -3.41 -4.94 -6.44 -8.75 -12.28
Av Of 1/100 H-Mean 9.58 10.38 6.11 6.76 7.42 10.61 14.12 20.36
Av Of 1/100 L-Mean -5.91 -6.31 -4.61 -4.97 -8.02 -10.48 -14.49 -20.34
Av Of 1/1000 H-Mean 9.58 10.38 6.11 6.76 7.42 10.61 14.12 20.36
Av Of 1/1000 L-Mean -5.91 -6.31 -4.61 -4.97 -8.02 -10.48 -14.49 -20.34
Maximum - Mean 9.58 10.38 6.11 6.76 7.42 10.61 14.12 20.36
Minimum - Mean -5.91 -6.31 -4.61 -4.97 -8.02 -10.48 -14.49 -20.34
Pred. Max-Mean 11.56 12.52 7.40 8.17 8.96 12.81 17.02 24.53
Pred. Min-Mean -7.13 -7.61 -5.59 -6.01 -9.68 -12.65 -17.47 -24.51

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.23 -0.48 -4.20


Variance 0.25 0.00 0.04
Root Mean Square 2.28 0.49 4.21
Std. Deviation 0.50 0.04 0.20
Skewness 0.06 0.33 -0.02
Kurtosis -0.27 -0.21 -0.12

Number of Peaks 207 143 232

Av Of 1/3 Highest -1.40 -0.41 -3.80


Av Of 1/3 Lowest -3.04 -0.53 -4.61
Av Of 1/100 Highest -0.89 -0.38 -3.61
Av Of 1/100 Lowest -3.45 -0.58 -4.81
Av Of 1/1000 Highest -0.81 -0.38 -3.59
Av Of 1/1000 Lowest -3.46 -0.58 -4.82
Maximum -0.81 -0.38 -3.59
Minimum -3.46 -0.58 -4.82
Pred. Max -0.52 -0.36 -3.46
Pred. Min -3.70 -0.60 -4.94

Av Of 1/3 H-Mean 0.82 0.07 0.40


Av Of 1/3 L-Mean -0.81 -0.05 -0.41
Av Of 1/100 H-Mean 1.34 0.11 0.60
Av Of 1/100 L-Mean -1.22 -0.09 -0.61
Av Of 1/1000 H-Mean 1.42 0.11 0.62
Av Of 1/1000 L-Mean -1.23 -0.09 -0.61
Maximum - Mean 1.42 0.11 0.62
Minimum - Mean -1.23 -0.09 -0.61
Pred. Max-Mean 1.70 0.13 0.74
Pred. Min-Mean -1.48 -0.11 -0.73
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.23 -0.48 -4.20 -2.16 -0.48 4.33 61.78 -0.49 -4.71 61.84 -0.49
Variance 0.25 0.00 0.04 0.25 0.00 0.04 0.25 0.00 0.00 0.25 0.00
Root Mean Square 2.28 0.49 4.21 2.22 0.49 4.33 61.78 0.49 4.71 61.85 0.49
Std. Deviation 0.50 0.04 0.20 0.50 0.04 0.20 0.50 0.04 0.02 0.50 0.04
Skewness 0.06 0.33 -0.02 0.06 0.35 -0.02 0.06 0.33 -0.12 0.06 0.34
Kurtosis -0.27 -0.21 -0.12 -0.27 -0.19 -0.12 -0.27 -0.11 0.00 -0.27 -0.08

Number of Peaks 207 143 232 193 80 232 207 142 220 193 78

Av Of 1/3 Highest -1.40 -0.41 -3.80 -1.35 -0.41 4.73 62.60 -0.42 -4.67 62.66 -0.42
Av Of 1/3 Lowest -3.04 -0.53 -4.61 -2.95 -0.54 3.92 60.96 -0.54 -4.74 61.05 -0.54
Av Of 1/100 Highest -0.89 -0.38 -3.61 -0.76 -0.38 4.92 63.12 -0.38 -4.66 63.24 -0.38
Av Of 1/100 Lowest -3.45 -0.58 -4.81 -3.39 -0.58 3.72 60.56 -0.58 -4.76 60.62 -0.58
Av Of 1/1000 Highest -0.81 -0.38 -3.59 -0.76 -0.38 4.95 63.20 -0.38 -4.66 63.24 -0.38
Av Of 1/1000 Lowest -3.46 -0.58 -4.82 -3.39 -0.58 3.72 60.55 -0.58 -4.76 60.62 -0.58
Maximum -0.81 -0.38 -3.59 -0.76 -0.38 4.95 63.20 -0.38 -4.66 63.24 -0.38
Minimum -3.46 -0.58 -4.82 -3.39 -0.58 3.72 60.55 -0.58 -4.76 60.62 -0.58
Pred. Max -0.52 -0.36 -3.46 -0.48 -0.35 5.07 63.48 -0.36 -4.65 63.53 -0.36
Pred. Min -3.70 -0.60 -4.94 -3.64 -0.60 3.60 60.30 -0.60 -4.77 60.36 -0.60

Av Of 1/3 H-Mean 0.82 0.07 0.40 0.81 0.07 0.40 0.82 0.07 0.03 0.81 0.07
Av Of 1/3 L-Mean -0.81 -0.05 -0.41 -0.79 -0.05 -0.41 -0.81 -0.05 -0.03 -0.79 -0.05
Av Of 1/100 H-Mean 1.34 0.11 0.60 1.40 0.10 0.59 1.34 0.11 0.05 1.40 0.11
Av Of 1/100 L-Mean -1.22 -0.09 -0.61 -1.23 -0.09 -0.61 -1.22 -0.09 -0.05 -1.23 -0.09
Av Of 1/1000 H-Mean 1.42 0.11 0.62 1.40 0.10 0.62 1.42 0.11 0.05 1.40 0.11
Av Of 1/1000 L-Mean -1.23 -0.09 -0.61 -1.23 -0.09 -0.61 -1.23 -0.09 -0.05 -1.23 -0.09
Maximum - Mean 1.42 0.11 0.62 1.40 0.10 0.62 1.42 0.11 0.05 1.40 0.11
Minimum - Mean -1.23 -0.09 -0.61 -1.23 -0.09 -0.61 -1.23 -0.09 -0.05 -1.23 -0.09
Pred. Max-Mean 1.70 0.13 0.74 1.69 0.13 0.74 1.71 0.13 0.06 1.69 0.13
Pred. Min-Mean -1.48 -0.11 -0.73 -1.48 -0.11 -0.73 -1.48 -0.11 -0.06 -1.48 -0.12

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 125.78 -0.49 -5.21 125.85 -0.49 3.33


Variance 0.00 0.25 0.00 0.05 0.25 0.00 0.05
Root Mean Square 3.83 125.78 0.49 5.21 125.85 0.49 3.34
Std. Deviation 0.02 0.50 0.04 0.22 0.50 0.04 0.22
Skewness -0.13 0.06 0.31 0.01 0.06 0.33 0.00
Kurtosis -0.01 -0.27 -0.01 -0.12 -0.27 0.02 -0.12

Number of Peaks 220 207 144 232 195 78 232

Av Of 1/3 Highest 3.86 126.61 -0.42 -4.76 126.67 -0.42 3.77


Av Of 1/3 Lowest 3.79 124.97 -0.54 -5.65 125.06 -0.55 2.88
Av Of 1/100 Highest 3.88 127.12 -0.38 -4.55 127.25 -0.39 3.98
Av Of 1/100 Lowest 3.78 124.56 -0.59 -5.87 124.62 -0.59 2.67
Av Of 1/1000 Highest 3.88 127.20 -0.38 -4.55 127.25 -0.39 3.99
Av Of 1/1000 Lowest 3.78 124.56 -0.59 -5.89 124.62 -0.59 2.64
Maximum 3.88 127.20 -0.38 -4.55 127.25 -0.39 3.99
Minimum 3.78 124.56 -0.59 -5.89 124.62 -0.59 2.64
Pred. Max 3.89 127.49 -0.36 -4.42 127.54 -0.36 4.12
Pred. Min 3.77 124.31 -0.61 -6.03 124.37 -0.61 2.51

Av Of 1/3 H-Mean 0.03 0.82 0.07 0.44 0.82 0.07 0.45


Av Of 1/3 L-Mean -0.03 -0.81 -0.05 -0.44 -0.79 -0.06 -0.45
Av Of 1/100 H-Mean 0.05 1.34 0.11 0.65 1.40 0.11 0.65
Av Of 1/100 L-Mean -0.05 -1.22 -0.10 -0.66 -1.23 -0.10 -0.66
Av Of 1/1000 H-Mean 0.05 1.42 0.11 0.66 1.40 0.11 0.66
Av Of 1/1000 L-Mean -0.05 -1.23 -0.10 -0.69 -1.23 -0.10 -0.69
Maximum - Mean 0.05 1.42 0.11 0.66 1.40 0.11 0.66
Minimum - Mean -0.05 -1.23 -0.10 -0.69 -1.23 -0.10 -0.69
Pred. Max-Mean 0.06 1.71 0.13 0.79 1.69 0.13 0.79
Pred. Min-Mean -0.06 -1.48 -0.12 -0.82 -1.48 -0.12 -0.82
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -17 -5 -4 0 0 0 20


BM2S DB30 -29 9 -6 0 0 0 32
BM3P DB30 -7 -12 -4 0 0 0 15
BM3S DB30 -27 48 -8 0 0 0 56
BM4P DB30 11 -18 -4 0 0 0 22
BM4S DB30 37 65 -9 0 0 0 76
BM5P DB30 24 -17 -5 0 0 0 31
BM5S DB30 58 15 -8 0 0 0 60
MAINLN DB30 5 -3 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 258 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.4 -5.7 -24740.5 51 1663748 -379


Buoyancy -202.2 5.9 25884.1 -277 -1832613 417
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.2 -3.4 150 35 -2462
Wave -19.5 -19.3 29.9 57 -1840 -942
Flex. Connectors 52.5 76.6 -1170.1 -442 171038 3944
======= ======= ======= ======= ======= =======
Total -1.6 -2.8 0.1 -50 118 -1084

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.7 4.4 -1114.3 -7 166282 654


Wind -5.0 -5.9 0.1 14 -34 -867
Flex. Connectors -0.1 -0.3 1114.8 12 -166358 -43
======= ======= ======= ======= ======= =======
Total -1.5 -1.8 0.7 18 -111 -256
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.06 1001.58 636.92 19.63 0.0734 13.60 0.00


BM2S 999.55 1001.58 536.62 31.69 0.1167 26.49 0.00
BM3P 997.30 1001.57 680.71 15.33 0.0579 8.92 0.00
BM3S 1001.50 1001.57 382.55 56.19 0.2150 52.29 0.00
BM4P 998.48 1001.50 616.76 22.19 0.0802 16.33 0.00
BM4S 1002.69 1001.50 288.84 75.50 0.2861 72.40 0.00
BM5P 999.42 1001.47 548.86 30.59 0.1164 25.30 0.00
BM5S 1001.71 1001.46 364.86 60.24 0.2188 56.50 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.37 -2.43 -4.21 0.01 0.45 0.00


N Force -1.57 -2.85 0.15 -50 118 -1084

WHPBJKT Location -0.84 -3.06 22.43 -0.23 0.19 0.13


N Force -1.49 -1.79 0.67 18 -111 -256
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 18.46 31.36 14.07 58.64 21.12 80.73 30.14 63.45


Variance 5.16 13.58 1.24 9.27 1.85 20.76 8.57 39.51
Root Mean Square 18.60 31.58 14.12 58.72 21.16 80.86 30.28 63.76
Std. Deviation 2.27 3.68 1.11 3.04 1.36 4.56 2.93 6.29
Skewness 0.14 0.18 -0.17 0.30 -0.08 0.31 0.02 0.18
Kurtosis -0.79 -0.83 -0.51 -0.57 -0.63 -0.30 -0.88 -0.73

Number of Peaks 88 85 80 120 75 68 80 76

Av Of 1/3 Highest 22.61 38.08 15.93 64.46 23.36 88.09 35.38 74.25
Av Of 1/3 Lowest 14.93 25.32 12.34 54.08 18.92 73.41 25.39 53.43
Av Of 1/100 Highest 23.73 39.77 16.46 66.47 24.15 92.77 36.23 78.68
Av Of 1/100 Lowest 13.78 24.44 11.42 52.58 17.83 71.55 23.87 51.14
Av Of 1/1000 Highest 23.73 39.77 16.46 66.47 24.15 92.77 36.23 78.68
Av Of 1/1000 Lowest 13.78 24.44 11.42 52.58 17.83 71.55 23.87 51.14
Maximum 23.73 39.77 16.46 66.47 24.15 92.77 36.23 78.68
Minimum 13.78 24.44 11.42 52.58 17.83 71.55 23.87 51.14
Pred. Max 24.98 41.78 17.03 68.22 24.89 95.78 37.70 82.40
Pred. Min 12.67 22.79 10.78 51.23 17.02 69.25 22.35 48.13

Av Of 1/3 H-Mean 4.15 6.72 1.86 5.82 2.24 7.36 5.25 10.81
Av Of 1/3 L-Mean -3.53 -6.04 -1.73 -4.57 -2.20 -7.32 -4.75 -10.01
Av Of 1/100 H-Mean 5.27 8.41 2.38 7.82 3.03 12.04 6.09 15.23
Av Of 1/100 L-Mean -4.68 -6.92 -2.65 -6.06 -3.29 -9.18 -6.27 -12.30
Av Of 1/1000 H-Mean 5.27 8.41 2.38 7.82 3.03 12.04 6.09 15.23
Av Of 1/1000 L-Mean -4.68 -6.92 -2.65 -6.06 -3.29 -9.18 -6.27 -12.30
Maximum - Mean 5.27 8.41 2.38 7.82 3.03 12.04 6.09 15.23
Minimum - Mean -4.68 -6.92 -2.65 -6.06 -3.29 -9.18 -6.27 -12.30
Pred. Max-Mean 6.52 10.42 2.96 9.57 3.78 15.06 7.57 18.96
Pred. Min-Mean -5.79 -8.57 -3.29 -7.42 -4.10 -11.48 -7.79 -15.32

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.51 -2.69 -4.21


Variance 0.16 0.02 0.00
Root Mean Square 1.56 2.70 4.21
Std. Deviation 0.40 0.14 0.02
Skewness -0.05 -0.21 0.00
Kurtosis -0.82 -0.52 -0.21

Number of Peaks 107 268 335

Av Of 1/3 Highest -0.85 -2.49 -4.17


Av Of 1/3 Lowest -2.20 -2.92 -4.24
Av Of 1/100 Highest -0.70 -2.39 -4.15
Av Of 1/100 Lowest -2.40 -3.07 -4.26
Av Of 1/1000 Highest -0.70 -2.38 -4.14
Av Of 1/1000 Lowest -2.40 -3.10 -4.26
Maximum -0.70 -2.38 -4.14
Minimum -2.40 -3.10 -4.26
Pred. Max -0.51 -2.31 -4.13
Pred. Min -2.60 -3.18 -4.27

Av Of 1/3 H-Mean 0.66 0.20 0.04


Av Of 1/3 L-Mean -0.69 -0.23 -0.04
Av Of 1/100 H-Mean 0.81 0.30 0.06
Av Of 1/100 L-Mean -0.89 -0.38 -0.06
Av Of 1/1000 H-Mean 0.81 0.32 0.07
Av Of 1/1000 L-Mean -0.89 -0.41 -0.06
Maximum - Mean 0.81 0.32 0.07
Minimum - Mean -0.89 -0.41 -0.06
Pred. Max-Mean 0.99 0.38 0.08
Pred. Min-Mean -1.09 -0.49 -0.07
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.51 -2.69 -4.21 -1.44 -2.69 4.33 62.50 -2.70 -4.71 62.57 -2.70
Variance 0.16 0.02 0.00 0.16 0.02 0.00 0.16 0.02 0.00 0.16 0.02
Root Mean Square 1.56 2.70 4.21 1.49 2.70 4.33 62.50 2.70 4.71 62.57 2.70
Std. Deviation 0.40 0.14 0.02 0.40 0.14 0.02 0.40 0.14 0.01 0.40 0.14
Skewness -0.05 -0.21 0.00 -0.05 -0.21 0.00 -0.05 -0.21 0.04 -0.05 -0.20
Kurtosis -0.82 -0.52 -0.21 -0.82 -0.53 -0.21 -0.82 -0.52 -0.06 -0.82 -0.53

Number of Peaks 107 268 335 98 134 335 107 268 321 98 134

Av Of 1/3 Highest -0.85 -2.49 -4.17 -0.77 -2.50 4.36 63.16 -2.49 -4.68 63.23 -2.50
Av Of 1/3 Lowest -2.20 -2.92 -4.24 -2.14 -2.89 4.29 61.81 -2.92 -4.73 61.87 -2.90
Av Of 1/100 Highest -0.70 -2.39 -4.15 -0.63 -2.40 4.39 63.31 -2.39 -4.67 63.37 -2.40
Av Of 1/100 Lowest -2.40 -3.07 -4.26 -2.33 -3.06 4.27 61.61 -3.08 -4.74 61.68 -3.06
Av Of 1/1000 Highest -0.70 -2.38 -4.14 -0.63 -2.40 4.39 63.31 -2.38 -4.67 63.37 -2.40
Av Of 1/1000 Lowest -2.40 -3.10 -4.26 -2.33 -3.06 4.27 61.61 -3.10 -4.74 61.68 -3.06
Maximum -0.70 -2.38 -4.14 -0.63 -2.40 4.39 63.31 -2.38 -4.67 63.37 -2.40
Minimum -2.40 -3.10 -4.26 -2.33 -3.06 4.27 61.61 -3.10 -4.74 61.68 -3.06
Pred. Max -0.51 -2.31 -4.13 -0.45 -2.33 4.41 63.49 -2.31 -4.66 63.56 -2.33
Pred. Min -2.60 -3.18 -4.27 -2.53 -3.14 4.26 61.40 -3.18 -4.75 61.47 -3.14

Av Of 1/3 H-Mean 0.66 0.20 0.04 0.67 0.20 0.04 0.66 0.20 0.02 0.67 0.20
Av Of 1/3 L-Mean -0.69 -0.23 -0.04 -0.70 -0.20 -0.04 -0.69 -0.23 -0.02 -0.70 -0.20
Av Of 1/100 H-Mean 0.81 0.30 0.06 0.81 0.30 0.06 0.81 0.31 0.04 0.81 0.30
Av Of 1/100 L-Mean -0.89 -0.38 -0.06 -0.89 -0.37 -0.05 -0.89 -0.38 -0.03 -0.89 -0.36
Av Of 1/1000 H-Mean 0.81 0.32 0.07 0.81 0.30 0.07 0.81 0.32 0.04 0.81 0.30
Av Of 1/1000 L-Mean -0.89 -0.41 -0.06 -0.89 -0.37 -0.06 -0.89 -0.40 -0.03 -0.89 -0.36
Maximum - Mean 0.81 0.32 0.07 0.81 0.30 0.07 0.81 0.32 0.04 0.81 0.30
Minimum - Mean -0.89 -0.41 -0.06 -0.89 -0.37 -0.06 -0.89 -0.40 -0.03 -0.89 -0.36
Pred. Max-Mean 0.99 0.38 0.08 0.99 0.36 0.08 0.99 0.38 0.04 0.99 0.36
Pred. Min-Mean -1.09 -0.49 -0.07 -1.09 -0.45 -0.07 -1.10 -0.48 -0.04 -1.09 -0.44

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 126.51 -2.70 -5.21 126.57 -2.70 3.33


Variance 0.00 0.16 0.02 0.00 0.16 0.02 0.00
Root Mean Square 3.83 126.51 2.70 5.21 126.57 2.71 3.33
Std. Deviation 0.01 0.40 0.14 0.04 0.40 0.14 0.04
Skewness 0.04 -0.05 -0.21 0.02 -0.05 -0.20 0.02
Kurtosis -0.07 -0.82 -0.52 -0.23 -0.82 -0.53 -0.23

Number of Peaks 321 109 267 327 98 134 327

Av Of 1/3 Highest 3.85 127.17 -2.49 -5.13 127.24 -2.50 3.40


Av Of 1/3 Lowest 3.81 125.82 -2.92 -5.28 125.87 -2.90 3.25
Av Of 1/100 Highest 3.86 127.31 -2.39 -5.09 127.38 -2.40 3.44
Av Of 1/100 Lowest 3.79 125.61 -3.06 -5.31 125.68 -3.06 3.22
Av Of 1/1000 Highest 3.86 127.31 -2.38 -5.09 127.38 -2.40 3.44
Av Of 1/1000 Lowest 3.79 125.61 -3.10 -5.32 125.68 -3.06 3.22
Maximum 3.86 127.31 -2.38 -5.09 127.38 -2.40 3.44
Minimum 3.79 125.61 -3.10 -5.32 125.68 -3.06 3.22
Pred. Max 3.87 127.50 -2.31 -5.07 127.57 -2.33 3.46
Pred. Min 3.79 125.41 -3.18 -5.34 125.48 -3.14 3.20

Av Of 1/3 H-Mean 0.02 0.66 0.20 0.08 0.67 0.20 0.08


Av Of 1/3 L-Mean -0.02 -0.68 -0.22 -0.07 -0.70 -0.20 -0.07
Av Of 1/100 H-Mean 0.04 0.81 0.31 0.11 0.81 0.30 0.11
Av Of 1/100 L-Mean -0.03 -0.89 -0.36 -0.11 -0.89 -0.36 -0.11
Av Of 1/1000 H-Mean 0.04 0.81 0.32 0.11 0.81 0.30 0.11
Av Of 1/1000 L-Mean -0.03 -0.89 -0.40 -0.11 -0.89 -0.36 -0.11
Maximum - Mean 0.04 0.81 0.32 0.11 0.81 0.30 0.11
Minimum - Mean -0.03 -0.89 -0.40 -0.11 -0.89 -0.36 -0.11
Pred. Max-Mean 0.04 0.99 0.39 0.13 0.99 0.37 0.13
Pred. Min-Mean -0.04 -1.09 -0.48 -0.13 -1.10 -0.44 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -17 -5 -4 0 0 0 19


BM2S DB30 -28 9 -6 0 0 0 31
BM3P DB30 -6 -11 -4 0 0 0 15
BM3S DB30 -27 48 -8 0 0 0 56
BM4P DB30 11 -18 -4 0 0 0 22
BM4S DB30 38 66 -9 0 0 0 77
BM5P DB30 24 -17 -5 0 0 0 31
BM5S DB30 59 15 -8 0 0 0 61
MAINLN DB30 5 -3 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 258 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 -1.5 -24740.5 13 1663748 -97


Buoyancy -202.1 1.5 25881.1 -71 -1832388 108
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.2 -3.4 150 36 -2462
Wave -23.3 -23.0 33.6 -62 -2155 -1026
Flex. Connectors 55.1 78.7 -1170.0 -501 171080 4133
======= ======= ======= ======= ======= =======
Total -2.7 -4.7 0.9 -60 71 -1006

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.5 4.2 -1114.3 -6 166282 620


Wind -5.0 -5.9 0.1 14 -34 -867
Flex. Connectors -0.2 -0.3 1114.7 13 -166347 -46
======= ======= ======= ======= ======= =======
Total -1.7 -2.0 0.6 19 -100 -294
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 997.99 1001.58 640.74 19.24 0.0719 13.17 0.00


BM2S 999.51 1001.58 539.43 31.32 0.1154 26.10 0.00
BM3P 997.23 1001.57 683.91 15.05 0.0568 8.61 0.00
BM3S 1001.52 1001.57 381.51 56.37 0.2158 52.49 0.00
BM4P 998.47 1001.50 617.60 22.10 0.0798 16.23 0.00
BM4S 1002.76 1001.50 283.47 76.64 0.2904 73.59 0.00
BM5P 999.44 1001.47 547.78 30.73 0.1169 25.45 0.00
BM5S 1001.78 1001.46 359.61 61.23 0.2224 57.54 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.42 -2.48 -4.21 0.00 0.45 0.00


N Force -2.73 -4.68 0.92 -60 71 -1006

WHPBJKT Location -0.88 -3.04 22.40 -0.21 0.18 0.12


N Force -1.70 -2.04 0.59 19 -100 -294
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 17.81 30.86 13.53 59.44 20.82 82.92 30.16 65.11


Variance 4.38 11.35 1.28 8.47 1.60 23.95 6.97 36.60
Root Mean Square 17.94 31.04 13.58 59.51 20.86 83.06 30.27 65.39
Std. Deviation 2.09 3.37 1.13 2.91 1.26 4.89 2.64 6.05
Skewness 0.21 0.38 -0.30 0.34 -0.10 0.51 -0.14 0.13
Kurtosis -0.57 -0.43 -0.66 -0.28 -0.26 -0.35 -0.44 -0.54

Number of Peaks 182 223 190 245 259 206 235 189

Av Of 1/3 Highest 21.40 36.89 15.21 64.46 22.74 90.65 34.20 74.26
Av Of 1/3 Lowest 14.83 26.01 11.69 55.17 18.85 76.07 25.79 55.41
Av Of 1/100 Highest 23.63 39.85 15.91 67.44 24.04 95.48 36.55 80.63
Av Of 1/100 Lowest 13.26 24.06 10.97 53.03 17.57 73.44 24.04 51.14
Av Of 1/1000 Highest 23.63 40.27 15.91 67.51 24.09 95.58 36.63 80.63
Av Of 1/1000 Lowest 13.26 23.80 10.97 53.01 17.56 73.29 23.93 51.14
Maximum 23.63 40.27 15.91 67.51 24.09 95.58 36.63 80.63
Minimum 13.26 23.80 10.97 53.01 17.56 73.29 23.93 51.14
Pred. Max 24.83 42.16 16.40 69.09 24.73 98.15 37.92 83.82
Pred. Min 12.32 22.39 10.44 51.74 16.93 71.34 22.69 48.27

Av Of 1/3 H-Mean 3.58 6.04 1.68 5.02 1.92 7.73 4.04 9.15
Av Of 1/3 L-Mean -2.99 -4.84 -1.83 -4.27 -1.97 -6.85 -4.37 -9.70
Av Of 1/100 H-Mean 5.81 8.99 2.38 8.00 3.22 12.56 6.39 15.52
Av Of 1/100 L-Mean -4.55 -6.80 -2.56 -6.41 -3.25 -9.48 -6.12 -13.97
Av Of 1/1000 H-Mean 5.81 9.42 2.38 8.07 3.27 12.66 6.47 15.52
Av Of 1/1000 L-Mean -4.55 -7.06 -2.56 -6.43 -3.26 -9.63 -6.23 -13.97
Maximum - Mean 5.81 9.42 2.38 8.07 3.27 12.66 6.47 15.52
Minimum - Mean -4.55 -7.06 -2.56 -6.43 -3.26 -9.63 -6.23 -13.97
Pred. Max-Mean 7.02 11.30 2.87 9.65 3.91 15.23 7.76 18.71
Pred. Min-Mean -5.49 -8.47 -3.09 -7.70 -3.89 -11.58 -7.47 -16.84

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.59 -2.80 -4.21


Variance 0.14 0.03 0.00
Root Mean Square 1.63 2.81 4.21
Std. Deviation 0.37 0.18 0.03
Skewness 0.06 -0.54 -0.05
Kurtosis -0.56 -0.52 -0.18

Number of Peaks 218 252 287

Av Of 1/3 Highest -0.96 -2.58 -4.15


Av Of 1/3 Lowest -2.16 -3.11 -4.27
Av Of 1/100 Highest -0.68 -2.51 -4.12
Av Of 1/100 Lowest -2.45 -3.27 -4.30
Av Of 1/1000 Highest -0.66 -2.51 -4.12
Av Of 1/1000 Lowest -2.49 -3.29 -4.31
Maximum -0.66 -2.48 -4.12
Minimum -2.49 -3.29 -4.31
Pred. Max -0.47 -2.41 -4.10
Pred. Min -2.67 -3.39 -4.33

Av Of 1/3 H-Mean 0.62 0.23 0.06


Av Of 1/3 L-Mean -0.57 -0.31 -0.06
Av Of 1/100 H-Mean 0.91 0.29 0.08
Av Of 1/100 L-Mean -0.86 -0.46 -0.09
Av Of 1/1000 H-Mean 0.93 0.29 0.09
Av Of 1/1000 L-Mean -0.90 -0.49 -0.10
Maximum - Mean 0.93 0.33 0.09
Minimum - Mean -0.90 -0.49 -0.10
Pred. Max-Mean 1.12 0.39 0.10
Pred. Min-Mean -1.08 -0.59 -0.12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.59 -2.80 -4.21 -1.52 -2.80 4.33 62.42 -2.80 -4.71 62.48 -2.80
Variance 0.14 0.03 0.00 0.14 0.03 0.00 0.14 0.03 0.00 0.14 0.03
Root Mean Square 1.63 2.81 4.21 1.57 2.81 4.33 62.42 2.81 4.71 62.49 2.81
Std. Deviation 0.37 0.18 0.03 0.37 0.17 0.03 0.37 0.17 0.03 0.37 0.17
Skewness 0.06 -0.54 -0.05 0.06 -0.55 -0.05 0.06 -0.54 -0.05 0.06 -0.54
Kurtosis -0.56 -0.52 -0.18 -0.56 -0.54 -0.18 -0.56 -0.51 -0.23 -0.56 -0.53

Number of Peaks 218 252 287 214 263 287 218 252 285 214 263

Av Of 1/3 Highest -0.96 -2.58 -4.15 -0.89 -2.58 4.38 63.04 -2.57 -4.65 63.11 -2.58
Av Of 1/3 Lowest -2.16 -3.11 -4.27 -2.10 -3.10 4.27 61.84 -3.11 -4.76 61.91 -3.10
Av Of 1/100 Highest -0.68 -2.51 -4.12 -0.61 -2.51 4.41 63.33 -2.51 -4.63 63.39 -2.50
Av Of 1/100 Lowest -2.45 -3.27 -4.30 -2.39 -3.26 4.23 61.55 -3.27 -4.79 61.62 -3.26
Av Of 1/1000 Highest -0.66 -2.51 -4.12 -0.59 -2.50 4.41 63.35 -2.51 -4.63 63.42 -2.50
Av Of 1/1000 Lowest -2.49 -3.29 -4.31 -2.43 -3.27 4.22 61.51 -3.29 -4.80 61.58 -3.27
Maximum -0.66 -2.48 -4.12 -0.59 -2.48 4.41 63.35 -2.48 -4.63 63.42 -2.48
Minimum -2.49 -3.29 -4.31 -2.43 -3.27 4.22 61.51 -3.29 -4.80 61.58 -3.27
Pred. Max -0.47 -2.41 -4.10 -0.40 -2.41 4.43 63.54 -2.41 -4.61 63.61 -2.41
Pred. Min -2.67 -3.39 -4.33 -2.61 -3.36 4.20 61.33 -3.39 -4.82 61.40 -3.36

Av Of 1/3 H-Mean 0.62 0.23 0.06 0.63 0.22 0.06 0.62 0.23 0.05 0.63 0.22
Av Of 1/3 L-Mean -0.57 -0.31 -0.06 -0.58 -0.30 -0.06 -0.57 -0.31 -0.05 -0.58 -0.30
Av Of 1/100 H-Mean 0.91 0.29 0.08 0.91 0.30 0.08 0.91 0.29 0.08 0.91 0.30
Av Of 1/100 L-Mean -0.86 -0.46 -0.09 -0.86 -0.46 -0.09 -0.86 -0.47 -0.08 -0.86 -0.46
Av Of 1/1000 H-Mean 0.93 0.29 0.09 0.93 0.30 0.09 0.93 0.29 0.08 0.93 0.30
Av Of 1/1000 L-Mean -0.90 -0.49 -0.10 -0.90 -0.47 -0.10 -0.90 -0.49 -0.09 -0.90 -0.47
Maximum - Mean 0.93 0.33 0.09 0.93 0.33 0.09 0.93 0.32 0.08 0.93 0.32
Minimum - Mean -0.90 -0.49 -0.10 -0.90 -0.47 -0.10 -0.90 -0.49 -0.09 -0.90 -0.47
Pred. Max-Mean 1.12 0.39 0.10 1.12 0.39 0.10 1.12 0.39 0.10 1.12 0.39
Pred. Min-Mean -1.08 -0.59 -0.12 -1.09 -0.56 -0.12 -1.08 -0.59 -0.11 -1.09 -0.56

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 126.42 -2.80 -5.21 126.49 -2.80 3.33


Variance 0.00 0.14 0.03 0.00 0.14 0.03 0.00
Root Mean Square 3.83 126.42 2.80 5.21 126.49 2.80 3.33
Std. Deviation 0.03 0.37 0.17 0.03 0.37 0.17 0.03
Skewness -0.05 0.06 -0.54 -0.03 0.06 -0.54 -0.03
Kurtosis -0.23 -0.56 -0.50 -0.11 -0.56 -0.52 -0.11

Number of Peaks 285 217 252 278 214 263 278

Av Of 1/3 Highest 3.88 127.05 -2.57 -5.15 127.12 -2.57 3.38


Av Of 1/3 Lowest 3.78 125.85 -3.10 -5.26 125.91 -3.09 3.28
Av Of 1/100 Highest 3.90 127.33 -2.50 -5.13 127.40 -2.49 3.41
Av Of 1/100 Lowest 3.74 125.56 -3.26 -5.29 125.63 -3.26 3.25
Av Of 1/1000 Highest 3.91 127.36 -2.50 -5.13 127.42 -2.49 3.41
Av Of 1/1000 Lowest 3.74 125.52 -3.29 -5.29 125.59 -3.27 3.25
Maximum 3.91 127.36 -2.48 -5.13 127.42 -2.48 3.41
Minimum 3.74 125.52 -3.29 -5.29 125.59 -3.27 3.25
Pred. Max 3.92 127.54 -2.41 -5.11 127.61 -2.41 3.42
Pred. Min 3.72 125.34 -3.39 -5.31 125.40 -3.36 3.23

Av Of 1/3 H-Mean 0.05 0.62 0.23 0.05 0.63 0.22 0.05


Av Of 1/3 L-Mean -0.05 -0.57 -0.30 -0.05 -0.58 -0.30 -0.05
Av Of 1/100 H-Mean 0.08 0.91 0.30 0.08 0.91 0.30 0.08
Av Of 1/100 L-Mean -0.08 -0.86 -0.47 -0.08 -0.86 -0.46 -0.08
Av Of 1/1000 H-Mean 0.08 0.93 0.30 0.08 0.93 0.31 0.08
Av Of 1/1000 L-Mean -0.09 -0.90 -0.49 -0.08 -0.90 -0.47 -0.08
Maximum - Mean 0.08 0.93 0.32 0.08 0.93 0.32 0.08
Minimum - Mean -0.09 -0.90 -0.49 -0.08 -0.90 -0.47 -0.08
Pred. Max-Mean 0.10 1.12 0.38 0.09 1.12 0.38 0.09
Pred. Min-Mean -0.11 -1.08 -0.59 -0.10 -1.09 -0.56 -0.10
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -15 -5 -4 0 0 0 18


BM2S DB30 -27 9 -6 0 0 0 30
BM3P DB30 -6 -10 -3 0 0 0 14
BM3S DB30 -27 50 -8 0 0 0 58
BM4P DB30 10 -17 -4 0 0 0 21
BM4S DB30 40 70 -9 0 0 0 81
BM5P DB30 24 -17 -5 0 0 0 31
BM5S DB30 62 16 -8 0 0 0 64
MAINLN DB30 5 -3 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 2.6 -24740.5 -23 1663748 177


Buoyancy -202.2 -2.8 25881.9 129 -1832456 -193
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.2 -3.4 150 37 -2462
Wave -29.4 -29.1 32.3 -164 -2129 -1416
Flex. Connectors 61.9 86.4 -1170.1 -568 171166 4684
======= ======= ======= ======= ======= =======
Total -1.9 -3.2 0.2 -65 116 -871

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.7 4.4 -1114.3 -7 166282 657


Wind -5.0 -5.9 0.1 14 -34 -867
Flex. Connectors -0.1 -0.3 1114.8 11 -166353 -41
======= ======= ======= ======= ======= =======
Total -1.5 -1.8 0.6 18 -106 -252
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 997.77 1001.58 653.67 17.92 0.0670 11.73 0.00


BM2S 999.42 1001.58 546.41 30.40 0.1120 25.13 0.00
BM3P 996.96 1001.57 696.55 13.92 0.0525 7.38 0.00
BM3S 1001.62 1001.57 373.22 57.88 0.2215 54.07 0.00
BM4P 998.37 1001.50 623.89 21.39 0.0773 15.47 0.00
BM4S 1003.02 1001.50 262.18 81.15 0.3075 78.29 0.00
BM5P 999.44 1001.47 547.71 30.74 0.1170 25.46 0.00
BM5S 1001.99 1001.46 342.24 64.50 0.2343 60.96 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.59 -2.69 -4.21 -0.01 0.45 0.00


N Force -1.94 -3.24 0.21 -65 116 -871

WHPBJKT Location -1.06 -3.29 22.43 -0.23 0.19 0.13


N Force -1.46 -1.75 0.64 18 -106 -252
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 16.97 29.97 13.00 59.61 20.44 86.44 30.39 67.67


Variance 5.59 12.41 2.26 11.40 2.08 49.03 7.60 53.04
Root Mean Square 17.14 30.18 13.09 59.71 20.49 86.73 30.52 68.06
Std. Deviation 2.37 3.52 1.50 3.38 1.44 7.00 2.76 7.28
Skewness 0.24 0.33 0.16 0.32 -0.15 0.23 -0.14 0.18
Kurtosis -0.51 -0.51 -0.61 -0.45 -0.51 -0.71 -0.50 -0.61

Number of Peaks 138 130 156 105 95 182 128 162

Av Of 1/3 Highest 21.32 36.32 15.16 65.46 22.44 97.93 34.53 79.98
Av Of 1/3 Lowest 13.65 24.90 10.76 55.25 18.16 76.38 25.60 55.91
Av Of 1/100 Highest 23.24 38.12 17.15 67.83 23.55 103.06 37.13 85.48
Av Of 1/100 Lowest 12.11 22.49 10.09 52.48 17.03 70.89 24.55 52.00
Av Of 1/1000 Highest 23.24 38.12 17.15 67.83 23.55 103.06 37.13 85.48
Av Of 1/1000 Lowest 12.11 22.49 10.09 52.48 17.03 70.89 24.55 52.00
Maximum 23.24 38.12 17.15 67.83 23.55 103.06 37.13 85.48
Minimum 12.11 22.49 10.09 52.48 17.03 70.89 24.55 52.00
Pred. Max 24.60 39.91 18.03 69.72 24.27 106.51 38.62 89.24
Pred. Min 11.05 20.84 9.47 50.84 16.24 67.67 23.25 48.69

Av Of 1/3 H-Mean 4.35 6.36 2.16 5.85 2.00 11.49 4.14 12.31
Av Of 1/3 L-Mean -3.32 -5.07 -2.25 -4.36 -2.28 -10.06 -4.79 -11.76
Av Of 1/100 H-Mean 6.27 8.15 4.14 8.22 3.11 16.62 6.74 17.80
Av Of 1/100 L-Mean -4.86 -7.48 -2.91 -7.13 -3.41 -15.55 -5.85 -15.67
Av Of 1/1000 H-Mean 6.27 8.15 4.14 8.22 3.11 16.62 6.74 17.80
Av Of 1/1000 L-Mean -4.86 -7.48 -2.91 -7.13 -3.41 -15.55 -5.85 -15.67
Maximum - Mean 6.27 8.15 4.14 8.22 3.11 16.62 6.74 17.80
Minimum - Mean -4.86 -7.48 -2.91 -7.13 -3.41 -15.55 -5.85 -15.67
Pred. Max-Mean 7.63 9.94 5.03 10.11 3.84 20.06 8.23 21.57
Pred. Min-Mean -5.92 -9.13 -3.53 -8.77 -4.20 -18.78 -7.14 -18.98

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.73 -2.88 -4.21


Variance 0.18 0.08 0.02
Root Mean Square 1.78 2.90 4.21
Std. Deviation 0.42 0.28 0.13
Skewness -0.02 -0.05 0.00
Kurtosis -0.57 -0.59 -0.23

Number of Peaks 210 255 271

Av Of 1/3 Highest -1.03 -2.48 -3.95


Av Of 1/3 Lowest -2.40 -3.32 -4.46
Av Of 1/100 Highest -0.78 -2.23 -3.83
Av Of 1/100 Lowest -2.75 -3.55 -4.60
Av Of 1/1000 Highest -0.77 -2.23 -3.82
Av Of 1/1000 Lowest -2.76 -3.58 -4.62
Maximum -0.77 -2.23 -3.82
Minimum -2.76 -3.58 -4.62
Pred. Max -0.57 -2.10 -3.74
Pred. Min -2.97 -3.72 -4.70

Av Of 1/3 H-Mean 0.69 0.41 0.26


Av Of 1/3 L-Mean -0.67 -0.44 -0.26
Av Of 1/100 H-Mean 0.95 0.65 0.38
Av Of 1/100 L-Mean -1.02 -0.67 -0.39
Av Of 1/1000 H-Mean 0.96 0.65 0.39
Av Of 1/1000 L-Mean -1.03 -0.70 -0.41
Maximum - Mean 0.96 0.65 0.39
Minimum - Mean -1.03 -0.70 -0.41
Pred. Max-Mean 1.15 0.78 0.46
Pred. Min-Mean -1.24 -0.83 -0.49
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.73 -2.88 -4.21 -1.66 -2.88 4.33 62.28 -2.92 -4.71 62.35 -2.92
Variance 0.18 0.08 0.02 0.18 0.08 0.02 0.18 0.08 0.00 0.18 0.08
Root Mean Square 1.78 2.90 4.21 1.71 2.90 4.33 62.28 2.94 4.71 62.35 2.93
Std. Deviation 0.42 0.28 0.13 0.42 0.28 0.13 0.42 0.28 0.02 0.42 0.28
Skewness -0.02 -0.05 0.00 -0.01 -0.05 0.00 -0.02 -0.08 -0.02 -0.02 -0.08
Kurtosis -0.57 -0.59 -0.23 -0.59 -0.61 -0.23 -0.57 -0.72 0.11 -0.59 -0.74

Number of Peaks 210 255 271 164 208 271 210 255 250 164 209

Av Of 1/3 Highest -1.03 -2.48 -3.95 -0.94 -2.45 4.59 62.98 -2.52 -4.67 63.06 -2.50
Av Of 1/3 Lowest -2.40 -3.32 -4.46 -2.35 -3.33 4.07 61.61 -3.36 -4.74 61.66 -3.37
Av Of 1/100 Highest -0.78 -2.23 -3.83 -0.74 -2.26 4.71 63.23 -2.31 -4.66 63.27 -2.33
Av Of 1/100 Lowest -2.75 -3.55 -4.60 -2.68 -3.52 3.94 61.26 -3.57 -4.76 61.33 -3.53
Av Of 1/1000 Highest -0.77 -2.23 -3.82 -0.74 -2.25 4.71 63.24 -2.30 -4.66 63.27 -2.32
Av Of 1/1000 Lowest -2.76 -3.58 -4.62 -2.68 -3.55 3.92 61.25 -3.60 -4.76 61.33 -3.56
Maximum -0.77 -2.23 -3.82 -0.74 -2.25 4.71 63.24 -2.30 -4.66 63.27 -2.32
Minimum -2.76 -3.58 -4.62 -2.68 -3.55 3.92 61.25 -3.60 -4.76 61.33 -3.56
Pred. Max -0.57 -2.10 -3.74 -0.54 -2.12 4.79 63.43 -2.18 -4.65 63.46 -2.20
Pred. Min -2.97 -3.72 -4.70 -2.89 -3.68 3.84 61.04 -3.73 -4.77 61.11 -3.69

Av Of 1/3 H-Mean 0.69 0.41 0.26 0.71 0.43 0.26 0.69 0.41 0.03 0.71 0.43
Av Of 1/3 L-Mean -0.67 -0.44 -0.26 -0.69 -0.45 -0.26 -0.67 -0.43 -0.03 -0.69 -0.45
Av Of 1/100 H-Mean 0.95 0.65 0.38 0.92 0.63 0.38 0.95 0.62 0.05 0.92 0.59
Av Of 1/100 L-Mean -1.02 -0.67 -0.39 -1.02 -0.63 -0.39 -1.02 -0.65 -0.06 -1.02 -0.61
Av Of 1/1000 H-Mean 0.96 0.65 0.39 0.92 0.64 0.39 0.96 0.62 0.05 0.92 0.60
Av Of 1/1000 L-Mean -1.03 -0.70 -0.41 -1.02 -0.66 -0.41 -1.03 -0.67 -0.06 -1.02 -0.64
Maximum - Mean 0.96 0.65 0.39 0.92 0.64 0.39 0.96 0.62 0.05 0.92 0.60
Minimum - Mean -1.03 -0.70 -0.41 -1.02 -0.66 -0.41 -1.03 -0.67 -0.06 -1.02 -0.64
Pred. Max-Mean 1.15 0.78 0.46 1.12 0.77 0.46 1.15 0.74 0.06 1.12 0.72
Pred. Min-Mean -1.24 -0.83 -0.49 -1.23 -0.80 -0.49 -1.24 -0.81 -0.07 -1.23 -0.77

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 126.29 -2.96 -5.21 126.35 -2.96 3.33


Variance 0.00 0.18 0.08 0.01 0.18 0.08 0.01
Root Mean Square 3.83 126.29 2.97 5.21 126.35 2.97 3.33
Std. Deviation 0.02 0.42 0.28 0.12 0.42 0.28 0.12
Skewness -0.03 -0.02 -0.11 0.00 -0.02 -0.11 0.00
Kurtosis 0.11 -0.57 -0.81 -0.13 -0.59 -0.82 -0.13

Number of Peaks 251 211 254 265 168 209 265

Av Of 1/3 Highest 3.86 126.98 -2.55 -4.96 127.07 -2.53 3.57


Av Of 1/3 Lowest 3.80 125.62 -3.40 -5.45 125.67 -3.41 3.08
Av Of 1/100 Highest 3.88 127.23 -2.38 -4.83 127.28 -2.40 3.70
Av Of 1/100 Lowest 3.77 125.26 -3.59 -5.58 125.33 -3.56 2.96
Av Of 1/1000 Highest 3.88 127.25 -2.37 -4.83 127.28 -2.39 3.70
Av Of 1/1000 Lowest 3.77 125.25 -3.61 -5.58 125.33 -3.58 2.95
Maximum 3.88 127.25 -2.37 -4.83 127.28 -2.39 3.70
Minimum 3.77 125.25 -3.61 -5.58 125.33 -3.58 2.95
Pred. Max 3.89 127.44 -2.26 -4.76 127.47 -2.27 3.77
Pred. Min 3.76 125.04 -3.74 -5.65 125.12 -3.70 2.88

Av Of 1/3 H-Mean 0.03 0.69 0.41 0.25 0.71 0.43 0.25


Av Of 1/3 L-Mean -0.03 -0.67 -0.44 -0.25 -0.69 -0.45 -0.25
Av Of 1/100 H-Mean 0.05 0.95 0.58 0.37 0.92 0.56 0.37
Av Of 1/100 L-Mean -0.06 -1.03 -0.63 -0.37 -1.02 -0.60 -0.37
Av Of 1/1000 H-Mean 0.05 0.96 0.59 0.37 0.92 0.57 0.37
Av Of 1/1000 L-Mean -0.06 -1.04 -0.65 -0.38 -1.02 -0.62 -0.38
Maximum - Mean 0.05 0.96 0.59 0.37 0.92 0.57 0.37
Minimum - Mean -0.06 -1.04 -0.65 -0.38 -1.02 -0.62 -0.38
Pred. Max-Mean 0.06 1.15 0.70 0.44 1.12 0.68 0.44
Pred. Min-Mean -0.07 -1.24 -0.78 -0.45 -1.23 -0.74 -0.45
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -15 -4 -4 0 0 0 17


BM2S DB30 -27 9 -6 0 0 0 30
BM3P DB30 -6 -10 -3 0 0 0 13
BM3S DB30 -28 50 -8 0 0 0 58
BM4P DB30 10 -17 -4 0 0 0 21
BM4S DB30 41 71 -9 0 0 0 83
BM5P DB30 24 -18 -5 0 0 0 31
BM5S DB30 64 16 -8 0 0 0 66
MAINLN DB30 6 -2 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 258 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 5.1 -24740.5 -45 1663748 344


Buoyancy -202.3 -5.4 25900.2 251 -1833664 -376
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.3 -3.4 150 37 -2464
Wave -37.2 -37.1 13.7 -193 -988 -2106
Flex. Connectors 66.8 89.8 -1170.2 -657 171282 4986
======= ======= ======= ======= ======= =======
Total -5.0 -7.9 -0.1 -83 166 -1278

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.3 3.9 -1114.3 -6 166282 586


Wind -5.0 -5.9 0.1 14 -35 -867
Flex. Connectors -0.2 -0.3 1114.9 13 -166369 -48
======= ======= ======= ======= ======= =======
Total -1.9 -2.3 0.7 20 -123 -330
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 997.65 1001.58 660.43 17.22 0.0644 10.98 0.00


BM2S 999.34 1001.58 551.66 29.71 0.1095 24.40 0.00
BM3P 996.85 1001.57 702.00 13.44 0.0507 6.85 0.00
BM3S 1001.63 1001.57 371.90 58.11 0.2225 54.32 0.00
BM4P 998.36 1001.50 624.81 21.30 0.0769 15.36 0.00
BM4S 1003.14 1001.50 253.21 83.17 0.3152 80.39 0.00
BM5P 999.47 1001.47 545.41 31.04 0.1181 25.78 0.00
BM5S 1002.10 1001.46 332.98 66.34 0.2410 62.89 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.69 -2.76 -4.21 -0.01 0.45 0.00


N Force -5.01 -7.94 -0.11 -83 166 -1278

WHPBJKT Location -1.13 -3.26 22.37 -0.20 0.17 0.11


N Force -1.90 -2.28 0.73 20 -123 -330
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 15.74 29.14 11.88 61.92 19.60 91.86 30.17 71.44


Variance 5.16 10.86 2.37 12.62 2.05 64.25 6.19 57.27
Root Mean Square 15.91 29.32 11.98 62.02 19.65 92.21 30.27 71.84
Std. Deviation 2.27 3.30 1.54 3.55 1.43 8.02 2.49 7.57
Skewness 0.41 0.48 0.69 0.34 -0.17 -0.10 -0.38 0.09
Kurtosis -0.16 0.27 0.35 0.14 -0.11 -0.26 0.38 -0.41

Number of Peaks 209 218 206 216 235 214 219 212

Av Of 1/3 Highest 19.70 34.86 14.55 67.81 21.61 104.09 33.79 84.07
Av Of 1/3 Lowest 12.48 24.28 9.88 57.05 17.39 78.92 26.01 59.64
Av Of 1/100 Highest 22.33 40.29 16.75 72.86 22.97 111.03 36.95 90.93
Av Of 1/100 Lowest 11.15 21.48 8.84 53.52 15.82 71.59 22.50 53.64
Av Of 1/1000 Highest 22.62 41.10 16.99 72.89 23.04 111.43 37.26 92.58
Av Of 1/1000 Lowest 10.93 20.76 8.78 53.34 15.66 70.88 22.19 53.53
Maximum 22.62 41.10 16.99 72.89 23.04 111.43 37.26 92.58
Minimum 10.93 20.76 8.78 53.34 15.66 70.88 22.19 53.53
Pred. Max 24.01 43.50 18.02 75.10 23.72 115.37 38.68 96.84
Pred. Min 9.95 19.08 8.15 51.62 14.88 66.66 20.59 49.91

Av Of 1/3 H-Mean 3.96 5.73 2.68 5.90 2.01 12.23 3.62 12.63
Av Of 1/3 L-Mean -3.26 -4.85 -1.99 -4.87 -2.21 -12.94 -4.16 -11.80
Av Of 1/100 H-Mean 6.58 11.15 4.87 10.95 3.37 19.17 6.79 19.49
Av Of 1/100 L-Mean -4.59 -7.66 -3.04 -8.40 -3.78 -20.27 -7.66 -17.80
Av Of 1/1000 H-Mean 6.88 11.96 5.11 10.97 3.44 19.57 7.09 21.14
Av Of 1/1000 L-Mean -4.82 -8.37 -3.10 -8.58 -3.94 -20.98 -7.98 -17.91
Maximum - Mean 6.88 11.96 5.11 10.97 3.44 19.57 7.09 21.14
Minimum - Mean -4.82 -8.37 -3.10 -8.58 -3.94 -20.98 -7.98 -17.91
Pred. Max-Mean 8.27 14.37 6.15 13.18 4.12 23.51 8.51 25.40
Pred. Min-Mean -5.79 -10.05 -3.73 -10.30 -4.72 -25.21 -9.58 -21.53

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.90 -3.16 -4.21


Variance 0.17 0.11 0.01
Root Mean Square 1.94 3.18 4.21
Std. Deviation 0.42 0.34 0.10
Skewness 0.04 0.43 -0.02
Kurtosis -0.33 -0.08 -0.12

Number of Peaks 204 234 241

Av Of 1/3 Highest -1.20 -2.59 -4.00


Av Of 1/3 Lowest -2.56 -3.65 -4.42
Av Of 1/100 Highest -0.82 -2.22 -3.90
Av Of 1/100 Lowest -2.92 -3.87 -4.53
Av Of 1/1000 Highest -0.76 -2.18 -3.89
Av Of 1/1000 Lowest -3.05 -3.88 -4.54
Maximum -0.76 -2.18 -3.89
Minimum -3.05 -3.88 -4.54
Pred. Max -0.53 -1.99 -3.82
Pred. Min -3.28 -4.03 -4.61

Av Of 1/3 H-Mean 0.69 0.57 0.21


Av Of 1/3 L-Mean -0.66 -0.49 -0.21
Av Of 1/100 H-Mean 1.08 0.94 0.31
Av Of 1/100 L-Mean -1.03 -0.71 -0.32
Av Of 1/1000 H-Mean 1.14 0.98 0.32
Av Of 1/1000 L-Mean -1.15 -0.72 -0.34
Maximum - Mean 1.14 0.98 0.32
Minimum - Mean -1.15 -0.72 -0.34
Pred. Max-Mean 1.37 1.17 0.39
Pred. Min-Mean -1.39 -0.87 -0.40
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.90 -3.16 -4.21 -1.83 -3.16 4.32 62.11 -3.18 -4.71 62.18 -3.18
Variance 0.17 0.11 0.01 0.17 0.11 0.01 0.17 0.11 0.01 0.17 0.11
Root Mean Square 1.94 3.18 4.21 1.88 3.17 4.33 62.11 3.20 4.71 62.18 3.20
Std. Deviation 0.42 0.34 0.10 0.42 0.33 0.10 0.42 0.34 0.08 0.42 0.33
Skewness 0.04 0.43 -0.02 0.04 0.46 -0.02 0.04 0.38 -0.03 0.04 0.42
Kurtosis -0.33 -0.08 -0.12 -0.33 -0.04 -0.12 -0.34 -0.11 -0.11 -0.33 -0.08

Number of Peaks 204 234 241 211 214 241 204 234 234 212 214

Av Of 1/3 Highest -1.20 -2.59 -4.00 -1.15 -2.65 4.53 62.80 -2.61 -4.54 62.86 -2.67
Av Of 1/3 Lowest -2.56 -3.65 -4.42 -2.51 -3.61 4.11 61.45 -3.69 -4.88 61.50 -3.65
Av Of 1/100 Highest -0.82 -2.22 -3.90 -0.74 -2.26 4.63 63.19 -2.27 -4.47 63.27 -2.31
Av Of 1/100 Lowest -2.92 -3.87 -4.53 -2.86 -3.83 4.01 61.09 -3.91 -4.95 61.14 -3.87
Av Of 1/1000 Highest -0.76 -2.18 -3.89 -0.67 -2.23 4.65 63.24 -2.22 -4.45 63.33 -2.28
Av Of 1/1000 Lowest -3.05 -3.88 -4.54 -3.00 -3.84 3.99 60.96 -3.92 -4.96 61.01 -3.88
Maximum -0.76 -2.18 -3.89 -0.67 -2.23 4.65 63.24 -2.22 -4.45 63.33 -2.28
Minimum -3.05 -3.88 -4.54 -3.00 -3.84 3.99 60.96 -3.92 -4.96 61.01 -3.88
Pred. Max -0.53 -1.99 -3.82 -0.44 -2.05 4.71 63.47 -2.03 -4.40 63.57 -2.10
Pred. Min -3.28 -4.03 -4.61 -3.23 -3.98 3.92 60.72 -4.07 -5.01 60.78 -4.02

Av Of 1/3 H-Mean 0.69 0.57 0.21 0.68 0.51 0.21 0.69 0.57 0.16 0.68 0.51
Av Of 1/3 L-Mean -0.66 -0.49 -0.21 -0.68 -0.45 -0.21 -0.66 -0.50 -0.17 -0.68 -0.46
Av Of 1/100 H-Mean 1.08 0.94 0.31 1.09 0.90 0.31 1.08 0.92 0.24 1.09 0.87
Av Of 1/100 L-Mean -1.03 -0.71 -0.32 -1.03 -0.68 -0.32 -1.03 -0.72 -0.25 -1.03 -0.69
Av Of 1/1000 H-Mean 1.14 0.98 0.32 1.16 0.92 0.32 1.13 0.96 0.25 1.16 0.90
Av Of 1/1000 L-Mean -1.15 -0.72 -0.34 -1.17 -0.69 -0.34 -1.15 -0.74 -0.25 -1.17 -0.70
Maximum - Mean 1.14 0.98 0.32 1.16 0.92 0.32 1.13 0.96 0.25 1.16 0.90
Minimum - Mean -1.15 -0.72 -0.34 -1.17 -0.69 -0.34 -1.15 -0.74 -0.25 -1.17 -0.70
Pred. Max-Mean 1.37 1.17 0.39 1.39 1.11 0.39 1.36 1.15 0.31 1.39 1.08
Pred. Min-Mean -1.39 -0.87 -0.40 -1.40 -0.82 -0.40 -1.39 -0.88 -0.30 -1.40 -0.84

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 126.12 -3.21 -5.21 126.18 -3.20 3.33


Variance 0.01 0.17 0.11 0.01 0.17 0.11 0.01
Root Mean Square 3.83 126.12 3.22 5.21 126.18 3.22 3.33
Std. Deviation 0.08 0.42 0.34 0.10 0.42 0.33 0.10
Skewness -0.03 0.04 0.34 -0.02 0.04 0.37 -0.02
Kurtosis -0.11 -0.34 -0.14 -0.15 -0.33 -0.11 -0.15

Number of Peaks 234 204 234 231 212 212 231

Av Of 1/3 Highest 3.99 126.81 -2.63 -5.00 126.87 -2.70 3.53


Av Of 1/3 Lowest 3.66 125.46 -3.72 -5.42 125.51 -3.68 3.12
Av Of 1/100 Highest 4.07 127.19 -2.31 -4.90 127.27 -2.35 3.63
Av Of 1/100 Lowest 3.58 125.09 -3.94 -5.52 125.15 -3.91 3.02
Av Of 1/1000 Highest 4.08 127.25 -2.27 -4.89 127.34 -2.32 3.65
Av Of 1/1000 Lowest 3.58 124.96 -3.96 -5.52 125.02 -3.92 3.02
Maximum 4.08 127.25 -2.27 -4.89 127.34 -2.32 3.65
Minimum 3.58 124.96 -3.96 -5.52 125.02 -3.92 3.02
Pred. Max 4.13 127.48 -2.08 -4.82 127.57 -2.14 3.71
Pred. Min 3.53 124.73 -4.11 -5.58 124.78 -4.06 2.95

Av Of 1/3 H-Mean 0.16 0.69 0.57 0.21 0.68 0.51 0.21


Av Of 1/3 L-Mean -0.17 -0.66 -0.51 -0.21 -0.68 -0.47 -0.21
Av Of 1/100 H-Mean 0.24 1.08 0.90 0.31 1.09 0.85 0.31
Av Of 1/100 L-Mean -0.25 -1.02 -0.74 -0.31 -1.03 -0.71 -0.31
Av Of 1/1000 H-Mean 0.25 1.13 0.94 0.32 1.15 0.88 0.32
Av Of 1/1000 L-Mean -0.25 -1.15 -0.75 -0.31 -1.17 -0.71 -0.31
Maximum - Mean 0.25 1.13 0.94 0.32 1.15 0.88 0.32
Minimum - Mean -0.25 -1.15 -0.75 -0.31 -1.17 -0.71 -0.31
Pred. Max-Mean 0.31 1.36 1.12 0.39 1.39 1.06 0.39
Pred. Min-Mean -0.30 -1.39 -0.90 -0.37 -1.40 -0.86 -0.37
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -20 -6 -5 0 0 0 22


BM2S DB30 -44 14 -7 0 0 0 48
BM3P DB30 -5 -9 -3 0 0 0 12
BM3S DB30 -41 74 -10 0 0 0 85
BM4P DB30 6 -9 -3 0 0 0 12
BM4S DB30 45 78 -10 0 0 0 90
BM5P DB30 13 -9 -4 0 0 0 18
BM5S DB30 50 13 -7 0 0 0 52
MAINLN DB30 9 -6 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 -5.6 -24740.5 51 1663748 -377


Buoyancy -202.4 5.9 25909.7 -275 -1834290 414
Wind 0.0 -34.2 0.0 583 0 -2311
Drag 0.0 -51.3 0.0 213 -1 -3486
Wave 0.0 -47.8 1.0 142 -67 -3178
Flex. Connectors 9.1 133.3 -1171.1 -767 170723 7310
======= ======= ======= ======= ======= =======
Total 0.0 0.3 -0.8 -55 110 -1630

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 7.0 -1114.3 -11 166275 1047


Wind -0.1 -8.2 0.2 19 -29 -1230
Flex. Connectors 0.0 -0.3 1114.8 10 -166348 -37
======= ======= ======= ======= ======= =======
Total 0.0 -1.5 0.7 17 -103 -221
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.48 1001.58 611.39 22.42 0.0838 16.60 0.00


BM2S 1000.91 1001.58 429.49 47.78 0.1760 43.49 0.00
BM3P 996.49 1001.57 718.71 11.95 0.0451 5.22 0.00
BM3S 1003.29 1001.57 237.36 85.47 0.3271 82.80 0.00
BM4P 996.69 1001.50 714.28 12.49 0.0452 5.81 0.00
BM4S 1003.53 1001.50 222.54 90.09 0.3414 87.56 0.00
BM5P 997.74 1001.47 659.24 17.65 0.0672 11.43 0.00
BM5S 1001.16 1001.46 410.62 51.93 0.1887 47.81 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.41 -3.94 -4.21 0.01 0.45 0.00


N Force -0.02 0.25 -0.82 -55 110 -1630

WHPBJKT Location 0.34 -4.22 21.94 -0.36 0.00 -0.07


N Force -0.02 -1.46 0.70 17 -103 -221
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 21.88 48.55 11.49 88.67 12.04 93.36 16.99 52.78


Variance 0.71 1.65 0.77 24.64 0.88 27.04 1.17 1.74
Root Mean Square 21.89 48.56 11.52 88.81 12.08 93.50 17.02 52.80
Std. Deviation 0.84 1.28 0.88 4.96 0.94 5.20 1.08 1.32
Skewness -0.12 0.28 0.06 0.30 0.10 0.30 -0.01 0.33
Kurtosis -0.50 -0.15 -0.18 -0.22 -0.19 -0.24 -0.56 -0.02

Number of Peaks 328 334 334 340 332 338 332 334

Av Of 1/3 Highest 23.18 50.73 12.92 96.81 13.60 101.82 18.69 54.89
Av Of 1/3 Lowest 20.58 46.57 10.18 81.41 10.64 85.75 15.34 50.76
Av Of 1/100 Highest 23.85 52.11 13.81 102.89 14.61 109.19 19.65 57.52
Av Of 1/100 Lowest 19.36 45.52 9.06 77.67 9.52 82.04 14.27 49.71
Av Of 1/1000 Highest 23.92 52.12 13.88 103.09 14.63 109.50 19.66 57.70
Av Of 1/1000 Lowest 19.30 45.41 9.02 77.64 9.48 81.96 14.24 49.70
Maximum 23.92 52.12 13.88 103.09 14.63 109.50 19.66 57.70
Minimum 19.30 45.41 9.02 77.64 9.48 81.96 14.24 49.70
Pred. Max 24.30 52.79 14.33 105.78 15.11 112.51 20.17 58.62
Pred. Min 18.81 44.82 8.55 75.58 9.00 79.83 13.73 49.12

Av Of 1/3 H-Mean 1.31 2.19 1.42 8.14 1.55 8.46 1.70 2.11
Av Of 1/3 L-Mean -1.29 -1.97 -1.31 -7.26 -1.41 -7.61 -1.65 -2.02
Av Of 1/100 H-Mean 1.97 3.57 2.32 14.22 2.56 15.83 2.67 4.74
Av Of 1/100 L-Mean -2.52 -3.03 -2.43 -11.00 -2.53 -11.32 -2.72 -3.07
Av Of 1/1000 H-Mean 2.04 3.58 2.39 14.42 2.59 16.14 2.68 4.92
Av Of 1/1000 L-Mean -2.58 -3.14 -2.48 -11.03 -2.56 -11.40 -2.75 -3.08
Maximum - Mean 2.04 3.58 2.39 14.42 2.59 16.14 2.68 4.92
Minimum - Mean -2.58 -3.14 -2.48 -11.03 -2.56 -11.40 -2.75 -3.08
Pred. Max-Mean 2.42 4.25 2.84 17.11 3.07 19.15 3.18 5.85
Pred. Min-Mean -3.07 -3.72 -2.94 -13.09 -3.04 -13.53 -3.26 -3.66

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.42 -4.16 -4.21


Variance 0.00 0.11 0.00
Root Mean Square 0.42 4.17 4.21
Std. Deviation 0.02 0.32 0.05
Skewness -1.00 -0.27 0.00
Kurtosis 2.29 -0.34 -0.11

Number of Peaks 301 329 341

Av Of 1/3 Highest -0.39 -3.67 -4.11


Av Of 1/3 Lowest -0.45 -4.70 -4.31
Av Of 1/100 Highest -0.38 -3.47 -4.06
Av Of 1/100 Lowest -0.51 -5.02 -4.37
Av Of 1/1000 Highest -0.38 -3.46 -4.05
Av Of 1/1000 Lowest -0.51 -5.05 -4.38
Maximum -0.38 -3.46 -4.05
Minimum -0.51 -5.05 -4.38
Pred. Max -0.37 -3.33 -4.03
Pred. Min -0.53 -5.22 -4.41

Av Of 1/3 H-Mean 0.03 0.48 0.10


Av Of 1/3 L-Mean -0.03 -0.54 -0.10
Av Of 1/100 H-Mean 0.04 0.69 0.15
Av Of 1/100 L-Mean -0.08 -0.86 -0.16
Av Of 1/1000 H-Mean 0.05 0.70 0.15
Av Of 1/1000 L-Mean -0.09 -0.90 -0.17
Maximum - Mean 0.05 0.70 0.15
Minimum - Mean -0.09 -0.90 -0.17
Pred. Max-Mean 0.05 0.83 0.18
Pred. Min-Mean -0.11 -1.07 -0.20
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.42 -4.16 -4.21 -0.35 -4.16 4.32 63.59 -4.15 -4.71 63.65 -4.15
Variance 0.00 0.11 0.00 0.00 0.11 0.00 0.00 0.10 0.00 0.00 0.11
Root Mean Square 0.42 4.17 4.21 0.35 4.17 4.32 63.59 4.16 4.71 63.65 4.16
Std. Deviation 0.02 0.32 0.05 0.02 0.33 0.05 0.02 0.32 0.04 0.02 0.33
Skewness -1.00 -0.27 0.00 -1.03 -0.26 0.00 -1.00 -0.27 0.00 -1.03 -0.26
Kurtosis 2.29 -0.34 -0.11 2.33 -0.26 -0.11 2.28 -0.35 -0.13 2.33 -0.27

Number of Peaks 301 329 341 311 341 341 299 329 333 308 341

Av Of 1/3 Highest -0.39 -3.67 -4.11 -0.33 -3.68 4.43 63.61 -3.67 -4.63 63.68 -3.67
Av Of 1/3 Lowest -0.45 -4.70 -4.31 -0.39 -4.69 4.22 63.55 -4.69 -4.79 63.62 -4.68
Av Of 1/100 Highest -0.38 -3.47 -4.06 -0.31 -3.43 4.47 63.63 -3.46 -4.60 63.70 -3.42
Av Of 1/100 Lowest -0.51 -5.02 -4.37 -0.44 -5.10 4.16 63.50 -5.01 -4.83 63.57 -5.10
Av Of 1/1000 Highest -0.38 -3.46 -4.05 -0.31 -3.42 4.48 63.63 -3.46 -4.60 63.70 -3.42
Av Of 1/1000 Lowest -0.51 -5.05 -4.38 -0.44 -5.10 4.16 63.49 -5.05 -4.84 63.56 -5.10
Maximum -0.38 -3.46 -4.05 -0.31 -3.42 4.48 63.63 -3.46 -4.60 63.70 -3.42
Minimum -0.51 -5.05 -4.38 -0.44 -5.10 4.16 63.49 -5.05 -4.84 63.56 -5.10
Pred. Max -0.37 -3.33 -4.03 -0.30 -3.29 4.51 63.64 -3.33 -4.58 63.70 -3.29
Pred. Min -0.53 -5.22 -4.41 -0.46 -5.28 4.13 63.47 -5.22 -4.86 63.54 -5.28

Av Of 1/3 H-Mean 0.03 0.48 0.10 0.03 0.48 0.10 0.03 0.48 0.08 0.03 0.48
Av Of 1/3 L-Mean -0.03 -0.54 -0.10 -0.03 -0.53 -0.10 -0.03 -0.54 -0.08 -0.03 -0.53
Av Of 1/100 H-Mean 0.04 0.69 0.15 0.04 0.73 0.15 0.04 0.69 0.11 0.04 0.73
Av Of 1/100 L-Mean -0.08 -0.86 -0.16 -0.08 -0.94 -0.16 -0.09 -0.86 -0.12 -0.08 -0.94
Av Of 1/1000 H-Mean 0.05 0.70 0.15 0.04 0.74 0.15 0.05 0.69 0.11 0.04 0.73
Av Of 1/1000 L-Mean -0.09 -0.90 -0.17 -0.09 -0.95 -0.17 -0.09 -0.90 -0.13 -0.09 -0.95
Maximum - Mean 0.05 0.70 0.15 0.04 0.74 0.15 0.05 0.69 0.11 0.04 0.73
Minimum - Mean -0.09 -0.90 -0.17 -0.09 -0.95 -0.17 -0.09 -0.90 -0.13 -0.09 -0.95
Pred. Max-Mean 0.05 0.83 0.18 0.05 0.87 0.18 0.05 0.82 0.13 0.05 0.87
Pred. Min-Mean -0.11 -1.07 -0.20 -0.11 -1.12 -0.20 -0.11 -1.07 -0.15 -0.11 -1.13

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.59 -4.14 -5.21 127.66 -4.14 3.32


Variance 0.00 0.00 0.10 0.00 0.00 0.11 0.00
Root Mean Square 3.82 127.59 4.15 5.21 127.66 4.16 3.32
Std. Deviation 0.04 0.02 0.32 0.03 0.02 0.33 0.03
Skewness -0.01 -1.00 -0.26 0.00 -1.03 -0.26 0.00
Kurtosis -0.13 2.28 -0.36 -0.14 2.33 -0.28 -0.15

Number of Peaks 333 298 329 323 305 341 323

Av Of 1/3 Highest 3.90 127.62 -3.66 -5.15 127.68 -3.66 3.38


Av Of 1/3 Lowest 3.74 127.56 -4.68 -5.27 127.63 -4.67 3.26
Av Of 1/100 Highest 3.94 127.64 -3.46 -5.12 127.70 -3.42 3.41
Av Of 1/100 Lowest 3.70 127.51 -5.00 -5.30 127.57 -5.09 3.23
Av Of 1/1000 Highest 3.94 127.64 -3.46 -5.12 127.70 -3.42 3.41
Av Of 1/1000 Lowest 3.70 127.50 -5.05 -5.30 127.57 -5.10 3.23
Maximum 3.94 127.64 -3.46 -5.12 127.70 -3.42 3.41
Minimum 3.70 127.50 -5.05 -5.30 127.57 -5.10 3.23
Pred. Max 3.96 127.65 -3.33 -5.10 127.71 -3.28 3.43
Pred. Min 3.67 127.48 -5.22 -5.32 127.55 -5.27 3.22

Av Of 1/3 H-Mean 0.08 0.03 0.48 0.06 0.03 0.48 0.06


Av Of 1/3 L-Mean -0.08 -0.03 -0.54 -0.06 -0.03 -0.53 -0.06
Av Of 1/100 H-Mean 0.11 0.04 0.68 0.09 0.04 0.72 0.09
Av Of 1/100 L-Mean -0.12 -0.09 -0.86 -0.09 -0.08 -0.95 -0.09
Av Of 1/1000 H-Mean 0.11 0.05 0.69 0.09 0.04 0.73 0.09
Av Of 1/1000 L-Mean -0.13 -0.09 -0.90 -0.09 -0.09 -0.95 -0.09
Maximum - Mean 0.11 0.05 0.69 0.09 0.04 0.73 0.09
Minimum - Mean -0.13 -0.09 -0.90 -0.09 -0.09 -0.95 -0.09
Pred. Max-Mean 0.13 0.05 0.81 0.11 0.05 0.86 0.11
Pred. Min-Mean -0.15 -0.11 -1.07 -0.11 -0.11 -1.13 -0.11
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -20 -6 -5 0 0 0 23


BM2S DB30 -44 14 -7 0 0 0 48
BM3P DB30 -5 -9 -3 0 0 0 12
BM3S DB30 -41 73 -10 0 0 0 85
BM4P DB30 6 -9 -3 0 0 0 13
BM4S DB30 44 77 -10 0 0 0 89
BM5P DB30 14 -10 -4 0 0 0 18
BM5S DB30 50 13 -7 0 0 0 52
MAINLN DB30 9 -6 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 -5.2 -24740.5 47 1663748 -351


Buoyancy -202.4 5.5 25911.1 -257 -1834393 387
Wind 0.0 -34.2 0.0 583 0 -2311
Drag 0.0 -51.3 0.0 213 -1 -3486
Wave 0.0 -45.9 -0.3 106 35 -3057
Flex. Connectors 9.1 131.3 -1170.9 -740 170703 7176
======= ======= ======= ======= ======= =======
Total 0.0 0.3 -0.7 -48 90 -1645

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 7.1 -1114.3 -12 166275 1061


Wind -0.1 -8.2 0.2 19 -29 -1230
Flex. Connectors 0.0 -0.2 1114.6 9 -166330 -33
======= ======= ======= ======= ======= =======
Total 0.0 -1.3 0.6 16 -85 -203
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.49 1001.58 610.30 22.54 0.0843 16.74 0.00


BM2S 1000.90 1001.58 430.60 47.59 0.1753 43.29 0.00
BM3P 996.53 1001.57 716.98 12.10 0.0457 5.38 0.00
BM3S 1003.25 1001.57 240.64 84.74 0.3243 82.05 0.00
BM4P 996.74 1001.50 712.32 12.66 0.0458 6.00 0.00
BM4S 1003.48 1001.50 225.87 89.34 0.3386 86.78 0.00
BM5P 997.77 1001.47 657.58 17.82 0.0678 11.62 0.00
BM5S 1001.14 1001.46 411.66 51.75 0.1880 47.62 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.41 -3.89 -4.21 0.01 0.45 0.00


N Force 0.00 0.28 -0.67 -48 90 -1645

WHPBJKT Location 0.34 -4.17 21.94 -0.37 0.00 -0.07


N Force -0.02 -1.34 0.57 16 -85 -203
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 21.85 48.19 11.43 88.90 12.36 92.23 17.31 53.05


Variance 1.04 2.30 0.99 31.15 1.27 34.74 1.56 2.97
Root Mean Square 21.88 48.22 11.47 89.08 12.41 92.42 17.36 53.08
Std. Deviation 1.02 1.52 1.00 5.58 1.13 5.89 1.25 1.72
Skewness -0.29 0.02 -0.07 0.33 0.23 0.42 0.08 0.60
Kurtosis 0.03 -0.09 -0.12 -0.36 -0.20 -0.02 -0.47 0.77

Number of Peaks 298 309 315 311 312 307 311 307

Av Of 1/3 Highest 23.54 50.71 13.09 98.24 14.39 101.82 19.47 56.06
Av Of 1/3 Lowest 20.16 45.57 9.85 80.32 10.67 83.28 15.39 50.38
Av Of 1/100 Highest 24.70 53.43 14.41 105.61 15.64 111.53 20.65 59.17
Av Of 1/100 Lowest 18.83 43.71 8.62 76.17 9.16 78.04 13.77 48.20
Av Of 1/1000 Highest 25.06 53.72 14.61 107.13 15.84 112.42 20.73 59.41
Av Of 1/1000 Lowest 18.78 43.69 8.44 76.01 8.89 78.03 13.51 47.74
Maximum 25.06 53.72 14.61 107.13 15.84 112.42 20.73 59.41
Minimum 18.78 43.69 8.44 76.01 8.89 78.03 13.51 47.74
Pred. Max 25.67 54.77 15.21 110.59 16.49 116.25 21.37 60.62
Pred. Min 18.20 42.84 7.87 73.57 8.24 75.34 12.79 46.73

Av Of 1/3 H-Mean 1.68 2.51 1.67 9.34 2.03 9.59 2.16 3.01
Av Of 1/3 L-Mean -1.69 -2.63 -1.57 -8.58 -1.68 -8.95 -1.93 -2.67
Av Of 1/100 H-Mean 2.85 5.23 2.98 16.71 3.28 19.30 3.34 6.12
Av Of 1/100 L-Mean -3.02 -4.49 -2.81 -12.73 -3.20 -14.19 -3.54 -4.85
Av Of 1/1000 H-Mean 3.21 5.52 3.18 18.23 3.48 20.19 3.41 6.36
Av Of 1/1000 L-Mean -3.07 -4.50 -2.99 -12.89 -3.47 -14.20 -3.80 -5.31
Maximum - Mean 3.21 5.52 3.18 18.23 3.48 20.19 3.41 6.36
Minimum - Mean -3.07 -4.50 -2.99 -12.89 -3.47 -14.20 -3.80 -5.31
Pred. Max-Mean 3.82 6.57 3.79 21.68 4.13 24.02 4.06 7.57
Pred. Min-Mean -3.65 -5.36 -3.55 -15.33 -4.12 -16.89 -4.52 -6.32

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.44 -4.20 -4.21


Variance 0.00 0.14 0.02
Root Mean Square 0.44 4.22 4.21
Std. Deviation 0.05 0.38 0.13
Skewness -0.62 -0.43 -0.04
Kurtosis 1.61 -0.45 -0.28

Number of Peaks 187 272 289

Av Of 1/3 Highest -0.36 -3.66 -3.95


Av Of 1/3 Lowest -0.51 -4.84 -4.47
Av Of 1/100 Highest -0.31 -3.44 -3.82
Av Of 1/100 Lowest -0.63 -5.29 -4.61
Av Of 1/1000 Highest -0.31 -3.42 -3.81
Av Of 1/1000 Lowest -0.63 -5.33 -4.64
Maximum -0.31 -3.42 -3.81
Minimum -0.63 -5.33 -4.64
Pred. Max -0.28 -3.27 -3.74
Pred. Min -0.67 -5.55 -4.72

Av Of 1/3 H-Mean 0.07 0.54 0.26


Av Of 1/3 L-Mean -0.07 -0.64 -0.27
Av Of 1/100 H-Mean 0.13 0.76 0.39
Av Of 1/100 L-Mean -0.19 -1.09 -0.40
Av Of 1/1000 H-Mean 0.13 0.77 0.39
Av Of 1/1000 L-Mean -0.19 -1.13 -0.43
Maximum - Mean 0.13 0.77 0.39
Minimum - Mean -0.19 -1.13 -0.43
Pred. Max-Mean 0.16 0.92 0.47
Pred. Min-Mean -0.23 -1.35 -0.51
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.44 -4.20 -4.21 -0.37 -4.20 4.32 63.57 -4.12 -4.71 63.64 -4.12
Variance 0.00 0.14 0.02 0.00 0.14 0.02 0.00 0.14 0.01 0.00 0.13
Root Mean Square 0.44 4.22 4.21 0.37 4.22 4.33 63.57 4.13 4.71 63.64 4.13
Std. Deviation 0.05 0.38 0.13 0.05 0.37 0.13 0.05 0.37 0.09 0.05 0.37
Skewness -0.62 -0.43 -0.04 -0.66 -0.36 -0.05 -0.62 -0.41 -0.04 -0.66 -0.33
Kurtosis 1.61 -0.45 -0.28 1.73 -0.34 -0.28 1.60 -0.38 -0.30 1.72 -0.27

Number of Peaks 187 272 289 205 313 289 190 272 289 203 313

Av Of 1/3 Highest -0.36 -3.66 -3.95 -0.31 -3.64 4.58 63.64 -3.58 -4.52 63.70 -3.56
Av Of 1/3 Lowest -0.51 -4.84 -4.47 -0.44 -4.83 4.06 63.50 -4.74 -4.90 63.57 -4.72
Av Of 1/100 Highest -0.31 -3.44 -3.82 -0.25 -3.34 4.71 63.70 -3.35 -4.43 63.75 -3.26
Av Of 1/100 Lowest -0.63 -5.29 -4.61 -0.55 -5.30 3.92 63.38 -5.22 -5.01 63.46 -5.24
Av Of 1/1000 Highest -0.31 -3.42 -3.81 -0.24 -3.33 4.72 63.70 -3.33 -4.42 63.76 -3.24
Av Of 1/1000 Lowest -0.63 -5.33 -4.64 -0.55 -5.35 3.89 63.38 -5.26 -5.02 63.46 -5.31
Maximum -0.31 -3.42 -3.81 -0.24 -3.33 4.72 63.70 -3.33 -4.42 63.76 -3.24
Minimum -0.63 -5.33 -4.64 -0.55 -5.35 3.89 63.38 -5.26 -5.02 63.46 -5.31
Pred. Max -0.28 -3.27 -3.74 -0.22 -3.17 4.79 63.73 -3.17 -4.36 63.79 -3.08
Pred. Min -0.67 -5.55 -4.72 -0.58 -5.57 3.81 63.34 -5.48 -5.08 63.42 -5.53

Av Of 1/3 H-Mean 0.07 0.54 0.26 0.07 0.56 0.26 0.07 0.54 0.19 0.07 0.56
Av Of 1/3 L-Mean -0.07 -0.64 -0.27 -0.07 -0.63 -0.27 -0.07 -0.62 -0.19 -0.07 -0.61
Av Of 1/100 H-Mean 0.13 0.76 0.39 0.12 0.86 0.39 0.13 0.77 0.28 0.12 0.86
Av Of 1/100 L-Mean -0.19 -1.09 -0.40 -0.18 -1.09 -0.40 -0.19 -1.11 -0.30 -0.18 -1.12
Av Of 1/1000 H-Mean 0.13 0.77 0.39 0.13 0.87 0.39 0.13 0.79 0.29 0.13 0.88
Av Of 1/1000 L-Mean -0.19 -1.13 -0.43 -0.18 -1.15 -0.43 -0.19 -1.15 -0.31 -0.18 -1.19
Maximum - Mean 0.13 0.77 0.39 0.13 0.87 0.39 0.13 0.79 0.29 0.13 0.88
Minimum - Mean -0.19 -1.13 -0.43 -0.18 -1.15 -0.43 -0.19 -1.15 -0.31 -0.18 -1.19
Pred. Max-Mean 0.16 0.92 0.47 0.15 1.03 0.47 0.16 0.94 0.35 0.16 1.04
Pred. Min-Mean -0.23 -1.35 -0.51 -0.21 -1.37 -0.51 -0.23 -1.37 -0.37 -0.21 -1.41

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.57 -4.03 -5.21 127.64 -4.04 3.32


Variance 0.01 0.00 0.14 0.00 0.00 0.13 0.00
Root Mean Square 3.82 127.57 4.05 5.21 127.64 4.05 3.32
Std. Deviation 0.09 0.05 0.37 0.07 0.05 0.37 0.07
Skewness -0.04 -0.61 -0.36 -0.03 -0.66 -0.28 -0.03
Kurtosis -0.30 1.59 -0.31 -0.15 1.72 -0.20 -0.16

Number of Peaks 287 193 272 281 200 313 281

Av Of 1/3 Highest 4.01 127.65 -3.49 -5.07 127.71 -3.47 3.46


Av Of 1/3 Lowest 3.63 127.51 -4.65 -5.35 127.58 -4.63 3.18
Av Of 1/100 Highest 4.11 127.71 -3.20 -5.00 127.77 -3.14 3.53
Av Of 1/100 Lowest 3.53 127.38 -5.16 -5.43 127.46 -5.19 3.11
Av Of 1/1000 Highest 4.12 127.71 -3.17 -4.99 127.77 -3.13 3.54
Av Of 1/1000 Lowest 3.51 127.38 -5.20 -5.43 127.46 -5.26 3.10
Maximum 4.12 127.71 -3.17 -4.99 127.77 -3.13 3.54
Minimum 3.51 127.38 -5.20 -5.43 127.46 -5.26 3.10
Pred. Max 4.17 127.73 -3.00 -4.95 127.80 -2.96 3.59
Pred. Min 3.45 127.34 -5.42 -5.48 127.43 -5.49 3.06

Av Of 1/3 H-Mean 0.19 0.07 0.55 0.14 0.07 0.57 0.14


Av Of 1/3 L-Mean -0.20 -0.07 -0.61 -0.14 -0.06 -0.59 -0.14
Av Of 1/100 H-Mean 0.28 0.13 0.83 0.21 0.13 0.89 0.20
Av Of 1/100 L-Mean -0.30 -0.19 -1.12 -0.22 -0.18 -1.15 -0.22
Av Of 1/1000 H-Mean 0.29 0.13 0.86 0.22 0.13 0.90 0.22
Av Of 1/1000 L-Mean -0.31 -0.19 -1.16 -0.22 -0.18 -1.23 -0.22
Maximum - Mean 0.29 0.13 0.86 0.22 0.13 0.90 0.22
Minimum - Mean -0.31 -0.19 -1.16 -0.22 -0.18 -1.23 -0.22
Pred. Max-Mean 0.35 0.16 1.03 0.26 0.16 1.07 0.26
Pred. Min-Mean -0.37 -0.23 -1.39 -0.27 -0.22 -1.46 -0.27
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -20 -6 -5 0 0 0 23


BM2S DB30 -44 14 -7 0 0 0 48
BM3P DB30 -5 -9 -3 0 0 0 12
BM3S DB30 -41 73 -10 0 0 0 85
BM4P DB30 6 -9 -3 0 0 0 13
BM4S DB30 44 77 -10 0 0 0 89
BM5P DB30 14 -10 -4 0 0 0 18
BM5S DB30 50 13 -7 0 0 0 52
MAINLN DB30 9 -6 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.4 -1.9 -24740.5 17 1663748 -128


Buoyancy -202.4 2.0 25908.4 -93 -1834235 142
Wind 0.0 -34.2 0.0 583 0 -2311
Drag 0.0 -51.3 0.0 213 0 -3485
Wave 0.0 -45.9 2.3 -13 -124 -3036
Flex. Connectors 9.1 131.6 -1171.0 -752 170714 7201
======= ======= ======= ======= ======= =======
Total 0.0 0.3 -0.7 -48 101 -1621

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 7.1 -1114.3 -12 166275 1064


Wind -0.1 -8.2 0.2 19 -29 -1230
Flex. Connectors 0.0 -0.2 1114.7 9 -166342 -33
======= ======= ======= ======= ======= =======
Total 0.0 -1.3 0.7 16 -97 -200
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.49 1001.58 610.36 22.54 0.0843 16.73 0.00


BM2S 1000.90 1001.58 430.53 47.60 0.1754 43.30 0.00
BM3P 996.53 1001.57 717.08 12.09 0.0456 5.37 0.00
BM3S 1003.26 1001.57 240.46 84.77 0.3245 82.09 0.00
BM4P 996.73 1001.50 712.43 12.66 0.0458 5.99 0.00
BM4S 1003.49 1001.50 225.69 89.38 0.3387 86.82 0.00
BM5P 997.77 1001.47 657.67 17.81 0.0678 11.61 0.00
BM5S 1001.14 1001.46 411.60 51.76 0.1880 47.63 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.41 -3.90 -4.21 0.00 0.45 0.00


N Force 0.00 0.29 -0.74 -48 101 -1621

WHPBJKT Location 0.34 -4.16 21.94 -0.37 0.00 -0.07


N Force -0.01 -1.32 0.65 16 -97 -200
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 22.01 47.80 11.47 89.01 12.97 89.93 17.86 53.10


Variance 1.76 3.87 1.91 54.71 2.91 61.92 3.05 4.70
Root Mean Square 22.05 47.84 11.55 89.32 13.09 90.27 17.95 53.14
Std. Deviation 1.33 1.97 1.38 7.40 1.70 7.87 1.75 2.17
Skewness 0.19 -0.07 0.48 -0.01 0.81 -0.08 0.51 0.11
Kurtosis -0.07 -0.29 0.06 -0.56 1.10 0.11 0.43 -0.23

Number of Peaks 279 285 290 289 289 293 289 285

Av Of 1/3 Highest 24.18 51.20 13.77 100.63 15.92 102.10 20.82 56.76
Av Of 1/3 Lowest 19.96 44.38 9.51 77.38 10.64 77.55 15.28 49.63
Av Of 1/100 Highest 26.23 53.35 15.85 107.74 19.46 111.28 24.00 59.59
Av Of 1/100 Lowest 18.46 42.37 8.33 70.91 9.11 67.45 13.69 47.07
Av Of 1/1000 Highest 26.25 53.48 15.93 108.02 19.57 111.41 24.08 60.03
Av Of 1/1000 Lowest 18.40 42.37 8.23 70.28 8.96 67.02 13.49 46.98
Maximum 26.25 53.48 15.93 108.02 19.57 111.41 24.08 60.03
Minimum 18.40 42.37 8.23 70.28 8.96 67.02 13.49 46.98
Pred. Max 27.06 54.57 16.78 111.66 20.84 115.51 25.27 61.36
Pred. Min 17.71 41.32 7.61 66.70 8.19 62.64 12.65 45.81

Av Of 1/3 H-Mean 2.17 3.40 2.30 11.62 2.95 12.17 2.96 3.66
Av Of 1/3 L-Mean -2.05 -3.43 -1.96 -11.63 -2.33 -12.38 -2.58 -3.47
Av Of 1/100 H-Mean 4.22 5.55 4.38 18.73 6.49 21.35 6.13 6.49
Av Of 1/100 L-Mean -3.55 -5.43 -3.14 -18.10 -3.86 -22.48 -4.17 -6.03
Av Of 1/1000 H-Mean 4.24 5.68 4.46 19.01 6.60 21.48 6.21 6.93
Av Of 1/1000 L-Mean -3.61 -5.43 -3.24 -18.73 -4.01 -22.90 -4.38 -6.12
Maximum - Mean 4.24 5.68 4.46 19.01 6.60 21.48 6.21 6.93
Minimum - Mean -3.61 -5.43 -3.24 -18.73 -4.01 -22.90 -4.38 -6.12
Pred. Max-Mean 5.06 6.77 5.31 22.65 7.87 25.59 7.40 8.26
Pred. Min-Mean -4.30 -6.48 -3.86 -22.31 -4.78 -27.28 -5.21 -7.29

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.44 -4.24 -4.21


Variance 0.00 0.27 0.05
Root Mean Square 0.45 4.27 4.21
Std. Deviation 0.04 0.52 0.23
Skewness -0.21 -0.05 -0.02
Kurtosis -0.32 -0.43 -0.16

Number of Peaks 182 253 269

Av Of 1/3 Highest -0.39 -3.40 -3.74


Av Of 1/3 Lowest -0.51 -5.14 -4.68
Av Of 1/100 Highest -0.34 -2.87 -3.51
Av Of 1/100 Lowest -0.57 -5.68 -4.93
Av Of 1/1000 Highest -0.34 -2.81 -3.48
Av Of 1/1000 Lowest -0.57 -5.70 -4.96
Maximum -0.34 -2.81 -3.48
Minimum -0.57 -5.70 -4.96
Pred. Max -0.32 -2.53 -3.34
Pred. Min -0.59 -5.99 -5.11

Av Of 1/3 H-Mean 0.06 0.83 0.46


Av Of 1/3 L-Mean -0.07 -0.90 -0.47
Av Of 1/100 H-Mean 0.10 1.36 0.70
Av Of 1/100 L-Mean -0.12 -1.44 -0.72
Av Of 1/1000 H-Mean 0.10 1.43 0.73
Av Of 1/1000 L-Mean -0.12 -1.47 -0.76
Maximum - Mean 0.10 1.43 0.73
Minimum - Mean -0.12 -1.47 -0.76
Pred. Max-Mean 0.12 1.71 0.87
Pred. Min-Mean -0.15 -1.75 -0.90
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.44 -4.24 -4.21 -0.38 -4.24 4.32 63.56 -4.04 -4.71 63.63 -4.04
Variance 0.00 0.27 0.05 0.00 0.24 0.05 0.00 0.27 0.03 0.00 0.24
Root Mean Square 0.45 4.27 4.21 0.38 4.27 4.33 63.56 4.07 4.71 63.63 4.07
Std. Deviation 0.04 0.52 0.23 0.04 0.49 0.23 0.04 0.52 0.19 0.04 0.49
Skewness -0.21 -0.05 -0.02 -0.20 0.03 -0.03 -0.22 0.01 -0.05 -0.20 0.11
Kurtosis -0.32 -0.43 -0.16 -0.35 -0.61 -0.16 -0.30 -0.12 -0.14 -0.35 -0.21

Number of Peaks 182 253 269 229 301 273 190 253 267 217 301

Av Of 1/3 Highest -0.39 -3.40 -3.74 -0.32 -3.47 4.79 63.62 -3.21 -4.34 63.69 -3.28
Av Of 1/3 Lowest -0.51 -5.14 -4.68 -0.44 -5.00 3.85 63.49 -4.92 -5.09 63.56 -4.78
Av Of 1/100 Highest -0.34 -2.87 -3.51 -0.29 -3.06 5.03 63.66 -2.51 -4.15 63.72 -2.70
Av Of 1/100 Lowest -0.57 -5.68 -4.93 -0.48 -5.44 3.60 63.44 -5.51 -5.31 63.52 -5.29
Av Of 1/1000 Highest -0.34 -2.81 -3.48 -0.28 -3.01 5.06 63.66 -2.44 -4.14 63.73 -2.64
Av Of 1/1000 Lowest -0.57 -5.70 -4.96 -0.48 -5.45 3.57 63.44 -5.53 -5.33 63.52 -5.30
Maximum -0.34 -2.81 -3.48 -0.28 -3.01 5.06 63.66 -2.44 -4.14 63.73 -2.64
Minimum -0.57 -5.70 -4.96 -0.48 -5.45 3.57 63.44 -5.53 -5.33 63.52 -5.30
Pred. Max -0.32 -2.53 -3.34 -0.26 -2.78 5.20 63.68 -2.12 -4.03 63.75 -2.38
Pred. Min -0.59 -5.99 -5.11 -0.51 -5.68 3.43 63.41 -5.82 -5.45 63.50 -5.54

Av Of 1/3 H-Mean 0.06 0.83 0.46 0.06 0.77 0.46 0.06 0.83 0.37 0.06 0.76
Av Of 1/3 L-Mean -0.07 -0.90 -0.47 -0.07 -0.76 -0.47 -0.07 -0.88 -0.38 -0.06 -0.74
Av Of 1/100 H-Mean 0.10 1.36 0.70 0.09 1.18 0.70 0.10 1.53 0.56 0.09 1.34
Av Of 1/100 L-Mean -0.12 -1.44 -0.72 -0.11 -1.20 -0.72 -0.12 -1.47 -0.60 -0.10 -1.25
Av Of 1/1000 H-Mean 0.10 1.43 0.73 0.10 1.23 0.73 0.10 1.60 0.57 0.10 1.40
Av Of 1/1000 L-Mean -0.12 -1.47 -0.76 -0.11 -1.21 -0.75 -0.12 -1.49 -0.62 -0.11 -1.26
Maximum - Mean 0.10 1.43 0.73 0.10 1.23 0.73 0.10 1.60 0.57 0.10 1.40
Minimum - Mean -0.12 -1.47 -0.76 -0.11 -1.21 -0.75 -0.12 -1.49 -0.62 -0.11 -1.26
Pred. Max-Mean 0.12 1.71 0.87 0.12 1.46 0.87 0.12 1.91 0.68 0.12 1.66
Pred. Min-Mean -0.15 -1.75 -0.90 -0.13 -1.44 -0.90 -0.15 -1.78 -0.74 -0.13 -1.50

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.57 -3.84 -5.21 127.63 -3.84 3.32


Variance 0.03 0.00 0.29 0.02 0.00 0.25 0.02
Root Mean Square 3.83 127.57 3.88 5.21 127.63 3.87 3.32
Std. Deviation 0.19 0.04 0.53 0.16 0.04 0.50 0.16
Skewness -0.05 -0.22 0.10 -0.06 -0.20 0.21 -0.06
Kurtosis -0.14 -0.29 0.31 -0.02 -0.35 0.34 -0.02

Number of Peaks 267 197 253 257 210 301 261

Av Of 1/3 Highest 4.20 127.62 -2.98 -4.90 127.69 -3.05 3.63


Av Of 1/3 Lowest 3.44 127.50 -4.72 -5.53 127.57 -4.59 3.00
Av Of 1/100 Highest 4.39 127.67 -2.14 -4.75 127.72 -2.33 3.79
Av Of 1/100 Lowest 3.23 127.44 -5.34 -5.71 127.53 -5.15 2.82
Av Of 1/1000 Highest 4.40 127.67 -2.07 -4.74 127.73 -2.28 3.80
Av Of 1/1000 Lowest 3.20 127.44 -5.36 -5.72 127.53 -5.19 2.81
Maximum 4.40 127.67 -2.07 -4.74 127.73 -2.28 3.80
Minimum 3.20 127.44 -5.36 -5.72 127.53 -5.19 2.81
Pred. Max 4.51 127.69 -1.72 -4.64 127.75 -1.98 3.89
Pred. Min 3.08 127.41 -5.66 -5.82 127.51 -5.44 2.71

Av Of 1/3 H-Mean 0.37 0.06 0.86 0.31 0.06 0.79 0.31


Av Of 1/3 L-Mean -0.38 -0.07 -0.88 -0.32 -0.07 -0.75 -0.32
Av Of 1/100 H-Mean 0.57 0.10 1.70 0.47 0.09 1.51 0.47
Av Of 1/100 L-Mean -0.59 -0.13 -1.50 -0.50 -0.10 -1.31 -0.50
Av Of 1/1000 H-Mean 0.57 0.10 1.77 0.47 0.10 1.57 0.48
Av Of 1/1000 L-Mean -0.62 -0.13 -1.52 -0.51 -0.11 -1.35 -0.51
Maximum - Mean 0.57 0.10 1.77 0.47 0.10 1.57 0.48
Minimum - Mean -0.62 -0.13 -1.52 -0.51 -0.11 -1.35 -0.51
Pred. Max-Mean 0.68 0.12 2.12 0.57 0.12 1.86 0.57
Pred. Min-Mean -0.74 -0.15 -1.81 -0.61 -0.13 -1.60 -0.61
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -19 -6 -5 0 0 0 22


BM2S DB30 -44 14 -7 0 0 0 48
BM3P DB30 -5 -8 -3 0 0 0 12
BM3S DB30 -42 75 -10 0 0 0 87
BM4P DB30 6 -9 -3 0 0 0 12
BM4S DB30 46 79 -10 0 0 0 92
BM5P DB30 13 -9 -4 0 0 0 17
BM5S DB30 50 13 -7 0 0 0 52
MAINLN DB30 9 -5 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 5.1 -24740.5 -45 1663747 345


Buoyancy -202.3 -5.4 25910.2 252 -1834317 -378
Wind 0.0 -34.2 0.0 583 0 -2311
Drag 0.0 -51.3 0.0 213 2 -3486
Wave 0.0 -53.6 0.5 -186 -40 -3517
Flex. Connectors 9.0 138.7 -1171.4 -888 170759 7732
======= ======= ======= ======= ======= =======
Total 0.0 -0.7 -1.2 -73 149 -1618

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 6.8 -1114.3 -11 166275 1007


Wind -0.1 -8.2 0.2 19 -29 -1230
Flex. Connectors 0.0 -0.3 1115.0 13 -166383 -46
======= ======= ======= ======= ======= =======
Total 0.0 -1.8 0.9 20 -138 -270
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.43 1001.58 614.25 22.09 0.0826 16.24 0.00


BM2S 1000.95 1001.58 426.59 48.26 0.1778 44.01 0.00
BM3P 996.38 1001.57 722.78 11.65 0.0440 4.88 0.00
BM3S 1003.40 1001.57 228.70 87.39 0.3345 84.80 0.00
BM4P 996.59 1001.50 718.50 12.17 0.0440 5.44 0.00
BM4S 1003.64 1001.50 213.82 92.09 0.3490 89.64 0.00
BM5P 997.66 1001.47 663.64 17.20 0.0655 10.94 0.00
BM5S 1001.19 1001.46 407.85 52.40 0.1904 48.32 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.42 -4.07 -4.21 -0.01 0.45 0.00


N Force -0.02 -0.66 -1.15 -73 149 -1618

WHPBJKT Location 0.33 -4.31 21.94 -0.35 0.00 -0.06


N Force -0.02 -1.79 0.93 20 -138 -270
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 21.23 49.30 10.78 93.37 11.65 96.76 16.50 54.13


Variance 1.77 4.33 2.00 66.27 2.45 74.56 2.74 4.93
Root Mean Square 21.27 49.35 10.87 93.73 11.76 97.15 16.58 54.17
Std. Deviation 1.33 2.08 1.41 8.14 1.56 8.63 1.66 2.22
Skewness 0.79 -0.17 1.04 -0.27 1.21 -0.32 0.94 -0.40
Kurtosis 1.22 0.05 1.79 0.23 2.61 0.67 1.54 0.59

Number of Peaks 252 263 253 237 285 237 287 257

Av Of 1/3 Highest 23.57 52.80 13.23 106.68 14.17 110.40 19.23 57.56
Av Of 1/3 Lowest 19.31 45.83 8.90 79.85 9.69 82.63 14.37 50.56
Av Of 1/100 Highest 26.02 54.92 16.43 115.35 18.56 122.06 23.21 59.64
Av Of 1/100 Lowest 17.69 43.17 7.72 68.15 8.09 68.39 12.51 46.62
Av Of 1/1000 Highest 26.30 55.03 16.53 116.85 18.80 123.75 23.49 59.68
Av Of 1/1000 Lowest 17.63 43.08 7.67 67.27 7.95 68.16 12.29 46.19
Maximum 26.30 55.03 16.53 116.85 18.80 123.75 23.49 59.68
Minimum 17.63 43.08 7.67 67.27 7.95 68.16 12.29 46.19
Pred. Max 27.29 56.14 17.66 121.50 20.18 129.09 24.83 60.76
Pred. Min 16.93 41.87 7.06 62.11 7.24 62.50 11.48 44.64

Av Of 1/3 H-Mean 2.34 3.50 2.46 13.30 2.52 13.64 2.73 3.43
Av Of 1/3 L-Mean -1.92 -3.48 -1.88 -13.52 -1.96 -14.13 -2.13 -3.57
Av Of 1/100 H-Mean 4.80 5.62 5.65 21.97 6.91 25.29 6.72 5.51
Av Of 1/100 L-Mean -3.53 -6.14 -3.06 -25.22 -3.56 -28.38 -3.99 -7.51
Av Of 1/1000 H-Mean 5.07 5.73 5.75 23.47 7.15 26.99 6.99 5.55
Av Of 1/1000 L-Mean -3.59 -6.22 -3.11 -26.10 -3.70 -28.60 -4.21 -7.93
Maximum - Mean 5.07 5.73 5.75 23.47 7.15 26.99 6.99 5.55
Minimum - Mean -3.59 -6.22 -3.11 -26.10 -3.70 -28.60 -4.21 -7.93
Pred. Max-Mean 6.07 6.84 6.88 28.12 8.52 32.33 8.34 6.64
Pred. Min-Mean -4.30 -7.43 -3.72 -31.27 -4.41 -34.26 -5.01 -9.48

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.44 -4.49 -4.21


Variance 0.00 0.40 0.16
Root Mean Square 0.44 4.53 4.22
Std. Deviation 0.04 0.64 0.40
Skewness 0.04 0.09 -0.03
Kurtosis 0.04 -0.07 -0.10

Number of Peaks 209 237 239

Av Of 1/3 Highest -0.38 -3.35 -3.40


Av Of 1/3 Lowest -0.50 -5.63 -5.03
Av Of 1/100 Highest -0.34 -2.61 -2.98
Av Of 1/100 Lowest -0.56 -6.30 -5.46
Av Of 1/1000 Highest -0.34 -2.46 -2.94
Av Of 1/1000 Lowest -0.56 -6.39 -5.47
Maximum -0.34 -2.46 -2.94
Minimum -0.56 -6.39 -5.47
Pred. Max -0.31 -2.05 -2.69
Pred. Min -0.58 -6.77 -5.72

Av Of 1/3 H-Mean 0.06 1.13 0.81


Av Of 1/3 L-Mean -0.06 -1.14 -0.83
Av Of 1/100 H-Mean 0.11 1.87 1.22
Av Of 1/100 L-Mean -0.11 -1.81 -1.25
Av Of 1/1000 H-Mean 0.11 2.03 1.27
Av Of 1/1000 L-Mean -0.12 -1.91 -1.26
Maximum - Mean 0.11 2.03 1.27
Minimum - Mean -0.12 -1.91 -1.26
Pred. Max-Mean 0.13 2.43 1.52
Pred. Min-Mean -0.14 -2.28 -1.51
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.44 -4.49 -4.21 -0.38 -4.48 4.32 63.56 -4.40 -4.71 63.63 -4.40
Variance 0.00 0.40 0.16 0.00 0.29 0.16 0.00 0.41 0.14 0.00 0.29
Root Mean Square 0.44 4.53 4.22 0.38 4.52 4.34 63.56 4.44 4.73 63.63 4.43
Std. Deviation 0.04 0.64 0.40 0.04 0.53 0.40 0.04 0.64 0.37 0.04 0.54
Skewness 0.04 0.09 -0.03 0.09 0.36 -0.03 0.03 0.10 -0.07 0.10 0.38
Kurtosis 0.04 -0.07 -0.10 -0.01 0.28 -0.10 0.05 0.08 -0.09 -0.01 0.53

Number of Peaks 209 237 239 207 233 241 211 237 235 195 233

Av Of 1/3 Highest -0.38 -3.35 -3.40 -0.32 -3.56 5.13 63.62 -3.26 -3.98 63.68 -3.48
Av Of 1/3 Lowest -0.50 -5.63 -5.03 -0.44 -5.34 3.50 63.50 -5.53 -5.48 63.57 -5.25
Av Of 1/100 Highest -0.34 -2.61 -2.98 -0.27 -2.79 5.55 63.67 -2.44 -3.60 63.74 -2.62
Av Of 1/100 Lowest -0.56 -6.30 -5.46 -0.48 -5.85 3.08 63.45 -6.31 -5.86 63.52 -5.86
Av Of 1/1000 Highest -0.34 -2.46 -2.94 -0.27 -2.72 5.60 63.67 -2.28 -3.55 63.74 -2.55
Av Of 1/1000 Lowest -0.56 -6.39 -5.47 -0.48 -5.95 3.07 63.44 -6.40 -5.88 63.52 -5.96
Maximum -0.34 -2.46 -2.94 -0.27 -2.72 5.60 63.67 -2.28 -3.55 63.74 -2.55
Minimum -0.56 -6.39 -5.47 -0.48 -5.95 3.07 63.44 -6.40 -5.88 63.52 -5.96
Pred. Max -0.31 -2.05 -2.69 -0.25 -2.37 5.85 63.69 -1.87 -3.32 63.76 -2.18
Pred. Min -0.58 -6.77 -5.72 -0.50 -6.24 2.82 63.42 -6.80 -6.11 63.50 -6.28

Av Of 1/3 H-Mean 0.06 1.13 0.81 0.05 0.92 0.80 0.06 1.14 0.73 0.05 0.91
Av Of 1/3 L-Mean -0.06 -1.14 -0.83 -0.06 -0.86 -0.82 -0.06 -1.14 -0.77 -0.06 -0.85
Av Of 1/100 H-Mean 0.11 1.87 1.22 0.10 1.70 1.22 0.11 1.96 1.11 0.11 1.78
Av Of 1/100 L-Mean -0.11 -1.81 -1.25 -0.10 -1.37 -1.25 -0.12 -1.91 -1.15 -0.11 -1.47
Av Of 1/1000 H-Mean 0.11 2.03 1.27 0.11 1.76 1.27 0.11 2.11 1.16 0.11 1.85
Av Of 1/1000 L-Mean -0.12 -1.91 -1.26 -0.11 -1.47 -1.26 -0.12 -2.01 -1.17 -0.11 -1.57
Maximum - Mean 0.11 2.03 1.27 0.11 1.76 1.27 0.11 2.11 1.16 0.11 1.85
Minimum - Mean -0.12 -1.91 -1.26 -0.11 -1.47 -1.26 -0.12 -2.01 -1.17 -0.11 -1.57
Pred. Max-Mean 0.13 2.43 1.52 0.13 2.11 1.52 0.13 2.53 1.39 0.13 2.21
Pred. Min-Mean -0.14 -2.28 -1.51 -0.13 -1.76 -1.51 -0.14 -2.40 -1.40 -0.13 -1.88

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.57 -4.31 -5.22 127.64 -4.31 3.31


Variance 0.14 0.00 0.41 0.13 0.00 0.29 0.13
Root Mean Square 3.84 127.57 4.36 5.23 127.64 4.34 3.33
Std. Deviation 0.37 0.04 0.64 0.36 0.04 0.54 0.36
Skewness -0.07 0.01 0.11 -0.10 0.10 0.39 -0.10
Kurtosis -0.09 0.06 0.26 -0.06 -0.01 0.83 -0.06

Number of Peaks 235 208 237 230 186 233 231

Av Of 1/3 Highest 4.56 127.63 -3.17 -4.50 127.69 -3.40 4.04


Av Of 1/3 Lowest 3.05 127.51 -5.44 -5.97 127.57 -5.16 2.56
Av Of 1/100 Highest 4.93 127.67 -2.27 -4.18 127.74 -2.44 4.36
Av Of 1/100 Lowest 2.68 127.45 -6.32 -6.35 127.53 -5.88 2.18
Av Of 1/1000 Highest 4.98 127.68 -2.11 -4.16 127.74 -2.38 4.37
Av Of 1/1000 Lowest 2.65 127.45 -6.41 -6.37 127.53 -5.98 2.16
Maximum 4.98 127.68 -2.11 -4.16 127.74 -2.38 4.37
Minimum 2.65 127.45 -6.41 -6.37 127.53 -5.98 2.16
Pred. Max 5.21 127.70 -1.68 -3.95 127.77 -2.00 4.58
Pred. Min 2.42 127.42 -6.83 -6.60 127.51 -6.31 1.93

Av Of 1/3 H-Mean 0.74 0.06 1.14 0.72 0.06 0.91 0.72


Av Of 1/3 L-Mean -0.77 -0.06 -1.13 -0.76 -0.06 -0.85 -0.75
Av Of 1/100 H-Mean 1.11 0.11 2.04 1.04 0.11 1.86 1.04
Av Of 1/100 L-Mean -1.14 -0.12 -2.01 -1.14 -0.10 -1.57 -1.13
Av Of 1/1000 H-Mean 1.16 0.11 2.20 1.05 0.11 1.93 1.06
Av Of 1/1000 L-Mean -1.17 -0.12 -2.10 -1.16 -0.10 -1.67 -1.15
Maximum - Mean 1.16 0.11 2.20 1.05 0.11 1.93 1.06
Minimum - Mean -1.17 -0.12 -2.10 -1.16 -0.10 -1.67 -1.15
Pred. Max-Mean 1.40 0.13 2.63 1.26 0.13 2.31 1.27
Pred. Min-Mean -1.40 -0.15 -2.52 -1.38 -0.13 -2.00 -1.38
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -33 -11 -6 0 0 0 37


BM2S DB30 -53 17 -8 0 0 0 57
BM3P DB30 -9 -16 -4 0 0 0 21
BM3S DB30 -35 63 -9 0 0 0 74
BM4P DB30 7 -12 -3 0 0 0 16
BM4S DB30 29 51 -8 0 0 0 60
BM5P DB30 13 -9 -4 0 0 0 18
BM5S DB30 32 8 -5 0 0 0 34
MAINLN DB30 14 -4 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.9 -5.3 -24740.5 47 1663761 -352


Buoyancy -203.8 5.5 25877.7 -257 -1832687 387
Wind 12.7 -24.2 0.0 412 247 -1611
Drag 12.9 -36.2 3.4 150 -37 -2462
Wave 21.3 -21.5 30.2 72 -1749 -1580
Flex. Connectors -38.1 81.7 -1170.7 -423 170449 3897
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -17 -1724

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -475


Wind 6.5 3.2 -0.1 -7 40 471
Flex. Connectors -0.2 -0.1 1114.3 2 -166284 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 19 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.01 1001.58 501.67 36.60 0.1368 31.70 0.00


BM2S 1001.56 1001.58 376.06 57.11 0.2103 53.26 0.00
BM3P 998.31 1001.57 624.14 21.05 0.0794 15.11 0.00
BM3S 1002.61 1001.57 292.29 73.67 0.2819 70.53 0.00
BM4P 997.38 1001.50 680.55 15.58 0.0563 9.18 0.00
BM4S 1001.72 1001.50 368.30 59.65 0.2261 55.89 0.00
BM5P 997.73 1001.47 659.53 17.62 0.0671 11.40 0.00
BM5S 999.71 1001.46 526.51 33.61 0.1221 28.51 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 0.71 -2.50 -4.20 0.01 0.45 0.00


N Force -0.01 0.01 0.12 0 -17 -1724

WHPBJKT Location 93.96 135.06 21.09 0.16 -0.32 -67.51


N Force 0.01 0.00 -0.12 0 19 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 36.74 58.75 20.37 76.63 14.86 61.69 17.07 34.14


Variance 35.91 72.12 3.61 34.41 2.46 19.50 6.85 34.90
Root Mean Square 37.22 59.36 20.46 76.85 14.95 61.84 17.27 34.65
Std. Deviation 5.99 8.49 1.90 5.87 1.57 4.42 2.62 5.91
Skewness 0.19 0.20 0.10 0.29 -0.01 0.16 0.21 0.23
Kurtosis -0.87 -0.78 -0.75 -0.46 -0.60 -0.75 -0.75 -0.83

Number of Peaks 83 79 99 83 121 91 95 79

Av Of 1/3 Highest 47.54 72.79 23.48 86.64 17.53 70.08 22.08 45.41
Av Of 1/3 Lowest 26.93 44.74 17.07 67.31 12.51 54.97 13.21 24.97
Av Of 1/100 Highest 49.69 79.50 24.44 92.85 18.70 72.37 23.58 48.11
Av Of 1/100 Lowest 25.21 42.34 16.20 64.71 11.16 53.21 11.53 23.50
Av Of 1/1000 Highest 49.69 79.50 24.44 92.85 18.70 72.37 23.58 48.11
Av Of 1/1000 Lowest 25.21 42.34 16.20 64.71 11.16 53.21 11.53 23.50
Maximum 49.69 79.50 24.44 92.85 18.70 72.37 23.58 48.11
Minimum 25.21 42.34 16.20 64.71 11.16 53.21 11.53 23.50
Pred. Max 52.81 84.54 25.38 96.74 19.56 74.89 25.11 51.50
Pred. Min 22.43 38.36 15.23 61.85 10.34 51.21 10.23 20.92

Av Of 1/3 H-Mean 10.80 14.04 3.11 10.01 2.67 8.39 5.01 11.27
Av Of 1/3 L-Mean -9.81 -14.01 -3.30 -9.32 -2.35 -6.72 -3.86 -9.17
Av Of 1/100 H-Mean 12.96 20.75 4.07 16.22 3.84 10.68 6.51 13.97
Av Of 1/100 L-Mean -11.53 -16.40 -4.17 -11.92 -3.70 -8.47 -5.54 -10.64
Av Of 1/1000 H-Mean 12.96 20.75 4.07 16.22 3.84 10.68 6.51 13.97
Av Of 1/1000 L-Mean -11.53 -16.40 -4.17 -11.92 -3.70 -8.47 -5.54 -10.64
Maximum - Mean 12.96 20.75 4.07 16.22 3.84 10.68 6.51 13.97
Minimum - Mean -11.53 -16.40 -4.17 -11.92 -3.70 -8.47 -5.54 -10.64
Pred. Max-Mean 16.07 25.79 5.01 20.11 4.69 13.20 8.04 17.36
Pred. Min-Mean -14.30 -20.39 -5.14 -14.78 -4.53 -10.47 -6.84 -13.22

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 0.75 -2.68 -4.20


Variance 0.33 0.02 0.00
Root Mean Square 0.95 2.68 4.20
Std. Deviation 0.58 0.15 0.04
Skewness 0.03 -0.21 0.08
Kurtosis -0.86 -0.41 -0.01

Number of Peaks 71 252 332

Av Of 1/3 Highest 1.77 -2.45 -4.13


Av Of 1/3 Lowest -0.22 -2.92 -4.27
Av Of 1/100 Highest 1.99 -2.33 -4.08
Av Of 1/100 Lowest -0.45 -3.10 -4.30
Av Of 1/1000 Highest 1.99 -2.32 -4.07
Av Of 1/1000 Lowest -0.45 -3.13 -4.31
Maximum 1.99 -2.32 -4.07
Minimum -0.45 -3.13 -4.31
Pred. Max 2.30 -2.25 -4.04
Pred. Min -0.75 -3.22 -4.33

Av Of 1/3 H-Mean 1.02 0.23 0.07


Av Of 1/3 L-Mean -0.98 -0.24 -0.07
Av Of 1/100 H-Mean 1.24 0.35 0.12
Av Of 1/100 L-Mean -1.20 -0.42 -0.10
Av Of 1/1000 H-Mean 1.24 0.36 0.13
Av Of 1/1000 L-Mean -1.20 -0.45 -0.11
Maximum - Mean 1.24 0.36 0.13
Minimum - Mean -1.20 -0.45 -0.11
Pred. Max-Mean 1.55 0.43 0.16
Pred. Min-Mean -1.50 -0.54 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 0.75 -2.68 -4.20 0.82 -2.68 4.33 64.76 -2.67 -4.70 64.83 -2.68
Variance 0.33 0.02 0.00 0.33 0.02 0.00 0.33 0.02 0.00 0.33 0.02
Root Mean Square 0.95 2.68 4.20 1.00 2.68 4.33 64.76 2.68 4.70 64.83 2.68
Std. Deviation 0.58 0.15 0.04 0.58 0.15 0.04 0.58 0.15 0.01 0.58 0.15
Skewness 0.03 -0.21 0.08 0.03 -0.21 0.08 0.03 -0.21 -0.01 0.03 -0.22
Kurtosis -0.86 -0.41 -0.01 -0.86 -0.43 -0.01 -0.86 -0.41 -0.07 -0.86 -0.43

Number of Peaks 71 252 332 79 104 333 71 252 313 76 102

Av Of 1/3 Highest 1.77 -2.45 -4.13 1.74 -2.50 4.41 65.78 -2.45 -4.69 65.76 -2.49
Av Of 1/3 Lowest -0.22 -2.92 -4.27 -0.19 -2.92 4.26 63.78 -2.92 -4.72 63.81 -2.92
Av Of 1/100 Highest 1.99 -2.33 -4.08 2.06 -2.36 4.46 66.00 -2.33 -4.68 66.07 -2.36
Av Of 1/100 Lowest -0.45 -3.10 -4.30 -0.38 -3.09 4.23 63.55 -3.10 -4.73 63.63 -3.09
Av Of 1/1000 Highest 1.99 -2.32 -4.07 2.06 -2.36 4.47 66.00 -2.32 -4.68 66.07 -2.36
Av Of 1/1000 Lowest -0.45 -3.13 -4.31 -0.38 -3.09 4.23 63.55 -3.13 -4.73 63.63 -3.09
Maximum 1.99 -2.32 -4.07 2.06 -2.36 4.47 66.00 -2.32 -4.68 66.07 -2.36
Minimum -0.45 -3.13 -4.31 -0.38 -3.09 4.23 63.55 -3.13 -4.73 63.63 -3.09
Pred. Max 2.30 -2.25 -4.04 2.36 -2.29 4.49 66.30 -2.25 -4.68 66.37 -2.29
Pred. Min -0.75 -3.22 -4.33 -0.67 -3.19 4.21 63.26 -3.22 -4.74 63.33 -3.18

Av Of 1/3 H-Mean 1.02 0.23 0.07 0.92 0.18 0.07 1.02 0.23 0.02 0.94 0.19
Av Of 1/3 L-Mean -0.98 -0.24 -0.07 -1.01 -0.24 -0.07 -0.98 -0.24 -0.02 -1.01 -0.24
Av Of 1/100 H-Mean 1.24 0.35 0.12 1.24 0.32 0.12 1.24 0.35 0.02 1.24 0.31
Av Of 1/100 L-Mean -1.20 -0.42 -0.10 -1.20 -0.41 -0.10 -1.20 -0.42 -0.02 -1.20 -0.41
Av Of 1/1000 H-Mean 1.24 0.36 0.13 1.24 0.32 0.13 1.24 0.35 0.02 1.24 0.31
Av Of 1/1000 L-Mean -1.20 -0.45 -0.11 -1.20 -0.41 -0.11 -1.20 -0.45 -0.03 -1.20 -0.41
Maximum - Mean 1.24 0.36 0.13 1.24 0.32 0.13 1.24 0.35 0.02 1.24 0.31
Minimum - Mean -1.20 -0.45 -0.11 -1.20 -0.41 -0.11 -1.20 -0.45 -0.03 -1.20 -0.41
Pred. Max-Mean 1.55 0.43 0.16 1.55 0.39 0.16 1.55 0.42 0.03 1.55 0.39
Pred. Min-Mean -1.50 -0.54 -0.13 -1.49 -0.50 -0.13 -1.50 -0.54 -0.03 -1.49 -0.51

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 128.76 -2.67 -5.21 128.83 -2.67 3.32


Variance 0.00 0.33 0.02 0.00 0.33 0.02 0.00
Root Mean Square 3.83 128.77 2.67 5.21 128.83 2.68 3.32
Std. Deviation 0.01 0.58 0.15 0.04 0.58 0.15 0.04
Skewness -0.01 0.03 -0.22 -0.04 0.03 -0.22 -0.04
Kurtosis -0.07 -0.86 -0.41 -0.10 -0.86 -0.43 -0.10

Number of Peaks 313 71 252 321 77 100 321

Av Of 1/3 Highest 3.84 129.78 -2.44 -5.12 129.77 -2.48 3.41


Av Of 1/3 Lowest 3.81 127.79 -2.91 -5.30 127.82 -2.92 3.23
Av Of 1/100 Highest 3.85 130.00 -2.32 -5.08 130.07 -2.36 3.45
Av Of 1/100 Lowest 3.81 127.56 -3.09 -5.35 127.63 -3.08 3.18
Av Of 1/1000 Highest 3.85 130.00 -2.32 -5.08 130.07 -2.36 3.45
Av Of 1/1000 Lowest 3.80 127.56 -3.12 -5.35 127.63 -3.08 3.18
Maximum 3.85 130.00 -2.32 -5.08 130.07 -2.36 3.45
Minimum 3.80 127.56 -3.12 -5.35 127.63 -3.08 3.18
Pred. Max 3.86 130.31 -2.25 -5.06 130.38 -2.29 3.48
Pred. Min 3.80 127.26 -3.21 -5.38 127.34 -3.18 3.15

Av Of 1/3 H-Mean 0.02 1.02 0.23 0.09 0.94 0.19 0.09


Av Of 1/3 L-Mean -0.02 -0.98 -0.24 -0.09 -1.01 -0.24 -0.09
Av Of 1/100 H-Mean 0.02 1.24 0.35 0.13 1.24 0.31 0.13
Av Of 1/100 L-Mean -0.02 -1.20 -0.42 -0.14 -1.20 -0.41 -0.14
Av Of 1/1000 H-Mean 0.02 1.24 0.35 0.13 1.24 0.31 0.13
Av Of 1/1000 L-Mean -0.03 -1.20 -0.45 -0.14 -1.20 -0.41 -0.14
Maximum - Mean 0.02 1.24 0.35 0.13 1.24 0.31 0.13
Minimum - Mean -0.03 -1.20 -0.45 -0.14 -1.20 -0.41 -0.14
Pred. Max-Mean 0.03 1.55 0.42 0.15 1.55 0.38 0.15
Pred. Min-Mean -0.03 -1.50 -0.54 -0.17 -1.49 -0.51 -0.17
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -33 -11 -6 0 0 0 37


BM2S DB30 -54 17 -8 0 0 0 58
BM3P DB30 -9 -16 -4 0 0 0 21
BM3S DB30 -36 65 -9 0 0 0 75
BM4P DB30 7 -12 -3 0 0 0 15
BM4S DB30 30 52 -8 0 0 0 60
BM5P DB30 13 -9 -4 0 0 0 17
BM5S DB30 32 8 -5 0 0 0 33
MAINLN DB30 14 -4 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.6 -1.1 -24740.5 9 1663758 -70


Buoyancy -203.4 1.1 25873.9 -51 -1832325 78
Wind 12.7 -24.2 0.0 412 247 -1611
Drag 12.9 -36.2 3.4 150 -36 -2462
Wave 24.5 -24.8 34.0 -47 -2067 -1868
Flex. Connectors -41.3 85.1 -1170.6 -471 170389 4109
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.2 0 -35 -1827

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -477


Wind 6.5 3.3 -0.1 -7 40 473
Flex. Connectors -0.2 -0.1 1114.2 2 -166266 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.2 0 36 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.04 1001.58 498.99 36.99 0.1382 32.11 0.00


BM2S 1001.65 1001.58 368.94 58.42 0.2152 54.64 0.00
BM3P 998.27 1001.57 626.53 20.78 0.0784 14.83 0.00
BM3S 1002.71 1001.57 283.87 75.43 0.2887 72.36 0.00
BM4P 997.27 1001.50 685.74 15.11 0.0546 8.66 0.00
BM4S 1001.75 1001.50 365.02 60.26 0.2284 56.52 0.00
BM5P 997.63 1001.47 665.44 17.02 0.0648 10.74 0.00
BM5S 999.67 1001.46 529.74 33.16 0.1205 28.03 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 0.78 -2.59 -4.20 0.00 0.45 0.00


N Force -0.01 0.00 0.24 0 -35 -1827

WHPBJKT Location 94.32 135.12 21.09 0.16 -0.32 -67.64


N Force 0.01 0.00 -0.24 0 36 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 37.12 59.80 20.14 78.27 14.63 61.49 16.64 33.52


Variance 24.45 53.69 2.43 32.61 2.16 13.61 5.10 23.48
Root Mean Square 37.45 60.25 20.20 78.48 14.70 61.60 16.79 33.87
Std. Deviation 4.95 7.33 1.56 5.71 1.47 3.69 2.26 4.85
Skewness 0.10 0.19 0.04 0.47 -0.12 0.16 0.20 0.36
Kurtosis -0.53 -0.44 -0.21 -0.11 -0.44 -0.32 -0.42 -0.41

Number of Peaks 194 159 220 157 159 202 152 199

Av Of 1/3 Highest 45.02 72.00 22.70 87.84 16.91 67.86 20.82 42.32
Av Of 1/3 Lowest 29.05 47.52 17.59 69.50 12.47 55.58 13.40 26.74
Av Of 1/100 Highest 49.08 77.76 24.31 94.01 18.34 71.28 22.96 46.54
Av Of 1/100 Lowest 26.21 43.33 16.34 65.61 11.22 52.94 11.74 23.84
Av Of 1/1000 Highest 49.08 77.76 24.50 94.01 18.34 71.67 22.96 46.54
Av Of 1/1000 Lowest 26.21 43.33 16.13 65.61 11.22 52.70 11.74 23.84
Maximum 49.08 77.76 24.50 94.01 18.34 71.67 22.96 46.54
Minimum 26.21 43.33 16.13 65.61 11.22 52.70 11.74 23.84
Pred. Max 51.53 81.57 25.38 97.35 19.13 73.74 24.31 49.19
Pred. Min 23.97 39.84 15.33 62.92 10.50 50.91 10.69 21.87

Av Of 1/3 H-Mean 7.90 12.20 2.56 9.57 2.29 6.37 4.18 8.80
Av Of 1/3 L-Mean -8.07 -12.28 -2.55 -8.77 -2.16 -5.91 -3.24 -6.78
Av Of 1/100 H-Mean 11.96 17.96 4.18 15.73 3.72 9.79 6.32 13.02
Av Of 1/100 L-Mean -10.92 -16.46 -3.80 -12.66 -3.41 -8.55 -4.90 -9.68
Av Of 1/1000 H-Mean 11.96 17.96 4.37 15.73 3.72 10.18 6.32 13.02
Av Of 1/1000 L-Mean -10.92 -16.46 -4.01 -12.66 -3.41 -8.79 -4.90 -9.68
Maximum - Mean 11.96 17.96 4.37 15.73 3.72 10.18 6.32 13.02
Minimum - Mean -10.92 -16.46 -4.01 -12.66 -3.41 -8.79 -4.90 -9.68
Pred. Max-Mean 14.41 21.77 5.24 19.08 4.51 12.25 7.67 15.67
Pred. Min-Mean -13.15 -19.96 -4.81 -15.35 -4.13 -10.58 -5.95 -11.65

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 0.82 -2.76 -4.20


Variance 0.23 0.04 0.00
Root Mean Square 0.95 2.77 4.20
Std. Deviation 0.48 0.19 0.06
Skewness -0.03 -0.37 0.02
Kurtosis -0.51 -0.50 -0.23

Number of Peaks 177 263 284

Av Of 1/3 Highest 1.57 -2.48 -4.07


Av Of 1/3 Lowest -0.02 -3.09 -4.33
Av Of 1/100 Highest 1.92 -2.33 -4.01
Av Of 1/100 Lowest -0.35 -3.27 -4.39
Av Of 1/1000 Highest 1.92 -2.33 -3.99
Av Of 1/1000 Lowest -0.35 -3.28 -4.39
Maximum 1.92 -2.33 -3.99
Minimum -0.35 -3.28 -4.39
Pred. Max 2.15 -2.24 -3.95
Pred. Min -0.59 -3.38 -4.43

Av Of 1/3 H-Mean 0.76 0.28 0.13


Av Of 1/3 L-Mean -0.83 -0.32 -0.13
Av Of 1/100 H-Mean 1.10 0.43 0.20
Av Of 1/100 L-Mean -1.17 -0.51 -0.19
Av Of 1/1000 H-Mean 1.10 0.44 0.21
Av Of 1/1000 L-Mean -1.17 -0.52 -0.19
Maximum - Mean 1.10 0.44 0.21
Minimum - Mean -1.17 -0.52 -0.19
Pred. Max-Mean 1.33 0.52 0.25
Pred. Min-Mean -1.41 -0.62 -0.23
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 0.82 -2.76 -4.20 0.88 -2.77 4.33 64.82 -2.72 -4.70 64.89 -2.72
Variance 0.23 0.04 0.00 0.23 0.04 0.00 0.23 0.04 0.00 0.23 0.03
Root Mean Square 0.95 2.77 4.20 1.01 2.77 4.33 64.82 2.73 4.70 64.89 2.73
Std. Deviation 0.48 0.19 0.06 0.48 0.19 0.06 0.48 0.19 0.03 0.48 0.18
Skewness -0.03 -0.37 0.02 -0.03 -0.41 0.02 -0.03 -0.33 0.01 -0.03 -0.36
Kurtosis -0.51 -0.50 -0.23 -0.51 -0.59 -0.23 -0.51 -0.49 -0.24 -0.51 -0.59

Number of Peaks 177 263 284 179 200 285 179 263 287 179 200

Av Of 1/3 Highest 1.57 -2.48 -4.07 1.62 -2.49 4.46 65.58 -2.44 -4.63 65.62 -2.45
Av Of 1/3 Lowest -0.02 -3.09 -4.33 0.05 -3.07 4.21 63.99 -3.04 -4.77 64.06 -3.02
Av Of 1/100 Highest 1.92 -2.33 -4.01 1.98 -2.43 4.53 65.93 -2.33 -4.60 65.99 -2.39
Av Of 1/100 Lowest -0.35 -3.27 -4.39 -0.28 -3.22 4.15 63.66 -3.21 -4.81 63.72 -3.19
Av Of 1/1000 Highest 1.92 -2.33 -3.99 1.98 -2.43 4.55 65.93 -2.32 -4.59 65.99 -2.39
Av Of 1/1000 Lowest -0.35 -3.28 -4.39 -0.28 -3.22 4.14 63.66 -3.22 -4.81 63.72 -3.19
Maximum 1.92 -2.33 -3.99 1.98 -2.43 4.55 65.93 -2.32 -4.59 65.99 -2.39
Minimum -0.35 -3.28 -4.39 -0.28 -3.22 4.14 63.66 -3.22 -4.81 63.72 -3.19
Pred. Max 2.15 -2.24 -3.95 2.21 -2.36 4.59 66.16 -2.24 -4.57 66.21 -2.33
Pred. Min -0.59 -3.38 -4.43 -0.52 -3.31 4.11 63.42 -3.31 -4.83 63.48 -3.28

Av Of 1/3 H-Mean 0.76 0.28 0.13 0.73 0.27 0.13 0.76 0.28 0.07 0.73 0.27
Av Of 1/3 L-Mean -0.83 -0.32 -0.13 -0.83 -0.31 -0.13 -0.83 -0.31 -0.07 -0.83 -0.30
Av Of 1/100 H-Mean 1.10 0.43 0.20 1.10 0.34 0.20 1.10 0.40 0.11 1.10 0.33
Av Of 1/100 L-Mean -1.17 -0.51 -0.19 -1.17 -0.45 -0.19 -1.17 -0.48 -0.10 -1.17 -0.46
Av Of 1/1000 H-Mean 1.10 0.44 0.21 1.10 0.34 0.21 1.10 0.40 0.11 1.10 0.33
Av Of 1/1000 L-Mean -1.17 -0.52 -0.19 -1.17 -0.45 -0.19 -1.17 -0.49 -0.11 -1.17 -0.46
Maximum - Mean 1.10 0.44 0.21 1.10 0.34 0.21 1.10 0.40 0.11 1.10 0.33
Minimum - Mean -1.17 -0.52 -0.19 -1.17 -0.45 -0.19 -1.17 -0.49 -0.11 -1.17 -0.46
Pred. Max-Mean 1.33 0.52 0.25 1.32 0.40 0.25 1.33 0.48 0.13 1.32 0.40
Pred. Min-Mean -1.41 -0.62 -0.23 -1.41 -0.55 -0.23 -1.41 -0.59 -0.13 -1.41 -0.56

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 128.83 -2.68 -5.21 128.90 -2.68 3.33


Variance 0.00 0.23 0.04 0.00 0.23 0.03 0.00
Root Mean Square 3.83 128.83 2.69 5.21 128.90 2.69 3.33
Std. Deviation 0.03 0.48 0.19 0.01 0.48 0.18 0.01
Skewness 0.01 -0.03 -0.26 0.05 -0.03 -0.29 0.04
Kurtosis -0.24 -0.51 -0.47 0.22 -0.51 -0.56 0.22

Number of Peaks 287 179 263 288 179 199 288

Av Of 1/3 Highest 3.90 129.58 -2.39 -5.19 129.63 -2.41 3.34


Av Of 1/3 Lowest 3.76 127.99 -2.99 -5.22 128.06 -2.98 3.31
Av Of 1/100 Highest 3.94 129.93 -2.31 -5.18 129.99 -2.32 3.35
Av Of 1/100 Lowest 3.73 127.66 -3.17 -5.23 127.73 -3.16 3.30
Av Of 1/1000 Highest 3.94 129.93 -2.31 -5.18 129.99 -2.32 3.35
Av Of 1/1000 Lowest 3.72 127.66 -3.17 -5.23 127.73 -3.16 3.30
Maximum 3.94 129.93 -2.31 -5.18 129.99 -2.32 3.35
Minimum 3.72 127.66 -3.17 -5.23 127.73 -3.16 3.30
Pred. Max 3.96 130.16 -2.24 -5.18 130.22 -2.25 3.36
Pred. Min 3.70 127.42 -3.27 -5.24 127.49 -3.25 3.29

Av Of 1/3 H-Mean 0.07 0.76 0.29 0.02 0.73 0.28 0.02


Av Of 1/3 L-Mean -0.07 -0.83 -0.31 -0.02 -0.83 -0.30 -0.02
Av Of 1/100 H-Mean 0.11 1.10 0.37 0.03 1.10 0.36 0.03
Av Of 1/100 L-Mean -0.10 -1.17 -0.49 -0.03 -1.17 -0.47 -0.03
Av Of 1/1000 H-Mean 0.11 1.10 0.37 0.03 1.10 0.36 0.03
Av Of 1/1000 L-Mean -0.11 -1.17 -0.49 -0.03 -1.17 -0.47 -0.03
Maximum - Mean 0.11 1.10 0.37 0.03 1.10 0.36 0.03
Minimum - Mean -0.11 -1.17 -0.49 -0.03 -1.17 -0.47 -0.03
Pred. Max-Mean 0.13 1.33 0.45 0.03 1.32 0.44 0.03
Pred. Min-Mean -0.13 -1.41 -0.58 -0.03 -1.41 -0.57 -0.03
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -34 -11 -6 0 0 0 38


BM2S DB30 -56 18 -9 0 0 0 61
BM3P DB30 -9 -16 -4 0 0 0 20
BM3S DB30 -38 67 -10 0 0 0 79
BM4P DB30 7 -11 -3 0 0 0 14
BM4S DB30 30 53 -8 0 0 0 61
BM5P DB30 12 -8 -3 0 0 0 16
BM5S DB30 31 8 -5 0 0 0 32
MAINLN DB30 14 -4 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.1 3.3 -24740.5 -29 1663754 224


Buoyancy -202.9 -3.5 25875.4 164 -1832267 -244
Wind 12.7 -24.2 0.0 412 247 -1611
Drag 12.9 -36.2 3.4 150 -34 -2462
Wave 30.1 -30.4 32.7 -150 -2047 -2227
Flex. Connectors -47.0 90.9 -1170.7 -544 170313 4463
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.3 0 -37 -1861

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -474


Wind 6.5 3.2 -0.1 -7 40 470
Flex. Connectors -0.2 -0.1 1114.1 2 -166264 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.3 0 38 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.10 1001.58 494.34 37.66 0.1407 32.82 0.00


BM2S 1001.80 1001.58 356.47 60.73 0.2237 57.06 0.00
BM3P 998.20 1001.57 630.38 20.39 0.0769 14.40 0.00
BM3S 1002.90 1001.57 269.03 78.53 0.3006 75.59 0.00
BM4P 997.09 1001.50 694.85 14.27 0.0516 7.75 0.00
BM4S 1001.83 1001.50 359.20 61.33 0.2324 57.65 0.00
BM5P 997.45 1001.47 675.76 15.96 0.0607 9.60 0.00
BM5S 999.59 1001.46 535.22 32.43 0.1178 27.26 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 0.89 -2.73 -4.20 -0.01 0.45 0.00


N Force -0.01 0.01 0.25 0 -37 -1861

WHPBJKT Location 94.00 134.81 21.09 0.16 -0.32 -67.46


N Force 0.01 0.00 -0.25 0 38 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 37.71 62.05 19.41 82.23 14.05 62.00 15.88 32.87


Variance 22.31 57.78 2.35 48.40 2.93 14.90 5.44 20.60
Root Mean Square 38.00 62.51 19.47 82.52 14.16 62.12 16.05 33.18
Std. Deviation 4.72 7.60 1.53 6.96 1.71 3.86 2.33 4.54
Skewness 0.07 0.20 -0.13 0.31 0.19 0.14 0.30 0.34
Kurtosis -0.63 -0.46 -0.41 -0.49 -0.25 -0.39 -0.14 -0.52

Number of Peaks 99 115 153 119 137 99 123 111

Av Of 1/3 Highest 46.20 74.66 21.79 93.68 16.51 68.91 19.55 41.53
Av Of 1/3 Lowest 29.96 50.27 16.98 71.41 11.43 56.19 12.31 26.04
Av Of 1/100 Highest 49.73 82.07 23.01 101.79 19.40 72.20 23.26 44.54
Av Of 1/100 Lowest 27.77 44.49 15.24 66.73 10.37 52.28 10.91 23.66
Av Of 1/1000 Highest 49.73 82.07 23.01 101.79 19.40 72.20 23.26 44.54
Av Of 1/1000 Lowest 27.77 44.49 15.24 66.73 10.37 52.28 10.91 23.66
Maximum 49.73 82.07 23.01 101.79 19.40 72.20 23.26 44.54
Minimum 27.77 44.49 15.24 66.73 10.37 52.28 10.91 23.66
Pred. Max 52.52 86.59 23.77 106.17 20.56 74.56 24.90 47.18
Pred. Min 25.47 40.53 14.35 63.26 9.57 50.02 9.81 21.57

Av Of 1/3 H-Mean 8.49 12.61 2.37 11.45 2.45 6.90 3.67 8.66
Av Of 1/3 L-Mean -7.75 -11.77 -2.43 -10.82 -2.63 -5.82 -3.57 -6.83
Av Of 1/100 H-Mean 12.02 20.03 3.59 19.56 5.34 10.19 7.38 11.66
Av Of 1/100 L-Mean -9.93 -17.56 -4.17 -15.50 -3.68 -9.73 -4.97 -9.21
Av Of 1/1000 H-Mean 12.02 20.03 3.59 19.56 5.34 10.19 7.38 11.66
Av Of 1/1000 L-Mean -9.93 -17.56 -4.17 -15.50 -3.68 -9.73 -4.97 -9.21
Maximum - Mean 12.02 20.03 3.59 19.56 5.34 10.19 7.38 11.66
Minimum - Mean -9.93 -17.56 -4.17 -15.50 -3.68 -9.73 -4.97 -9.21
Pred. Max-Mean 14.81 24.54 4.36 23.94 6.51 12.56 9.02 14.31
Pred. Min-Mean -12.24 -21.52 -5.06 -18.97 -4.48 -11.98 -6.07 -11.30

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 0.93 -2.99 -4.20


Variance 0.22 0.08 0.04
Root Mean Square 1.04 3.00 4.21
Std. Deviation 0.47 0.28 0.19
Skewness -0.02 -0.19 0.02
Kurtosis -0.52 -0.89 -0.17

Number of Peaks 186 257 272

Av Of 1/3 Highest 1.70 -2.59 -3.81


Av Of 1/3 Lowest 0.16 -3.42 -4.58
Av Of 1/100 Highest 2.05 -2.49 -3.61
Av Of 1/100 Lowest -0.23 -3.66 -4.77
Av Of 1/1000 Highest 2.05 -2.49 -3.60
Av Of 1/1000 Lowest -0.23 -3.67 -4.79
Maximum 2.05 -2.49 -3.60
Minimum -0.23 -3.67 -4.79
Pred. Max 2.29 -2.39 -3.48
Pred. Min -0.47 -3.81 -4.90

Av Of 1/3 H-Mean 0.77 0.40 0.39


Av Of 1/3 L-Mean -0.76 -0.43 -0.38
Av Of 1/100 H-Mean 1.13 0.50 0.59
Av Of 1/100 L-Mean -1.15 -0.67 -0.57
Av Of 1/1000 H-Mean 1.13 0.50 0.60
Av Of 1/1000 L-Mean -1.15 -0.69 -0.59
Maximum - Mean 1.13 0.50 0.60
Minimum - Mean -1.15 -0.69 -0.59
Pred. Max-Mean 1.36 0.60 0.72
Pred. Min-Mean -1.39 -0.82 -0.70
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 0.93 -2.99 -4.20 0.99 -2.99 4.33 64.93 -2.88 -4.70 65.00 -2.87
Variance 0.22 0.08 0.04 0.22 0.08 0.04 0.22 0.07 0.00 0.22 0.07
Root Mean Square 1.04 3.00 4.21 1.10 3.00 4.34 64.93 2.89 4.70 65.00 2.89
Std. Deviation 0.47 0.28 0.19 0.47 0.27 0.19 0.47 0.27 0.03 0.47 0.27
Skewness -0.02 -0.19 0.02 -0.01 -0.19 0.02 -0.02 -0.13 -0.01 -0.02 -0.13
Kurtosis -0.52 -0.89 -0.17 -0.53 -0.92 -0.17 -0.52 -0.75 -0.07 -0.53 -0.78

Number of Peaks 186 257 272 129 178 270 189 258 277 129 172

Av Of 1/3 Highest 1.70 -2.59 -3.81 1.80 -2.58 4.72 65.70 -2.48 -4.64 65.81 -2.47
Av Of 1/3 Lowest 0.16 -3.42 -4.58 0.18 -3.42 3.95 64.17 -3.30 -4.77 64.18 -3.31
Av Of 1/100 Highest 2.05 -2.49 -3.61 2.10 -2.52 4.92 66.06 -2.30 -4.61 66.11 -2.32
Av Of 1/100 Lowest -0.23 -3.66 -4.77 -0.14 -3.64 3.76 63.78 -3.50 -4.80 63.86 -3.46
Av Of 1/1000 Highest 2.05 -2.49 -3.60 2.10 -2.52 4.93 66.06 -2.30 -4.61 66.11 -2.32
Av Of 1/1000 Lowest -0.23 -3.67 -4.79 -0.14 -3.64 3.75 63.78 -3.50 -4.81 63.86 -3.46
Maximum 2.05 -2.49 -3.60 2.10 -2.52 4.93 66.06 -2.30 -4.61 66.11 -2.32
Minimum -0.23 -3.67 -4.79 -0.14 -3.64 3.75 63.78 -3.50 -4.81 63.86 -3.46
Pred. Max 2.29 -2.39 -3.48 2.34 -2.43 5.05 66.29 -2.18 -4.59 66.35 -2.20
Pred. Min -0.47 -3.81 -4.90 -0.40 -3.77 3.63 63.54 -3.62 -4.82 63.61 -3.59

Av Of 1/3 H-Mean 0.77 0.40 0.39 0.81 0.41 0.39 0.76 0.39 0.06 0.81 0.40
Av Of 1/3 L-Mean -0.76 -0.43 -0.38 -0.81 -0.43 -0.38 -0.76 -0.42 -0.06 -0.82 -0.44
Av Of 1/100 H-Mean 1.13 0.50 0.59 1.11 0.46 0.59 1.13 0.58 0.09 1.11 0.56
Av Of 1/100 L-Mean -1.15 -0.67 -0.57 -1.14 -0.65 -0.57 -1.15 -0.62 -0.10 -1.14 -0.59
Av Of 1/1000 H-Mean 1.13 0.50 0.60 1.11 0.46 0.60 1.13 0.58 0.10 1.11 0.56
Av Of 1/1000 L-Mean -1.15 -0.69 -0.59 -1.14 -0.65 -0.59 -1.15 -0.63 -0.10 -1.14 -0.59
Maximum - Mean 1.13 0.50 0.60 1.11 0.46 0.60 1.13 0.58 0.10 1.11 0.56
Minimum - Mean -1.15 -0.69 -0.59 -1.14 -0.65 -0.59 -1.15 -0.63 -0.10 -1.14 -0.59
Pred. Max-Mean 1.36 0.60 0.72 1.35 0.56 0.72 1.36 0.69 0.12 1.35 0.68
Pred. Min-Mean -1.39 -0.82 -0.70 -1.39 -0.79 -0.70 -1.39 -0.75 -0.12 -1.39 -0.71

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 128.94 -2.76 -5.21 129.00 -2.76 3.33


Variance 0.00 0.22 0.08 0.02 0.22 0.08 0.02
Root Mean Square 3.83 128.94 2.78 5.21 129.00 2.78 3.33
Std. Deviation 0.03 0.47 0.28 0.14 0.47 0.28 0.14
Skewness -0.01 -0.02 -0.01 -0.02 -0.02 -0.01 -0.02
Kurtosis -0.07 -0.51 -0.38 -0.09 -0.53 -0.39 -0.09

Number of Peaks 276 194 258 267 137 174 267

Av Of 1/3 Highest 3.89 129.69 -2.34 -4.92 129.83 -2.34 3.62


Av Of 1/3 Lowest 3.77 128.18 -3.20 -5.50 128.20 -3.23 3.04
Av Of 1/100 Highest 3.92 130.07 -2.09 -4.78 130.11 -2.11 3.76
Av Of 1/100 Lowest 3.73 127.78 -3.43 -5.66 127.86 -3.39 2.88
Av Of 1/1000 Highest 3.93 130.07 -2.09 -4.76 130.11 -2.11 3.77
Av Of 1/1000 Lowest 3.73 127.78 -3.44 -5.68 127.86 -3.39 2.86
Maximum 3.93 130.07 -2.09 -4.76 130.11 -2.11 3.77
Minimum 3.73 127.78 -3.44 -5.68 127.86 -3.39 2.86
Pred. Max 3.94 130.30 -1.96 -4.68 130.35 -1.97 3.86
Pred. Min 3.71 127.54 -3.57 -5.77 127.62 -3.52 2.76

Av Of 1/3 H-Mean 0.06 0.76 0.42 0.29 0.82 0.43 0.29


Av Of 1/3 L-Mean -0.06 -0.75 -0.44 -0.29 -0.81 -0.46 -0.29
Av Of 1/100 H-Mean 0.09 1.13 0.68 0.43 1.11 0.65 0.43
Av Of 1/100 L-Mean -0.10 -1.16 -0.66 -0.45 -1.14 -0.63 -0.45
Av Of 1/1000 H-Mean 0.10 1.13 0.68 0.44 1.11 0.65 0.44
Av Of 1/1000 L-Mean -0.10 -1.16 -0.67 -0.47 -1.14 -0.63 -0.47
Maximum - Mean 0.10 1.13 0.68 0.44 1.11 0.65 0.44
Minimum - Mean -0.10 -1.16 -0.67 -0.47 -1.14 -0.63 -0.47
Pred. Max-Mean 0.11 1.36 0.81 0.53 1.35 0.79 0.53
Pred. Min-Mean -0.12 -1.39 -0.81 -0.56 -1.39 -0.76 -0.56
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -35 -11 -7 0 0 0 39


BM2S DB30 -59 19 -9 0 0 0 64
BM3P DB30 -9 -15 -4 0 0 0 20
BM3S DB30 -40 71 -10 0 0 0 83
BM4P DB30 6 -10 -3 0 0 0 13
BM4S DB30 31 54 -8 0 0 0 63
BM5P DB30 11 -8 -3 0 0 0 15
BM5S DB30 30 8 -5 0 0 0 31
MAINLN DB30 14 -3 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.4 6.3 -24740.5 -55 1663748 420


Buoyancy -202.3 -6.5 25894.1 307 -1833286 -460
Wind 12.7 -24.2 0.0 412 247 -1610
Drag 12.9 -36.3 3.4 150 -34 -2463
Wave 37.7 -37.8 14.2 -184 -928 -2611
Flex. Connectors -54.4 98.5 -1171.2 -628 170260 4898
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 5 -1830

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -477


Wind 6.5 3.3 -0.1 -7 40 473
Flex. Connectors -0.2 -0.1 1114.4 2 -166307 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -3 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.19 1001.58 487.85 38.59 0.1442 33.80 0.00


BM2S 1002.01 1001.58 339.50 63.87 0.2353 60.35 0.00
BM3P 998.12 1001.57 635.42 19.87 0.0750 13.84 0.00
BM3S 1003.14 1001.57 249.28 82.81 0.3170 80.05 0.00
BM4P 996.84 1001.50 707.12 13.15 0.0475 6.52 0.00
BM4S 1001.92 1001.50 351.59 62.77 0.2379 59.16 0.00
BM5P 997.21 1001.47 687.38 14.92 0.0568 8.46 0.00
BM5S 999.49 1001.46 542.81 31.41 0.1142 26.18 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.05 -2.93 -4.21 -0.01 0.45 0.00


N Force 0.00 0.00 -0.04 0 5 -1830

WHPBJKT Location 94.54 134.78 21.09 0.16 -0.32 -67.62


N Force 0.01 0.00 0.03 0 -3 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 38.91 64.93 19.12 85.92 13.41 61.99 14.98 31.55


Variance 14.43 49.19 1.78 58.09 3.26 11.82 4.83 12.60
Root Mean Square 39.10 65.30 19.17 86.26 13.53 62.08 15.14 31.75
Std. Deviation 3.80 7.01 1.34 7.62 1.80 3.44 2.20 3.55
Skewness 0.01 0.04 -0.03 0.09 0.77 -0.15 0.70 0.44
Kurtosis -0.20 -0.11 0.05 -0.07 0.87 -0.02 1.03 0.16

Number of Peaks 231 223 234 229 216 194 213 229

Av Of 1/3 Highest 45.00 76.16 21.06 97.78 16.13 67.26 18.39 37.78
Av Of 1/3 Lowest 32.78 54.30 17.01 74.47 11.04 57.35 11.89 26.34
Av Of 1/100 Highest 48.79 82.10 22.48 106.55 19.92 70.71 23.05 42.59
Av Of 1/100 Lowest 29.06 45.95 15.55 66.84 9.89 51.30 10.73 23.65
Av Of 1/1000 Highest 49.13 82.44 22.50 106.69 20.07 70.71 23.49 42.94
Av Of 1/1000 Lowest 28.91 44.91 15.51 66.53 9.85 51.30 10.70 23.22
Maximum 49.13 82.44 22.50 106.69 20.07 70.71 23.49 42.94
Minimum 28.91 44.91 15.51 66.53 9.85 51.30 10.70 23.22
Pred. Max 51.16 85.94 23.17 110.82 21.41 72.50 25.21 45.21
Pred. Min 26.93 40.91 14.79 62.67 9.14 49.11 9.84 21.56

Av Of 1/3 H-Mean 6.09 11.24 1.94 11.86 2.73 5.28 3.41 6.22
Av Of 1/3 L-Mean -6.13 -10.63 -2.11 -11.45 -2.37 -4.64 -3.08 -5.21
Av Of 1/100 H-Mean 9.88 17.17 3.36 20.62 6.51 8.72 8.08 11.04
Av Of 1/100 L-Mean -9.85 -18.98 -3.57 -19.08 -3.52 -10.69 -4.25 -7.91
Av Of 1/1000 H-Mean 10.22 17.52 3.38 20.77 6.66 8.72 8.51 11.39
Av Of 1/1000 L-Mean -10.00 -20.02 -3.61 -19.39 -3.56 -10.69 -4.28 -8.34
Maximum - Mean 10.22 17.52 3.38 20.77 6.66 8.72 8.51 11.39
Minimum - Mean -10.00 -20.02 -3.61 -19.39 -3.56 -10.69 -4.28 -8.34
Pred. Max-Mean 12.25 21.02 4.05 24.90 8.00 10.51 10.23 13.66
Pred. Min-Mean -11.98 -24.02 -4.33 -23.25 -4.27 -12.88 -5.14 -10.00

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.08 -3.15 -4.21


Variance 0.16 0.11 0.04
Root Mean Square 1.16 3.17 4.21
Std. Deviation 0.40 0.34 0.19
Skewness -0.13 -0.08 0.03
Kurtosis -0.05 -0.05 -0.10

Number of Peaks 213 240 240

Av Of 1/3 Highest 1.71 -2.61 -3.82


Av Of 1/3 Lowest 0.45 -3.70 -4.59
Av Of 1/100 Highest 2.01 -2.39 -3.61
Av Of 1/100 Lowest -0.04 -4.06 -4.79
Av Of 1/1000 Highest 2.05 -2.38 -3.60
Av Of 1/1000 Lowest -0.12 -4.08 -4.82
Maximum 2.05 -2.38 -3.60
Minimum -0.12 -4.08 -4.82
Pred. Max 2.25 -2.23 -3.48
Pred. Min -0.36 -4.27 -4.94

Av Of 1/3 H-Mean 0.62 0.55 0.39


Av Of 1/3 L-Mean -0.64 -0.55 -0.39
Av Of 1/100 H-Mean 0.92 0.76 0.60
Av Of 1/100 L-Mean -1.12 -0.91 -0.59
Av Of 1/1000 H-Mean 0.97 0.77 0.60
Av Of 1/1000 L-Mean -1.20 -0.93 -0.61
Maximum - Mean 0.97 0.77 0.60
Minimum - Mean -1.20 -0.93 -0.61
Pred. Max-Mean 1.16 0.92 0.72
Pred. Min-Mean -1.44 -1.12 -0.74
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.08 -3.15 -4.21 1.15 -3.15 4.33 65.09 -3.00 -4.71 65.16 -3.00
Variance 0.16 0.11 0.04 0.16 0.11 0.04 0.16 0.11 0.01 0.16 0.10
Root Mean Square 1.16 3.17 4.21 1.22 3.17 4.33 65.09 3.01 4.71 65.16 3.01
Std. Deviation 0.40 0.34 0.19 0.40 0.33 0.19 0.40 0.33 0.11 0.40 0.32
Skewness -0.13 -0.08 0.03 -0.13 -0.09 0.03 -0.13 0.15 0.00 -0.13 0.16
Kurtosis -0.05 -0.05 -0.10 -0.05 0.01 -0.10 -0.05 -0.25 -0.11 -0.05 -0.20

Number of Peaks 213 240 240 223 219 240 210 240 238 223 217

Av Of 1/3 Highest 1.71 -2.61 -3.82 1.77 -2.62 4.72 65.72 -2.46 -4.49 65.77 -2.49
Av Of 1/3 Lowest 0.45 -3.70 -4.59 0.50 -3.64 3.94 64.45 -3.49 -4.93 64.51 -3.43
Av Of 1/100 Highest 2.01 -2.39 -3.61 2.09 -2.43 4.93 66.01 -2.18 -4.38 66.09 -2.21
Av Of 1/100 Lowest -0.04 -4.06 -4.79 0.03 -4.03 3.74 63.97 -3.82 -5.04 64.03 -3.79
Av Of 1/1000 Highest 2.05 -2.38 -3.60 2.14 -2.43 4.93 66.06 -2.16 -4.37 66.14 -2.20
Av Of 1/1000 Lowest -0.12 -4.08 -4.82 -0.05 -4.03 3.71 63.89 -3.84 -5.06 63.95 -3.79
Maximum 2.05 -2.38 -3.60 2.14 -2.43 4.93 66.06 -2.16 -4.37 66.14 -2.20
Minimum -0.12 -4.08 -4.82 -0.05 -4.03 3.71 63.89 -3.84 -5.06 63.95 -3.79
Pred. Max 2.25 -2.23 -3.48 2.34 -2.28 5.05 66.25 -1.99 -4.31 66.34 -2.05
Pred. Min -0.36 -4.27 -4.94 -0.29 -4.21 3.59 63.65 -4.01 -5.13 63.71 -3.95

Av Of 1/3 H-Mean 0.62 0.55 0.39 0.61 0.53 0.39 0.63 0.54 0.22 0.61 0.51
Av Of 1/3 L-Mean -0.64 -0.55 -0.39 -0.65 -0.49 -0.39 -0.64 -0.50 -0.22 -0.65 -0.43
Av Of 1/100 H-Mean 0.92 0.76 0.60 0.94 0.72 0.60 0.92 0.82 0.33 0.93 0.78
Av Of 1/100 L-Mean -1.12 -0.91 -0.59 -1.13 -0.88 -0.59 -1.12 -0.82 -0.33 -1.13 -0.79
Av Of 1/1000 H-Mean 0.97 0.77 0.60 0.99 0.72 0.60 0.97 0.84 0.34 0.99 0.79
Av Of 1/1000 L-Mean -1.20 -0.93 -0.61 -1.20 -0.88 -0.61 -1.20 -0.85 -0.35 -1.20 -0.80
Maximum - Mean 0.97 0.77 0.60 0.99 0.72 0.60 0.97 0.84 0.34 0.99 0.79
Minimum - Mean -1.20 -0.93 -0.61 -1.20 -0.88 -0.61 -1.20 -0.85 -0.35 -1.20 -0.80
Pred. Max-Mean 1.16 0.92 0.72 1.19 0.87 0.72 1.16 1.01 0.40 1.18 0.95
Pred. Min-Mean -1.44 -1.12 -0.74 -1.44 -1.06 -0.74 -1.44 -1.02 -0.42 -1.44 -0.96

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 129.10 -2.84 -5.21 129.16 -2.84 3.32


Variance 0.01 0.16 0.11 0.01 0.16 0.11 0.01
Root Mean Square 3.83 129.10 2.86 5.21 129.16 2.86 3.33
Std. Deviation 0.11 0.40 0.34 0.11 0.40 0.33 0.11
Skewness 0.00 -0.13 0.41 -0.06 -0.13 0.43 -0.06
Kurtosis -0.11 -0.05 -0.13 -0.16 -0.05 -0.08 -0.16

Number of Peaks 238 211 240 231 223 217 231

Av Of 1/3 Highest 4.05 129.72 -2.29 -5.00 129.78 -2.33 3.54


Av Of 1/3 Lowest 3.60 128.46 -3.32 -5.43 128.51 -3.27 3.10
Av Of 1/100 Highest 4.15 130.02 -1.89 -4.90 130.10 -1.93 3.63
Av Of 1/100 Lowest 3.50 127.98 -3.58 -5.53 128.04 -3.55 3.00
Av Of 1/1000 Highest 4.16 130.06 -1.87 -4.90 130.15 -1.92 3.63
Av Of 1/1000 Lowest 3.48 127.90 -3.60 -5.54 127.96 -3.55 2.99
Maximum 4.16 130.06 -1.87 -4.90 130.15 -1.92 3.63
Minimum 3.48 127.90 -3.60 -5.54 127.96 -3.55 2.99
Pred. Max 4.23 130.26 -1.68 -4.84 130.35 -1.73 3.70
Pred. Min 3.41 127.65 -3.76 -5.60 127.72 -3.69 2.93

Av Of 1/3 H-Mean 0.22 0.62 0.55 0.21 0.61 0.51 0.21


Av Of 1/3 L-Mean -0.22 -0.64 -0.48 -0.22 -0.65 -0.43 -0.22
Av Of 1/100 H-Mean 0.33 0.92 0.95 0.31 0.93 0.91 0.31
Av Of 1/100 L-Mean -0.33 -1.12 -0.74 -0.32 -1.13 -0.71 -0.32
Av Of 1/1000 H-Mean 0.34 0.97 0.97 0.31 0.99 0.92 0.31
Av Of 1/1000 L-Mean -0.35 -1.20 -0.76 -0.33 -1.20 -0.71 -0.33
Maximum - Mean 0.34 0.97 0.97 0.31 0.99 0.92 0.31
Minimum - Mean -0.35 -1.20 -0.76 -0.33 -1.20 -0.71 -0.33
Pred. Max-Mean 0.40 1.16 1.16 0.37 1.18 1.11 0.37
Pred. Min-Mean -0.42 -1.44 -0.91 -0.39 -1.44 -0.85 -0.39
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -44 -15 -8 0 0 0 49


BM2S DB30 -47 15 -8 0 0 0 51
BM3P DB30 -19 -33 -7 0 0 0 40
BM3S DB30 -22 40 -7 0 0 0 46
BM4P DB30 14 -23 -5 0 0 0 28
BM4S DB30 16 28 -5 0 0 0 33
BM5P DB30 20 -14 -5 0 0 0 26
BM5S DB30 25 6 -5 0 0 0 26
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 201.0 2.0 -24740.4 -17 1663813 135


Buoyancy -208.7 -2.1 25688.4 98 -1822071 -146
Wind 18.0 0.0 0.0 0 350 34
Drag 18.1 0.0 4.8 0 -53 0
Wave 17.7 0.0 218.3 -35 -12534 -14
Flex. Connectors -46.3 0.1 -1171.1 -44 170497 -634
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -1 -628

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -29


Wind 7.0 0.2 -0.1 0 28 15
Flex. Connectors -0.2 0.0 1114.3 0 -166288 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 2 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.96 1001.58 425.76 48.50 0.1810 44.18 0.00


BM2S 1001.15 1001.58 410.17 51.16 0.1882 46.97 0.00
BM3P 1000.33 1001.57 477.95 40.34 0.1519 35.58 0.00
BM3S 1000.81 1001.57 439.28 46.44 0.1775 42.00 0.00
BM4P 999.17 1001.50 569.77 27.89 0.1007 22.40 0.00
BM4S 999.67 1001.50 532.71 32.83 0.1243 27.66 0.00
BM5P 998.90 1001.47 586.48 25.75 0.0979 20.13 0.00
BM5S 998.93 1001.46 583.23 26.18 0.0951 20.58 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 0.96 -0.29 -4.15 0.00 0.47 0.00


N Force -0.02 0.00 0.00 0 -1 -628

WHPBJKT Location 2.18 1.64 21.04 0.01 -0.35 -0.73


N Force 0.06 0.00 0.00 0 2 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 49.39 52.85 38.81 49.61 27.87 32.28 25.41 26.16


Variance 38.72 43.87 8.75 13.67 5.70 6.36 10.43 15.66
Root Mean Square 49.78 53.26 38.92 49.75 27.97 32.38 25.62 26.46
Std. Deviation 6.22 6.62 2.96 3.70 2.39 2.52 3.23 3.96
Skewness 0.22 0.23 -0.12 0.48 0.27 -0.21 0.19 0.21
Kurtosis -0.68 -0.70 -0.75 -0.50 -0.62 -0.56 -0.72 -0.73

Number of Peaks 134 128 176 144 244 177 214 142

Av Of 1/3 Highest 60.40 64.22 43.64 56.57 31.87 36.11 30.79 33.00
Av Of 1/3 Lowest 39.59 42.30 33.95 44.04 24.28 27.98 20.35 20.05
Av Of 1/100 Highest 65.43 69.65 45.50 59.29 33.96 38.27 33.53 37.54
Av Of 1/100 Lowest 35.30 38.16 30.96 42.69 22.51 25.94 18.76 18.02
Av Of 1/1000 Highest 65.43 69.65 45.50 59.29 34.31 38.27 34.36 37.54
Av Of 1/1000 Lowest 35.30 38.16 30.96 42.69 22.49 25.94 18.67 18.02
Maximum 65.43 69.65 45.50 59.29 34.31 38.27 34.36 37.54
Minimum 35.30 38.16 30.96 42.69 22.49 25.94 18.67 18.02
Pred. Max 68.94 73.36 46.90 61.38 35.58 39.52 36.16 40.01
Pred. Min 32.21 34.92 29.32 41.19 21.42 24.62 17.31 16.26

Av Of 1/3 H-Mean 11.01 11.37 4.83 6.96 3.99 3.83 5.38 6.84
Av Of 1/3 L-Mean -9.80 -10.55 -4.86 -5.57 -3.59 -4.30 -5.06 -6.11
Av Of 1/100 H-Mean 16.04 16.80 6.69 9.68 6.09 5.99 8.12 11.38
Av Of 1/100 L-Mean -14.09 -14.68 -7.85 -6.92 -5.36 -6.34 -6.65 -8.14
Av Of 1/1000 H-Mean 16.04 16.80 6.69 9.68 6.44 5.99 8.94 11.38
Av Of 1/1000 L-Mean -14.09 -14.68 -7.85 -6.92 -5.38 -6.34 -6.74 -8.14
Maximum - Mean 16.04 16.80 6.69 9.68 6.44 5.99 8.94 11.38
Minimum - Mean -14.09 -14.68 -7.85 -6.92 -5.38 -6.34 -6.74 -8.14
Pred. Max-Mean 19.55 20.51 8.08 11.77 7.71 7.24 10.75 13.85
Pred. Min-Mean -17.18 -17.93 -9.49 -8.42 -6.45 -7.66 -8.10 -9.90

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.04 -0.55 -4.15


Variance 0.23 0.02 0.01
Root Mean Square 1.15 0.57 4.15
Std. Deviation 0.48 0.14 0.07
Skewness 0.10 -0.06 0.05
Kurtosis -0.75 -0.50 0.04

Number of Peaks 76 283 337

Av Of 1/3 Highest 1.83 -0.31 -4.00


Av Of 1/3 Lowest 0.24 -0.79 -4.30
Av Of 1/100 Highest 2.19 -0.21 -3.90
Av Of 1/100 Lowest -0.08 -0.94 -4.39
Av Of 1/1000 Highest 2.19 -0.20 -3.89
Av Of 1/1000 Lowest -0.08 -0.94 -4.39
Maximum 2.19 -0.20 -3.89
Minimum -0.08 -0.97 -4.39
Pred. Max 2.47 -0.13 -3.84
Pred. Min -0.35 -1.05 -4.43

Av Of 1/3 H-Mean 0.79 0.24 0.15


Av Of 1/3 L-Mean -0.80 -0.24 -0.15
Av Of 1/100 H-Mean 1.15 0.34 0.26
Av Of 1/100 L-Mean -1.12 -0.39 -0.24
Av Of 1/1000 H-Mean 1.15 0.35 0.26
Av Of 1/1000 L-Mean -1.12 -0.39 -0.24
Maximum - Mean 1.15 0.35 0.26
Minimum - Mean -1.12 -0.42 -0.24
Pred. Max-Mean 1.43 0.41 0.31
Pred. Min-Mean -1.39 -0.50 -0.28
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.04 -0.55 -4.15 1.11 -0.55 4.38 65.05 -0.38 -4.67 65.12 -0.38
Variance 0.23 0.02 0.01 0.23 0.01 0.01 0.23 0.01 0.01 0.23 0.00
Root Mean Square 1.15 0.57 4.15 1.21 0.56 4.38 65.05 0.39 4.67 65.12 0.38
Std. Deviation 0.48 0.14 0.07 0.48 0.12 0.07 0.48 0.10 0.07 0.48 0.06
Skewness 0.10 -0.06 0.05 0.10 0.12 0.05 0.10 -0.45 0.03 0.10 -0.84
Kurtosis -0.75 -0.50 0.04 -0.75 -0.63 0.04 -0.75 0.24 -0.08 -0.75 0.92

Number of Peaks 76 283 337 114 218 335 76 284 324 112 217

Av Of 1/3 Highest 1.83 -0.31 -4.00 1.93 -0.36 4.53 65.84 -0.21 -4.52 65.94 -0.30
Av Of 1/3 Lowest 0.24 -0.79 -4.30 0.29 -0.72 4.23 64.25 -0.57 -4.82 64.30 -0.48
Av Of 1/100 Highest 2.19 -0.21 -3.90 2.26 -0.29 4.64 66.19 -0.13 -4.45 66.26 -0.26
Av Of 1/100 Lowest -0.08 -0.94 -4.39 -0.04 -0.81 4.15 63.93 -0.72 -4.90 63.97 -0.59
Av Of 1/1000 Highest 2.19 -0.20 -3.89 2.26 -0.29 4.65 66.19 -0.11 -4.44 66.26 -0.25
Av Of 1/1000 Lowest -0.08 -0.94 -4.39 -0.04 -0.83 4.15 63.93 -0.72 -4.91 63.97 -0.60
Maximum 2.19 -0.20 -3.89 2.26 -0.29 4.65 66.19 -0.11 -4.44 66.26 -0.25
Minimum -0.08 -0.97 -4.39 -0.04 -0.83 4.15 63.93 -0.72 -4.91 63.97 -0.60
Pred. Max 2.47 -0.13 -3.84 2.51 -0.23 4.70 66.47 -0.06 -4.39 66.52 -0.22
Pred. Min -0.35 -1.05 -4.43 -0.30 -0.89 4.10 63.66 -0.79 -4.95 63.71 -0.65

Av Of 1/3 H-Mean 0.79 0.24 0.15 0.82 0.19 0.15 0.79 0.17 0.15 0.82 0.08
Av Of 1/3 L-Mean -0.80 -0.24 -0.15 -0.82 -0.17 -0.15 -0.80 -0.19 -0.15 -0.82 -0.11
Av Of 1/100 H-Mean 1.15 0.34 0.26 1.15 0.26 0.25 1.15 0.25 0.23 1.15 0.12
Av Of 1/100 L-Mean -1.12 -0.39 -0.24 -1.15 -0.27 -0.23 -1.12 -0.34 -0.23 -1.15 -0.21
Av Of 1/1000 H-Mean 1.15 0.35 0.26 1.15 0.26 0.26 1.15 0.27 0.24 1.15 0.13
Av Of 1/1000 L-Mean -1.12 -0.39 -0.24 -1.15 -0.28 -0.24 -1.12 -0.34 -0.23 -1.15 -0.22
Maximum - Mean 1.15 0.35 0.26 1.15 0.26 0.26 1.15 0.27 0.24 1.15 0.13
Minimum - Mean -1.12 -0.42 -0.24 -1.15 -0.28 -0.24 -1.12 -0.34 -0.23 -1.15 -0.22
Pred. Max-Mean 1.43 0.41 0.31 1.40 0.31 0.31 1.43 0.32 0.28 1.40 0.16
Pred. Min-Mean -1.39 -0.50 -0.28 -1.41 -0.34 -0.28 -1.39 -0.41 -0.28 -1.41 -0.27

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.86 129.05 -0.21 -5.19 129.12 -0.21 3.34


Variance 0.01 0.23 0.02 0.02 0.23 0.01 0.02
Root Mean Square 3.86 129.05 0.25 5.20 129.12 0.24 3.34
Std. Deviation 0.07 0.48 0.14 0.15 0.48 0.12 0.15
Skewness 0.03 0.10 0.02 0.01 0.10 0.04 0.00
Kurtosis -0.08 -0.75 -0.34 -0.11 -0.75 -0.76 -0.11

Number of Peaks 325 76 284 312 110 216 312

Av Of 1/3 Highest 4.01 129.84 0.03 -4.88 129.94 -0.03 3.65


Av Of 1/3 Lowest 3.71 128.25 -0.45 -5.51 128.30 -0.38 3.02
Av Of 1/100 Highest 4.09 130.20 0.20 -4.73 130.27 0.04 3.80
Av Of 1/100 Lowest 3.63 127.94 -0.61 -5.67 127.97 -0.47 2.86
Av Of 1/1000 Highest 4.10 130.20 0.20 -4.72 130.27 0.05 3.81
Av Of 1/1000 Lowest 3.63 127.94 -0.61 -5.70 127.97 -0.49 2.83
Maximum 4.10 130.20 0.20 -4.72 130.27 0.05 3.81
Minimum 3.63 127.94 -0.61 -5.70 127.97 -0.49 2.83
Pred. Max 4.14 130.48 0.28 -4.63 130.53 0.10 3.90
Pred. Min 3.58 127.66 -0.69 -5.80 127.71 -0.55 2.73

Av Of 1/3 H-Mean 0.15 0.79 0.24 0.31 0.82 0.18 0.31


Av Of 1/3 L-Mean -0.15 -0.80 -0.24 -0.32 -0.82 -0.17 -0.32
Av Of 1/100 H-Mean 0.22 1.15 0.41 0.46 1.15 0.25 0.46
Av Of 1/100 L-Mean -0.23 -1.12 -0.40 -0.48 -1.15 -0.26 -0.48
Av Of 1/1000 H-Mean 0.23 1.15 0.41 0.47 1.15 0.26 0.47
Av Of 1/1000 L-Mean -0.24 -1.12 -0.40 -0.51 -1.15 -0.28 -0.51
Maximum - Mean 0.23 1.15 0.41 0.47 1.15 0.26 0.47
Minimum - Mean -0.24 -1.12 -0.40 -0.51 -1.15 -0.28 -0.51
Pred. Max-Mean 0.28 1.43 0.49 0.56 1.41 0.31 0.56
Pred. Min-Mean -0.28 -1.39 -0.48 -0.61 -1.41 -0.34 -0.61
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -48 -16 -8 0 0 0 52


BM2S DB30 -51 16 -8 0 0 0 55
BM3P DB30 -20 -35 -7 0 0 0 42
BM3S DB30 -23 41 -7 0 0 0 48
BM4P DB30 13 -22 -5 0 0 0 27
BM4S DB30 15 27 -5 0 0 0 31
BM5P DB30 18 -13 -5 0 0 0 24
BM5S DB30 23 6 -4 0 0 0 24
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.2 1.6 -24740.5 -14 1663755 109


Buoyancy -201.9 -1.7 25737.0 79 -1823109 -118
Wind 18.0 0.0 0.0 0 350 34
Drag 18.2 0.0 4.8 0 -51 0
Wave 32.5 0.0 170.0 -23 -11226 4
Flex. Connectors -60.9 0.1 -1171.3 -40 170288 -589
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 3 -561

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -29


Wind 7.0 0.2 -0.1 0 28 16
Flex. Connectors -0.2 0.0 1114.4 0 -166294 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 -3 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.24 1001.58 402.90 52.37 0.1955 48.27 0.00


BM2S 1001.42 1001.58 387.51 55.03 0.2026 51.06 0.00
BM3P 1000.49 1001.57 465.19 42.30 0.1595 37.68 0.00
BM3S 1000.95 1001.57 427.97 48.32 0.1848 44.01 0.00
BM4P 999.03 1001.50 579.46 26.68 0.0963 21.11 0.00
BM4S 999.52 1001.50 544.25 31.26 0.1184 25.98 0.00
BM5P 998.68 1001.47 601.32 24.03 0.0913 18.27 0.00
BM5S 998.65 1001.46 602.55 23.89 0.0867 18.12 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.25 -0.28 -4.18 0.00 0.45 0.00


N Force -0.02 0.00 -0.04 0 3 -561

WHPBJKT Location 2.45 1.71 21.05 0.01 -0.35 -0.76


N Force 0.05 0.00 0.04 0 -3 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 53.36 56.10 42.69 48.77 26.60 31.14 23.94 23.86


Variance 61.01 65.36 14.36 15.42 6.17 8.39 12.51 18.97
Root Mean Square 53.93 56.68 42.86 48.93 26.72 31.28 24.20 24.25
Std. Deviation 7.81 8.08 3.79 3.93 2.48 2.90 3.54 4.36
Skewness 0.22 0.20 0.20 0.11 0.22 0.12 0.33 0.38
Kurtosis -0.39 -0.40 -0.38 -0.42 -0.36 -0.42 -0.37 -0.33

Number of Peaks 162 162 176 178 174 174 168 162

Av Of 1/3 Highest 66.39 69.57 48.62 54.92 31.03 36.21 30.43 31.92
Av Of 1/3 Lowest 40.69 42.92 36.56 42.28 22.75 26.42 18.43 17.25
Av Of 1/100 Highest 73.32 76.60 52.29 58.49 33.03 38.44 33.54 35.97
Av Of 1/100 Lowest 36.62 38.58 34.40 39.83 21.15 24.65 16.62 15.24
Av Of 1/1000 Highest 73.32 76.60 52.29 58.49 33.03 38.44 33.54 35.97
Av Of 1/1000 Lowest 36.62 38.58 34.40 39.83 21.15 24.65 16.62 15.24
Maximum 73.32 76.60 52.29 58.49 33.03 38.44 33.54 35.97
Minimum 36.62 38.58 34.40 39.83 21.15 24.65 16.62 15.24
Pred. Max 77.54 80.94 54.29 60.51 34.37 39.97 35.56 38.53
Pred. Min 33.08 34.88 32.67 37.97 20.01 23.29 15.09 13.42

Av Of 1/3 H-Mean 13.03 13.46 5.92 6.14 4.43 5.07 6.49 8.07
Av Of 1/3 L-Mean -12.67 -13.18 -6.14 -6.50 -3.85 -4.72 -5.51 -6.60
Av Of 1/100 H-Mean 19.95 20.50 9.60 9.72 6.43 7.30 9.61 12.11
Av Of 1/100 L-Mean -16.74 -17.52 -8.30 -8.94 -5.45 -6.49 -7.31 -8.61
Av Of 1/1000 H-Mean 19.95 20.50 9.60 9.72 6.43 7.30 9.61 12.11
Av Of 1/1000 L-Mean -16.74 -17.52 -8.30 -8.94 -5.45 -6.49 -7.31 -8.61
Maximum - Mean 19.95 20.50 9.60 9.72 6.43 7.30 9.61 12.11
Minimum - Mean -16.74 -17.52 -8.30 -8.94 -5.45 -6.49 -7.31 -8.61
Pred. Max-Mean 24.17 24.84 11.60 11.74 7.77 8.83 11.63 14.67
Pred. Min-Mean -20.28 -21.22 -10.03 -10.80 -6.59 -7.85 -8.85 -10.44

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.30 -0.28 -4.18


Variance 0.33 0.00 0.01
Root Mean Square 1.42 0.28 4.18
Std. Deviation 0.57 0.01 0.11
Skewness 0.03 0.12 -0.01
Kurtosis -0.45 -0.72 -0.32

Number of Peaks 120 236 287

Av Of 1/3 Highest 2.26 -0.26 -3.94


Av Of 1/3 Lowest 0.29 -0.31 -4.41
Av Of 1/100 Highest 2.67 -0.25 -3.85
Av Of 1/100 Lowest -0.04 -0.31 -4.53
Av Of 1/1000 Highest 2.67 -0.25 -3.85
Av Of 1/1000 Lowest -0.04 -0.32 -4.56
Maximum 2.67 -0.25 -3.85
Minimum -0.04 -0.32 -4.56
Pred. Max 2.98 -0.24 -3.78
Pred. Min -0.34 -0.32 -4.63

Av Of 1/3 H-Mean 0.96 0.02 0.24


Av Of 1/3 L-Mean -1.01 -0.02 -0.24
Av Of 1/100 H-Mean 1.37 0.03 0.33
Av Of 1/100 L-Mean -1.34 -0.03 -0.36
Av Of 1/1000 H-Mean 1.37 0.03 0.33
Av Of 1/1000 L-Mean -1.34 -0.03 -0.38
Maximum - Mean 1.37 0.03 0.33
Minimum - Mean -1.34 -0.03 -0.38
Pred. Max-Mean 1.68 0.04 0.39
Pred. Min-Mean -1.64 -0.04 -0.46
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.30 -0.28 -4.18 1.37 -0.28 4.36 65.31 -0.28 -4.68 65.37 -0.28
Variance 0.33 0.00 0.01 0.33 0.00 0.01 0.33 0.00 0.00 0.33 0.00
Root Mean Square 1.42 0.28 4.18 1.48 0.28 4.36 65.31 0.28 4.68 65.38 0.28
Std. Deviation 0.57 0.01 0.11 0.58 0.01 0.11 0.57 0.01 0.06 0.58 0.02
Skewness 0.03 0.12 -0.01 0.03 0.11 -0.01 0.03 0.11 0.00 0.03 0.10
Kurtosis -0.45 -0.72 -0.32 -0.44 -0.76 -0.32 -0.45 -0.70 -0.08 -0.44 -0.73

Number of Peaks 120 236 287 160 177 287 116 234 283 156 177

Av Of 1/3 Highest 2.26 -0.26 -3.94 2.30 -0.26 4.59 66.27 -0.26 -4.57 66.33 -0.26
Av Of 1/3 Lowest 0.29 -0.31 -4.41 0.40 -0.31 4.12 64.30 -0.30 -4.80 64.40 -0.31
Av Of 1/100 Highest 2.67 -0.25 -3.85 2.74 -0.25 4.68 66.68 -0.25 -4.52 66.75 -0.25
Av Of 1/100 Lowest -0.04 -0.31 -4.53 0.02 -0.31 4.00 63.97 -0.31 -4.88 64.03 -0.31
Av Of 1/1000 Highest 2.67 -0.25 -3.85 2.74 -0.25 4.69 66.68 -0.25 -4.51 66.75 -0.25
Av Of 1/1000 Lowest -0.04 -0.32 -4.56 0.02 -0.31 3.97 63.97 -0.31 -4.89 64.03 -0.31
Maximum 2.67 -0.25 -3.85 2.74 -0.25 4.69 66.68 -0.25 -4.51 66.75 -0.25
Minimum -0.04 -0.32 -4.56 0.02 -0.31 3.97 63.97 -0.31 -4.89 64.03 -0.31
Pred. Max 2.98 -0.24 -3.78 3.04 -0.25 4.75 66.98 -0.24 -4.48 67.04 -0.24
Pred. Min -0.34 -0.32 -4.63 -0.26 -0.32 3.90 63.67 -0.32 -4.93 63.74 -0.32

Av Of 1/3 H-Mean 0.96 0.02 0.24 0.94 0.03 0.24 0.96 0.02 0.12 0.95 0.03
Av Of 1/3 L-Mean -1.01 -0.02 -0.24 -0.97 -0.02 -0.24 -1.01 -0.02 -0.12 -0.97 -0.02
Av Of 1/100 H-Mean 1.37 0.03 0.33 1.38 0.03 0.33 1.37 0.03 0.17 1.38 0.03
Av Of 1/100 L-Mean -1.34 -0.03 -0.36 -1.35 -0.03 -0.35 -1.34 -0.03 -0.20 -1.35 -0.03
Av Of 1/1000 H-Mean 1.37 0.03 0.33 1.38 0.03 0.33 1.37 0.03 0.17 1.38 0.03
Av Of 1/1000 L-Mean -1.34 -0.03 -0.38 -1.35 -0.03 -0.38 -1.34 -0.03 -0.21 -1.35 -0.03
Maximum - Mean 1.37 0.03 0.33 1.38 0.03 0.33 1.37 0.03 0.17 1.38 0.03
Minimum - Mean -1.34 -0.03 -0.38 -1.35 -0.03 -0.38 -1.34 -0.03 -0.21 -1.35 -0.03
Pred. Max-Mean 1.68 0.04 0.39 1.67 0.04 0.39 1.68 0.04 0.20 1.67 0.04
Pred. Min-Mean -1.64 -0.04 -0.46 -1.63 -0.04 -0.46 -1.64 -0.04 -0.25 -1.63 -0.04

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.85 129.31 -0.28 -5.19 129.38 -0.28 3.35


Variance 0.00 0.33 0.00 0.01 0.33 0.00 0.01
Root Mean Square 3.85 129.31 0.28 5.19 129.38 0.28 3.35
Std. Deviation 0.06 0.57 0.02 0.08 0.58 0.02 0.08
Skewness 0.00 0.03 0.09 0.00 0.03 0.09 0.00
Kurtosis -0.08 -0.45 -0.68 -0.13 -0.44 -0.71 -0.13

Number of Peaks 283 114 234 292 156 179 293

Av Of 1/3 Highest 3.97 130.29 -0.25 -5.02 130.33 -0.25 3.51


Av Of 1/3 Lowest 3.74 128.29 -0.30 -5.34 128.41 -0.30 3.19
Av Of 1/100 Highest 4.02 130.68 -0.24 -4.95 130.75 -0.25 3.58
Av Of 1/100 Lowest 3.66 127.98 -0.31 -5.43 128.03 -0.31 3.10
Av Of 1/1000 Highest 4.02 130.68 -0.24 -4.94 130.75 -0.25 3.59
Av Of 1/1000 Lowest 3.65 127.98 -0.31 -5.45 128.03 -0.31 3.08
Maximum 4.02 130.68 -0.24 -4.94 130.75 -0.25 3.59
Minimum 3.65 127.98 -0.31 -5.45 128.03 -0.31 3.08
Pred. Max 4.05 130.99 -0.24 -4.90 131.05 -0.24 3.64
Pred. Min 3.61 127.67 -0.32 -5.50 127.75 -0.32 3.03

Av Of 1/3 H-Mean 0.12 0.98 0.02 0.16 0.95 0.02 0.16


Av Of 1/3 L-Mean -0.12 -1.02 -0.02 -0.16 -0.97 -0.03 -0.16
Av Of 1/100 H-Mean 0.17 1.37 0.04 0.23 1.38 0.03 0.23
Av Of 1/100 L-Mean -0.20 -1.34 -0.03 -0.25 -1.35 -0.03 -0.25
Av Of 1/1000 H-Mean 0.17 1.37 0.04 0.24 1.38 0.03 0.24
Av Of 1/1000 L-Mean -0.21 -1.34 -0.03 -0.26 -1.35 -0.03 -0.26
Maximum - Mean 0.17 1.37 0.04 0.24 1.38 0.03 0.24
Minimum - Mean -0.21 -1.34 -0.03 -0.26 -1.35 -0.03 -0.26
Pred. Max-Mean 0.20 1.68 0.04 0.29 1.67 0.04 0.29
Pred. Min-Mean -0.25 -1.64 -0.04 -0.31 -1.63 -0.04 -0.31
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -50 -16 -8 0 0 0 55


BM2S DB30 -53 17 -8 0 0 0 57
BM3P DB30 -21 -36 -7 0 0 0 43
BM3S DB30 -23 42 -7 0 0 0 49
BM4P DB30 13 -21 -5 0 0 0 26
BM4S DB30 15 26 -5 0 0 0 30
BM5P DB30 18 -13 -4 0 0 0 23
BM5S DB30 21 5 -4 0 0 0 23
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.4 1.1 -24740.5 -9 1663749 74


Buoyancy -201.6 -1.1 25791.8 54 -1826504 -80
Wind 18.0 0.0 0.0 0 350 34
Drag 18.2 0.0 4.8 0 -50 0
Wave 41.0 0.0 115.3 -6 -7710 3
Flex. Connectors -69.1 0.1 -1171.4 -36 170163 -564
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -5 -535

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -29


Wind 7.0 0.2 -0.1 0 28 15
Flex. Connectors -0.2 0.0 1114.3 0 -166285 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 5 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.39 1001.58 390.07 54.55 0.2037 50.57 0.00


BM2S 1001.58 1001.58 374.82 57.35 0.2112 53.50 0.00
BM3P 1000.58 1001.57 457.96 43.42 0.1638 38.88 0.00
BM3S 1001.03 1001.57 421.74 49.36 0.1888 45.12 0.00
BM4P 998.96 1001.50 584.60 26.06 0.0941 20.45 0.00
BM4S 999.43 1001.50 550.60 30.42 0.1152 25.10 0.00
BM5P 998.56 1001.47 609.56 23.06 0.0877 17.24 0.00
BM5S 998.49 1001.46 613.37 22.59 0.0820 16.74 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.41 -0.27 -4.19 0.00 0.45 0.00


N Force -0.03 0.00 0.02 0 -5 -535

WHPBJKT Location 2.61 1.62 21.05 0.01 -0.35 -0.72


N Force 0.06 0.01 -0.02 0 5 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 55.84 58.62 43.94 49.92 25.86 30.21 22.88 22.54


Variance 67.46 71.56 15.80 16.36 6.07 8.49 11.94 17.82
Root Mean Square 56.44 59.23 44.12 50.08 25.98 30.35 23.14 22.93
Std. Deviation 8.21 8.46 3.98 4.05 2.46 2.91 3.46 4.22
Skewness 0.22 0.19 0.19 0.12 0.20 0.13 0.34 0.41
Kurtosis -0.44 -0.44 -0.45 -0.45 -0.35 -0.42 -0.32 -0.26

Number of Peaks 146 148 126 124 162 162 164 170

Av Of 1/3 Highest 70.37 73.55 51.15 56.76 30.27 35.32 29.17 30.22
Av Of 1/3 Lowest 42.59 44.88 37.34 43.08 21.93 25.55 17.70 16.34
Av Of 1/100 Highest 77.50 80.74 54.20 60.09 32.05 37.64 32.09 34.35
Av Of 1/100 Lowest 38.00 40.14 35.08 40.91 20.49 23.68 15.68 14.17
Av Of 1/1000 Highest 77.50 80.74 54.20 60.09 32.05 37.64 32.09 34.35
Av Of 1/1000 Lowest 38.00 40.14 35.08 40.91 20.49 23.68 15.68 14.17
Maximum 77.50 80.74 54.20 60.09 32.05 37.64 32.09 34.35
Minimum 38.00 40.14 35.08 40.91 20.49 23.68 15.68 14.17
Pred. Max 82.16 85.49 56.48 62.36 33.36 39.21 34.04 36.83
Pred. Min 34.16 36.17 33.12 38.90 19.35 22.29 14.16 12.41

Av Of 1/3 H-Mean 14.53 14.93 7.21 6.85 4.40 5.10 6.28 7.68
Av Of 1/3 L-Mean -13.25 -13.74 -6.60 -6.84 -3.94 -4.67 -5.19 -6.20
Av Of 1/100 H-Mean 21.65 22.12 10.26 10.18 6.19 7.43 9.21 11.81
Av Of 1/100 L-Mean -17.84 -18.48 -8.86 -9.01 -5.37 -6.54 -7.21 -8.37
Av Of 1/1000 H-Mean 21.65 22.12 10.26 10.18 6.19 7.43 9.21 11.81
Av Of 1/1000 L-Mean -17.84 -18.48 -8.86 -9.01 -5.37 -6.54 -7.21 -8.37
Maximum - Mean 21.65 22.12 10.26 10.18 6.19 7.43 9.21 11.81
Minimum - Mean -17.84 -18.48 -8.86 -9.01 -5.37 -6.54 -7.21 -8.37
Pred. Max-Mean 26.32 26.87 12.54 12.44 7.50 9.00 11.16 14.29
Pred. Min-Mean -21.69 -22.46 -10.82 -11.01 -6.51 -7.92 -8.73 -10.13

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.48 -0.28 -4.19


Variance 0.35 0.00 0.04
Root Mean Square 1.59 0.28 4.19
Std. Deviation 0.59 0.02 0.20
Skewness 0.03 -0.13 0.02
Kurtosis -0.43 -0.73 -0.11

Number of Peaks 212 138 265

Av Of 1/3 Highest 2.37 -0.25 -3.78


Av Of 1/3 Lowest 0.54 -0.30 -4.59
Av Of 1/100 Highest 2.93 -0.24 -3.57
Av Of 1/100 Lowest 0.07 -0.31 -4.81
Av Of 1/1000 Highest 2.97 -0.24 -3.54
Av Of 1/1000 Lowest 0.06 -0.31 -4.81
Maximum 2.97 -0.24 -3.54
Minimum 0.06 -0.31 -4.81
Pred. Max 3.27 -0.24 -3.42
Pred. Min -0.23 -0.32 -4.93

Av Of 1/3 H-Mean 0.89 0.02 0.41


Av Of 1/3 L-Mean -0.94 -0.03 -0.40
Av Of 1/100 H-Mean 1.45 0.03 0.62
Av Of 1/100 L-Mean -1.41 -0.04 -0.62
Av Of 1/1000 H-Mean 1.49 0.03 0.65
Av Of 1/1000 L-Mean -1.42 -0.04 -0.62
Maximum - Mean 1.49 0.03 0.65
Minimum - Mean -1.42 -0.04 -0.62
Pred. Max-Mean 1.79 0.04 0.77
Pred. Min-Mean -1.71 -0.04 -0.74
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.48 -0.28 -4.19 1.55 -0.27 4.34 65.49 -0.27 -4.69 65.55 -0.27
Variance 0.35 0.00 0.04 0.35 0.00 0.04 0.35 0.00 0.01 0.35 0.00
Root Mean Square 1.59 0.28 4.19 1.66 0.28 4.35 65.49 0.28 4.69 65.56 0.28
Std. Deviation 0.59 0.02 0.20 0.59 0.02 0.20 0.59 0.02 0.08 0.59 0.02
Skewness 0.03 -0.13 0.02 0.03 -0.14 0.02 0.03 -0.11 0.00 0.03 -0.12
Kurtosis -0.43 -0.73 -0.11 -0.44 -0.73 -0.11 -0.42 -0.74 -0.22 -0.44 -0.74

Number of Peaks 212 138 265 195 84 265 214 138 271 196 85

Av Of 1/3 Highest 2.37 -0.25 -3.78 2.46 -0.25 4.75 66.38 -0.25 -4.52 66.47 -0.25
Av Of 1/3 Lowest 0.54 -0.30 -4.59 0.60 -0.30 3.94 64.54 -0.30 -4.86 64.59 -0.30
Av Of 1/100 Highest 2.93 -0.24 -3.57 3.02 -0.24 4.96 66.94 -0.24 -4.45 67.02 -0.24
Av Of 1/100 Lowest 0.07 -0.31 -4.81 0.15 -0.31 3.72 64.07 -0.31 -4.94 64.16 -0.31
Av Of 1/1000 Highest 2.97 -0.24 -3.54 3.02 -0.24 4.99 66.98 -0.24 -4.45 67.02 -0.24
Av Of 1/1000 Lowest 0.06 -0.31 -4.81 0.15 -0.31 3.72 64.06 -0.31 -4.95 64.16 -0.31
Maximum 2.97 -0.24 -3.54 3.02 -0.24 4.99 66.98 -0.24 -4.45 67.02 -0.24
Minimum 0.06 -0.31 -4.81 0.15 -0.31 3.72 64.06 -0.31 -4.95 64.16 -0.31
Pred. Max 3.27 -0.24 -3.42 3.32 -0.23 5.12 67.28 -0.24 -4.40 67.32 -0.23
Pred. Min -0.23 -0.32 -4.93 -0.13 -0.32 3.60 63.78 -0.32 -5.00 63.87 -0.32

Av Of 1/3 H-Mean 0.89 0.02 0.41 0.92 0.02 0.41 0.89 0.02 0.17 0.92 0.02
Av Of 1/3 L-Mean -0.94 -0.03 -0.40 -0.95 -0.03 -0.40 -0.94 -0.03 -0.16 -0.96 -0.02
Av Of 1/100 H-Mean 1.45 0.03 0.62 1.47 0.03 0.62 1.45 0.03 0.24 1.47 0.03
Av Of 1/100 L-Mean -1.41 -0.04 -0.62 -1.40 -0.04 -0.62 -1.42 -0.04 -0.25 -1.40 -0.04
Av Of 1/1000 H-Mean 1.49 0.03 0.65 1.47 0.03 0.65 1.49 0.03 0.24 1.47 0.03
Av Of 1/1000 L-Mean -1.42 -0.04 -0.62 -1.40 -0.04 -0.62 -1.42 -0.04 -0.26 -1.40 -0.04
Maximum - Mean 1.49 0.03 0.65 1.47 0.03 0.65 1.49 0.03 0.24 1.47 0.03
Minimum - Mean -1.42 -0.04 -0.62 -1.40 -0.04 -0.62 -1.42 -0.04 -0.26 -1.40 -0.04
Pred. Max-Mean 1.79 0.04 0.77 1.77 0.04 0.77 1.79 0.04 0.29 1.77 0.04
Pred. Min-Mean -1.71 -0.04 -0.74 -1.68 -0.04 -0.74 -1.71 -0.04 -0.30 -1.68 -0.04

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.84 129.49 -0.27 -5.19 129.56 -0.27 3.34


Variance 0.01 0.35 0.00 0.01 0.35 0.00 0.01
Root Mean Square 3.84 129.49 0.28 5.19 129.56 0.27 3.34
Std. Deviation 0.08 0.59 0.02 0.11 0.59 0.02 0.11
Skewness 0.00 0.03 -0.09 -0.01 0.03 -0.09 -0.01
Kurtosis -0.22 -0.42 -0.74 -0.14 -0.44 -0.74 -0.14

Number of Peaks 271 216 138 265 196 85 265

Av Of 1/3 Highest 4.01 130.42 -0.25 -4.97 130.48 -0.25 3.57


Av Of 1/3 Lowest 3.68 128.55 -0.30 -5.42 128.60 -0.30 3.11
Av Of 1/100 Highest 4.08 130.94 -0.24 -4.86 131.03 -0.24 3.67
Av Of 1/100 Lowest 3.59 128.07 -0.31 -5.55 128.16 -0.31 2.99
Av Of 1/1000 Highest 4.08 130.99 -0.24 -4.86 131.03 -0.24 3.68
Av Of 1/1000 Lowest 3.59 128.07 -0.31 -5.57 128.16 -0.31 2.97
Maximum 4.08 130.99 -0.24 -4.86 131.03 -0.24 3.68
Minimum 3.59 128.07 -0.31 -5.57 128.16 -0.31 2.97
Pred. Max 4.13 131.29 -0.24 -4.79 131.33 -0.23 3.74
Pred. Min 3.54 127.78 -0.32 -5.64 127.88 -0.32 2.89

Av Of 1/3 H-Mean 0.17 0.93 0.02 0.23 0.92 0.02 0.23


Av Of 1/3 L-Mean -0.16 -0.94 -0.03 -0.23 -0.96 -0.02 -0.23
Av Of 1/100 H-Mean 0.24 1.45 0.03 0.33 1.47 0.03 0.33
Av Of 1/100 L-Mean -0.25 -1.42 -0.04 -0.35 -1.40 -0.03 -0.35
Av Of 1/1000 H-Mean 0.24 1.49 0.03 0.34 1.47 0.03 0.34
Av Of 1/1000 L-Mean -0.25 -1.43 -0.04 -0.37 -1.40 -0.03 -0.37
Maximum - Mean 0.24 1.49 0.03 0.34 1.47 0.03 0.34
Minimum - Mean -0.25 -1.43 -0.04 -0.37 -1.40 -0.03 -0.37
Pred. Max-Mean 0.29 1.79 0.04 0.40 1.77 0.04 0.40
Pred. Min-Mean -0.30 -1.71 -0.04 -0.45 -1.68 -0.04 -0.45
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -52 -17 -8 0 0 0 57


BM2S DB30 -55 17 -8 0 0 0 59
BM3P DB30 -21 -36 -7 0 0 0 44
BM3S DB30 -24 43 -7 0 0 0 50
BM4P DB30 12 -21 -5 0 0 0 26
BM4S DB30 15 25 -5 0 0 0 30
BM5P DB30 17 -12 -4 0 0 0 22
BM5S DB30 20 5 -4 0 0 0 22
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.9 0.9 -24740.5 -7 1663745 59


Buoyancy -201.7 -0.9 25865.9 43 -1831270 -64
Wind 18.0 0.0 0.0 0 350 34
Drag 18.3 0.0 4.8 0 -50 0
Wave 48.6 0.0 41.3 0 -2841 2
Flex. Connectors -76.1 0.0 -1171.5 -34 170073 -543
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 4 -513

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -28


Wind 7.0 0.2 -0.1 0 28 14
Flex. Connectors -0.2 0.0 1114.4 0 -166295 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 -4 -14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.52 1001.58 379.31 56.51 0.2111 52.65 0.00


BM2S 1001.71 1001.58 364.19 59.30 0.2184 55.56 0.00
BM3P 1000.66 1001.57 451.97 44.34 0.1673 39.86 0.00
BM3S 1001.09 1001.57 416.47 50.23 0.1923 46.05 0.00
BM4P 998.89 1001.50 588.95 25.52 0.0922 19.89 0.00
BM4S 999.36 1001.50 555.87 29.72 0.1126 24.37 0.00
BM5P 998.45 1001.47 616.49 22.24 0.0846 16.38 0.00
BM5S 998.36 1001.46 622.29 21.53 0.0782 15.61 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.55 -0.27 -4.20 0.00 0.45 0.00


N Force -0.03 0.00 -0.05 0 4 -513

WHPBJKT Location 2.74 1.53 21.04 0.01 -0.35 -0.69


N Force 0.08 0.01 0.05 0 -4 -14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 57.62 60.42 44.85 50.73 25.27 29.49 22.00 21.44


Variance 43.23 45.52 10.19 10.14 3.55 5.17 6.93 10.22
Root Mean Square 58.00 60.80 44.96 50.83 25.34 29.58 22.16 21.68
Std. Deviation 6.58 6.75 3.19 3.18 1.88 2.27 2.63 3.20
Skewness 0.13 0.11 0.12 0.03 0.24 0.20 0.43 0.51
Kurtosis -0.10 -0.12 -0.04 -0.11 0.15 0.18 0.24 0.44

Number of Peaks 162 164 145 147 163 158 164 164

Av Of 1/3 Highest 68.40 71.32 49.78 55.62 28.41 33.15 26.40 26.85
Av Of 1/3 Lowest 47.68 50.13 40.17 45.88 22.43 26.11 18.24 16.82
Av Of 1/100 Highest 74.65 77.76 53.11 58.80 31.10 36.68 30.65 32.42
Av Of 1/100 Lowest 40.21 42.58 36.27 42.21 20.93 24.26 16.34 14.92
Av Of 1/1000 Highest 74.65 77.76 53.11 58.80 31.10 36.68 30.65 32.42
Av Of 1/1000 Lowest 40.21 42.58 36.27 42.21 20.93 24.26 16.34 14.92
Maximum 74.65 77.76 53.11 58.80 31.10 36.68 30.65 32.42
Minimum 40.21 42.58 36.27 42.21 20.93 24.26 16.34 14.92
Pred. Max 78.25 81.42 54.89 60.54 32.33 38.20 32.48 34.73
Pred. Min 36.52 38.81 34.42 40.37 20.02 23.15 15.15 13.54

Av Of 1/3 H-Mean 10.77 10.90 4.94 4.90 3.14 3.66 4.40 5.41
Av Of 1/3 L-Mean -9.94 -10.29 -4.67 -4.85 -2.85 -3.38 -3.76 -4.62
Av Of 1/100 H-Mean 17.02 17.34 8.26 8.07 5.83 7.19 8.65 10.97
Av Of 1/100 L-Mean -17.42 -17.85 -8.57 -8.52 -4.34 -5.23 -5.66 -6.52
Av Of 1/1000 H-Mean 17.02 17.34 8.26 8.07 5.83 7.19 8.65 10.97
Av Of 1/1000 L-Mean -17.42 -17.85 -8.57 -8.52 -4.34 -5.23 -5.66 -6.52
Maximum - Mean 17.02 17.34 8.26 8.07 5.83 7.19 8.65 10.97
Minimum - Mean -17.42 -17.85 -8.57 -8.52 -4.34 -5.23 -5.66 -6.52
Pred. Max-Mean 20.62 20.99 10.05 9.81 7.06 8.72 10.48 13.29
Pred. Min-Mean -21.10 -21.61 -10.42 -10.36 -5.25 -6.34 -6.86 -7.90

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.62 -0.27 -4.20


Variance 0.22 0.00 0.12
Root Mean Square 1.68 0.27 4.22
Std. Deviation 0.47 0.02 0.35
Skewness -0.05 -0.45 0.03
Kurtosis -0.05 -0.03 -0.12

Number of Peaks 219 203 232

Av Of 1/3 Highest 2.36 -0.25 -3.50


Av Of 1/3 Lowest 0.87 -0.29 -4.90
Av Of 1/100 Highest 2.75 -0.24 -3.13
Av Of 1/100 Lowest 0.30 -0.31 -5.22
Av Of 1/1000 Highest 2.78 -0.24 -3.13
Av Of 1/1000 Lowest 0.26 -0.31 -5.27
Maximum 2.78 -0.24 -3.13
Minimum 0.26 -0.31 -5.27
Pred. Max 3.01 -0.23 -2.92
Pred. Min -0.01 -0.32 -5.48

Av Of 1/3 H-Mean 0.74 0.02 0.71


Av Of 1/3 L-Mean -0.75 -0.02 -0.70
Av Of 1/100 H-Mean 1.14 0.03 1.07
Av Of 1/100 L-Mean -1.32 -0.04 -1.02
Av Of 1/1000 H-Mean 1.17 0.03 1.07
Av Of 1/1000 L-Mean -1.35 -0.04 -1.07
Maximum - Mean 1.17 0.03 1.07
Minimum - Mean -1.35 -0.04 -1.07
Pred. Max-Mean 1.40 0.04 1.28
Pred. Min-Mean -1.62 -0.05 -1.28
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.62 -0.27 -4.20 1.68 -0.27 4.33 65.62 -0.27 -4.70 65.69 -0.27
Variance 0.22 0.00 0.12 0.22 0.00 0.12 0.22 0.00 0.00 0.22 0.00
Root Mean Square 1.68 0.27 4.22 1.75 0.27 4.35 65.62 0.27 4.70 65.69 0.27
Std. Deviation 0.47 0.02 0.35 0.47 0.02 0.35 0.47 0.01 0.05 0.47 0.01
Skewness -0.05 -0.45 0.03 -0.05 -0.46 0.03 -0.05 -0.35 0.04 -0.05 -0.36
Kurtosis -0.05 -0.03 -0.12 -0.04 -0.02 -0.12 -0.05 -0.13 -0.19 -0.04 -0.14

Number of Peaks 219 203 232 182 126 232 221 204 246 184 130

Av Of 1/3 Highest 2.36 -0.25 -3.50 2.39 -0.25 5.04 66.36 -0.25 -4.60 66.39 -0.25
Av Of 1/3 Lowest 0.87 -0.29 -4.90 0.93 -0.29 3.63 64.87 -0.29 -4.81 64.93 -0.29
Av Of 1/100 Highest 2.75 -0.24 -3.13 2.82 -0.24 5.40 66.76 -0.24 -4.54 66.83 -0.24
Av Of 1/100 Lowest 0.30 -0.31 -5.22 0.34 -0.31 3.31 64.30 -0.31 -4.87 64.35 -0.31
Av Of 1/1000 Highest 2.78 -0.24 -3.13 2.82 -0.24 5.40 66.79 -0.24 -4.54 66.83 -0.24
Av Of 1/1000 Lowest 0.26 -0.31 -5.27 0.34 -0.31 3.26 64.27 -0.31 -4.87 64.35 -0.31
Maximum 2.78 -0.24 -3.13 2.82 -0.24 5.40 66.79 -0.24 -4.54 66.83 -0.24
Minimum 0.26 -0.31 -5.27 0.34 -0.31 3.26 64.27 -0.31 -4.87 64.35 -0.31
Pred. Max 3.01 -0.23 -2.92 3.06 -0.23 5.61 67.02 -0.23 -4.51 67.07 -0.23
Pred. Min -0.01 -0.32 -5.48 0.06 -0.32 3.05 64.00 -0.32 -4.90 64.07 -0.32

Av Of 1/3 H-Mean 0.74 0.02 0.71 0.70 0.02 0.71 0.74 0.02 0.11 0.70 0.02
Av Of 1/3 L-Mean -0.75 -0.02 -0.70 -0.75 -0.03 -0.70 -0.75 -0.02 -0.11 -0.76 -0.02
Av Of 1/100 H-Mean 1.14 0.03 1.07 1.14 0.03 1.07 1.14 0.03 0.16 1.14 0.03
Av Of 1/100 L-Mean -1.32 -0.04 -1.02 -1.34 -0.04 -1.02 -1.32 -0.04 -0.16 -1.34 -0.04
Av Of 1/1000 H-Mean 1.17 0.03 1.07 1.14 0.03 1.07 1.17 0.03 0.16 1.14 0.03
Av Of 1/1000 L-Mean -1.35 -0.04 -1.07 -1.34 -0.04 -1.07 -1.35 -0.04 -0.17 -1.34 -0.04
Maximum - Mean 1.17 0.03 1.07 1.14 0.03 1.07 1.17 0.03 0.16 1.14 0.03
Minimum - Mean -1.35 -0.04 -1.07 -1.34 -0.04 -1.07 -1.35 -0.04 -0.17 -1.34 -0.04
Pred. Max-Mean 1.40 0.04 1.28 1.38 0.04 1.28 1.40 0.04 0.20 1.38 0.04
Pred. Min-Mean -1.62 -0.05 -1.28 -1.62 -0.05 -1.28 -1.62 -0.05 -0.20 -1.62 -0.05

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 129.63 -0.27 -5.20 129.69 -0.27 3.33


Variance 0.00 0.22 0.00 0.06 0.22 0.00 0.06
Root Mean Square 3.83 129.63 0.27 5.21 129.69 0.27 3.34
Std. Deviation 0.05 0.47 0.01 0.25 0.47 0.01 0.25
Skewness 0.03 -0.05 -0.28 -0.03 -0.05 -0.28 -0.04
Kurtosis -0.19 -0.05 -0.11 -0.12 -0.04 -0.14 -0.12

Number of Peaks 246 223 206 227 185 132 228

Av Of 1/3 Highest 3.94 130.36 -0.25 -4.69 130.40 -0.25 3.84


Av Of 1/3 Lowest 3.73 128.88 -0.29 -5.72 128.94 -0.29 2.82
Av Of 1/100 Highest 3.99 130.76 -0.24 -4.47 130.84 -0.24 4.07
Av Of 1/100 Lowest 3.67 128.31 -0.31 -5.96 128.35 -0.31 2.58
Av Of 1/1000 Highest 3.99 130.80 -0.24 -4.45 130.84 -0.24 4.08
Av Of 1/1000 Lowest 3.66 128.27 -0.31 -5.96 128.35 -0.31 2.57
Maximum 3.99 130.80 -0.24 -4.45 130.84 -0.24 4.08
Minimum 3.66 128.27 -0.31 -5.96 128.35 -0.31 2.57
Pred. Max 4.03 131.03 -0.24 -4.30 131.08 -0.24 4.23
Pred. Min 3.63 128.00 -0.32 -6.12 128.08 -0.32 2.42

Av Of 1/3 H-Mean 0.11 0.74 0.02 0.51 0.70 0.02 0.51


Av Of 1/3 L-Mean -0.11 -0.75 -0.02 -0.51 -0.76 -0.02 -0.51
Av Of 1/100 H-Mean 0.16 1.14 0.03 0.74 1.15 0.03 0.74
Av Of 1/100 L-Mean -0.16 -1.32 -0.04 -0.75 -1.34 -0.04 -0.75
Av Of 1/1000 H-Mean 0.16 1.17 0.03 0.75 1.15 0.03 0.75
Av Of 1/1000 L-Mean -0.17 -1.35 -0.04 -0.76 -1.34 -0.04 -0.76
Maximum - Mean 0.16 1.17 0.03 0.75 1.15 0.03 0.75
Minimum - Mean -0.17 -1.35 -0.04 -0.76 -1.34 -0.04 -0.76
Pred. Max-Mean 0.19 1.40 0.04 0.90 1.38 0.04 0.90
Pred. Min-Mean -0.20 -1.62 -0.05 -0.91 -1.62 -0.05 -0.91
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -52 -17 -8 0 0 0 57


BM2S DB30 -38 12 -7 0 0 0 42
BM3P DB30 -32 -55 -9 0 0 0 66
BM3S DB30 -11 22 -5 0 0 0 26
BM4P DB30 25 -42 -7 0 0 0 50
BM4S DB30 9 15 -4 0 0 0 18
BM5P DB30 31 -23 -6 0 0 0 40
BM5S DB30 21 5 -4 0 0 0 23
MAINLN DB30 13 5 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.8 7.4 -24740.5 -65 1663760 497


Buoyancy -203.7 -7.7 25878.4 363 -1832685 -544
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.2 3.4 -149 -37 2463
Wave 22.0 22.2 30.9 -52 -1789 1564
Flex. Connectors -38.9 -82.3 -1172.7 357 170542 -5333
======= ======= ======= ======= ======= =======
Total -0.2 -0.1 -0.6 38 35 304

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -4.1 -5.0 -1114.3 9 166268 -750


Wind 5.0 5.9 -0.2 -13 47 872
Flex. Connectors 0.0 0.2 1114.9 -6 -166375 27
======= ======= ======= ======= ======= =======
Total 0.9 1.1 0.5 -11 -61 149
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.56 1001.58 376.33 57.07 0.2132 53.22 0.00


BM2S 1000.43 1001.58 468.48 41.56 0.1531 36.94 0.00
BM3P 1002.11 1001.57 332.59 65.57 0.2473 62.09 0.00
BM3S 998.91 1001.57 584.47 25.63 0.0981 20.04 0.00
BM4P 1001.08 1001.50 420.90 50.21 0.1814 45.99 0.00
BM4S 997.87 1001.50 653.64 18.25 0.0692 12.08 0.00
BM5P 1000.30 1001.47 481.14 40.34 0.1534 35.61 0.00
BM5S 998.52 1001.46 611.61 22.77 0.0828 16.96 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 0.86 1.85 -4.20 -0.02 0.45 0.00


N Force -0.16 -0.06 -0.58 38 35 304

WHPBJKT Location 1.88 2.63 21.38 0.26 -0.21 -0.17


N Force 0.89 1.06 0.47 -11 -61 149
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 59.15 42.18 68.51 24.92 51.80 17.37 41.21 22.50


Variance 86.18 54.38 39.31 6.29 19.61 4.28 35.57 20.74
Root Mean Square 59.87 42.82 68.80 25.05 51.99 17.49 41.64 22.96
Std. Deviation 9.28 7.37 6.27 2.51 4.43 2.07 5.96 4.55
Skewness 0.24 0.23 0.31 0.08 0.18 0.09 0.19 0.29
Kurtosis -0.70 -0.79 -0.39 -0.72 -0.70 -0.67 -0.79 -0.74

Number of Peaks 73 79 69 97 91 78 80 79

Av Of 1/3 Highest 75.70 55.34 79.78 29.08 59.56 20.85 52.10 30.98
Av Of 1/3 Lowest 44.34 30.56 58.75 20.75 44.96 13.97 31.72 15.41
Av Of 1/100 Highest 83.18 59.42 86.66 30.74 63.07 22.56 56.44 33.76
Av Of 1/100 Lowest 41.24 27.43 55.39 19.35 42.80 12.38 29.58 13.70
Av Of 1/1000 Highest 83.18 59.42 86.66 30.74 63.07 22.56 56.44 33.76
Av Of 1/1000 Lowest 41.24 27.43 55.39 19.35 42.80 12.38 29.58 13.70
Maximum 83.18 59.42 86.66 30.74 63.07 22.56 56.44 33.76
Minimum 41.24 27.43 55.39 19.35 42.80 12.38 29.58 13.70
Pred. Max 89.11 63.61 91.19 32.09 65.73 23.83 60.13 36.49
Pred. Min 36.83 23.85 52.11 18.05 40.68 11.17 26.76 11.56

Av Of 1/3 H-Mean 16.55 13.15 11.26 4.16 7.76 3.49 10.89 8.48
Av Of 1/3 L-Mean -14.80 -11.63 -9.76 -4.17 -6.84 -3.40 -9.49 -7.09
Av Of 1/100 H-Mean 24.03 17.24 18.14 5.82 11.27 5.20 15.23 11.26
Av Of 1/100 L-Mean -17.90 -14.76 -13.13 -5.58 -9.00 -4.98 -11.64 -8.80
Av Of 1/1000 H-Mean 24.03 17.24 18.14 5.82 11.27 5.20 15.23 11.26
Av Of 1/1000 L-Mean -17.90 -14.76 -13.13 -5.58 -9.00 -4.98 -11.64 -8.80
Maximum - Mean 24.03 17.24 18.14 5.82 11.27 5.20 15.23 11.26
Minimum - Mean -17.90 -14.76 -13.13 -5.58 -9.00 -4.98 -11.64 -8.80
Pred. Max-Mean 29.96 21.42 22.68 7.17 13.93 6.46 18.92 13.99
Pred. Min-Mean -22.32 -18.34 -16.40 -6.87 -11.12 -6.20 -14.45 -10.93

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 0.92 2.01 -4.20


Variance 0.40 0.03 0.00
Root Mean Square 1.12 2.02 4.20
Std. Deviation 0.63 0.16 0.03
Skewness 0.06 0.24 0.09
Kurtosis -0.80 -0.50 0.03

Number of Peaks 74 144 329

Av Of 1/3 Highest 2.01 2.28 -4.13


Av Of 1/3 Lowest -0.16 1.76 -4.27
Av Of 1/100 Highest 2.37 2.41 -4.08
Av Of 1/100 Lowest -0.44 1.68 -4.30
Av Of 1/1000 Highest 2.37 2.41 -4.07
Av Of 1/1000 Lowest -0.44 1.68 -4.30
Maximum 2.37 2.41 -4.07
Minimum -0.44 1.68 -4.30
Pred. Max 2.73 2.50 -4.05
Pred. Min -0.77 1.61 -4.32

Av Of 1/3 H-Mean 1.09 0.27 0.07


Av Of 1/3 L-Mean -1.08 -0.26 -0.07
Av Of 1/100 H-Mean 1.45 0.40 0.12
Av Of 1/100 L-Mean -1.36 -0.34 -0.10
Av Of 1/1000 H-Mean 1.45 0.40 0.13
Av Of 1/1000 L-Mean -1.36 -0.34 -0.10
Maximum - Mean 1.45 0.40 0.13
Minimum - Mean -1.36 -0.34 -0.10
Pred. Max-Mean 1.81 0.48 0.15
Pred. Min-Mean -1.69 -0.41 -0.12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 0.92 2.01 -4.20 0.99 2.02 4.33 64.93 2.01 -4.71 65.00 2.01
Variance 0.40 0.03 0.00 0.40 0.03 0.00 0.40 0.03 0.00 0.40 0.03
Root Mean Square 1.12 2.02 4.20 1.18 2.02 4.33 64.93 2.02 4.71 65.00 2.02
Std. Deviation 0.63 0.16 0.03 0.63 0.16 0.03 0.63 0.16 0.01 0.63 0.16
Skewness 0.06 0.24 0.09 0.06 0.24 0.09 0.06 0.24 0.02 0.06 0.24
Kurtosis -0.80 -0.50 0.03 -0.80 -0.50 0.03 -0.80 -0.52 -0.06 -0.80 -0.52

Number of Peaks 74 144 329 77 61 329 75 144 317 77 63

Av Of 1/3 Highest 2.01 2.28 -4.13 2.14 2.26 4.41 66.02 2.28 -4.69 66.14 2.26
Av Of 1/3 Lowest -0.16 1.76 -4.27 -0.09 1.76 4.26 63.85 1.75 -4.72 63.91 1.76
Av Of 1/100 Highest 2.37 2.41 -4.08 2.44 2.41 4.45 66.38 2.40 -4.68 66.44 2.40
Av Of 1/100 Lowest -0.44 1.68 -4.30 -0.38 1.69 4.23 63.57 1.68 -4.73 63.62 1.69
Av Of 1/1000 Highest 2.37 2.41 -4.07 2.44 2.41 4.46 66.38 2.40 -4.68 66.44 2.40
Av Of 1/1000 Lowest -0.44 1.68 -4.30 -0.38 1.69 4.23 63.57 1.68 -4.73 63.62 1.69
Maximum 2.37 2.41 -4.07 2.44 2.41 4.46 66.38 2.40 -4.68 66.44 2.40
Minimum -0.44 1.68 -4.30 -0.38 1.69 4.23 63.57 1.68 -4.73 63.62 1.69
Pred. Max 2.73 2.50 -4.05 2.79 2.51 4.48 66.74 2.49 -4.67 66.80 2.50
Pred. Min -0.77 1.61 -4.32 -0.72 1.61 4.21 63.24 1.61 -4.74 63.29 1.61

Av Of 1/3 H-Mean 1.09 0.27 0.07 1.15 0.25 0.07 1.09 0.27 0.02 1.15 0.25
Av Of 1/3 L-Mean -1.08 -0.26 -0.07 -1.08 -0.25 -0.07 -1.08 -0.26 -0.02 -1.08 -0.25
Av Of 1/100 H-Mean 1.45 0.40 0.12 1.45 0.39 0.12 1.45 0.39 0.03 1.45 0.39
Av Of 1/100 L-Mean -1.36 -0.34 -0.10 -1.37 -0.32 -0.10 -1.36 -0.33 -0.03 -1.37 -0.32
Av Of 1/1000 H-Mean 1.45 0.40 0.13 1.45 0.39 0.13 1.45 0.39 0.03 1.45 0.39
Av Of 1/1000 L-Mean -1.36 -0.34 -0.10 -1.37 -0.32 -0.10 -1.36 -0.33 -0.03 -1.37 -0.32
Maximum - Mean 1.45 0.40 0.13 1.45 0.39 0.13 1.45 0.39 0.03 1.45 0.39
Minimum - Mean -1.36 -0.34 -0.10 -1.37 -0.32 -0.10 -1.36 -0.33 -0.03 -1.37 -0.32
Pred. Max-Mean 1.81 0.48 0.15 1.80 0.49 0.15 1.81 0.48 0.03 1.80 0.49
Pred. Min-Mean -1.69 -0.41 -0.12 -1.71 -0.41 -0.12 -1.69 -0.40 -0.03 -1.71 -0.40

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 128.93 2.00 -5.21 129.00 2.01 3.32


Variance 0.00 0.40 0.03 0.00 0.40 0.03 0.00
Root Mean Square 3.83 128.94 2.01 5.21 129.00 2.01 3.32
Std. Deviation 0.01 0.63 0.16 0.04 0.63 0.16 0.04
Skewness 0.02 0.06 0.24 -0.04 0.06 0.24 -0.04
Kurtosis -0.06 -0.80 -0.53 -0.09 -0.80 -0.53 -0.09

Number of Peaks 317 76 145 321 77 63 321

Av Of 1/3 Highest 3.85 130.03 2.27 -5.13 130.15 2.25 3.41


Av Of 1/3 Lowest 3.81 127.86 1.75 -5.29 127.92 1.75 3.24
Av Of 1/100 Highest 3.86 130.39 2.40 -5.09 130.45 2.40 3.44
Av Of 1/100 Lowest 3.80 127.58 1.68 -5.34 127.63 1.69 3.20
Av Of 1/1000 Highest 3.86 130.39 2.40 -5.09 130.45 2.40 3.44
Av Of 1/1000 Lowest 3.80 127.58 1.68 -5.34 127.63 1.69 3.19
Maximum 3.86 130.39 2.40 -5.09 130.45 2.40 3.44
Minimum 3.80 127.58 1.68 -5.34 127.63 1.69 3.19
Pred. Max 3.86 130.74 2.48 -5.07 130.80 2.50 3.46
Pred. Min 3.80 127.25 1.61 -5.37 127.30 1.61 3.17

Av Of 1/3 H-Mean 0.02 1.09 0.26 0.08 1.15 0.25 0.08


Av Of 1/3 L-Mean -0.02 -1.08 -0.25 -0.08 -1.08 -0.25 -0.08
Av Of 1/100 H-Mean 0.03 1.45 0.40 0.12 1.45 0.39 0.12
Av Of 1/100 L-Mean -0.03 -1.36 -0.33 -0.13 -1.37 -0.32 -0.13
Av Of 1/1000 H-Mean 0.03 1.45 0.40 0.12 1.45 0.39 0.12
Av Of 1/1000 L-Mean -0.03 -1.36 -0.33 -0.13 -1.37 -0.32 -0.13
Maximum - Mean 0.03 1.45 0.40 0.12 1.45 0.39 0.12
Minimum - Mean -0.03 -1.36 -0.33 -0.13 -1.37 -0.32 -0.13
Pred. Max-Mean 0.03 1.81 0.48 0.14 1.80 0.49 0.14
Pred. Min-Mean -0.03 -1.69 -0.40 -0.16 -1.71 -0.40 -0.16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -54 -18 -8 0 0 0 59


BM2S DB30 -39 12 -7 0 0 0 42
BM3P DB30 -33 -56 -9 0 0 0 68
BM3S DB30 -11 21 -5 0 0 0 25
BM4P DB30 25 -43 -7 0 0 0 51
BM4S DB30 8 15 -4 0 0 0 17
BM5P DB30 31 -23 -6 0 0 0 40
BM5S DB30 21 5 -4 0 0 0 22
MAINLN DB30 13 5 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.4 3.6 -24740.5 -32 1663757 243


Buoyancy -203.2 -3.8 25875.6 178 -1832377 -266
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.2 3.4 -149 -36 2463
Wave 25.6 25.9 33.9 58 -2058 1948
Flex. Connectors -42.6 -86.2 -1172.6 382 170475 -5520
======= ======= ======= ======= ======= =======
Total -0.2 -0.1 -0.2 23 5 525

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -4.3 -5.3 -1114.3 10 166267 -788


Wind 5.0 5.9 -0.2 -13 47 873
Flex. Connectors 0.0 0.1 1114.6 -3 -166332 16
======= ======= ======= ======= ======= =======
Total 0.6 0.7 0.2 -8 -18 100
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.67 1001.58 367.09 58.77 0.2195 55.00 0.00


BM2S 1000.48 1001.58 464.61 42.17 0.1554 37.59 0.00
BM3P 1002.25 1001.57 321.74 67.71 0.2554 64.32 0.00
BM3S 998.86 1001.57 587.76 25.26 0.0967 19.63 0.00
BM4P 1001.13 1001.50 416.74 50.93 0.1840 46.76 0.00
BM4S 997.74 1001.50 661.31 17.46 0.0662 11.23 0.00
BM5P 1000.30 1001.47 481.10 40.34 0.1535 35.62 0.00
BM5S 998.41 1001.46 618.72 21.93 0.0797 16.06 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 0.94 1.95 -4.20 -0.01 0.45 0.00


N Force -0.19 -0.15 -0.23 23 5 525

WHPBJKT Location 1.97 2.82 21.35 0.27 -0.22 -0.20


N Force 0.62 0.73 0.17 -8 -18 100
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 60.43 42.68 70.34 24.57 51.80 16.95 40.78 21.71


Variance 63.56 35.87 37.50 4.08 13.19 3.70 22.21 13.57
Root Mean Square 60.95 43.09 70.61 24.65 51.93 17.06 41.05 22.02
Std. Deviation 7.97 5.99 6.12 2.02 3.63 1.92 4.71 3.68
Skewness 0.31 0.18 0.54 -0.05 0.22 -0.06 0.30 0.28
Kurtosis -0.32 -0.47 -0.02 -0.19 -0.25 -0.49 -0.36 -0.42

Number of Peaks 138 166 138 190 188 134 182 128

Av Of 1/3 Highest 73.04 52.69 80.87 27.90 58.14 20.29 49.60 28.36
Av Of 1/3 Lowest 47.20 32.65 61.09 21.27 46.13 14.36 33.41 16.35
Av Of 1/100 Highest 81.80 57.38 87.99 30.16 61.84 21.49 53.66 31.59
Av Of 1/100 Lowest 43.80 29.79 57.71 19.55 43.05 12.31 31.18 14.13
Av Of 1/1000 Highest 81.80 57.38 87.99 30.16 61.84 21.49 53.66 31.59
Av Of 1/1000 Lowest 43.80 29.79 57.71 19.55 43.05 12.31 31.18 14.13
Maximum 81.80 57.38 87.99 30.16 61.84 21.49 53.66 31.59
Minimum 43.80 29.79 57.71 19.55 43.05 12.31 31.18 14.13
Pred. Max 86.45 60.47 91.83 31.30 63.91 22.48 56.32 33.78
Pred. Min 40.18 27.08 54.97 18.52 41.25 11.29 29.18 12.45

Av Of 1/3 H-Mean 12.61 10.02 10.53 3.33 6.34 3.35 8.81 6.65
Av Of 1/3 L-Mean -13.23 -10.03 -9.25 -3.30 -5.67 -2.59 -7.37 -5.36
Av Of 1/100 H-Mean 21.37 14.70 17.65 5.59 10.04 4.54 12.87 9.88
Av Of 1/100 L-Mean -16.62 -12.88 -12.63 -5.02 -8.75 -4.64 -9.61 -7.58
Av Of 1/1000 H-Mean 21.37 14.70 17.65 5.59 10.04 4.54 12.87 9.88
Av Of 1/1000 L-Mean -16.62 -12.88 -12.63 -5.02 -8.75 -4.64 -9.61 -7.58
Maximum - Mean 21.37 14.70 17.65 5.59 10.04 4.54 12.87 9.88
Minimum - Mean -16.62 -12.88 -12.63 -5.02 -8.75 -4.64 -9.61 -7.58
Pred. Max-Mean 26.02 17.79 21.49 6.73 12.10 5.53 15.54 12.07
Pred. Min-Mean -20.24 -15.60 -15.37 -6.05 -10.55 -5.65 -11.60 -9.26

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.00 2.11 -4.20


Variance 0.27 0.04 0.00
Root Mean Square 1.12 2.12 4.20
Std. Deviation 0.52 0.21 0.06
Skewness 0.06 0.39 0.02
Kurtosis -0.46 -0.54 -0.21

Number of Peaks 174 257 286

Av Of 1/3 Highest 1.87 2.47 -4.07


Av Of 1/3 Lowest 0.12 1.82 -4.33
Av Of 1/100 Highest 2.26 2.65 -4.01
Av Of 1/100 Lowest -0.22 1.69 -4.39
Av Of 1/1000 Highest 2.26 2.66 -4.00
Av Of 1/1000 Lowest -0.22 1.69 -4.39
Maximum 2.26 2.66 -4.00
Minimum -0.22 1.69 -4.39
Pred. Max 2.52 2.77 -3.96
Pred. Min -0.47 1.60 -4.43

Av Of 1/3 H-Mean 0.87 0.36 0.13


Av Of 1/3 L-Mean -0.88 -0.29 -0.12
Av Of 1/100 H-Mean 1.26 0.54 0.19
Av Of 1/100 L-Mean -1.21 -0.42 -0.19
Av Of 1/1000 H-Mean 1.26 0.55 0.20
Av Of 1/1000 L-Mean -1.21 -0.43 -0.19
Maximum - Mean 1.26 0.55 0.20
Minimum - Mean -1.21 -0.43 -0.19
Pred. Max-Mean 1.52 0.66 0.24
Pred. Min-Mean -1.47 -0.51 -0.22
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.00 2.11 -4.20 1.06 2.11 4.33 65.00 2.08 -4.70 65.07 2.08
Variance 0.27 0.04 0.00 0.27 0.04 0.00 0.27 0.04 0.00 0.27 0.04
Root Mean Square 1.12 2.12 4.20 1.18 2.12 4.33 65.00 2.09 4.70 65.07 2.09
Std. Deviation 0.52 0.21 0.06 0.52 0.21 0.06 0.52 0.21 0.03 0.52 0.20
Skewness 0.06 0.39 0.02 0.06 0.41 0.02 0.06 0.36 0.01 0.06 0.37
Kurtosis -0.46 -0.54 -0.21 -0.46 -0.60 -0.21 -0.46 -0.55 -0.23 -0.46 -0.63

Number of Peaks 174 257 286 169 183 286 174 257 290 168 183

Av Of 1/3 Highest 1.87 2.47 -4.07 1.91 2.49 4.46 65.87 2.43 -4.64 65.92 2.44
Av Of 1/3 Lowest 0.12 1.82 -4.33 0.19 1.81 4.21 64.12 1.78 -4.77 64.18 1.77
Av Of 1/100 Highest 2.26 2.65 -4.01 2.32 2.61 4.53 66.26 2.60 -4.60 66.33 2.57
Av Of 1/100 Lowest -0.22 1.69 -4.39 -0.15 1.76 4.15 63.79 1.66 -4.81 63.86 1.72
Av Of 1/1000 Highest 2.26 2.66 -4.00 2.32 2.61 4.54 66.26 2.60 -4.59 66.33 2.57
Av Of 1/1000 Lowest -0.22 1.69 -4.39 -0.15 1.76 4.14 63.79 1.66 -4.81 63.86 1.72
Maximum 2.26 2.66 -4.00 2.32 2.61 4.54 66.26 2.60 -4.59 66.33 2.57
Minimum -0.22 1.69 -4.39 -0.15 1.76 4.14 63.79 1.66 -4.81 63.86 1.72
Pred. Max 2.52 2.77 -3.96 2.58 2.71 4.58 66.53 2.71 -4.57 66.59 2.67
Pred. Min -0.47 1.60 -4.43 -0.40 1.69 4.11 63.54 1.58 -4.83 63.61 1.65

Av Of 1/3 H-Mean 0.87 0.36 0.13 0.85 0.37 0.13 0.87 0.35 0.07 0.85 0.37
Av Of 1/3 L-Mean -0.88 -0.29 -0.12 -0.87 -0.31 -0.12 -0.88 -0.29 -0.07 -0.89 -0.31
Av Of 1/100 H-Mean 1.26 0.54 0.19 1.26 0.49 0.19 1.26 0.52 0.10 1.26 0.49
Av Of 1/100 L-Mean -1.21 -0.42 -0.19 -1.21 -0.35 -0.19 -1.21 -0.41 -0.10 -1.21 -0.35
Av Of 1/1000 H-Mean 1.26 0.55 0.20 1.26 0.49 0.20 1.26 0.53 0.11 1.26 0.49
Av Of 1/1000 L-Mean -1.21 -0.43 -0.19 -1.21 -0.35 -0.19 -1.21 -0.42 -0.11 -1.21 -0.35
Maximum - Mean 1.26 0.55 0.20 1.26 0.49 0.20 1.26 0.53 0.11 1.26 0.49
Minimum - Mean -1.21 -0.43 -0.19 -1.21 -0.35 -0.19 -1.21 -0.42 -0.11 -1.21 -0.35
Pred. Max-Mean 1.52 0.66 0.24 1.52 0.59 0.24 1.52 0.63 0.13 1.52 0.60
Pred. Min-Mean -1.47 -0.51 -0.22 -1.46 -0.42 -0.22 -1.47 -0.50 -0.13 -1.46 -0.43

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 129.01 2.04 -5.21 129.08 2.04 3.33


Variance 0.00 0.27 0.04 0.00 0.27 0.04 0.00
Root Mean Square 3.83 129.01 2.05 5.21 129.08 2.05 3.33
Std. Deviation 0.03 0.52 0.21 0.01 0.52 0.20 0.01
Skewness 0.01 0.06 0.30 0.05 0.06 0.31 0.03
Kurtosis -0.23 -0.46 -0.56 0.21 -0.46 -0.64 0.21

Number of Peaks 290 174 257 288 170 184 288

Av Of 1/3 Highest 3.90 129.88 2.39 -5.19 129.92 2.39 3.34


Av Of 1/3 Lowest 3.76 128.13 1.74 -5.22 128.19 1.74 3.31
Av Of 1/100 Highest 3.93 130.27 2.56 -5.18 130.33 2.54 3.35
Av Of 1/100 Lowest 3.73 127.79 1.63 -5.23 127.87 1.66 3.30
Av Of 1/1000 Highest 3.94 130.27 2.57 -5.18 130.33 2.54 3.35
Av Of 1/1000 Lowest 3.72 127.79 1.62 -5.24 127.87 1.66 3.30
Maximum 3.94 130.27 2.57 -5.18 130.33 2.54 3.35
Minimum 3.72 127.79 1.62 -5.24 127.87 1.66 3.30
Pred. Max 3.96 130.53 2.67 -5.18 130.60 2.65 3.36
Pred. Min 3.70 127.54 1.54 -5.24 127.61 1.58 3.29

Av Of 1/3 H-Mean 0.07 0.87 0.35 0.02 0.85 0.35 0.02


Av Of 1/3 L-Mean -0.07 -0.88 -0.30 -0.02 -0.88 -0.31 -0.02
Av Of 1/100 H-Mean 0.10 1.26 0.52 0.03 1.26 0.50 0.03
Av Of 1/100 L-Mean -0.10 -1.21 -0.41 -0.03 -1.21 -0.39 -0.03
Av Of 1/1000 H-Mean 0.11 1.26 0.53 0.03 1.26 0.50 0.03
Av Of 1/1000 L-Mean -0.11 -1.21 -0.42 -0.03 -1.21 -0.39 -0.03
Maximum - Mean 0.11 1.26 0.53 0.03 1.26 0.50 0.03
Minimum - Mean -0.11 -1.21 -0.42 -0.03 -1.21 -0.39 -0.03
Pred. Max-Mean 0.13 1.52 0.63 0.03 1.52 0.60 0.03
Pred. Min-Mean -0.13 -1.47 -0.50 -0.03 -1.46 -0.46 -0.03
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -56 -19 -9 0 0 0 61


BM2S DB30 -39 12 -7 0 0 0 43
BM3P DB30 -35 -59 -9 0 0 0 70
BM3S DB30 -11 21 -5 0 0 0 25
BM4P DB30 26 -43 -7 0 0 0 52
BM4S DB30 8 14 -4 0 0 0 16
BM5P DB30 31 -23 -6 0 0 0 40
BM5S DB30 20 5 -4 0 0 0 21
MAINLN DB30 13 5 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.9 -0.7 -24740.5 6 1663753 -45


Buoyancy -202.8 0.7 25877.2 -33 -1832337 51
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.2 3.4 -149 -35 2463
Wave 30.8 31.0 32.5 155 -2028 2275
Flex. Connectors -47.7 -91.6 -1173.2 471 170452 -5836
======= ======= ======= ======= ======= =======
Total -0.1 -0.1 -0.7 36 50 564

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -4.2 -5.1 -1114.3 9 166267 -762


Wind 5.0 5.9 -0.2 -13 47 873
Flex. Connectors 0.0 0.2 1115.0 -5 -166383 24
======= ======= ======= ======= ======= =======
Total 0.8 1.0 0.5 -10 -69 133
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.81 1001.58 355.45 60.91 0.2276 57.24 0.00


BM2S 1000.54 1001.58 459.52 42.98 0.1583 38.44 0.00
BM3P 1002.41 1001.57 308.26 70.36 0.2654 67.10 0.00
BM3S 998.80 1001.57 591.62 24.81 0.0950 19.15 0.00
BM4P 1001.19 1001.50 411.84 51.79 0.1871 47.66 0.00
BM4S 997.57 1001.50 670.82 16.49 0.0625 10.16 0.00
BM5P 1000.30 1001.47 481.33 40.30 0.1533 35.58 0.00
BM5S 998.28 1001.46 626.94 21.04 0.0764 15.09 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.05 2.08 -4.20 0.00 0.45 0.00


N Force -0.11 -0.12 -0.65 36 50 564

WHPBJKT Location 2.07 2.87 21.37 0.26 -0.22 -0.18


N Force 0.80 0.95 0.52 -10 -69 133
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 62.54 43.30 73.88 23.66 52.24 16.33 40.62 20.75


Variance 64.01 30.04 51.37 3.69 12.94 4.74 17.26 11.79
Root Mean Square 63.05 43.65 74.23 23.74 52.36 16.48 40.83 21.04
Std. Deviation 8.00 5.48 7.17 1.92 3.60 2.18 4.16 3.43
Skewness 0.27 0.12 0.34 -0.20 0.16 0.22 0.32 0.32
Kurtosis -0.36 -0.50 -0.47 -0.50 -0.35 -0.25 -0.50 -0.20

Number of Peaks 117 105 131 131 99 135 93 109

Av Of 1/3 Highest 76.61 52.94 85.49 26.54 59.04 19.93 48.56 26.81
Av Of 1/3 Lowest 50.51 34.16 63.32 20.51 47.05 12.86 34.55 15.46
Av Of 1/100 Highest 85.40 57.37 94.74 28.41 62.15 22.81 51.50 31.30
Av Of 1/100 Lowest 43.59 31.04 58.41 18.55 42.98 11.51 32.48 13.29
Av Of 1/1000 Highest 85.40 57.37 94.74 28.41 62.15 22.81 51.50 31.30
Av Of 1/1000 Lowest 43.59 31.04 58.41 18.55 42.98 11.51 32.48 13.29
Maximum 85.40 57.37 94.74 28.41 62.15 22.81 51.50 31.30
Minimum 43.59 31.04 58.41 18.55 42.98 11.51 32.48 13.29
Pred. Max 90.53 60.59 99.32 29.45 64.46 24.22 54.05 33.70
Pred. Min 39.33 28.23 55.01 17.42 40.83 10.46 30.57 11.59

Av Of 1/3 H-Mean 14.07 9.64 11.61 2.88 6.81 3.59 7.94 6.06
Av Of 1/3 L-Mean -12.03 -9.14 -10.56 -3.15 -5.19 -3.47 -6.07 -5.30
Av Of 1/100 H-Mean 22.85 14.06 20.86 4.74 9.92 6.47 10.88 10.55
Av Of 1/100 L-Mean -18.96 -12.26 -15.47 -5.12 -9.26 -4.82 -8.14 -7.46
Av Of 1/1000 H-Mean 22.85 14.06 20.86 4.74 9.92 6.47 10.88 10.55
Av Of 1/1000 L-Mean -18.96 -12.26 -15.47 -5.12 -9.26 -4.82 -8.14 -7.46
Maximum - Mean 22.85 14.06 20.86 4.74 9.92 6.47 10.88 10.55
Minimum - Mean -18.96 -12.26 -15.47 -5.12 -9.26 -4.82 -8.14 -7.46
Pred. Max-Mean 27.99 17.29 25.44 5.78 12.22 7.89 13.43 12.95
Pred. Min-Mean -23.22 -15.07 -18.87 -6.24 -11.41 -5.87 -10.05 -9.16

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.09 2.32 -4.20


Variance 0.24 0.09 0.04
Root Mean Square 1.20 2.34 4.21
Std. Deviation 0.49 0.29 0.19
Skewness 0.03 0.16 0.02
Kurtosis -0.40 -0.92 -0.17

Number of Peaks 189 256 271

Av Of 1/3 Highest 1.87 2.78 -3.81


Av Of 1/3 Lowest 0.30 1.91 -4.58
Av Of 1/100 Highest 2.39 3.02 -3.61
Av Of 1/100 Lowest -0.20 1.78 -4.77
Av Of 1/1000 Highest 2.39 3.02 -3.60
Av Of 1/1000 Lowest -0.20 1.77 -4.79
Maximum 2.39 3.02 -3.60
Minimum -0.20 1.77 -4.79
Pred. Max 2.65 3.16 -3.48
Pred. Min -0.47 1.67 -4.91

Av Of 1/3 H-Mean 0.78 0.46 0.39


Av Of 1/3 L-Mean -0.79 -0.42 -0.38
Av Of 1/100 H-Mean 1.29 0.69 0.59
Av Of 1/100 L-Mean -1.30 -0.54 -0.57
Av Of 1/1000 H-Mean 1.29 0.70 0.61
Av Of 1/1000 L-Mean -1.30 -0.55 -0.59
Maximum - Mean 1.29 0.70 0.61
Minimum - Mean -1.30 -0.55 -0.59
Pred. Max-Mean 1.56 0.84 0.72
Pred. Min-Mean -1.56 -0.66 -0.71
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.09 2.32 -4.20 1.16 2.32 4.33 65.10 2.22 -4.70 65.17 2.22
Variance 0.24 0.09 0.04 0.24 0.08 0.04 0.24 0.08 0.00 0.24 0.08
Root Mean Square 1.20 2.34 4.21 1.26 2.34 4.34 65.10 2.24 4.70 65.17 2.24
Std. Deviation 0.49 0.29 0.19 0.49 0.29 0.19 0.49 0.29 0.03 0.49 0.28
Skewness 0.03 0.16 0.02 0.03 0.16 0.02 0.03 0.11 -0.01 0.03 0.11
Kurtosis -0.40 -0.92 -0.17 -0.41 -0.95 -0.17 -0.40 -0.78 -0.07 -0.41 -0.81

Number of Peaks 189 256 271 125 162 271 192 254 277 127 160

Av Of 1/3 Highest 1.87 2.78 -3.81 2.00 2.79 4.72 65.88 2.67 -4.64 65.99 2.69
Av Of 1/3 Lowest 0.30 1.91 -4.58 0.30 1.88 3.95 64.31 1.81 -4.77 64.31 1.78
Av Of 1/100 Highest 2.39 3.02 -3.61 2.43 2.99 4.92 66.39 2.85 -4.61 66.44 2.83
Av Of 1/100 Lowest -0.20 1.78 -4.77 -0.11 1.81 3.76 63.80 1.58 -4.80 63.90 1.61
Av Of 1/1000 Highest 2.39 3.02 -3.60 2.43 2.99 4.94 66.39 2.86 -4.61 66.44 2.83
Av Of 1/1000 Lowest -0.20 1.77 -4.79 -0.11 1.81 3.74 63.80 1.58 -4.81 63.90 1.61
Maximum 2.39 3.02 -3.60 2.43 2.99 4.94 66.39 2.86 -4.61 66.44 2.83
Minimum -0.20 1.77 -4.79 -0.11 1.81 3.74 63.80 1.58 -4.81 63.90 1.61
Pred. Max 2.65 3.16 -3.48 2.71 3.13 5.05 66.66 2.98 -4.59 66.72 2.96
Pred. Min -0.47 1.67 -4.91 -0.39 1.70 3.63 63.53 1.45 -4.83 63.62 1.48

Av Of 1/3 H-Mean 0.78 0.46 0.39 0.84 0.47 0.39 0.78 0.45 0.06 0.83 0.47
Av Of 1/3 L-Mean -0.79 -0.42 -0.38 -0.86 -0.45 -0.38 -0.79 -0.41 -0.06 -0.85 -0.44
Av Of 1/100 H-Mean 1.29 0.69 0.59 1.27 0.67 0.59 1.29 0.63 0.09 1.27 0.61
Av Of 1/100 L-Mean -1.30 -0.54 -0.57 -1.27 -0.51 -0.57 -1.30 -0.64 -0.10 -1.27 -0.60
Av Of 1/1000 H-Mean 1.29 0.70 0.61 1.27 0.67 0.61 1.29 0.64 0.09 1.27 0.61
Av Of 1/1000 L-Mean -1.30 -0.55 -0.59 -1.27 -0.51 -0.59 -1.30 -0.64 -0.10 -1.27 -0.60
Maximum - Mean 1.29 0.70 0.61 1.27 0.67 0.61 1.29 0.64 0.09 1.27 0.61
Minimum - Mean -1.30 -0.55 -0.59 -1.27 -0.51 -0.59 -1.30 -0.64 -0.10 -1.27 -0.60
Pred. Max-Mean 1.56 0.84 0.72 1.55 0.81 0.72 1.56 0.77 0.11 1.55 0.74
Pred. Min-Mean -1.56 -0.66 -0.71 -1.55 -0.62 -0.70 -1.57 -0.77 -0.12 -1.55 -0.73

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 129.10 2.11 -5.21 129.17 2.11 3.33


Variance 0.00 0.24 0.09 0.02 0.24 0.08 0.02
Root Mean Square 3.83 129.11 2.13 5.21 129.17 2.13 3.33
Std. Deviation 0.03 0.49 0.29 0.14 0.49 0.29 0.14
Skewness -0.01 0.03 0.01 -0.02 0.03 0.01 -0.02
Kurtosis -0.07 -0.40 -0.43 -0.08 -0.41 -0.45 -0.08

Number of Peaks 277 192 254 267 129 156 267

Av Of 1/3 Highest 3.89 129.87 2.58 -4.92 130.00 2.62 3.62


Av Of 1/3 Lowest 3.77 128.31 1.69 -5.50 128.32 1.64 3.03
Av Of 1/100 Highest 3.92 130.40 2.78 -4.77 130.44 2.74 3.76
Av Of 1/100 Lowest 3.73 127.80 1.38 -5.66 127.90 1.41 2.87
Av Of 1/1000 Highest 3.92 130.40 2.79 -4.76 130.44 2.74 3.77
Av Of 1/1000 Lowest 3.73 127.80 1.38 -5.68 127.90 1.41 2.85
Maximum 3.92 130.40 2.79 -4.76 130.44 2.74 3.77
Minimum 3.73 127.80 1.38 -5.68 127.90 1.41 2.85
Pred. Max 3.94 130.67 2.92 -4.68 130.72 2.87 3.86
Pred. Min 3.71 127.54 1.23 -5.77 127.62 1.26 2.76

Av Of 1/3 H-Mean 0.06 0.77 0.46 0.29 0.83 0.51 0.29


Av Of 1/3 L-Mean -0.06 -0.79 -0.42 -0.29 -0.85 -0.47 -0.29
Av Of 1/100 H-Mean 0.09 1.30 0.67 0.43 1.27 0.63 0.44
Av Of 1/100 L-Mean -0.10 -1.30 -0.73 -0.45 -1.27 -0.70 -0.45
Av Of 1/1000 H-Mean 0.09 1.30 0.68 0.45 1.27 0.63 0.45
Av Of 1/1000 L-Mean -0.10 -1.30 -0.74 -0.47 -1.27 -0.70 -0.47
Maximum - Mean 0.09 1.30 0.68 0.45 1.27 0.63 0.45
Minimum - Mean -0.10 -1.30 -0.74 -0.47 -1.27 -0.70 -0.47
Pred. Max-Mean 0.11 1.56 0.81 0.53 1.55 0.76 0.53
Pred. Min-Mean -0.12 -1.57 -0.88 -0.56 -1.55 -0.85 -0.57
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -59 -20 -9 0 0 0 64


BM2S DB30 -41 13 -7 0 0 0 44
BM3P DB30 -37 -62 -9 0 0 0 74
BM3S DB30 -11 20 -5 0 0 0 24
BM4P DB30 26 -44 -7 0 0 0 53
BM4S DB30 7 13 -3 0 0 0 15
BM5P DB30 31 -23 -6 0 0 0 40
BM5S DB30 19 5 -4 0 0 0 20
MAINLN DB30 13 5 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 -3.4 -24740.5 30 1663747 -225


Buoyancy -202.2 3.5 25895.9 -165 -1833372 248
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.3 3.4 -149 -34 2464
Wave 37.9 38.0 14.0 186 -912 2629
Flex. Connectors -54.7 -98.7 -1173.1 541 170327 -6183
======= ======= ======= ======= ======= =======
Total -0.1 -0.1 -0.3 29 0 591

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -4.3 -5.2 -1114.3 9 166267 -778


Wind 5.0 5.9 -0.2 -13 47 873
Flex. Connectors 0.0 0.1 1114.6 -4 -166330 19
======= ======= ======= ======= ======= =======
Total 0.7 0.8 0.2 -9 -16 113
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1002.02 1001.58 338.40 64.11 0.2396 60.60 0.00


BM2S 1000.63 1001.58 452.05 44.16 0.1627 39.68 0.00
BM3P 1002.65 1001.57 288.72 74.39 0.2807 71.30 0.00
BM3S 998.72 1001.57 597.27 24.16 0.0925 18.46 0.00
BM4P 1001.27 1001.50 404.67 53.04 0.1916 48.97 0.00
BM4S 997.33 1001.50 683.11 15.33 0.0581 8.90 0.00
BM5P 1000.29 1001.47 481.69 40.24 0.1531 35.52 0.00
BM5S 998.08 1001.46 638.52 19.82 0.0720 13.77 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.20 2.27 -4.21 0.01 0.45 0.00


N Force -0.14 -0.10 -0.28 29 1 591

WHPBJKT Location 2.23 3.09 21.36 0.27 -0.22 -0.19


N Force 0.69 0.82 0.16 -9 -16 113
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 65.23 44.55 77.38 23.19 52.13 15.67 39.83 19.54


Variance 52.74 18.38 58.45 2.76 9.64 5.14 8.62 8.28
Root Mean Square 65.64 44.76 77.76 23.24 52.22 15.83 39.93 19.75
Std. Deviation 7.26 4.29 7.64 1.66 3.10 2.27 2.94 2.88
Skewness 0.07 -0.01 0.12 -0.06 -0.14 0.79 0.38 0.63
Kurtosis 0.09 -0.05 0.05 0.06 0.17 1.15 0.04 1.02

Number of Peaks 217 225 221 230 195 219 220 213

Av Of 1/3 Highest 76.70 51.54 89.17 25.61 56.69 19.05 44.88 24.38
Av Of 1/3 Lowest 54.38 37.61 65.59 20.58 47.72 12.70 35.41 15.49
Av Of 1/100 Highest 84.09 55.61 98.82 27.34 60.42 23.88 49.22 30.37
Av Of 1/100 Lowest 44.47 32.54 58.25 18.78 42.25 11.14 33.08 13.67
Av Of 1/1000 Highest 84.22 55.83 98.91 27.51 60.42 24.25 49.25 30.99
Av Of 1/1000 Lowest 43.63 32.41 57.53 18.61 42.25 11.13 32.88 13.65
Maximum 84.22 55.83 98.91 27.51 60.42 24.25 49.25 30.99
Minimum 43.63 32.41 57.53 18.61 42.25 11.13 32.88 13.65
Pred. Max 88.03 58.08 103.22 28.38 62.12 25.97 51.14 33.30
Pred. Min 39.29 29.99 53.55 17.69 40.23 10.22 31.49 12.46

Av Of 1/3 H-Mean 11.46 6.99 11.79 2.43 4.56 3.39 5.05 4.84
Av Of 1/3 L-Mean -10.85 -6.94 -11.79 -2.60 -4.41 -2.97 -4.41 -4.05
Av Of 1/100 H-Mean 18.85 11.06 21.44 4.15 8.30 8.21 9.39 10.83
Av Of 1/100 L-Mean -20.77 -12.01 -19.13 -4.41 -9.87 -4.53 -6.74 -5.87
Av Of 1/1000 H-Mean 18.99 11.28 21.53 4.33 8.30 8.58 9.42 11.45
Av Of 1/1000 L-Mean -21.60 -12.14 -19.85 -4.58 -9.87 -4.54 -6.94 -5.89
Maximum - Mean 18.99 11.28 21.53 4.33 8.30 8.58 9.42 11.45
Minimum - Mean -21.60 -12.14 -19.85 -4.58 -9.87 -4.54 -6.94 -5.89
Pred. Max-Mean 22.80 13.53 25.84 5.19 9.99 10.30 11.31 13.76
Pred. Min-Mean -25.95 -14.56 -23.83 -5.49 -11.90 -5.45 -8.34 -7.08

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.24 2.50 -4.21


Variance 0.16 0.12 0.04
Root Mean Square 1.30 2.52 4.21
Std. Deviation 0.40 0.35 0.19
Skewness -0.13 0.07 0.03
Kurtosis 0.19 -0.05 -0.09

Number of Peaks 216 240 240

Av Of 1/3 Highest 1.86 3.06 -3.82


Av Of 1/3 Lowest 0.60 1.93 -4.59
Av Of 1/100 Highest 2.19 3.42 -3.61
Av Of 1/100 Lowest -0.02 1.70 -4.79
Av Of 1/1000 Highest 2.21 3.43 -3.61
Av Of 1/1000 Lowest -0.07 1.68 -4.81
Maximum 2.21 3.43 -3.61
Minimum -0.07 1.68 -4.81
Pred. Max 2.41 3.62 -3.49
Pred. Min -0.33 1.52 -4.93

Av Of 1/3 H-Mean 0.62 0.57 0.39


Av Of 1/3 L-Mean -0.64 -0.57 -0.39
Av Of 1/100 H-Mean 0.96 0.92 0.60
Av Of 1/100 L-Mean -1.26 -0.80 -0.58
Av Of 1/1000 H-Mean 0.97 0.93 0.60
Av Of 1/1000 L-Mean -1.31 -0.81 -0.61
Maximum - Mean 0.97 0.93 0.60
Minimum - Mean -1.31 -0.81 -0.61
Pred. Max-Mean 1.17 1.12 0.72
Pred. Min-Mean -1.57 -0.97 -0.73
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.24 2.50 -4.21 1.30 2.50 4.33 65.24 2.33 -4.71 65.31 2.33
Variance 0.16 0.12 0.04 0.16 0.12 0.04 0.16 0.11 0.01 0.16 0.11
Root Mean Square 1.30 2.52 4.21 1.37 2.52 4.33 65.24 2.36 4.71 65.31 2.36
Std. Deviation 0.40 0.35 0.19 0.41 0.34 0.19 0.40 0.34 0.11 0.41 0.33
Skewness -0.13 0.07 0.03 -0.13 0.08 0.03 -0.13 -0.17 0.00 -0.13 -0.18
Kurtosis 0.19 -0.05 -0.09 0.19 0.01 -0.09 0.19 -0.23 -0.10 0.19 -0.18

Number of Peaks 216 240 240 226 217 240 212 240 236 226 217

Av Of 1/3 Highest 1.86 3.06 -3.82 1.94 2.99 4.72 65.87 2.84 -4.49 65.95 2.78
Av Of 1/3 Lowest 0.60 1.93 -4.59 0.68 1.95 3.94 64.61 1.78 -4.93 64.68 1.81
Av Of 1/100 Highest 2.19 3.42 -3.61 2.28 3.38 4.93 66.20 3.16 -4.38 66.28 3.13
Av Of 1/100 Lowest -0.02 1.70 -4.79 0.04 1.76 3.75 63.98 1.47 -5.04 64.04 1.50
Av Of 1/1000 Highest 2.21 3.43 -3.61 2.31 3.39 4.93 66.22 3.18 -4.37 66.31 3.14
Av Of 1/1000 Lowest -0.07 1.68 -4.81 -0.01 1.75 3.72 63.93 1.43 -5.05 64.00 1.50
Maximum 2.21 3.43 -3.61 2.31 3.39 4.93 66.22 3.18 -4.37 66.31 3.14
Minimum -0.07 1.68 -4.81 -0.01 1.75 3.72 63.93 1.43 -5.05 64.00 1.50
Pred. Max 2.41 3.62 -3.49 2.51 3.57 5.05 66.41 3.35 -4.31 66.51 3.30
Pred. Min -0.33 1.52 -4.93 -0.27 1.60 3.60 63.67 1.25 -5.12 63.74 1.33

Av Of 1/3 H-Mean 0.62 0.57 0.39 0.64 0.50 0.39 0.62 0.51 0.22 0.64 0.45
Av Of 1/3 L-Mean -0.64 -0.57 -0.39 -0.63 -0.55 -0.39 -0.63 -0.55 -0.22 -0.63 -0.52
Av Of 1/100 H-Mean 0.96 0.92 0.60 0.97 0.89 0.60 0.96 0.83 0.33 0.97 0.80
Av Of 1/100 L-Mean -1.26 -0.80 -0.58 -1.27 -0.74 -0.58 -1.26 -0.87 -0.33 -1.27 -0.83
Av Of 1/1000 H-Mean 0.97 0.93 0.60 1.00 0.89 0.60 0.97 0.85 0.34 1.00 0.80
Av Of 1/1000 L-Mean -1.31 -0.81 -0.61 -1.31 -0.74 -0.61 -1.31 -0.90 -0.35 -1.31 -0.84
Maximum - Mean 0.97 0.93 0.60 1.00 0.89 0.60 0.97 0.85 0.34 1.00 0.80
Minimum - Mean -1.31 -0.81 -0.61 -1.31 -0.74 -0.61 -1.31 -0.90 -0.35 -1.31 -0.84
Pred. Max-Mean 1.17 1.12 0.72 1.20 1.07 0.72 1.17 1.01 0.40 1.20 0.96
Pred. Min-Mean -1.57 -0.97 -0.73 -1.57 -0.89 -0.73 -1.57 -1.08 -0.41 -1.57 -1.01

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 129.25 2.17 -5.21 129.32 2.17 3.32


Variance 0.01 0.16 0.12 0.01 0.16 0.11 0.01
Root Mean Square 3.83 129.25 2.20 5.21 129.32 2.20 3.33
Std. Deviation 0.11 0.40 0.35 0.11 0.41 0.34 0.11
Skewness 0.00 -0.13 -0.42 -0.06 -0.13 -0.44 -0.06
Kurtosis -0.10 0.19 -0.08 -0.16 0.19 -0.03 -0.16

Number of Peaks 236 212 240 231 226 219 230

Av Of 1/3 Highest 4.04 129.87 2.66 -5.00 129.95 2.63 3.53


Av Of 1/3 Lowest 3.60 128.61 1.60 -5.43 128.69 1.65 3.10
Av Of 1/100 Highest 4.16 130.20 2.93 -4.89 130.29 2.88 3.64
Av Of 1/100 Lowest 3.50 127.99 1.17 -5.53 128.05 1.21 3.00
Av Of 1/1000 Highest 4.16 130.22 2.93 -4.89 130.32 2.88 3.64
Av Of 1/1000 Lowest 3.48 127.94 1.13 -5.54 128.01 1.20 2.99
Maximum 4.16 130.22 2.93 -4.89 130.32 2.88 3.64
Minimum 3.48 127.94 1.13 -5.54 128.01 1.20 2.99
Pred. Max 4.23 130.42 3.08 -4.83 130.51 3.03 3.70
Pred. Min 3.41 127.68 0.93 -5.61 127.74 1.00 2.92

Av Of 1/3 H-Mean 0.22 0.62 0.49 0.21 0.64 0.46 0.21


Av Of 1/3 L-Mean -0.22 -0.63 -0.57 -0.22 -0.63 -0.52 -0.22
Av Of 1/100 H-Mean 0.33 0.95 0.76 0.32 0.97 0.71 0.31
Av Of 1/100 L-Mean -0.33 -1.26 -1.00 -0.32 -1.27 -0.96 -0.32
Av Of 1/1000 H-Mean 0.34 0.97 0.76 0.32 1.00 0.71 0.32
Av Of 1/1000 L-Mean -0.35 -1.31 -1.04 -0.33 -1.31 -0.97 -0.33
Maximum - Mean 0.34 0.97 0.76 0.32 1.00 0.71 0.32
Minimum - Mean -0.35 -1.31 -1.04 -0.33 -1.31 -0.97 -0.33
Pred. Max-Mean 0.40 1.17 0.91 0.38 1.20 0.86 0.38
Pred. Min-Mean -0.41 -1.57 -1.24 -0.40 -1.57 -1.17 -0.40
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -44 -15 -7 0 0 0 48


BM2S DB30 -26 8 -5 0 0 0 29
BM3P DB30 -35 -58 -9 0 0 0 70
BM3S DB30 -7 14 -4 0 0 0 17
BM4P DB30 34 -59 -8 0 0 0 70
BM4S DB30 8 14 -4 0 0 0 17
BM5P DB30 46 -35 -7 0 0 0 59
BM5S DB30 28 7 -5 0 0 0 29
MAINLN DB30 9 5 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.6 7.0 -24740.5 -62 1663750 474


Buoyancy -202.7 -7.4 25911.0 346 -1834478 -519
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 -1 3487
Wave 0.0 47.7 1.3 -147 -75 3179
Flex. Connectors 9.2 -122.3 -1173.5 730 170989 -8600
======= ======= ======= ======= ======= =======
Total 0.1 10.4 -1.6 69 182 330

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.0 -5.5 -1114.3 10 166276 -819


Wind 0.1 8.2 -0.3 -18 42 1231
Flex. Connectors 0.0 0.5 1115.4 -18 -166448 69
======= ======= ======= ======= ======= =======
Total 0.0 3.2 0.9 -27 -130 480
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.94 1001.58 427.53 48.13 0.1798 43.86 0.00


BM2S 999.24 1001.58 559.48 28.68 0.1057 23.31 0.00
BM3P 1002.38 1001.57 310.44 69.93 0.2638 66.65 0.00
BM3S 997.65 1001.57 662.33 17.10 0.0655 10.86 0.00
BM4P 1002.34 1001.50 317.25 69.63 0.2516 66.29 0.00
BM4S 997.58 1001.50 670.52 16.50 0.0626 10.20 0.00
BM5P 1001.62 1001.47 373.47 58.62 0.2230 54.81 0.00
BM5S 999.24 1001.46 561.22 28.96 0.1053 23.58 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.11 2.75 -4.21 -0.02 0.45 0.00


N Force 0.09 10.44 -1.61 69 182 330

WHPBJKT Location 0.64 3.00 21.93 0.28 0.00 0.04


N Force 0.04 3.19 0.88 -27 -130 480
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 50.65 27.69 76.93 15.20 76.06 14.63 62.67 27.64


Variance 3.94 0.74 22.79 1.35 19.23 1.54 8.07 1.17
Root Mean Square 50.68 27.70 77.08 15.24 76.18 14.69 62.74 27.66
Std. Deviation 1.99 0.86 4.77 1.16 4.39 1.24 2.84 1.08
Skewness 0.37 0.01 0.36 0.04 0.27 -0.15 0.24 -0.16
Kurtosis -0.22 -0.39 -0.24 -0.20 -0.23 -0.28 -0.19 -0.45

Number of Peaks 328 324 340 326 336 336 334 308

Av Of 1/3 Highest 53.91 29.03 84.85 17.07 83.25 16.53 67.24 29.28
Av Of 1/3 Lowest 47.78 26.32 70.10 13.44 69.58 12.63 58.40 25.93
Av Of 1/100 Highest 56.10 30.07 90.04 18.32 89.27 17.70 71.43 30.09
Av Of 1/100 Lowest 46.50 25.52 66.83 12.03 65.88 11.46 55.59 24.88
Av Of 1/1000 Highest 56.15 30.18 90.29 18.49 89.45 17.74 71.58 30.21
Av Of 1/1000 Lowest 46.34 25.49 66.78 11.99 65.31 11.40 55.27 24.84
Maximum 56.15 30.18 90.29 18.49 89.45 17.74 71.58 30.21
Minimum 46.34 25.49 66.78 11.99 65.31 11.40 55.27 24.84
Pred. Max 57.19 30.65 92.79 19.11 91.95 18.32 73.25 30.70
Pred. Min 45.53 25.08 64.89 11.38 63.29 10.79 53.89 24.31

Av Of 1/3 H-Mean 3.27 1.34 7.92 1.87 7.19 1.90 4.56 1.64
Av Of 1/3 L-Mean -2.87 -1.37 -6.84 -1.76 -6.48 -2.01 -4.28 -1.71
Av Of 1/100 H-Mean 5.45 2.38 13.10 3.12 13.21 3.07 8.76 2.45
Av Of 1/100 L-Mean -4.14 -2.17 -10.10 -3.17 -10.18 -3.17 -7.08 -2.76
Av Of 1/1000 H-Mean 5.51 2.49 13.36 3.29 13.39 3.10 8.91 2.57
Av Of 1/1000 L-Mean -4.31 -2.20 -10.15 -3.21 -10.75 -3.24 -7.40 -2.80
Maximum - Mean 5.51 2.49 13.36 3.29 13.39 3.10 8.91 2.57
Minimum - Mean -4.31 -2.20 -10.15 -3.21 -10.75 -3.24 -7.40 -2.80
Pred. Max-Mean 6.54 2.96 15.86 3.91 15.90 3.68 10.57 3.06
Pred. Min-Mean -5.12 -2.61 -12.05 -3.81 -12.76 -3.84 -8.79 -3.33

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.08 3.21 -4.21


Variance 0.01 0.09 0.00
Root Mean Square 0.11 3.23 4.21
Std. Deviation 0.07 0.31 0.05
Skewness 0.13 0.27 0.01
Kurtosis -0.58 -0.35 -0.07

Number of Peaks 137 327 339

Av Of 1/3 Highest 0.03 3.72 -4.10


Av Of 1/3 Lowest -0.20 2.76 -4.32
Av Of 1/100 Highest 0.09 4.03 -4.06
Av Of 1/100 Lowest -0.23 2.56 -4.38
Av Of 1/1000 Highest 0.09 4.05 -4.06
Av Of 1/1000 Lowest -0.23 2.54 -4.38
Maximum 0.09 4.05 -4.06
Minimum -0.23 2.54 -4.38
Pred. Max 0.13 4.20 -4.03
Pred. Min -0.26 2.42 -4.41

Av Of 1/3 H-Mean 0.12 0.51 0.11


Av Of 1/3 L-Mean -0.12 -0.46 -0.11
Av Of 1/100 H-Mean 0.18 0.81 0.15
Av Of 1/100 L-Mean -0.15 -0.66 -0.17
Av Of 1/1000 H-Mean 0.18 0.83 0.15
Av Of 1/1000 L-Mean -0.15 -0.67 -0.17
Maximum - Mean 0.18 0.83 0.15
Minimum - Mean -0.15 -0.67 -0.17
Pred. Max-Mean 0.22 0.99 0.18
Pred. Min-Mean -0.18 -0.80 -0.20
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.08 3.21 -4.21 -0.02 3.22 4.32 63.92 3.21 -4.71 63.99 3.21
Variance 0.01 0.09 0.00 0.01 0.10 0.00 0.01 0.09 0.00 0.01 0.10
Root Mean Square 0.11 3.23 4.21 0.07 3.23 4.33 63.92 3.22 4.71 63.99 3.23
Std. Deviation 0.07 0.31 0.05 0.07 0.31 0.05 0.07 0.31 0.04 0.07 0.31
Skewness 0.13 0.27 0.01 0.13 0.27 0.00 0.13 0.27 -0.01 0.13 0.26
Kurtosis -0.58 -0.35 -0.07 -0.58 -0.28 -0.07 -0.57 -0.36 -0.13 -0.58 -0.29

Number of Peaks 137 327 339 123 345 339 137 327 339 123 344

Av Of 1/3 Highest 0.03 3.72 -4.10 0.09 3.73 4.43 64.04 3.71 -4.63 64.10 3.72
Av Of 1/3 Lowest -0.20 2.76 -4.32 -0.14 2.76 4.22 63.80 2.75 -4.79 63.87 2.76
Av Of 1/100 Highest 0.09 4.03 -4.06 0.16 4.09 4.47 64.10 4.02 -4.60 64.17 4.09
Av Of 1/100 Lowest -0.23 2.56 -4.38 -0.16 2.51 4.16 63.77 2.55 -4.83 63.84 2.51
Av Of 1/1000 Highest 0.09 4.05 -4.06 0.16 4.10 4.48 64.10 4.04 -4.59 64.17 4.10
Av Of 1/1000 Lowest -0.23 2.54 -4.38 -0.16 2.50 4.15 63.77 2.54 -4.84 63.84 2.49
Maximum 0.09 4.05 -4.06 0.16 4.10 4.48 64.10 4.04 -4.59 64.17 4.10
Minimum -0.23 2.54 -4.38 -0.16 2.50 4.15 63.77 2.54 -4.84 63.84 2.49
Pred. Max 0.13 4.20 -4.03 0.20 4.27 4.50 64.14 4.20 -4.57 64.21 4.26
Pred. Min -0.26 2.42 -4.41 -0.19 2.36 4.12 63.74 2.41 -4.86 63.81 2.35

Av Of 1/3 H-Mean 0.12 0.51 0.11 0.11 0.51 0.11 0.12 0.51 0.08 0.11 0.51
Av Of 1/3 L-Mean -0.12 -0.46 -0.11 -0.12 -0.45 -0.11 -0.12 -0.46 -0.08 -0.12 -0.45
Av Of 1/100 H-Mean 0.18 0.81 0.15 0.18 0.87 0.15 0.18 0.81 0.11 0.18 0.87
Av Of 1/100 L-Mean -0.15 -0.66 -0.17 -0.14 -0.71 -0.17 -0.15 -0.66 -0.12 -0.14 -0.71
Av Of 1/1000 H-Mean 0.18 0.83 0.15 0.18 0.88 0.15 0.18 0.83 0.12 0.18 0.89
Av Of 1/1000 L-Mean -0.15 -0.67 -0.17 -0.14 -0.72 -0.17 -0.15 -0.67 -0.13 -0.14 -0.72
Maximum - Mean 0.18 0.83 0.15 0.18 0.88 0.15 0.18 0.83 0.12 0.18 0.89
Minimum - Mean -0.15 -0.67 -0.17 -0.14 -0.72 -0.17 -0.15 -0.67 -0.13 -0.14 -0.72
Pred. Max-Mean 0.22 0.99 0.18 0.22 1.05 0.18 0.22 0.99 0.14 0.22 1.05
Pred. Min-Mean -0.18 -0.80 -0.20 -0.18 -0.86 -0.20 -0.18 -0.80 -0.15 -0.18 -0.86

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.93 3.20 -5.21 127.99 3.20 3.32


Variance 0.00 0.01 0.09 0.00 0.01 0.10 0.00
Root Mean Square 3.82 127.93 3.22 5.21 127.99 3.22 3.32
Std. Deviation 0.04 0.07 0.31 0.03 0.07 0.31 0.03
Skewness -0.01 0.13 0.27 -0.03 0.13 0.26 -0.03
Kurtosis -0.13 -0.57 -0.37 -0.22 -0.58 -0.30 -0.22

Number of Peaks 339 137 326 321 122 344 321

Av Of 1/3 Highest 3.90 128.04 3.71 -5.15 128.10 3.71 3.38


Av Of 1/3 Lowest 3.74 127.81 2.74 -5.27 127.87 2.75 3.26
Av Of 1/100 Highest 3.94 128.11 4.01 -5.13 128.17 4.08 3.40
Av Of 1/100 Lowest 3.70 127.78 2.55 -5.30 127.85 2.50 3.23
Av Of 1/1000 Highest 3.94 128.11 4.04 -5.13 128.17 4.09 3.41
Av Of 1/1000 Lowest 3.70 127.78 2.53 -5.30 127.85 2.48 3.23
Maximum 3.94 128.11 4.04 -5.13 128.17 4.09 3.41
Minimum 3.70 127.78 2.53 -5.30 127.85 2.48 3.23
Pred. Max 3.96 128.14 4.19 -5.11 128.21 4.26 3.42
Pred. Min 3.67 127.75 2.40 -5.32 127.82 2.34 3.21

Av Of 1/3 H-Mean 0.08 0.12 0.50 0.06 0.10 0.50 0.06


Av Of 1/3 L-Mean -0.08 -0.12 -0.46 -0.06 -0.12 -0.45 -0.06
Av Of 1/100 H-Mean 0.11 0.18 0.81 0.08 0.18 0.88 0.08
Av Of 1/100 L-Mean -0.12 -0.15 -0.65 -0.09 -0.14 -0.70 -0.09
Av Of 1/1000 H-Mean 0.12 0.18 0.84 0.08 0.18 0.89 0.08
Av Of 1/1000 L-Mean -0.13 -0.15 -0.67 -0.09 -0.14 -0.72 -0.09
Maximum - Mean 0.12 0.18 0.84 0.08 0.18 0.89 0.08
Minimum - Mean -0.13 -0.15 -0.67 -0.09 -0.14 -0.72 -0.09
Pred. Max-Mean 0.14 0.22 0.99 0.10 0.22 1.05 0.10
Pred. Min-Mean -0.15 -0.18 -0.80 -0.11 -0.18 -0.86 -0.11
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -45 -15 -8 0 0 0 50


BM2S DB30 -25 8 -5 0 0 0 28
BM3P DB30 -36 -62 -9 0 0 0 74
BM3S DB30 -7 13 -4 0 0 0 16
BM4P DB30 36 -62 -9 0 0 0 73
BM4S DB30 7 13 -3 0 0 0 15
BM5P DB30 47 -36 -8 0 0 0 61
BM5S DB30 27 7 -5 0 0 0 28
MAINLN DB30 9 7 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.6 6.9 -24740.5 -61 1663750 464


Buoyancy -202.7 -7.2 25913.0 339 -1834607 -508
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 -1 3487
Wave 0.0 46.1 0.1 -103 5 3078
Flex. Connectors 9.1 -131.4 -1173.7 692 171002 -9068
======= ======= ======= ======= ======= =======
Total 0.0 -0.1 -1.2 69 147 -236

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -0.1 -6.8 -1114.3 12 166275 -1017


Wind 0.1 8.2 -0.3 -18 43 1231
Flex. Connectors 0.0 0.3 1115.4 -11 -166442 46
======= ======= ======= ======= ======= =======
Total 0.0 1.7 0.8 -19 -125 259
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.04 1001.58 419.16 49.56 0.1852 45.36 0.00


BM2S 999.18 1001.58 563.56 28.15 0.1038 22.74 0.00
BM3P 1002.61 1001.57 291.85 73.74 0.2782 70.61 0.00
BM3S 997.44 1001.57 674.37 15.88 0.0608 9.53 0.00
BM4P 1002.55 1001.50 300.00 73.13 0.2642 69.94 0.00
BM4S 997.35 1001.50 682.39 15.38 0.0583 8.97 0.00
BM5P 1001.76 1001.47 361.71 60.79 0.2312 57.08 0.00
BM5S 999.16 1001.46 567.13 28.17 0.1024 22.74 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.09 3.00 -4.21 -0.02 0.45 0.00


N Force 0.04 -0.13 -1.16 69 147 -236

WHPBJKT Location 0.67 3.29 21.92 0.35 0.00 0.06


N Force 0.02 1.71 0.84 -19 -125 259
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 50.65 27.52 77.84 14.92 76.10 14.71 62.90 27.62


Variance 4.68 0.63 28.76 1.55 23.38 2.00 9.39 1.33
Root Mean Square 50.70 27.53 78.03 14.97 76.25 14.78 62.97 27.65
Std. Deviation 2.16 0.79 5.36 1.25 4.83 1.42 3.06 1.15
Skewness 0.25 -0.15 0.39 -0.12 0.35 -0.01 0.35 -0.02
Kurtosis -0.05 -0.28 -0.23 -0.25 -0.18 -0.15 -0.15 -0.11

Number of Peaks 307 297 307 317 311 313 307 295

Av Of 1/3 Highest 54.22 28.90 86.98 16.99 84.23 17.11 68.13 29.58
Av Of 1/3 Lowest 47.17 26.14 69.73 12.90 68.61 12.47 58.00 25.83
Av Of 1/100 Highest 57.22 29.50 94.18 18.34 91.81 19.02 73.27 31.25
Av Of 1/100 Lowest 44.55 25.05 65.12 11.38 64.39 10.87 55.60 24.62
Av Of 1/1000 Highest 57.33 29.51 94.79 18.53 93.05 19.37 74.18 31.45
Av Of 1/1000 Lowest 44.08 24.87 64.19 11.21 64.35 10.72 55.60 24.61
Maximum 57.33 29.51 94.79 18.53 93.05 19.37 74.18 31.45
Minimum 44.08 24.87 64.19 11.21 64.35 10.72 55.60 24.61
Pred. Max 58.59 29.89 98.01 19.21 96.26 20.25 76.32 32.18
Pred. Min 42.83 24.36 61.59 10.50 62.13 9.97 54.21 24.03

Av Of 1/3 H-Mean 3.57 1.39 9.14 2.07 8.13 2.40 5.23 1.95
Av Of 1/3 L-Mean -3.48 -1.37 -8.12 -2.02 -7.49 -2.24 -4.90 -1.80
Av Of 1/100 H-Mean 6.56 1.99 16.34 3.42 15.70 4.31 10.38 3.62
Av Of 1/100 L-Mean -6.10 -2.47 -12.72 -3.54 -11.71 -3.84 -7.30 -3.01
Av Of 1/1000 H-Mean 6.68 1.99 16.95 3.61 16.95 4.66 11.29 3.82
Av Of 1/1000 L-Mean -6.58 -2.65 -13.66 -3.71 -11.75 -3.98 -7.30 -3.02
Maximum - Mean 6.68 1.99 16.95 3.61 16.95 4.66 11.29 3.82
Minimum - Mean -6.58 -2.65 -13.66 -3.71 -11.75 -3.98 -7.30 -3.02
Pred. Max-Mean 7.94 2.37 20.16 4.29 20.16 5.54 13.43 4.55
Pred. Min-Mean -7.82 -3.15 -16.25 -4.42 -13.98 -4.74 -8.68 -3.59

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.10 3.30 -4.21


Variance 0.00 0.12 0.02
Root Mean Square 0.11 3.32 4.21
Std. Deviation 0.06 0.35 0.13
Skewness -0.01 0.42 -0.02
Kurtosis -0.31 -0.42 -0.29

Number of Peaks 158 278 287

Av Of 1/3 Highest -0.01 3.90 -3.95


Av Of 1/3 Lowest -0.19 2.80 -4.47
Av Of 1/100 Highest 0.05 4.34 -3.83
Av Of 1/100 Lowest -0.24 2.56 -4.61
Av Of 1/1000 Highest 0.05 4.35 -3.82
Av Of 1/1000 Lowest -0.24 2.56 -4.65
Maximum 0.05 4.35 -3.82
Minimum -0.24 2.56 -4.65
Pred. Max 0.08 4.55 -3.75
Pred. Min -0.27 2.42 -4.73

Av Of 1/3 H-Mean 0.09 0.60 0.26


Av Of 1/3 L-Mean -0.10 -0.50 -0.27
Av Of 1/100 H-Mean 0.15 1.04 0.38
Av Of 1/100 L-Mean -0.14 -0.73 -0.40
Av Of 1/1000 H-Mean 0.15 1.05 0.39
Av Of 1/1000 L-Mean -0.14 -0.74 -0.44
Maximum - Mean 0.15 1.05 0.39
Minimum - Mean -0.14 -0.74 -0.44
Pred. Max-Mean 0.18 1.26 0.46
Pred. Min-Mean -0.17 -0.88 -0.52
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.10 3.30 -4.21 -0.03 3.30 4.32 63.91 3.24 -4.71 63.98 3.24
Variance 0.00 0.12 0.02 0.00 0.12 0.02 0.00 0.12 0.01 0.00 0.12
Root Mean Square 0.11 3.32 4.21 0.06 3.32 4.33 63.91 3.26 4.71 63.98 3.26
Std. Deviation 0.06 0.35 0.13 0.06 0.35 0.13 0.06 0.35 0.09 0.06 0.34
Skewness -0.01 0.42 -0.02 -0.02 0.35 -0.03 -0.01 0.40 -0.04 -0.02 0.32
Kurtosis -0.31 -0.42 -0.29 -0.31 -0.31 -0.29 -0.31 -0.38 -0.31 -0.31 -0.27

Number of Peaks 158 278 287 165 311 286 162 276 287 163 313

Av Of 1/3 Highest -0.01 3.90 -3.95 0.05 3.89 4.58 63.99 3.84 -4.52 64.06 3.81
Av Of 1/3 Lowest -0.19 2.80 -4.47 -0.12 2.77 4.06 63.81 2.73 -4.91 63.89 2.71
Av Of 1/100 Highest 0.05 4.34 -3.83 0.11 4.31 4.71 64.06 4.29 -4.42 64.12 4.27
Av Of 1/100 Lowest -0.24 2.56 -4.61 -0.17 2.49 3.92 63.77 2.48 -5.01 63.83 2.42
Av Of 1/1000 Highest 0.05 4.35 -3.82 0.11 4.37 4.71 64.06 4.30 -4.40 64.12 4.33
Av Of 1/1000 Lowest -0.24 2.56 -4.65 -0.17 2.46 3.88 63.77 2.45 -5.01 63.83 2.40
Maximum 0.05 4.35 -3.82 0.11 4.37 4.71 64.06 4.30 -4.40 64.12 4.33
Minimum -0.24 2.56 -4.65 -0.17 2.46 3.88 63.77 2.45 -5.01 63.83 2.40
Pred. Max 0.08 4.55 -3.75 0.14 4.57 4.78 64.09 4.51 -4.35 64.15 4.53
Pred. Min -0.27 2.42 -4.73 -0.20 2.30 3.80 63.74 2.30 -5.07 63.80 2.24

Av Of 1/3 H-Mean 0.09 0.60 0.26 0.08 0.59 0.26 0.09 0.60 0.19 0.08 0.57
Av Of 1/3 L-Mean -0.10 -0.50 -0.27 -0.09 -0.53 -0.27 -0.10 -0.50 -0.20 -0.09 -0.53
Av Of 1/100 H-Mean 0.15 1.04 0.38 0.14 1.01 0.38 0.15 1.05 0.29 0.14 1.03
Av Of 1/100 L-Mean -0.14 -0.73 -0.40 -0.14 -0.81 -0.40 -0.14 -0.76 -0.30 -0.14 -0.82
Av Of 1/1000 H-Mean 0.15 1.05 0.39 0.14 1.07 0.39 0.15 1.06 0.30 0.14 1.09
Av Of 1/1000 L-Mean -0.14 -0.74 -0.44 -0.14 -0.84 -0.44 -0.14 -0.79 -0.30 -0.14 -0.84
Maximum - Mean 0.15 1.05 0.39 0.14 1.07 0.39 0.15 1.06 0.30 0.14 1.09
Minimum - Mean -0.14 -0.74 -0.44 -0.14 -0.84 -0.44 -0.14 -0.79 -0.30 -0.14 -0.84
Pred. Max-Mean 0.18 1.26 0.46 0.17 1.27 0.46 0.18 1.27 0.36 0.17 1.29
Pred. Min-Mean -0.17 -0.88 -0.52 -0.17 -1.00 -0.53 -0.17 -0.94 -0.36 -0.17 -1.00

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.92 3.18 -5.21 127.98 3.18 3.32


Variance 0.01 0.00 0.12 0.00 0.00 0.12 0.00
Root Mean Square 3.82 127.92 3.20 5.21 127.98 3.20 3.32
Std. Deviation 0.09 0.06 0.35 0.07 0.06 0.34 0.07
Skewness -0.04 -0.02 0.36 -0.03 -0.02 0.28 -0.04
Kurtosis -0.31 -0.31 -0.34 -0.19 -0.32 -0.24 -0.19

Number of Peaks 287 160 276 283 162 313 283

Av Of 1/3 Highest 4.01 128.00 3.77 -5.08 128.06 3.74 3.46


Av Of 1/3 Lowest 3.63 127.82 2.67 -5.35 127.89 2.65 3.18
Av Of 1/100 Highest 4.11 128.06 4.24 -5.00 128.12 4.22 3.53
Av Of 1/100 Lowest 3.53 127.77 2.37 -5.41 127.84 2.33 3.12
Av Of 1/1000 Highest 4.13 128.06 4.25 -4.99 128.12 4.29 3.54
Av Of 1/1000 Lowest 3.52 127.77 2.34 -5.42 127.84 2.33 3.11
Maximum 4.13 128.06 4.25 -4.99 128.12 4.29 3.54
Minimum 3.52 127.77 2.34 -5.42 127.84 2.33 3.11
Pred. Max 4.19 128.09 4.46 -4.94 128.15 4.50 3.59
Pred. Min 3.46 127.74 2.18 -5.46 127.81 2.17 3.07

Av Of 1/3 H-Mean 0.19 0.09 0.59 0.14 0.08 0.56 0.14


Av Of 1/3 L-Mean -0.20 -0.10 -0.51 -0.14 -0.09 -0.53 -0.14
Av Of 1/100 H-Mean 0.29 0.15 1.06 0.21 0.14 1.04 0.21
Av Of 1/100 L-Mean -0.30 -0.14 -0.81 -0.20 -0.14 -0.85 -0.20
Av Of 1/1000 H-Mean 0.30 0.15 1.08 0.22 0.14 1.11 0.22
Av Of 1/1000 L-Mean -0.31 -0.14 -0.84 -0.21 -0.14 -0.85 -0.21
Maximum - Mean 0.30 0.15 1.08 0.22 0.14 1.11 0.22
Minimum - Mean -0.31 -0.14 -0.84 -0.21 -0.14 -0.85 -0.21
Pred. Max-Mean 0.36 0.18 1.28 0.27 0.17 1.31 0.27
Pred. Min-Mean -0.36 -0.17 -1.00 -0.25 -0.17 -1.01 -0.25
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -45 -15 -8 0 0 0 50


BM2S DB30 -25 8 -5 0 0 0 28
BM3P DB30 -36 -62 -9 0 0 0 74
BM3S DB30 -7 13 -4 0 0 0 16
BM4P DB30 36 -62 -9 0 0 0 73
BM4S DB30 7 13 -3 0 0 0 15
BM5P DB30 47 -36 -8 0 0 0 61
BM5S DB30 27 7 -5 0 0 0 28
MAINLN DB30 9 7 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.7 3.6 -24740.5 -31 1663751 240


Buoyancy -202.8 -3.7 25910.6 176 -1834472 -263
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 0 3487
Wave 0.0 46.3 2.4 16 -130 3064
Flex. Connectors 9.1 -131.7 -1173.8 705 171008 -9100
======= ======= ======= ======= ======= =======
Total 0.0 -0.1 -1.2 69 153 -260

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -0.1 -6.8 -1114.3 12 166275 -1018


Wind 0.1 8.2 -0.3 -18 43 1231
Flex. Connectors 0.0 0.3 1115.4 -11 -166449 46
======= ======= ======= ======= ======= =======
Total 0.0 1.7 0.9 -18 -131 257
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.04 1001.58 419.02 49.58 0.1853 45.38 0.00


BM2S 999.18 1001.58 563.63 28.15 0.1037 22.73 0.00
BM3P 1002.62 1001.57 291.52 73.80 0.2784 70.68 0.00
BM3S 997.43 1001.57 674.56 15.87 0.0608 9.51 0.00
BM4P 1002.56 1001.50 299.68 73.19 0.2644 70.01 0.00
BM4S 997.34 1001.50 682.59 15.36 0.0583 8.95 0.00
BM5P 1001.77 1001.47 361.50 60.82 0.2314 57.12 0.00
BM5S 999.16 1001.46 567.24 28.16 0.1024 22.73 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.09 3.01 -4.21 -0.01 0.45 0.00


N Force 0.04 -0.14 -1.19 69 153 -260

WHPBJKT Location 0.67 3.28 21.92 0.35 0.00 0.06


N Force 0.02 1.70 0.89 -18 -131 257
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 49.97 27.44 77.76 14.89 74.49 15.44 62.27 27.97


Variance 7.56 1.09 50.21 3.05 42.96 4.48 17.12 2.21
Root Mean Square 50.05 27.46 78.09 14.99 74.77 15.58 62.41 28.01
Std. Deviation 2.75 1.04 7.09 1.75 6.55 2.12 4.14 1.49
Skewness -0.07 0.10 0.02 0.37 -0.02 0.73 0.00 0.31
Kurtosis -0.03 -0.36 -0.44 -0.20 -0.05 1.06 -0.21 0.15

Number of Peaks 285 283 287 299 291 291 289 281

Av Of 1/3 Highest 54.52 29.25 89.07 17.86 84.85 19.08 68.95 30.58
Av Of 1/3 Lowest 45.42 25.72 66.54 12.35 64.14 12.46 55.66 25.62
Av Of 1/100 Highest 57.60 30.47 96.75 20.10 92.88 23.34 74.63 32.79
Av Of 1/100 Lowest 42.10 24.36 60.13 10.95 56.32 10.74 51.01 24.05
Av Of 1/1000 Highest 57.98 30.50 97.31 20.19 93.33 23.47 74.88 32.82
Av Of 1/1000 Lowest 42.07 24.04 59.55 10.74 55.96 10.50 50.95 23.86
Maximum 57.98 30.50 97.31 20.19 93.33 23.47 74.88 32.82
Minimum 42.07 24.04 59.55 10.74 55.96 10.50 50.95 23.86
Pred. Max 59.52 31.09 101.06 21.20 96.94 25.01 77.29 33.75
Pred. Min 40.55 23.39 56.06 9.94 52.41 9.56 48.78 23.07

Av Of 1/3 H-Mean 4.55 1.81 11.31 2.97 10.36 3.64 6.67 2.61
Av Of 1/3 L-Mean -4.56 -1.73 -11.22 -2.54 -10.35 -2.98 -6.61 -2.36
Av Of 1/100 H-Mean 7.63 3.03 18.98 5.21 18.39 7.91 12.36 4.82
Av Of 1/100 L-Mean -7.88 -3.08 -17.63 -3.94 -18.17 -4.70 -11.26 -3.93
Av Of 1/1000 H-Mean 8.01 3.06 19.54 5.30 18.85 8.03 12.60 4.84
Av Of 1/1000 L-Mean -7.91 -3.40 -18.21 -4.15 -18.53 -4.94 -11.32 -4.11
Maximum - Mean 8.01 3.06 19.54 5.30 18.85 8.03 12.60 4.84
Minimum - Mean -7.91 -3.40 -18.21 -4.15 -18.53 -4.94 -11.32 -4.11
Pred. Max-Mean 9.55 3.65 23.29 6.31 22.45 9.57 15.02 5.78
Pred. Min-Mean -9.43 -4.06 -21.71 -4.95 -22.08 -5.88 -13.49 -4.91

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.13 3.34 -4.21


Variance 0.00 0.25 0.05
Root Mean Square 0.14 3.37 4.21
Std. Deviation 0.06 0.50 0.23
Skewness -0.05 0.07 -0.02
Kurtosis -0.23 -0.38 -0.16

Number of Peaks 184 255 273

Av Of 1/3 Highest -0.05 4.20 -3.75


Av Of 1/3 Lowest -0.21 2.54 -4.68
Av Of 1/100 Highest 0.02 4.75 -3.52
Av Of 1/100 Lowest -0.28 2.03 -4.93
Av Of 1/1000 Highest 0.02 4.76 -3.50
Av Of 1/1000 Lowest -0.28 1.97 -4.93
Maximum 0.02 4.76 -3.50
Minimum -0.28 1.97 -4.93
Pred. Max 0.06 5.04 -3.37
Pred. Min -0.31 1.71 -5.07

Av Of 1/3 H-Mean 0.08 0.86 0.46


Av Of 1/3 L-Mean -0.08 -0.80 -0.47
Av Of 1/100 H-Mean 0.15 1.42 0.69
Av Of 1/100 L-Mean -0.15 -1.31 -0.72
Av Of 1/1000 H-Mean 0.15 1.42 0.70
Av Of 1/1000 L-Mean -0.15 -1.36 -0.72
Maximum - Mean 0.15 1.42 0.70
Minimum - Mean -0.15 -1.36 -0.72
Pred. Max-Mean 0.19 1.70 0.84
Pred. Min-Mean -0.18 -1.63 -0.86
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.13 3.34 -4.21 -0.06 3.34 4.32 63.88 3.17 -4.71 63.94 3.18
Variance 0.00 0.25 0.05 0.00 0.22 0.05 0.00 0.24 0.03 0.00 0.21
Root Mean Square 0.14 3.37 4.21 0.08 3.37 4.33 63.88 3.21 4.71 63.94 3.21
Std. Deviation 0.06 0.50 0.23 0.05 0.47 0.23 0.06 0.49 0.18 0.05 0.46
Skewness -0.05 0.07 -0.02 -0.06 -0.02 -0.03 -0.04 0.02 -0.04 -0.06 -0.09
Kurtosis -0.23 -0.38 -0.16 -0.24 -0.57 -0.16 -0.23 -0.12 -0.14 -0.24 -0.23

Number of Peaks 184 255 273 197 303 273 187 255 269 185 303

Av Of 1/3 Highest -0.05 4.20 -3.75 0.02 4.06 4.78 63.96 4.02 -4.34 64.03 3.88
Av Of 1/3 Lowest -0.21 2.54 -4.68 -0.14 2.61 3.85 63.79 2.38 -5.09 63.86 2.45
Av Of 1/100 Highest 0.02 4.75 -3.52 0.08 4.50 5.02 64.03 4.62 -4.15 64.09 4.37
Av Of 1/100 Lowest -0.28 2.03 -4.93 -0.21 2.21 3.61 63.73 1.72 -5.29 63.79 1.91
Av Of 1/1000 Highest 0.02 4.76 -3.50 0.08 4.51 5.03 64.03 4.63 -4.14 64.09 4.38
Av Of 1/1000 Lowest -0.28 1.97 -4.93 -0.21 2.16 3.60 63.73 1.67 -5.32 63.79 1.86
Maximum 0.02 4.76 -3.50 0.08 4.51 5.03 64.03 4.63 -4.14 64.09 4.38
Minimum -0.28 1.97 -4.93 -0.21 2.16 3.60 63.73 1.67 -5.32 63.79 1.86
Pred. Max 0.06 5.04 -3.37 0.11 4.73 5.16 64.06 4.91 -4.03 64.12 4.60
Pred. Min -0.31 1.71 -5.07 -0.24 1.94 3.46 63.69 1.38 -5.44 63.76 1.61

Av Of 1/3 H-Mean 0.08 0.86 0.46 0.08 0.72 0.46 0.08 0.85 0.37 0.08 0.71
Av Of 1/3 L-Mean -0.08 -0.80 -0.47 -0.08 -0.73 -0.47 -0.09 -0.80 -0.38 -0.08 -0.73
Av Of 1/100 H-Mean 0.15 1.42 0.69 0.15 1.16 0.69 0.16 1.44 0.56 0.14 1.20
Av Of 1/100 L-Mean -0.15 -1.31 -0.72 -0.15 -1.13 -0.72 -0.15 -1.45 -0.58 -0.15 -1.26
Av Of 1/1000 H-Mean 0.15 1.42 0.70 0.15 1.17 0.70 0.16 1.45 0.57 0.14 1.20
Av Of 1/1000 L-Mean -0.15 -1.36 -0.72 -0.15 -1.17 -0.72 -0.15 -1.50 -0.61 -0.15 -1.31
Maximum - Mean 0.15 1.42 0.70 0.15 1.17 0.70 0.16 1.45 0.57 0.14 1.20
Minimum - Mean -0.15 -1.36 -0.72 -0.15 -1.17 -0.72 -0.15 -1.50 -0.61 -0.15 -1.31
Pred. Max-Mean 0.19 1.70 0.84 0.17 1.39 0.84 0.19 1.74 0.68 0.17 1.43
Pred. Min-Mean -0.18 -1.63 -0.86 -0.18 -1.40 -0.86 -0.18 -1.79 -0.73 -0.18 -1.56

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.88 3.01 -5.21 127.95 3.01 3.32


Variance 0.03 0.00 0.26 0.02 0.00 0.23 0.02
Root Mean Square 3.83 127.88 3.05 5.21 127.95 3.05 3.32
Std. Deviation 0.18 0.06 0.51 0.16 0.05 0.47 0.16
Skewness -0.04 -0.04 -0.05 -0.06 -0.06 -0.17 -0.06
Kurtosis -0.14 -0.23 0.23 -0.03 -0.24 0.22 -0.04

Number of Peaks 269 194 255 261 174 303 263

Av Of 1/3 Highest 4.19 127.97 3.86 -4.90 128.03 3.72 3.63


Av Of 1/3 Lowest 3.44 127.80 2.19 -5.54 127.86 2.27 3.00
Av Of 1/100 Highest 4.39 128.04 4.48 -4.74 128.09 4.25 3.79
Av Of 1/100 Lowest 3.24 127.73 1.42 -5.72 127.80 1.61 2.81
Av Of 1/1000 Highest 4.39 128.04 4.49 -4.73 128.09 4.28 3.81
Av Of 1/1000 Lowest 3.21 127.73 1.37 -5.72 127.80 1.56 2.81
Maximum 4.39 128.04 4.49 -4.73 128.09 4.28 3.81
Minimum 3.21 127.73 1.37 -5.72 127.80 1.56 2.81
Pred. Max 4.50 128.07 4.78 -4.63 128.12 4.52 3.90
Pred. Min 3.09 127.70 1.05 -5.82 127.77 1.29 2.71

Av Of 1/3 H-Mean 0.37 0.08 0.85 0.31 0.09 0.71 0.32


Av Of 1/3 L-Mean -0.38 -0.09 -0.82 -0.32 -0.08 -0.75 -0.32
Av Of 1/100 H-Mean 0.56 0.16 1.47 0.47 0.14 1.24 0.48
Av Of 1/100 L-Mean -0.58 -0.15 -1.59 -0.51 -0.15 -1.40 -0.51
Av Of 1/1000 H-Mean 0.57 0.16 1.48 0.49 0.14 1.26 0.49
Av Of 1/1000 L-Mean -0.61 -0.15 -1.64 -0.51 -0.15 -1.45 -0.51
Maximum - Mean 0.57 0.16 1.48 0.49 0.14 1.26 0.49
Minimum - Mean -0.61 -0.15 -1.64 -0.51 -0.15 -1.45 -0.51
Pred. Max-Mean 0.68 0.19 1.77 0.58 0.17 1.50 0.58
Pred. Min-Mean -0.73 -0.18 -1.96 -0.61 -0.18 -1.73 -0.61
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -46 -15 -8 0 0 0 51


BM2S DB30 -25 8 -5 0 0 0 28
BM3P DB30 -38 -64 -9 0 0 0 77
BM3S DB30 -6 13 -4 0 0 0 15
BM4P DB30 38 -64 -9 0 0 0 76
BM4S DB30 7 12 -3 0 0 0 15
BM5P DB30 49 -37 -8 0 0 0 63
BM5S DB30 26 6 -5 0 0 0 28
MAINLN DB30 9 7 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.5 -2.9 -24740.5 26 1663750 -197


Buoyancy -202.6 3.1 25913.1 -143 -1834594 217
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 1 3487
Wave 0.0 53.8 0.3 188 -30 3533
Flex. Connectors 9.1 -139.6 -1173.9 774 171007 -9614
======= ======= ======= ======= ======= =======
Total 0.0 -0.1 -1.0 49 131 -262

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -0.1 -7.1 -1114.3 13 166274 -1061


Wind 0.1 8.2 -0.3 -18 43 1231
Flex. Connectors 0.0 0.2 1115.3 -8 -166436 34
======= ======= ======= ======= ======= =======
Total 0.0 1.3 0.8 -15 -119 203
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1001.12 1001.58 412.66 50.66 0.1893 46.52 0.00


BM2S 999.14 1001.58 566.84 27.73 0.1022 22.28 0.00
BM3P 1002.79 1001.57 277.33 76.79 0.2897 73.79 0.00
BM3S 997.27 1001.57 682.25 15.19 0.0582 8.76 0.00
BM4P 1002.72 1001.50 286.46 75.95 0.2744 72.88 0.00
BM4S 997.17 1001.50 691.09 14.61 0.0554 8.12 0.00
BM5P 1001.88 1001.47 352.40 62.53 0.2379 58.91 0.00
BM5S 999.10 1001.46 571.71 27.58 0.1002 22.10 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -0.08 3.21 -4.21 0.01 0.45 0.00


N Force -0.01 -0.11 -0.99 49 131 -262

WHPBJKT Location 0.68 3.46 21.92 0.37 0.00 0.07


N Force 0.01 1.33 0.80 -15 -119 203
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 52.14 27.04 81.76 14.16 80.20 13.75 65.41 26.99


Variance 8.54 1.18 60.43 3.28 53.67 3.88 21.09 2.24
Root Mean Square 52.22 27.07 82.13 14.27 80.54 13.89 65.58 27.03
Std. Deviation 2.92 1.08 7.77 1.81 7.33 1.97 4.59 1.50
Skewness -0.33 0.49 -0.26 0.97 -0.22 1.17 -0.22 0.60
Kurtosis 0.32 0.76 0.33 1.61 0.50 2.29 0.48 0.69

Number of Peaks 265 255 239 241 237 271 241 257

Av Of 1/3 Highest 56.70 29.00 94.56 17.41 92.34 17.08 73.10 29.67
Av Of 1/3 Lowest 47.36 25.33 68.86 11.69 68.19 11.23 57.89 24.75
Av Of 1/100 Highest 59.50 30.95 103.13 21.40 101.76 22.25 78.88 32.13
Av Of 1/100 Lowest 43.01 23.75 57.29 10.06 56.88 9.55 51.00 23.18
Av Of 1/1000 Highest 59.63 30.98 104.26 21.49 103.27 22.33 79.71 32.30
Av Of 1/1000 Lowest 42.85 23.75 57.09 9.95 56.46 9.46 50.18 23.11
Maximum 59.63 30.98 104.26 21.49 103.27 22.33 79.71 32.30
Minimum 42.85 23.75 57.09 9.95 56.46 9.46 50.18 23.11
Pred. Max 61.09 31.75 108.71 22.94 107.84 23.99 82.54 33.34
Pred. Min 41.04 23.11 52.21 9.13 51.75 8.63 47.17 22.35

Av Of 1/3 H-Mean 4.56 1.95 12.80 3.25 12.14 3.32 7.68 2.68
Av Of 1/3 L-Mean -4.78 -1.71 -12.91 -2.47 -12.02 -2.53 -7.53 -2.24
Av Of 1/100 H-Mean 7.36 3.90 21.37 7.25 21.56 8.50 13.46 5.14
Av Of 1/100 L-Mean -9.13 -3.29 -24.47 -4.09 -23.33 -4.20 -14.42 -3.81
Av Of 1/1000 H-Mean 7.49 3.94 22.50 7.34 23.07 8.57 14.30 5.31
Av Of 1/1000 L-Mean -9.29 -3.29 -24.68 -4.20 -23.75 -4.29 -15.24 -3.88
Maximum - Mean 7.49 3.94 22.50 7.34 23.07 8.57 14.30 5.31
Minimum - Mean -9.29 -3.29 -24.68 -4.20 -23.75 -4.29 -15.24 -3.88
Pred. Max-Mean 8.95 4.71 26.95 8.79 27.64 10.24 17.12 6.35
Pred. Min-Mean -11.10 -3.94 -29.56 -5.03 -28.45 -5.12 -18.24 -4.64

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -0.08 3.54 -4.21


Variance 0.00 0.38 0.16
Root Mean Square 0.10 3.59 4.22
Std. Deviation 0.06 0.61 0.40
Skewness -0.36 -0.06 -0.03
Kurtosis -0.16 -0.01 -0.09

Number of Peaks 164 236 239

Av Of 1/3 Highest 0.01 4.65 -3.41


Av Of 1/3 Lowest -0.16 2.44 -5.03
Av Of 1/100 Highest 0.06 5.37 -3.01
Av Of 1/100 Lowest -0.26 1.72 -5.46
Av Of 1/1000 Highest 0.06 5.44 -2.96
Av Of 1/1000 Lowest -0.26 1.61 -5.46
Maximum 0.06 5.44 -2.96
Minimum -0.26 1.61 -5.46
Pred. Max 0.09 5.81 -2.71
Pred. Min -0.30 1.23 -5.71

Av Of 1/3 H-Mean 0.09 1.11 0.80


Av Of 1/3 L-Mean -0.08 -1.10 -0.82
Av Of 1/100 H-Mean 0.14 1.83 1.20
Av Of 1/100 L-Mean -0.18 -1.82 -1.25
Av Of 1/1000 H-Mean 0.14 1.90 1.25
Av Of 1/1000 L-Mean -0.18 -1.93 -1.26
Maximum - Mean 0.14 1.90 1.25
Minimum - Mean -0.18 -1.93 -1.26
Pred. Max-Mean 0.17 2.28 1.50
Pred. Min-Mean -0.22 -2.31 -1.51
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -0.08 3.54 -4.21 -0.01 3.54 4.33 63.93 3.50 -4.71 64.00 3.50
Variance 0.00 0.38 0.16 0.00 0.26 0.16 0.00 0.38 0.14 0.00 0.26
Root Mean Square 0.10 3.59 4.22 0.06 3.57 4.34 63.93 3.56 4.73 64.00 3.54
Std. Deviation 0.06 0.61 0.40 0.06 0.51 0.40 0.06 0.62 0.37 0.06 0.51
Skewness -0.36 -0.06 -0.03 -0.38 -0.35 -0.03 -0.36 -0.06 -0.07 -0.38 -0.35
Kurtosis -0.16 -0.01 -0.09 -0.15 0.40 -0.09 -0.16 0.06 -0.08 -0.15 0.52

Number of Peaks 164 236 239 144 235 239 167 237 235 129 234

Av Of 1/3 Highest 0.01 4.65 -3.41 0.08 4.35 5.13 64.02 4.61 -3.98 64.09 4.32
Av Of 1/3 Lowest -0.16 2.44 -5.03 -0.10 2.67 3.51 63.84 2.40 -5.48 63.91 2.63
Av Of 1/100 Highest 0.06 5.37 -3.01 0.12 4.88 5.52 64.07 5.38 -3.61 64.12 4.90
Av Of 1/100 Lowest -0.26 1.72 -5.46 -0.19 1.88 3.08 63.75 1.64 -5.85 63.82 1.81
Av Of 1/1000 Highest 0.06 5.44 -2.96 0.12 4.99 5.57 64.07 5.45 -3.56 64.12 5.01
Av Of 1/1000 Lowest -0.26 1.61 -5.46 -0.19 1.86 3.07 63.75 1.53 -5.86 63.82 1.78
Maximum 0.06 5.44 -2.96 0.12 4.99 5.57 64.07 5.45 -3.56 64.12 5.01
Minimum -0.26 1.61 -5.46 -0.19 1.86 3.07 63.75 1.53 -5.86 63.82 1.78
Pred. Max 0.09 5.81 -2.71 0.15 5.28 5.81 64.10 5.84 -3.33 64.15 5.31
Pred. Min -0.30 1.23 -5.71 -0.23 1.53 2.82 63.71 1.14 -6.08 63.78 1.44

Av Of 1/3 H-Mean 0.09 1.11 0.80 0.09 0.81 0.80 0.09 1.11 0.73 0.09 0.82
Av Of 1/3 L-Mean -0.08 -1.10 -0.82 -0.09 -0.87 -0.82 -0.08 -1.10 -0.77 -0.09 -0.87
Av Of 1/100 H-Mean 0.14 1.83 1.20 0.13 1.35 1.20 0.14 1.88 1.10 0.13 1.40
Av Of 1/100 L-Mean -0.18 -1.82 -1.25 -0.18 -1.65 -1.25 -0.18 -1.86 -1.14 -0.18 -1.69
Av Of 1/1000 H-Mean 0.14 1.90 1.25 0.13 1.46 1.24 0.14 1.95 1.15 0.13 1.51
Av Of 1/1000 L-Mean -0.18 -1.93 -1.26 -0.18 -1.68 -1.26 -0.18 -1.97 -1.15 -0.18 -1.72
Maximum - Mean 0.14 1.90 1.25 0.13 1.46 1.24 0.14 1.95 1.15 0.13 1.51
Minimum - Mean -0.18 -1.93 -1.26 -0.18 -1.68 -1.26 -0.18 -1.97 -1.15 -0.18 -1.72
Pred. Max-Mean 0.17 2.28 1.50 0.16 1.75 1.49 0.17 2.34 1.38 0.16 1.81
Pred. Min-Mean -0.22 -2.31 -1.51 -0.21 -2.01 -1.51 -0.22 -2.36 -1.37 -0.22 -2.06

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 127.93 3.46 -5.22 128.00 3.46 3.31


Variance 0.14 0.00 0.39 0.13 0.00 0.27 0.13
Root Mean Square 3.84 127.93 3.52 5.23 128.00 3.50 3.33
Std. Deviation 0.37 0.06 0.62 0.37 0.06 0.52 0.37
Skewness -0.07 -0.36 -0.06 -0.09 -0.38 -0.36 -0.09
Kurtosis -0.08 -0.16 0.13 -0.08 -0.15 0.64 -0.08

Number of Peaks 235 171 237 231 123 235 231

Av Of 1/3 Highest 4.56 128.02 4.58 -4.49 128.09 4.28 4.04


Av Of 1/3 Lowest 3.05 127.85 2.35 -5.98 127.91 2.60 2.55
Av Of 1/100 Highest 4.93 128.08 5.39 -4.16 128.13 4.92 4.37
Av Of 1/100 Lowest 2.68 127.75 1.56 -6.35 127.82 1.73 2.18
Av Of 1/1000 Highest 4.98 128.08 5.47 -4.14 128.13 5.03 4.40
Av Of 1/1000 Lowest 2.67 127.75 1.45 -6.37 127.82 1.70 2.16
Maximum 4.98 128.08 5.47 -4.14 128.13 5.03 4.40
Minimum 2.67 127.75 1.45 -6.37 127.82 1.70 2.16
Pred. Max 5.21 128.11 5.86 -3.92 128.15 5.33 4.61
Pred. Min 2.45 127.72 1.06 -6.60 127.78 1.36 1.93

Av Of 1/3 H-Mean 0.74 0.09 1.11 0.72 0.09 0.82 0.73


Av Of 1/3 L-Mean -0.77 -0.09 -1.11 -0.76 -0.09 -0.87 -0.76
Av Of 1/100 H-Mean 1.11 0.14 1.93 1.06 0.13 1.45 1.06
Av Of 1/100 L-Mean -1.14 -0.18 -1.91 -1.13 -0.18 -1.74 -1.13
Av Of 1/1000 H-Mean 1.16 0.14 2.00 1.08 0.13 1.56 1.08
Av Of 1/1000 L-Mean -1.15 -0.18 -2.01 -1.15 -0.18 -1.76 -1.15
Maximum - Mean 1.16 0.14 2.00 1.08 0.13 1.56 1.08
Minimum - Mean -1.15 -0.18 -2.01 -1.15 -0.18 -1.76 -1.15
Pred. Max-Mean 1.39 0.17 2.40 1.29 0.15 1.87 1.30
Pred. Min-Mean -1.37 -0.22 -2.41 -1.38 -0.22 -2.11 -1.38
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -28 -9 -6 0 0 0 32


BM2S DB30 -20 6 -5 0 0 0 23
BM3P DB30 -23 -39 -7 0 0 0 47
BM3S DB30 -8 16 -4 0 0 0 19
BM4P DB30 31 -53 -8 0 0 0 63
BM4S DB30 13 23 -5 0 0 0 27
BM5P DB30 48 -36 -8 0 0 0 61
BM5S DB30 42 10 -6 0 0 0 44
MAINLN DB30 4 6 -1113 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.5 9.5 -24740.5 -85 1663749 641


Buoyancy -202.4 -10.0 25884.3 469 -1832667 -702
Wind -12.7 24.2 0.0 -411 -246 1612
Drag -12.9 36.2 -3.3 -149 34 2464
Wave -20.2 20.0 30.6 -38 -1880 930
Flex. Connectors 54.7 -79.9 -1171.1 218 171020 -6332
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 6 -1389

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.5 -5.9 -1114.3 11 166282 -884


Wind -4.6 6.0 -0.2 -13 20 912
Flex. Connectors 0.1 -0.1 1114.5 3 -166308 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -5 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 999.55 1001.58 536.71 31.67 0.1183 26.47 0.00


BM2S 998.51 1001.58 609.10 22.68 0.0836 16.88 0.00
BM3P 1000.89 1001.57 432.90 47.45 0.1790 43.12 0.00
BM3S 998.04 1001.57 639.68 19.41 0.0743 13.36 0.00
BM4P 1001.94 1001.50 349.83 63.17 0.2282 59.55 0.00
BM4S 999.07 1001.50 577.26 26.92 0.1021 21.41 0.00
BM5P 1001.81 1001.47 358.19 61.45 0.2337 57.76 0.00
BM5S 1000.56 1001.46 459.19 43.78 0.1591 39.27 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.20 1.66 -4.21 -0.02 0.45 0.00


N Force -0.01 0.00 -0.04 0 6 -1389

WHPBJKT Location -0.57 -5.16 22.54 0.30 0.23 2.77


N Force 0.00 0.00 0.04 0 -5 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 31.89 22.32 48.61 18.68 65.45 26.26 63.50 44.26


Variance 19.76 10.96 11.14 2.73 20.67 4.18 40.15 35.24
Root Mean Square 32.20 22.56 48.72 18.75 65.61 26.34 63.81 44.66
Std. Deviation 4.44 3.31 3.34 1.65 4.55 2.05 6.34 5.94
Skewness 0.17 0.15 0.22 -0.09 0.33 0.00 0.26 0.18
Kurtosis -0.85 -0.85 -0.73 -0.59 -0.45 -0.81 -0.66 -0.86

Number of Peaks 90 62 126 64 58 108 58 74

Av Of 1/3 Highest 40.53 28.41 54.88 21.54 73.57 29.80 74.89 54.48
Av Of 1/3 Lowest 24.96 17.12 43.23 15.69 58.09 22.73 53.19 33.97
Av Of 1/100 Highest 42.99 29.92 57.35 22.57 77.92 30.60 80.02 58.12
Av Of 1/100 Lowest 23.36 15.55 42.14 14.76 56.16 21.47 51.50 32.23
Av Of 1/1000 Highest 42.99 29.92 57.35 22.57 77.92 30.60 80.02 58.12
Av Of 1/1000 Lowest 23.36 15.55 42.14 14.76 56.16 21.47 51.50 32.23
Maximum 42.99 29.92 57.35 22.57 77.92 30.60 80.02 58.12
Minimum 23.36 15.55 42.14 14.76 56.16 21.47 51.50 32.23
Pred. Max 45.61 31.87 59.28 23.55 81.16 31.59 84.30 61.53
Pred. Min 21.34 13.82 40.71 13.76 53.75 20.38 48.39 29.27

Av Of 1/3 H-Mean 8.64 6.09 6.27 2.85 8.12 3.54 11.39 10.22
Av Of 1/3 L-Mean -6.93 -5.20 -5.38 -2.99 -7.36 -3.53 -10.31 -10.29
Av Of 1/100 H-Mean 11.10 7.61 8.74 3.88 12.47 4.34 16.52 13.86
Av Of 1/100 L-Mean -8.54 -6.77 -6.47 -3.93 -9.29 -4.79 -12.00 -12.03
Av Of 1/1000 H-Mean 11.10 7.61 8.74 3.88 12.47 4.34 16.52 13.86
Av Of 1/1000 L-Mean -8.54 -6.77 -6.47 -3.93 -9.29 -4.79 -12.00 -12.03
Maximum - Mean 11.10 7.61 8.74 3.88 12.47 4.34 16.52 13.86
Minimum - Mean -8.54 -6.77 -6.47 -3.93 -9.29 -4.79 -12.00 -12.03
Pred. Max-Mean 13.72 9.55 10.68 4.87 15.71 5.33 20.80 17.27
Pred. Min-Mean -10.56 -8.50 -7.90 -4.92 -11.70 -5.88 -15.11 -14.99

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.25 1.78 -4.21


Variance 0.23 0.02 0.00
Root Mean Square 1.34 1.78 4.21
Std. Deviation 0.48 0.12 0.02
Skewness -0.07 0.19 -0.01
Kurtosis -0.86 -0.44 -0.19

Number of Peaks 90 164 333

Av Of 1/3 Highest -0.40 1.97 -4.17


Av Of 1/3 Lowest -2.01 1.61 -4.24
Av Of 1/100 Highest -0.23 2.14 -4.14
Av Of 1/100 Lowest -2.34 1.51 -4.26
Av Of 1/1000 Highest -0.23 2.14 -4.14
Av Of 1/1000 Lowest -2.34 1.51 -4.27
Maximum -0.23 2.14 -4.14
Minimum -2.34 1.51 -4.27
Pred. Max 0.02 2.22 -4.13
Pred. Min -2.59 1.45 -4.28

Av Of 1/3 H-Mean 0.85 0.19 0.04


Av Of 1/3 L-Mean -0.75 -0.17 -0.04
Av Of 1/100 H-Mean 1.03 0.36 0.06
Av Of 1/100 L-Mean -1.08 -0.27 -0.06
Av Of 1/1000 H-Mean 1.03 0.36 0.07
Av Of 1/1000 L-Mean -1.08 -0.27 -0.06
Maximum - Mean 1.03 0.36 0.07
Minimum - Mean -1.08 -0.27 -0.06
Pred. Max-Mean 1.27 0.44 0.08
Pred. Min-Mean -1.34 -0.33 -0.07
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.25 1.78 -4.21 -1.19 1.78 4.33 62.75 1.78 -4.71 62.82 1.79
Variance 0.23 0.02 0.00 0.23 0.02 0.00 0.23 0.02 0.00 0.23 0.02
Root Mean Square 1.34 1.78 4.21 1.28 1.79 4.33 62.76 1.79 4.71 62.82 1.79
Std. Deviation 0.48 0.12 0.02 0.48 0.12 0.02 0.48 0.12 0.01 0.48 0.12
Skewness -0.07 0.19 -0.01 -0.07 0.19 -0.01 -0.07 0.19 0.06 -0.07 0.18
Kurtosis -0.86 -0.44 -0.19 -0.86 -0.44 -0.19 -0.86 -0.46 0.00 -0.86 -0.46

Number of Peaks 90 164 333 84 136 333 92 165 323 84 137

Av Of 1/3 Highest -0.40 1.97 -4.17 -0.34 1.95 4.36 63.59 1.98 -4.69 63.67 1.96
Av Of 1/3 Lowest -2.01 1.61 -4.24 -1.95 1.61 4.29 62.01 1.61 -4.73 62.05 1.61
Av Of 1/100 Highest -0.23 2.14 -4.14 -0.17 2.13 4.39 63.78 2.14 -4.68 63.84 2.13
Av Of 1/100 Lowest -2.34 1.51 -4.26 -2.27 1.51 4.27 61.67 1.51 -4.74 61.74 1.52
Av Of 1/1000 Highest -0.23 2.14 -4.14 -0.17 2.13 4.39 63.78 2.14 -4.67 63.84 2.13
Av Of 1/1000 Lowest -2.34 1.51 -4.27 -2.27 1.51 4.27 61.67 1.51 -4.74 61.74 1.52
Maximum -0.23 2.14 -4.14 -0.17 2.13 4.39 63.78 2.14 -4.67 63.84 2.13
Minimum -2.34 1.51 -4.27 -2.27 1.51 4.27 61.67 1.51 -4.74 61.74 1.52
Pred. Max 0.02 2.22 -4.13 0.08 2.21 4.41 64.02 2.22 -4.67 64.08 2.21
Pred. Min -2.59 1.45 -4.28 -2.53 1.45 4.26 61.41 1.46 -4.74 61.48 1.46

Av Of 1/3 H-Mean 0.85 0.19 0.04 0.85 0.17 0.04 0.84 0.20 0.02 0.85 0.17
Av Of 1/3 L-Mean -0.75 -0.17 -0.04 -0.77 -0.18 -0.04 -0.74 -0.17 -0.02 -0.77 -0.18
Av Of 1/100 H-Mean 1.03 0.36 0.06 1.02 0.35 0.06 1.03 0.36 0.03 1.02 0.34
Av Of 1/100 L-Mean -1.08 -0.27 -0.06 -1.08 -0.27 -0.06 -1.08 -0.27 -0.03 -1.08 -0.27
Av Of 1/1000 H-Mean 1.03 0.36 0.07 1.02 0.35 0.07 1.03 0.36 0.03 1.02 0.34
Av Of 1/1000 L-Mean -1.08 -0.27 -0.06 -1.08 -0.27 -0.06 -1.08 -0.27 -0.03 -1.08 -0.27
Maximum - Mean 1.03 0.36 0.07 1.02 0.35 0.07 1.03 0.36 0.03 1.02 0.34
Minimum - Mean -1.08 -0.27 -0.06 -1.08 -0.27 -0.06 -1.08 -0.27 -0.03 -1.08 -0.27
Pred. Max-Mean 1.27 0.44 0.08 1.26 0.42 0.08 1.27 0.44 0.04 1.26 0.42
Pred. Min-Mean -1.34 -0.33 -0.07 -1.34 -0.33 -0.07 -1.34 -0.33 -0.03 -1.34 -0.33

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 126.76 1.79 -5.21 126.83 1.79 3.33


Variance 0.00 0.23 0.02 0.00 0.23 0.02 0.00
Root Mean Square 3.83 126.76 1.80 5.21 126.83 1.80 3.33
Std. Deviation 0.01 0.48 0.12 0.03 0.48 0.12 0.03
Skewness 0.06 -0.07 0.18 0.03 -0.07 0.18 0.03
Kurtosis 0.00 -0.86 -0.48 -0.20 -0.86 -0.48 -0.20

Number of Peaks 323 94 165 325 82 138 325

Av Of 1/3 Highest 3.85 127.60 1.99 -5.13 127.67 1.97 3.40


Av Of 1/3 Lowest 3.81 126.00 1.62 -5.28 126.06 1.62 3.26
Av Of 1/100 Highest 3.86 127.79 2.15 -5.10 127.84 2.14 3.43
Av Of 1/100 Lowest 3.80 125.67 1.52 -5.30 125.74 1.53 3.23
Av Of 1/1000 Highest 3.86 127.79 2.15 -5.10 127.84 2.14 3.44
Av Of 1/1000 Lowest 3.80 125.67 1.52 -5.31 125.74 1.53 3.23
Maximum 3.86 127.79 2.15 -5.10 127.84 2.14 3.44
Minimum 3.80 125.67 1.52 -5.31 125.74 1.53 3.23
Pred. Max 3.87 128.03 2.22 -5.08 128.09 2.21 3.46
Pred. Min 3.79 125.42 1.47 -5.33 125.48 1.47 3.21

Av Of 1/3 H-Mean 0.02 0.84 0.20 0.07 0.85 0.17 0.07


Av Of 1/3 L-Mean -0.02 -0.76 -0.17 -0.07 -0.77 -0.18 -0.07
Av Of 1/100 H-Mean 0.03 1.03 0.36 0.11 1.02 0.34 0.11
Av Of 1/100 L-Mean -0.03 -1.08 -0.27 -0.10 -1.08 -0.27 -0.10
Av Of 1/1000 H-Mean 0.03 1.03 0.36 0.11 1.02 0.34 0.11
Av Of 1/1000 L-Mean -0.03 -1.08 -0.27 -0.10 -1.08 -0.27 -0.10
Maximum - Mean 0.03 1.03 0.36 0.11 1.02 0.34 0.11
Minimum - Mean -0.03 -1.08 -0.27 -0.10 -1.08 -0.27 -0.10
Pred. Max-Mean 0.04 1.27 0.43 0.13 1.26 0.42 0.13
Pred. Min-Mean -0.03 -1.34 -0.33 -0.12 -1.35 -0.33 -0.12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -28 -9 -6 0 0 0 31


BM2S DB30 -19 6 -5 0 0 0 22
BM3P DB30 -23 -40 -7 0 0 0 48
BM3S DB30 -8 16 -4 0 0 0 19
BM4P DB30 32 -55 -8 0 0 0 65
BM4S DB30 13 22 -5 0 0 0 27
BM5P DB30 49 -38 -8 0 0 0 63
BM5S DB30 43 11 -6 0 0 0 44
MAINLN DB30 4 6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.5 5.3 -24740.5 -47 1663749 357


Buoyancy -202.3 -5.6 25881.4 261 -1832467 -390
Wind -12.7 24.2 0.0 -411 -246 1612
Drag -12.9 36.2 -3.4 -149 35 2463
Wave -24.4 24.1 33.5 73 -2144 1109
Flex. Connectors 58.9 -84.3 -1171.1 276 171081 -6709
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 4 -1560

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.6 -5.9 -1114.3 11 166282 -879


Wind -4.6 6.0 -0.2 -13 20 907
Flex. Connectors 0.1 -0.1 1114.5 3 -166306 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -4 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 999.51 1001.58 539.92 31.25 0.1168 26.02 0.00


BM2S 998.41 1001.58 615.97 21.88 0.0806 16.01 0.00
BM3P 1000.93 1001.57 429.61 48.00 0.1811 43.71 0.00
BM3S 997.92 1001.57 646.60 18.71 0.0717 12.59 0.00
BM4P 1002.06 1001.50 339.87 65.05 0.2350 61.52 0.00
BM4S 999.02 1001.50 580.30 26.53 0.1006 20.98 0.00
BM5P 1001.93 1001.47 348.32 63.36 0.2410 59.76 0.00
BM5S 1000.62 1001.46 454.79 44.50 0.1617 40.01 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.28 1.75 -4.21 -0.01 0.45 0.00


N Force -0.01 0.00 -0.03 0 4 -1560

WHPBJKT Location -0.69 -4.27 22.55 0.30 0.23 2.46


N Force 0.00 0.00 0.03 0 -4 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 31.44 21.52 49.36 17.90 67.44 25.83 65.42 44.82


Variance 14.01 7.80 8.44 2.29 19.97 2.97 33.70 25.57
Root Mean Square 31.66 21.70 49.45 17.97 67.59 25.89 65.68 45.10
Std. Deviation 3.74 2.79 2.91 1.51 4.47 1.72 5.80 5.06
Skewness 0.34 0.20 0.37 -0.34 0.57 -0.09 0.36 0.07
Kurtosis -0.39 -0.46 -0.27 -0.46 -0.13 -0.38 -0.31 -0.50

Number of Peaks 201 165 231 167 191 237 177 199

Av Of 1/3 Highest 38.23 26.52 54.34 20.31 74.40 28.62 74.46 53.09
Av Of 1/3 Lowest 25.87 17.85 45.04 15.55 60.91 23.05 56.20 36.43
Av Of 1/100 Highest 41.42 29.28 57.49 21.25 80.17 29.84 81.16 56.82
Av Of 1/100 Lowest 24.07 15.62 43.33 14.20 58.57 21.47 52.58 32.87
Av Of 1/1000 Highest 41.91 29.28 57.65 21.25 80.17 29.92 81.16 56.82
Av Of 1/1000 Lowest 24.02 15.62 43.23 14.20 58.57 21.37 52.58 32.87
Maximum 41.91 29.28 57.65 21.25 80.17 29.92 81.16 56.82
Minimum 24.02 15.62 43.23 14.20 58.57 21.37 52.58 32.87
Pred. Max 44.04 30.92 59.29 21.95 82.78 30.72 84.43 59.27
Pred. Min 22.51 14.37 42.01 13.42 56.75 20.49 49.91 30.44

Av Of 1/3 H-Mean 6.79 5.00 4.97 2.40 6.96 2.79 9.04 8.27
Av Of 1/3 L-Mean -5.57 -3.67 -4.32 -2.36 -6.53 -2.78 -9.22 -8.39
Av Of 1/100 H-Mean 9.98 7.76 8.13 3.34 12.73 4.01 15.73 12.00
Av Of 1/100 L-Mean -7.36 -5.90 -6.03 -3.70 -8.87 -4.36 -12.84 -11.94
Av Of 1/1000 H-Mean 10.47 7.76 8.28 3.34 12.73 4.08 15.73 12.00
Av Of 1/1000 L-Mean -7.42 -5.90 -6.13 -3.70 -8.87 -4.46 -12.84 -11.94
Maximum - Mean 10.47 7.76 8.28 3.34 12.73 4.08 15.73 12.00
Minimum - Mean -7.42 -5.90 -6.13 -3.70 -8.87 -4.46 -12.84 -11.94
Pred. Max-Mean 12.60 9.40 9.93 4.04 15.34 4.89 19.01 14.45
Pred. Min-Mean -8.93 -7.15 -7.35 -4.48 -10.69 -5.35 -15.52 -14.38

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.33 1.89 -4.21


Variance 0.17 0.02 0.00
Root Mean Square 1.39 1.90 4.21
Std. Deviation 0.41 0.15 0.03
Skewness 0.00 0.57 -0.07
Kurtosis -0.49 -0.31 -0.14

Number of Peaks 189 258 285

Av Of 1/3 Highest -0.63 2.16 -4.15


Av Of 1/3 Lowest -1.97 1.69 -4.26
Av Of 1/100 Highest -0.31 2.34 -4.12
Av Of 1/100 Lowest -2.29 1.61 -4.30
Av Of 1/1000 Highest -0.31 2.37 -4.12
Av Of 1/1000 Lowest -2.29 1.60 -4.32
Maximum -0.31 2.37 -4.12
Minimum -2.29 1.60 -4.32
Pred. Max -0.11 2.46 -4.11
Pred. Min -2.49 1.55 -4.34

Av Of 1/3 H-Mean 0.70 0.27 0.06


Av Of 1/3 L-Mean -0.65 -0.21 -0.06
Av Of 1/100 H-Mean 1.01 0.45 0.08
Av Of 1/100 L-Mean -0.96 -0.28 -0.10
Av Of 1/1000 H-Mean 1.01 0.47 0.08
Av Of 1/1000 L-Mean -0.96 -0.29 -0.11
Maximum - Mean 1.01 0.47 0.08
Minimum - Mean -0.96 -0.29 -0.11
Pred. Max-Mean 1.22 0.57 0.10
Pred. Min-Mean -1.16 -0.35 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.33 1.89 -4.21 -1.26 1.90 4.33 62.68 1.89 -4.71 62.74 1.89
Variance 0.17 0.02 0.00 0.17 0.02 0.00 0.17 0.02 0.00 0.17 0.02
Root Mean Square 1.39 1.90 4.21 1.33 1.90 4.33 62.68 1.90 4.71 62.75 1.90
Std. Deviation 0.41 0.15 0.03 0.41 0.15 0.03 0.41 0.15 0.03 0.41 0.15
Skewness 0.00 0.57 -0.07 0.00 0.57 -0.07 0.00 0.57 -0.05 0.00 0.57
Kurtosis -0.49 -0.31 -0.14 -0.49 -0.34 -0.14 -0.49 -0.29 -0.21 -0.49 -0.33

Number of Peaks 189 258 285 191 269 285 189 258 284 191 269

Av Of 1/3 Highest -0.63 2.16 -4.15 -0.56 2.14 4.38 63.38 2.16 -4.66 63.45 2.14
Av Of 1/3 Lowest -1.97 1.69 -4.26 -1.91 1.70 4.27 62.03 1.69 -4.76 62.10 1.70
Av Of 1/100 Highest -0.31 2.34 -4.12 -0.25 2.32 4.41 63.69 2.34 -4.63 63.76 2.32
Av Of 1/100 Lowest -2.29 1.61 -4.30 -2.22 1.61 4.23 61.72 1.61 -4.79 61.78 1.61
Av Of 1/1000 Highest -0.31 2.37 -4.12 -0.25 2.33 4.41 63.69 2.37 -4.63 63.76 2.33
Av Of 1/1000 Lowest -2.29 1.60 -4.32 -2.22 1.60 4.22 61.72 1.60 -4.79 61.78 1.60
Maximum -0.31 2.37 -4.12 -0.25 2.33 4.41 63.69 2.37 -4.63 63.76 2.33
Minimum -2.29 1.60 -4.32 -2.22 1.60 4.22 61.72 1.60 -4.79 61.78 1.60
Pred. Max -0.11 2.46 -4.11 -0.04 2.42 4.43 63.90 2.46 -4.61 63.97 2.41
Pred. Min -2.49 1.55 -4.34 -2.42 1.55 4.20 61.52 1.54 -4.81 61.58 1.54

Av Of 1/3 H-Mean 0.70 0.27 0.06 0.70 0.25 0.06 0.70 0.26 0.05 0.70 0.25
Av Of 1/3 L-Mean -0.65 -0.21 -0.06 -0.64 -0.20 -0.06 -0.65 -0.21 -0.05 -0.64 -0.20
Av Of 1/100 H-Mean 1.01 0.45 0.08 1.02 0.43 0.08 1.01 0.45 0.08 1.02 0.43
Av Of 1/100 L-Mean -0.96 -0.28 -0.10 -0.96 -0.28 -0.10 -0.96 -0.28 -0.08 -0.96 -0.29
Av Of 1/1000 H-Mean 1.01 0.47 0.08 1.02 0.44 0.08 1.01 0.47 0.08 1.02 0.44
Av Of 1/1000 L-Mean -0.96 -0.29 -0.11 -0.96 -0.29 -0.11 -0.96 -0.29 -0.09 -0.96 -0.29
Maximum - Mean 1.01 0.47 0.08 1.02 0.44 0.08 1.01 0.47 0.08 1.02 0.44
Minimum - Mean -0.96 -0.29 -0.11 -0.96 -0.29 -0.11 -0.96 -0.29 -0.09 -0.96 -0.29
Pred. Max-Mean 1.22 0.57 0.10 1.22 0.52 0.10 1.22 0.57 0.10 1.22 0.52
Pred. Min-Mean -1.16 -0.35 -0.13 -1.16 -0.35 -0.13 -1.16 -0.35 -0.10 -1.16 -0.35

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 126.68 1.89 -5.21 126.75 1.89 3.33


Variance 0.00 0.17 0.02 0.00 0.17 0.02 0.00
Root Mean Square 3.83 126.68 1.89 5.21 126.75 1.90 3.33
Std. Deviation 0.03 0.41 0.15 0.02 0.41 0.15 0.02
Skewness -0.05 0.00 0.56 -0.04 0.00 0.56 -0.04
Kurtosis -0.21 -0.49 -0.28 -0.11 -0.49 -0.31 -0.11

Number of Peaks 287 189 258 273 191 269 275

Av Of 1/3 Highest 3.88 127.38 2.15 -5.16 127.45 2.13 3.38


Av Of 1/3 Lowest 3.78 126.04 1.68 -5.26 126.10 1.69 3.28
Av Of 1/100 Highest 3.90 127.70 2.34 -5.13 127.76 2.32 3.40
Av Of 1/100 Lowest 3.74 125.72 1.60 -5.29 125.79 1.60 3.25
Av Of 1/1000 Highest 3.91 127.70 2.36 -5.13 127.76 2.33 3.41
Av Of 1/1000 Lowest 3.74 125.72 1.60 -5.29 125.79 1.60 3.24
Maximum 3.91 127.70 2.36 -5.13 127.76 2.33 3.41
Minimum 3.74 125.72 1.60 -5.29 125.79 1.60 3.24
Pred. Max 3.92 127.91 2.46 -5.11 127.97 2.41 3.42
Pred. Min 3.72 125.52 1.54 -5.31 125.59 1.54 3.23

Av Of 1/3 H-Mean 0.05 0.70 0.26 0.05 0.70 0.24 0.05


Av Of 1/3 L-Mean -0.05 -0.65 -0.21 -0.05 -0.64 -0.20 -0.05
Av Of 1/100 H-Mean 0.08 1.01 0.45 0.08 1.02 0.43 0.08
Av Of 1/100 L-Mean -0.08 -0.96 -0.28 -0.08 -0.96 -0.29 -0.08
Av Of 1/1000 H-Mean 0.08 1.01 0.48 0.08 1.02 0.44 0.08
Av Of 1/1000 L-Mean -0.09 -0.96 -0.29 -0.08 -0.96 -0.29 -0.08
Maximum - Mean 0.08 1.01 0.48 0.08 1.02 0.44 0.08
Minimum - Mean -0.09 -0.96 -0.29 -0.08 -0.96 -0.29 -0.08
Pred. Max-Mean 0.10 1.22 0.57 0.10 1.22 0.52 0.10
Pred. Min-Mean -0.10 -1.16 -0.35 -0.10 -1.16 -0.35 -0.10
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -27 -9 -6 0 0 0 31


BM2S DB30 -18 6 -4 0 0 0 21
BM3P DB30 -24 -40 -7 0 0 0 49
BM3S DB30 -8 15 -4 0 0 0 18
BM4P DB30 34 -57 -8 0 0 0 68
BM4S DB30 13 22 -5 0 0 0 26
BM5P DB30 51 -39 -8 0 0 0 66
BM5S DB30 44 11 -6 0 0 0 45
MAINLN DB30 4 6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.5 1.2 -24740.5 -10 1663749 80


Buoyancy -202.4 -1.3 25883.0 59 -1832588 -87
Wind -12.7 24.2 0.0 -411 -246 1612
Drag -12.9 36.2 -3.4 -149 36 2463
Wave -30.0 29.7 32.0 168 -2109 1463
Flex. Connectors 64.5 -90.1 -1171.1 347 171146 -7209
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -14 -1679

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.5 -5.9 -1114.3 11 166282 -883


Wind -4.6 6.0 -0.2 -13 20 911
Flex. Connectors 0.1 -0.1 1114.4 3 -166287 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 15 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 999.45 1001.58 544.29 30.68 0.1146 25.42 0.00


BM2S 998.27 1001.58 624.59 20.92 0.0771 14.99 0.00
BM3P 1000.98 1001.57 425.38 48.72 0.1838 44.47 0.00
BM3S 997.76 1001.57 655.75 17.78 0.0681 11.58 0.00
BM4P 1002.22 1001.50 326.81 67.69 0.2445 64.27 0.00
BM4S 998.97 1001.50 584.18 26.04 0.0987 20.45 0.00
BM5P 1002.09 1001.47 335.23 65.94 0.2508 62.46 0.00
BM5S 1000.69 1001.46 448.82 45.46 0.1652 41.02 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.39 1.88 -4.21 0.00 0.45 0.00


N Force -0.01 0.00 0.10 0 -14 -1679

WHPBJKT Location -0.77 -4.83 22.54 0.30 0.23 2.72


N Force 0.00 0.00 -0.10 0 15 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 30.74 20.71 49.40 17.35 69.79 25.52 67.73 45.93


Variance 13.21 8.33 9.24 3.60 33.61 3.20 46.07 26.49
Root Mean Square 30.95 20.91 49.49 17.46 70.03 25.58 68.07 46.22
Std. Deviation 3.63 2.89 3.04 1.90 5.80 1.79 6.79 5.15
Skewness 0.31 0.23 0.32 0.10 0.29 -0.12 0.28 0.10
Kurtosis -0.50 -0.35 -0.43 -0.45 -0.55 -0.41 -0.49 -0.53

Number of Peaks 110 128 88 162 185 83 158 132

Av Of 1/3 Highest 37.69 26.07 54.17 20.32 79.72 28.24 79.48 54.91
Av Of 1/3 Lowest 25.47 16.15 44.98 14.34 61.57 22.37 57.68 37.38
Av Of 1/100 Highest 40.03 29.05 57.55 22.97 84.72 29.74 85.03 59.49
Av Of 1/100 Lowest 22.99 14.93 42.80 13.29 55.98 21.03 51.50 34.77
Av Of 1/1000 Highest 40.03 29.05 57.55 22.97 84.72 29.74 85.03 59.49
Av Of 1/1000 Lowest 22.99 14.93 42.80 13.29 55.98 21.03 51.50 34.77
Maximum 40.03 29.05 57.55 22.97 84.72 29.74 85.03 59.49
Minimum 22.99 14.93 42.80 13.29 55.98 21.03 51.50 34.77
Pred. Max 42.14 30.89 59.48 24.16 87.80 30.76 88.71 62.47
Pred. Min 21.23 13.65 41.24 12.44 53.13 19.95 48.05 32.32

Av Of 1/3 H-Mean 6.95 5.36 4.77 2.96 9.93 2.72 11.74 8.97
Av Of 1/3 L-Mean -5.27 -4.57 -4.42 -3.02 -8.22 -3.15 -10.06 -8.56
Av Of 1/100 H-Mean 9.29 8.33 8.15 5.62 14.93 4.22 17.30 13.56
Av Of 1/100 L-Mean -7.75 -5.79 -6.60 -4.06 -13.81 -4.49 -16.23 -11.16
Av Of 1/1000 H-Mean 9.29 8.33 8.15 5.62 14.93 4.22 17.30 13.56
Av Of 1/1000 L-Mean -7.75 -5.79 -6.60 -4.06 -13.81 -4.49 -16.23 -11.16
Maximum - Mean 9.29 8.33 8.15 5.62 14.93 4.22 17.30 13.56
Minimum - Mean -7.75 -5.79 -6.60 -4.06 -13.81 -4.49 -16.23 -11.16
Pred. Max-Mean 11.40 10.17 10.09 6.80 18.02 5.24 20.98 16.54
Pred. Min-Mean -9.51 -7.07 -8.16 -4.92 -16.66 -5.57 -19.68 -13.61

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.43 1.95 -4.21


Variance 0.18 0.06 0.02
Root Mean Square 1.49 1.97 4.21
Std. Deviation 0.42 0.24 0.13
Skewness -0.03 0.02 0.00
Kurtosis -0.48 -0.51 -0.23

Number of Peaks 210 261 272

Av Of 1/3 Highest -0.76 2.32 -3.95


Av Of 1/3 Lowest -2.12 1.61 -4.46
Av Of 1/100 Highest -0.44 2.54 -3.83
Av Of 1/100 Lowest -2.44 1.39 -4.60
Av Of 1/1000 Highest -0.42 2.56 -3.82
Av Of 1/1000 Lowest -2.50 1.38 -4.62
Maximum -0.42 2.56 -3.82
Minimum -2.50 1.38 -4.62
Pred. Max -0.22 2.68 -3.75
Pred. Min -2.72 1.27 -4.70

Av Of 1/3 H-Mean 0.68 0.37 0.26


Av Of 1/3 L-Mean -0.69 -0.35 -0.26
Av Of 1/100 H-Mean 1.00 0.59 0.38
Av Of 1/100 L-Mean -1.01 -0.56 -0.39
Av Of 1/1000 H-Mean 1.01 0.61 0.39
Av Of 1/1000 L-Mean -1.07 -0.57 -0.41
Maximum - Mean 1.01 0.61 0.39
Minimum - Mean -1.07 -0.57 -0.41
Pred. Max-Mean 1.22 0.73 0.46
Pred. Min-Mean -1.28 -0.68 -0.49
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.43 1.95 -4.21 -1.37 1.95 4.33 62.57 1.98 -4.71 62.64 1.98
Variance 0.18 0.06 0.02 0.18 0.05 0.02 0.18 0.06 0.00 0.18 0.05
Root Mean Square 1.49 1.97 4.21 1.43 1.97 4.33 62.57 1.99 4.71 62.64 1.99
Std. Deviation 0.42 0.24 0.13 0.42 0.23 0.13 0.42 0.23 0.02 0.42 0.23
Skewness -0.03 0.02 0.00 -0.03 0.02 0.00 -0.03 0.06 -0.03 -0.03 0.06
Kurtosis -0.48 -0.51 -0.23 -0.50 -0.52 -0.23 -0.48 -0.63 0.10 -0.50 -0.65

Number of Peaks 210 261 272 156 228 272 212 261 251 158 231

Av Of 1/3 Highest -0.76 2.32 -3.95 -0.65 2.33 4.59 63.24 2.34 -4.67 63.35 2.35
Av Of 1/3 Lowest -2.12 1.61 -4.46 -2.11 1.59 4.07 61.89 1.63 -4.74 61.90 1.62
Av Of 1/100 Highest -0.44 2.54 -3.83 -0.36 2.50 4.71 63.57 2.55 -4.66 63.64 2.51
Av Of 1/100 Lowest -2.44 1.39 -4.60 -2.40 1.41 3.94 61.56 1.44 -4.76 61.61 1.46
Av Of 1/1000 Highest -0.42 2.56 -3.82 -0.36 2.53 4.71 63.58 2.57 -4.66 63.64 2.54
Av Of 1/1000 Lowest -2.50 1.38 -4.62 -2.40 1.40 3.92 61.50 1.43 -4.77 61.61 1.45
Maximum -0.42 2.56 -3.82 -0.36 2.53 4.71 63.58 2.57 -4.66 63.64 2.54
Minimum -2.50 1.38 -4.62 -2.40 1.40 3.92 61.50 1.43 -4.77 61.61 1.45
Pred. Max -0.22 2.68 -3.75 -0.15 2.64 4.79 63.79 2.68 -4.65 63.86 2.65
Pred. Min -2.72 1.27 -4.70 -2.61 1.29 3.84 61.29 1.32 -4.78 61.39 1.35

Av Of 1/3 H-Mean 0.68 0.37 0.26 0.71 0.38 0.26 0.67 0.36 0.03 0.71 0.37
Av Of 1/3 L-Mean -0.69 -0.35 -0.26 -0.74 -0.36 -0.26 -0.68 -0.34 -0.03 -0.74 -0.36
Av Of 1/100 H-Mean 1.00 0.59 0.38 1.00 0.55 0.38 1.00 0.57 0.05 1.00 0.54
Av Of 1/100 L-Mean -1.01 -0.56 -0.39 -1.03 -0.54 -0.39 -1.01 -0.54 -0.06 -1.03 -0.52
Av Of 1/1000 H-Mean 1.01 0.61 0.39 1.00 0.58 0.39 1.01 0.59 0.05 1.00 0.56
Av Of 1/1000 L-Mean -1.07 -0.57 -0.41 -1.03 -0.55 -0.41 -1.07 -0.55 -0.06 -1.03 -0.53
Maximum - Mean 1.01 0.61 0.39 1.00 0.58 0.39 1.01 0.59 0.05 1.00 0.56
Minimum - Mean -1.07 -0.57 -0.41 -1.03 -0.55 -0.41 -1.07 -0.55 -0.06 -1.03 -0.53
Pred. Max-Mean 1.22 0.73 0.46 1.22 0.69 0.46 1.22 0.71 0.06 1.22 0.67
Pred. Min-Mean -1.28 -0.68 -0.49 -1.25 -0.66 -0.49 -1.29 -0.66 -0.07 -1.25 -0.63

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 126.58 2.00 -5.21 126.65 2.00 3.33


Variance 0.00 0.18 0.06 0.01 0.18 0.05 0.01
Root Mean Square 3.83 126.58 2.02 5.21 126.65 2.02 3.33
Std. Deviation 0.02 0.42 0.23 0.12 0.42 0.23 0.12
Skewness -0.03 -0.03 0.10 0.00 -0.03 0.09 0.00
Kurtosis 0.10 -0.48 -0.72 -0.13 -0.50 -0.74 -0.13

Number of Peaks 249 214 261 268 158 231 268

Av Of 1/3 Highest 3.86 127.25 2.37 -4.96 127.35 2.38 3.57


Av Of 1/3 Lowest 3.79 125.90 1.66 -5.45 125.91 1.65 3.08
Av Of 1/100 Highest 3.88 127.58 2.56 -4.83 127.65 2.52 3.71
Av Of 1/100 Lowest 3.77 125.57 1.49 -5.58 125.61 1.51 2.95
Av Of 1/1000 Highest 3.88 127.59 2.58 -4.83 127.65 2.55 3.71
Av Of 1/1000 Lowest 3.77 125.51 1.48 -5.59 125.61 1.50 2.94
Maximum 3.88 127.59 2.58 -4.83 127.65 2.55 3.71
Minimum 3.77 125.51 1.48 -5.59 125.61 1.50 2.94
Pred. Max 3.89 127.79 2.69 -4.75 127.86 2.65 3.78
Pred. Min 3.76 125.29 1.37 -5.66 125.39 1.40 2.87

Av Of 1/3 H-Mean 0.03 0.67 0.37 0.25 0.71 0.37 0.25


Av Of 1/3 L-Mean -0.03 -0.68 -0.34 -0.25 -0.74 -0.35 -0.25
Av Of 1/100 H-Mean 0.05 1.00 0.55 0.38 1.00 0.52 0.38
Av Of 1/100 L-Mean -0.06 -1.01 -0.52 -0.37 -1.03 -0.49 -0.37
Av Of 1/1000 H-Mean 0.05 1.01 0.57 0.38 1.00 0.54 0.38
Av Of 1/1000 L-Mean -0.06 -1.07 -0.53 -0.38 -1.03 -0.50 -0.38
Maximum - Mean 0.05 1.01 0.57 0.38 1.00 0.54 0.38
Minimum - Mean -0.06 -1.07 -0.53 -0.38 -1.03 -0.50 -0.38
Pred. Max-Mean 0.06 1.22 0.69 0.46 1.22 0.65 0.46
Pred. Min-Mean -0.07 -1.29 -0.63 -0.46 -1.25 -0.60 -0.46
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -27 -9 -6 0 0 0 30


BM2S DB30 -17 6 -4 0 0 0 20
BM3P DB30 -24 -41 -7 0 0 0 50
BM3S DB30 -7 14 -4 0 0 0 17
BM4P DB30 35 -60 -8 0 0 0 71
BM4S DB30 12 21 -5 0 0 0 25
BM5P DB30 54 -41 -8 0 0 0 69
BM5S DB30 45 11 -7 0 0 0 47
MAINLN DB30 4 6 -1113 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.5 -1.6 -24740.5 14 1663750 -104


Buoyancy -202.6 1.6 25901.7 -76 -1833840 115
Wind -12.7 24.2 0.0 -411 -246 1611
Drag -12.9 36.3 -3.4 -149 36 2465
Wave -37.4 37.3 13.4 196 -972 2121
Flex. Connectors 72.0 -97.8 -1171.3 430 171280 -7861
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 4 -1653

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.5 -5.9 -1114.3 11 166282 -882


Wind -4.6 6.0 -0.2 -13 20 910
Flex. Connectors 0.1 -0.1 1114.5 3 -166307 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -4 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 999.36 1001.58 550.22 29.90 0.1118 24.60 0.00


BM2S 998.08 1001.58 635.52 19.79 0.0729 13.76 0.00
BM3P 1001.05 1001.57 419.55 49.70 0.1875 45.51 0.00
BM3S 997.54 1001.57 668.26 16.51 0.0632 10.20 0.00
BM4P 1002.44 1001.50 308.97 71.30 0.2576 68.04 0.00
BM4S 998.90 1001.50 589.09 25.46 0.0965 19.84 0.00
BM5P 1002.31 1001.47 317.36 69.47 0.2643 66.14 0.00
BM5S 1000.79 1001.46 440.71 46.77 0.1699 42.39 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* INTACT CONDITION *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -1.53 2.05 -4.21 0.00 0.45 0.00


N Force 0.00 0.00 -0.03 0 4 -1653

WHPBJKT Location -0.92 -4.57 22.54 0.30 0.23 2.68


N Force 0.00 0.00 0.03 0 -4 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 30.23 19.53 51.11 16.05 73.92 24.52 71.52 46.82


Variance 9.94 6.70 8.49 3.67 40.19 2.64 48.23 21.00
Root Mean Square 30.39 19.70 51.20 16.17 74.19 24.57 71.86 47.04
Std. Deviation 3.15 2.59 2.91 1.92 6.34 1.63 6.94 4.58
Skewness 0.43 0.37 0.42 0.63 -0.06 -0.16 0.08 0.03
Kurtosis 0.06 -0.02 0.56 0.45 -0.08 0.45 -0.17 -0.24

Number of Peaks 221 209 221 223 221 229 214 221

Av Of 1/3 Highest 35.83 23.95 56.10 19.33 83.20 26.75 82.33 54.52
Av Of 1/3 Lowest 25.42 15.78 47.14 13.43 63.84 21.90 60.80 39.54
Av Of 1/100 Highest 40.01 27.27 60.48 22.30 90.00 29.01 89.64 58.57
Av Of 1/100 Lowest 23.57 13.99 43.59 11.88 57.17 19.95 53.52 35.35
Av Of 1/1000 Highest 40.56 27.42 61.13 22.56 90.97 29.46 90.69 58.82
Av Of 1/1000 Lowest 23.30 13.88 42.90 11.84 56.70 19.55 53.44 34.60
Maximum 40.56 27.42 61.13 22.56 90.97 29.46 90.69 58.82
Minimum 23.30 13.88 42.90 11.84 56.70 19.55 53.44 34.60
Pred. Max 42.63 29.02 63.14 23.87 94.39 30.44 94.55 61.23
Pred. Min 21.91 12.74 41.25 10.99 53.25 18.56 49.80 32.15

Av Of 1/3 H-Mean 5.61 4.42 4.98 3.28 9.28 2.23 10.81 7.70
Av Of 1/3 L-Mean -4.81 -3.75 -3.98 -2.62 -10.08 -2.62 -10.72 -7.28
Av Of 1/100 H-Mean 9.78 7.74 9.37 6.25 16.08 4.49 18.12 11.75
Av Of 1/100 L-Mean -6.66 -5.54 -7.52 -4.17 -16.75 -4.57 -18.00 -11.47
Av Of 1/1000 H-Mean 10.33 7.90 10.02 6.51 17.05 4.94 19.17 12.00
Av Of 1/1000 L-Mean -6.93 -5.65 -8.22 -4.21 -17.22 -4.97 -18.08 -12.22
Maximum - Mean 10.33 7.90 10.02 6.51 17.05 4.94 19.17 12.00
Minimum - Mean -6.93 -5.65 -8.22 -4.21 -17.22 -4.97 -18.08 -12.22
Pred. Max-Mean 12.41 9.49 12.03 7.81 20.47 5.92 23.03 14.41
Pred. Min-Mean -8.32 -6.79 -9.86 -5.06 -20.67 -5.96 -21.72 -14.67

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -1.56 2.17 -4.21


Variance 0.15 0.08 0.01
Root Mean Square 1.60 2.19 4.21
Std. Deviation 0.38 0.28 0.10
Skewness 0.02 -0.50 -0.02
Kurtosis -0.25 0.10 -0.12

Number of Peaks 211 235 242

Av Of 1/3 Highest -0.94 2.58 -4.00


Av Of 1/3 Lowest -2.17 1.69 -4.42
Av Of 1/100 Highest -0.59 2.78 -3.90
Av Of 1/100 Lowest -2.52 1.35 -4.53
Av Of 1/1000 Highest -0.58 2.79 -3.89
Av Of 1/1000 Lowest -2.52 1.31 -4.55
Maximum -0.58 2.79 -3.89
Minimum -2.52 1.31 -4.55
Pred. Max -0.38 2.92 -3.83
Pred. Min -2.72 1.14 -4.61

Av Of 1/3 H-Mean 0.62 0.41 0.21


Av Of 1/3 L-Mean -0.61 -0.48 -0.21
Av Of 1/100 H-Mean 0.96 0.61 0.31
Av Of 1/100 L-Mean -0.96 -0.82 -0.32
Av Of 1/1000 H-Mean 0.98 0.62 0.32
Av Of 1/1000 L-Mean -0.96 -0.86 -0.34
Maximum - Mean 0.98 0.62 0.32
Minimum - Mean -0.96 -0.86 -0.34
Pred. Max-Mean 1.18 0.74 0.38
Pred. Min-Mean -1.16 -1.03 -0.40
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -1.56 2.17 -4.21 -1.49 2.17 4.32 62.45 2.19 -4.71 62.51 2.19
Variance 0.15 0.08 0.01 0.15 0.07 0.01 0.15 0.08 0.01 0.15 0.07
Root Mean Square 1.60 2.19 4.21 1.54 2.19 4.33 62.45 2.21 4.71 62.52 2.21
Std. Deviation 0.38 0.28 0.10 0.38 0.27 0.10 0.38 0.28 0.08 0.38 0.27
Skewness 0.02 -0.50 -0.02 0.02 -0.55 -0.02 0.02 -0.45 -0.04 0.02 -0.50
Kurtosis -0.25 0.10 -0.12 -0.24 0.17 -0.12 -0.25 0.05 -0.10 -0.24 0.12

Number of Peaks 211 235 242 217 225 242 211 235 234 217 227

Av Of 1/3 Highest -0.94 2.58 -4.00 -0.87 2.55 4.53 63.06 2.61 -4.55 63.14 2.60
Av Of 1/3 Lowest -2.17 1.69 -4.42 -2.10 1.75 4.11 61.84 1.71 -4.88 61.91 1.77
Av Of 1/100 Highest -0.59 2.78 -3.90 -0.52 2.74 4.63 63.41 2.80 -4.47 63.49 2.78
Av Of 1/100 Lowest -2.52 1.35 -4.53 -2.46 1.39 4.00 61.49 1.39 -4.96 61.55 1.43
Av Of 1/1000 Highest -0.58 2.79 -3.89 -0.49 2.74 4.65 63.43 2.83 -4.46 63.51 2.78
Av Of 1/1000 Lowest -2.52 1.31 -4.55 -2.46 1.36 3.99 61.49 1.35 -4.96 61.55 1.40
Maximum -0.58 2.79 -3.89 -0.49 2.74 4.65 63.43 2.83 -4.46 63.51 2.78
Minimum -2.52 1.31 -4.55 -2.46 1.36 3.99 61.49 1.35 -4.96 61.55 1.40
Pred. Max -0.38 2.92 -3.83 -0.29 2.86 4.71 63.62 2.95 -4.41 63.72 2.89
Pred. Min -2.72 1.14 -4.61 -2.65 1.20 3.92 61.29 1.18 -5.01 61.35 1.24

Av Of 1/3 H-Mean 0.62 0.41 0.21 0.62 0.38 0.21 0.61 0.42 0.16 0.62 0.40
Av Of 1/3 L-Mean -0.61 -0.48 -0.21 -0.60 -0.42 -0.21 -0.61 -0.48 -0.17 -0.60 -0.42
Av Of 1/100 H-Mean 0.96 0.61 0.31 0.98 0.57 0.31 0.96 0.61 0.24 0.97 0.58
Av Of 1/100 L-Mean -0.96 -0.82 -0.32 -0.97 -0.78 -0.32 -0.96 -0.81 -0.25 -0.97 -0.76
Av Of 1/1000 H-Mean 0.98 0.62 0.32 1.00 0.57 0.32 0.98 0.63 0.25 1.00 0.58
Av Of 1/1000 L-Mean -0.96 -0.86 -0.34 -0.97 -0.81 -0.34 -0.96 -0.84 -0.25 -0.97 -0.79
Maximum - Mean 0.98 0.62 0.32 1.00 0.57 0.32 0.98 0.63 0.25 1.00 0.58
Minimum - Mean -0.96 -0.86 -0.34 -0.97 -0.81 -0.34 -0.96 -0.84 -0.25 -0.97 -0.79
Pred. Max-Mean 1.18 0.74 0.38 1.20 0.69 0.38 1.18 0.76 0.30 1.20 0.70
Pred. Min-Mean -1.16 -1.03 -0.40 -1.16 -0.97 -0.40 -1.16 -1.01 -0.30 -1.16 -0.95

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 126.45 2.22 -5.21 126.52 2.21 3.32


Variance 0.01 0.15 0.08 0.01 0.15 0.07 0.01
Root Mean Square 3.83 126.45 2.23 5.21 126.52 2.23 3.33
Std. Deviation 0.08 0.38 0.28 0.10 0.38 0.27 0.10
Skewness -0.04 0.02 -0.39 -0.02 0.02 -0.44 -0.02
Kurtosis -0.10 -0.25 0.02 -0.14 -0.25 0.08 -0.14

Number of Peaks 234 211 235 231 217 227 231

Av Of 1/3 Highest 3.99 127.07 2.64 -5.00 127.14 2.63 3.54


Av Of 1/3 Lowest 3.66 125.85 1.74 -5.42 125.92 1.79 3.11
Av Of 1/100 Highest 4.07 127.42 2.83 -4.90 127.49 2.81 3.64
Av Of 1/100 Lowest 3.58 125.50 1.42 -5.52 125.55 1.47 3.01
Av Of 1/1000 Highest 4.08 127.43 2.86 -4.88 127.52 2.81 3.65
Av Of 1/1000 Lowest 3.57 125.49 1.39 -5.52 125.55 1.44 3.01
Maximum 4.08 127.43 2.86 -4.88 127.52 2.81 3.65
Minimum 3.57 125.49 1.39 -5.52 125.55 1.44 3.01
Pred. Max 4.13 127.63 2.99 -4.82 127.72 2.93 3.72
Pred. Min 3.52 125.30 1.23 -5.58 125.36 1.29 2.95

Av Of 1/3 H-Mean 0.16 0.61 0.42 0.21 0.62 0.41 0.21


Av Of 1/3 L-Mean -0.17 -0.61 -0.48 -0.21 -0.60 -0.42 -0.21
Av Of 1/100 H-Mean 0.24 0.96 0.62 0.31 0.97 0.60 0.31
Av Of 1/100 L-Mean -0.25 -0.96 -0.79 -0.31 -0.97 -0.75 -0.31
Av Of 1/1000 H-Mean 0.25 0.98 0.65 0.33 1.00 0.60 0.33
Av Of 1/1000 L-Mean -0.25 -0.96 -0.83 -0.31 -0.97 -0.77 -0.31
Maximum - Mean 0.25 0.98 0.65 0.33 1.00 0.60 0.33
Minimum - Mean -0.25 -0.96 -0.83 -0.31 -0.97 -0.77 -0.31
Pred. Max-Mean 0.30 1.18 0.77 0.39 1.20 0.71 0.39
Pred. Min-Mean -0.30 -1.16 -0.99 -0.37 -1.16 -0.93 -0.37
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

APPENDIX D
MOSES OUTPUTS (DAMAGED CONDITION)
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -10 -3 -3 0 0 0 13


BM2S DB30 -13 4 -4 0 0 0 15
BM3P DB30 -7 -12 -4 0 0 0 16
BM3S DB30 -13 25 -5 0 0 0 30
BM4P DB30 22 -37 -6 0 0 0 44
BM4S DB30 36 62 -9 0 0 0 72
BM5P DB30 48 -36 -8 0 0 0 61
MAINLN DB30 2 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 198.3 -2.5 -24740.4 23 1663790 -169


Buoyancy -205.8 2.6 25687.3 -123 -1821121 185
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.1 0.0 -4.8 0 53 0
Wave -16.7 0.0 218.0 -35 -12589 14
Flex. Connectors 60.5 -0.1 -1160.1 137 170241 -577
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 22 -582

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 6.4 0.0 -1114.3 0 166286 5


Wind -7.0 0.0 0.0 0 -13 11
Flex. Connectors 0.0 0.0 1114.3 0 -166282 0
======= ======= ======= ======= ======= =======
Total -0.5 0.0 0.0 0 -10 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 996.65 1001.58 709.80 12.71 0.0474 6.02 0.00


BM2S 997.29 1001.58 679.01 15.48 0.0569 9.04 0.00
BM3P 997.44 1001.57 673.76 16.00 0.0602 9.60 0.00
BM3S 999.37 1001.57 551.30 29.94 0.1144 24.56 0.00
BM4P 1000.62 1001.50 457.89 44.09 0.1592 39.54 0.00
BM4S 1002.51 1001.50 303.52 72.41 0.2743 69.17 0.00
BM5P 1001.78 1001.47 360.05 61.12 0.2324 57.40 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -3.32 -1.09 -4.16 0.01 0.46 0.00


N Force 0.11 0.00 -0.04 0 23 -582

WHPBJKT Location -2.94 -2.27 22.81 0.00 0.33 0.45


N Force -0.48 0.00 0.04 0 -10 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 12.29 15.08 15.60 29.63 43.56 75.62 61.86 0.00


Variance 1.91 3.03 1.26 3.28 6.29 17.43 23.46 0.00
Root Mean Square 12.37 15.18 15.64 29.69 43.63 75.74 62.05 0.00
Std. Deviation 1.38 1.74 1.12 1.81 2.51 4.17 4.84 0.00
Skewness 0.16 0.11 -0.05 0.07 0.04 0.26 0.13 0.00
Kurtosis -0.94 -0.77 -0.87 -0.62 -0.66 -0.81 -0.80 0.00

Number of Peaks 221 235 243 226 264 173 226 0

Av Of 1/3 Highest 14.53 17.70 17.28 32.44 47.36 82.95 69.68 0.00
Av Of 1/3 Lowest 10.24 12.45 13.82 26.85 39.85 69.61 54.88 0.00
Av Of 1/100 Highest 15.37 19.15 17.87 34.17 49.98 86.24 73.08 0.00
Av Of 1/100 Lowest 9.43 11.52 13.05 25.72 37.77 67.76 51.71 0.00
Av Of 1/1000 Highest 15.48 19.23 17.91 34.25 50.00 86.24 73.11 0.00
Av Of 1/1000 Lowest 9.42 11.38 13.02 25.60 37.73 67.76 51.48 0.00
Maximum 15.48 19.23 17.91 34.25 50.00 86.24 73.11 0.00
Minimum 9.42 11.38 13.02 25.60 37.49 67.76 51.48 0.00
Pred. Max 16.12 20.05 18.36 35.17 51.26 88.46 75.35 0.00
Pred. Min 8.84 10.65 12.51 24.80 36.31 66.12 49.41 0.00

Av Of 1/3 H-Mean 2.24 2.62 1.68 2.80 3.81 7.33 7.81 0.00
Av Of 1/3 L-Mean -2.05 -2.63 -1.78 -2.78 -3.71 -6.01 -6.98 0.00
Av Of 1/100 H-Mean 3.08 4.07 2.27 4.54 6.43 10.62 11.22 0.00
Av Of 1/100 L-Mean -2.87 -3.56 -2.55 -3.91 -5.78 -7.86 -10.15 0.00
Av Of 1/1000 H-Mean 3.19 4.15 2.31 4.61 6.45 10.62 11.24 0.00
Av Of 1/1000 L-Mean -2.87 -3.69 -2.58 -4.03 -5.83 -7.86 -10.38 0.00
Maximum - Mean 3.19 4.15 2.31 4.61 6.45 10.62 11.24 0.00
Minimum - Mean -2.87 -3.69 -2.58 -4.03 -6.07 -7.86 -10.38 0.00
Pred. Max-Mean 3.82 4.98 2.76 5.53 7.70 12.84 13.49 0.00
Pred. Min-Mean -3.45 -4.43 -3.09 -4.84 -7.25 -9.51 -12.46 0.00

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -3.46 -1.11 -4.16


Variance 0.17 0.01 0.00
Root Mean Square 3.49 1.12 4.16
Std. Deviation 0.41 0.11 0.04
Skewness -0.14 -0.43 0.13
Kurtosis -0.89 0.73 -0.04

Number of Peaks 129 289 305

Av Of 1/3 Highest -2.82 -0.93 -4.08


Av Of 1/3 Lowest -4.07 -1.32 -4.24
Av Of 1/100 Highest -2.62 -0.82 -4.02
Av Of 1/100 Lowest -4.41 -1.58 -4.29
Av Of 1/1000 Highest -2.62 -0.81 -4.02
Av Of 1/1000 Lowest -4.41 -1.60 -4.29
Maximum -2.62 -0.81 -4.02
Minimum -4.41 -1.60 -4.29
Pred. Max -2.43 -0.76 -3.99
Pred. Min -4.62 -1.69 -4.32

Av Of 1/3 H-Mean 0.65 0.19 0.08


Av Of 1/3 L-Mean -0.61 -0.21 -0.08
Av Of 1/100 H-Mean 0.84 0.30 0.14
Av Of 1/100 L-Mean -0.95 -0.46 -0.12
Av Of 1/1000 H-Mean 0.84 0.30 0.14
Av Of 1/1000 L-Mean -0.95 -0.48 -0.13
Maximum - Mean 0.84 0.30 0.14
Minimum - Mean -0.95 -0.48 -0.13
Pred. Max-Mean 1.03 0.36 0.17
Pred. Min-Mean -1.16 -0.58 -0.16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -3.46 -1.11 -4.16 -3.39 -1.11 4.37 60.54 -1.18 -4.67 60.61 -1.18
Variance 0.17 0.01 0.00 0.17 0.01 0.00 0.17 0.01 0.01 0.17 0.01
Root Mean Square 3.49 1.12 4.16 3.42 1.12 4.37 60.55 1.18 4.67 60.61 1.18
Std. Deviation 0.41 0.11 0.04 0.41 0.09 0.04 0.41 0.11 0.07 0.41 0.08
Skewness -0.14 -0.43 0.13 -0.14 -0.55 0.13 -0.14 -0.53 0.10 -0.14 -0.68
Kurtosis -0.89 0.73 -0.04 -0.89 1.51 -0.04 -0.89 0.40 -0.10 -0.89 0.63

Number of Peaks 129 289 305 169 214 304 129 289 325 167 205

Av Of 1/3 Highest -2.82 -0.93 -4.08 -2.76 -0.98 4.45 61.19 -1.00 -4.52 61.25 -1.07
Av Of 1/3 Lowest -4.07 -1.32 -4.24 -4.06 -1.25 4.29 59.93 -1.39 -4.82 59.96 -1.31
Av Of 1/100 Highest -2.62 -0.82 -4.02 -2.54 -0.92 4.51 61.39 -0.92 -4.44 61.46 -1.04
Av Of 1/100 Lowest -4.41 -1.58 -4.29 -4.35 -1.43 4.25 59.59 -1.61 -4.88 59.65 -1.47
Av Of 1/1000 Highest -2.62 -0.81 -4.02 -2.54 -0.91 4.51 61.39 -0.91 -4.43 61.46 -1.03
Av Of 1/1000 Lowest -4.41 -1.60 -4.29 -4.35 -1.45 4.24 59.59 -1.62 -4.89 59.65 -1.48
Maximum -2.62 -0.81 -4.02 -2.54 -0.91 4.51 61.39 -0.91 -4.43 61.46 -1.03
Minimum -4.41 -1.60 -4.29 -4.35 -1.45 4.24 59.59 -1.62 -4.89 59.65 -1.48
Pred. Max -2.43 -0.76 -3.99 -2.37 -0.87 4.54 61.57 -0.86 -4.38 61.64 -1.00
Pred. Min -4.62 -1.69 -4.32 -4.55 -1.52 4.21 59.39 -1.71 -4.93 59.45 -1.54

Av Of 1/3 H-Mean 0.65 0.19 0.08 0.63 0.13 0.08 0.65 0.18 0.15 0.64 0.11
Av Of 1/3 L-Mean -0.61 -0.21 -0.08 -0.67 -0.13 -0.08 -0.61 -0.21 -0.14 -0.65 -0.13
Av Of 1/100 H-Mean 0.84 0.30 0.14 0.85 0.20 0.14 0.84 0.26 0.23 0.85 0.14
Av Of 1/100 L-Mean -0.95 -0.46 -0.12 -0.96 -0.32 -0.12 -0.95 -0.43 -0.21 -0.96 -0.29
Av Of 1/1000 H-Mean 0.84 0.30 0.14 0.85 0.20 0.14 0.84 0.27 0.25 0.85 0.15
Av Of 1/1000 L-Mean -0.95 -0.48 -0.13 -0.96 -0.33 -0.13 -0.95 -0.44 -0.22 -0.96 -0.30
Maximum - Mean 0.84 0.30 0.14 0.85 0.20 0.14 0.84 0.27 0.25 0.85 0.15
Minimum - Mean -0.95 -0.48 -0.13 -0.96 -0.33 -0.13 -0.95 -0.44 -0.22 -0.96 -0.30
Pred. Max-Mean 1.03 0.36 0.17 1.03 0.24 0.17 1.03 0.32 0.29 1.03 0.18
Pred. Min-Mean -1.16 -0.58 -0.16 -1.16 -0.40 -0.16 -1.16 -0.53 -0.26 -1.16 -0.36

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.86 124.55 -1.24 -5.19 124.62 -1.24 3.35


Variance 0.01 0.17 0.01 0.02 0.17 0.01 0.02
Root Mean Square 3.86 124.55 1.25 5.19 124.62 1.25 3.35
Std. Deviation 0.07 0.41 0.12 0.14 0.41 0.09 0.14
Skewness 0.09 -0.14 -0.36 0.07 -0.14 -0.28 0.07
Kurtosis -0.11 -0.89 -0.16 -0.18 -0.89 -0.59 -0.18

Number of Peaks 325 123 289 317 164 201 317

Av Of 1/3 Highest 4.01 125.20 -1.05 -4.88 125.26 -1.11 3.66


Av Of 1/3 Lowest 3.72 123.93 -1.48 -5.48 123.99 -1.40 3.05
Av Of 1/100 Highest 4.09 125.39 -0.95 -4.72 125.47 -1.06 3.81
Av Of 1/100 Lowest 3.65 123.60 -1.63 -5.59 123.66 -1.50 2.94
Av Of 1/1000 Highest 4.11 125.39 -0.95 -4.72 125.47 -1.06 3.82
Av Of 1/1000 Lowest 3.64 123.60 -1.64 -5.60 123.66 -1.51 2.93
Maximum 4.11 125.39 -0.95 -4.72 125.47 -1.06 3.82
Minimum 3.64 123.60 -1.64 -5.60 123.66 -1.51 2.93
Pred. Max 4.15 125.58 -0.89 -4.63 125.65 -1.02 3.91
Pred. Min 3.60 123.39 -1.72 -5.68 123.46 -1.56 2.86

Av Of 1/3 H-Mean 0.15 0.65 0.20 0.31 0.64 0.14 0.31


Av Of 1/3 L-Mean -0.14 -0.62 -0.23 -0.29 -0.63 -0.15 -0.29
Av Of 1/100 H-Mean 0.23 0.84 0.29 0.47 0.85 0.18 0.47
Av Of 1/100 L-Mean -0.21 -0.95 -0.39 -0.41 -0.96 -0.25 -0.41
Av Of 1/1000 H-Mean 0.25 0.84 0.30 0.47 0.85 0.18 0.47
Av Of 1/1000 L-Mean -0.22 -0.95 -0.40 -0.41 -0.96 -0.26 -0.41
Maximum - Mean 0.25 0.84 0.30 0.47 0.85 0.18 0.47
Minimum - Mean -0.22 -0.95 -0.40 -0.41 -0.96 -0.26 -0.41
Pred. Max-Mean 0.29 1.03 0.35 0.56 1.03 0.22 0.56
Pred. Min-Mean -0.26 -1.16 -0.48 -0.49 -1.16 -0.32 -0.49
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -9 -2 -3 0 0 0 11
BM2S DB30 -11 4 -3 0 0 0 13
BM3P DB30 -6 -11 -3 0 0 0 14
BM3S DB30 -13 24 -5 0 0 0 28
BM4P DB30 23 -39 -7 0 0 0 47
BM4S DB30 40 68 -9 0 0 0 79
BM5P DB30 53 -40 -8 0 0 0 67
MAINLN DB30 2 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.9 -3.0 -24740.5 27 1663744 -199


Buoyancy -200.6 3.1 25735.6 -145 -1822604 218
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.2 0.0 -4.8 0 51 0
Wave -31.7 0.0 169.5 -23 -11272 -5
Flex. Connectors 75.7 -0.1 -1159.9 143 170449 -528
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 17 -549

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 6.5 0.0 -1114.3 0 166287 5


Wind -7.0 0.0 0.0 0 -13 11
Flex. Connectors 0.0 0.0 1114.3 0 -166277 0
======= ======= ======= ======= ======= =======
Total -0.4 0.0 0.0 0 -4 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 996.05 1001.58 733.35 10.82 0.0404 3.95 0.00


BM2S 996.77 1001.58 704.45 13.17 0.0485 6.54 0.00
BM3P 997.03 1001.57 693.30 14.23 0.0536 7.69 0.00
BM3S 999.19 1001.57 564.62 28.19 0.1078 22.74 0.00
BM4P 1000.81 1001.50 442.62 46.56 0.1681 42.14 0.00
BM4S 1002.91 1001.50 270.95 79.32 0.3005 76.34 0.00
BM5P 1002.17 1001.47 328.22 67.36 0.2561 63.90 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -3.91 -1.22 -4.18 0.01 0.45 0.00


N Force 0.11 -0.01 0.00 0 16 -549

WHPBJKT Location -3.55 -2.43 22.83 0.00 0.33 0.46


N Force -0.45 0.00 0.00 0 -4 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 10.87 13.37 13.96 28.06 47.55 81.76 69.71 0.00


Variance 9.79 16.23 6.84 20.98 49.34 120.87 188.29 0.00
Root Mean Square 11.31 13.96 14.20 28.43 48.06 82.50 71.05 0.00
Std. Deviation 3.13 4.03 2.62 4.58 7.02 10.99 13.72 0.00
Skewness 0.61 0.60 0.28 0.25 0.13 0.22 0.16 0.00
Kurtosis -0.28 -0.31 -0.75 -0.84 -0.95 -0.88 -0.95 0.00

Number of Peaks 93 89 96 105 109 91 95 0

Av Of 1/3 Highest 17.45 20.52 18.65 35.63 58.79 101.78 92.60 0.00
Av Of 1/3 Lowest 6.82 8.11 9.96 21.49 37.34 64.91 50.02 0.00
Av Of 1/100 Highest 20.46 25.83 20.81 39.89 62.86 105.43 99.66 0.00
Av Of 1/100 Lowest 6.03 7.32 9.39 19.83 32.95 59.38 41.74 0.00
Av Of 1/1000 Highest 20.46 25.83 20.81 39.89 62.86 105.43 99.66 0.00
Av Of 1/1000 Lowest 6.03 7.32 9.39 19.83 32.95 59.38 41.74 0.00
Maximum 20.46 25.83 20.81 39.89 62.86 105.43 99.66 0.00
Minimum 6.03 7.32 9.39 19.83 32.95 59.38 41.74 0.00
Pred. Max 22.71 28.79 22.41 42.61 66.35 111.02 106.66 0.00
Pred. Min 4.89 5.89 8.32 17.94 29.63 54.11 35.19 0.00

Av Of 1/3 H-Mean 6.58 7.16 4.70 7.57 11.24 20.02 22.89 0.00
Av Of 1/3 L-Mean -4.05 -5.25 -4.00 -6.57 -10.20 -16.85 -19.69 0.00
Av Of 1/100 H-Mean 9.59 12.47 6.85 11.83 15.32 23.67 29.95 0.00
Av Of 1/100 L-Mean -4.84 -6.05 -4.57 -8.23 -14.60 -22.38 -27.97 0.00
Av Of 1/1000 H-Mean 9.59 12.47 6.85 11.83 15.32 23.67 29.95 0.00
Av Of 1/1000 L-Mean -4.84 -6.05 -4.57 -8.23 -14.60 -22.38 -27.97 0.00
Maximum - Mean 9.59 12.47 6.85 11.83 15.32 23.67 29.95 0.00
Minimum - Mean -4.84 -6.05 -4.57 -8.23 -14.60 -22.38 -27.97 0.00
Pred. Max-Mean 11.84 15.42 8.45 14.55 18.81 29.26 36.95 0.00
Pred. Min-Mean -5.98 -7.48 -5.63 -10.12 -17.92 -27.65 -34.52 0.00

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -4.08 -1.26 -4.18


Variance 1.23 0.03 0.00
Root Mean Square 4.23 1.27 4.18
Std. Deviation 1.11 0.17 0.03
Skewness -0.07 -0.25 0.13
Kurtosis -0.93 -0.82 0.06

Number of Peaks 79 29 291

Av Of 1/3 Highest -2.41 -0.97 -4.12


Av Of 1/3 Lowest -5.91 -1.58 -4.25
Av Of 1/100 Highest -1.64 -0.92 -4.08
Av Of 1/100 Lowest -6.38 -1.63 -4.28
Av Of 1/1000 Highest -1.64 -0.92 -4.07
Av Of 1/1000 Lowest -6.38 -1.63 -4.29
Maximum -1.64 -0.92 -4.07
Minimum -6.38 -1.63 -4.29
Pred. Max -1.05 -0.82 -4.05
Pred. Min -6.94 -1.75 -4.31

Av Of 1/3 H-Mean 1.67 0.29 0.07


Av Of 1/3 L-Mean -1.82 -0.32 -0.06
Av Of 1/100 H-Mean 2.44 0.34 0.10
Av Of 1/100 L-Mean -2.30 -0.37 -0.10
Av Of 1/1000 H-Mean 2.44 0.34 0.11
Av Of 1/1000 L-Mean -2.30 -0.37 -0.11
Maximum - Mean 2.44 0.34 0.11
Minimum - Mean -2.30 -0.37 -0.11
Pred. Max-Mean 3.03 0.44 0.13
Pred. Min-Mean -2.86 -0.49 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -4.08 -1.26 -4.18 -4.02 -1.26 4.35 59.92 -1.26 -4.68 59.99 -1.26
Variance 1.23 0.03 0.00 1.23 0.03 0.00 1.23 0.03 0.00 1.23 0.03
Root Mean Square 4.23 1.27 4.18 4.17 1.27 4.35 59.93 1.27 4.68 60.00 1.27
Std. Deviation 1.11 0.17 0.03 1.11 0.17 0.03 1.11 0.17 0.03 1.11 0.17
Skewness -0.07 -0.25 0.13 -0.07 -0.25 0.13 -0.07 -0.25 0.01 -0.07 -0.25
Kurtosis -0.93 -0.82 0.06 -0.93 -0.82 0.06 -0.93 -0.82 -0.04 -0.93 -0.82

Number of Peaks 79 29 291 91 25 291 79 29 289 87 25

Av Of 1/3 Highest -2.41 -0.97 -4.12 -2.38 -0.98 4.42 61.60 -0.97 -4.63 61.65 -0.98
Av Of 1/3 Lowest -5.91 -1.58 -4.25 -5.80 -1.58 4.29 58.10 -1.58 -4.74 58.18 -1.58
Av Of 1/100 Highest -1.64 -0.92 -4.08 -1.58 -0.93 4.45 62.36 -0.92 -4.60 62.42 -0.93
Av Of 1/100 Lowest -6.38 -1.63 -4.28 -6.32 -1.63 4.25 57.63 -1.63 -4.77 57.69 -1.63
Av Of 1/1000 Highest -1.64 -0.92 -4.07 -1.58 -0.93 4.46 62.36 -0.92 -4.60 62.42 -0.93
Av Of 1/1000 Lowest -6.38 -1.63 -4.29 -6.32 -1.63 4.24 57.63 -1.63 -4.78 57.69 -1.63
Maximum -1.64 -0.92 -4.07 -1.58 -0.93 4.46 62.36 -0.92 -4.60 62.42 -0.93
Minimum -6.38 -1.63 -4.29 -6.32 -1.63 4.24 57.63 -1.63 -4.78 57.69 -1.63
Pred. Max -1.05 -0.82 -4.05 -1.01 -0.82 4.48 62.96 -0.82 -4.58 63.00 -0.82
Pred. Min -6.94 -1.75 -4.31 -6.86 -1.75 4.22 57.07 -1.75 -4.80 57.14 -1.75

Av Of 1/3 H-Mean 1.67 0.29 0.07 1.64 0.28 0.07 1.67 0.29 0.05 1.66 0.28
Av Of 1/3 L-Mean -1.82 -0.32 -0.06 -1.79 -0.32 -0.06 -1.82 -0.32 -0.05 -1.81 -0.32
Av Of 1/100 H-Mean 2.44 0.34 0.10 2.43 0.34 0.10 2.44 0.34 0.08 2.43 0.34
Av Of 1/100 L-Mean -2.30 -0.37 -0.10 -2.30 -0.37 -0.10 -2.30 -0.37 -0.09 -2.30 -0.37
Av Of 1/1000 H-Mean 2.44 0.34 0.11 2.43 0.34 0.11 2.44 0.34 0.08 2.43 0.34
Av Of 1/1000 L-Mean -2.30 -0.37 -0.11 -2.30 -0.37 -0.11 -2.30 -0.37 -0.10 -2.30 -0.37
Maximum - Mean 2.44 0.34 0.11 2.43 0.34 0.11 2.44 0.34 0.08 2.43 0.34
Minimum - Mean -2.30 -0.37 -0.11 -2.30 -0.37 -0.11 -2.30 -0.37 -0.10 -2.30 -0.37
Pred. Max-Mean 3.03 0.44 0.13 3.01 0.44 0.13 3.03 0.44 0.10 3.01 0.44
Pred. Min-Mean -2.86 -0.49 -0.13 -2.84 -0.49 -0.13 -2.86 -0.49 -0.11 -2.85 -0.49

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.85 123.93 -1.26 -5.18 124.00 -1.26 3.35


Variance 0.00 1.23 0.03 0.01 1.23 0.03 0.01
Root Mean Square 3.85 123.93 1.27 5.18 124.00 1.27 3.35
Std. Deviation 0.03 1.11 0.17 0.08 1.11 0.17 0.08
Skewness 0.01 -0.07 -0.25 -0.02 -0.07 -0.25 -0.02
Kurtosis -0.04 -0.93 -0.82 -0.20 -0.93 -0.82 -0.20

Number of Peaks 289 79 28 291 87 25 291

Av Of 1/3 Highest 3.91 125.60 -0.97 -5.03 125.65 -0.98 3.51


Av Of 1/3 Lowest 3.80 122.11 -1.58 -5.34 122.19 -1.58 3.20
Av Of 1/100 Highest 3.93 126.37 -0.93 -4.95 126.43 -0.93 3.58
Av Of 1/100 Lowest 3.76 121.63 -1.63 -5.41 121.70 -1.64 3.12
Av Of 1/1000 Highest 3.94 126.37 -0.93 -4.95 126.43 -0.93 3.58
Av Of 1/1000 Lowest 3.76 121.63 -1.63 -5.42 121.70 -1.64 3.12
Maximum 3.94 126.37 -0.93 -4.95 126.43 -0.93 3.58
Minimum 3.76 121.63 -1.63 -5.42 121.70 -1.64 3.12
Pred. Max 3.95 126.96 -0.82 -4.91 127.01 -0.82 3.63
Pred. Min 3.74 121.07 -1.75 -5.46 121.15 -1.75 3.07

Av Of 1/3 H-Mean 0.05 1.67 0.29 0.15 1.66 0.28 0.15


Av Of 1/3 L-Mean -0.05 -1.82 -0.32 -0.16 -1.81 -0.32 -0.16
Av Of 1/100 H-Mean 0.08 2.44 0.34 0.23 2.43 0.34 0.23
Av Of 1/100 L-Mean -0.09 -2.30 -0.37 -0.23 -2.30 -0.37 -0.23
Av Of 1/1000 H-Mean 0.08 2.44 0.34 0.23 2.43 0.34 0.23
Av Of 1/1000 L-Mean -0.10 -2.30 -0.37 -0.24 -2.30 -0.37 -0.24
Maximum - Mean 0.08 2.44 0.34 0.23 2.43 0.34 0.23
Minimum - Mean -0.10 -2.30 -0.37 -0.24 -2.30 -0.37 -0.24
Pred. Max-Mean 0.10 3.03 0.44 0.27 3.01 0.44 0.27
Pred. Min-Mean -0.11 -2.86 -0.49 -0.28 -2.85 -0.49 -0.28
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -8 -2 -3 0 0 0 10
BM2S DB30 -10 3 -3 0 0 0 12
BM3P DB30 -5 -10 -3 0 0 0 13
BM3S DB30 -12 23 -5 0 0 0 27
BM4P DB30 24 -40 -7 0 0 0 48
BM4S DB30 42 72 -9 0 0 0 83
BM5P DB30 56 -42 -8 0 0 0 71
MAINLN DB30 2 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.0 -3.5 -24740.5 31 1663745 -234


Buoyancy -201.1 3.7 25790.3 -171 -1826264 257
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.2 0.0 -4.8 0 51 0
Wave -40.3 0.0 114.7 -6 -7748 -3
Flex. Connectors 84.7 -0.1 -1159.6 147 170564 -496
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.2 0 -3 -512

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 6.4 0.0 -1114.3 0 166286 5


Wind -7.0 0.0 0.0 0 -13 11
Flex. Connectors 0.0 0.0 1114.1 0 -166253 0
======= ======= ======= ======= ======= =======
Total -0.5 0.0 -0.2 0 18 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.70 1001.58 746.46 9.82 0.0367 2.84 0.00


BM2S 996.45 1001.58 718.27 11.98 0.0441 5.23 0.00
BM3P 996.79 1001.57 704.80 13.19 0.0498 6.57 0.00
BM3S 999.08 1001.57 572.59 27.16 0.1039 21.64 0.00
BM4P 1000.92 1001.50 433.46 48.02 0.1734 43.69 0.00
BM4S 1003.15 1001.50 252.00 83.47 0.3162 80.67 0.00
BM5P 1002.41 1001.47 309.30 71.09 0.2704 67.81 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -4.26 -1.29 -4.19 0.01 0.45 0.00


N Force 0.10 0.01 0.15 0 -3 -512

WHPBJKT Location -3.90 -2.48 22.81 0.00 0.33 0.45


N Force -0.50 0.00 -0.16 0 18 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 10.08 12.43 13.16 27.18 48.97 85.58 73.22 0.00


Variance 10.18 16.58 7.77 21.67 54.27 154.16 217.19 0.00
Root Mean Square 10.58 13.08 13.45 27.58 49.52 86.48 74.69 0.00
Std. Deviation 3.19 4.07 2.79 4.66 7.37 12.42 14.74 0.00
Skewness 0.84 0.82 0.52 0.39 0.01 -0.01 0.00 0.00
Kurtosis 0.11 0.03 -0.58 -0.75 -0.95 -0.94 -0.96 0.00

Number of Peaks 98 98 76 107 136 110 128 0

Av Of 1/3 Highest 16.85 20.32 17.93 36.06 60.38 105.56 95.92 0.00
Av Of 1/3 Lowest 6.29 7.75 9.30 20.63 37.12 67.87 49.99 0.00
Av Of 1/100 Highest 20.35 25.69 20.74 39.71 66.67 112.79 107.71 0.00
Av Of 1/100 Lowest 5.46 6.47 8.46 18.51 33.00 59.35 41.82 0.00
Av Of 1/1000 Highest 20.35 25.69 20.74 39.71 66.67 112.79 107.71 0.00
Av Of 1/1000 Lowest 5.46 6.47 8.46 18.51 33.00 59.35 41.82 0.00
Maximum 20.35 25.69 20.74 39.71 66.67 112.79 107.71 0.00
Minimum 5.46 6.47 8.46 18.51 33.00 59.35 41.82 0.00
Pred. Max 22.74 28.77 22.60 42.57 70.53 118.97 115.33 0.00
Pred. Min 4.39 5.08 7.32 16.53 29.52 53.39 34.88 0.00

Av Of 1/3 H-Mean 6.77 7.88 4.77 8.88 11.41 19.98 22.70 0.00
Av Of 1/3 L-Mean -3.79 -4.68 -3.85 -6.55 -11.84 -17.71 -23.23 0.00
Av Of 1/100 H-Mean 10.27 13.26 7.59 12.53 17.70 27.21 34.49 0.00
Av Of 1/100 L-Mean -4.62 -5.96 -4.69 -8.67 -15.96 -26.23 -31.40 0.00
Av Of 1/1000 H-Mean 10.27 13.26 7.59 12.53 17.70 27.21 34.49 0.00
Av Of 1/1000 L-Mean -4.62 -5.96 -4.69 -8.67 -15.96 -26.23 -31.40 0.00
Maximum - Mean 10.27 13.26 7.59 12.53 17.70 27.21 34.49 0.00
Minimum - Mean -4.62 -5.96 -4.69 -8.67 -15.96 -26.23 -31.40 0.00
Pred. Max-Mean 12.65 16.34 9.44 15.39 21.56 33.39 42.11 0.00
Pred. Min-Mean -5.70 -7.35 -5.84 -10.65 -19.45 -32.19 -38.34 0.00

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -4.40 -1.32 -4.19


Variance 1.44 0.04 0.01
Root Mean Square 4.56 1.34 4.19
Std. Deviation 1.20 0.20 0.09
Skewness 0.12 0.01 -0.03
Kurtosis -0.92 -0.95 -0.29

Number of Peaks 149 31 271

Av Of 1/3 Highest -2.43 -1.00 -4.02


Av Of 1/3 Lowest -6.27 -1.65 -4.37
Av Of 1/100 Highest -1.63 -0.90 -3.95
Av Of 1/100 Lowest -7.02 -1.73 -4.45
Av Of 1/1000 Highest -1.63 -0.90 -3.95
Av Of 1/1000 Lowest -7.02 -1.73 -4.46
Maximum -1.63 -0.90 -3.95
Minimum -7.02 -1.73 -4.46
Pred. Max -1.04 -0.77 -3.90
Pred. Min -7.58 -1.86 -4.51

Av Of 1/3 H-Mean 1.97 0.32 0.18


Av Of 1/3 L-Mean -1.87 -0.33 -0.18
Av Of 1/100 H-Mean 2.77 0.43 0.24
Av Of 1/100 L-Mean -2.62 -0.41 -0.26
Av Of 1/1000 H-Mean 2.77 0.43 0.24
Av Of 1/1000 L-Mean -2.62 -0.41 -0.27
Maximum - Mean 2.77 0.43 0.24
Minimum - Mean -2.62 -0.41 -0.27
Pred. Max-Mean 3.36 0.56 0.29
Pred. Min-Mean -3.18 -0.54 -0.32
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -4.40 -1.32 -4.19 -4.33 -1.32 4.34 59.61 -1.32 -4.69 59.67 -1.33
Variance 1.44 0.04 0.01 1.44 0.04 0.01 1.44 0.04 0.00 1.44 0.04
Root Mean Square 4.56 1.34 4.19 4.50 1.34 4.34 59.62 1.34 4.69 59.68 1.34
Std. Deviation 1.20 0.20 0.09 1.20 0.20 0.09 1.20 0.20 0.05 1.20 0.20
Skewness 0.12 0.01 -0.03 0.12 0.01 -0.03 0.12 0.01 0.02 0.12 0.01
Kurtosis -0.92 -0.95 -0.29 -0.92 -0.94 -0.29 -0.92 -0.94 0.01 -0.92 -0.94

Number of Peaks 149 31 271 133 24 271 155 31 257 132 25

Av Of 1/3 Highest -2.43 -1.00 -4.02 -2.38 -0.98 4.52 61.56 -1.00 -4.59 61.65 -0.99
Av Of 1/3 Lowest -6.27 -1.65 -4.37 -6.20 -1.68 4.16 57.76 -1.65 -4.79 57.79 -1.67
Av Of 1/100 Highest -1.63 -0.90 -3.95 -1.59 -0.90 4.58 62.38 -0.90 -4.54 62.42 -0.90
Av Of 1/100 Lowest -7.02 -1.73 -4.45 -6.93 -1.74 4.08 56.98 -1.74 -4.85 57.08 -1.74
Av Of 1/1000 Highest -1.63 -0.90 -3.95 -1.59 -0.90 4.59 62.38 -0.90 -4.53 62.42 -0.90
Av Of 1/1000 Lowest -7.02 -1.73 -4.46 -6.93 -1.74 4.07 56.98 -1.74 -4.85 57.08 -1.74
Maximum -1.63 -0.90 -3.95 -1.59 -0.90 4.59 62.38 -0.90 -4.53 62.42 -0.90
Minimum -7.02 -1.73 -4.46 -6.93 -1.74 4.07 56.98 -1.74 -4.85 57.08 -1.74
Pred. Max -1.04 -0.77 -3.90 -0.98 -0.76 4.63 62.97 -0.77 -4.50 63.02 -0.76
Pred. Min -7.58 -1.86 -4.51 -7.49 -1.87 4.02 56.42 -1.86 -4.89 56.51 -1.87

Av Of 1/3 H-Mean 1.97 0.32 0.18 1.95 0.35 0.18 1.95 0.32 0.10 1.97 0.33
Av Of 1/3 L-Mean -1.87 -0.33 -0.18 -1.86 -0.36 -0.18 -1.85 -0.33 -0.10 -1.88 -0.34
Av Of 1/100 H-Mean 2.77 0.43 0.24 2.75 0.43 0.24 2.77 0.43 0.15 2.75 0.43
Av Of 1/100 L-Mean -2.62 -0.41 -0.26 -2.59 -0.41 -0.26 -2.62 -0.41 -0.16 -2.59 -0.41
Av Of 1/1000 H-Mean 2.77 0.43 0.24 2.75 0.43 0.24 2.77 0.43 0.16 2.75 0.43
Av Of 1/1000 L-Mean -2.62 -0.41 -0.27 -2.59 -0.41 -0.27 -2.62 -0.41 -0.16 -2.59 -0.41
Maximum - Mean 2.77 0.43 0.24 2.75 0.43 0.24 2.77 0.43 0.16 2.75 0.43
Minimum - Mean -2.62 -0.41 -0.27 -2.59 -0.41 -0.27 -2.62 -0.41 -0.16 -2.59 -0.41
Pred. Max-Mean 3.36 0.56 0.29 3.35 0.56 0.29 3.36 0.56 0.19 3.35 0.56
Pred. Min-Mean -3.18 -0.54 -0.32 -3.16 -0.55 -0.32 -3.18 -0.54 -0.19 -3.16 -0.54

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.84 123.61 -1.33 -5.19 123.68 -1.33 3.34


Variance 0.00 1.44 0.04 0.02 1.44 0.04 0.02
Root Mean Square 3.84 123.62 1.34 5.19 123.68 1.34 3.35
Std. Deviation 0.05 1.20 0.20 0.15 1.20 0.20 0.15
Skewness 0.02 0.12 0.01 0.02 0.12 0.01 0.02
Kurtosis 0.01 -0.92 -0.94 -0.13 -0.92 -0.94 -0.13

Number of Peaks 257 157 30 263 133 25 262

Av Of 1/3 Highest 3.94 125.57 -1.00 -4.89 125.63 -1.00 3.64


Av Of 1/3 Lowest 3.74 121.78 -1.67 -5.49 121.82 -1.67 3.05
Av Of 1/100 Highest 3.99 126.38 -0.90 -4.74 126.43 -0.90 3.79
Av Of 1/100 Lowest 3.68 120.99 -1.74 -5.62 121.08 -1.74 2.91
Av Of 1/1000 Highest 4.00 126.38 -0.90 -4.73 126.43 -0.90 3.81
Av Of 1/1000 Lowest 3.68 120.99 -1.74 -5.65 121.08 -1.74 2.89
Maximum 4.00 126.38 -0.90 -4.73 126.43 -0.90 3.81
Minimum 3.68 120.99 -1.74 -5.65 121.08 -1.74 2.89
Pred. Max 4.03 126.97 -0.77 -4.63 127.03 -0.76 3.90
Pred. Min 3.65 120.43 -1.86 -5.74 120.51 -1.87 2.80

Av Of 1/3 H-Mean 0.10 1.96 0.33 0.30 1.95 0.33 0.30


Av Of 1/3 L-Mean -0.10 -1.83 -0.34 -0.29 -1.86 -0.34 -0.30
Av Of 1/100 H-Mean 0.15 2.77 0.43 0.45 2.75 0.43 0.45
Av Of 1/100 L-Mean -0.16 -2.63 -0.41 -0.43 -2.60 -0.41 -0.43
Av Of 1/1000 H-Mean 0.16 2.77 0.43 0.47 2.75 0.43 0.47
Av Of 1/1000 L-Mean -0.16 -2.63 -0.41 -0.46 -2.60 -0.41 -0.46
Maximum - Mean 0.16 2.77 0.43 0.47 2.75 0.43 0.47
Minimum - Mean -0.16 -2.63 -0.41 -0.46 -2.60 -0.41 -0.46
Pred. Max-Mean 0.19 3.36 0.56 0.56 3.35 0.56 0.56
Pred. Min-Mean -0.19 -3.18 -0.54 -0.55 -3.17 -0.55 -0.55
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 0 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA000

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 0.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 0.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 0.0


22.8 0.60 0.0
45.6 0.20 0.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -7 -2 -2 0 0 0 9
BM2S DB30 -9 3 -3 0 0 0 11
BM3P DB30 -5 -9 -3 0 0 0 12
BM3S DB30 -12 22 -5 0 0 0 26
BM4P DB30 25 -41 -7 0 0 0 49
BM4S DB30 44 75 -9 0 0 0 87
BM5P DB30 59 -44 -9 0 0 0 75
MAINLN DB30 2 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.3 -3.7 -24740.5 33 1663747 -249


Buoyancy -202.0 3.9 25864.3 -182 -1831270 274
Wind -18.0 0.0 0.0 0 -349 -33
Drag -18.3 0.0 -4.8 0 51 0
Wave -47.7 0.0 40.6 0 -2865 -1
Flex. Connectors 92.8 -0.2 -1159.6 149 170700 -472
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.1 0 11 -484

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 6.4 0.0 -1114.3 0 166286 5


Wind -7.0 0.0 0.0 0 -13 11
Flex. Connectors 0.0 0.0 1114.2 0 -166268 0
======= ======= ======= ======= ======= =======
Total -0.5 0.0 -0.1 0 3 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.38 1001.58 758.32 8.91 0.0333 1.84 0.00


BM2S 996.17 1001.58 728.83 11.16 0.0411 4.34 0.00
BM3P 996.57 1001.57 715.24 12.26 0.0463 5.55 0.00
BM3S 998.98 1001.57 579.72 26.23 0.1004 20.67 0.00
BM4P 1001.02 1001.50 425.13 49.46 0.1787 45.22 0.00
BM4S 1003.37 1001.50 234.93 87.31 0.3308 84.66 0.00
BM5P 1002.61 1001.47 292.52 74.62 0.2839 71.50 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -4.57 -1.36 -4.20 0.01 0.45 0.00


N Force 0.13 0.00 0.05 0 11 -484

WHPBJKT Location -4.22 -2.55 22.80 0.00 0.33 0.45


N Force -0.51 0.00 -0.06 0 3 16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (MOORING TENSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 9.14 11.29 12.30 26.17 50.26 89.21 76.49 0.00


Variance 6.63 10.44 5.66 13.47 35.27 127.45 153.70 0.00
Root Mean Square 9.50 11.75 12.53 26.42 50.61 89.92 77.49 0.00
Std. Deviation 2.58 3.23 2.38 3.67 5.94 11.29 12.40 0.00
Skewness 1.44 1.42 0.94 0.78 -0.24 -0.10 -0.18 0.00
Kurtosis 2.67 2.60 1.01 0.60 -0.32 -0.11 -0.24 0.00

Number of Peaks 105 106 93 121 129 112 145 0

Av Of 1/3 Highest 14.56 18.43 16.32 33.02 59.89 106.98 95.57 0.00
Av Of 1/3 Lowest 6.40 7.65 9.07 21.08 40.27 71.33 57.48 0.00
Av Of 1/100 Highest 19.88 24.74 20.71 38.87 62.49 116.38 104.21 0.00
Av Of 1/100 Lowest 5.39 6.53 8.08 19.86 33.72 59.77 42.97 0.00
Av Of 1/1000 Highest 19.88 24.74 20.71 38.87 62.49 116.38 104.21 0.00
Av Of 1/1000 Lowest 5.39 6.53 8.08 19.86 33.72 59.77 42.97 0.00
Maximum 19.88 24.74 20.71 38.87 62.49 116.38 104.21 0.00
Minimum 5.32 6.53 8.08 19.86 33.72 59.77 42.97 0.00
Pred. Max 22.34 27.82 22.68 41.70 65.19 122.54 110.19 0.00
Pred. Min 4.44 5.44 7.09 18.45 30.07 53.10 35.74 0.00

Av Of 1/3 H-Mean 5.42 7.14 4.01 6.86 9.63 17.77 19.08 0.00
Av Of 1/3 L-Mean -2.75 -3.64 -3.23 -5.09 -9.99 -17.88 -19.01 0.00
Av Of 1/100 H-Mean 10.73 13.45 8.41 12.70 12.23 27.17 27.72 0.00
Av Of 1/100 L-Mean -3.76 -4.76 -4.22 -6.31 -16.54 -29.44 -33.52 0.00
Av Of 1/1000 H-Mean 10.73 13.45 8.41 12.70 12.23 27.17 27.72 0.00
Av Of 1/1000 L-Mean -3.76 -4.76 -4.22 -6.31 -16.54 -29.44 -33.52 0.00
Maximum - Mean 10.73 13.45 8.41 12.70 12.23 27.17 27.72 0.00
Minimum - Mean -3.83 -4.76 -4.22 -6.31 -16.54 -29.44 -33.52 0.00
Pred. Max-Mean 13.19 16.53 10.38 15.53 14.93 33.33 33.70 0.00
Pred. Min-Mean -4.71 -5.85 -5.21 -7.72 -20.19 -36.11 -40.75 0.00

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -4.71 -1.38 -4.20


Variance 1.06 0.04 0.04
Root Mean Square 4.82 1.40 4.21
Std. Deviation 1.03 0.19 0.20
Skewness 0.30 0.13 -0.02
Kurtosis -0.03 0.01 -0.11

Number of Peaks 169 23 232

Av Of 1/3 Highest -2.99 -1.02 -3.80


Av Of 1/3 Lowest -6.21 -1.73 -4.61
Av Of 1/100 Highest -1.73 -0.87 -3.60
Av Of 1/100 Lowest -6.99 -1.85 -4.80
Av Of 1/1000 Highest -1.73 -0.87 -3.59
Av Of 1/1000 Lowest -6.99 -1.85 -4.80
Maximum -1.73 -0.87 -3.59
Minimum -6.99 -1.85 -4.80
Pred. Max -1.10 -0.71 -3.47
Pred. Min -7.46 -2.00 -4.92

Av Of 1/3 H-Mean 1.72 0.36 0.40


Av Of 1/3 L-Mean -1.50 -0.35 -0.41
Av Of 1/100 H-Mean 2.98 0.51 0.60
Av Of 1/100 L-Mean -2.28 -0.46 -0.59
Av Of 1/1000 H-Mean 2.98 0.51 0.61
Av Of 1/1000 L-Mean -2.28 -0.46 -0.59
Maximum - Mean 2.98 0.51 0.61
Minimum - Mean -2.28 -0.46 -0.59
Pred. Max-Mean 3.61 0.68 0.74
Pred. Min-Mean -2.75 -0.62 -0.71
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -4.71 -1.38 -4.20 -4.64 -1.38 4.33 59.30 -1.39 -4.70 59.36 -1.39
Variance 1.06 0.04 0.04 1.05 0.04 0.04 1.06 0.04 0.00 1.05 0.04
Root Mean Square 4.82 1.40 4.21 4.75 1.40 4.34 59.31 1.40 4.70 59.37 1.40
Std. Deviation 1.03 0.19 0.20 1.03 0.19 0.20 1.03 0.19 0.02 1.03 0.19
Skewness 0.30 0.13 -0.02 0.30 0.13 -0.02 0.30 0.13 -0.14 0.30 0.13
Kurtosis -0.03 0.01 -0.11 -0.03 0.02 -0.11 -0.03 0.02 0.05 -0.03 0.03

Number of Peaks 169 23 232 165 25 232 169 23 219 161 25

Av Of 1/3 Highest -2.99 -1.02 -3.80 -2.91 -1.00 4.73 61.02 -1.02 -4.67 61.12 -1.00
Av Of 1/3 Lowest -6.21 -1.73 -4.61 -6.23 -1.70 3.93 57.80 -1.73 -4.74 57.76 -1.71
Av Of 1/100 Highest -1.73 -0.87 -3.60 -1.69 -0.87 4.93 62.28 -0.87 -4.65 62.31 -0.87
Av Of 1/100 Lowest -6.99 -1.85 -4.80 -6.91 -1.85 3.74 57.02 -1.85 -4.76 57.09 -1.85
Av Of 1/1000 Highest -1.73 -0.87 -3.59 -1.69 -0.87 4.94 62.28 -0.87 -4.65 62.31 -0.87
Av Of 1/1000 Lowest -6.99 -1.85 -4.80 -6.91 -1.85 3.74 57.02 -1.85 -4.76 57.09 -1.85
Maximum -1.73 -0.87 -3.59 -1.69 -0.87 4.94 62.28 -0.87 -4.65 62.31 -0.87
Minimum -6.99 -1.85 -4.80 -6.91 -1.85 3.74 57.02 -1.85 -4.76 57.09 -1.85
Pred. Max -1.10 -0.71 -3.47 -1.07 -0.71 5.07 62.91 -0.71 -4.64 62.94 -0.71
Pred. Min -7.46 -2.00 -4.92 -7.39 -2.00 3.62 56.54 -2.00 -4.77 56.61 -2.00

Av Of 1/3 H-Mean 1.72 0.36 0.40 1.73 0.38 0.40 1.72 0.36 0.03 1.76 0.38
Av Of 1/3 L-Mean -1.50 -0.35 -0.41 -1.59 -0.32 -0.41 -1.50 -0.35 -0.03 -1.60 -0.32
Av Of 1/100 H-Mean 2.98 0.51 0.60 2.95 0.51 0.60 2.98 0.51 0.05 2.95 0.51
Av Of 1/100 L-Mean -2.28 -0.46 -0.59 -2.27 -0.46 -0.59 -2.28 -0.47 -0.05 -2.27 -0.46
Av Of 1/1000 H-Mean 2.98 0.51 0.61 2.95 0.51 0.61 2.98 0.51 0.05 2.95 0.51
Av Of 1/1000 L-Mean -2.28 -0.46 -0.59 -2.27 -0.46 -0.59 -2.28 -0.47 -0.05 -2.27 -0.46
Maximum - Mean 2.98 0.51 0.61 2.95 0.51 0.61 2.98 0.51 0.05 2.95 0.51
Minimum - Mean -2.28 -0.46 -0.59 -2.27 -0.46 -0.59 -2.28 -0.47 -0.05 -2.27 -0.46
Pred. Max-Mean 3.61 0.68 0.74 3.57 0.67 0.73 3.61 0.68 0.06 3.57 0.67
Pred. Min-Mean -2.75 -0.62 -0.71 -2.75 -0.61 -0.71 -2.75 -0.62 -0.06 -2.75 -0.61

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=0deg (BARGE EXCURSION-BM5S DAMAGED) *
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 123.30 -1.39 -5.20 123.37 -1.39 3.33


Variance 0.00 1.06 0.04 0.05 1.05 0.04 0.05
Root Mean Square 3.83 123.31 1.40 5.21 123.37 1.40 3.34
Std. Deviation 0.02 1.03 0.19 0.22 1.03 0.19 0.22
Skewness -0.14 0.30 0.12 0.00 0.30 0.13 0.00
Kurtosis 0.04 -0.03 0.03 -0.11 -0.03 0.04 -0.11

Number of Peaks 219 172 23 232 164 25 232

Av Of 1/3 Highest 3.86 125.02 -1.02 -4.76 125.10 -1.01 3.77


Av Of 1/3 Lowest 3.80 121.80 -1.74 -5.65 121.78 -1.71 2.88
Av Of 1/100 Highest 3.88 126.29 -0.88 -4.56 126.32 -0.88 3.98
Av Of 1/100 Lowest 3.78 121.03 -1.85 -5.87 121.10 -1.85 2.66
Av Of 1/1000 Highest 3.88 126.29 -0.88 -4.56 126.32 -0.88 3.98
Av Of 1/1000 Lowest 3.78 121.03 -1.85 -5.87 121.10 -1.85 2.66
Maximum 3.88 126.29 -0.88 -4.56 126.32 -0.88 3.98
Minimum 3.78 121.03 -1.85 -5.87 121.10 -1.85 2.66
Pred. Max 3.89 126.91 -0.71 -4.43 126.94 -0.71 4.11
Pred. Min 3.77 120.55 -2.01 -6.01 120.62 -2.00 2.53

Av Of 1/3 H-Mean 0.03 1.72 0.36 0.44 1.73 0.38 0.44


Av Of 1/3 L-Mean -0.03 -1.50 -0.35 -0.45 -1.59 -0.32 -0.45
Av Of 1/100 H-Mean 0.05 2.99 0.51 0.65 2.95 0.51 0.65
Av Of 1/100 L-Mean -0.05 -2.28 -0.47 -0.67 -2.27 -0.47 -0.67
Av Of 1/1000 H-Mean 0.05 2.99 0.51 0.65 2.95 0.51 0.65
Av Of 1/1000 L-Mean -0.05 -2.28 -0.47 -0.67 -2.27 -0.47 -0.67
Maximum - Mean 0.05 2.99 0.51 0.65 2.95 0.51 0.65
Minimum - Mean -0.05 -2.28 -0.47 -0.67 -2.27 -0.47 -0.67
Pred. Max-Mean 0.06 3.61 0.68 0.78 3.57 0.68 0.78
Pred. Min-Mean -0.06 -2.75 -0.62 -0.80 -2.75 -0.61 -0.80
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -7 -2 -3 0 0 0 9
BM2S DB30 -23 8 -5 0 0 0 26
BM3P DB30 -2 -4 -2 0 0 0 6
BM3S DB30 -41 75 -10 0 0 0 87
BM4P DB30 6 -9 -3 0 0 0 12
BM5P DB30 19 -14 -5 0 0 0 25
BM5S DB30 96 24 -10 0 0 0 99
MAINLN DB30 5 -3 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.2 -6.9 -24740.5 62 1663738 -460


Buoyancy -200.9 7.2 25875.0 -336 -1831630 505
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.2 -3.4 150 34 -2461
Wave -19.5 -19.3 29.9 57 -1840 -942
Flex. Connectors 48.6 69.7 -1158.5 -374 169827 -770
======= ======= ======= ======= ======= =======
Total -5.4 -9.7 2.6 -30 -119 -5790

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.4 4.1 -1114.3 -6 166282 605


Wind -5.0 -5.9 0.1 14 -34 -867
Flex. Connectors -0.1 -0.3 1114.4 12 -166305 -44
======= ======= ======= ======= ======= =======
Total -1.8 -2.1 0.3 19 -59 -307
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.58 1001.58 750.68 9.49 0.0355 2.49 0.00


BM2S 998.94 1001.58 580.54 26.04 0.0959 20.47 0.00
BM3P 993.88 1001.57 799.12 6.32 0.0239 0.31 0.00
BM3S 1003.35 1001.57 232.69 86.51 0.3311 83.88 0.00
BM4P 996.66 1001.50 715.73 12.38 0.0447 5.68 0.00
BM5P 998.82 1001.47 592.35 25.05 0.0953 19.39 0.00
BM5S 1003.99 1001.46 183.34 99.28 0.3606 97.07 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.95 -5.46 -4.21 0.02 0.45 0.00


N Force -5.36 -9.72 2.61 -30 -120 -5790

WHPBJKT Location -2.41 -6.05 22.40 -0.21 0.17 0.12


N Force -1.76 -2.12 0.31 19 -59 -307
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 7.85 24.56 5.13 97.24 10.61 0.00 23.59 113.18


Variance 0.40 5.68 0.08 16.14 0.44 0.00 3.71 47.26
Root Mean Square 7.87 24.67 5.14 97.32 10.63 0.00 23.67 113.39
Std. Deviation 0.63 2.38 0.29 4.02 0.67 0.00 1.93 6.87
Skewness 0.32 0.16 0.53 -0.08 0.11 0.00 0.05 0.01
Kurtosis -0.05 -0.69 1.17 -0.01 -0.01 0.00 -0.71 -0.55

Number of Peaks 123 131 135 167 148 0 133 127

Av Of 1/3 Highest 8.69 28.34 5.49 103.72 11.78 0.00 26.68 123.87
Av Of 1/3 Lowest 6.92 20.76 4.72 92.10 9.52 0.00 20.57 103.82
Av Of 1/100 Highest 9.57 30.59 5.75 107.47 12.20 0.00 28.49 128.55
Av Of 1/100 Lowest 6.52 19.73 4.52 87.71 8.94 0.00 19.52 97.73
Av Of 1/1000 Highest 9.57 30.59 5.75 107.47 12.20 0.00 28.49 128.55
Av Of 1/1000 Lowest 6.52 19.73 4.52 87.71 8.94 0.00 19.52 97.73
Maximum 9.57 30.59 6.32 107.47 12.38 0.00 28.49 128.55
Minimum 6.52 19.73 4.52 86.52 8.94 0.00 19.52 97.73
Pred. Max 9.95 31.92 6.59 109.63 12.76 0.00 29.56 131.95
Pred. Min 6.22 18.66 4.39 84.26 8.58 0.00 18.62 94.31

Av Of 1/3 H-Mean 0.84 3.79 0.36 6.48 1.17 0.00 3.09 10.69
Av Of 1/3 L-Mean -0.93 -3.80 -0.41 -5.15 -1.09 0.00 -3.03 -9.36
Av Of 1/100 H-Mean 1.72 6.04 0.62 10.23 1.59 0.00 4.89 15.37
Av Of 1/100 L-Mean -1.33 -4.83 -0.61 -9.53 -1.66 0.00 -4.08 -15.46
Av Of 1/1000 H-Mean 1.72 6.04 0.62 10.23 1.59 0.00 4.89 15.37
Av Of 1/1000 L-Mean -1.33 -4.83 -0.61 -9.53 -1.66 0.00 -4.08 -15.46
Maximum - Mean 1.72 6.04 1.20 10.23 1.77 0.00 4.89 15.37
Minimum - Mean -1.33 -4.83 -0.61 -10.72 -1.66 0.00 -4.08 -15.46
Pred. Max-Mean 2.11 7.36 1.46 12.38 2.15 0.00 5.97 18.77
Pred. Min-Mean -1.63 -5.89 -0.74 -12.98 -2.02 0.00 -4.97 -18.87

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -3.46 -6.44 -4.21


Variance 0.12 0.07 0.00
Root Mean Square 3.48 6.45 4.21
Std. Deviation 0.34 0.26 0.02
Skewness -0.02 0.44 0.05
Kurtosis -0.67 0.72 -0.15

Number of Peaks 165 230 333

Av Of 1/3 Highest -2.97 -6.11 -4.17


Av Of 1/3 Lowest -4.01 -6.85 -4.25
Av Of 1/100 Highest -2.69 -5.88 -4.14
Av Of 1/100 Lowest -4.23 -7.02 -4.26
Av Of 1/1000 Highest -2.69 -5.87 -4.14
Av Of 1/1000 Lowest -4.23 -7.03 -4.26
Maximum -2.69 -5.46 -4.14
Minimum -4.23 -7.03 -4.26
Pred. Max -2.52 -5.27 -4.12
Pred. Min -4.39 -7.14 -4.27

Av Of 1/3 H-Mean 0.49 0.33 0.04


Av Of 1/3 L-Mean -0.55 -0.41 -0.04
Av Of 1/100 H-Mean 0.78 0.56 0.07
Av Of 1/100 L-Mean -0.76 -0.58 -0.06
Av Of 1/1000 H-Mean 0.78 0.57 0.07
Av Of 1/1000 L-Mean -0.76 -0.59 -0.06
Maximum - Mean 0.78 0.98 0.07
Minimum - Mean -0.76 -0.59 -0.06
Pred. Max-Mean 0.94 1.17 0.08
Pred. Min-Mean -0.93 -0.70 -0.07
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -3.46 -6.44 -4.21 -3.40 -6.44 4.33 60.54 -6.44 -4.70 60.61 -6.45
Variance 0.12 0.07 0.00 0.12 0.07 0.00 0.12 0.07 0.00 0.12 0.07
Root Mean Square 3.48 6.45 4.21 3.41 6.45 4.33 60.54 6.45 4.70 60.61 6.45
Std. Deviation 0.34 0.26 0.02 0.34 0.26 0.02 0.34 0.27 0.01 0.34 0.27
Skewness -0.02 0.44 0.05 -0.01 0.45 0.05 -0.02 0.44 -0.01 -0.01 0.45
Kurtosis -0.67 0.72 -0.15 -0.67 0.74 -0.15 -0.67 0.73 -0.01 -0.67 0.75

Number of Peaks 165 230 333 148 122 331 165 230 324 149 121

Av Of 1/3 Highest -2.97 -6.11 -4.17 -2.92 -6.12 4.36 61.03 -6.11 -4.68 61.09 -6.12
Av Of 1/3 Lowest -4.01 -6.85 -4.25 -3.94 -6.86 4.29 59.99 -6.85 -4.73 60.07 -6.87
Av Of 1/100 Highest -2.69 -5.88 -4.14 -2.62 -5.89 4.39 61.32 -5.88 -4.67 61.38 -5.89
Av Of 1/100 Lowest -4.23 -7.02 -4.26 -4.15 -7.01 4.27 59.78 -7.02 -4.74 59.85 -7.01
Av Of 1/1000 Highest -2.69 -5.87 -4.14 -2.62 -5.89 4.40 61.32 -5.87 -4.67 61.38 -5.89
Av Of 1/1000 Lowest -4.23 -7.03 -4.26 -4.15 -7.01 4.27 59.78 -7.03 -4.74 59.85 -7.01
Maximum -2.69 -5.46 -4.14 -2.62 -5.47 4.40 61.32 -5.46 -4.67 61.38 -5.47
Minimum -4.23 -7.03 -4.26 -4.15 -7.01 4.27 59.78 -7.03 -4.74 59.85 -7.01
Pred. Max -2.52 -5.27 -4.12 -2.45 -5.25 4.41 61.48 -5.27 -4.66 61.55 -5.25
Pred. Min -4.39 -7.14 -4.27 -4.31 -7.13 4.26 59.62 -7.14 -4.75 59.69 -7.13

Av Of 1/3 H-Mean 0.49 0.33 0.04 0.48 0.32 0.04 0.49 0.33 0.02 0.48 0.32
Av Of 1/3 L-Mean -0.55 -0.41 -0.04 -0.54 -0.42 -0.04 -0.55 -0.41 -0.02 -0.54 -0.42
Av Of 1/100 H-Mean 0.78 0.56 0.07 0.78 0.55 0.07 0.78 0.56 0.03 0.78 0.55
Av Of 1/100 L-Mean -0.76 -0.58 -0.06 -0.75 -0.56 -0.06 -0.76 -0.58 -0.04 -0.76 -0.56
Av Of 1/1000 H-Mean 0.78 0.57 0.07 0.78 0.55 0.07 0.78 0.57 0.03 0.78 0.55
Av Of 1/1000 L-Mean -0.76 -0.59 -0.06 -0.75 -0.56 -0.06 -0.76 -0.58 -0.04 -0.76 -0.56
Maximum - Mean 0.78 0.98 0.07 0.78 0.98 0.07 0.78 0.98 0.03 0.78 0.98
Minimum - Mean -0.76 -0.59 -0.06 -0.75 -0.56 -0.06 -0.76 -0.58 -0.04 -0.76 -0.56
Pred. Max-Mean 0.94 1.17 0.08 0.94 1.19 0.08 0.94 1.17 0.04 0.94 1.20
Pred. Min-Mean -0.93 -0.70 -0.07 -0.92 -0.69 -0.07 -0.93 -0.70 -0.04 -0.92 -0.69

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 124.55 -6.45 -5.20 124.61 -6.45 3.33


Variance 0.00 0.12 0.07 0.00 0.12 0.07 0.00
Root Mean Square 3.83 124.55 6.45 5.20 124.61 6.45 3.33
Std. Deviation 0.01 0.34 0.27 0.04 0.34 0.27 0.04
Skewness -0.01 -0.02 0.45 -0.02 -0.01 0.45 -0.02
Kurtosis -0.01 -0.67 0.74 -0.22 -0.67 0.75 -0.22

Number of Peaks 324 166 229 327 151 123 327

Av Of 1/3 Highest 3.85 125.04 -6.12 -5.13 125.09 -6.12 3.41


Av Of 1/3 Lowest 3.81 124.00 -6.86 -5.28 124.08 -6.88 3.26
Av Of 1/100 Highest 3.86 125.33 -5.88 -5.09 125.39 -5.89 3.44
Av Of 1/100 Lowest 3.79 123.78 -7.02 -5.31 123.86 -7.01 3.22
Av Of 1/1000 Highest 3.86 125.33 -5.87 -5.09 125.39 -5.89 3.44
Av Of 1/1000 Lowest 3.79 123.78 -7.03 -5.31 123.86 -7.01 3.22
Maximum 3.86 125.33 -5.46 -5.09 125.39 -5.47 3.44
Minimum 3.79 123.78 -7.03 -5.31 123.86 -7.01 3.22
Pred. Max 3.87 125.49 -5.27 -5.07 125.56 -5.25 3.46
Pred. Min 3.79 123.62 -7.15 -5.33 123.70 -7.13 3.20

Av Of 1/3 H-Mean 0.02 0.49 0.33 0.07 0.47 0.33 0.07


Av Of 1/3 L-Mean -0.02 -0.55 -0.41 -0.08 -0.54 -0.43 -0.08
Av Of 1/100 H-Mean 0.03 0.78 0.57 0.11 0.78 0.56 0.11
Av Of 1/100 L-Mean -0.04 -0.77 -0.57 -0.11 -0.76 -0.56 -0.11
Av Of 1/1000 H-Mean 0.03 0.78 0.57 0.11 0.78 0.56 0.11
Av Of 1/1000 L-Mean -0.04 -0.77 -0.58 -0.11 -0.76 -0.56 -0.11
Maximum - Mean 0.03 0.78 0.98 0.11 0.78 0.98 0.11
Minimum - Mean -0.04 -0.77 -0.58 -0.11 -0.76 -0.56 -0.11
Pred. Max-Mean 0.04 0.94 1.18 0.13 0.94 1.20 0.13
Pred. Min-Mean -0.04 -0.93 -0.70 -0.13 -0.92 -0.68 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -7 -2 -2 0 0 0 9
BM2S DB30 -23 7 -5 0 0 0 25
BM3P DB30 -2 -3 -2 0 0 0 6
BM3S DB30 -43 77 -10 0 0 0 89
BM4P DB30 6 -9 -3 0 0 0 12
BM5P DB30 19 -14 -5 0 0 0 25
BM5S DB30 100 25 -10 0 0 0 103
MAINLN DB30 5 -3 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.1 -2.9 -24740.5 26 1663737 -193


Buoyancy -200.8 3.0 25871.3 -141 -1831355 212
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.2 -3.4 150 35 -2461
Wave -23.3 -23.0 33.6 -62 -2155 -1026
Flex. Connectors 52.5 73.9 -1158.4 -429 169856 -621
======= ======= ======= ======= ======= =======
Total -5.1 -9.4 2.7 -45 -130 -5750

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.4 4.1 -1114.3 -6 166282 613


Wind -5.0 -5.9 0.1 14 -34 -867
Flex. Connectors -0.1 -0.3 1114.4 12 -166295 -43
======= ======= ======= ======= ======= =======
Total -1.7 -2.1 0.2 18 -48 -298
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.34 1001.58 759.62 8.81 0.0329 1.73 0.00


BM2S 998.86 1001.58 586.09 25.38 0.0935 19.77 0.00
BM3P 993.57 1001.57 806.95 5.84 0.0220 0.06 0.00
BM3S 1003.49 1001.57 221.55 88.99 0.3406 86.46 0.00
BM4P 996.52 1001.50 721.06 11.97 0.0432 5.22 0.00
BM5P 998.79 1001.47 593.98 24.86 0.0946 19.19 0.00
BM5S 1004.22 1001.46 166.17 103.47 0.3758 101.40 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -3.12 -5.72 -4.21 0.01 0.44 0.00


N Force -5.13 -9.37 2.71 -45 -130 -5750

WHPBJKT Location -2.58 -6.31 22.40 -0.21 0.18 0.12


N Force -1.71 -2.06 0.24 18 -48 -298
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 7.45 24.02 4.87 99.94 10.22 0.00 23.48 117.49


Variance 0.60 10.03 0.11 27.21 0.71 0.00 6.81 81.77
Root Mean Square 7.49 24.23 4.89 100.07 10.25 0.00 23.62 117.83
Std. Deviation 0.77 3.17 0.34 5.22 0.84 0.00 2.61 9.04
Skewness -0.07 0.21 -0.21 0.17 -0.08 0.00 0.01 0.16
Kurtosis -0.80 -1.01 -0.41 -0.70 -0.84 0.00 -1.11 -0.95

Number of Peaks 158 226 156 230 246 0 224 188

Av Of 1/3 Highest 8.63 29.09 5.33 108.30 11.47 0.00 27.46 131.82
Av Of 1/3 Lowest 6.26 19.60 4.30 92.26 8.86 0.00 19.51 104.35
Av Of 1/100 Highest 9.41 32.09 5.49 112.73 11.92 0.00 28.92 137.89
Av Of 1/100 Lowest 5.78 18.62 4.06 89.55 8.47 0.00 18.38 97.92
Av Of 1/1000 Highest 9.41 32.13 5.49 113.15 11.94 0.00 29.03 137.89
Av Of 1/1000 Lowest 5.78 18.57 4.06 89.55 8.41 0.00 18.31 97.92
Maximum 9.41 32.13 5.84 113.15 11.97 0.00 29.03 137.89
Minimum 5.78 18.57 4.06 89.00 8.41 0.00 18.31 97.92
Pred. Max 9.82 33.75 6.04 115.78 12.31 0.00 30.14 142.10
Pred. Min 5.42 17.48 3.89 86.82 8.05 0.00 17.28 93.89

Av Of 1/3 H-Mean 1.18 5.07 0.46 8.36 1.25 0.00 3.98 14.34
Av Of 1/3 L-Mean -1.20 -4.42 -0.57 -7.68 -1.36 0.00 -3.96 -13.14
Av Of 1/100 H-Mean 1.95 8.07 0.61 12.79 1.71 0.00 5.45 20.41
Av Of 1/100 L-Mean -1.67 -5.40 -0.81 -10.38 -1.75 0.00 -5.09 -19.57
Av Of 1/1000 H-Mean 1.95 8.11 0.61 13.22 1.72 0.00 5.55 20.41
Av Of 1/1000 L-Mean -1.67 -5.45 -0.81 -10.39 -1.81 0.00 -5.17 -19.57
Maximum - Mean 1.95 8.11 0.97 13.22 1.75 0.00 5.55 20.41
Minimum - Mean -1.67 -5.45 -0.81 -10.94 -1.81 0.00 -5.17 -19.57
Pred. Max-Mean 2.37 9.73 1.17 15.85 2.10 0.00 6.66 24.61
Pred. Min-Mean -2.03 -6.54 -0.98 -13.11 -2.16 0.00 -6.20 -23.60

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -3.63 -6.71 -4.21


Variance 0.21 0.10 0.00
Root Mean Square 3.66 6.71 4.21
Std. Deviation 0.45 0.31 0.03
Skewness -0.07 -0.17 -0.04
Kurtosis -1.03 -0.04 -0.18

Number of Peaks 216 241 286

Av Of 1/3 Highest -2.96 -6.35 -4.15


Av Of 1/3 Lowest -4.34 -7.23 -4.27
Av Of 1/100 Highest -2.62 -6.19 -4.12
Av Of 1/100 Lowest -4.57 -7.45 -4.31
Av Of 1/1000 Highest -2.61 -6.19 -4.12
Av Of 1/1000 Lowest -4.57 -7.46 -4.32
Maximum -2.61 -5.72 -4.12
Minimum -4.57 -7.46 -4.32
Pred. Max -2.40 -5.53 -4.10
Pred. Min -4.77 -7.61 -4.34

Av Of 1/3 H-Mean 0.67 0.36 0.06


Av Of 1/3 L-Mean -0.71 -0.52 -0.06
Av Of 1/100 H-Mean 1.01 0.52 0.09
Av Of 1/100 L-Mean -0.94 -0.74 -0.10
Av Of 1/1000 H-Mean 1.02 0.52 0.09
Av Of 1/1000 L-Mean -0.95 -0.75 -0.11
Maximum - Mean 1.02 0.98 0.09
Minimum - Mean -0.95 -0.75 -0.11
Pred. Max-Mean 1.23 1.18 0.11
Pred. Min-Mean -1.14 -0.90 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -3.63 -6.71 -4.21 -3.56 -6.71 4.33 60.38 -6.70 -4.70 60.44 -6.70
Variance 0.21 0.10 0.00 0.21 0.10 0.00 0.21 0.10 0.00 0.21 0.10
Root Mean Square 3.66 6.71 4.21 3.59 6.71 4.33 60.38 6.71 4.70 60.45 6.71
Std. Deviation 0.45 0.31 0.03 0.45 0.31 0.03 0.45 0.31 0.03 0.45 0.31
Skewness -0.07 -0.17 -0.04 -0.07 -0.16 -0.04 -0.07 -0.17 -0.03 -0.07 -0.16
Kurtosis -1.03 -0.04 -0.18 -1.03 -0.03 -0.18 -1.03 -0.04 -0.23 -1.03 -0.03

Number of Peaks 216 241 286 218 198 286 216 241 284 218 199

Av Of 1/3 Highest -2.96 -6.35 -4.15 -2.90 -6.34 4.39 61.05 -6.35 -4.65 61.11 -6.33
Av Of 1/3 Lowest -4.34 -7.23 -4.27 -4.27 -7.24 4.26 59.66 -7.22 -4.76 59.74 -7.23
Av Of 1/100 Highest -2.62 -6.19 -4.12 -2.55 -6.20 4.41 61.39 -6.19 -4.63 61.45 -6.19
Av Of 1/100 Lowest -4.57 -7.45 -4.31 -4.50 -7.45 4.23 59.44 -7.45 -4.79 59.50 -7.44
Av Of 1/1000 Highest -2.61 -6.19 -4.12 -2.54 -6.20 4.42 61.40 -6.18 -4.63 61.47 -6.19
Av Of 1/1000 Lowest -4.57 -7.46 -4.32 -4.51 -7.45 4.22 59.43 -7.46 -4.80 59.50 -7.44
Maximum -2.61 -5.72 -4.12 -2.54 -5.72 4.42 61.40 -5.72 -4.63 61.47 -5.72
Minimum -4.57 -7.46 -4.32 -4.51 -7.45 4.22 59.43 -7.46 -4.80 59.50 -7.44
Pred. Max -2.40 -5.53 -4.10 -2.33 -5.52 4.44 61.61 -5.53 -4.61 61.67 -5.52
Pred. Min -4.77 -7.61 -4.34 -4.70 -7.60 4.20 59.24 -7.60 -4.81 59.31 -7.59

Av Of 1/3 H-Mean 0.67 0.36 0.06 0.67 0.37 0.06 0.67 0.36 0.05 0.67 0.37
Av Of 1/3 L-Mean -0.71 -0.52 -0.06 -0.71 -0.54 -0.06 -0.71 -0.52 -0.05 -0.71 -0.53
Av Of 1/100 H-Mean 1.01 0.52 0.09 1.01 0.51 0.09 1.01 0.52 0.07 1.01 0.51
Av Of 1/100 L-Mean -0.94 -0.74 -0.10 -0.94 -0.74 -0.10 -0.94 -0.75 -0.08 -0.94 -0.74
Av Of 1/1000 H-Mean 1.02 0.52 0.09 1.02 0.51 0.09 1.02 0.52 0.08 1.02 0.51
Av Of 1/1000 L-Mean -0.95 -0.75 -0.11 -0.95 -0.74 -0.11 -0.95 -0.75 -0.09 -0.95 -0.74
Maximum - Mean 1.02 0.98 0.09 1.02 0.98 0.09 1.02 0.98 0.08 1.02 0.98
Minimum - Mean -0.95 -0.75 -0.11 -0.95 -0.74 -0.11 -0.95 -0.75 -0.09 -0.95 -0.74
Pred. Max-Mean 1.23 1.18 0.11 1.23 1.18 0.11 1.23 1.17 0.09 1.23 1.18
Pred. Min-Mean -1.14 -0.90 -0.13 -1.14 -0.89 -0.13 -1.14 -0.90 -0.11 -1.14 -0.89

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 124.38 -6.70 -5.20 124.45 -6.70 3.33


Variance 0.00 0.21 0.10 0.00 0.21 0.10 0.00
Root Mean Square 3.83 124.38 6.71 5.20 124.45 6.71 3.33
Std. Deviation 0.03 0.45 0.31 0.02 0.45 0.31 0.02
Skewness -0.02 -0.07 -0.17 0.00 -0.07 -0.17 0.00
Kurtosis -0.23 -1.03 -0.04 -0.13 -1.03 -0.03 -0.13

Number of Peaks 284 216 241 273 216 200 273

Av Of 1/3 Highest 3.88 125.05 -6.34 -5.15 125.12 -6.32 3.38


Av Of 1/3 Lowest 3.78 123.67 -7.22 -5.25 123.74 -7.23 3.28
Av Of 1/100 Highest 3.90 125.39 -6.18 -5.12 125.46 -6.18 3.41
Av Of 1/100 Lowest 3.75 123.44 -7.45 -5.28 123.51 -7.44 3.26
Av Of 1/1000 Highest 3.91 125.41 -6.17 -5.12 125.47 -6.18 3.41
Av Of 1/1000 Lowest 3.74 123.44 -7.45 -5.28 123.50 -7.44 3.26
Maximum 3.91 125.41 -5.72 -5.12 125.47 -5.72 3.41
Minimum 3.74 123.44 -7.45 -5.28 123.50 -7.44 3.26
Pred. Max 3.92 125.61 -5.53 -5.11 125.68 -5.53 3.43
Pred. Min 3.72 123.25 -7.60 -5.29 123.31 -7.59 3.24

Av Of 1/3 H-Mean 0.05 0.67 0.36 0.05 0.67 0.38 0.05


Av Of 1/3 L-Mean -0.05 -0.71 -0.52 -0.05 -0.71 -0.53 -0.05
Av Of 1/100 H-Mean 0.07 1.01 0.52 0.08 1.01 0.52 0.08
Av Of 1/100 L-Mean -0.08 -0.94 -0.75 -0.08 -0.94 -0.74 -0.08
Av Of 1/1000 H-Mean 0.08 1.02 0.52 0.08 1.02 0.52 0.08
Av Of 1/1000 L-Mean -0.09 -0.95 -0.75 -0.08 -0.95 -0.74 -0.08
Maximum - Mean 0.08 1.02 0.97 0.08 1.02 0.97 0.08
Minimum - Mean -0.09 -0.95 -0.75 -0.08 -0.95 -0.74 -0.08
Pred. Max-Mean 0.09 1.23 1.17 0.09 1.23 1.17 0.09
Pred. Min-Mean -0.11 -1.14 -0.90 -0.09 -1.14 -0.89 -0.09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -6 -1 -2 0 0 0 8
BM2S DB30 -22 7 -5 0 0 0 25
BM3P DB30 -1 -3 -2 0 0 0 6
BM3S DB30 -44 79 -10 0 0 0 92
BM4P DB30 6 -8 -3 0 0 0 12
BM5P DB30 19 -14 -5 0 0 0 25
BM5S DB30 104 27 -10 0 0 0 108
MAINLN DB30 5 -3 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.1 1.1 -24740.5 -9 1663738 77


Buoyancy -200.8 -1.2 25872.8 56 -1831465 -83
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.2 -3.4 150 36 -2461
Wave -29.4 -29.1 32.3 -164 -2129 -1416
Flex. Connectors 57.2 78.3 -1158.4 -498 169928 -454
======= ======= ======= ======= ======= =======
Total -6.5 -11.2 2.8 -55 -141 -5999

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.4 4.0 -1114.3 -6 166282 598


Wind -5.0 -5.9 0.1 14 -34 -867
Flex. Connectors -0.1 -0.3 1114.4 12 -166305 -44
======= ======= ======= ======= ======= =======
Total -1.8 -2.2 0.3 19 -59 -313
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.07 1001.58 767.42 8.29 0.0310 1.35 0.00


BM2S 998.75 1001.58 593.14 24.55 0.0905 18.88 0.00
BM3P 993.23 1001.57 813.24 5.50 0.0208 0.00 0.00
BM3S 1003.64 1001.57 210.31 91.55 0.3504 89.12 0.00
BM4P 996.38 1001.50 726.47 11.55 0.0417 4.75 0.00
BM5P 998.78 1001.47 594.84 24.77 0.0942 19.08 0.00
BM5S 1004.48 1001.46 146.58 108.34 0.3935 106.44 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -3.32 -6.00 -4.21 0.00 0.44 0.00


N Force -6.47 -11.22 2.85 -55 -141 -5999

WHPBJKT Location -2.77 -6.55 22.39 -0.21 0.17 0.12


N Force -1.79 -2.17 0.31 19 -59 -313
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 6.94 23.02 4.56 102.45 9.74 0.00 23.41 123.64


Variance 0.91 11.88 0.26 47.11 1.01 0.00 8.32 139.40
Root Mean Square 7.01 23.28 4.59 102.68 9.79 0.00 23.59 124.21
Std. Deviation 0.95 3.45 0.51 6.86 1.01 0.00 2.88 11.81
Skewness 0.20 0.32 -0.07 0.19 0.17 0.00 0.07 0.13
Kurtosis -0.65 -0.52 -0.60 -0.66 -0.95 0.00 -0.88 -0.56

Number of Peaks 114 128 156 101 133 0 107 150

Av Of 1/3 Highest 8.68 29.09 5.29 115.94 11.41 0.00 28.60 143.02
Av Of 1/3 Lowest 5.52 17.93 3.77 92.70 8.18 0.00 18.81 104.78
Av Of 1/100 Highest 9.29 32.30 5.67 118.86 11.85 0.00 30.14 151.17
Av Of 1/100 Lowest 5.20 16.38 3.47 89.06 7.77 0.00 17.16 98.97
Av Of 1/1000 Highest 9.29 32.30 5.67 118.86 11.85 0.00 30.14 151.17
Av Of 1/1000 Lowest 5.20 16.38 3.47 89.06 7.77 0.00 17.16 98.97
Maximum 9.29 32.30 5.67 118.86 11.85 0.00 30.14 151.17
Minimum 5.20 16.38 3.47 89.06 7.77 0.00 17.16 98.97
Pred. Max 9.82 34.35 5.90 122.66 12.31 0.00 31.68 157.07
Pred. Min 4.81 14.92 3.23 85.97 7.34 0.00 15.73 93.67

Av Of 1/3 H-Mean 1.73 6.07 0.73 13.48 1.67 0.00 5.19 19.37
Av Of 1/3 L-Mean -1.42 -5.09 -0.79 -9.76 -1.56 0.00 -4.60 -18.86
Av Of 1/100 H-Mean 2.35 9.28 1.11 16.41 2.11 0.00 6.73 27.52
Av Of 1/100 L-Mean -1.74 -6.64 -1.10 -13.39 -1.97 0.00 -6.25 -24.68
Av Of 1/1000 H-Mean 2.35 9.28 1.11 16.41 2.11 0.00 6.73 27.52
Av Of 1/1000 L-Mean -1.74 -6.64 -1.10 -13.39 -1.97 0.00 -6.25 -24.68
Maximum - Mean 2.35 9.28 1.11 16.41 2.11 0.00 6.73 27.52
Minimum - Mean -1.74 -6.64 -1.10 -13.39 -1.97 0.00 -6.25 -24.68
Pred. Max-Mean 2.88 11.33 1.34 20.20 2.57 0.00 8.27 33.43
Pred. Min-Mean -2.14 -8.11 -1.33 -16.48 -2.40 0.00 -7.68 -29.97

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -3.88 -6.99 -4.21


Variance 0.31 0.25 0.02
Root Mean Square 3.92 7.01 4.21
Std. Deviation 0.55 0.50 0.13
Skewness -0.06 -0.08 0.02
Kurtosis -0.57 -0.52 -0.22

Number of Peaks 198 232 267

Av Of 1/3 Highest -3.01 -6.28 -3.94


Av Of 1/3 Lowest -4.76 -7.80 -4.47
Av Of 1/100 Highest -2.63 -5.93 -3.83
Av Of 1/100 Lowest -5.22 -8.17 -4.60
Av Of 1/1000 Highest -2.63 -5.92 -3.82
Av Of 1/1000 Lowest -5.22 -8.17 -4.62
Maximum -2.63 -5.92 -3.82
Minimum -5.22 -8.17 -4.62
Pred. Max -2.37 -5.70 -3.75
Pred. Min -5.49 -8.41 -4.70

Av Of 1/3 H-Mean 0.87 0.71 0.27


Av Of 1/3 L-Mean -0.88 -0.81 -0.26
Av Of 1/100 H-Mean 1.25 1.06 0.38
Av Of 1/100 L-Mean -1.34 -1.18 -0.39
Av Of 1/1000 H-Mean 1.25 1.08 0.38
Av Of 1/1000 L-Mean -1.34 -1.18 -0.42
Maximum - Mean 1.25 1.08 0.38
Minimum - Mean -1.34 -1.18 -0.42
Pred. Max-Mean 1.51 1.29 0.46
Pred. Min-Mean -1.61 -1.41 -0.50
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -3.88 -6.99 -4.21 -3.81 -6.99 4.33 60.13 -7.03 -4.70 60.19 -7.03
Variance 0.31 0.25 0.02 0.31 0.25 0.02 0.31 0.25 0.00 0.31 0.25
Root Mean Square 3.92 7.01 4.21 3.85 7.01 4.33 60.13 7.05 4.70 60.20 7.05
Std. Deviation 0.55 0.50 0.13 0.55 0.50 0.13 0.55 0.50 0.02 0.55 0.50
Skewness -0.06 -0.08 0.02 -0.06 -0.08 0.02 -0.06 -0.09 -0.03 -0.06 -0.08
Kurtosis -0.57 -0.52 -0.22 -0.58 -0.53 -0.22 -0.57 -0.56 0.12 -0.58 -0.56

Number of Peaks 198 232 267 172 146 267 200 233 252 174 144

Av Of 1/3 Highest -3.01 -6.28 -3.94 -2.96 -6.26 4.59 60.99 -6.31 -4.67 61.05 -6.28
Av Of 1/3 Lowest -4.76 -7.80 -4.47 -4.66 -7.82 4.06 59.25 -7.85 -4.74 59.34 -7.87
Av Of 1/100 Highest -2.63 -5.93 -3.83 -2.59 -5.92 4.71 61.38 -6.01 -4.65 61.42 -6.00
Av Of 1/100 Lowest -5.22 -8.17 -4.60 -5.11 -8.13 3.93 58.78 -8.19 -4.76 58.89 -8.15
Av Of 1/1000 Highest -2.63 -5.92 -3.82 -2.59 -5.92 4.71 61.38 -5.99 -4.65 61.42 -6.00
Av Of 1/1000 Lowest -5.22 -8.17 -4.62 -5.11 -8.13 3.91 58.78 -8.19 -4.76 58.89 -8.15
Maximum -2.63 -5.92 -3.82 -2.59 -5.92 4.71 61.38 -5.99 -4.65 61.42 -6.00
Minimum -5.22 -8.17 -4.62 -5.11 -8.13 3.91 58.78 -8.19 -4.76 58.89 -8.15
Pred. Max -2.37 -5.70 -3.75 -2.33 -5.69 4.78 61.64 -5.78 -4.64 61.68 -5.77
Pred. Min -5.49 -8.41 -4.70 -5.38 -8.38 3.83 58.51 -8.42 -4.78 58.62 -8.39

Av Of 1/3 H-Mean 0.87 0.71 0.27 0.86 0.74 0.26 0.86 0.72 0.03 0.86 0.76
Av Of 1/3 L-Mean -0.88 -0.81 -0.26 -0.85 -0.82 -0.26 -0.87 -0.81 -0.03 -0.85 -0.84
Av Of 1/100 H-Mean 1.25 1.06 0.38 1.23 1.07 0.38 1.25 1.03 0.05 1.23 1.04
Av Of 1/100 L-Mean -1.34 -1.18 -0.39 -1.30 -1.14 -0.39 -1.34 -1.15 -0.06 -1.30 -1.12
Av Of 1/1000 H-Mean 1.25 1.08 0.38 1.23 1.07 0.38 1.25 1.04 0.05 1.23 1.04
Av Of 1/1000 L-Mean -1.34 -1.18 -0.42 -1.30 -1.14 -0.42 -1.34 -1.16 -0.06 -1.30 -1.12
Maximum - Mean 1.25 1.08 0.38 1.23 1.07 0.38 1.25 1.04 0.05 1.23 1.04
Minimum - Mean -1.34 -1.18 -0.42 -1.30 -1.14 -0.42 -1.34 -1.16 -0.06 -1.30 -1.12
Pred. Max-Mean 1.51 1.29 0.46 1.48 1.30 0.46 1.51 1.25 0.06 1.48 1.26
Pred. Min-Mean -1.61 -1.41 -0.50 -1.57 -1.39 -0.50 -1.62 -1.39 -0.07 -1.57 -1.36

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 124.13 -7.07 -5.20 124.20 -7.07 3.33


Variance 0.00 0.31 0.26 0.01 0.31 0.26 0.01
Root Mean Square 3.83 124.13 7.09 5.20 124.20 7.09 3.34
Std. Deviation 0.02 0.55 0.51 0.12 0.55 0.51 0.12
Skewness -0.03 -0.06 -0.09 -0.02 -0.06 -0.09 -0.02
Kurtosis 0.12 -0.57 -0.58 -0.12 -0.58 -0.58 -0.12

Number of Peaks 252 198 233 263 176 144 263

Av Of 1/3 Highest 3.86 125.00 -6.34 -4.95 125.05 -6.30 3.58


Av Of 1/3 Lowest 3.80 123.25 -7.89 -5.45 123.33 -7.92 3.08
Av Of 1/100 Highest 3.88 125.39 -6.08 -4.82 125.43 -6.07 3.71
Av Of 1/100 Lowest 3.77 122.79 -8.20 -5.57 122.89 -8.18 2.96
Av Of 1/1000 Highest 3.88 125.39 -6.06 -4.82 125.43 -6.07 3.72
Av Of 1/1000 Lowest 3.77 122.79 -8.21 -5.58 122.89 -8.18 2.95
Maximum 3.88 125.39 -6.00 -4.82 125.43 -6.00 3.72
Minimum 3.77 122.79 -8.21 -5.58 122.89 -8.18 2.95
Pred. Max 3.89 125.65 -5.79 -4.74 125.68 -5.77 3.79
Pred. Min 3.76 122.51 -8.43 -5.66 122.62 -8.42 2.88

Av Of 1/3 H-Mean 0.03 0.87 0.73 0.25 0.85 0.77 0.25


Av Of 1/3 L-Mean -0.03 -0.88 -0.82 -0.25 -0.87 -0.85 -0.25
Av Of 1/100 H-Mean 0.05 1.26 0.99 0.38 1.23 1.00 0.38
Av Of 1/100 L-Mean -0.06 -1.35 -1.13 -0.37 -1.30 -1.11 -0.37
Av Of 1/1000 H-Mean 0.05 1.26 1.01 0.38 1.23 1.00 0.38
Av Of 1/1000 L-Mean -0.06 -1.35 -1.14 -0.38 -1.30 -1.11 -0.38
Maximum - Mean 0.05 1.26 1.07 0.38 1.23 1.07 0.38
Minimum - Mean -0.06 -1.35 -1.14 -0.38 -1.30 -1.11 -0.38
Pred. Max-Mean 0.06 1.51 1.28 0.46 1.49 1.30 0.46
Pred. Min-Mean -0.07 -1.62 -1.36 -0.46 -1.58 -1.35 -0.46
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 45 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA045

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 45.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 45.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 45.0


22.8 0.60 45.0
45.6 0.20 45.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -5 -1 -2 0 0 0 8
BM2S DB30 -20 7 -5 0 0 0 23
BM3P DB30 -1 -3 -2 0 0 0 5
BM3S DB30 -46 83 -11 0 0 0 97
BM4P DB30 5 -8 -3 0 0 0 11
BM5P DB30 19 -13 -5 0 0 0 24
BM5S DB30 113 29 -11 0 0 0 117
MAINLN DB30 5 -3 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.1 3.9 -24740.5 -34 1663737 260


Buoyancy -200.9 -4.0 25889.9 190 -1832585 -284
Wind -12.7 -24.2 0.0 412 -246 -1658
Drag -12.9 -36.2 -3.4 150 37 -2462
Wave -37.2 -37.1 13.7 -193 -988 -2106
Flex. Connectors 64.7 86.2 -1158.3 -585 169990 -200
======= ======= ======= ======= ======= =======
Total -6.9 -11.5 1.4 -61 -58 -6454

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 3.4 4.1 -1114.3 -6 166282 605


Wind -5.0 -5.9 0.1 14 -34 -867
Flex. Connectors -0.1 -0.3 1114.3 12 -166288 -43
======= ======= ======= ======= ======= =======
Total -1.8 -2.1 0.2 19 -42 -306
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 994.58 1001.58 779.85 7.51 0.0281 0.93 0.00


BM2S 998.58 1001.58 604.54 23.21 0.0856 17.45 0.00
BM3P 992.62 1001.57 823.32 5.00 0.0189 0.00 0.00
BM3S 1003.91 1001.57 189.06 96.56 0.3696 94.31 0.00
BM4P 996.11 1001.50 736.84 10.74 0.0388 3.86 0.00
BM5P 998.74 1001.47 597.65 24.44 0.0930 18.73 0.00
BM5S 1004.93 1001.46 113.08 116.97 0.4249 115.36 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -3.66 -6.51 -4.21 -0.01 0.44 0.00


N Force -6.91 -11.47 1.38 -61 -58 -6454

WHPBJKT Location -3.11 -7.06 22.39 -0.21 0.17 0.12


N Force -1.75 -2.12 0.20 19 -42 -306
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 6.22 21.89 4.04 108.86 8.97 0.00 22.86 133.06


Variance 0.83 11.95 0.29 61.84 0.94 0.00 7.89 169.84
Root Mean Square 6.29 22.16 4.08 109.14 9.02 0.00 23.03 133.69
Std. Deviation 0.91 3.46 0.54 7.86 0.97 0.00 2.81 13.03
Skewness 0.62 0.79 0.55 0.10 0.49 0.00 -0.15 0.00
Kurtosis -0.24 0.98 -0.46 -0.24 -0.24 0.00 0.03 -0.27

Number of Peaks 210 230 200 176 230 0 231 212

Av Of 1/3 Highest 7.79 27.80 4.90 121.18 10.55 0.00 27.04 153.01
Av Of 1/3 Lowest 5.07 17.13 3.36 97.02 7.69 0.00 18.42 113.25
Av Of 1/100 Highest 8.71 34.86 5.51 130.50 11.32 0.00 30.92 165.03
Av Of 1/100 Lowest 4.56 14.84 3.13 91.34 6.83 0.00 15.03 102.28
Av Of 1/1000 Highest 8.79 35.63 5.51 130.50 11.33 0.00 31.74 165.34
Av Of 1/1000 Lowest 4.55 14.30 3.13 91.34 6.77 0.00 14.97 102.10
Maximum 8.79 35.63 5.51 130.50 11.33 0.00 31.74 165.34
Minimum 4.55 14.30 3.13 91.34 6.77 0.00 14.97 102.10
Pred. Max 9.31 38.36 5.81 135.01 11.80 0.00 33.50 171.85
Pred. Min 4.21 12.79 2.95 87.69 6.33 0.00 13.40 95.86

Av Of 1/3 H-Mean 1.57 5.91 0.86 12.32 1.59 0.00 4.17 19.95
Av Of 1/3 L-Mean -1.15 -4.77 -0.68 -11.84 -1.27 0.00 -4.44 -19.80
Av Of 1/100 H-Mean 2.49 12.97 1.47 21.64 2.36 0.00 8.06 31.98
Av Of 1/100 L-Mean -1.66 -7.06 -0.91 -17.52 -2.14 0.00 -7.83 -30.78
Av Of 1/1000 H-Mean 2.57 13.73 1.47 21.64 2.36 0.00 8.87 32.29
Av Of 1/1000 L-Mean -1.68 -7.59 -0.91 -17.52 -2.20 0.00 -7.89 -30.95
Maximum - Mean 2.57 13.73 1.47 21.64 2.36 0.00 8.87 32.29
Minimum - Mean -1.68 -7.59 -0.91 -17.52 -2.20 0.00 -7.89 -30.95
Pred. Max-Mean 3.08 16.47 1.77 26.15 2.83 0.00 10.64 38.80
Pred. Min-Mean -2.02 -9.10 -1.09 -21.17 -2.64 0.00 -9.46 -37.20

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -4.23 -7.59 -4.21


Variance 0.34 0.36 0.01
Root Mean Square 4.27 7.61 4.21
Std. Deviation 0.59 0.60 0.11
Skewness 0.09 0.22 0.00
Kurtosis -0.14 -0.21 -0.11

Number of Peaks 212 224 240

Av Of 1/3 Highest -3.30 -6.66 -3.99


Av Of 1/3 Lowest -5.16 -8.44 -4.43
Av Of 1/100 Highest -2.73 -6.11 -3.89
Av Of 1/100 Lowest -5.61 -8.97 -4.54
Av Of 1/1000 Highest -2.60 -6.10 -3.88
Av Of 1/1000 Lowest -5.62 -8.97 -4.56
Maximum -2.60 -6.10 -3.88
Minimum -5.62 -8.97 -4.56
Pred. Max -2.27 -5.80 -3.82
Pred. Min -5.90 -9.25 -4.63

Av Of 1/3 H-Mean 0.92 0.93 0.22


Av Of 1/3 L-Mean -0.93 -0.85 -0.22
Av Of 1/100 H-Mean 1.50 1.48 0.32
Av Of 1/100 L-Mean -1.38 -1.38 -0.33
Av Of 1/1000 H-Mean 1.63 1.49 0.33
Av Of 1/1000 L-Mean -1.39 -1.38 -0.35
Maximum - Mean 1.63 1.49 0.33
Minimum - Mean -1.39 -1.38 -0.35
Pred. Max-Mean 1.96 1.79 0.40
Pred. Min-Mean -1.67 -1.66 -0.41
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -4.23 -7.59 -4.21 -4.16 -7.59 4.32 59.78 -7.61 -4.71 59.85 -7.61
Variance 0.34 0.36 0.01 0.34 0.36 0.01 0.34 0.36 0.01 0.34 0.36
Root Mean Square 4.27 7.61 4.21 4.20 7.61 4.32 59.78 7.64 4.71 59.85 7.64
Std. Deviation 0.59 0.60 0.11 0.59 0.60 0.11 0.59 0.60 0.08 0.59 0.60
Skewness 0.09 0.22 0.00 0.09 0.23 0.00 0.09 0.20 -0.01 0.09 0.21
Kurtosis -0.14 -0.21 -0.11 -0.14 -0.21 -0.12 -0.14 -0.21 -0.12 -0.14 -0.21

Number of Peaks 212 224 240 220 193 240 212 224 233 220 194

Av Of 1/3 Highest -3.30 -6.66 -3.99 -3.24 -6.67 4.54 60.70 -6.68 -4.54 60.76 -6.69
Av Of 1/3 Lowest -5.16 -8.44 -4.43 -5.06 -8.44 4.11 58.87 -8.47 -4.87 58.95 -8.47
Av Of 1/100 Highest -2.73 -6.11 -3.89 -2.64 -6.12 4.64 61.28 -6.15 -4.47 61.36 -6.16
Av Of 1/100 Lowest -5.61 -8.97 -4.54 -5.55 -8.95 3.99 58.40 -9.01 -4.95 58.45 -8.99
Av Of 1/1000 Highest -2.60 -6.10 -3.88 -2.51 -6.12 4.65 61.41 -6.14 -4.46 61.49 -6.16
Av Of 1/1000 Lowest -5.62 -8.97 -4.56 -5.56 -8.95 3.98 58.39 -9.01 -4.96 58.44 -8.99
Maximum -2.60 -6.10 -3.88 -2.51 -6.12 4.65 61.41 -6.14 -4.46 61.49 -6.16
Minimum -5.62 -8.97 -4.56 -5.56 -8.95 3.98 58.39 -9.01 -4.96 58.44 -8.99
Pred. Max -2.27 -5.80 -3.82 -2.18 -5.81 4.72 61.74 -5.85 -4.41 61.82 -5.86
Pred. Min -5.90 -9.25 -4.63 -5.84 -9.23 3.91 58.11 -9.29 -5.01 58.16 -9.27

Av Of 1/3 H-Mean 0.92 0.93 0.22 0.92 0.91 0.22 0.92 0.94 0.16 0.92 0.92
Av Of 1/3 L-Mean -0.93 -0.85 -0.22 -0.90 -0.85 -0.22 -0.90 -0.86 -0.16 -0.90 -0.86
Av Of 1/100 H-Mean 1.50 1.48 0.32 1.52 1.47 0.32 1.50 1.46 0.24 1.52 1.45
Av Of 1/100 L-Mean -1.38 -1.38 -0.33 -1.39 -1.36 -0.33 -1.38 -1.40 -0.25 -1.39 -1.37
Av Of 1/1000 H-Mean 1.63 1.49 0.33 1.65 1.47 0.33 1.63 1.47 0.25 1.65 1.45
Av Of 1/1000 L-Mean -1.39 -1.38 -0.35 -1.40 -1.36 -0.35 -1.39 -1.40 -0.25 -1.40 -1.37
Maximum - Mean 1.63 1.49 0.33 1.65 1.47 0.33 1.63 1.47 0.25 1.65 1.45
Minimum - Mean -1.39 -1.38 -0.35 -1.40 -1.36 -0.35 -1.39 -1.40 -0.25 -1.40 -1.37
Pred. Max-Mean 1.96 1.79 0.40 1.98 1.77 0.39 1.96 1.77 0.30 1.98 1.75
Pred. Min-Mean -1.67 -1.66 -0.41 -1.68 -1.64 -0.41 -1.67 -1.68 -0.30 -1.68 -1.66

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=45deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 123.79 -7.64 -5.20 123.85 -7.64 3.33


Variance 0.01 0.34 0.37 0.01 0.34 0.36 0.01
Root Mean Square 3.83 123.79 7.66 5.20 123.85 7.66 3.33
Std. Deviation 0.08 0.59 0.60 0.10 0.59 0.60 0.10
Skewness -0.01 0.09 0.18 -0.01 0.09 0.19 -0.01
Kurtosis -0.12 -0.14 -0.21 -0.16 -0.14 -0.21 -0.16

Number of Peaks 233 212 224 231 222 193 231

Av Of 1/3 Highest 3.99 124.71 -6.70 -5.00 124.77 -6.71 3.54


Av Of 1/3 Lowest 3.66 122.88 -8.50 -5.41 122.93 -8.50 3.13
Av Of 1/100 Highest 4.07 125.28 -6.20 -4.90 125.37 -6.21 3.63
Av Of 1/100 Lowest 3.58 122.40 -9.05 -5.51 122.46 -9.03 3.03
Av Of 1/1000 Highest 4.08 125.42 -6.19 -4.89 125.50 -6.21 3.64
Av Of 1/1000 Lowest 3.57 122.40 -9.05 -5.51 122.45 -9.03 3.02
Maximum 4.08 125.42 -6.19 -4.89 125.50 -6.21 3.64
Minimum 3.57 122.40 -9.05 -5.51 122.45 -9.03 3.02
Pred. Max 4.13 125.74 -5.90 -4.83 125.83 -5.91 3.71
Pred. Min 3.52 122.12 -9.33 -5.57 122.17 -9.31 2.96

Av Of 1/3 H-Mean 0.16 0.92 0.94 0.21 0.92 0.92 0.21


Av Of 1/3 L-Mean -0.16 -0.90 -0.86 -0.20 -0.93 -0.87 -0.20
Av Of 1/100 H-Mean 0.24 1.50 1.44 0.30 1.52 1.43 0.30
Av Of 1/100 L-Mean -0.25 -1.38 -1.41 -0.30 -1.39 -1.39 -0.30
Av Of 1/1000 H-Mean 0.25 1.63 1.45 0.31 1.65 1.43 0.31
Av Of 1/1000 L-Mean -0.25 -1.39 -1.41 -0.31 -1.40 -1.39 -0.31
Maximum - Mean 0.25 1.63 1.45 0.31 1.65 1.43 0.31
Minimum - Mean -0.25 -1.39 -1.41 -0.31 -1.40 -1.39 -0.31
Pred. Max-Mean 0.30 1.96 1.74 0.37 1.97 1.72 0.37
Pred. Min-Mean -0.30 -1.67 -1.69 -0.37 -1.68 -1.67 -0.37
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -6 -2 -2 0 0 0 9
BM2S DB30 -35 11 -7 0 0 0 39
BM3P DB30 -1 -2 -1 0 0 0 4
BM3S DB30 -65 115 -13 0 0 0 133
BM4P DB30 3 -4 -2 0 0 0 7
BM5P DB30 10 -7 -3 0 0 0 13
BM5S DB30 98 25 -10 0 0 0 102
MAINLN DB30 9 -5 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.1 -6.3 -24740.5 57 1663737 -425


Buoyancy -201.0 6.6 25898.8 -311 -1833173 467
Wind 0.0 -34.2 0.0 583 0 -2312
Drag 0.0 -51.3 0.0 213 -1 -3484
Wave 0.0 -47.8 1.0 142 -67 -3178
Flex. Connectors 8.0 126.9 -1159.3 -739 169496 1178
======= ======= ======= ======= ======= =======
Total -0.9 -6.1 0.0 -56 -9 -7755

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 6.4 -1114.3 -10 166275 962


Wind -0.1 -8.2 0.2 19 -29 -1230
Flex. Connectors 0.0 -0.3 1114.3 13 -166275 -47
======= ======= ======= ======= ======= =======
Total 0.0 -2.1 0.2 21 -30 -315
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.26 1001.58 762.31 8.61 0.0322 1.52 0.00


BM2S 1000.22 1001.58 485.36 38.96 0.1435 34.20 0.00
BM3P 991.96 1001.57 834.30 4.45 0.0169 0.00 0.00
BM3S 1005.85 1001.57 46.49 133.31 0.5102 132.25 0.00
BM4P 994.17 1001.50 796.11 6.59 0.0239 0.41 0.00
BM5P 996.83 1001.47 705.66 13.28 0.0506 6.67 0.00
BM5S 1004.11 1001.46 174.17 101.52 0.3687 99.38 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.42 -8.03 -4.21 0.01 0.44 0.00


N Force -0.93 -6.10 0.00 -56 -9 -7755

WHPBJKT Location -1.67 -8.30 21.95 -0.33 0.00 -0.06


N Force -0.05 -2.09 0.21 21 -30 -315
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 7.79 39.40 3.77 146.20 5.74 0.00 11.94 110.02


Variance 0.19 1.04 0.09 38.49 0.10 0.00 0.36 21.30
Root Mean Square 7.80 39.42 3.78 146.33 5.75 0.00 11.95 110.12
Std. Deviation 0.44 1.02 0.30 6.20 0.32 0.00 0.60 4.62
Skewness -0.14 0.24 0.30 0.21 0.30 0.00 0.11 0.18
Kurtosis -0.41 -0.38 -0.85 -0.63 -0.06 0.00 -0.69 -0.43

Number of Peaks 293 326 316 333 324 0 328 314

Av Of 1/3 Highest 8.42 41.19 4.23 156.06 6.26 0.00 12.90 117.19
Av Of 1/3 Lowest 7.11 37.83 3.38 137.63 5.25 0.00 11.00 103.51
Av Of 1/100 Highest 8.87 42.73 4.56 163.08 6.77 0.00 13.59 122.67
Av Of 1/100 Lowest 6.55 36.85 3.17 132.12 4.88 0.00 10.49 100.05
Av Of 1/1000 Highest 8.95 42.89 4.61 164.01 6.83 0.00 13.59 123.14
Av Of 1/1000 Lowest 6.51 36.79 3.16 131.67 4.86 0.00 10.44 99.66
Maximum 8.95 42.89 4.61 164.01 6.83 0.00 13.59 123.14
Minimum 6.51 36.79 3.16 131.67 4.86 0.00 10.44 99.66
Pred. Max 9.17 43.55 4.77 167.35 7.04 0.00 13.90 125.62
Pred. Min 6.26 36.29 3.04 128.95 4.69 0.00 10.16 97.70

Av Of 1/3 H-Mean 0.64 1.79 0.45 9.87 0.53 0.00 0.96 7.17
Av Of 1/3 L-Mean -0.67 -1.58 -0.40 -8.57 -0.49 0.00 -0.93 -6.51
Av Of 1/100 H-Mean 1.09 3.32 0.78 16.89 1.04 0.00 1.65 12.65
Av Of 1/100 L-Mean -1.24 -2.56 -0.60 -14.08 -0.85 0.00 -1.45 -9.97
Av Of 1/1000 H-Mean 1.16 3.49 0.83 17.82 1.09 0.00 1.66 13.12
Av Of 1/1000 L-Mean -1.28 -2.62 -0.62 -14.52 -0.88 0.00 -1.50 -10.36
Maximum - Mean 1.16 3.49 0.83 17.82 1.09 0.00 1.66 13.12
Minimum - Mean -1.28 -2.62 -0.62 -14.52 -0.88 0.00 -1.50 -10.36
Pred. Max-Mean 1.38 4.14 0.99 21.15 1.30 0.00 1.97 15.60
Pred. Min-Mean -1.53 -3.11 -0.73 -17.24 -1.04 0.00 -1.78 -12.32

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.66 -8.92 -4.21


Variance 0.02 0.18 0.00
Root Mean Square 2.66 8.93 4.21
Std. Deviation 0.15 0.43 0.05
Skewness -0.13 -0.18 0.04
Kurtosis -0.45 -0.62 -0.06

Number of Peaks 114 321 339

Av Of 1/3 Highest -2.43 -8.33 -4.11


Av Of 1/3 Lowest -2.93 -9.61 -4.31
Av Of 1/100 Highest -2.33 -7.98 -4.05
Av Of 1/100 Lowest -3.04 -10.08 -4.36
Av Of 1/1000 Highest -2.33 -7.98 -4.05
Av Of 1/1000 Lowest -3.04 -10.08 -4.37
Maximum -2.33 -7.98 -4.05
Minimum -3.04 -10.08 -4.37
Pred. Max -2.26 -7.80 -4.02
Pred. Min -3.12 -10.30 -4.40

Av Of 1/3 H-Mean 0.22 0.60 0.11


Av Of 1/3 L-Mean -0.27 -0.69 -0.10
Av Of 1/100 H-Mean 0.33 0.94 0.16
Av Of 1/100 L-Mean -0.38 -1.16 -0.15
Av Of 1/1000 H-Mean 0.33 0.95 0.16
Av Of 1/1000 L-Mean -0.38 -1.16 -0.16
Maximum - Mean 0.33 0.95 0.16
Minimum - Mean -0.38 -1.16 -0.16
Pred. Max-Mean 0.40 1.12 0.19
Pred. Min-Mean -0.46 -1.38 -0.19
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.66 -8.92 -4.21 -2.59 -8.92 4.32 61.35 -8.91 -4.71 61.41 -8.92
Variance 0.02 0.18 0.00 0.02 0.18 0.00 0.02 0.18 0.00 0.02 0.18
Root Mean Square 2.66 8.93 4.21 2.60 8.93 4.32 61.35 8.92 4.71 61.41 8.93
Std. Deviation 0.15 0.43 0.05 0.15 0.43 0.05 0.15 0.43 0.04 0.15 0.43
Skewness -0.13 -0.18 0.04 -0.13 -0.18 0.03 -0.13 -0.19 0.04 -0.13 -0.19
Kurtosis -0.45 -0.62 -0.06 -0.45 -0.57 -0.06 -0.45 -0.62 -0.10 -0.45 -0.57

Number of Peaks 114 321 339 105 336 338 113 322 331 105 336

Av Of 1/3 Highest -2.43 -8.33 -4.11 -2.35 -8.31 4.43 61.56 -8.32 -4.63 61.66 -8.31
Av Of 1/3 Lowest -2.93 -9.61 -4.31 -2.85 -9.59 4.22 61.07 -9.60 -4.79 61.16 -9.58
Av Of 1/100 Highest -2.33 -7.98 -4.05 -2.27 -7.93 4.48 61.68 -7.98 -4.59 61.74 -7.93
Av Of 1/100 Lowest -3.04 -10.08 -4.36 -2.97 -10.12 4.17 60.97 -10.08 -4.82 61.04 -10.11
Av Of 1/1000 Highest -2.33 -7.98 -4.05 -2.27 -7.89 4.48 61.68 -7.97 -4.59 61.74 -7.89
Av Of 1/1000 Lowest -3.04 -10.08 -4.37 -2.97 -10.16 4.16 60.97 -10.08 -4.83 61.04 -10.15
Maximum -2.33 -7.98 -4.05 -2.27 -7.89 4.48 61.68 -7.97 -4.59 61.74 -7.89
Minimum -3.04 -10.08 -4.37 -2.97 -10.16 4.16 60.97 -10.08 -4.83 61.04 -10.15
Pred. Max -2.26 -7.80 -4.02 -2.19 -7.70 4.51 61.75 -7.80 -4.57 61.81 -7.70
Pred. Min -3.12 -10.30 -4.40 -3.05 -10.39 4.13 60.88 -10.30 -4.85 60.95 -10.39

Av Of 1/3 H-Mean 0.22 0.60 0.11 0.24 0.61 0.10 0.22 0.59 0.08 0.24 0.61
Av Of 1/3 L-Mean -0.27 -0.69 -0.10 -0.25 -0.66 -0.10 -0.27 -0.68 -0.08 -0.25 -0.66
Av Of 1/100 H-Mean 0.33 0.94 0.16 0.33 0.99 0.16 0.33 0.94 0.12 0.33 0.98
Av Of 1/100 L-Mean -0.38 -1.16 -0.15 -0.38 -1.19 -0.15 -0.38 -1.16 -0.11 -0.38 -1.19
Av Of 1/1000 H-Mean 0.33 0.95 0.16 0.33 1.03 0.16 0.33 0.94 0.12 0.33 1.03
Av Of 1/1000 L-Mean -0.38 -1.16 -0.16 -0.38 -1.23 -0.16 -0.38 -1.16 -0.12 -0.38 -1.24
Maximum - Mean 0.33 0.95 0.16 0.33 1.03 0.16 0.33 0.94 0.12 0.33 1.03
Minimum - Mean -0.38 -1.16 -0.16 -0.38 -1.23 -0.16 -0.38 -1.16 -0.12 -0.38 -1.24
Pred. Max-Mean 0.40 1.12 0.19 0.40 1.23 0.19 0.40 1.12 0.14 0.40 1.22
Pred. Min-Mean -0.46 -1.38 -0.19 -0.46 -1.46 -0.19 -0.46 -1.38 -0.14 -0.46 -1.47

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 125.35 -8.91 -5.21 125.42 -8.91 3.33


Variance 0.00 0.02 0.18 0.00 0.02 0.18 0.00
Root Mean Square 3.83 125.35 8.92 5.21 125.42 8.92 3.33
Std. Deviation 0.04 0.15 0.42 0.03 0.15 0.43 0.03
Skewness 0.03 -0.13 -0.19 0.04 -0.13 -0.19 0.03
Kurtosis -0.10 -0.45 -0.62 -0.13 -0.45 -0.57 -0.13

Number of Peaks 331 112 322 322 101 336 322

Av Of 1/3 Highest 3.91 125.57 -8.31 -5.14 125.67 -8.30 3.39


Av Of 1/3 Lowest 3.75 125.08 -9.59 -5.27 125.16 -9.57 3.27
Av Of 1/100 Highest 3.94 125.68 -7.98 -5.12 125.75 -7.93 3.42
Av Of 1/100 Lowest 3.71 124.98 -10.07 -5.29 125.04 -10.11 3.24
Av Of 1/1000 Highest 3.94 125.68 -7.97 -5.12 125.75 -7.89 3.42
Av Of 1/1000 Lowest 3.71 124.98 -10.08 -5.29 125.04 -10.15 3.24
Maximum 3.94 125.68 -7.97 -5.12 125.75 -7.89 3.42
Minimum 3.71 124.98 -10.08 -5.29 125.04 -10.15 3.24
Pred. Max 3.96 125.76 -7.80 -5.10 125.82 -7.70 3.44
Pred. Min 3.68 124.89 -10.30 -5.31 124.96 -10.38 3.23

Av Of 1/3 H-Mean 0.08 0.22 0.59 0.06 0.25 0.61 0.06


Av Of 1/3 L-Mean -0.08 -0.27 -0.68 -0.06 -0.26 -0.66 -0.06
Av Of 1/100 H-Mean 0.12 0.33 0.93 0.09 0.33 0.98 0.09
Av Of 1/100 L-Mean -0.11 -0.38 -1.16 -0.09 -0.38 -1.20 -0.09
Av Of 1/1000 H-Mean 0.12 0.33 0.93 0.09 0.33 1.02 0.09
Av Of 1/1000 L-Mean -0.12 -0.38 -1.17 -0.09 -0.38 -1.24 -0.09
Maximum - Mean 0.12 0.33 0.93 0.09 0.33 1.02 0.09
Minimum - Mean -0.12 -0.38 -1.17 -0.09 -0.38 -1.24 -0.09
Pred. Max-Mean 0.14 0.40 1.11 0.11 0.40 1.21 0.11
Pred. Min-Mean -0.14 -0.46 -1.39 -0.10 -0.46 -1.47 -0.10
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -6 -1 -2 0 0 0 8
BM2S DB30 -35 12 -7 0 0 0 39
BM3P DB30 -1 -2 -1 0 0 0 4
BM3S DB30 -66 119 -13 0 0 0 137
BM4P DB30 3 -4 -2 0 0 0 6
BM5P DB30 10 -6 -3 0 0 0 13
BM5S DB30 101 26 -10 0 0 0 104
MAINLN DB30 9 -6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.0 -6.3 -24740.5 57 1663737 -422


Buoyancy -201.0 6.6 25899.9 -308 -1833237 464
Wind 0.0 -34.2 0.0 583 0 -2312
Drag 0.0 -51.3 0.0 213 -1 -3484
Wave 0.0 -45.9 -0.3 106 35 -3057
Flex. Connectors 8.7 130.9 -1159.4 -686 169505 1174
======= ======= ======= ======= ======= =======
Total -0.2 -0.1 -0.3 -37 36 -7638

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 7.3 -1114.3 -12 166274 1096


Wind -0.1 -8.2 0.2 19 -28 -1230
Flex. Connectors 0.0 -0.1 1114.3 6 -166279 -21
======= ======= ======= ======= ======= =======
Total 0.0 -1.0 0.2 12 -34 -156
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.09 1001.58 766.78 8.33 0.0311 1.37 0.00


BM2S 1000.22 1001.58 485.28 38.97 0.1436 34.22 0.00
BM3P 991.67 1001.57 839.07 4.22 0.0160 0.00 0.00
BM3S 1006.05 1001.57 32.15 137.27 0.5254 136.33 0.00
BM4P 993.97 1001.50 801.50 6.25 0.0226 0.19 0.00
BM5P 996.72 1001.47 710.59 12.84 0.0489 6.19 0.00
BM5S 1004.27 1001.46 162.29 104.42 0.3793 102.38 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.51 -8.32 -4.21 0.01 0.44 0.00


N Force -0.23 -0.12 -0.33 -37 36 -7638

WHPBJKT Location -1.76 -8.58 21.95 -0.38 0.00 -0.08


N Force -0.02 -1.03 0.23 12 -34 -156
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 7.94 39.09 3.88 144.07 5.96 0.00 12.35 108.69


Variance 0.23 1.48 0.10 38.92 0.16 0.00 0.48 23.27
Root Mean Square 7.96 39.11 3.89 144.20 5.98 0.00 12.37 108.79
Std. Deviation 0.48 1.22 0.32 6.24 0.40 0.00 0.69 4.82
Skewness -0.10 0.07 0.06 0.52 0.37 0.00 -0.05 0.22
Kurtosis -0.23 0.19 -0.78 -0.11 0.25 0.00 -0.10 -0.52

Number of Peaks 285 303 303 311 301 0 311 289

Av Of 1/3 Highest 8.71 41.37 4.39 154.75 6.71 0.00 13.57 116.26
Av Of 1/3 Lowest 7.19 37.00 3.41 135.13 5.34 0.00 11.17 101.59
Av Of 1/100 Highest 9.28 43.29 4.69 164.25 7.26 0.00 14.34 121.46
Av Of 1/100 Lowest 6.60 35.01 3.15 129.53 4.80 0.00 10.23 97.83
Av Of 1/1000 Highest 9.30 43.34 4.71 165.54 7.27 0.00 14.38 121.72
Av Of 1/1000 Lowest 6.55 34.83 3.11 129.19 4.72 0.00 10.03 97.29
Maximum 9.30 43.34 4.71 165.54 7.27 0.00 14.38 121.72
Minimum 6.55 34.83 3.11 129.19 4.72 0.00 10.03 97.29
Pred. Max 9.56 44.15 4.87 169.61 7.52 0.00 14.76 124.21
Pred. Min 6.28 34.02 2.97 126.37 4.48 0.00 9.59 95.11

Av Of 1/3 H-Mean 0.77 2.28 0.52 10.69 0.75 0.00 1.22 7.57
Av Of 1/3 L-Mean -0.76 -2.09 -0.47 -8.93 -0.62 0.00 -1.18 -7.10
Av Of 1/100 H-Mean 1.34 4.20 0.82 20.18 1.29 0.00 1.99 12.78
Av Of 1/100 L-Mean -1.34 -4.08 -0.72 -14.54 -1.17 0.00 -2.12 -10.85
Av Of 1/1000 H-Mean 1.36 4.26 0.83 21.47 1.31 0.00 2.02 13.03
Av Of 1/1000 L-Mean -1.39 -4.26 -0.76 -14.88 -1.25 0.00 -2.32 -11.39
Maximum - Mean 1.36 4.26 0.83 21.47 1.31 0.00 2.02 13.03
Minimum - Mean -1.39 -4.26 -0.76 -14.88 -1.25 0.00 -2.32 -11.39
Pred. Max-Mean 1.62 5.07 0.99 25.54 1.56 0.00 2.41 15.52
Pred. Min-Mean -1.66 -5.07 -0.91 -17.69 -1.48 0.00 -2.76 -13.58

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.63 -8.80 -4.21


Variance 0.03 0.19 0.02
Root Mean Square 2.63 8.81 4.21
Std. Deviation 0.16 0.44 0.13
Skewness -0.18 -0.44 0.00
Kurtosis -0.38 -0.43 -0.26

Number of Peaks 89 267 291

Av Of 1/3 Highest -2.39 -8.18 -3.95


Av Of 1/3 Lowest -2.92 -9.55 -4.48
Av Of 1/100 Highest -2.27 -7.84 -3.81
Av Of 1/100 Lowest -3.11 -9.97 -4.62
Av Of 1/1000 Highest -2.27 -7.77 -3.79
Av Of 1/1000 Lowest -3.11 -10.01 -4.65
Maximum -2.27 -7.77 -3.79
Minimum -3.11 -10.01 -4.65
Pred. Max -2.19 -7.57 -3.71
Pred. Min -3.22 -10.24 -4.74

Av Of 1/3 H-Mean 0.23 0.62 0.26


Av Of 1/3 L-Mean -0.29 -0.75 -0.27
Av Of 1/100 H-Mean 0.35 0.96 0.40
Av Of 1/100 L-Mean -0.48 -1.17 -0.41
Av Of 1/1000 H-Mean 0.35 1.03 0.42
Av Of 1/1000 L-Mean -0.48 -1.21 -0.44
Maximum - Mean 0.35 1.03 0.42
Minimum - Mean -0.48 -1.21 -0.44
Pred. Max-Mean 0.44 1.22 0.50
Pred. Min-Mean -0.60 -1.45 -0.53
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.63 -8.80 -4.21 -2.56 -8.80 4.32 61.38 -8.72 -4.71 61.45 -8.72
Variance 0.03 0.19 0.02 0.03 0.19 0.02 0.03 0.19 0.01 0.03 0.18
Root Mean Square 2.63 8.81 4.21 2.56 8.81 4.32 61.38 8.73 4.71 61.45 8.73
Std. Deviation 0.16 0.44 0.13 0.16 0.43 0.13 0.16 0.43 0.10 0.16 0.43
Skewness -0.18 -0.44 0.00 -0.18 -0.40 0.00 -0.18 -0.40 -0.01 -0.18 -0.36
Kurtosis -0.38 -0.43 -0.26 -0.38 -0.38 -0.26 -0.38 -0.27 -0.28 -0.38 -0.21

Number of Peaks 89 267 291 93 317 291 91 267 291 85 316

Av Of 1/3 Highest -2.39 -8.18 -3.95 -2.31 -8.18 4.59 61.61 -8.10 -4.51 61.70 -8.10
Av Of 1/3 Lowest -2.92 -9.55 -4.48 -2.84 -9.52 4.06 61.11 -9.46 -4.90 61.16 -9.42
Av Of 1/100 Highest -2.27 -7.84 -3.81 -2.21 -7.80 4.72 61.73 -7.69 -4.43 61.80 -7.65
Av Of 1/100 Lowest -3.11 -9.97 -4.62 -3.04 -10.08 3.92 60.90 -9.92 -5.01 60.96 -10.03
Av Of 1/1000 Highest -2.27 -7.77 -3.79 -2.21 -7.74 4.74 61.73 -7.62 -4.43 61.80 -7.59
Av Of 1/1000 Lowest -3.11 -10.01 -4.65 -3.04 -10.20 3.88 60.90 -9.94 -5.04 60.96 -10.15
Maximum -2.27 -7.77 -3.79 -2.21 -7.74 4.74 61.73 -7.62 -4.43 61.80 -7.59
Minimum -3.11 -10.01 -4.65 -3.04 -10.20 3.88 60.90 -9.94 -5.04 60.96 -10.15
Pred. Max -2.19 -7.57 -3.71 -2.12 -7.54 4.82 61.82 -7.41 -4.37 61.88 -7.37
Pred. Min -3.22 -10.24 -4.74 -3.16 -10.46 3.79 60.78 -10.18 -5.10 60.85 -10.42

Av Of 1/3 H-Mean 0.23 0.62 0.26 0.25 0.62 0.26 0.23 0.62 0.19 0.26 0.62
Av Of 1/3 L-Mean -0.29 -0.75 -0.27 -0.28 -0.72 -0.27 -0.27 -0.74 -0.20 -0.29 -0.70
Av Of 1/100 H-Mean 0.35 0.96 0.40 0.35 1.00 0.40 0.35 1.03 0.28 0.35 1.07
Av Of 1/100 L-Mean -0.48 -1.17 -0.41 -0.48 -1.28 -0.41 -0.48 -1.20 -0.30 -0.48 -1.31
Av Of 1/1000 H-Mean 0.35 1.03 0.42 0.35 1.06 0.42 0.35 1.10 0.28 0.35 1.14
Av Of 1/1000 L-Mean -0.48 -1.21 -0.44 -0.48 -1.40 -0.44 -0.48 -1.22 -0.33 -0.48 -1.43
Maximum - Mean 0.35 1.03 0.42 0.35 1.06 0.42 0.35 1.10 0.28 0.35 1.14
Minimum - Mean -0.48 -1.21 -0.44 -0.48 -1.40 -0.44 -0.48 -1.22 -0.33 -0.48 -1.43
Pred. Max-Mean 0.44 1.22 0.50 0.44 1.26 0.50 0.44 1.31 0.33 0.44 1.35
Pred. Min-Mean -0.60 -1.45 -0.53 -0.60 -1.66 -0.53 -0.60 -1.46 -0.39 -0.60 -1.70

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 125.39 -8.64 -5.21 125.45 -8.64 3.33


Variance 0.01 0.03 0.19 0.00 0.03 0.19 0.00
Root Mean Square 3.83 125.39 8.65 5.21 125.45 8.65 3.33
Std. Deviation 0.10 0.16 0.43 0.07 0.16 0.43 0.07
Skewness -0.02 -0.18 -0.33 -0.03 -0.18 -0.28 -0.03
Kurtosis -0.28 -0.38 -0.10 -0.16 -0.38 -0.02 -0.16

Number of Peaks 291 97 267 283 84 317 283

Av Of 1/3 Highest 4.02 125.61 -8.00 -5.07 125.71 -8.01 3.47


Av Of 1/3 Lowest 3.63 125.12 -9.37 -5.35 125.16 -9.33 3.19
Av Of 1/100 Highest 4.10 125.74 -7.53 -5.00 125.80 -7.50 3.54
Av Of 1/100 Lowest 3.52 124.90 -9.86 -5.41 124.97 -9.98 3.12
Av Of 1/1000 Highest 4.11 125.74 -7.47 -4.98 125.80 -7.43 3.55
Av Of 1/1000 Lowest 3.50 124.90 -9.88 -5.42 124.97 -10.10 3.11
Maximum 4.11 125.74 -7.47 -4.98 125.80 -7.43 3.55
Minimum 3.50 124.90 -9.88 -5.42 124.97 -10.10 3.11
Pred. Max 4.16 125.82 -7.24 -4.94 125.89 -7.20 3.59
Pred. Min 3.43 124.79 -10.12 -5.46 124.85 -10.38 3.07

Av Of 1/3 H-Mean 0.19 0.22 0.64 0.14 0.26 0.64 0.14


Av Of 1/3 L-Mean -0.20 -0.26 -0.73 -0.14 -0.29 -0.69 -0.14
Av Of 1/100 H-Mean 0.28 0.35 1.11 0.21 0.35 1.14 0.21
Av Of 1/100 L-Mean -0.30 -0.48 -1.22 -0.21 -0.48 -1.34 -0.21
Av Of 1/1000 H-Mean 0.28 0.35 1.17 0.22 0.35 1.21 0.22
Av Of 1/1000 L-Mean -0.33 -0.48 -1.24 -0.22 -0.48 -1.46 -0.22
Maximum - Mean 0.28 0.35 1.17 0.22 0.35 1.21 0.22
Minimum - Mean -0.33 -0.48 -1.24 -0.22 -0.48 -1.46 -0.22
Pred. Max-Mean 0.33 0.44 1.40 0.27 0.44 1.44 0.27
Pred. Min-Mean -0.39 -0.60 -1.48 -0.26 -0.60 -1.73 -0.26
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -6 -1 -2 0 0 0 8
BM2S DB30 -35 12 -7 0 0 0 39
BM3P DB30 -1 -2 -1 0 0 0 4
BM3S DB30 -67 119 -13 0 0 0 138
BM4P DB30 3 -4 -2 0 0 0 6
BM5P DB30 10 -6 -3 0 0 0 13
BM5S DB30 101 26 -10 0 0 0 105
MAINLN DB30 9 -7 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.1 -3.4 -24740.5 31 1663737 -229


Buoyancy -201.0 3.6 25897.3 -168 -1833080 253
Wind 0.0 -34.2 0.0 583 0 -2312
Drag 0.0 -51.3 0.0 213 0 -3483
Wave 0.0 -45.9 2.3 -13 -124 -3036
Flex. Connectors 8.9 131.3 -1159.1 -659 169463 1144
======= ======= ======= ======= ======= =======
Total 0.0 0.1 0.0 -15 -5 -7667

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 7.7 -1114.2 -13 166274 1151


Wind -0.1 -8.2 0.2 19 -28 -1230
Flex. Connectors 0.0 0.0 1114.0 1 -166237 -3
======= ======= ======= ======= ======= =======
Total 0.0 -0.5 0.0 7 7 -83
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 995.06 1001.58 767.53 8.28 0.0310 1.35 0.00


BM2S 1000.22 1001.58 485.44 38.95 0.1435 34.19 0.00
BM3P 991.62 1001.57 839.82 4.18 0.0158 0.00 0.00
BM3S 1006.08 1001.57 30.22 137.86 0.5276 136.94 0.00
BM4P 993.94 1001.50 802.30 6.20 0.0224 0.16 0.00
BM5P 996.71 1001.47 711.26 12.78 0.0486 6.12 0.00
BM5S 1004.29 1001.46 160.27 104.91 0.3811 102.89 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.52 -8.36 -4.21 0.01 0.44 0.00


N Force -0.04 0.10 0.03 -15 -5 -7667

WHPBJKT Location -1.78 -8.59 21.95 -0.40 0.00 -0.10


N Force -0.01 -0.54 -0.05 7 7 -83
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 8.31 38.76 4.10 140.36 6.50 0.00 13.14 105.95


Variance 0.71 3.53 0.25 90.51 0.61 0.00 1.52 48.53
Root Mean Square 8.36 38.81 4.13 140.68 6.54 0.00 13.20 106.18
Std. Deviation 0.84 1.88 0.50 9.51 0.78 0.00 1.23 6.97
Skewness 0.95 0.01 0.38 0.00 0.64 0.00 0.39 -0.13
Kurtosis 2.29 0.05 -0.19 -0.53 0.33 0.00 0.00 0.18

Number of Peaks 268 278 276 285 284 0 288 268

Av Of 1/3 Highest 9.60 42.04 4.90 155.21 7.84 0.00 15.29 116.71
Av Of 1/3 Lowest 7.13 35.54 3.38 125.71 5.39 0.00 11.24 96.28
Av Of 1/100 Highest 11.75 44.67 5.68 165.47 8.91 0.00 16.92 123.05
Av Of 1/100 Lowest 6.47 33.02 3.09 116.06 4.76 0.00 10.12 84.20
Av Of 1/1000 Highest 11.93 44.90 5.74 166.50 8.92 0.00 16.98 123.13
Av Of 1/1000 Lowest 6.46 32.90 3.09 115.92 4.75 0.00 10.07 84.19
Maximum 11.93 44.90 5.74 166.50 8.92 0.00 16.98 123.13
Minimum 6.46 32.90 3.09 115.92 4.75 0.00 10.07 84.19
Pred. Max 12.63 46.08 6.05 171.52 9.39 0.00 17.72 126.47
Pred. Min 6.10 31.77 2.90 111.23 4.41 0.00 9.49 79.97

Av Of 1/3 H-Mean 1.29 3.28 0.80 14.85 1.34 0.00 2.15 10.76
Av Of 1/3 L-Mean -1.19 -3.23 -0.72 -14.65 -1.11 0.00 -1.90 -9.67
Av Of 1/100 H-Mean 3.43 5.91 1.58 25.11 2.42 0.00 3.78 17.10
Av Of 1/100 L-Mean -1.85 -5.74 -1.01 -24.30 -1.74 0.00 -3.02 -21.75
Av Of 1/1000 H-Mean 3.62 6.13 1.64 26.14 2.43 0.00 3.84 17.18
Av Of 1/1000 L-Mean -1.86 -5.86 -1.01 -24.44 -1.75 0.00 -3.07 -21.76
Maximum - Mean 3.62 6.13 1.64 26.14 2.43 0.00 3.84 17.18
Minimum - Mean -1.86 -5.86 -1.01 -24.44 -1.75 0.00 -3.07 -21.76
Pred. Max-Mean 4.32 7.32 1.96 31.15 2.89 0.00 4.58 20.51
Pred. Min-Mean -2.22 -6.99 -1.20 -29.13 -2.08 0.00 -3.65 -25.98

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.55 -8.57 -4.21


Variance 0.06 0.45 0.05
Root Mean Square 2.56 8.59 4.22
Std. Deviation 0.24 0.67 0.23
Skewness 0.18 0.01 -0.01
Kurtosis 0.57 -0.45 -0.18

Number of Peaks 74 253 273

Av Of 1/3 Highest -2.22 -7.51 -3.74


Av Of 1/3 Lowest -2.90 -9.68 -4.68
Av Of 1/100 Highest -1.77 -6.79 -3.51
Av Of 1/100 Lowest -3.17 -10.13 -4.93
Av Of 1/1000 Highest -1.77 -6.75 -3.49
Av Of 1/1000 Lowest -3.17 -10.14 -4.95
Maximum -1.77 -6.75 -3.49
Minimum -3.17 -10.14 -4.95
Pred. Max -1.58 -6.40 -3.35
Pred. Min -3.33 -10.45 -5.09

Av Of 1/3 H-Mean 0.33 1.06 0.47


Av Of 1/3 L-Mean -0.35 -1.11 -0.47
Av Of 1/100 H-Mean 0.78 1.78 0.70
Av Of 1/100 L-Mean -0.63 -1.57 -0.72
Av Of 1/1000 H-Mean 0.78 1.81 0.72
Av Of 1/1000 L-Mean -0.63 -1.57 -0.74
Maximum - Mean 0.78 1.81 0.72
Minimum - Mean -0.63 -1.57 -0.74
Pred. Max-Mean 0.97 2.17 0.86
Pred. Min-Mean -0.78 -1.88 -0.88
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.55 -8.57 -4.21 -2.48 -8.57 4.32 61.46 -8.37 -4.71 61.52 -8.37
Variance 0.06 0.45 0.05 0.06 0.42 0.05 0.06 0.47 0.04 0.06 0.44
Root Mean Square 2.56 8.59 4.22 2.49 8.59 4.33 61.46 8.40 4.71 61.52 8.40
Std. Deviation 0.24 0.67 0.23 0.24 0.65 0.23 0.24 0.68 0.19 0.24 0.66
Skewness 0.18 0.01 -0.01 0.18 0.06 -0.01 0.18 0.10 -0.04 0.18 0.16
Kurtosis 0.57 -0.45 -0.18 0.57 -0.53 -0.18 0.56 -0.12 -0.17 0.57 -0.12

Number of Peaks 74 253 273 77 289 275 78 253 263 73 291

Av Of 1/3 Highest -2.22 -7.51 -3.74 -2.16 -7.57 4.79 61.81 -7.29 -4.33 61.85 -7.37
Av Of 1/3 Lowest -2.90 -9.68 -4.68 -2.93 -9.55 3.85 61.08 -9.48 -5.09 61.13 -9.36
Av Of 1/100 Highest -1.77 -6.79 -3.51 -1.70 -6.85 5.03 62.24 -6.43 -4.15 62.30 -6.49
Av Of 1/100 Lowest -3.17 -10.13 -4.93 -3.10 -10.19 3.60 60.83 -10.01 -5.30 60.90 -10.07
Av Of 1/1000 Highest -1.77 -6.75 -3.49 -1.70 -6.79 5.05 62.24 -6.39 -4.15 62.30 -6.43
Av Of 1/1000 Lowest -3.17 -10.14 -4.95 -3.10 -10.25 3.58 60.83 -10.01 -5.33 60.90 -10.13
Maximum -1.77 -6.75 -3.49 -1.70 -6.79 5.05 62.24 -6.39 -4.15 62.30 -6.43
Minimum -3.17 -10.14 -4.95 -3.10 -10.25 3.58 60.83 -10.01 -5.33 60.90 -10.13
Pred. Max -1.58 -6.40 -3.35 -1.51 -6.45 5.19 62.43 -6.00 -4.04 62.50 -6.05
Pred. Min -3.33 -10.45 -5.09 -3.25 -10.57 3.44 60.68 -10.33 -5.45 60.75 -10.46

Av Of 1/3 H-Mean 0.33 1.06 0.47 0.32 1.00 0.47 0.35 1.08 0.38 0.32 1.01
Av Of 1/3 L-Mean -0.35 -1.11 -0.47 -0.45 -0.98 -0.47 -0.37 -1.11 -0.39 -0.40 -0.98
Av Of 1/100 H-Mean 0.78 1.78 0.70 0.78 1.71 0.70 0.78 1.94 0.56 0.78 1.88
Av Of 1/100 L-Mean -0.63 -1.57 -0.72 -0.62 -1.62 -0.72 -0.63 -1.64 -0.60 -0.62 -1.70
Av Of 1/1000 H-Mean 0.78 1.81 0.72 0.78 1.78 0.72 0.78 1.98 0.56 0.78 1.95
Av Of 1/1000 L-Mean -0.63 -1.57 -0.74 -0.62 -1.68 -0.74 -0.63 -1.64 -0.62 -0.62 -1.75
Maximum - Mean 0.78 1.81 0.72 0.78 1.78 0.72 0.78 1.98 0.56 0.78 1.95
Minimum - Mean -0.63 -1.57 -0.74 -0.62 -1.68 -0.74 -0.63 -1.64 -0.62 -0.62 -1.75
Pred. Max-Mean 0.97 2.17 0.86 0.97 2.12 0.86 0.97 2.37 0.67 0.97 2.32
Pred. Min-Mean -0.78 -1.88 -0.88 -0.77 -2.00 -0.88 -0.78 -1.96 -0.74 -0.77 -2.09

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 125.46 -8.17 -5.21 125.53 -8.18 3.33


Variance 0.04 0.06 0.51 0.02 0.06 0.47 0.02
Root Mean Square 3.83 125.46 8.20 5.21 125.53 8.20 3.33
Std. Deviation 0.19 0.24 0.71 0.16 0.24 0.69 0.16
Skewness -0.04 0.18 0.19 -0.05 0.18 0.25 -0.05
Kurtosis -0.17 0.56 0.23 -0.07 0.56 0.29 -0.08

Number of Peaks 263 84 253 259 70 290 259

Av Of 1/3 Highest 4.20 125.81 -7.06 -4.89 125.87 -7.14 3.64


Av Of 1/3 Lowest 3.44 125.10 -9.31 -5.53 125.12 -9.18 3.00
Av Of 1/100 Highest 4.38 126.24 -6.06 -4.74 126.31 -6.13 3.79
Av Of 1/100 Lowest 3.23 124.84 -9.90 -5.71 124.91 -9.96 2.82
Av Of 1/1000 Highest 4.39 126.24 -6.03 -4.74 126.31 -6.06 3.79
Av Of 1/1000 Lowest 3.20 124.84 -9.91 -5.72 124.91 -10.01 2.82
Maximum 4.39 126.24 -6.03 -4.74 126.31 -6.06 3.79
Minimum 3.20 124.84 -9.91 -5.72 124.91 -10.01 2.82
Pred. Max 4.50 126.43 -5.60 -4.65 126.50 -5.66 3.89
Pred. Min 3.08 124.69 -10.25 -5.82 124.76 -10.36 2.72

Av Of 1/3 H-Mean 0.38 0.35 1.12 0.32 0.34 1.04 0.32


Av Of 1/3 L-Mean -0.38 -0.36 -1.13 -0.32 -0.41 -1.01 -0.32
Av Of 1/100 H-Mean 0.56 0.78 2.11 0.47 0.78 2.05 0.47
Av Of 1/100 L-Mean -0.59 -0.63 -1.73 -0.51 -0.62 -1.78 -0.51
Av Of 1/1000 H-Mean 0.56 0.78 2.15 0.47 0.78 2.11 0.47
Av Of 1/1000 L-Mean -0.62 -0.63 -1.73 -0.51 -0.62 -1.83 -0.51
Maximum - Mean 0.56 0.78 2.15 0.47 0.78 2.11 0.47
Minimum - Mean -0.62 -0.63 -1.73 -0.51 -0.62 -1.83 -0.51
Pred. Max-Mean 0.67 0.97 2.57 0.56 0.97 2.52 0.56
Pred. Min-Mean -0.74 -0.78 -2.07 -0.61 -0.77 -2.18 -0.61
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 90 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA090

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 90.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 90.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 90.0


22.8 0.60 90.0
45.6 0.20 90.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -6 -1 -2 0 0 0 8
BM2S DB30 -36 12 -7 0 0 0 39
BM3P DB30 -1 -2 -1 0 0 0 4
BM3S DB30 -69 123 -13 0 0 0 142
BM4P DB30 3 -3 -2 0 0 0 6
BM5P DB30 9 -6 -3 0 0 0 12
BM5S DB30 103 27 -10 0 0 0 107
MAINLN DB30 9 -6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 192.0 4.0 -24740.5 -35 1663736 269


Buoyancy -200.9 -4.2 25899.2 197 -1833167 -294
Wind 0.0 -34.2 0.0 583 0 -2312
Drag 0.0 -51.3 0.0 213 1 -3484
Wave 0.0 -53.6 0.5 -186 -40 -3517
Flex. Connectors 8.5 138.0 -1159.5 -819 169505 1481
======= ======= ======= ======= ======= =======
Total -0.5 -1.3 -0.3 -50 34 -7860

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.1 7.1 -1114.3 -12 166275 1061


Wind -0.1 -8.2 0.2 19 -29 -1230
Flex. Connectors 0.0 -0.2 1114.3 8 -166284 -29
======= ======= ======= ======= ======= =======
Total 0.0 -1.3 0.3 15 -39 -199
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 994.91 1001.58 771.35 8.04 0.0301 1.22 0.00


BM2S 1000.25 1001.58 482.95 39.30 0.1448 34.57 0.00
BM3P 991.34 1001.57 844.47 3.95 0.0150 0.00 0.00
BM3S 1006.31 1001.57 19.95 142.34 0.5448 141.51 0.08
BM4P 993.72 1001.50 807.64 5.88 0.0212 0.00 0.00
BM5P 996.58 1001.47 717.57 12.23 0.0465 5.50 0.00
BM5S 1004.42 1001.46 150.44 107.33 0.3899 105.41 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM4S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.58 -8.66 -4.21 -0.01 0.44 0.00


N Force -0.46 -1.31 -0.34 -50 34 -7860

WHPBJKT Location -1.84 -8.88 21.95 -0.37 0.00 -0.08


N Force -0.03 -1.32 0.27 15 -39 -199
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (MOORING TENSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 7.68 39.46 3.71 149.07 5.74 0.00 11.92 111.75


Variance 0.67 4.52 0.21 116.42 0.41 0.00 1.29 54.60
Root Mean Square 7.72 39.52 3.73 149.46 5.77 0.00 11.97 112.00
Std. Deviation 0.82 2.13 0.46 10.79 0.64 0.00 1.14 7.39
Skewness 1.19 0.11 1.23 -0.22 0.98 0.00 0.66 -0.53
Kurtosis 3.18 -0.28 1.60 -0.29 0.93 0.00 0.04 1.03

Number of Peaks 244 261 252 237 268 0 272 219

Av Of 1/3 Highest 9.05 43.16 4.55 165.99 6.81 0.00 13.82 123.07
Av Of 1/3 Lowest 6.51 35.91 3.14 131.84 4.90 0.00 10.37 101.17
Av Of 1/100 Highest 11.22 45.82 5.40 176.90 8.03 0.00 15.40 128.24
Av Of 1/100 Lowest 5.98 34.00 2.92 119.70 4.44 0.00 9.63 88.02
Av Of 1/1000 Highest 11.39 45.92 5.57 178.44 8.10 0.00 15.45 128.36
Av Of 1/1000 Lowest 5.94 33.65 2.92 118.17 4.42 0.00 9.59 85.87
Maximum 11.39 45.92 5.57 178.44 8.10 0.00 15.45 128.36
Minimum 5.94 33.65 2.92 118.17 4.42 0.00 9.59 85.87
Pred. Max 12.12 47.18 5.93 184.25 8.56 0.00 16.13 131.70
Pred. Min 5.60 32.52 2.76 112.05 4.16 0.00 9.14 80.68

Av Of 1/3 H-Mean 1.37 3.69 0.84 16.91 1.07 0.00 1.90 11.31
Av Of 1/3 L-Mean -1.17 -3.55 -0.56 -17.24 -0.84 0.00 -1.55 -10.58
Av Of 1/100 H-Mean 3.54 6.36 1.70 27.82 2.29 0.00 3.48 16.49
Av Of 1/100 L-Mean -1.69 -5.47 -0.78 -29.38 -1.30 0.00 -2.29 -23.73
Av Of 1/1000 H-Mean 3.71 6.46 1.86 29.37 2.37 0.00 3.53 16.61
Av Of 1/1000 L-Mean -1.74 -5.81 -0.79 -30.90 -1.32 0.00 -2.33 -25.88
Maximum - Mean 3.71 6.46 1.86 29.37 2.37 0.00 3.53 16.61
Minimum - Mean -1.74 -5.81 -0.79 -30.90 -1.32 0.00 -2.33 -25.88
Pred. Max-Mean 4.45 7.72 2.23 35.18 2.82 0.00 4.21 19.94
Pred. Min-Mean -2.08 -6.94 -0.94 -37.02 -1.57 0.00 -2.78 -31.07

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.71 -9.12 -4.21


Variance 0.06 0.63 0.16
Root Mean Square 2.72 9.16 4.23
Std. Deviation 0.25 0.79 0.40
Skewness 0.61 0.19 -0.02
Kurtosis 1.29 -0.14 -0.13

Number of Peaks 93 238 240

Av Of 1/3 Highest -2.37 -7.77 -3.40


Av Of 1/3 Lowest -3.11 -10.46 -5.03
Av Of 1/100 Highest -1.80 -6.77 -3.02
Av Of 1/100 Lowest -3.23 -11.12 -5.46
Av Of 1/1000 Highest -1.80 -6.52 -2.98
Av Of 1/1000 Lowest -3.23 -11.12 -5.47
Maximum -1.80 -6.52 -2.98
Minimum -3.23 -11.12 -5.47
Pred. Max -1.58 -6.00 -2.74
Pred. Min -3.36 -11.52 -5.72

Av Of 1/3 H-Mean 0.34 1.35 0.80


Av Of 1/3 L-Mean -0.40 -1.34 -0.82
Av Of 1/100 H-Mean 0.91 2.35 1.19
Av Of 1/100 L-Mean -0.53 -2.00 -1.25
Av Of 1/1000 H-Mean 0.91 2.60 1.23
Av Of 1/1000 L-Mean -0.53 -2.00 -1.26
Maximum - Mean 0.91 2.60 1.23
Minimum - Mean -0.53 -2.00 -1.26
Pred. Max-Mean 1.13 3.12 1.47
Pred. Min-Mean -0.65 -2.40 -1.51
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.71 -9.12 -4.21 -2.64 -9.12 4.32 61.30 -9.06 -4.71 61.37 -9.06
Variance 0.06 0.63 0.16 0.06 0.51 0.16 0.06 0.64 0.14 0.06 0.52
Root Mean Square 2.72 9.16 4.23 2.65 9.15 4.34 61.30 9.10 4.72 61.37 9.09
Std. Deviation 0.25 0.79 0.40 0.25 0.72 0.40 0.25 0.80 0.37 0.25 0.72
Skewness 0.61 0.19 -0.02 0.61 0.35 -0.02 0.61 0.21 -0.06 0.61 0.37
Kurtosis 1.29 -0.14 -0.13 1.30 -0.01 -0.13 1.29 -0.09 -0.12 1.30 0.06

Number of Peaks 93 238 240 69 234 240 101 238 236 63 234

Av Of 1/3 Highest -2.37 -7.77 -3.40 -2.28 -7.95 5.13 61.63 -7.71 -3.97 61.72 -7.89
Av Of 1/3 Lowest -3.11 -10.46 -5.03 -3.06 -10.21 3.51 60.90 -10.39 -5.48 60.94 -10.15
Av Of 1/100 Highest -1.80 -6.77 -3.02 -1.73 -6.98 5.51 62.21 -6.65 -3.62 62.27 -6.86
Av Of 1/100 Lowest -3.23 -11.12 -5.46 -3.17 -10.73 3.08 60.77 -11.08 -5.85 60.84 -10.69
Av Of 1/1000 Highest -1.80 -6.52 -2.98 -1.73 -6.80 5.55 62.21 -6.39 -3.58 62.27 -6.68
Av Of 1/1000 Lowest -3.23 -11.12 -5.47 -3.17 -10.80 3.06 60.77 -11.13 -5.85 60.84 -10.71
Maximum -1.80 -6.52 -2.98 -1.73 -6.80 5.55 62.21 -6.39 -3.58 62.27 -6.68
Minimum -3.23 -11.12 -5.47 -3.17 -10.80 3.06 60.77 -11.13 -5.85 60.84 -10.71
Pred. Max -1.58 -6.00 -2.74 -1.51 -6.34 5.79 62.42 -5.87 -3.35 62.50 -6.20
Pred. Min -3.36 -11.52 -5.72 -3.30 -11.14 2.81 60.65 -11.54 -6.08 60.70 -11.04

Av Of 1/3 H-Mean 0.34 1.35 0.80 0.36 1.17 0.81 0.33 1.36 0.74 0.36 1.17
Av Of 1/3 L-Mean -0.40 -1.34 -0.82 -0.42 -1.09 -0.82 -0.40 -1.33 -0.77 -0.42 -1.09
Av Of 1/100 H-Mean 0.91 2.35 1.19 0.91 2.14 1.19 0.91 2.41 1.08 0.91 2.20
Av Of 1/100 L-Mean -0.53 -2.00 -1.25 -0.53 -1.61 -1.25 -0.53 -2.02 -1.14 -0.53 -1.63
Av Of 1/1000 H-Mean 0.91 2.60 1.23 0.91 2.32 1.22 0.91 2.67 1.13 0.91 2.39
Av Of 1/1000 L-Mean -0.53 -2.00 -1.26 -0.53 -1.68 -1.26 -0.53 -2.07 -1.14 -0.53 -1.65
Maximum - Mean 0.91 2.60 1.23 0.91 2.32 1.22 0.91 2.67 1.13 0.91 2.39
Minimum - Mean -0.53 -2.00 -1.26 -0.53 -1.68 -1.26 -0.53 -2.07 -1.14 -0.53 -1.65
Pred. Max-Mean 1.13 3.12 1.47 1.13 2.78 1.47 1.12 3.20 1.35 1.14 2.86
Pred. Min-Mean -0.65 -2.40 -1.51 -0.66 -2.02 -1.51 -0.65 -2.47 -1.37 -0.67 -1.98

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=90deg (BARGE EXCURSION-BM4S DAMAGED)*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 125.31 -9.00 -5.21 125.37 -9.00 3.32


Variance 0.14 0.06 0.64 0.13 0.06 0.53 0.13
Root Mean Square 3.84 125.31 9.04 5.22 125.37 9.03 3.34
Std. Deviation 0.37 0.25 0.80 0.36 0.25 0.73 0.36
Skewness -0.06 0.61 0.22 -0.09 0.61 0.39 -0.09
Kurtosis -0.12 1.29 -0.03 -0.10 1.30 0.14 -0.10

Number of Peaks 236 103 238 232 63 233 232

Av Of 1/3 Highest 4.56 125.64 -7.64 -4.49 125.75 -7.84 4.04


Av Of 1/3 Lowest 3.06 124.92 -10.33 -5.97 124.95 -10.08 2.57
Av Of 1/100 Highest 4.91 126.22 -6.52 -4.18 126.28 -6.74 4.35
Av Of 1/100 Lowest 2.69 124.78 -11.04 -6.34 124.84 -10.66 2.19
Av Of 1/1000 Highest 4.96 126.22 -6.27 -4.17 126.28 -6.55 4.37
Av Of 1/1000 Lowest 2.68 124.78 -11.14 -6.35 124.84 -10.68 2.19
Maximum 4.96 126.22 -6.27 -4.17 126.28 -6.55 4.37
Minimum 2.68 124.78 -11.14 -6.35 124.84 -10.68 2.19
Pred. Max 5.18 126.43 -5.73 -3.96 126.51 -6.06 4.57
Pred. Min 2.46 124.66 -11.57 -6.57 124.71 -11.02 1.96

Av Of 1/3 H-Mean 0.74 0.34 1.36 0.72 0.37 1.16 0.72


Av Of 1/3 L-Mean -0.77 -0.39 -1.33 -0.76 -0.42 -1.08 -0.75
Av Of 1/100 H-Mean 1.09 0.91 2.48 1.03 0.91 2.27 1.03
Av Of 1/100 L-Mean -1.13 -0.53 -2.04 -1.13 -0.53 -1.65 -1.13
Av Of 1/1000 H-Mean 1.13 0.91 2.73 1.04 0.91 2.45 1.05
Av Of 1/1000 L-Mean -1.14 -0.53 -2.14 -1.14 -0.53 -1.68 -1.13
Maximum - Mean 1.13 0.91 2.73 1.04 0.91 2.45 1.05
Minimum - Mean -1.14 -0.53 -2.14 -1.14 -0.53 -1.68 -1.13
Pred. Max-Mean 1.36 1.12 3.27 1.25 1.14 2.94 1.25
Pred. Min-Mean -1.36 -0.65 -2.56 -1.36 -0.66 -2.02 -1.36
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -36 -12 -7 0 0 0 40


BM2S DB30 -90 28 -11 0 0 0 96
BM3P DB30 -5 -8 -3 0 0 0 11
BM4P DB30 3 -4 -2 0 0 0 6
BM4S DB30 47 82 -10 0 0 0 95
BM5P DB30 5 -3 -2 0 0 0 7
BM5S DB30 26 7 -5 0 0 0 28
MAINLN DB30 14 -4 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 196.2 -5.0 -24740.4 45 1663772 -334


Buoyancy -205.1 5.2 25867.5 -244 -1832411 368
Wind 12.7 -24.2 0.0 412 247 -1611
Drag 12.9 -36.2 3.4 150 -37 -2462
Wave 21.3 -21.5 30.2 72 -1749 -1580
Flex. Connectors -38.1 81.7 -1160.5 -433 170162 8434
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -18 2811

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -474


Wind 6.5 3.2 -0.1 -7 40 470
Flex. Connectors -0.2 -0.1 1114.3 2 -166283 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 19 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.32 1001.58 477.35 40.19 0.1501 35.49 0.00


BM2S 1003.88 1001.58 189.69 96.00 0.3535 93.71 0.00
BM3P 996.28 1001.57 726.51 11.37 0.0429 4.57 0.00
BM4P 993.86 1001.50 804.36 6.06 0.0219 0.08 0.00
BM4S 1003.81 1001.50 200.38 95.32 0.3612 92.97 0.00
BM5P 994.62 1001.47 783.05 7.41 0.0282 0.84 0.00
BM5S 999.13 1001.46 569.93 27.82 0.1011 22.35 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.14 -5.74 -4.20 0.01 0.45 0.00


N Force 0.00 0.01 0.12 0 -18 2811

WHPBJKT Location 95.34 131.81 21.09 0.16 -0.32 -67.49


N Force 0.01 0.00 -0.12 0 19 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 40.44 100.16 10.70 0.00 5.70 99.79 6.91 27.78


Variance 20.97 60.44 0.49 0.00 0.12 20.55 0.40 12.61
Root Mean Square 40.70 100.46 10.72 0.00 5.71 99.89 6.94 28.01
Std. Deviation 4.58 7.77 0.70 0.00 0.34 4.53 0.63 3.55
Skewness 0.07 0.11 -0.08 0.00 0.28 0.11 -0.10 0.26
Kurtosis -0.78 -0.68 -0.61 0.00 -0.16 -0.63 -0.64 -0.69

Number of Peaks 99 96 137 0 234 97 182 96

Av Of 1/3 Highest 47.98 113.22 11.88 0.00 6.28 107.99 7.92 34.48
Av Of 1/3 Lowest 32.44 87.57 9.50 0.00 5.21 91.90 5.90 22.34
Av Of 1/100 Highest 50.84 118.65 12.35 0.00 6.62 111.14 8.21 36.31
Av Of 1/100 Lowest 31.17 83.77 8.97 0.00 4.91 89.98 5.45 21.10
Av Of 1/1000 Highest 50.84 118.65 12.35 0.00 6.63 111.14 8.21 36.31
Av Of 1/1000 Lowest 31.17 83.77 8.97 0.00 4.89 89.98 5.45 21.10
Maximum 50.84 118.65 12.35 0.00 6.63 111.14 8.21 36.31
Minimum 31.17 83.77 8.97 0.00 4.89 89.98 5.45 21.10
Pred. Max 53.25 122.97 12.71 0.00 6.81 113.79 8.48 38.30
Pred. Min 29.02 79.94 8.59 0.00 4.73 87.70 5.15 19.54

Av Of 1/3 H-Mean 7.53 13.06 1.18 0.00 0.57 8.21 1.00 6.70
Av Of 1/3 L-Mean -8.01 -12.59 -1.20 0.00 -0.49 -7.89 -1.01 -5.44
Av Of 1/100 H-Mean 10.39 18.49 1.65 0.00 0.92 11.35 1.30 8.53
Av Of 1/100 L-Mean -9.27 -16.40 -1.73 0.00 -0.79 -9.81 -1.46 -6.68
Av Of 1/1000 H-Mean 10.39 18.49 1.65 0.00 0.92 11.35 1.30 8.53
Av Of 1/1000 L-Mean -9.27 -16.40 -1.73 0.00 -0.81 -9.81 -1.46 -6.68
Maximum - Mean 10.39 18.49 1.65 0.00 0.92 11.35 1.30 8.53
Minimum - Mean -9.27 -16.40 -1.73 0.00 -0.81 -9.81 -1.46 -6.68
Pred. Max-Mean 12.80 22.81 2.01 0.00 1.10 14.00 1.57 10.52
Pred. Min-Mean -11.42 -20.22 -2.10 0.00 -0.97 -12.09 -1.77 -8.24

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.26 -6.09 -4.19


Variance 0.17 0.06 0.00
Root Mean Square 2.30 6.10 4.20
Std. Deviation 0.42 0.24 0.04
Skewness 0.00 -0.07 0.06
Kurtosis -0.75 -0.76 -0.03

Number of Peaks 89 224 331

Av Of 1/3 Highest 2.97 -5.74 -4.12


Av Of 1/3 Lowest 1.59 -6.47 -4.27
Av Of 1/100 Highest 3.16 -5.53 -4.07
Av Of 1/100 Lowest 1.35 -6.65 -4.30
Av Of 1/1000 Highest 3.16 -5.51 -4.06
Av Of 1/1000 Lowest 1.35 -6.66 -4.30
Maximum 3.16 -5.51 -4.06
Minimum 1.35 -6.66 -4.30
Pred. Max 3.37 -5.39 -4.03
Pred. Min 1.14 -6.77 -4.32

Av Of 1/3 H-Mean 0.70 0.35 0.08


Av Of 1/3 L-Mean -0.67 -0.37 -0.07
Av Of 1/100 H-Mean 0.90 0.56 0.12
Av Of 1/100 L-Mean -0.91 -0.56 -0.11
Av Of 1/1000 H-Mean 0.90 0.58 0.14
Av Of 1/1000 L-Mean -0.91 -0.56 -0.11
Maximum - Mean 0.90 0.58 0.14
Minimum - Mean -0.91 -0.56 -0.11
Pred. Max-Mean 1.11 0.70 0.16
Pred. Min-Mean -1.13 -0.68 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.26 -6.09 -4.19 2.33 -6.10 4.34 66.27 -6.09 -4.70 66.34 -6.09
Variance 0.17 0.06 0.00 0.17 0.06 0.00 0.17 0.06 0.00 0.17 0.06
Root Mean Square 2.30 6.10 4.20 2.37 6.10 4.34 66.27 6.09 4.70 66.34 6.10
Std. Deviation 0.42 0.24 0.04 0.42 0.24 0.04 0.42 0.24 0.01 0.42 0.24
Skewness 0.00 -0.07 0.06 0.00 -0.07 0.06 0.00 -0.07 -0.01 0.00 -0.07
Kurtosis -0.75 -0.76 -0.03 -0.75 -0.78 -0.03 -0.75 -0.76 -0.08 -0.75 -0.78

Number of Peaks 89 224 331 99 64 331 89 221 315 97 65

Av Of 1/3 Highest 2.97 -5.74 -4.12 3.01 -5.74 4.41 66.97 -5.74 -4.69 67.02 -5.73
Av Of 1/3 Lowest 1.59 -6.47 -4.27 1.63 -6.48 4.27 65.60 -6.46 -4.72 65.65 -6.47
Av Of 1/100 Highest 3.16 -5.53 -4.07 3.22 -5.56 4.46 67.16 -5.53 -4.68 67.23 -5.56
Av Of 1/100 Lowest 1.35 -6.65 -4.30 1.42 -6.63 4.23 65.36 -6.65 -4.73 65.42 -6.63
Av Of 1/1000 Highest 3.16 -5.51 -4.06 3.22 -5.56 4.47 67.16 -5.51 -4.68 67.23 -5.56
Av Of 1/1000 Lowest 1.35 -6.66 -4.30 1.42 -6.63 4.23 65.36 -6.65 -4.73 65.42 -6.63
Maximum 3.16 -5.51 -4.06 3.22 -5.56 4.47 67.16 -5.51 -4.68 67.23 -5.56
Minimum 1.35 -6.66 -4.30 1.42 -6.63 4.23 65.36 -6.65 -4.73 65.42 -6.63
Pred. Max 3.37 -5.39 -4.03 3.43 -5.43 4.50 67.38 -5.39 -4.68 67.44 -5.43
Pred. Min 1.14 -6.77 -4.32 1.21 -6.77 4.21 65.14 -6.77 -4.73 65.21 -6.76

Av Of 1/3 H-Mean 0.70 0.35 0.08 0.69 0.36 0.08 0.70 0.35 0.02 0.69 0.36
Av Of 1/3 L-Mean -0.67 -0.37 -0.07 -0.69 -0.38 -0.07 -0.67 -0.37 -0.01 -0.68 -0.38
Av Of 1/100 H-Mean 0.90 0.56 0.12 0.90 0.53 0.12 0.90 0.56 0.02 0.90 0.53
Av Of 1/100 L-Mean -0.91 -0.56 -0.11 -0.91 -0.53 -0.10 -0.91 -0.56 -0.02 -0.91 -0.54
Av Of 1/1000 H-Mean 0.90 0.58 0.14 0.90 0.53 0.14 0.90 0.58 0.02 0.90 0.53
Av Of 1/1000 L-Mean -0.91 -0.56 -0.11 -0.91 -0.53 -0.11 -0.91 -0.56 -0.03 -0.91 -0.54
Maximum - Mean 0.90 0.58 0.14 0.90 0.53 0.14 0.90 0.58 0.02 0.90 0.53
Minimum - Mean -0.91 -0.56 -0.11 -0.91 -0.53 -0.11 -0.91 -0.56 -0.03 -0.91 -0.54
Pred. Max-Mean 1.11 0.70 0.16 1.10 0.67 0.16 1.11 0.70 0.03 1.10 0.67
Pred. Min-Mean -1.13 -0.68 -0.13 -1.12 -0.67 -0.13 -1.13 -0.68 -0.03 -1.12 -0.67

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.27 -6.08 -5.21 130.34 -6.09 3.32


Variance 0.00 0.17 0.06 0.00 0.17 0.06 0.00
Root Mean Square 3.83 130.27 6.09 5.21 130.34 6.09 3.32
Std. Deviation 0.01 0.42 0.24 0.04 0.42 0.24 0.04
Skewness -0.01 0.00 -0.08 -0.03 0.00 -0.08 -0.03
Kurtosis -0.08 -0.75 -0.77 -0.11 -0.75 -0.78 -0.11

Number of Peaks 315 89 222 325 96 65 325

Av Of 1/3 Highest 3.85 130.98 -5.73 -5.12 131.04 -5.73 3.41


Av Of 1/3 Lowest 3.82 129.60 -6.46 -5.30 129.65 -6.47 3.23
Av Of 1/100 Highest 3.85 131.17 -5.53 -5.08 131.24 -5.56 3.45
Av Of 1/100 Lowest 3.81 129.36 -6.65 -5.35 129.43 -6.62 3.18
Av Of 1/1000 Highest 3.85 131.17 -5.51 -5.08 131.24 -5.56 3.45
Av Of 1/1000 Lowest 3.81 129.36 -6.65 -5.35 129.43 -6.62 3.18
Maximum 3.85 131.17 -5.51 -5.08 131.24 -5.56 3.45
Minimum 3.81 129.36 -6.65 -5.35 129.43 -6.62 3.18
Pred. Max 3.86 131.38 -5.39 -5.06 131.45 -5.43 3.48
Pred. Min 3.80 129.15 -6.76 -5.38 129.22 -6.76 3.15

Av Of 1/3 H-Mean 0.02 0.70 0.35 0.09 0.69 0.36 0.09


Av Of 1/3 L-Mean -0.01 -0.67 -0.37 -0.09 -0.70 -0.38 -0.09
Av Of 1/100 H-Mean 0.02 0.90 0.56 0.13 0.90 0.53 0.13
Av Of 1/100 L-Mean -0.02 -0.91 -0.56 -0.14 -0.91 -0.54 -0.14
Av Of 1/1000 H-Mean 0.02 0.90 0.58 0.13 0.90 0.53 0.13
Av Of 1/1000 L-Mean -0.03 -0.91 -0.57 -0.14 -0.91 -0.54 -0.14
Maximum - Mean 0.02 0.90 0.58 0.13 0.90 0.53 0.13
Minimum - Mean -0.03 -0.91 -0.57 -0.14 -0.91 -0.54 -0.14
Pred. Max-Mean 0.03 1.11 0.69 0.15 1.10 0.66 0.15
Pred. Min-Mean -0.03 -1.13 -0.68 -0.17 -1.12 -0.67 -0.17
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -37 -12 -7 0 0 0 41


BM2S DB30 -93 29 -11 0 0 0 99
BM3P DB30 -4 -8 -3 0 0 0 11
BM4P DB30 3 -3 -2 0 0 0 6
BM4S DB30 48 84 -10 0 0 0 97
BM5P DB30 5 -3 -2 0 0 0 7
BM5S DB30 26 7 -5 0 0 0 27
MAINLN DB30 14 -4 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 195.8 -0.8 -24740.5 7 1663769 -49


Buoyancy -204.7 0.8 25863.8 -36 -1832054 55
Wind 12.7 -24.2 0.0 412 247 -1611
Drag 12.9 -36.2 3.4 150 -36 -2461
Wave 24.5 -24.8 34.0 -47 -2067 -1868
Flex. Connectors -41.3 85.1 -1160.6 -484 170125 8765
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -19 2826

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -472


Wind 6.5 3.2 -0.1 -7 40 468
Flex. Connectors -0.2 -0.1 1114.3 2 -166282 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 20 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.36 1001.58 473.87 40.74 0.1522 36.06 0.00


BM2S 1004.05 1001.58 176.85 99.08 0.3649 96.91 0.00
BM3P 996.17 1001.57 730.66 11.06 0.0417 4.22 0.00
BM4P 993.63 1001.50 809.09 5.80 0.0210 0.00 0.00
BM4S 1003.93 1001.50 191.33 97.48 0.3694 95.21 0.00
BM5P 994.41 1001.47 788.49 7.07 0.0269 0.68 0.00
BM5S 999.07 1001.46 574.36 27.22 0.0989 21.72 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.25 -5.94 -4.20 0.00 0.45 0.00


N Force 0.00 0.01 0.13 0 -19 2826

WHPBJKT Location 95.16 131.50 21.09 0.16 -0.32 -67.37


N Force 0.01 0.00 -0.13 0 20 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 41.05 102.85 10.41 0.00 5.54 100.96 6.66 27.29


Variance 23.09 71.14 0.61 0.00 0.13 25.24 0.46 13.53
Root Mean Square 41.33 103.20 10.44 0.00 5.55 101.09 6.69 27.54
Std. Deviation 4.81 8.43 0.78 0.00 0.36 5.02 0.68 3.68
Skewness -0.03 0.10 -0.15 0.00 -0.07 0.17 -0.06 0.37
Kurtosis -0.76 -0.71 -0.52 0.00 -0.31 -0.63 -0.82 -0.60

Number of Peaks 216 168 244 0 217 208 167 230

Av Of 1/3 Highest 48.46 116.59 11.55 0.00 6.10 109.29 7.74 33.57
Av Of 1/3 Lowest 33.36 90.03 9.16 0.00 4.96 93.54 5.55 22.13
Av Of 1/100 Highest 52.13 122.74 12.37 0.00 6.44 113.41 8.21 37.42
Av Of 1/100 Lowest 30.28 83.08 8.51 0.00 4.66 89.39 5.26 20.20
Av Of 1/1000 Highest 52.51 122.74 12.62 0.00 6.48 114.12 8.21 37.44
Av Of 1/1000 Lowest 30.21 83.08 8.48 0.00 4.66 88.41 5.26 20.13
Maximum 52.51 122.74 12.62 0.00 6.48 114.12 8.21 37.44
Minimum 30.21 83.08 8.48 0.00 4.66 88.41 5.26 20.13
Pred. Max 54.81 126.91 13.05 0.00 6.67 116.78 8.54 39.46
Pred. Min 28.03 78.93 8.11 0.00 4.48 85.86 4.97 18.70

Av Of 1/3 H-Mean 7.41 13.74 1.14 0.00 0.56 8.33 1.08 6.28
Av Of 1/3 L-Mean -7.69 -12.82 -1.25 0.00 -0.58 -7.42 -1.10 -5.17
Av Of 1/100 H-Mean 11.08 19.88 1.96 0.00 0.90 12.45 1.56 10.13
Av Of 1/100 L-Mean -10.77 -19.77 -1.90 0.00 -0.88 -11.57 -1.39 -7.09
Av Of 1/1000 H-Mean 11.46 19.88 2.21 0.00 0.94 13.16 1.56 10.15
Av Of 1/1000 L-Mean -10.84 -19.77 -1.93 0.00 -0.88 -12.56 -1.39 -7.17
Maximum - Mean 11.46 19.88 2.21 0.00 0.94 13.16 1.56 10.15
Minimum - Mean -10.84 -19.77 -1.93 0.00 -0.88 -12.56 -1.39 -7.17
Pred. Max-Mean 13.76 24.06 2.64 0.00 1.13 15.82 1.89 12.17
Pred. Min-Mean -13.02 -23.93 -2.31 0.00 -1.06 -15.10 -1.69 -8.59

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.37 -6.29 -4.20


Variance 0.19 0.09 0.00
Root Mean Square 2.41 6.30 4.20
Std. Deviation 0.44 0.30 0.06
Skewness -0.06 -0.37 0.01
Kurtosis -0.75 -0.68 -0.23

Number of Peaks 213 254 285

Av Of 1/3 Highest 3.01 -5.88 -4.06


Av Of 1/3 Lowest 1.68 -6.79 -4.33
Av Of 1/100 Highest 3.33 -5.68 -4.00
Av Of 1/100 Lowest 1.30 -7.02 -4.39
Av Of 1/1000 Highest 3.37 -5.65 -3.99
Av Of 1/1000 Lowest 1.29 -7.03 -4.39
Maximum 3.37 -5.65 -3.99
Minimum 1.29 -7.03 -4.39
Pred. Max 3.57 -5.52 -3.95
Pred. Min 1.08 -7.17 -4.43

Av Of 1/3 H-Mean 0.65 0.41 0.13


Av Of 1/3 L-Mean -0.69 -0.50 -0.13
Av Of 1/100 H-Mean 0.96 0.61 0.20
Av Of 1/100 L-Mean -1.07 -0.73 -0.19
Av Of 1/1000 H-Mean 1.00 0.64 0.21
Av Of 1/1000 L-Mean -1.07 -0.74 -0.19
Maximum - Mean 1.00 0.64 0.21
Minimum - Mean -1.07 -0.74 -0.19
Pred. Max-Mean 1.20 0.77 0.25
Pred. Min-Mean -1.29 -0.88 -0.23
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.37 -6.29 -4.20 2.43 -6.29 4.34 66.37 -6.25 -4.70 66.44 -6.25
Variance 0.19 0.09 0.00 0.19 0.09 0.00 0.19 0.09 0.00 0.19 0.08
Root Mean Square 2.41 6.30 4.20 2.47 6.30 4.34 66.37 6.25 4.70 66.44 6.26
Std. Deviation 0.44 0.30 0.06 0.44 0.29 0.06 0.44 0.29 0.03 0.44 0.29
Skewness -0.06 -0.37 0.01 -0.06 -0.38 0.01 -0.06 -0.34 0.00 -0.06 -0.35
Kurtosis -0.75 -0.68 -0.23 -0.75 -0.73 -0.23 -0.75 -0.64 -0.24 -0.75 -0.69

Number of Peaks 213 254 285 215 143 285 215 253 285 215 145

Av Of 1/3 Highest 3.01 -5.88 -4.06 3.08 -5.85 4.47 67.02 -5.84 -4.63 67.09 -5.81
Av Of 1/3 Lowest 1.68 -6.79 -4.33 1.75 -6.82 4.21 65.69 -6.73 -4.77 65.75 -6.76
Av Of 1/100 Highest 3.33 -5.68 -4.00 3.39 -5.76 4.53 67.33 -5.66 -4.60 67.40 -5.69
Av Of 1/100 Lowest 1.30 -7.02 -4.39 1.37 -6.96 4.14 65.30 -6.95 -4.81 65.37 -6.89
Av Of 1/1000 Highest 3.37 -5.65 -3.99 3.43 -5.76 4.55 67.37 -5.64 -4.59 67.43 -5.69
Av Of 1/1000 Lowest 1.29 -7.03 -4.39 1.36 -6.96 4.14 65.30 -6.96 -4.81 65.36 -6.89
Maximum 3.37 -5.65 -3.99 3.43 -5.76 4.55 67.37 -5.64 -4.59 67.43 -5.69
Minimum 1.29 -7.03 -4.39 1.36 -6.96 4.14 65.30 -6.96 -4.81 65.36 -6.89
Pred. Max 3.57 -5.52 -3.95 3.63 -5.65 4.59 67.57 -5.52 -4.57 67.63 -5.57
Pred. Min 1.08 -7.17 -4.43 1.14 -7.11 4.11 65.08 -7.10 -4.83 65.15 -7.03

Av Of 1/3 H-Mean 0.65 0.41 0.13 0.65 0.44 0.13 0.65 0.41 0.07 0.65 0.44
Av Of 1/3 L-Mean -0.69 -0.50 -0.13 -0.69 -0.53 -0.13 -0.69 -0.49 -0.07 -0.69 -0.51
Av Of 1/100 H-Mean 0.96 0.61 0.20 0.96 0.53 0.20 0.96 0.59 0.10 0.96 0.56
Av Of 1/100 L-Mean -1.07 -0.73 -0.19 -1.06 -0.67 -0.19 -1.07 -0.70 -0.10 -1.06 -0.64
Av Of 1/1000 H-Mean 1.00 0.64 0.21 0.99 0.53 0.21 1.00 0.61 0.11 0.99 0.56
Av Of 1/1000 L-Mean -1.07 -0.74 -0.19 -1.07 -0.67 -0.19 -1.07 -0.71 -0.10 -1.07 -0.64
Maximum - Mean 1.00 0.64 0.21 0.99 0.53 0.21 1.00 0.61 0.11 0.99 0.56
Minimum - Mean -1.07 -0.74 -0.19 -1.07 -0.67 -0.19 -1.07 -0.71 -0.10 -1.07 -0.64
Pred. Max-Mean 1.20 0.77 0.25 1.19 0.65 0.25 1.20 0.73 0.13 1.19 0.68
Pred. Min-Mean -1.29 -0.88 -0.23 -1.29 -0.82 -0.23 -1.29 -0.85 -0.12 -1.29 -0.78

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.38 -6.21 -5.21 130.45 -6.21 3.32


Variance 0.00 0.19 0.08 0.00 0.19 0.08 0.00
Root Mean Square 3.83 130.38 6.21 5.21 130.45 6.21 3.32
Std. Deviation 0.03 0.44 0.29 0.01 0.44 0.29 0.01
Skewness 0.00 -0.06 -0.30 0.15 -0.06 -0.31 0.13
Kurtosis -0.24 -0.75 -0.59 0.25 -0.75 -0.63 0.25

Number of Peaks 285 212 254 283 215 145 282

Av Of 1/3 Highest 3.90 131.01 -5.79 -5.19 131.09 -5.76 3.34


Av Of 1/3 Lowest 3.76 129.69 -6.68 -5.22 129.76 -6.71 3.31
Av Of 1/100 Highest 3.94 131.34 -5.62 -5.18 131.41 -5.61 3.35
Av Of 1/100 Lowest 3.73 129.31 -6.91 -5.23 129.38 -6.85 3.30
Av Of 1/1000 Highest 3.94 131.38 -5.61 -5.18 131.44 -5.61 3.35
Av Of 1/1000 Lowest 3.73 129.30 -6.91 -5.24 129.37 -6.85 3.30
Maximum 3.94 131.38 -5.61 -5.18 131.44 -5.61 3.35
Minimum 3.73 129.30 -6.91 -5.24 129.37 -6.85 3.30
Pred. Max 3.96 131.58 -5.49 -5.18 131.64 -5.48 3.35
Pred. Min 3.71 129.09 -7.05 -5.24 129.15 -6.98 3.29

Av Of 1/3 H-Mean 0.07 0.63 0.42 0.02 0.65 0.44 0.02


Av Of 1/3 L-Mean -0.07 -0.69 -0.48 -0.01 -0.69 -0.50 -0.01
Av Of 1/100 H-Mean 0.10 0.96 0.59 0.03 0.96 0.60 0.02
Av Of 1/100 L-Mean -0.10 -1.07 -0.70 -0.02 -1.07 -0.64 -0.02
Av Of 1/1000 H-Mean 0.11 1.00 0.60 0.03 0.99 0.60 0.03
Av Of 1/1000 L-Mean -0.10 -1.07 -0.71 -0.03 -1.07 -0.64 -0.03
Maximum - Mean 0.11 1.00 0.60 0.03 0.99 0.60 0.03
Minimum - Mean -0.10 -1.07 -0.71 -0.03 -1.07 -0.64 -0.03
Pred. Max-Mean 0.13 1.20 0.71 0.03 1.19 0.73 0.03
Pred. Min-Mean -0.12 -1.29 -0.84 -0.03 -1.29 -0.78 -0.03
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -38 -12 -7 0 0 0 42


BM2S DB30 -98 31 -12 0 0 0 105
BM3P DB30 -4 -7 -3 0 0 0 11
BM4P DB30 2 -3 -2 0 0 0 5
BM4S DB30 50 87 -10 0 0 0 101
BM5P DB30 5 -3 -2 0 0 0 6
BM5S DB30 25 6 -5 0 0 0 26
MAINLN DB30 14 -4 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 195.4 3.7 -24740.5 -32 1663765 247


Buoyancy -204.2 -3.8 25865.3 181 -1832012 -270
Wind 12.7 -24.2 0.0 412 247 -1611
Drag 12.9 -36.2 3.4 150 -35 -2462
Wave 30.1 -30.4 32.7 -150 -2047 -2227
Flex. Connectors -47.0 90.9 -1160.8 -559 170068 9318
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -16 2991

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -475


Wind 6.5 3.2 -0.1 -7 40 470
Flex. Connectors -0.2 -0.1 1114.3 2 -166285 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 17 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.44 1001.58 467.39 41.76 0.1560 37.13 0.00


BM2S 1004.35 1001.58 153.80 104.61 0.3853 102.64 0.00
BM3P 995.97 1001.57 737.94 10.50 0.0396 3.60 0.00
BM4P 993.22 1001.50 816.20 5.43 0.0197 0.00 0.00
BM4S 1004.14 1001.50 175.40 101.28 0.3838 99.15 0.00
BM5P 994.03 1001.47 798.21 6.47 0.0246 0.39 0.00
BM5S 998.96 1001.46 581.83 26.33 0.0957 20.76 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.46 -6.30 -4.20 -0.01 0.45 0.00


N Force -0.01 0.01 0.11 0 -16 2991

WHPBJKT Location 95.65 131.28 21.09 0.16 -0.32 -67.49


N Force 0.01 0.00 -0.11 0 17 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 41.90 108.65 9.69 0.00 5.19 104.62 6.15 26.53


Variance 26.51 110.46 0.91 0.00 0.29 44.57 0.63 14.72
Root Mean Square 42.22 109.16 9.73 0.00 5.22 104.83 6.21 26.80
Std. Deviation 5.15 10.51 0.95 0.00 0.54 6.68 0.79 3.84
Skewness -0.03 0.07 0.04 0.00 0.13 0.17 0.40 0.43
Kurtosis -0.72 -0.52 -0.84 0.00 -0.17 -0.46 -0.54 -0.45

Number of Peaks 123 137 206 0 222 101 187 133

Av Of 1/3 Highest 50.35 126.07 11.09 0.00 5.97 116.54 7.48 32.84
Av Of 1/3 Lowest 33.62 91.52 8.29 0.00 4.37 94.33 5.05 20.97
Av Of 1/100 Highest 53.22 134.23 11.91 0.00 6.61 121.32 8.23 37.35
Av Of 1/100 Lowest 30.36 84.05 7.62 0.00 3.95 89.32 4.64 19.55
Av Of 1/1000 Highest 53.22 134.23 11.99 0.00 6.70 121.32 8.23 37.35
Av Of 1/1000 Lowest 30.36 84.05 7.51 0.00 3.95 89.32 4.64 19.55
Maximum 53.22 134.23 11.99 0.00 6.70 121.32 8.23 37.35
Minimum 30.36 84.05 7.51 0.00 3.95 89.32 4.64 19.55
Pred. Max 55.74 139.80 12.46 0.00 7.00 125.18 8.65 39.72
Pred. Min 27.79 78.68 7.07 0.00 3.71 85.78 4.32 18.02

Av Of 1/3 H-Mean 8.45 17.41 1.40 0.00 0.78 11.92 1.33 6.31
Av Of 1/3 L-Mean -8.28 -17.13 -1.40 0.00 -0.82 -10.29 -1.10 -5.56
Av Of 1/100 H-Mean 11.32 25.58 2.22 0.00 1.42 16.70 2.07 10.82
Av Of 1/100 L-Mean -11.55 -24.61 -2.07 0.00 -1.24 -15.30 -1.52 -6.98
Av Of 1/1000 H-Mean 11.32 25.58 2.31 0.00 1.51 16.70 2.07 10.82
Av Of 1/1000 L-Mean -11.55 -24.61 -2.18 0.00 -1.24 -15.30 -1.52 -6.98
Maximum - Mean 11.32 25.58 2.31 0.00 1.51 16.70 2.07 10.82
Minimum - Mean -11.55 -24.61 -2.18 0.00 -1.24 -15.30 -1.52 -6.98
Pred. Max-Mean 13.83 31.15 2.77 0.00 1.81 20.56 2.50 13.20
Pred. Min-Mean -14.11 -29.97 -2.62 0.00 -1.49 -18.84 -1.83 -8.51

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.57 -6.75 -4.20


Variance 0.25 0.23 0.04
Root Mean Square 2.62 6.77 4.20
Std. Deviation 0.50 0.48 0.19
Skewness -0.07 -0.16 0.01
Kurtosis -0.52 -0.68 -0.19

Number of Peaks 205 231 267

Av Of 1/3 Highest 3.33 -6.03 -3.81


Av Of 1/3 Lowest 1.75 -7.52 -4.59
Av Of 1/100 Highest 3.66 -5.85 -3.60
Av Of 1/100 Lowest 1.33 -7.88 -4.78
Av Of 1/1000 Highest 3.67 -5.85 -3.57
Av Of 1/1000 Lowest 1.26 -7.89 -4.79
Maximum 3.67 -5.85 -3.57
Minimum 1.26 -7.89 -4.79
Pred. Max 3.89 -5.67 -3.45
Pred. Min 1.00 -8.11 -4.90

Av Of 1/3 H-Mean 0.76 0.73 0.39


Av Of 1/3 L-Mean -0.82 -0.77 -0.39
Av Of 1/100 H-Mean 1.09 0.90 0.59
Av Of 1/100 L-Mean -1.24 -1.13 -0.58
Av Of 1/1000 H-Mean 1.10 0.90 0.62
Av Of 1/1000 L-Mean -1.31 -1.13 -0.59
Maximum - Mean 1.10 0.90 0.62
Minimum - Mean -1.31 -1.13 -0.59
Pred. Max-Mean 1.32 1.08 0.74
Pred. Min-Mean -1.57 -1.36 -0.71
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.57 -6.75 -4.20 2.64 -6.75 4.34 66.58 -6.64 -4.70 66.64 -6.64
Variance 0.25 0.23 0.04 0.25 0.23 0.04 0.25 0.23 0.00 0.25 0.22
Root Mean Square 2.62 6.77 4.20 2.68 6.77 4.34 66.58 6.66 4.70 66.64 6.66
Std. Deviation 0.50 0.48 0.19 0.50 0.48 0.19 0.50 0.47 0.03 0.50 0.47
Skewness -0.07 -0.16 0.01 -0.07 -0.16 0.01 -0.07 -0.13 -0.02 -0.07 -0.13
Kurtosis -0.52 -0.68 -0.19 -0.53 -0.69 -0.19 -0.52 -0.63 -0.11 -0.53 -0.63

Number of Peaks 205 231 267 159 93 267 211 233 275 163 94

Av Of 1/3 Highest 3.33 -6.03 -3.81 3.43 -6.00 4.73 67.34 -5.94 -4.64 67.40 -5.94
Av Of 1/3 Lowest 1.75 -7.52 -4.59 1.79 -7.60 3.95 65.77 -7.40 -4.76 65.81 -7.49
Av Of 1/100 Highest 3.66 -5.85 -3.60 3.73 -5.86 4.93 67.66 -5.64 -4.61 67.71 -5.65
Av Of 1/100 Lowest 1.33 -7.88 -4.78 1.36 -7.86 3.76 65.33 -7.70 -4.80 65.36 -7.68
Av Of 1/1000 Highest 3.67 -5.85 -3.57 3.73 -5.86 4.96 67.67 -5.64 -4.61 67.71 -5.65
Av Of 1/1000 Lowest 1.26 -7.89 -4.79 1.36 -7.86 3.75 65.27 -7.71 -4.81 65.36 -7.68
Maximum 3.67 -5.85 -3.57 3.73 -5.86 4.96 67.67 -5.64 -4.61 67.73 -5.65
Minimum 1.26 -7.89 -4.79 1.36 -7.86 3.75 65.27 -7.71 -4.81 65.36 -7.68
Pred. Max 3.89 -5.67 -3.45 3.96 -5.65 5.08 67.89 -5.44 -4.59 67.96 -5.42
Pred. Min 1.00 -8.11 -4.90 1.09 -8.12 3.63 65.00 -7.92 -4.83 65.09 -7.93

Av Of 1/3 H-Mean 0.76 0.73 0.39 0.79 0.75 0.39 0.77 0.70 0.06 0.75 0.70
Av Of 1/3 L-Mean -0.82 -0.77 -0.39 -0.84 -0.84 -0.39 -0.81 -0.76 -0.06 -0.84 -0.85
Av Of 1/100 H-Mean 1.09 0.90 0.59 1.09 0.89 0.59 1.09 1.00 0.09 1.07 0.99
Av Of 1/100 L-Mean -1.24 -1.13 -0.58 -1.28 -1.10 -0.58 -1.24 -1.06 -0.10 -1.28 -1.04
Av Of 1/1000 H-Mean 1.10 0.90 0.62 1.09 0.89 0.62 1.10 1.00 0.09 1.07 0.99
Av Of 1/1000 L-Mean -1.31 -1.13 -0.59 -1.28 -1.10 -0.59 -1.31 -1.07 -0.10 -1.28 -1.04
Maximum - Mean 1.10 0.90 0.62 1.09 0.89 0.62 1.10 1.00 0.09 1.09 0.99
Minimum - Mean -1.31 -1.13 -0.59 -1.28 -1.10 -0.59 -1.31 -1.07 -0.10 -1.28 -1.04
Pred. Max-Mean 1.32 1.08 0.74 1.32 1.10 0.74 1.32 1.20 0.11 1.32 1.22
Pred. Min-Mean -1.57 -1.36 -0.71 -1.55 -1.36 -0.71 -1.57 -1.28 -0.13 -1.55 -1.29

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.58 -6.53 -5.21 130.65 -6.53 3.32


Variance 0.00 0.25 0.23 0.02 0.25 0.22 0.02
Root Mean Square 3.83 130.58 6.54 5.21 130.65 6.54 3.33
Std. Deviation 0.03 0.50 0.48 0.14 0.50 0.47 0.14
Skewness -0.02 -0.07 -0.08 0.00 -0.07 -0.08 0.00
Kurtosis -0.10 -0.51 -0.49 -0.12 -0.53 -0.50 -0.12

Number of Peaks 275 211 233 265 164 94 265

Av Of 1/3 Highest 3.89 131.35 -5.83 -4.92 131.43 -5.87 3.62


Av Of 1/3 Lowest 3.77 129.77 -7.29 -5.50 129.81 -7.37 3.04
Av Of 1/100 Highest 3.92 131.67 -5.43 -4.79 131.74 -5.44 3.75
Av Of 1/100 Lowest 3.73 129.33 -7.62 -5.65 129.37 -7.57 2.88
Av Of 1/1000 Highest 3.92 131.68 -5.43 -4.77 131.74 -5.44 3.77
Av Of 1/1000 Lowest 3.73 129.27 -7.62 -5.67 129.37 -7.57 2.87
Maximum 3.92 131.68 -5.43 -4.77 131.74 -5.44 3.77
Minimum 3.73 129.27 -7.62 -5.67 129.37 -7.57 2.87
Pred. Max 3.94 131.90 -5.22 -4.68 131.97 -5.19 3.85
Pred. Min 3.71 129.00 -7.84 -5.75 129.10 -7.81 2.78

Av Of 1/3 H-Mean 0.06 0.77 0.69 0.29 0.78 0.65 0.29


Av Of 1/3 L-Mean -0.06 -0.81 -0.76 -0.29 -0.84 -0.85 -0.29
Av Of 1/100 H-Mean 0.09 1.09 1.09 0.42 1.09 1.08 0.42
Av Of 1/100 L-Mean -0.10 -1.25 -1.09 -0.44 -1.28 -1.04 -0.45
Av Of 1/1000 H-Mean 0.09 1.10 1.09 0.44 1.09 1.08 0.44
Av Of 1/1000 L-Mean -0.10 -1.31 -1.10 -0.46 -1.28 -1.04 -0.46
Maximum - Mean 0.09 1.10 1.09 0.44 1.09 1.08 0.44
Minimum - Mean -0.10 -1.31 -1.10 -0.46 -1.28 -1.04 -0.46
Pred. Max-Mean 0.11 1.32 1.31 0.53 1.32 1.34 0.53
Pred. Min-Mean -0.12 -1.58 -1.31 -0.54 -1.55 -1.29 -0.55
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 135 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA135

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 135.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 135.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 135.0


22.8 0.60 135.0
45.6 0.20 135.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -39 -13 -7 0 0 0 43


BM2S DB30 -105 33 -12 0 0 0 112
BM3P DB30 -4 -7 -3 0 0 0 10
BM4P DB30 2 -3 -1 0 0 0 5
BM4S DB30 52 92 -10 0 0 0 106
BM5P DB30 4 -2 -2 0 0 0 6
BM5S DB30 24 6 -5 0 0 0 25
MAINLN DB30 14 -3 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.7 6.7 -24740.5 -59 1663760 448


Buoyancy -203.7 -7.0 25884.0 328 -1833048 -491
Wind 12.7 -24.2 0.0 412 247 -1610
Drag 12.9 -36.2 3.4 150 -34 -2463
Wave 37.7 -37.8 14.2 -184 -928 -2611
Flex. Connectors -54.4 98.5 -1161.0 -645 169987 10028
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -18 3297

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.3 -3.2 -1114.3 6 166263 -474


Wind 6.5 3.2 -0.1 -7 40 469
Flex. Connectors -0.2 -0.1 1114.3 2 -166283 -7
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 19 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1000.55 1001.58 458.97 43.08 0.1609 38.53 0.00


BM2S 1004.74 1001.58 124.75 111.93 0.4123 110.22 0.00
BM3P 995.72 1001.57 747.33 9.79 0.0369 2.81 0.00
BM4P 992.69 1001.50 825.40 4.96 0.0180 0.00 0.00
BM4S 1004.41 1001.50 155.29 106.30 0.4029 104.34 0.00
BM5P 993.54 1001.47 810.77 5.68 0.0216 0.00 0.00
BM5S 998.81 1001.46 591.46 25.17 0.0915 19.54 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.72 -6.76 -4.20 -0.02 0.45 0.00


N Force -0.01 0.01 0.13 0 -18 3297

WHPBJKT Location 95.81 130.79 21.09 0.16 -0.32 -67.44


N Force 0.01 0.00 -0.12 0 19 -12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (MOORING TENSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 43.47 115.16 9.21 0.00 4.84 107.47 5.68 25.19


Variance 21.89 125.47 0.87 0.00 0.37 51.27 0.61 11.05
Root Mean Square 43.72 115.70 9.25 0.00 4.87 107.71 5.73 25.41
Std. Deviation 4.68 11.20 0.93 0.00 0.61 7.16 0.78 3.32
Skewness 0.01 0.01 0.31 0.00 0.38 0.02 0.82 0.53
Kurtosis -0.13 -0.17 -0.34 0.00 0.19 -0.04 0.52 0.38

Number of Peaks 229 219 244 0 209 154 213 229

Av Of 1/3 Highest 50.98 133.11 10.70 0.00 5.78 118.97 6.97 31.05
Av Of 1/3 Lowest 36.03 98.31 7.90 0.00 3.95 97.27 4.68 20.36
Av Of 1/100 Highest 55.62 141.79 11.44 0.00 6.77 125.80 8.18 35.72
Av Of 1/100 Lowest 31.36 85.90 7.10 0.00 3.53 88.61 4.20 18.11
Av Of 1/1000 Highest 56.46 141.82 11.51 0.00 6.80 125.80 8.28 35.94
Av Of 1/1000 Lowest 30.79 85.42 7.09 0.00 3.51 88.61 4.18 17.61
Maximum 56.46 141.82 11.51 0.00 6.80 125.80 8.28 35.94
Minimum 30.79 85.42 7.09 0.00 3.51 88.61 4.18 17.61
Pred. Max 59.04 147.17 11.97 0.00 7.20 129.71 8.80 38.08
Pred. Min 28.26 79.46 6.68 0.00 3.24 84.58 3.87 16.10

Av Of 1/3 H-Mean 7.51 17.95 1.50 0.00 0.94 11.51 1.29 5.86
Av Of 1/3 L-Mean -7.44 -16.85 -1.31 0.00 -0.88 -10.19 -1.00 -4.83
Av Of 1/100 H-Mean 12.15 26.64 2.24 0.00 1.94 18.33 2.50 10.54
Av Of 1/100 L-Mean -12.10 -29.26 -2.10 0.00 -1.31 -18.86 -1.48 -7.08
Av Of 1/1000 H-Mean 12.99 26.66 2.31 0.00 1.97 18.33 2.60 10.76
Av Of 1/1000 L-Mean -12.68 -29.73 -2.11 0.00 -1.32 -18.86 -1.50 -7.58
Maximum - Mean 12.99 26.66 2.31 0.00 1.97 18.33 2.60 10.76
Minimum - Mean -12.68 -29.73 -2.11 0.00 -1.32 -18.86 -1.50 -7.58
Pred. Max-Mean 15.58 32.01 2.76 0.00 2.37 22.24 3.12 12.90
Pred. Min-Mean -15.20 -35.70 -2.53 0.00 -1.59 -22.89 -1.80 -9.09

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.82 -7.14 -4.20


Variance 0.24 0.35 0.04
Root Mean Square 2.86 7.17 4.21
Std. Deviation 0.49 0.59 0.19
Skewness -0.08 -0.10 0.01
Kurtosis -0.05 -0.02 -0.10

Number of Peaks 216 237 241

Av Of 1/3 Highest 3.60 -6.22 -3.82


Av Of 1/3 Lowest 2.04 -8.05 -4.59
Av Of 1/100 Highest 3.93 -5.90 -3.60
Av Of 1/100 Lowest 1.49 -8.71 -4.77
Av Of 1/1000 Highest 3.96 -5.89 -3.59
Av Of 1/1000 Lowest 1.48 -8.71 -4.79
Maximum 3.96 -5.89 -3.59
Minimum 1.48 -8.71 -4.79
Pred. Max 4.18 -5.64 -3.47
Pred. Min 1.21 -9.02 -4.91

Av Of 1/3 H-Mean 0.78 0.93 0.38


Av Of 1/3 L-Mean -0.79 -0.90 -0.39
Av Of 1/100 H-Mean 1.11 1.25 0.60
Av Of 1/100 L-Mean -1.33 -1.56 -0.57
Av Of 1/1000 H-Mean 1.13 1.26 0.61
Av Of 1/1000 L-Mean -1.34 -1.57 -0.59
Maximum - Mean 1.13 1.26 0.61
Minimum - Mean -1.34 -1.57 -0.59
Pred. Max-Mean 1.36 1.51 0.73
Pred. Min-Mean -1.61 -1.88 -0.71
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.82 -7.14 -4.20 2.89 -7.14 4.33 66.83 -6.99 -4.71 66.90 -6.99
Variance 0.24 0.35 0.04 0.24 0.34 0.04 0.24 0.33 0.01 0.24 0.33
Root Mean Square 2.86 7.17 4.21 2.93 7.17 4.34 66.83 7.01 4.71 66.90 7.01
Std. Deviation 0.49 0.59 0.19 0.49 0.58 0.19 0.49 0.58 0.11 0.49 0.57
Skewness -0.08 -0.10 0.01 -0.08 -0.10 0.01 -0.08 0.02 -0.02 -0.08 0.03
Kurtosis -0.05 -0.02 -0.10 -0.05 0.00 -0.10 -0.05 -0.14 -0.10 -0.05 -0.12

Number of Peaks 216 237 241 224 191 240 217 237 238 225 193

Av Of 1/3 Highest 3.60 -6.22 -3.82 3.68 -6.22 4.72 67.60 -6.08 -4.49 67.69 -6.11
Av Of 1/3 Lowest 2.04 -8.05 -4.59 2.11 -7.99 3.94 66.05 -7.84 -4.93 66.12 -7.79
Av Of 1/100 Highest 3.93 -5.90 -3.60 4.02 -5.90 4.94 67.94 -5.65 -4.37 68.02 -5.61
Av Of 1/100 Lowest 1.49 -8.71 -4.77 1.56 -8.67 3.76 65.50 -8.46 -5.04 65.56 -8.42
Av Of 1/1000 Highest 3.96 -5.89 -3.59 4.05 -5.90 4.94 67.96 -5.60 -4.36 68.05 -5.61
Av Of 1/1000 Lowest 1.48 -8.71 -4.79 1.55 -8.67 3.74 65.49 -8.47 -5.05 65.55 -8.42
Maximum 3.96 -5.89 -3.59 4.05 -5.90 4.94 67.96 -5.60 -4.36 68.05 -5.61
Minimum 1.48 -8.71 -4.79 1.55 -8.67 3.74 65.49 -8.47 -5.05 65.55 -8.42
Pred. Max 4.18 -5.64 -3.47 4.28 -5.64 5.06 68.19 -5.32 -4.29 68.28 -5.33
Pred. Min 1.21 -9.02 -4.91 1.28 -8.98 3.62 65.22 -8.76 -5.12 65.28 -8.72

Av Of 1/3 H-Mean 0.78 0.93 0.38 0.79 0.93 0.39 0.77 0.91 0.22 0.79 0.88
Av Of 1/3 L-Mean -0.79 -0.90 -0.39 -0.78 -0.85 -0.39 -0.78 -0.86 -0.22 -0.78 -0.81
Av Of 1/100 H-Mean 1.11 1.25 0.60 1.12 1.24 0.60 1.11 1.34 0.34 1.12 1.38
Av Of 1/100 L-Mean -1.33 -1.56 -0.57 -1.33 -1.52 -0.57 -1.33 -1.47 -0.33 -1.33 -1.43
Av Of 1/1000 H-Mean 1.13 1.26 0.61 1.16 1.24 0.61 1.13 1.39 0.34 1.16 1.38
Av Of 1/1000 L-Mean -1.34 -1.57 -0.59 -1.34 -1.52 -0.59 -1.34 -1.48 -0.35 -1.34 -1.43
Maximum - Mean 1.13 1.26 0.61 1.16 1.24 0.61 1.13 1.39 0.34 1.16 1.38
Minimum - Mean -1.34 -1.57 -0.59 -1.34 -1.52 -0.59 -1.34 -1.48 -0.35 -1.34 -1.43
Pred. Max-Mean 1.36 1.51 0.73 1.39 1.50 0.73 1.36 1.66 0.41 1.39 1.66
Pred. Min-Mean -1.61 -1.88 -0.71 -1.61 -1.84 -0.71 -1.61 -1.77 -0.42 -1.61 -1.73

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=135deg (BARGE EXCURSION-BM3S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.83 -6.83 -5.21 130.90 -6.83 3.32


Variance 0.01 0.24 0.33 0.01 0.24 0.32 0.01
Root Mean Square 3.83 130.84 6.86 5.21 130.90 6.86 3.32
Std. Deviation 0.11 0.49 0.57 0.10 0.49 0.57 0.10
Skewness -0.02 -0.08 0.18 -0.06 -0.08 0.18 -0.07
Kurtosis -0.10 -0.05 -0.17 -0.18 -0.05 -0.16 -0.17

Number of Peaks 238 218 237 231 225 193 231

Av Of 1/3 Highest 4.05 131.60 -5.94 -5.00 131.69 -5.98 3.53


Av Of 1/3 Lowest 3.60 130.06 -7.66 -5.43 130.13 -7.62 3.11
Av Of 1/100 Highest 4.16 131.94 -5.36 -4.91 132.02 -5.32 3.62
Av Of 1/100 Lowest 3.49 129.51 -8.22 -5.52 129.57 -8.18 3.01
Av Of 1/1000 Highest 4.17 131.96 -5.31 -4.91 132.06 -5.32 3.62
Av Of 1/1000 Lowest 3.48 129.49 -8.22 -5.53 129.56 -8.18 3.01
Maximum 4.17 131.96 -5.31 -4.91 132.06 -5.32 3.62
Minimum 3.48 129.49 -8.22 -5.53 129.56 -8.18 3.01
Pred. Max 4.24 132.19 -5.01 -4.85 132.29 -5.01 3.68
Pred. Min 3.41 129.22 -8.50 -5.59 129.29 -8.45 2.95

Av Of 1/3 H-Mean 0.22 0.77 0.90 0.21 0.79 0.85 0.21


Av Of 1/3 L-Mean -0.22 -0.78 -0.83 -0.21 -0.78 -0.79 -0.21
Av Of 1/100 H-Mean 0.34 1.11 1.48 0.30 1.12 1.51 0.30
Av Of 1/100 L-Mean -0.33 -1.33 -1.39 -0.31 -1.33 -1.35 -0.31
Av Of 1/1000 H-Mean 0.34 1.13 1.52 0.30 1.16 1.51 0.30
Av Of 1/1000 L-Mean -0.35 -1.34 -1.39 -0.31 -1.34 -1.35 -0.31
Maximum - Mean 0.34 1.13 1.52 0.30 1.16 1.51 0.30
Minimum - Mean -0.35 -1.34 -1.39 -0.31 -1.34 -1.35 -0.31
Pred. Max-Mean 0.41 1.36 1.82 0.36 1.39 1.82 0.36
Pred. Min-Mean -0.42 -1.61 -1.67 -0.38 -1.61 -1.62 -0.38
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -60 -20 -9 0 0 0 66


BM3P DB30 -21 -36 -7 0 0 0 44
BM3S DB30 -30 54 -9 0 0 0 63
BM4P DB30 9 -15 -4 0 0 0 19
BM4S DB30 15 26 -5 0 0 0 30
BM5P DB30 12 -9 -4 0 0 0 16
BM5S DB30 16 4 -4 0 0 0 17
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 201.5 -2.4 -24740.4 21 1663817 -159


Buoyancy -209.1 2.5 25679.4 -116 -1821627 174
Wind 18.0 0.0 0.0 0 350 34
Drag 18.1 0.0 4.8 0 -53 0
Wave 17.7 0.0 218.3 -35 -12534 -14
Flex. Connectors -46.4 -0.1 -1161.9 131 170032 -736
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -18 -703

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -29


Wind 7.0 0.2 -0.1 0 28 16
Flex. Connectors -0.2 0.0 1114.2 0 -166272 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 -0.1 0 18 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1002.12 1001.58 330.59 65.73 0.2453 62.21 0.00


BM3P 1000.62 1001.57 454.72 43.98 0.1657 39.41 0.00
BM3S 1001.95 1001.57 345.67 63.08 0.2412 59.43 0.00
BM4P 998.03 1001.50 644.04 19.27 0.0696 13.17 0.00
BM4S 999.42 1001.50 551.83 30.27 0.1146 24.93 0.00
BM5P 997.49 1001.47 673.69 16.18 0.0615 9.82 0.00
BM5S 997.70 1001.46 661.15 17.45 0.0633 11.19 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.36 -0.80 -4.15 0.01 0.47 0.00


N Force -0.02 0.00 0.11 0 -18 -703

WHPBJKT Location 3.58 1.20 21.04 0.01 -0.35 -0.77


N Force 0.05 0.00 -0.11 0 18 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 67.36 0.00 42.57 67.25 18.93 29.54 15.76 17.16


Variance 34.49 0.00 6.37 13.82 2.04 3.75 2.58 4.26
Root Mean Square 67.62 0.00 42.64 67.35 18.98 29.60 15.84 17.28
Std. Deviation 5.87 0.00 2.52 3.72 1.43 1.94 1.61 2.07
Skewness -0.02 0.00 0.03 -0.07 0.01 0.22 0.32 0.34
Kurtosis -0.83 0.00 -0.56 -0.71 -0.66 -0.62 -0.54 -0.68

Number of Peaks 201 0 229 219 295 237 287 219

Av Of 1/3 Highest 76.80 0.00 46.34 73.01 21.08 32.76 18.34 20.51
Av Of 1/3 Lowest 58.82 0.00 38.73 61.56 16.71 26.66 13.44 14.29
Av Of 1/100 Highest 80.25 0.00 48.99 75.11 22.80 34.44 20.15 22.57
Av Of 1/100 Lowest 54.21 0.00 36.64 58.58 15.96 25.78 12.57 13.14
Av Of 1/1000 Highest 80.34 0.00 49.02 75.24 22.92 34.76 20.32 22.64
Av Of 1/1000 Lowest 54.00 0.00 36.60 58.37 15.95 25.76 12.55 12.94
Maximum 80.34 0.00 49.02 75.24 22.92 34.76 20.32 22.64
Minimum 54.00 0.00 36.60 58.37 15.95 25.76 12.55 12.94
Pred. Max 82.98 0.00 50.30 76.85 23.69 35.79 21.19 23.74
Pred. Min 51.28 0.00 35.41 56.59 15.38 25.01 11.94 12.10

Av Of 1/3 H-Mean 9.43 0.00 3.77 5.76 2.15 3.22 2.58 3.35
Av Of 1/3 L-Mean -8.54 0.00 -3.83 -5.69 -2.22 -2.88 -2.32 -2.87
Av Of 1/100 H-Mean 12.89 0.00 6.42 7.86 3.87 4.90 4.39 5.41
Av Of 1/100 L-Mean -13.15 0.00 -5.92 -8.67 -2.97 -3.76 -3.19 -4.02
Av Of 1/1000 H-Mean 12.97 0.00 6.45 7.99 4.00 5.22 4.56 5.48
Av Of 1/1000 L-Mean -13.36 0.00 -5.97 -8.88 -2.98 -3.78 -3.21 -4.22
Maximum - Mean 12.97 0.00 6.45 7.99 4.00 5.22 4.56 5.48
Minimum - Mean -13.36 0.00 -5.97 -8.88 -2.98 -3.78 -3.21 -4.22
Pred. Max-Mean 15.61 0.00 7.74 9.60 4.76 6.25 5.43 6.58
Pred. Min-Mean -16.08 0.00 -7.16 -10.66 -3.55 -4.53 -3.83 -5.06

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.49 -1.06 -4.15


Variance 0.15 0.02 0.01
Root Mean Square 2.52 1.07 4.15
Std. Deviation 0.39 0.14 0.07
Skewness -0.08 0.01 0.05
Kurtosis -0.81 -0.55 0.00

Number of Peaks 128 286 333

Av Of 1/3 Highest 3.12 -0.82 -4.00


Av Of 1/3 Lowest 1.88 -1.31 -4.29
Av Of 1/100 Highest 3.31 -0.74 -3.89
Av Of 1/100 Lowest 1.59 -1.41 -4.38
Av Of 1/1000 Highest 3.31 -0.74 -3.89
Av Of 1/1000 Lowest 1.59 -1.41 -4.38
Maximum 3.31 -0.74 -3.89
Minimum 1.59 -1.43 -4.38
Pred. Max 3.49 -0.67 -3.84
Pred. Min 1.39 -1.50 -4.43

Av Of 1/3 H-Mean 0.62 0.24 0.15


Av Of 1/3 L-Mean -0.61 -0.25 -0.15
Av Of 1/100 H-Mean 0.82 0.32 0.25
Av Of 1/100 L-Mean -0.91 -0.35 -0.23
Av Of 1/1000 H-Mean 0.82 0.33 0.26
Av Of 1/1000 L-Mean -0.91 -0.35 -0.23
Maximum - Mean 0.82 0.33 0.26
Minimum - Mean -0.91 -0.37 -0.23
Pred. Max-Mean 1.00 0.39 0.31
Pred. Min-Mean -1.11 -0.44 -0.28
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.49 -1.06 -4.15 2.56 -1.06 4.39 66.50 -0.90 -4.67 66.57 -0.90
Variance 0.15 0.02 0.01 0.15 0.01 0.01 0.15 0.01 0.01 0.15 0.00
Root Mean Square 2.52 1.07 4.15 2.59 1.07 4.39 66.50 0.90 4.67 66.57 0.90
Std. Deviation 0.39 0.14 0.07 0.39 0.12 0.07 0.39 0.10 0.07 0.39 0.07
Skewness -0.08 0.01 0.05 -0.08 0.26 0.05 -0.08 -0.47 0.02 -0.08 -0.88
Kurtosis -0.81 -0.55 0.00 -0.81 -0.76 0.00 -0.81 0.43 -0.09 -0.81 0.96

Number of Peaks 128 286 333 189 209 333 129 286 323 183 215

Av Of 1/3 Highest 3.12 -0.82 -4.00 3.18 -0.88 4.53 67.12 -0.72 -4.53 67.19 -0.81
Av Of 1/3 Lowest 1.88 -1.31 -4.29 1.96 -1.22 4.24 65.89 -1.09 -4.82 65.97 -1.01
Av Of 1/100 Highest 3.31 -0.74 -3.89 3.40 -0.80 4.64 67.32 -0.62 -4.45 67.40 -0.78
Av Of 1/100 Lowest 1.59 -1.41 -4.38 1.64 -1.29 4.15 65.59 -1.28 -4.90 65.65 -1.15
Av Of 1/1000 Highest 3.31 -0.74 -3.89 3.40 -0.79 4.65 67.32 -0.62 -4.44 67.40 -0.78
Av Of 1/1000 Lowest 1.59 -1.41 -4.38 1.64 -1.29 4.15 65.59 -1.28 -4.91 65.65 -1.16
Maximum 3.31 -0.74 -3.89 3.40 -0.79 4.65 67.32 -0.62 -4.44 67.40 -0.78
Minimum 1.59 -1.43 -4.38 1.64 -1.29 4.15 65.59 -1.28 -4.91 65.65 -1.16
Pred. Max 3.49 -0.67 -3.84 3.57 -0.74 4.70 67.50 -0.56 -4.40 67.57 -0.75
Pred. Min 1.39 -1.50 -4.43 1.45 -1.34 4.11 65.39 -1.35 -4.95 65.46 -1.21

Av Of 1/3 H-Mean 0.62 0.24 0.15 0.62 0.19 0.15 0.62 0.17 0.15 0.62 0.09
Av Of 1/3 L-Mean -0.61 -0.25 -0.15 -0.61 -0.16 -0.15 -0.61 -0.20 -0.15 -0.60 -0.11
Av Of 1/100 H-Mean 0.82 0.32 0.25 0.83 0.27 0.25 0.82 0.27 0.22 0.83 0.12
Av Of 1/100 L-Mean -0.91 -0.35 -0.23 -0.92 -0.23 -0.23 -0.91 -0.38 -0.22 -0.92 -0.25
Av Of 1/1000 H-Mean 0.82 0.33 0.26 0.83 0.27 0.26 0.82 0.28 0.23 0.83 0.12
Av Of 1/1000 L-Mean -0.91 -0.35 -0.23 -0.92 -0.23 -0.23 -0.91 -0.38 -0.24 -0.92 -0.26
Maximum - Mean 0.82 0.33 0.26 0.83 0.27 0.26 0.82 0.28 0.23 0.83 0.12
Minimum - Mean -0.91 -0.37 -0.23 -0.92 -0.23 -0.23 -0.91 -0.38 -0.24 -0.92 -0.26
Pred. Max-Mean 1.00 0.39 0.31 1.00 0.32 0.31 1.00 0.33 0.27 1.00 0.15
Pred. Min-Mean -1.11 -0.44 -0.28 -1.11 -0.28 -0.28 -1.11 -0.45 -0.28 -1.11 -0.31

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.86 130.50 -0.73 -5.19 130.57 -0.73 3.34


Variance 0.01 0.15 0.02 0.02 0.15 0.02 0.02
Root Mean Square 3.86 130.51 0.75 5.20 130.57 0.74 3.34
Std. Deviation 0.07 0.39 0.15 0.15 0.39 0.13 0.15
Skewness 0.02 -0.08 -0.08 -0.01 -0.08 -0.12 -0.01
Kurtosis -0.09 -0.81 -0.22 -0.12 -0.81 -0.58 -0.12

Number of Peaks 323 125 286 312 181 216 312

Av Of 1/3 Highest 4.01 131.14 -0.49 -4.88 131.20 -0.54 3.65


Av Of 1/3 Lowest 3.72 129.89 -0.98 -5.51 129.99 -0.92 3.02
Av Of 1/100 Highest 4.08 131.32 -0.32 -4.74 131.40 -0.49 3.80
Av Of 1/100 Lowest 3.64 129.60 -1.19 -5.67 129.66 -1.06 2.87
Av Of 1/1000 Highest 4.09 131.32 -0.32 -4.73 131.40 -0.49 3.80
Av Of 1/1000 Lowest 3.63 129.60 -1.20 -5.70 129.66 -1.08 2.84
Maximum 4.09 131.32 -0.32 -4.73 131.40 -0.49 3.80
Minimum 3.63 129.60 -1.20 -5.70 129.66 -1.08 2.84
Pred. Max 4.13 131.50 -0.24 -4.64 131.58 -0.44 3.89
Pred. Min 3.58 129.40 -1.28 -5.79 129.47 -1.15 2.74

Av Of 1/3 H-Mean 0.15 0.63 0.25 0.31 0.62 0.19 0.31


Av Of 1/3 L-Mean -0.15 -0.62 -0.24 -0.32 -0.59 -0.19 -0.32
Av Of 1/100 H-Mean 0.22 0.82 0.41 0.46 0.83 0.24 0.46
Av Of 1/100 L-Mean -0.22 -0.90 -0.46 -0.47 -0.92 -0.33 -0.47
Av Of 1/1000 H-Mean 0.23 0.82 0.41 0.46 0.83 0.24 0.46
Av Of 1/1000 L-Mean -0.24 -0.90 -0.46 -0.50 -0.92 -0.34 -0.50
Maximum - Mean 0.23 0.82 0.41 0.46 0.83 0.24 0.46
Minimum - Mean -0.24 -0.90 -0.46 -0.50 -0.92 -0.34 -0.50
Pred. Max-Mean 0.27 1.00 0.49 0.55 1.00 0.29 0.55
Pred. Min-Mean -0.28 -1.11 -0.55 -0.60 -1.11 -0.41 -0.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -67 -22 -9 0 0 0 72


BM3P DB30 -23 -38 -7 0 0 0 46
BM3S DB30 -32 58 -9 0 0 0 67
BM4P DB30 8 -14 -4 0 0 0 18
BM4S DB30 14 24 -5 0 0 0 29
BM5P DB30 11 -8 -3 0 0 0 15
BM5S DB30 14 4 -3 0 0 0 15
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.6 -2.9 -24740.5 26 1663759 -194


Buoyancy -202.3 3.0 25727.8 -142 -1822641 213
Wind 18.0 0.0 0.0 0 350 34
Drag 18.2 0.0 4.8 0 -51 0
Wave 32.5 0.0 170.0 -23 -11226 4
Flex. Connectors -61.0 -0.1 -1162.1 141 169812 -761
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 0 -706

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -29


Wind 7.0 0.2 -0.1 0 28 16
Flex. Connectors -0.2 0.0 1114.3 0 -166290 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 0 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1002.51 1001.58 298.10 72.12 0.2693 68.91 0.00


BM3P 1000.81 1001.57 439.78 46.30 0.1746 41.89 0.00
BM3S 1002.21 1001.57 324.40 67.21 0.2571 63.77 0.00
BM4P 997.78 1001.50 659.43 17.66 0.0637 11.41 0.00
BM4S 999.24 1001.50 564.69 28.60 0.1083 23.15 0.00
BM5P 997.12 1001.47 691.82 14.54 0.0553 8.03 0.00
BM5S 997.29 1001.46 682.64 15.39 0.0559 8.95 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.79 -0.84 -4.18 0.01 0.45 0.00


N Force -0.02 0.00 -0.01 0 0 -706

WHPBJKT Location 4.00 1.12 21.06 0.01 -0.35 -0.76


N Force 0.06 0.00 0.01 0 0 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 74.04 0.00 46.94 68.54 17.49 28.52 14.47 15.51


Variance 170.56 0.00 31.06 52.62 5.99 13.62 8.84 14.76
Root Mean Square 75.18 0.00 47.27 68.92 17.66 28.76 14.77 15.98
Std. Deviation 13.06 0.00 5.57 7.25 2.45 3.69 2.97 3.84
Skewness 0.08 0.00 0.05 0.10 0.15 0.15 0.27 0.32
Kurtosis -1.29 0.00 -1.31 -1.24 -1.25 -1.30 -1.21 -1.19

Number of Peaks 128 0 164 141 148 146 142 138

Av Of 1/3 Highest 94.46 0.00 55.50 80.36 21.48 34.48 19.44 22.08
Av Of 1/3 Lowest 54.80 0.00 38.77 57.87 13.88 23.23 10.37 10.36
Av Of 1/100 Highest 100.10 0.00 58.09 83.04 22.83 36.23 21.32 24.75
Av Of 1/100 Lowest 50.18 0.00 36.69 54.97 13.12 22.17 9.65 9.50
Av Of 1/1000 Highest 100.10 0.00 58.09 83.04 22.83 36.23 21.32 24.75
Av Of 1/1000 Lowest 50.18 0.00 36.69 54.97 13.12 22.17 9.65 9.50
Maximum 100.10 0.00 58.09 83.04 22.83 36.23 21.32 24.75
Minimum 50.18 0.00 36.69 54.97 13.12 22.17 9.65 9.50
Pred. Max 105.85 0.00 60.44 86.18 23.98 37.89 22.80 26.77
Pred. Min 44.91 0.00 34.53 52.03 12.17 20.80 8.61 8.19

Av Of 1/3 H-Mean 20.42 0.00 8.56 11.82 3.99 5.96 4.97 6.56
Av Of 1/3 L-Mean -19.25 0.00 -8.18 -10.67 -3.62 -5.29 -4.10 -5.16
Av Of 1/100 H-Mean 26.06 0.00 11.15 14.50 5.34 7.71 6.85 9.24
Av Of 1/100 L-Mean -23.86 0.00 -10.25 -13.57 -4.38 -6.35 -4.81 -6.01
Av Of 1/1000 H-Mean 26.06 0.00 11.15 14.50 5.34 7.71 6.85 9.24
Av Of 1/1000 L-Mean -23.86 0.00 -10.25 -13.57 -4.38 -6.35 -4.81 -6.01
Maximum - Mean 26.06 0.00 11.15 14.50 5.34 7.71 6.85 9.24
Minimum - Mean -23.86 0.00 -10.25 -13.57 -4.38 -6.35 -4.81 -6.01
Pred. Max-Mean 31.81 0.00 13.50 17.64 6.49 9.37 8.34 11.25
Pred. Min-Mean -29.13 0.00 -12.41 -16.51 -5.32 -7.72 -5.86 -7.32

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.89 -0.87 -4.18


Variance 0.70 0.01 0.01
Root Mean Square 3.01 0.87 4.18
Std. Deviation 0.84 0.07 0.11
Skewness 0.01 -0.22 0.01
Kurtosis -1.29 -0.96 -0.34

Number of Peaks 84 60 287

Av Of 1/3 Highest 4.26 -0.75 -3.94


Av Of 1/3 Lowest 1.63 -1.01 -4.41
Av Of 1/100 Highest 4.48 -0.73 -3.84
Av Of 1/100 Lowest 1.30 -1.03 -4.51
Av Of 1/1000 Highest 4.48 -0.73 -3.83
Av Of 1/1000 Lowest 1.30 -1.03 -4.53
Maximum 4.48 -0.73 -3.83
Minimum 1.30 -1.03 -4.53
Pred. Max 4.86 -0.70 -3.76
Pred. Min 0.92 -1.07 -4.60

Av Of 1/3 H-Mean 1.36 0.12 0.24


Av Of 1/3 L-Mean -1.26 -0.14 -0.23
Av Of 1/100 H-Mean 1.59 0.14 0.33
Av Of 1/100 L-Mean -1.59 -0.16 -0.34
Av Of 1/1000 H-Mean 1.59 0.14 0.35
Av Of 1/1000 L-Mean -1.59 -0.16 -0.36
Maximum - Mean 1.59 0.14 0.35
Minimum - Mean -1.59 -0.16 -0.36
Pred. Max-Mean 1.97 0.17 0.41
Pred. Min-Mean -1.97 -0.20 -0.43
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.89 -0.87 -4.18 2.96 -0.87 4.36 66.90 -0.87 -4.68 66.97 -0.87
Variance 0.70 0.01 0.01 0.70 0.01 0.01 0.70 0.01 0.00 0.70 0.01
Root Mean Square 3.01 0.87 4.18 3.08 0.87 4.36 66.90 0.87 4.68 66.97 0.87
Std. Deviation 0.84 0.07 0.11 0.84 0.07 0.11 0.84 0.07 0.06 0.84 0.07
Skewness 0.01 -0.22 0.01 0.01 -0.23 0.01 0.01 -0.23 0.02 0.01 -0.23
Kurtosis -1.29 -0.96 -0.34 -1.29 -0.96 -0.34 -1.29 -0.96 -0.11 -1.29 -0.96

Number of Peaks 84 60 287 119 41 287 83 61 283 116 38

Av Of 1/3 Highest 4.26 -0.75 -3.94 4.26 -0.76 4.59 68.26 -0.75 -4.56 68.26 -0.76
Av Of 1/3 Lowest 1.63 -1.01 -4.41 1.68 -1.01 4.13 65.64 -1.00 -4.79 65.68 -1.01
Av Of 1/100 Highest 4.48 -0.73 -3.84 4.57 -0.74 4.69 68.48 -0.73 -4.51 68.57 -0.73
Av Of 1/100 Lowest 1.30 -1.03 -4.51 1.35 -1.03 4.02 65.31 -1.03 -4.87 65.36 -1.03
Av Of 1/1000 Highest 4.48 -0.73 -3.83 4.57 -0.74 4.70 68.48 -0.73 -4.51 68.57 -0.73
Av Of 1/1000 Lowest 1.30 -1.03 -4.53 1.35 -1.03 4.00 65.31 -1.03 -4.88 65.36 -1.03
Maximum 4.48 -0.73 -3.83 4.57 -0.74 4.70 68.48 -0.73 -4.51 68.57 -0.73
Minimum 1.30 -1.03 -4.53 1.35 -1.03 4.00 65.31 -1.03 -4.88 65.36 -1.03
Pred. Max 4.86 -0.70 -3.76 4.92 -0.70 4.77 68.87 -0.70 -4.48 68.93 -0.70
Pred. Min 0.92 -1.07 -4.60 0.99 -1.07 3.93 64.93 -1.07 -4.91 64.99 -1.07

Av Of 1/3 H-Mean 1.36 0.12 0.24 1.30 0.11 0.24 1.36 0.12 0.12 1.30 0.11
Av Of 1/3 L-Mean -1.26 -0.14 -0.23 -1.28 -0.14 -0.23 -1.26 -0.13 -0.11 -1.28 -0.14
Av Of 1/100 H-Mean 1.59 0.14 0.33 1.60 0.13 0.33 1.59 0.14 0.17 1.60 0.13
Av Of 1/100 L-Mean -1.59 -0.16 -0.34 -1.61 -0.16 -0.34 -1.59 -0.16 -0.19 -1.61 -0.16
Av Of 1/1000 H-Mean 1.59 0.14 0.35 1.60 0.13 0.35 1.59 0.14 0.17 1.60 0.13
Av Of 1/1000 L-Mean -1.59 -0.16 -0.36 -1.61 -0.16 -0.36 -1.59 -0.16 -0.20 -1.61 -0.16
Maximum - Mean 1.59 0.14 0.35 1.60 0.13 0.35 1.59 0.14 0.17 1.60 0.13
Minimum - Mean -1.59 -0.16 -0.36 -1.61 -0.16 -0.36 -1.59 -0.16 -0.20 -1.61 -0.16
Pred. Max-Mean 1.97 0.17 0.41 1.96 0.17 0.41 1.97 0.17 0.20 1.96 0.17
Pred. Min-Mean -1.97 -0.20 -0.43 -1.97 -0.20 -0.43 -1.97 -0.21 -0.23 -1.97 -0.21

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.85 130.91 -0.87 -5.19 130.97 -0.87 3.35


Variance 0.00 0.70 0.01 0.01 0.70 0.01 0.01
Root Mean Square 3.85 130.91 0.87 5.19 130.98 0.87 3.35
Std. Deviation 0.06 0.84 0.07 0.08 0.84 0.07 0.08
Skewness 0.02 0.01 -0.23 0.01 0.01 -0.23 0.01
Kurtosis -0.11 -1.29 -0.96 -0.17 -1.29 -0.96 -0.17

Number of Peaks 283 81 59 291 115 39 291

Av Of 1/3 Highest 3.97 132.27 -0.75 -5.02 132.27 -0.76 3.51


Av Of 1/3 Lowest 3.74 129.64 -1.00 -5.34 129.69 -1.01 3.19
Av Of 1/100 Highest 4.02 132.49 -0.73 -4.95 132.57 -0.73 3.58
Av Of 1/100 Lowest 3.67 129.32 -1.03 -5.43 129.36 -1.03 3.10
Av Of 1/1000 Highest 4.02 132.49 -0.73 -4.95 132.57 -0.73 3.59
Av Of 1/1000 Lowest 3.66 129.32 -1.03 -5.45 129.36 -1.03 3.09
Maximum 4.02 132.49 -0.73 -4.95 132.57 -0.73 3.59
Minimum 3.66 129.32 -1.03 -5.45 129.36 -1.03 3.09
Pred. Max 4.06 132.87 -0.69 -4.90 132.94 -0.70 3.63
Pred. Min 3.62 128.93 -1.07 -5.50 129.00 -1.07 3.04

Av Of 1/3 H-Mean 0.12 1.36 0.12 0.16 1.30 0.11 0.16


Av Of 1/3 L-Mean -0.11 -1.26 -0.13 -0.16 -1.28 -0.14 -0.16
Av Of 1/100 H-Mean 0.17 1.58 0.14 0.24 1.60 0.13 0.24
Av Of 1/100 L-Mean -0.19 -1.59 -0.16 -0.25 -1.61 -0.16 -0.25
Av Of 1/1000 H-Mean 0.17 1.58 0.14 0.24 1.60 0.13 0.24
Av Of 1/1000 L-Mean -0.20 -1.59 -0.16 -0.26 -1.61 -0.16 -0.26
Maximum - Mean 0.17 1.58 0.14 0.24 1.60 0.13 0.24
Minimum - Mean -0.20 -1.59 -0.16 -0.26 -1.61 -0.16 -0.26
Pred. Max-Mean 0.20 1.97 0.17 0.28 1.96 0.17 0.28
Pred. Min-Mean -0.23 -1.97 -0.21 -0.31 -1.97 -0.21 -0.31
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -70 -23 -10 0 0 0 76


BM3P DB30 -23 -39 -7 0 0 0 48
BM3S DB30 -34 60 -9 0 0 0 70
BM4P DB30 8 -13 -4 0 0 0 17
BM4S DB30 13 23 -5 0 0 0 28
BM5P DB30 10 -7 -3 0 0 0 14
BM5S DB30 13 3 -3 0 0 0 14
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.8 -3.5 -24740.5 31 1663752 -234


Buoyancy -201.9 3.6 25782.5 -171 -1826024 257
Wind 18.0 0.0 0.0 0 350 34
Drag 18.2 0.0 4.8 0 -51 0
Wave 41.0 0.0 115.3 -6 -7710 3
Flex. Connectors -69.2 -0.1 -1162.1 147 169688 -778
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 2 -719

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -28


Wind 7.0 0.2 -0.1 0 28 14
Flex. Connectors -0.2 0.0 1114.3 0 -166293 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.0 0 -3 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1002.74 1001.58 280.25 75.87 0.2834 72.82 0.00


BM3P 1000.91 1001.57 431.58 47.68 0.1798 43.36 0.00
BM3S 1002.36 1001.57 312.12 69.60 0.2663 66.28 0.00
BM4P 997.63 1001.50 668.15 16.74 0.0604 10.43 0.00
BM4S 999.14 1001.50 571.61 27.69 0.1049 22.19 0.00
BM5P 996.90 1001.47 701.95 13.63 0.0518 7.03 0.00
BM5S 997.06 1001.46 693.99 14.35 0.0521 7.82 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 3.04 -0.87 -4.19 0.01 0.45 0.00


N Force -0.03 0.00 -0.04 0 2 -719

WHPBJKT Location 4.23 0.92 21.05 0.01 -0.35 -0.69


N Force 0.09 0.00 0.04 0 -3 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 78.24 0.00 48.49 71.26 16.61 27.57 13.51 14.40


Variance 199.98 0.00 34.91 64.87 6.54 14.07 8.94 14.56
Root Mean Square 79.51 0.00 48.85 71.71 16.81 27.82 13.84 14.90
Std. Deviation 14.14 0.00 5.91 8.05 2.56 3.75 2.99 3.82
Skewness 0.05 0.00 0.02 0.07 0.31 0.28 0.50 0.58
Kurtosis -0.96 0.00 -1.02 -0.86 -0.75 -0.90 -0.58 -0.48

Number of Peaks 138 0 116 116 129 126 137 143

Av Of 1/3 Highest 99.92 0.00 57.58 84.90 21.17 34.14 19.09 21.66
Av Of 1/3 Lowest 55.91 0.00 39.02 58.93 12.94 22.14 9.59 9.51
Av Of 1/100 Highest 111.04 0.00 61.92 90.01 23.39 37.11 22.26 25.98
Av Of 1/100 Lowest 48.06 0.00 35.82 54.08 11.67 20.17 8.20 8.10
Av Of 1/1000 Highest 111.04 0.00 61.92 90.01 23.39 37.11 22.26 25.98
Av Of 1/1000 Lowest 48.06 0.00 35.82 54.08 11.67 20.17 8.20 8.10
Maximum 111.04 0.00 61.92 90.01 23.39 37.11 22.26 25.98
Minimum 48.06 0.00 35.82 54.08 11.67 20.17 8.20 8.10
Pred. Max 118.18 0.00 64.95 94.23 24.88 39.22 24.16 28.49
Pred. Min 41.49 0.00 32.98 50.22 10.58 18.53 7.04 6.74

Av Of 1/3 H-Mean 21.68 0.00 9.09 13.65 4.56 6.57 5.57 7.26
Av Of 1/3 L-Mean -22.33 0.00 -9.47 -12.33 -3.67 -5.43 -3.92 -4.89
Av Of 1/100 H-Mean 32.79 0.00 13.43 18.75 6.77 9.54 8.74 11.58
Av Of 1/100 L-Mean -30.18 0.00 -12.67 -17.17 -4.94 -7.40 -5.32 -6.30
Av Of 1/1000 H-Mean 32.79 0.00 13.43 18.75 6.77 9.54 8.74 11.58
Av Of 1/1000 L-Mean -30.18 0.00 -12.67 -17.17 -4.94 -7.40 -5.32 -6.30
Maximum - Mean 32.79 0.00 13.43 18.75 6.77 9.54 8.74 11.58
Minimum - Mean -30.18 0.00 -12.67 -17.17 -4.94 -7.40 -5.32 -6.30
Pred. Max-Mean 39.94 0.00 16.45 22.97 8.27 11.65 10.65 14.09
Pred. Min-Mean -36.75 0.00 -15.52 -21.04 -6.03 -9.04 -6.48 -7.66

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 3.17 -0.90 -4.19


Variance 0.81 0.01 0.04
Root Mean Square 3.29 0.90 4.19
Std. Deviation 0.90 0.08 0.20
Skewness -0.05 -0.22 0.02
Kurtosis -0.91 -0.66 -0.13

Number of Peaks 199 41 267

Av Of 1/3 Highest 4.55 -0.77 -3.78


Av Of 1/3 Lowest 1.73 -1.07 -4.59
Av Of 1/100 Highest 5.21 -0.74 -3.55
Av Of 1/100 Lowest 1.07 -1.12 -4.81
Av Of 1/1000 Highest 5.21 -0.74 -3.54
Av Of 1/1000 Lowest 1.07 -1.12 -4.81
Maximum 5.21 -0.74 -3.54
Minimum 1.07 -1.12 -4.81
Pred. Max 5.63 -0.70 -3.41
Pred. Min 0.64 -1.18 -4.93

Av Of 1/3 H-Mean 1.38 0.13 0.40


Av Of 1/3 L-Mean -1.44 -0.17 -0.40
Av Of 1/100 H-Mean 2.04 0.16 0.63
Av Of 1/100 L-Mean -2.10 -0.22 -0.62
Av Of 1/1000 H-Mean 2.04 0.16 0.65
Av Of 1/1000 L-Mean -2.10 -0.22 -0.62
Maximum - Mean 2.04 0.16 0.65
Minimum - Mean -2.10 -0.22 -0.62
Pred. Max-Mean 2.46 0.20 0.77
Pred. Min-Mean -2.53 -0.28 -0.74
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.17 -0.90 -4.19 3.24 -0.90 4.35 67.17 -0.90 -4.69 67.24 -0.90
Variance 0.81 0.01 0.04 0.81 0.01 0.04 0.81 0.01 0.01 0.81 0.01
Root Mean Square 3.29 0.90 4.19 3.36 0.91 4.35 67.18 0.91 4.69 67.25 0.91
Std. Deviation 0.90 0.08 0.20 0.90 0.08 0.20 0.90 0.08 0.08 0.90 0.08
Skewness -0.05 -0.22 0.02 -0.05 -0.22 0.02 -0.05 -0.23 0.01 -0.05 -0.23
Kurtosis -0.91 -0.66 -0.13 -0.92 -0.66 -0.13 -0.91 -0.66 -0.23 -0.92 -0.65

Number of Peaks 199 41 267 163 29 266 199 40 269 160 28

Av Of 1/3 Highest 4.55 -0.77 -3.78 4.67 -0.76 4.75 68.56 -0.77 -4.52 68.69 -0.77
Av Of 1/3 Lowest 1.73 -1.07 -4.59 1.80 -1.06 3.94 65.73 -1.07 -4.86 65.79 -1.06
Av Of 1/100 Highest 5.21 -0.74 -3.55 5.24 -0.75 4.98 69.22 -0.74 -4.44 69.25 -0.75
Av Of 1/100 Lowest 1.07 -1.12 -4.81 1.16 -1.12 3.73 65.07 -1.12 -4.94 65.17 -1.12
Av Of 1/1000 Highest 5.21 -0.74 -3.54 5.24 -0.75 4.99 69.22 -0.74 -4.44 69.25 -0.75
Av Of 1/1000 Lowest 1.07 -1.12 -4.81 1.16 -1.12 3.72 65.07 -1.12 -4.95 65.17 -1.12
Maximum 5.21 -0.74 -3.54 5.24 -0.75 4.99 69.22 -0.74 -4.44 69.25 -0.75
Minimum 1.07 -1.12 -4.81 1.16 -1.12 3.72 65.07 -1.12 -4.95 65.17 -1.12
Pred. Max 5.63 -0.70 -3.41 5.66 -0.70 5.12 69.64 -0.70 -4.39 69.67 -0.70
Pred. Min 0.64 -1.18 -4.93 0.73 -1.18 3.60 64.65 -1.18 -5.00 64.73 -1.18

Av Of 1/3 H-Mean 1.38 0.13 0.40 1.44 0.14 0.40 1.38 0.13 0.17 1.45 0.13
Av Of 1/3 L-Mean -1.44 -0.17 -0.40 -1.44 -0.16 -0.40 -1.44 -0.17 -0.17 -1.45 -0.16
Av Of 1/100 H-Mean 2.04 0.16 0.63 2.00 0.16 0.63 2.05 0.16 0.25 2.00 0.16
Av Of 1/100 L-Mean -2.10 -0.22 -0.62 -2.07 -0.21 -0.62 -2.10 -0.22 -0.25 -2.07 -0.22
Av Of 1/1000 H-Mean 2.04 0.16 0.65 2.00 0.16 0.65 2.05 0.16 0.25 2.00 0.16
Av Of 1/1000 L-Mean -2.10 -0.22 -0.62 -2.07 -0.21 -0.62 -2.10 -0.22 -0.26 -2.07 -0.22
Maximum - Mean 2.04 0.16 0.65 2.00 0.16 0.65 2.05 0.16 0.25 2.00 0.16
Minimum - Mean -2.10 -0.22 -0.62 -2.07 -0.21 -0.62 -2.10 -0.22 -0.26 -2.07 -0.22
Pred. Max-Mean 2.46 0.20 0.77 2.43 0.20 0.77 2.46 0.20 0.30 2.43 0.20
Pred. Min-Mean -2.53 -0.28 -0.74 -2.51 -0.28 -0.74 -2.53 -0.28 -0.31 -2.51 -0.28

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.84 131.18 -0.90 -5.19 131.25 -0.90 3.34


Variance 0.01 0.81 0.01 0.01 0.81 0.01 0.01
Root Mean Square 3.85 131.18 0.91 5.19 131.25 0.91 3.34
Std. Deviation 0.08 0.90 0.08 0.11 0.90 0.08 0.11
Skewness 0.01 -0.05 -0.23 0.00 -0.05 -0.23 0.00
Kurtosis -0.23 -0.91 -0.65 -0.15 -0.92 -0.65 -0.15

Number of Peaks 269 203 43 263 163 29 263

Av Of 1/3 Highest 4.01 132.56 -0.78 -4.97 132.69 -0.76 3.57


Av Of 1/3 Lowest 3.68 129.74 -1.07 -5.42 129.81 -1.06 3.11
Av Of 1/100 Highest 4.09 133.17 -0.74 -4.87 133.25 -0.75 3.67
Av Of 1/100 Lowest 3.59 129.13 -1.12 -5.53 129.17 -1.12 3.00
Av Of 1/1000 Highest 4.10 133.23 -0.74 -4.86 133.25 -0.75 3.67
Av Of 1/1000 Lowest 3.58 129.08 -1.12 -5.55 129.17 -1.12 2.99
Maximum 4.10 133.23 -0.74 -4.86 133.25 -0.75 3.67
Minimum 3.58 129.08 -1.12 -5.55 129.17 -1.12 2.99
Pred. Max 4.15 133.64 -0.70 -4.80 133.68 -0.70 3.73
Pred. Min 3.53 128.65 -1.18 -5.62 128.73 -1.19 2.92

Av Of 1/3 H-Mean 0.17 1.38 0.12 0.23 1.44 0.14 0.23


Av Of 1/3 L-Mean -0.17 -1.44 -0.16 -0.23 -1.44 -0.16 -0.23
Av Of 1/100 H-Mean 0.25 1.99 0.16 0.33 2.01 0.16 0.33
Av Of 1/100 L-Mean -0.25 -2.05 -0.22 -0.34 -2.08 -0.22 -0.34
Av Of 1/1000 H-Mean 0.25 2.05 0.16 0.33 2.01 0.16 0.33
Av Of 1/1000 L-Mean -0.26 -2.10 -0.22 -0.36 -2.08 -0.22 -0.36
Maximum - Mean 0.25 2.05 0.16 0.33 2.01 0.16 0.33
Minimum - Mean -0.26 -2.10 -0.22 -0.36 -2.08 -0.22 -0.36
Pred. Max-Mean 0.30 2.46 0.20 0.39 2.43 0.21 0.39
Pred. Min-Mean -0.31 -2.53 -0.28 -0.43 -2.51 -0.28 -0.43
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 180 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA180

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 180.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 180.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 180.0


22.8 0.60 180.0
45.6 0.20 180.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -73 -24 -10 0 0 0 79


BM3P DB30 -24 -40 -7 0 0 0 49
BM3S DB30 -35 61 -9 0 0 0 72
BM4P DB30 8 -12 -4 0 0 0 16
BM4S DB30 13 23 -5 0 0 0 27
BM5P DB30 10 -6 -3 0 0 0 13
BM5S DB30 12 3 -3 0 0 0 13
MAINLN DB30 16 0 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.4 -3.8 -24740.5 34 1663748 -253


Buoyancy -202.0 3.9 25856.5 -184 -1830783 278
Wind 18.0 0.0 0.0 0 350 34
Drag 18.2 0.0 4.8 0 -50 0
Wave 48.6 0.0 41.3 0 -2841 2
Flex. Connectors -76.2 -0.2 -1162.2 152 169590 -802
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 10 -742

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -6.7 -0.2 -1114.3 0 166263 -28


Wind 7.0 0.2 -0.1 0 28 15
Flex. Connectors -0.2 0.0 1114.4 0 -166301 0
======= ======= ======= ======= ======= =======
Total 0.1 0.0 0.1 0 -10 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1002.93 1001.58 264.86 79.10 0.2955 76.20 0.00


BM3P 1000.99 1001.57 424.68 48.84 0.1842 44.59 0.00
BM3S 1002.50 1001.57 301.34 71.77 0.2747 68.56 0.00
BM4P 997.49 1001.50 674.70 16.12 0.0583 9.77 0.00
BM4S 999.06 1001.50 577.40 26.93 0.1020 21.39 0.00
BM5P 996.72 1001.47 710.83 12.82 0.0488 6.16 0.00
BM5S 996.86 1001.46 703.80 13.44 0.0488 6.84 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM2S DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 3.25 -0.90 -4.20 0.01 0.45 0.00


N Force -0.03 0.00 -0.09 0 10 -742

WHPBJKT Location 4.45 0.97 21.04 0.01 -0.35 -0.72


N Force 0.07 0.00 0.08 0 -10 -15
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (MOORING TENSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 81.14 0.00 49.56 73.14 15.91 26.81 12.72 13.42


Variance 139.67 0.00 22.77 49.38 4.49 8.62 5.72 8.76
Root Mean Square 82.00 0.00 49.79 73.48 16.05 26.97 12.94 13.74
Std. Deviation 11.82 0.00 4.77 7.03 2.12 2.94 2.39 2.96
Skewness 0.03 0.00 -0.02 0.06 0.48 0.45 0.75 0.88
Kurtosis -0.27 0.00 -0.31 -0.20 0.20 0.05 0.63 0.98

Number of Peaks 144 0 130 128 138 145 136 141

Av Of 1/3 Highest 99.19 0.00 57.37 83.96 19.06 31.04 16.75 18.54
Av Of 1/3 Lowest 63.22 0.00 42.96 63.30 12.85 22.51 9.50 9.53
Av Of 1/100 Highest 110.13 0.00 61.20 91.04 22.18 36.07 20.48 23.96
Av Of 1/100 Lowest 51.64 0.00 37.22 56.32 11.49 20.59 8.18 8.21
Av Of 1/1000 Highest 110.13 0.00 61.20 91.04 22.18 36.07 20.48 23.96
Av Of 1/1000 Lowest 51.64 0.00 37.22 56.32 11.49 20.59 8.18 8.21
Maximum 110.13 0.00 61.20 91.04 22.18 36.07 20.48 23.96
Minimum 51.64 0.00 37.22 56.32 11.49 20.59 8.18 8.21
Pred. Max 116.39 0.00 63.76 94.99 23.54 38.07 22.18 26.24
Pred. Min 45.27 0.00 34.50 52.60 10.52 19.25 7.18 7.08

Av Of 1/3 H-Mean 18.05 0.00 7.81 10.81 3.15 4.23 4.03 5.13
Av Of 1/3 L-Mean -17.92 0.00 -6.60 -9.84 -3.06 -4.30 -3.22 -3.88
Av Of 1/100 H-Mean 28.99 0.00 11.64 17.90 6.27 9.26 7.77 10.54
Av Of 1/100 L-Mean -29.50 0.00 -12.34 -16.82 -4.42 -6.22 -4.54 -5.20
Av Of 1/1000 H-Mean 28.99 0.00 11.64 17.90 6.27 9.26 7.77 10.54
Av Of 1/1000 L-Mean -29.50 0.00 -12.34 -16.82 -4.42 -6.22 -4.54 -5.20
Maximum - Mean 28.99 0.00 11.64 17.90 6.27 9.26 7.77 10.54
Minimum - Mean -29.50 0.00 -12.34 -16.82 -4.42 -6.22 -4.54 -5.20
Pred. Max-Mean 35.25 0.00 14.21 21.85 7.63 11.26 9.46 12.83
Pred. Min-Mean -35.87 0.00 -15.05 -20.54 -5.39 -7.56 -5.53 -6.33

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 3.37 -0.92 -4.20


Variance 0.56 0.01 0.12
Root Mean Square 3.45 0.92 4.21
Std. Deviation 0.75 0.08 0.35
Skewness -0.10 -0.15 0.03
Kurtosis -0.18 -0.19 -0.12

Number of Peaks 209 77 232

Av Of 1/3 Highest 4.44 -0.79 -3.49


Av Of 1/3 Lowest 2.21 -1.06 -4.90
Av Of 1/100 Highest 5.10 -0.74 -3.14
Av Of 1/100 Lowest 1.31 -1.14 -5.23
Av Of 1/1000 Highest 5.18 -0.74 -3.14
Av Of 1/1000 Lowest 1.29 -1.14 -5.29
Maximum 5.18 -0.74 -3.14
Minimum 1.29 -1.14 -5.29
Pred. Max 5.55 -0.70 -2.93
Pred. Min 0.87 -1.19 -5.50

Av Of 1/3 H-Mean 1.08 0.13 0.71


Av Of 1/3 L-Mean -1.15 -0.14 -0.70
Av Of 1/100 H-Mean 1.73 0.18 1.05
Av Of 1/100 L-Mean -2.06 -0.22 -1.03
Av Of 1/1000 H-Mean 1.82 0.18 1.06
Av Of 1/1000 L-Mean -2.08 -0.22 -1.09
Maximum - Mean 1.82 0.18 1.06
Minimum - Mean -2.08 -0.22 -1.09
Pred. Max-Mean 2.18 0.22 1.27
Pred. Min-Mean -2.50 -0.27 -1.30
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.37 -0.92 -4.20 3.43 -0.92 4.33 67.37 -0.93 -4.70 67.44 -0.93
Variance 0.56 0.01 0.12 0.56 0.01 0.12 0.56 0.01 0.00 0.56 0.01
Root Mean Square 3.45 0.92 4.21 3.51 0.93 4.35 67.38 0.93 4.70 67.44 0.93
Std. Deviation 0.75 0.08 0.35 0.75 0.08 0.35 0.75 0.08 0.05 0.75 0.08
Skewness -0.10 -0.15 0.03 -0.10 -0.15 0.03 -0.10 -0.17 0.03 -0.10 -0.17
Kurtosis -0.18 -0.19 -0.12 -0.19 -0.19 -0.12 -0.18 -0.18 -0.19 -0.19 -0.18

Number of Peaks 209 77 232 163 35 231 211 77 243 163 35

Av Of 1/3 Highest 4.44 -0.79 -3.49 4.51 -0.78 5.04 68.47 -0.79 -4.59 68.51 -0.79
Av Of 1/3 Lowest 2.21 -1.06 -4.90 2.30 -1.05 3.63 66.23 -1.07 -4.81 66.30 -1.06
Av Of 1/100 Highest 5.10 -0.74 -3.14 5.21 -0.75 5.39 69.15 -0.75 -4.54 69.22 -0.75
Av Of 1/100 Lowest 1.31 -1.14 -5.23 1.42 -1.14 3.31 65.31 -1.14 -4.86 65.42 -1.15
Av Of 1/1000 Highest 5.18 -0.74 -3.14 5.21 -0.75 5.39 69.19 -0.75 -4.53 69.22 -0.75
Av Of 1/1000 Lowest 1.29 -1.14 -5.29 1.42 -1.14 3.25 65.29 -1.14 -4.87 65.42 -1.15
Maximum 5.18 -0.74 -3.14 5.21 -0.75 5.39 69.19 -0.75 -4.53 69.22 -0.75
Minimum 1.29 -1.14 -5.29 1.42 -1.14 3.25 65.29 -1.14 -4.87 65.42 -1.15
Pred. Max 5.55 -0.70 -2.93 5.59 -0.70 5.60 69.56 -0.71 -4.50 69.60 -0.70
Pred. Min 0.87 -1.19 -5.50 1.00 -1.20 3.03 64.87 -1.20 -4.90 65.00 -1.21

Av Of 1/3 H-Mean 1.08 0.13 0.71 1.07 0.14 0.70 1.09 0.13 0.11 1.07 0.14
Av Of 1/3 L-Mean -1.15 -0.14 -0.70 -1.14 -0.13 -0.70 -1.14 -0.14 -0.11 -1.14 -0.13
Av Of 1/100 H-Mean 1.73 0.18 1.05 1.78 0.18 1.05 1.77 0.18 0.16 1.78 0.18
Av Of 1/100 L-Mean -2.06 -0.22 -1.03 -2.01 -0.22 -1.03 -2.06 -0.22 -0.16 -2.02 -0.22
Av Of 1/1000 H-Mean 1.82 0.18 1.06 1.78 0.18 1.06 1.82 0.18 0.17 1.78 0.18
Av Of 1/1000 L-Mean -2.08 -0.22 -1.09 -2.01 -0.22 -1.09 -2.08 -0.22 -0.17 -2.02 -0.22
Maximum - Mean 1.82 0.18 1.06 1.78 0.18 1.06 1.82 0.18 0.17 1.78 0.18
Minimum - Mean -2.08 -0.22 -1.09 -2.01 -0.22 -1.09 -2.08 -0.22 -0.17 -2.02 -0.22
Pred. Max-Mean 2.18 0.22 1.27 2.15 0.23 1.27 2.18 0.22 0.20 2.16 0.23
Pred. Min-Mean -2.50 -0.27 -1.30 -2.44 -0.28 -1.30 -2.50 -0.27 -0.20 -2.44 -0.28

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=180deg (BARGE EXCURSION-BM2S DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 131.38 -0.93 -5.20 131.44 -0.93 3.33


Variance 0.00 0.56 0.01 0.06 0.56 0.01 0.06
Root Mean Square 3.83 131.38 0.94 5.21 131.45 0.94 3.34
Std. Deviation 0.05 0.75 0.08 0.25 0.75 0.08 0.25
Skewness 0.02 -0.10 -0.18 -0.03 -0.10 -0.18 -0.03
Kurtosis -0.19 -0.18 -0.15 -0.12 -0.19 -0.15 -0.12

Number of Peaks 245 209 77 230 167 35 230

Av Of 1/3 Highest 3.94 132.46 -0.80 -4.69 132.55 -0.79 3.84


Av Of 1/3 Lowest 3.73 130.22 -1.07 -5.71 130.30 -1.06 2.82
Av Of 1/100 Highest 3.99 133.15 -0.75 -4.46 133.23 -0.75 4.07
Av Of 1/100 Lowest 3.67 129.31 -1.15 -5.97 129.42 -1.15 2.57
Av Of 1/1000 Highest 4.00 133.20 -0.75 -4.45 133.23 -0.75 4.08
Av Of 1/1000 Lowest 3.67 129.29 -1.15 -5.97 129.42 -1.15 2.56
Maximum 4.00 133.20 -0.75 -4.45 133.23 -0.75 4.08
Minimum 3.67 129.29 -1.15 -5.97 129.42 -1.15 2.56
Pred. Max 4.03 133.57 -0.70 -4.30 133.60 -0.70 4.23
Pred. Min 3.63 128.87 -1.21 -6.12 129.00 -1.22 2.41

Av Of 1/3 H-Mean 0.11 1.08 0.13 0.51 1.11 0.14 0.51


Av Of 1/3 L-Mean -0.10 -1.16 -0.14 -0.51 -1.14 -0.13 -0.51
Av Of 1/100 H-Mean 0.16 1.78 0.18 0.74 1.78 0.18 0.74
Av Of 1/100 L-Mean -0.16 -2.07 -0.22 -0.76 -2.02 -0.22 -0.76
Av Of 1/1000 H-Mean 0.17 1.82 0.18 0.75 1.78 0.18 0.75
Av Of 1/1000 L-Mean -0.17 -2.09 -0.22 -0.76 -2.02 -0.22 -0.77
Maximum - Mean 0.17 1.82 0.18 0.75 1.78 0.18 0.75
Minimum - Mean -0.17 -2.09 -0.22 -0.76 -2.02 -0.22 -0.77
Pred. Max-Mean 0.20 2.19 0.23 0.90 2.16 0.23 0.90
Pred. Min-Mean -0.20 -2.51 -0.27 -0.92 -2.45 -0.28 -0.92
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -79 -27 -10 0 0 0 85


BM2S DB30 -44 13 -7 0 0 0 47
BM3S DB30 -7 14 -4 0 0 0 17
BM4P DB30 34 -59 -8 0 0 0 70
BM4S DB30 4 7 -2 0 0 0 9
BM5P DB30 35 -27 -7 0 0 0 46
BM5S DB30 13 3 -3 0 0 0 14
MAINLN DB30 12 4 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 195.9 7.2 -24740.5 -64 1663770 486


Buoyancy -204.8 -7.6 25872.2 355 -1832639 -532
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.2 3.4 -149 -37 2463
Wave 22.0 22.2 30.9 -52 -1789 1564
Flex. Connectors -33.8 -73.5 -1163.7 369 170311 -8138
======= ======= ======= ======= ======= =======
Total 4.9 8.8 2.3 43 -139 -2499

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -3.3 -4.1 -1114.3 7 166270 -609


Wind 5.0 5.9 -0.2 -13 46 872
Flex. Connectors 0.1 0.3 1114.7 -11 -166342 45
======= ======= ======= ======= ======= =======
Total 1.7 2.1 0.3 -18 -26 306
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1003.29 1001.58 236.31 85.34 0.3188 82.67 0.00


BM2S 1000.88 1001.58 432.34 47.29 0.1742 42.98 0.00
BM3S 997.66 1001.57 661.85 17.16 0.0657 10.91 0.00
BM4P 1002.34 1001.50 316.92 69.70 0.2518 66.36 0.00
BM4S 995.51 1001.50 759.37 9.00 0.0341 1.94 0.00
BM5P 1000.73 1001.47 446.60 45.77 0.1741 41.34 0.00
BM5S 996.94 1001.46 699.56 13.81 0.0502 7.26 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.96 3.94 -4.20 -0.02 0.45 0.00


N Force 4.90 8.76 2.26 43 -139 -2499

WHPBJKT Location 2.93 4.53 21.48 0.21 -0.17 -0.12


N Force 1.75 2.11 0.27 -18 -26 306
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 96.96 49.77 0.00 14.84 77.80 7.36 48.26 11.75


Variance 77.22 36.26 0.00 1.44 21.69 0.37 24.05 2.61
Root Mean Square 97.36 50.13 0.00 14.89 77.94 7.39 48.50 11.86
Std. Deviation 8.79 6.02 0.00 1.20 4.66 0.61 4.90 1.62
Skewness 0.27 0.15 0.00 -0.03 0.23 -0.20 0.26 0.16
Kurtosis -0.57 -0.76 0.00 -0.52 -0.59 -0.27 -0.71 -0.61

Number of Peaks 86 86 0 106 85 135 83 96

Av Of 1/3 Highest 112.99 60.25 0.00 16.86 86.56 8.26 57.69 14.74
Av Of 1/3 Lowest 83.14 39.44 0.00 12.69 70.32 6.52 40.50 9.27
Av Of 1/100 Highest 120.48 64.05 0.00 17.62 89.87 8.46 60.85 15.64
Av Of 1/100 Lowest 79.68 37.59 0.00 11.86 68.53 5.72 38.94 8.28
Av Of 1/1000 Highest 120.48 64.05 0.00 17.62 89.87 8.46 60.85 15.64
Av Of 1/1000 Lowest 79.68 37.59 0.00 11.86 68.53 5.72 38.94 8.28
Maximum 120.48 64.05 0.00 17.62 89.87 9.00 60.85 15.64
Minimum 79.68 37.59 0.00 11.86 68.53 5.72 38.94 8.28
Pred. Max 126.09 67.46 0.00 18.26 92.76 9.36 63.88 16.54
Pred. Min 75.55 34.68 0.00 11.18 66.31 5.37 36.70 7.48

Av Of 1/3 H-Mean 16.02 10.48 0.00 2.02 8.76 0.90 9.44 2.99
Av Of 1/3 L-Mean -13.82 -10.33 0.00 -2.15 -7.48 -0.84 -7.76 -2.48
Av Of 1/100 H-Mean 23.51 14.28 0.00 2.78 12.07 1.10 12.60 3.89
Av Of 1/100 L-Mean -17.29 -12.18 0.00 -2.98 -9.27 -1.64 -9.32 -3.46
Av Of 1/1000 H-Mean 23.51 14.28 0.00 2.78 12.07 1.10 12.60 3.89
Av Of 1/1000 L-Mean -17.29 -12.18 0.00 -2.98 -9.27 -1.64 -9.32 -3.46
Maximum - Mean 23.51 14.28 0.00 2.78 12.07 1.64 12.60 3.89
Minimum - Mean -17.29 -12.18 0.00 -2.98 -9.27 -1.64 -9.32 -3.46
Pred. Max-Mean 29.13 17.69 0.00 3.42 14.96 2.00 15.62 4.80
Pred. Min-Mean -21.41 -15.09 0.00 -3.66 -11.49 -1.99 -11.56 -4.27

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.36 4.74 -4.20


Variance 0.22 0.07 0.00
Root Mean Square 2.41 4.74 4.20
Std. Deviation 0.47 0.26 0.03
Skewness 0.13 -0.08 0.08
Kurtosis -0.73 -0.41 0.00

Number of Peaks 78 108 330

Av Of 1/3 Highest 3.24 5.14 -4.12


Av Of 1/3 Lowest 1.59 4.40 -4.27
Av Of 1/100 Highest 3.52 5.29 -4.08
Av Of 1/100 Lowest 1.39 4.19 -4.29
Av Of 1/1000 Highest 3.52 5.29 -4.07
Av Of 1/1000 Lowest 1.39 4.19 -4.30
Maximum 3.52 5.29 -4.07
Minimum 1.39 3.94 -4.30
Pred. Max 3.80 5.42 -4.05
Pred. Min 1.15 3.76 -4.32

Av Of 1/3 H-Mean 0.87 0.40 0.07


Av Of 1/3 L-Mean -0.78 -0.33 -0.07
Av Of 1/100 H-Mean 1.16 0.56 0.12
Av Of 1/100 L-Mean -0.97 -0.55 -0.10
Av Of 1/1000 H-Mean 1.16 0.56 0.12
Av Of 1/1000 L-Mean -0.97 -0.55 -0.10
Maximum - Mean 1.16 0.56 0.12
Minimum - Mean -0.97 -0.79 -0.10
Pred. Max-Mean 1.44 0.68 0.15
Pred. Min-Mean -1.21 -0.98 -0.12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.36 4.74 -4.20 2.43 4.74 4.34 66.37 4.73 -4.70 66.44 4.73
Variance 0.22 0.07 0.00 0.22 0.07 0.00 0.22 0.07 0.00 0.22 0.07
Root Mean Square 2.41 4.74 4.20 2.48 4.75 4.34 66.37 4.74 4.70 66.44 4.74
Std. Deviation 0.47 0.26 0.03 0.47 0.26 0.03 0.47 0.26 0.01 0.47 0.26
Skewness 0.13 -0.08 0.08 0.13 -0.08 0.08 0.13 -0.08 0.01 0.13 -0.08
Kurtosis -0.73 -0.41 0.00 -0.72 -0.40 0.00 -0.73 -0.43 -0.08 -0.72 -0.43

Number of Peaks 78 108 330 84 45 330 77 107 322 83 44

Av Of 1/3 Highest 3.24 5.14 -4.12 3.25 5.13 4.41 67.21 5.12 -4.69 67.25 5.13
Av Of 1/3 Lowest 1.59 4.40 -4.27 1.64 4.33 4.27 65.59 4.39 -4.72 65.65 4.33
Av Of 1/100 Highest 3.52 5.29 -4.08 3.60 5.29 4.46 67.38 5.28 -4.68 67.60 5.28
Av Of 1/100 Lowest 1.39 4.19 -4.29 1.45 4.20 4.24 65.40 4.19 -4.73 65.46 4.20
Av Of 1/1000 Highest 3.52 5.29 -4.07 3.60 5.29 4.46 67.38 5.28 -4.68 67.60 5.28
Av Of 1/1000 Lowest 1.39 4.19 -4.30 1.45 4.20 4.24 65.40 4.19 -4.73 65.46 4.20
Maximum 3.52 5.29 -4.07 3.60 5.29 4.46 67.53 5.28 -4.68 67.60 5.28
Minimum 1.39 3.94 -4.30 1.45 3.94 4.24 65.40 3.94 -4.73 65.46 3.94
Pred. Max 3.80 5.42 -4.05 3.87 5.44 4.48 67.81 5.41 -4.67 67.88 5.43
Pred. Min 1.15 3.76 -4.32 1.22 3.73 4.22 65.16 3.76 -4.74 65.22 3.73

Av Of 1/3 H-Mean 0.87 0.40 0.07 0.82 0.40 0.07 0.84 0.39 0.02 0.82 0.39
Av Of 1/3 L-Mean -0.78 -0.33 -0.07 -0.79 -0.40 -0.07 -0.78 -0.34 -0.02 -0.79 -0.40
Av Of 1/100 H-Mean 1.16 0.56 0.12 1.16 0.55 0.12 1.01 0.55 0.03 1.16 0.55
Av Of 1/100 L-Mean -0.97 -0.55 -0.10 -0.98 -0.53 -0.10 -0.97 -0.54 -0.03 -0.98 -0.53
Av Of 1/1000 H-Mean 1.16 0.56 0.12 1.16 0.55 0.12 1.01 0.55 0.03 1.16 0.55
Av Of 1/1000 L-Mean -0.97 -0.55 -0.10 -0.98 -0.53 -0.10 -0.97 -0.54 -0.03 -0.98 -0.53
Maximum - Mean 1.16 0.56 0.12 1.16 0.55 0.12 1.16 0.55 0.03 1.16 0.55
Minimum - Mean -0.97 -0.79 -0.10 -0.98 -0.79 -0.10 -0.97 -0.79 -0.03 -0.98 -0.79
Pred. Max-Mean 1.44 0.68 0.15 1.44 0.70 0.15 1.44 0.68 0.03 1.44 0.70
Pred. Min-Mean -1.21 -0.98 -0.12 -1.21 -1.01 -0.12 -1.21 -0.97 -0.03 -1.21 -1.01

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.38 4.72 -5.21 130.44 4.73 3.32


Variance 0.00 0.22 0.07 0.00 0.22 0.07 0.00
Root Mean Square 3.83 130.38 4.73 5.21 130.44 4.73 3.32
Std. Deviation 0.01 0.47 0.26 0.04 0.47 0.26 0.04
Skewness 0.00 0.13 -0.07 -0.05 0.13 -0.07 -0.05
Kurtosis -0.08 -0.73 -0.45 -0.11 -0.72 -0.45 -0.11

Number of Peaks 322 78 109 322 82 41 322

Av Of 1/3 Highest 3.85 131.25 5.12 -5.13 131.26 5.14 3.40


Av Of 1/3 Lowest 3.81 129.60 4.39 -5.29 129.65 4.34 3.24
Av Of 1/100 Highest 3.86 131.53 5.27 -5.10 131.61 5.27 3.44
Av Of 1/100 Lowest 3.81 129.40 4.19 -5.34 129.47 4.20 3.19
Av Of 1/1000 Highest 3.86 131.53 5.27 -5.09 131.61 5.27 3.44
Av Of 1/1000 Lowest 3.80 129.40 4.19 -5.34 129.47 4.20 3.19
Maximum 3.86 131.53 5.27 -5.09 131.61 5.27 3.44
Minimum 3.80 129.40 3.94 -5.34 129.47 3.94 3.19
Pred. Max 3.86 131.82 5.40 -5.07 131.89 5.42 3.46
Pred. Min 3.80 129.17 3.76 -5.37 129.23 3.72 3.17

Av Of 1/3 H-Mean 0.02 0.87 0.39 0.08 0.82 0.41 0.08


Av Of 1/3 L-Mean -0.02 -0.78 -0.33 -0.08 -0.79 -0.38 -0.08
Av Of 1/100 H-Mean 0.03 1.16 0.55 0.12 1.16 0.54 0.12
Av Of 1/100 L-Mean -0.03 -0.97 -0.54 -0.13 -0.98 -0.52 -0.13
Av Of 1/1000 H-Mean 0.03 1.16 0.55 0.12 1.16 0.54 0.12
Av Of 1/1000 L-Mean -0.03 -0.97 -0.54 -0.13 -0.98 -0.52 -0.13
Maximum - Mean 0.03 1.16 0.55 0.12 1.16 0.54 0.12
Minimum - Mean -0.03 -0.97 -0.78 -0.13 -0.98 -0.78 -0.13
Pred. Max-Mean 0.03 1.44 0.67 0.14 1.44 0.69 0.14
Pred. Min-Mean -0.03 -1.21 -0.96 -0.16 -1.21 -1.00 -0.16
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -83 -28 -11 0 0 0 89


BM2S DB30 -45 14 -7 0 0 0 48
BM3S DB30 -7 14 -4 0 0 0 16
BM4P DB30 35 -61 -9 0 0 0 72
BM4S DB30 4 7 -2 0 0 0 8
BM5P DB30 36 -27 -7 0 0 0 46
BM5S DB30 12 3 -3 0 0 0 13
MAINLN DB30 12 4 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 195.6 3.4 -24740.5 -30 1663767 230


Buoyancy -204.4 -3.6 25869.1 168 -1832328 -251
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.2 3.4 -149 -36 2463
Wave 25.6 25.9 33.9 58 -2058 1948
Flex. Connectors -38.0 -78.4 -1163.8 424 170259 -8531
======= ======= ======= ======= ======= =======
Total 4.4 7.7 2.1 58 -150 -2483

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -3.4 -4.2 -1114.3 8 166270 -626


Wind 5.0 5.9 -0.2 -13 46 872
Flex. Connectors 0.1 0.3 1114.6 -11 -166325 43
======= ======= ======= ======= ======= =======
Total 1.6 2.0 0.2 -17 -9 287
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1003.52 1001.58 218.21 89.41 0.3340 86.89 0.00


BM2S 1000.95 1001.58 425.94 48.39 0.1783 44.13 0.00
BM3S 997.52 1001.57 669.65 16.37 0.0627 10.05 0.00
BM4P 1002.48 1001.50 305.63 71.99 0.2601 68.75 0.00
BM4S 995.21 1001.50 768.94 8.32 0.0315 1.29 0.00
BM5P 1000.76 1001.47 444.02 46.21 0.1758 41.80 0.00
BM5S 996.73 1001.46 709.99 12.87 0.0468 6.22 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.12 4.19 -4.20 -0.01 0.45 0.00


N Force 4.36 7.71 2.10 58 -150 -2483

WHPBJKT Location 3.09 4.79 21.47 0.22 -0.18 -0.13


N Force 1.64 1.99 0.16 -17 -9 287
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 100.08 50.71 0.00 14.39 78.96 7.06 48.24 11.21


Variance 81.49 33.36 0.00 1.42 22.84 0.46 21.45 2.28
Root Mean Square 100.49 51.03 0.00 14.44 79.11 7.09 48.46 11.31
Std. Deviation 9.03 5.78 0.00 1.19 4.78 0.68 4.63 1.51
Skewness 0.38 0.09 0.00 -0.25 0.37 -0.42 0.45 0.08
Kurtosis -0.42 -0.56 0.00 -0.40 -0.46 -0.50 -0.37 -0.45

Number of Peaks 164 210 0 231 205 164 212 160

Av Of 1/3 Highest 114.31 60.47 0.00 16.18 86.79 8.06 56.69 13.85
Av Of 1/3 Lowest 86.19 41.33 0.00 12.37 71.94 5.96 42.01 8.95
Av Of 1/100 Highest 124.21 64.19 0.00 17.07 91.54 8.30 60.54 15.36
Av Of 1/100 Lowest 80.26 37.59 0.00 11.49 69.61 5.44 38.99 8.02
Av Of 1/1000 Highest 124.21 64.53 0.00 17.23 92.34 8.30 60.75 15.36
Av Of 1/1000 Lowest 80.26 37.00 0.00 11.37 69.22 5.44 38.72 8.02
Maximum 124.21 64.53 0.00 17.23 92.34 8.32 60.75 15.36
Minimum 80.26 37.00 0.00 11.37 69.22 5.44 38.72 8.02
Pred. Max 129.30 67.32 0.00 17.79 95.06 8.58 63.28 16.24
Pred. Min 76.08 34.23 0.00 10.77 67.25 5.10 36.80 7.34

Av Of 1/3 H-Mean 14.23 9.76 0.00 1.79 7.83 1.00 8.45 2.63
Av Of 1/3 L-Mean -13.89 -9.37 0.00 -2.01 -7.02 -1.10 -6.24 -2.26
Av Of 1/100 H-Mean 24.13 13.48 0.00 2.68 12.58 1.24 12.30 4.15
Av Of 1/100 L-Mean -19.82 -13.12 0.00 -2.89 -9.36 -1.62 -9.25 -3.20
Av Of 1/1000 H-Mean 24.13 13.82 0.00 2.84 13.38 1.24 12.51 4.15
Av Of 1/1000 L-Mean -19.82 -13.70 0.00 -3.01 -9.74 -1.62 -9.52 -3.20
Maximum - Mean 24.13 13.82 0.00 2.84 13.38 1.25 12.51 4.15
Minimum - Mean -19.82 -13.70 0.00 -3.01 -9.74 -1.62 -9.52 -3.20
Pred. Max-Mean 29.22 16.62 0.00 3.41 16.10 1.52 15.04 5.03
Pred. Min-Mean -24.01 -16.47 0.00 -3.61 -11.72 -1.97 -11.44 -3.87

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.49 4.94 -4.20


Variance 0.21 0.11 0.00
Root Mean Square 2.53 4.95 4.20
Std. Deviation 0.46 0.33 0.06
Skewness 0.15 0.33 0.01
Kurtosis -0.53 -0.62 -0.22

Number of Peaks 191 247 287

Av Of 1/3 Highest 3.23 5.49 -4.07


Av Of 1/3 Lowest 1.74 4.52 -4.32
Av Of 1/100 Highest 3.61 5.72 -4.00
Av Of 1/100 Lowest 1.34 4.33 -4.38
Av Of 1/1000 Highest 3.61 5.72 -3.99
Av Of 1/1000 Lowest 1.34 4.30 -4.38
Maximum 3.61 5.72 -3.99
Minimum 1.34 4.19 -4.38
Pred. Max 3.84 5.88 -3.95
Pred. Min 1.11 4.05 -4.42

Av Of 1/3 H-Mean 0.75 0.55 0.13


Av Of 1/3 L-Mean -0.74 -0.42 -0.13
Av Of 1/100 H-Mean 1.13 0.78 0.19
Av Of 1/100 L-Mean -1.14 -0.61 -0.19
Av Of 1/1000 H-Mean 1.13 0.78 0.21
Av Of 1/1000 L-Mean -1.14 -0.63 -0.19
Maximum - Mean 1.13 0.78 0.21
Minimum - Mean -1.14 -0.74 -0.19
Pred. Max-Mean 1.36 0.94 0.25
Pred. Min-Mean -1.37 -0.89 -0.22
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.49 4.94 -4.20 2.55 4.94 4.34 66.49 4.90 -4.70 66.56 4.90
Variance 0.21 0.11 0.00 0.21 0.11 0.00 0.21 0.10 0.00 0.21 0.10
Root Mean Square 2.53 4.95 4.20 2.59 4.95 4.34 66.49 4.91 4.70 66.56 4.91
Std. Deviation 0.46 0.33 0.06 0.46 0.32 0.06 0.46 0.32 0.03 0.46 0.32
Skewness 0.15 0.33 0.01 0.15 0.33 0.01 0.15 0.33 0.00 0.15 0.33
Kurtosis -0.53 -0.62 -0.22 -0.54 -0.65 -0.22 -0.53 -0.63 -0.24 -0.54 -0.65

Number of Peaks 191 247 287 191 129 287 190 246 287 191 127

Av Of 1/3 Highest 3.23 5.49 -4.07 3.30 5.53 4.47 67.24 5.45 -4.63 67.30 5.49
Av Of 1/3 Lowest 1.74 4.52 -4.32 1.81 4.47 4.21 65.75 4.48 -4.77 65.82 4.43
Av Of 1/100 Highest 3.61 5.72 -4.00 3.68 5.67 4.53 67.62 5.66 -4.60 67.69 5.61
Av Of 1/100 Lowest 1.34 4.33 -4.38 1.41 4.38 4.15 65.35 4.31 -4.80 65.42 4.31
Av Of 1/1000 Highest 3.61 5.72 -3.99 3.68 5.67 4.54 67.62 5.66 -4.59 67.69 5.61
Av Of 1/1000 Lowest 1.34 4.30 -4.38 1.41 4.38 4.15 65.35 4.30 -4.81 65.42 4.31
Maximum 3.61 5.72 -3.99 3.68 5.67 4.54 67.62 5.66 -4.59 67.69 5.61
Minimum 1.34 4.19 -4.38 1.41 4.19 4.15 65.35 4.19 -4.81 65.42 4.19
Pred. Max 3.84 5.88 -3.95 3.91 5.83 4.58 67.85 5.81 -4.57 67.92 5.77
Pred. Min 1.11 4.05 -4.42 1.18 4.03 4.11 65.12 4.05 -4.83 65.19 4.04

Av Of 1/3 H-Mean 0.75 0.55 0.13 0.75 0.59 0.13 0.75 0.55 0.07 0.75 0.59
Av Of 1/3 L-Mean -0.74 -0.42 -0.13 -0.74 -0.47 -0.13 -0.74 -0.42 -0.07 -0.74 -0.47
Av Of 1/100 H-Mean 1.13 0.78 0.19 1.13 0.73 0.19 1.13 0.76 0.10 1.13 0.71
Av Of 1/100 L-Mean -1.14 -0.61 -0.19 -1.14 -0.55 -0.19 -1.14 -0.59 -0.10 -1.14 -0.59
Av Of 1/1000 H-Mean 1.13 0.78 0.21 1.13 0.73 0.21 1.13 0.76 0.11 1.13 0.71
Av Of 1/1000 L-Mean -1.14 -0.63 -0.19 -1.14 -0.55 -0.19 -1.14 -0.60 -0.10 -1.14 -0.59
Maximum - Mean 1.13 0.78 0.21 1.13 0.73 0.21 1.13 0.76 0.11 1.13 0.71
Minimum - Mean -1.14 -0.74 -0.19 -1.14 -0.74 -0.19 -1.14 -0.71 -0.10 -1.14 -0.71
Pred. Max-Mean 1.36 0.94 0.25 1.36 0.90 0.25 1.36 0.91 0.13 1.36 0.87
Pred. Min-Mean -1.37 -0.89 -0.22 -1.37 -0.91 -0.22 -1.37 -0.85 -0.12 -1.37 -0.86

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.50 4.86 -5.21 130.56 4.86 3.32


Variance 0.00 0.21 0.10 0.00 0.21 0.10 0.00
Root Mean Square 3.83 130.50 4.87 5.21 130.57 4.87 3.32
Std. Deviation 0.03 0.46 0.32 0.01 0.46 0.32 0.01
Skewness 0.00 0.15 0.31 0.09 0.15 0.31 0.08
Kurtosis -0.24 -0.53 -0.62 0.22 -0.54 -0.64 0.23

Number of Peaks 287 191 247 289 191 127 289

Av Of 1/3 Highest 3.90 131.24 5.40 -5.19 131.31 5.46 3.34


Av Of 1/3 Lowest 3.76 129.75 4.45 -5.23 129.82 4.40 3.31
Av Of 1/100 Highest 3.94 131.62 5.60 -5.18 131.69 5.55 3.35
Av Of 1/100 Lowest 3.73 129.36 4.27 -5.24 129.43 4.24 3.30
Av Of 1/1000 Highest 3.94 131.62 5.60 -5.18 131.69 5.55 3.35
Av Of 1/1000 Lowest 3.73 129.36 4.25 -5.24 129.43 4.24 3.30
Maximum 3.94 131.62 5.60 -5.18 131.69 5.55 3.35
Minimum 3.73 129.36 4.19 -5.24 129.43 4.19 3.30
Pred. Max 3.96 131.86 5.74 -5.18 131.93 5.70 3.36
Pred. Min 3.71 129.12 4.06 -5.24 129.19 4.04 3.29

Av Of 1/3 H-Mean 0.07 0.75 0.54 0.02 0.75 0.60 0.02


Av Of 1/3 L-Mean -0.07 -0.74 -0.41 -0.02 -0.74 -0.47 -0.02
Av Of 1/100 H-Mean 0.10 1.13 0.73 0.03 1.13 0.69 0.03
Av Of 1/100 L-Mean -0.10 -1.14 -0.60 -0.02 -1.14 -0.62 -0.02
Av Of 1/1000 H-Mean 0.11 1.13 0.74 0.03 1.13 0.69 0.03
Av Of 1/1000 L-Mean -0.10 -1.14 -0.61 -0.03 -1.14 -0.62 -0.03
Maximum - Mean 0.11 1.13 0.74 0.03 1.13 0.69 0.03
Minimum - Mean -0.10 -1.14 -0.67 -0.03 -1.14 -0.67 -0.03
Pred. Max-Mean 0.13 1.36 0.88 0.03 1.36 0.84 0.03
Pred. Min-Mean -0.12 -1.37 -0.80 -0.03 -1.37 -0.82 -0.03
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -87 -30 -11 0 0 0 94


BM2S DB30 -46 14 -8 0 0 0 50
BM3S DB30 -7 13 -4 0 0 0 16
BM4P DB30 37 -63 -9 0 0 0 74
BM4S DB30 4 6 -2 0 0 0 8
BM5P DB30 36 -27 -7 0 0 0 47
BM5S DB30 11 3 -3 0 0 0 12
MAINLN DB30 12 4 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 195.2 -0.4 -24740.5 4 1663764 -25


Buoyancy -204.0 0.4 25870.6 -18 -1832301 29
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.2 3.4 -149 -35 2463
Wave 30.8 31.0 32.5 155 -2028 2275
Flex. Connectors -42.8 -83.3 -1164.2 490 170240 -8932
======= ======= ======= ======= ======= =======
Total 4.8 8.2 1.7 67 -116 -2533

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -3.4 -4.2 -1114.3 8 166270 -627


Wind 5.0 5.9 -0.2 -13 46 872
Flex. Connectors 0.1 0.3 1114.8 -10 -166350 43
======= ======= ======= ======= ======= =======
Total 1.6 2.0 0.3 -17 -34 286
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1003.77 1001.58 198.45 93.92 0.3508 91.57 0.00


BM2S 1001.05 1001.58 418.46 49.68 0.1830 45.48 0.00
BM3S 997.38 1001.57 677.09 15.65 0.0599 9.27 0.00
BM4P 1002.63 1001.50 293.95 74.35 0.2686 71.22 0.00
BM4S 994.90 1001.50 777.09 7.80 0.0296 1.04 0.00
BM5P 1000.79 1001.47 441.80 46.58 0.1772 42.20 0.00
BM5S 996.50 1001.46 719.95 12.03 0.0437 5.30 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.29 4.46 -4.20 0.00 0.45 0.00


N Force 4.79 8.17 1.72 67 -115 -2533

WHPBJKT Location 3.27 5.04 21.47 0.22 -0.18 -0.13


N Force 1.64 1.98 0.32 -17 -34 286
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 105.33 51.93 0.00 13.47 81.51 6.58 48.70 10.46


Variance 118.91 35.34 0.00 1.92 35.15 0.78 21.05 2.61
Root Mean Square 105.89 52.27 0.00 13.54 81.72 6.64 48.92 10.58
Std. Deviation 10.90 5.94 0.00 1.39 5.93 0.88 4.59 1.62
Skewness 0.25 0.13 0.00 -0.08 0.30 0.17 0.42 0.29
Kurtosis -0.50 -0.52 0.00 -0.91 -0.52 -0.84 -0.62 -0.31

Number of Peaks 126 120 0 191 94 184 119 146

Av Of 1/3 Highest 124.54 61.82 0.00 15.52 92.33 7.98 57.59 13.00
Av Of 1/3 Lowest 89.47 42.54 0.00 11.35 73.66 5.27 42.22 8.16
Av Of 1/100 Highest 134.61 66.21 0.00 16.50 97.18 8.79 61.29 15.37
Av Of 1/100 Lowest 80.30 38.89 0.00 10.17 67.79 4.85 39.52 7.12
Av Of 1/1000 Highest 134.61 66.21 0.00 16.50 97.18 8.79 61.29 15.37
Av Of 1/1000 Lowest 80.30 38.89 0.00 10.17 67.79 4.85 39.52 7.12
Maximum 134.61 66.21 0.00 16.50 97.18 8.79 61.29 15.37
Minimum 80.30 38.89 0.00 10.17 67.79 4.85 39.52 7.12
Pred. Max 141.09 69.40 0.00 17.12 100.85 9.25 64.11 16.43
Pred. Min 74.75 35.97 0.00 9.49 64.58 4.49 37.47 6.40

Av Of 1/3 H-Mean 19.21 9.89 0.00 2.05 10.82 1.39 8.89 2.54
Av Of 1/3 L-Mean -15.86 -9.39 0.00 -2.13 -7.85 -1.32 -6.48 -2.30
Av Of 1/100 H-Mean 29.28 14.28 0.00 3.03 15.67 2.21 12.59 4.91
Av Of 1/100 L-Mean -25.03 -13.04 0.00 -3.30 -13.71 -1.73 -9.18 -3.34
Av Of 1/1000 H-Mean 29.28 14.28 0.00 3.03 15.67 2.21 12.59 4.91
Av Of 1/1000 L-Mean -25.03 -13.04 0.00 -3.30 -13.71 -1.73 -9.18 -3.34
Maximum - Mean 29.28 14.28 0.00 3.03 15.67 2.21 12.59 4.91
Minimum - Mean -25.03 -13.04 0.00 -3.30 -13.71 -1.73 -9.18 -3.34
Pred. Max-Mean 35.76 17.47 0.00 3.65 19.34 2.67 15.41 5.97
Pred. Min-Mean -30.58 -15.96 0.00 -3.98 -16.93 -2.09 -11.23 -4.06

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.67 5.33 -4.20


Variance 0.26 0.24 0.04
Root Mean Square 2.72 5.35 4.20
Std. Deviation 0.51 0.49 0.19
Skewness 0.13 0.16 0.01
Kurtosis -0.46 -0.76 -0.18

Number of Peaks 194 228 269

Av Of 1/3 Highest 3.48 6.12 -3.81


Av Of 1/3 Lowest 1.88 4.62 -4.59
Av Of 1/100 Highest 3.96 6.48 -3.60
Av Of 1/100 Lowest 1.43 4.41 -4.78
Av Of 1/1000 Highest 3.96 6.48 -3.57
Av Of 1/1000 Lowest 1.43 4.39 -4.78
Maximum 3.96 6.48 -3.57
Minimum 1.43 4.39 -4.78
Pred. Max 4.23 6.71 -3.45
Pred. Min 1.17 4.20 -4.89

Av Of 1/3 H-Mean 0.81 0.79 0.39


Av Of 1/3 L-Mean -0.79 -0.71 -0.39
Av Of 1/100 H-Mean 1.29 1.15 0.60
Av Of 1/100 L-Mean -1.24 -0.92 -0.58
Av Of 1/1000 H-Mean 1.29 1.16 0.62
Av Of 1/1000 L-Mean -1.24 -0.94 -0.58
Maximum - Mean 1.29 1.16 0.62
Minimum - Mean -1.24 -0.94 -0.58
Pred. Max-Mean 1.56 1.39 0.74
Pred. Min-Mean -1.50 -1.13 -0.69
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.67 5.33 -4.20 2.74 5.33 4.34 66.68 5.22 -4.70 66.74 5.22
Variance 0.26 0.24 0.04 0.26 0.24 0.04 0.26 0.24 0.00 0.26 0.23
Root Mean Square 2.72 5.35 4.20 2.78 5.35 4.34 66.68 5.24 4.70 66.75 5.24
Std. Deviation 0.51 0.49 0.19 0.51 0.49 0.19 0.51 0.49 0.03 0.51 0.48
Skewness 0.13 0.16 0.01 0.13 0.16 0.01 0.13 0.14 -0.02 0.13 0.14
Kurtosis -0.46 -0.76 -0.18 -0.47 -0.77 -0.18 -0.46 -0.69 -0.10 -0.47 -0.70

Number of Peaks 194 228 269 150 94 269 195 224 275 153 94

Av Of 1/3 Highest 3.48 6.12 -3.81 3.59 6.13 4.72 67.49 6.00 -4.64 67.58 6.02
Av Of 1/3 Lowest 1.88 4.62 -4.59 1.92 4.59 3.95 65.89 4.54 -4.76 65.93 4.54
Av Of 1/100 Highest 3.96 6.48 -3.60 4.01 6.46 4.93 67.97 6.32 -4.61 68.02 6.29
Av Of 1/100 Lowest 1.43 4.41 -4.78 1.51 4.40 3.76 65.43 4.21 -4.80 65.51 4.21
Av Of 1/1000 Highest 3.96 6.48 -3.57 4.01 6.46 4.96 67.97 6.32 -4.61 68.02 6.29
Av Of 1/1000 Lowest 1.43 4.39 -4.78 1.51 4.40 3.76 65.43 4.19 -4.81 65.51 4.21
Maximum 3.96 6.48 -3.57 4.01 6.46 4.96 67.97 6.32 -4.61 68.02 6.29
Minimum 1.43 4.39 -4.78 1.51 4.40 3.76 65.43 4.19 -4.81 65.51 4.21
Pred. Max 4.23 6.71 -3.45 4.29 6.72 5.08 68.23 6.54 -4.59 68.29 6.54
Pred. Min 1.17 4.20 -4.89 1.24 4.19 3.64 65.18 3.98 -4.83 65.25 3.97

Av Of 1/3 H-Mean 0.81 0.79 0.39 0.85 0.80 0.39 0.81 0.78 0.06 0.84 0.80
Av Of 1/3 L-Mean -0.79 -0.71 -0.39 -0.82 -0.73 -0.39 -0.79 -0.68 -0.06 -0.81 -0.68
Av Of 1/100 H-Mean 1.29 1.15 0.60 1.28 1.13 0.60 1.29 1.09 0.09 1.28 1.07
Av Of 1/100 L-Mean -1.24 -0.92 -0.58 -1.23 -0.92 -0.58 -1.24 -1.02 -0.10 -1.23 -1.02
Av Of 1/1000 H-Mean 1.29 1.16 0.62 1.28 1.13 0.62 1.29 1.10 0.09 1.28 1.07
Av Of 1/1000 L-Mean -1.24 -0.94 -0.58 -1.23 -0.92 -0.58 -1.24 -1.03 -0.10 -1.23 -1.02
Maximum - Mean 1.29 1.16 0.62 1.28 1.13 0.62 1.29 1.10 0.09 1.28 1.07
Minimum - Mean -1.24 -0.94 -0.58 -1.23 -0.92 -0.58 -1.24 -1.03 -0.10 -1.23 -1.02
Pred. Max-Mean 1.56 1.39 0.74 1.55 1.40 0.74 1.56 1.32 0.11 1.55 1.32
Pred. Min-Mean -1.50 -1.13 -0.69 -1.49 -1.14 -0.69 -1.50 -1.24 -0.12 -1.49 -1.25

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.68 5.12 -5.21 130.75 5.12 3.32


Variance 0.00 0.26 0.23 0.02 0.26 0.23 0.02
Root Mean Square 3.83 130.68 5.14 5.21 130.75 5.14 3.33
Std. Deviation 0.03 0.51 0.48 0.14 0.51 0.48 0.14
Skewness -0.02 0.13 0.10 -0.01 0.13 0.10 -0.01
Kurtosis -0.10 -0.46 -0.54 -0.10 -0.47 -0.55 -0.10

Number of Peaks 274 198 226 265 156 100 265

Av Of 1/3 Highest 3.89 131.49 5.90 -4.92 131.59 5.94 3.62


Av Of 1/3 Lowest 3.77 129.89 4.45 -5.50 129.94 4.49 3.03
Av Of 1/100 Highest 3.92 131.98 6.21 -4.78 132.03 6.16 3.75
Av Of 1/100 Lowest 3.73 129.44 4.01 -5.67 129.52 4.01 2.86
Av Of 1/1000 Highest 3.92 131.98 6.21 -4.76 132.03 6.16 3.77
Av Of 1/1000 Lowest 3.73 129.44 3.99 -5.68 129.52 4.01 2.85
Maximum 3.92 131.98 6.21 -4.76 132.03 6.16 3.77
Minimum 3.73 129.44 3.99 -5.68 129.52 4.01 2.85
Pred. Max 3.94 132.24 6.43 -4.67 132.30 6.40 3.86
Pred. Min 3.71 129.18 3.77 -5.77 129.26 3.75 2.76

Av Of 1/3 H-Mean 0.06 0.81 0.78 0.29 0.84 0.83 0.29


Av Of 1/3 L-Mean -0.06 -0.79 -0.67 -0.29 -0.81 -0.63 -0.29
Av Of 1/100 H-Mean 0.09 1.29 1.09 0.43 1.28 1.04 0.43
Av Of 1/100 L-Mean -0.10 -1.25 -1.11 -0.46 -1.23 -1.11 -0.46
Av Of 1/1000 H-Mean 0.09 1.29 1.09 0.45 1.28 1.04 0.45
Av Of 1/1000 L-Mean -0.10 -1.25 -1.13 -0.47 -1.23 -1.11 -0.47
Maximum - Mean 0.09 1.29 1.09 0.45 1.28 1.04 0.45
Minimum - Mean -0.10 -1.25 -1.13 -0.47 -1.23 -1.11 -0.47
Pred. Max-Mean 0.11 1.56 1.31 0.54 1.55 1.28 0.54
Pred. Min-Mean -0.12 -1.50 -1.35 -0.56 -1.49 -1.37 -0.57
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 225 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA225

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 225.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 225.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 225.0


22.8 0.60 225.0
45.6 0.20 225.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -92 -31 -11 0 0 0 99


BM2S DB30 -47 15 -8 0 0 0 51
BM3S DB30 -6 12 -4 0 0 0 15
BM4P DB30 38 -65 -9 0 0 0 77
BM4S DB30 3 6 -2 0 0 0 7
BM5P DB30 36 -28 -7 0 0 0 47
BM5S DB30 10 3 -3 0 0 0 11
MAINLN DB30 12 4 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.6 -2.9 -24740.5 26 1663759 -192


Buoyancy -203.6 3.0 25888.3 -140 -1833295 211
Wind 12.7 24.2 0.0 -411 247 1659
Drag 12.9 36.2 3.4 -149 -35 2464
Wave 37.9 38.0 14.0 186 -912 2629
Flex. Connectors -48.4 -88.3 -1164.4 564 170175 -9363
======= ======= ======= ======= ======= =======
Total 6.2 10.2 0.8 73 -63 -2592

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -3.4 -4.1 -1114.3 7 166270 -610


Wind 5.0 5.9 -0.2 -13 46 872
Flex. Connectors 0.1 0.3 1114.8 -11 -166347 44
======= ======= ======= ======= ======= =======
Total 1.7 2.1 0.3 -18 -31 305
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1004.04 1001.58 177.29 98.96 0.3697 96.80 0.00


BM2S 1001.15 1001.58 409.81 51.17 0.1885 47.04 0.00
BM3S 997.23 1001.57 683.87 15.05 0.0576 8.61 0.00
BM4P 1002.77 1001.50 282.20 76.87 0.2778 73.84 0.00
BM4S 994.56 1001.50 785.82 7.25 0.0275 0.77 0.00
BM5P 1000.81 1001.47 440.06 46.87 0.1783 42.51 0.00
BM5S 996.24 1001.46 729.76 11.27 0.0410 4.45 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 2.48 4.74 -4.20 0.01 0.45 0.00


N Force 6.23 10.20 0.81 73 -63 -2592

WHPBJKT Location 3.45 5.29 21.48 0.21 -0.17 -0.12


N Force 1.74 2.10 0.30 -18 -31 305
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 111.28 53.88 0.00 12.81 83.37 6.14 48.43 9.64


Variance 134.70 28.69 0.00 1.91 38.57 0.88 14.30 2.38
Root Mean Square 111.88 54.15 0.00 12.88 83.60 6.21 48.58 9.77
Std. Deviation 11.61 5.36 0.00 1.38 6.21 0.94 3.78 1.54
Skewness 0.02 0.04 0.00 0.20 0.07 0.76 0.38 0.76
Kurtosis -0.10 -0.06 0.00 -0.38 -0.07 0.28 0.05 0.77

Number of Peaks 219 224 0 239 177 204 227 211

Av Of 1/3 Highest 129.33 62.49 0.00 15.00 93.77 7.69 54.78 12.06
Av Of 1/3 Lowest 93.63 45.48 0.00 10.80 75.21 5.05 42.86 7.62
Av Of 1/100 Highest 141.53 68.88 0.00 16.03 100.38 9.18 60.07 15.23
Av Of 1/100 Lowest 80.28 39.70 0.00 9.53 66.35 4.40 39.68 6.65
Av Of 1/1000 Highest 142.21 69.75 0.00 16.06 100.38 9.35 60.15 15.24
Av Of 1/1000 Lowest 80.02 39.10 0.00 9.44 66.35 4.35 39.45 6.59
Maximum 142.21 69.75 0.00 16.06 100.38 9.35 60.15 15.24
Minimum 80.02 39.10 0.00 9.44 66.35 4.35 39.45 6.59
Pred. Max 148.42 72.93 0.00 16.70 103.92 10.01 62.49 16.37
Pred. Min 73.75 36.15 0.00 8.77 62.81 3.99 37.66 5.98

Av Of 1/3 H-Mean 18.05 8.61 0.00 2.20 10.40 1.55 6.35 2.42
Av Of 1/3 L-Mean -17.64 -8.40 0.00 -2.01 -8.16 -1.09 -5.57 -2.02
Av Of 1/100 H-Mean 30.25 15.00 0.00 3.23 17.01 3.04 11.64 5.58
Av Of 1/100 L-Mean -31.00 -14.18 0.00 -3.28 -17.02 -1.74 -8.76 -2.99
Av Of 1/1000 H-Mean 30.93 15.87 0.00 3.25 17.01 3.21 11.72 5.60
Av Of 1/1000 L-Mean -31.26 -14.78 0.00 -3.37 -17.02 -1.79 -8.98 -3.05
Maximum - Mean 30.93 15.87 0.00 3.25 17.01 3.21 11.72 5.60
Minimum - Mean -31.26 -14.78 0.00 -3.37 -17.02 -1.79 -8.98 -3.05
Pred. Max-Mean 37.14 19.05 0.00 3.89 20.55 3.86 14.05 6.73
Pred. Min-Mean -37.53 -17.73 0.00 -4.04 -20.56 -2.15 -10.77 -3.67

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 2.90 5.68 -4.20


Variance 0.24 0.35 0.04
Root Mean Square 2.95 5.71 4.21
Std. Deviation 0.49 0.60 0.19
Skewness -0.07 0.12 0.02
Kurtosis -0.02 -0.06 -0.10

Number of Peaks 215 234 240

Av Of 1/3 Highest 3.68 6.62 -3.82


Av Of 1/3 Lowest 2.14 4.76 -4.59
Av Of 1/100 Highest 4.08 7.25 -3.61
Av Of 1/100 Lowest 1.49 4.44 -4.77
Av Of 1/1000 Highest 4.09 7.25 -3.61
Av Of 1/1000 Lowest 1.46 4.42 -4.80
Maximum 4.09 7.25 -3.61
Minimum 1.46 4.42 -4.80
Pred. Max 4.33 7.56 -3.49
Pred. Min 1.17 4.16 -4.92

Av Of 1/3 H-Mean 0.78 0.94 0.39


Av Of 1/3 L-Mean -0.76 -0.93 -0.39
Av Of 1/100 H-Mean 1.18 1.57 0.59
Av Of 1/100 L-Mean -1.42 -1.24 -0.57
Av Of 1/1000 H-Mean 1.19 1.57 0.59
Av Of 1/1000 L-Mean -1.45 -1.27 -0.60
Maximum - Mean 1.19 1.57 0.59
Minimum - Mean -1.45 -1.27 -0.60
Pred. Max-Mean 1.43 1.88 0.71
Pred. Min-Mean -1.74 -1.52 -0.72
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 2.90 5.68 -4.20 2.97 5.68 4.33 66.91 5.52 -4.71 66.98 5.52
Variance 0.24 0.35 0.04 0.24 0.35 0.04 0.24 0.33 0.01 0.24 0.33
Root Mean Square 2.95 5.71 4.21 3.01 5.71 4.34 66.91 5.55 4.71 66.98 5.55
Std. Deviation 0.49 0.60 0.19 0.49 0.59 0.19 0.49 0.58 0.11 0.49 0.57
Skewness -0.07 0.12 0.02 -0.07 0.12 0.02 -0.07 0.00 -0.02 -0.07 0.00
Kurtosis -0.02 -0.06 -0.10 -0.02 -0.04 -0.10 -0.02 -0.15 -0.10 -0.02 -0.13

Number of Peaks 215 234 240 224 194 240 215 234 238 225 195

Av Of 1/3 Highest 3.68 6.62 -3.82 3.75 6.54 4.72 67.69 6.40 -4.49 67.76 6.33
Av Of 1/3 Lowest 2.14 4.76 -4.59 2.20 4.75 3.95 66.15 4.62 -4.93 66.20 4.63
Av Of 1/100 Highest 4.08 7.25 -3.61 4.16 7.21 4.92 68.09 7.00 -4.37 68.17 6.96
Av Of 1/100 Lowest 1.49 4.44 -4.77 1.55 4.43 3.76 65.49 4.15 -5.03 65.55 4.13
Av Of 1/1000 Highest 4.09 7.25 -3.61 4.16 7.21 4.93 68.10 7.00 -4.37 68.17 6.96
Av Of 1/1000 Lowest 1.46 4.42 -4.80 1.52 4.43 3.73 65.46 4.11 -5.04 65.53 4.13
Maximum 4.09 7.25 -3.61 4.16 7.21 4.93 68.10 7.00 -4.37 68.17 6.96
Minimum 1.46 4.42 -4.80 1.52 4.43 3.73 65.46 4.11 -5.04 65.53 4.13
Pred. Max 4.33 7.56 -3.49 4.40 7.52 5.04 68.34 7.29 -4.30 68.41 7.25
Pred. Min 1.17 4.16 -4.92 1.23 4.18 3.61 65.17 3.83 -5.11 65.24 3.85

Av Of 1/3 H-Mean 0.78 0.94 0.39 0.78 0.86 0.39 0.78 0.88 0.22 0.78 0.81
Av Of 1/3 L-Mean -0.76 -0.93 -0.39 -0.77 -0.93 -0.39 -0.76 -0.90 -0.22 -0.77 -0.88
Av Of 1/100 H-Mean 1.18 1.57 0.59 1.19 1.53 0.59 1.18 1.48 0.34 1.19 1.44
Av Of 1/100 L-Mean -1.42 -1.24 -0.57 -1.42 -1.25 -0.57 -1.42 -1.37 -0.33 -1.42 -1.38
Av Of 1/1000 H-Mean 1.19 1.57 0.59 1.19 1.53 0.59 1.19 1.48 0.34 1.19 1.44
Av Of 1/1000 L-Mean -1.45 -1.27 -0.60 -1.45 -1.25 -0.60 -1.45 -1.40 -0.34 -1.45 -1.38
Maximum - Mean 1.19 1.57 0.59 1.19 1.53 0.59 1.19 1.48 0.34 1.19 1.44
Minimum - Mean -1.45 -1.27 -0.60 -1.45 -1.25 -0.60 -1.45 -1.40 -0.34 -1.45 -1.38
Pred. Max-Mean 1.43 1.88 0.71 1.43 1.85 0.71 1.43 1.77 0.41 1.43 1.73
Pred. Min-Mean -1.74 -1.52 -0.72 -1.74 -1.50 -0.72 -1.74 -1.68 -0.40 -1.74 -1.67

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=225deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 130.91 5.35 -5.21 130.98 5.35 3.32


Variance 0.01 0.24 0.33 0.01 0.24 0.32 0.01
Root Mean Square 3.83 130.92 5.38 5.21 130.98 5.38 3.32
Std. Deviation 0.11 0.49 0.57 0.11 0.49 0.57 0.11
Skewness -0.02 -0.07 -0.16 -0.06 -0.07 -0.17 -0.07
Kurtosis -0.10 -0.01 -0.13 -0.18 -0.02 -0.12 -0.17

Number of Peaks 238 213 234 232 225 195 232

Av Of 1/3 Highest 4.05 131.69 6.20 -5.00 131.76 6.14 3.53


Av Of 1/3 Lowest 3.60 130.16 4.46 -5.43 130.21 4.51 3.10
Av Of 1/100 Highest 4.16 132.09 6.74 -4.91 132.17 6.70 3.63
Av Of 1/100 Lowest 3.50 129.50 3.85 -5.53 129.56 3.83 3.01
Av Of 1/1000 Highest 4.17 132.10 6.74 -4.90 132.17 6.70 3.63
Av Of 1/1000 Lowest 3.49 129.47 3.81 -5.53 129.53 3.83 3.01
Maximum 4.17 132.10 6.74 -4.90 132.17 6.70 3.63
Minimum 3.49 129.47 3.81 -5.53 129.53 3.83 3.01
Pred. Max 4.23 132.34 7.02 -4.84 132.41 6.98 3.69
Pred. Min 3.42 129.18 3.51 -5.59 129.25 3.52 2.94

Av Of 1/3 H-Mean 0.22 0.78 0.84 0.21 0.78 0.78 0.21


Av Of 1/3 L-Mean -0.22 -0.76 -0.90 -0.22 -0.77 -0.85 -0.22
Av Of 1/100 H-Mean 0.34 1.18 1.39 0.30 1.19 1.35 0.30
Av Of 1/100 L-Mean -0.33 -1.42 -1.51 -0.31 -1.42 -1.52 -0.31
Av Of 1/1000 H-Mean 0.34 1.19 1.39 0.31 1.19 1.35 0.31
Av Of 1/1000 L-Mean -0.34 -1.45 -1.54 -0.31 -1.45 -1.52 -0.32
Maximum - Mean 0.34 1.19 1.39 0.31 1.19 1.35 0.31
Minimum - Mean -0.34 -1.45 -1.54 -0.31 -1.45 -1.52 -0.32
Pred. Max-Mean 0.41 1.43 1.67 0.37 1.43 1.62 0.37
Pred. Min-Mean -0.40 -1.74 -1.85 -0.38 -1.74 -1.83 -0.38
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -81 -28 -11 0 0 0 88


BM2S DB30 -32 10 -6 0 0 0 35
BM3S DB30 -4 8 -3 0 0 0 10
BM4P DB30 51 -88 -10 0 0 0 103
BM4S DB30 3 5 -2 0 0 0 7
BM5P DB30 54 -42 -8 0 0 0 69
BM5S DB30 13 3 -3 0 0 0 14
MAINLN DB30 9 7 -1114 0 0 0 1115
SL115A WHPBJKT -106 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 284 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.8 7.6 -24740.5 -67 1663760 511


Buoyancy -203.9 -8.0 25903.2 374 -1834337 -560
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 -2 3487
Wave 0.0 47.7 1.3 -147 -75 3179
Flex. Connectors 9.9 -128.0 -1164.7 703 170739 -12974
======= ======= ======= ======= ======= =======
Total 0.8 4.8 -0.6 65 82 -4046

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 0.0 -6.5 -1114.3 12 166275 -970


Wind 0.1 8.2 -0.3 -18 43 1231
Flex. Connectors 0.0 0.3 1114.9 -12 -166365 47
======= ======= ======= ======= ======= =======
Total 0.0 2.0 0.3 -20 -47 307
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1003.44 1001.58 223.95 88.11 0.3292 85.55 0.00


BM2S 999.85 1001.58 513.60 34.88 0.1285 29.88 0.00
BM3S 995.76 1001.57 745.62 9.91 0.0380 2.96 0.00
BM4P 1004.24 1001.50 167.67 103.23 0.3730 101.16 0.00
BM4S 994.11 1001.50 797.29 6.52 0.0248 0.42 0.00
BM5P 1002.30 1001.47 317.95 69.36 0.2638 66.02 0.00
BM5S 996.98 1001.46 698.03 13.95 0.0507 7.41 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.46 5.84 -4.21 -0.02 0.45 0.00


N Force 0.83 4.77 -0.62 65 82 -4046

WHPBJKT Location 2.22 6.12 21.92 0.33 0.00 0.06


N Force 0.04 2.03 0.32 -20 -47 307
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 95.12 34.97 0.00 8.78 111.56 5.69 73.27 12.60


Variance 26.68 2.72 0.00 0.42 29.32 0.21 10.14 0.94
Root Mean Square 95.27 35.01 0.00 8.81 111.69 5.70 73.34 12.63
Std. Deviation 5.17 1.65 0.00 0.65 5.42 0.46 3.18 0.97
Skewness 0.21 0.05 0.00 0.18 0.27 0.39 0.32 0.20
Kurtosis -0.70 -0.68 0.00 -0.70 -0.47 -0.50 -0.53 -0.66

Number of Peaks 302 286 0 326 332 322 330 260

Av Of 1/3 Highest 103.59 37.47 0.00 9.80 120.37 6.46 78.79 14.16
Av Of 1/3 Lowest 87.60 32.45 0.00 7.86 103.93 5.05 68.75 11.17
Av Of 1/100 Highest 106.82 38.71 0.00 10.46 127.61 6.98 82.32 14.88
Av Of 1/100 Lowest 84.93 30.73 0.00 7.26 99.47 4.68 65.25 10.60
Av Of 1/1000 Highest 106.96 38.75 0.00 10.49 128.27 7.05 82.76 14.94
Av Of 1/1000 Lowest 84.79 30.26 0.00 7.21 99.46 4.68 65.19 10.59
Maximum 106.96 38.75 0.00 10.49 128.27 7.05 82.76 14.94
Minimum 84.79 30.26 0.00 7.21 99.46 4.68 65.19 10.59
Pred. Max 109.22 39.47 0.00 10.81 131.41 7.30 84.53 15.40
Pred. Min 82.83 29.36 0.00 6.92 97.19 4.49 63.67 10.19

Av Of 1/3 H-Mean 8.47 2.51 0.00 1.02 8.81 0.77 5.52 1.56
Av Of 1/3 L-Mean -7.52 -2.52 0.00 -0.92 -7.63 -0.64 -4.52 -1.42
Av Of 1/100 H-Mean 11.69 3.75 0.00 1.68 16.06 1.30 9.05 2.29
Av Of 1/100 L-Mean -10.19 -4.23 0.00 -1.53 -12.09 -1.00 -8.02 -2.00
Av Of 1/1000 H-Mean 11.84 3.78 0.00 1.70 16.72 1.36 9.49 2.34
Av Of 1/1000 L-Mean -10.33 -4.70 0.00 -1.57 -12.10 -1.01 -8.08 -2.01
Maximum - Mean 11.84 3.78 0.00 1.70 16.72 1.36 9.49 2.34
Minimum - Mean -10.33 -4.70 0.00 -1.57 -12.10 -1.01 -8.08 -2.01
Pred. Max-Mean 14.09 4.51 0.00 2.03 19.85 1.62 11.27 2.80
Pred. Min-Mean -12.30 -5.61 0.00 -1.87 -14.36 -1.20 -9.59 -2.40

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.66 6.48 -4.20


Variance 0.04 0.15 0.00
Root Mean Square 1.67 6.49 4.20
Std. Deviation 0.20 0.39 0.05
Skewness 0.16 0.21 0.03
Kurtosis -0.57 -0.65 -0.03

Number of Peaks 73 333 342

Av Of 1/3 Highest 1.96 7.10 -4.10


Av Of 1/3 Lowest 1.32 5.92 -4.31
Av Of 1/100 Highest 2.12 7.48 -4.04
Av Of 1/100 Lowest 1.21 5.63 -4.37
Av Of 1/1000 Highest 2.12 7.52 -4.04
Av Of 1/1000 Lowest 1.21 5.63 -4.38
Maximum 2.12 7.52 -4.04
Minimum 1.21 5.63 -4.38
Pred. Max 2.23 7.71 -4.01
Pred. Min 1.10 5.47 -4.41

Av Of 1/3 H-Mean 0.31 0.63 0.11


Av Of 1/3 L-Mean -0.34 -0.56 -0.11
Av Of 1/100 H-Mean 0.46 1.01 0.16
Av Of 1/100 L-Mean -0.44 -0.85 -0.17
Av Of 1/1000 H-Mean 0.46 1.04 0.16
Av Of 1/1000 L-Mean -0.44 -0.85 -0.17
Maximum - Mean 0.46 1.04 0.16
Minimum - Mean -0.44 -0.85 -0.17
Pred. Max-Mean 0.57 1.24 0.19
Pred. Min-Mean -0.55 -1.01 -0.20
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.66 6.48 -4.20 1.72 6.48 4.33 65.66 6.47 -4.71 65.73 6.47
Variance 0.04 0.15 0.00 0.04 0.15 0.00 0.04 0.15 0.00 0.04 0.15
Root Mean Square 1.67 6.49 4.20 1.73 6.49 4.33 65.66 6.48 4.71 65.73 6.48
Std. Deviation 0.20 0.39 0.05 0.20 0.39 0.05 0.20 0.39 0.04 0.20 0.39
Skewness 0.16 0.21 0.03 0.17 0.21 0.03 0.16 0.21 0.02 0.17 0.21
Kurtosis -0.57 -0.65 -0.03 -0.57 -0.59 -0.03 -0.57 -0.66 -0.10 -0.57 -0.59

Number of Peaks 73 333 342 60 338 342 75 333 334 60 338

Av Of 1/3 Highest 1.96 7.10 -4.10 2.06 7.09 4.44 65.97 7.09 -4.63 66.06 7.08
Av Of 1/3 Lowest 1.32 5.92 -4.31 1.37 5.93 4.22 65.32 5.91 -4.79 65.38 5.92
Av Of 1/100 Highest 2.12 7.48 -4.04 2.18 7.55 4.49 66.12 7.48 -4.59 66.19 7.54
Av Of 1/100 Lowest 1.21 5.63 -4.37 1.28 5.59 4.16 65.22 5.63 -4.83 65.29 5.59
Av Of 1/1000 Highest 2.12 7.52 -4.04 2.18 7.57 4.49 66.12 7.51 -4.59 66.19 7.56
Av Of 1/1000 Lowest 1.21 5.63 -4.38 1.28 5.55 4.16 65.22 5.63 -4.83 65.29 5.55
Maximum 2.12 7.52 -4.04 2.18 7.57 4.49 66.12 7.51 -4.59 66.19 7.56
Minimum 1.21 5.63 -4.38 1.28 5.55 4.16 65.22 5.63 -4.83 65.29 5.55
Pred. Max 2.23 7.71 -4.01 2.30 7.77 4.52 66.23 7.71 -4.57 66.31 7.77
Pred. Min 1.10 5.47 -4.41 1.17 5.38 4.13 65.11 5.47 -4.86 65.18 5.38

Av Of 1/3 H-Mean 0.31 0.63 0.11 0.34 0.61 0.11 0.31 0.63 0.08 0.33 0.61
Av Of 1/3 L-Mean -0.34 -0.56 -0.11 -0.35 -0.55 -0.11 -0.34 -0.56 -0.08 -0.35 -0.55
Av Of 1/100 H-Mean 0.46 1.01 0.16 0.46 1.07 0.16 0.46 1.01 0.12 0.46 1.07
Av Of 1/100 L-Mean -0.44 -0.85 -0.17 -0.44 -0.89 -0.17 -0.44 -0.84 -0.12 -0.44 -0.88
Av Of 1/1000 H-Mean 0.46 1.04 0.16 0.46 1.09 0.16 0.46 1.05 0.12 0.46 1.09
Av Of 1/1000 L-Mean -0.44 -0.85 -0.17 -0.44 -0.93 -0.17 -0.44 -0.84 -0.13 -0.44 -0.92
Maximum - Mean 0.46 1.04 0.16 0.46 1.09 0.16 0.46 1.05 0.12 0.46 1.09
Minimum - Mean -0.44 -0.85 -0.17 -0.44 -0.93 -0.17 -0.44 -0.84 -0.13 -0.44 -0.92
Pred. Max-Mean 0.57 1.24 0.19 0.58 1.29 0.19 0.57 1.24 0.14 0.58 1.30
Pred. Min-Mean -0.55 -1.01 -0.20 -0.55 -1.10 -0.20 -0.55 -1.00 -0.15 -0.55 -1.10

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 129.67 6.46 -5.21 129.73 6.46 3.32


Variance 0.00 0.04 0.15 0.00 0.04 0.15 0.00
Root Mean Square 3.83 129.67 6.47 5.21 129.73 6.47 3.32
Std. Deviation 0.04 0.20 0.39 0.03 0.20 0.39 0.03
Skewness 0.02 0.16 0.21 0.00 0.17 0.21 -0.01
Kurtosis -0.10 -0.57 -0.66 -0.19 -0.57 -0.60 -0.19

Number of Peaks 334 77 333 322 63 338 322

Av Of 1/3 Highest 3.91 130.01 7.08 -5.15 130.06 7.07 3.38


Av Of 1/3 Lowest 3.74 129.33 5.90 -5.27 129.39 5.91 3.26
Av Of 1/100 Highest 3.94 130.13 7.47 -5.13 130.20 7.54 3.40
Av Of 1/100 Lowest 3.70 129.22 5.63 -5.30 129.30 5.59 3.23
Av Of 1/1000 Highest 3.94 130.13 7.51 -5.13 130.20 7.56 3.40
Av Of 1/1000 Lowest 3.70 129.22 5.62 -5.30 129.30 5.55 3.23
Maximum 3.94 130.13 7.51 -5.13 130.20 7.56 3.40
Minimum 3.70 129.22 5.62 -5.30 129.30 5.55 3.23
Pred. Max 3.96 130.24 7.70 -5.11 130.31 7.76 3.42
Pred. Min 3.68 129.12 5.47 -5.32 129.18 5.38 3.21

Av Of 1/3 H-Mean 0.08 0.34 0.63 0.06 0.33 0.61 0.06


Av Of 1/3 L-Mean -0.08 -0.34 -0.55 -0.06 -0.34 -0.55 -0.06
Av Of 1/100 H-Mean 0.12 0.46 1.01 0.08 0.46 1.07 0.08
Av Of 1/100 L-Mean -0.12 -0.44 -0.83 -0.09 -0.44 -0.87 -0.09
Av Of 1/1000 H-Mean 0.12 0.46 1.05 0.08 0.46 1.10 0.08
Av Of 1/1000 L-Mean -0.13 -0.44 -0.83 -0.09 -0.44 -0.92 -0.09
Maximum - Mean 0.12 0.46 1.05 0.08 0.46 1.10 0.08
Minimum - Mean -0.13 -0.44 -0.83 -0.09 -0.44 -0.92 -0.09
Pred. Max-Mean 0.14 0.57 1.25 0.10 0.58 1.30 0.10
Pred. Min-Mean -0.15 -0.55 -0.99 -0.11 -0.55 -1.09 -0.11
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -84 -29 -11 0 0 0 90


BM2S DB30 -32 10 -6 0 0 0 35
BM3S DB30 -3 8 -3 0 0 0 10
BM4P DB30 52 -90 -10 0 0 0 106
BM4S DB30 3 5 -2 0 0 0 6
BM5P DB30 55 -42 -8 0 0 0 70
BM5S DB30 12 3 -3 0 0 0 13
MAINLN DB30 9 8 -1114 0 0 0 1115
SL115A WHPBJKT -105 86 275 0 0 0 307
SL115B WHPBJKT 111 85 299 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.8 7.2 -24740.5 -64 1663760 483


Buoyancy -203.9 -7.5 25904.7 353 -1834444 -529
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 -1 3487
Wave 0.0 46.1 0.1 -103 5 3078
Flex. Connectors 9.1 -131.3 -1164.9 649 170747 -13204
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.5 38 65 -4374

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -0.1 -7.4 -1114.3 13 166274 -1097


Wind 0.1 8.2 -0.3 -18 44 1230
Flex. Connectors 0.0 0.1 1114.9 -5 -166372 22
======= ======= ======= ======= ======= =======
Total 0.0 1.0 0.4 -11 -54 154
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1003.57 1001.58 213.56 90.45 0.3379 87.97 0.00


BM2S 999.87 1001.58 512.59 35.02 0.1291 30.04 0.00
BM3S 995.63 1001.57 750.42 9.55 0.0366 2.56 0.00
BM4P 1004.38 1001.50 157.56 105.71 0.3819 103.72 0.00
BM4S 993.91 1001.50 802.53 6.20 0.0235 0.25 0.00
BM5P 1002.36 1001.47 312.68 70.40 0.2678 67.11 0.00
BM5S 996.86 1001.46 703.74 13.43 0.0488 6.84 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.53 6.04 -4.21 -0.02 0.45 0.00


N Force 0.04 -0.01 -0.53 38 65 -4374

WHPBJKT Location 2.30 6.31 21.92 0.38 0.00 0.08


N Force 0.02 1.01 0.37 -11 -54 154
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 94.59 34.84 0.00 8.74 110.60 5.78 72.96 12.68


Variance 29.23 1.72 0.00 0.42 30.06 0.27 8.26 1.05
Root Mean Square 94.74 34.86 0.00 8.76 110.73 5.81 73.01 12.72
Std. Deviation 5.41 1.31 0.00 0.65 5.48 0.52 2.87 1.02
Skewness 0.35 0.06 0.00 0.05 0.42 0.29 0.44 0.11
Kurtosis -0.34 0.39 0.00 -0.54 0.00 -0.36 0.30 -0.39

Number of Peaks 288 301 0 311 311 299 313 281

Av Of 1/3 Highest 103.31 36.90 0.00 9.82 119.90 6.72 78.06 14.38
Av Of 1/3 Lowest 86.70 32.78 0.00 7.73 102.44 5.03 68.44 11.15
Av Of 1/100 Highest 109.03 38.93 0.00 10.51 129.11 7.29 83.25 15.70
Av Of 1/100 Lowest 81.99 30.16 0.00 7.02 96.95 4.50 65.19 10.11
Av Of 1/1000 Highest 109.89 39.07 0.00 10.54 130.76 7.31 84.58 15.83
Av Of 1/1000 Lowest 81.60 29.91 0.00 6.88 96.40 4.46 65.12 10.00
Maximum 109.89 39.07 0.00 10.54 130.76 7.31 84.58 15.83
Minimum 81.60 29.91 0.00 6.88 96.40 4.46 65.12 10.00
Pred. Max 112.83 39.87 0.00 10.88 134.57 7.60 86.77 16.43
Pred. Min 79.11 28.98 0.00 6.53 93.71 4.21 63.63 9.48

Av Of 1/3 H-Mean 8.72 2.06 0.00 1.08 9.30 0.94 5.10 1.70
Av Of 1/3 L-Mean -7.89 -2.06 0.00 -1.01 -8.16 -0.75 -4.52 -1.53
Av Of 1/100 H-Mean 14.44 4.09 0.00 1.77 18.51 1.51 10.30 3.02
Av Of 1/100 L-Mean -12.60 -4.68 0.00 -1.72 -13.65 -1.28 -7.77 -2.57
Av Of 1/1000 H-Mean 15.30 4.23 0.00 1.80 20.16 1.53 11.62 3.14
Av Of 1/1000 L-Mean -12.99 -4.93 0.00 -1.86 -14.20 -1.32 -7.84 -2.69
Maximum - Mean 15.30 4.23 0.00 1.80 20.16 1.53 11.62 3.14
Minimum - Mean -12.99 -4.93 0.00 -1.86 -14.20 -1.32 -7.84 -2.69
Pred. Max-Mean 18.24 5.03 0.00 2.14 23.98 1.82 13.82 3.75
Pred. Min-Mean -15.48 -5.87 0.00 -2.21 -16.89 -1.57 -9.32 -3.20

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.63 6.50 -4.20


Variance 0.04 0.18 0.02
Root Mean Square 1.64 6.52 4.21
Std. Deviation 0.19 0.42 0.13
Skewness 0.23 0.46 -0.01
Kurtosis 0.03 -0.51 -0.28

Number of Peaks 79 274 287

Av Of 1/3 Highest 1.95 7.24 -3.94


Av Of 1/3 Lowest 1.37 5.92 -4.47
Av Of 1/100 Highest 2.20 7.64 -3.83
Av Of 1/100 Lowest 1.13 5.61 -4.62
Av Of 1/1000 Highest 2.20 7.69 -3.83
Av Of 1/1000 Lowest 1.13 5.59 -4.66
Maximum 2.20 7.69 -3.83
Minimum 1.13 5.59 -4.66
Pred. Max 2.34 7.92 -3.75
Pred. Min 1.01 5.42 -4.75

Av Of 1/3 H-Mean 0.32 0.74 0.26


Av Of 1/3 L-Mean -0.27 -0.58 -0.27
Av Of 1/100 H-Mean 0.57 1.13 0.37
Av Of 1/100 L-Mean -0.50 -0.90 -0.41
Av Of 1/1000 H-Mean 0.57 1.19 0.38
Av Of 1/1000 L-Mean -0.50 -0.91 -0.46
Maximum - Mean 0.57 1.19 0.38
Minimum - Mean -0.50 -0.91 -0.46
Pred. Max-Mean 0.71 1.42 0.45
Pred. Min-Mean -0.62 -1.09 -0.54
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.63 6.50 -4.20 1.70 6.51 4.33 65.64 6.44 -4.71 65.71 6.44
Variance 0.04 0.18 0.02 0.04 0.18 0.02 0.04 0.17 0.01 0.04 0.17
Root Mean Square 1.64 6.52 4.21 1.71 6.52 4.33 65.64 6.45 4.71 65.71 6.45
Std. Deviation 0.19 0.42 0.13 0.19 0.42 0.13 0.19 0.41 0.10 0.19 0.41
Skewness 0.23 0.46 -0.01 0.23 0.42 -0.02 0.23 0.45 -0.03 0.23 0.40
Kurtosis 0.03 -0.51 -0.28 0.03 -0.45 -0.28 0.03 -0.41 -0.30 0.03 -0.35

Number of Peaks 79 274 287 72 314 287 84 275 288 68 317

Av Of 1/3 Highest 1.95 7.24 -3.94 1.99 7.21 4.59 65.96 7.16 -4.52 66.00 7.13
Av Of 1/3 Lowest 1.37 5.92 -4.47 1.40 5.91 4.06 65.34 5.86 -4.91 65.40 5.84
Av Of 1/100 Highest 2.20 7.64 -3.83 2.27 7.71 4.70 66.21 7.58 -4.43 66.27 7.66
Av Of 1/100 Lowest 1.13 5.61 -4.62 1.20 5.59 3.92 65.14 5.53 -5.02 65.21 5.51
Av Of 1/1000 Highest 2.20 7.69 -3.83 2.27 7.79 4.70 66.21 7.64 -4.41 66.27 7.75
Av Of 1/1000 Lowest 1.13 5.59 -4.66 1.20 5.58 3.87 65.14 5.46 -5.04 65.21 5.45
Maximum 2.20 7.69 -3.83 2.27 7.79 4.70 66.21 7.64 -4.41 66.27 7.75
Minimum 1.13 5.59 -4.66 1.20 5.58 3.87 65.14 5.46 -5.04 65.21 5.45
Pred. Max 2.34 7.92 -3.75 2.41 8.03 4.78 66.34 7.87 -4.36 66.41 7.99
Pred. Min 1.01 5.42 -4.75 1.08 5.40 3.78 65.02 5.28 -5.10 65.08 5.26

Av Of 1/3 H-Mean 0.32 0.74 0.26 0.29 0.71 0.26 0.32 0.72 0.19 0.29 0.69
Av Of 1/3 L-Mean -0.27 -0.58 -0.27 -0.30 -0.60 -0.27 -0.29 -0.58 -0.20 -0.30 -0.60
Av Of 1/100 H-Mean 0.57 1.13 0.37 0.57 1.20 0.37 0.57 1.14 0.28 0.57 1.22
Av Of 1/100 L-Mean -0.50 -0.90 -0.41 -0.50 -0.92 -0.41 -0.50 -0.90 -0.31 -0.50 -0.93
Av Of 1/1000 H-Mean 0.57 1.19 0.38 0.57 1.28 0.37 0.57 1.20 0.29 0.57 1.31
Av Of 1/1000 L-Mean -0.50 -0.91 -0.46 -0.50 -0.93 -0.46 -0.50 -0.97 -0.33 -0.50 -0.99
Maximum - Mean 0.57 1.19 0.38 0.57 1.28 0.37 0.57 1.20 0.29 0.57 1.31
Minimum - Mean -0.50 -0.91 -0.46 -0.50 -0.93 -0.46 -0.50 -0.97 -0.33 -0.50 -0.99
Pred. Max-Mean 0.71 1.42 0.45 0.71 1.53 0.45 0.70 1.43 0.35 0.71 1.55
Pred. Min-Mean -0.62 -1.09 -0.54 -0.62 -1.11 -0.55 -0.62 -1.16 -0.39 -0.62 -1.18

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 129.64 6.37 -5.21 129.71 6.37 3.32


Variance 0.01 0.04 0.17 0.00 0.04 0.17 0.00
Root Mean Square 3.83 129.64 6.38 5.21 129.71 6.38 3.32
Std. Deviation 0.10 0.19 0.41 0.07 0.19 0.41 0.07
Skewness -0.03 0.23 0.41 -0.04 0.23 0.36 -0.04
Kurtosis -0.30 0.03 -0.30 -0.19 0.03 -0.23 -0.19

Number of Peaks 289 86 274 283 64 317 283

Av Of 1/3 Highest 4.02 129.96 7.08 -5.08 130.01 7.04 3.46


Av Of 1/3 Lowest 3.63 129.36 5.78 -5.35 129.40 5.77 3.18
Av Of 1/100 Highest 4.10 130.21 7.52 -5.00 130.28 7.62 3.53
Av Of 1/100 Lowest 3.52 129.14 5.41 -5.42 129.21 5.38 3.11
Av Of 1/1000 Highest 4.12 130.21 7.58 -4.98 130.28 7.70 3.55
Av Of 1/1000 Lowest 3.50 129.14 5.34 -5.43 129.21 5.32 3.11
Maximum 4.12 130.21 7.58 -4.98 130.28 7.70 3.55
Minimum 3.50 129.14 5.34 -5.43 129.21 5.32 3.11
Pred. Max 4.17 130.35 7.81 -4.94 130.42 7.95 3.60
Pred. Min 3.43 129.02 5.14 -5.47 129.09 5.12 3.07

Av Of 1/3 H-Mean 0.19 0.32 0.71 0.14 0.30 0.68 0.14


Av Of 1/3 L-Mean -0.20 -0.29 -0.59 -0.14 -0.31 -0.60 -0.14
Av Of 1/100 H-Mean 0.28 0.57 1.15 0.22 0.57 1.25 0.21
Av Of 1/100 L-Mean -0.31 -0.50 -0.96 -0.21 -0.50 -0.99 -0.21
Av Of 1/1000 H-Mean 0.29 0.57 1.21 0.23 0.57 1.33 0.23
Av Of 1/1000 L-Mean -0.33 -0.50 -1.03 -0.21 -0.50 -1.05 -0.21
Maximum - Mean 0.29 0.57 1.21 0.23 0.57 1.33 0.23
Minimum - Mean -0.33 -0.50 -1.03 -0.21 -0.50 -1.05 -0.21
Pred. Max-Mean 0.35 0.70 1.44 0.28 0.71 1.58 0.28
Pred. Min-Mean -0.39 -0.62 -1.23 -0.26 -0.62 -1.25 -0.25
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -84 -29 -11 0 0 0 91


BM2S DB30 -32 10 -6 0 0 0 35
BM3S DB30 -3 8 -3 0 0 0 9
BM4P DB30 53 -91 -11 0 0 0 106
BM4S DB30 3 5 -2 0 0 0 6
BM5P DB30 55 -42 -8 0 0 0 71
BM5S DB30 12 3 -3 0 0 0 13
MAINLN DB30 9 8 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.9 5.2 -24740.5 -46 1663761 349


Buoyancy -203.9 -5.4 25902.6 256 -1834315 -383
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 -1 3487
Wave 0.0 46.3 2.4 16 -130 3064
Flex. Connectors 9.1 -131.5 -1164.5 571 170682 -13170
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -5 -4341

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -0.4 -8.1 -1114.2 15 166273 -1207


Wind 0.5 8.2 -0.3 -18 46 1229
Flex. Connectors 0.0 -0.1 1114.5 5 -166311 -17
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 6 3
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1003.60 1001.58 211.25 90.97 0.3398 88.51 0.00


BM2S 999.87 1001.58 512.68 35.01 0.1290 30.02 0.00
BM3S 995.59 1001.57 751.74 9.45 0.0362 2.45 0.00
BM4P 1004.41 1001.50 154.80 106.38 0.3844 104.42 0.00
BM4S 993.86 1001.50 803.81 6.12 0.0232 0.21 0.00
BM5P 1002.38 1001.47 311.04 70.72 0.2690 67.45 0.00
BM5S 996.83 1001.46 704.97 13.32 0.0484 6.72 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.55 6.09 -4.21 -0.01 0.45 0.00


N Force 0.00 0.00 0.04 0 -5 -4341

WHPBJKT Location 2.50 -0.96 21.87 0.42 -0.02 2.91


N Force 0.00 0.00 -0.04 0 6 3
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 92.63 34.63 0.00 8.87 107.62 6.15 71.83 13.08


Variance 51.47 1.59 0.00 0.97 66.51 0.74 16.27 2.02
Root Mean Square 92.91 34.65 0.00 8.93 107.93 6.21 71.94 13.16
Std. Deviation 7.17 1.26 0.00 0.99 8.16 0.86 4.03 1.42
Skewness 0.05 0.13 0.00 0.37 -0.08 0.64 0.01 0.30
Kurtosis -0.41 0.53 0.00 -0.64 -0.33 0.31 -0.41 -0.23

Number of Peaks 277 276 0 291 287 285 285 273

Av Of 1/3 Highest 103.85 36.80 0.00 10.47 120.20 7.58 78.39 15.40
Av Of 1/3 Lowest 82.42 32.56 0.00 7.52 94.85 4.96 65.45 10.94
Av Of 1/100 Highest 110.37 39.26 0.00 11.53 130.32 9.15 84.30 17.40
Av Of 1/100 Lowest 74.22 30.08 0.00 6.74 85.17 4.37 61.29 9.66
Av Of 1/1000 Highest 111.08 39.70 0.00 11.62 130.90 9.27 84.93 17.56
Av Of 1/1000 Lowest 74.03 29.88 0.00 6.74 84.85 4.35 61.27 9.53
Maximum 111.08 39.70 0.00 11.62 130.90 9.27 84.93 17.56
Minimum 74.03 29.88 0.00 6.74 84.85 4.35 61.27 9.53
Pred. Max 114.64 40.68 0.00 12.15 135.37 9.87 87.44 18.43
Pred. Min 70.44 28.96 0.00 6.33 80.48 4.01 59.24 8.85

Av Of 1/3 H-Mean 11.22 2.17 0.00 1.60 12.58 1.43 6.56 2.32
Av Of 1/3 L-Mean -10.21 -2.07 0.00 -1.36 -12.77 -1.19 -6.38 -2.14
Av Of 1/100 H-Mean 17.74 4.64 0.00 2.66 22.70 3.00 12.47 4.32
Av Of 1/100 L-Mean -18.41 -4.54 0.00 -2.13 -22.45 -1.77 -10.54 -3.42
Av Of 1/1000 H-Mean 18.45 5.08 0.00 2.75 23.28 3.13 13.09 4.48
Av Of 1/1000 L-Mean -18.60 -4.75 0.00 -2.14 -22.77 -1.79 -10.56 -3.55
Maximum - Mean 18.45 5.08 0.00 2.75 23.28 3.13 13.09 4.48
Minimum - Mean -18.60 -4.75 0.00 -2.14 -22.77 -1.79 -10.56 -3.55
Pred. Max-Mean 22.01 6.06 0.00 3.28 27.75 3.73 15.61 5.35
Pred. Min-Mean -22.18 -5.67 0.00 -2.54 -27.14 -2.14 -12.59 -4.23

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.56 6.47 -4.20


Variance 0.05 0.40 0.05
Root Mean Square 1.58 6.50 4.21
Std. Deviation 0.22 0.64 0.23
Skewness 0.05 0.08 -0.02
Kurtosis -0.11 -0.63 -0.17

Number of Peaks 80 253 275

Av Of 1/3 Highest 1.93 7.55 -3.74


Av Of 1/3 Lowest 1.28 5.48 -4.68
Av Of 1/100 Highest 2.22 7.99 -3.49
Av Of 1/100 Lowest 1.01 4.95 -4.95
Av Of 1/1000 Highest 2.22 8.00 -3.47
Av Of 1/1000 Lowest 1.01 4.87 -4.96
Maximum 2.22 8.00 -3.47
Minimum 1.01 4.87 -4.96
Pred. Max 2.37 8.30 -3.33
Pred. Min 0.87 4.56 -5.11

Av Of 1/3 H-Mean 0.36 1.08 0.46


Av Of 1/3 L-Mean -0.29 -0.99 -0.47
Av Of 1/100 H-Mean 0.65 1.52 0.71
Av Of 1/100 L-Mean -0.56 -1.52 -0.75
Av Of 1/1000 H-Mean 0.65 1.53 0.73
Av Of 1/1000 L-Mean -0.56 -1.60 -0.76
Maximum - Mean 0.65 1.53 0.73
Minimum - Mean -0.56 -1.60 -0.76
Pred. Max-Mean 0.81 1.83 0.87
Pred. Min-Mean -0.69 -1.91 -0.91
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.56 6.47 -4.20 1.63 6.47 4.33 65.57 6.29 -4.71 65.64 6.29
Variance 0.05 0.40 0.05 0.05 0.37 0.05 0.05 0.39 0.03 0.05 0.36
Root Mean Square 1.58 6.50 4.21 1.65 6.50 4.34 65.57 6.32 4.71 65.64 6.32
Std. Deviation 0.22 0.64 0.23 0.22 0.61 0.23 0.22 0.63 0.19 0.22 0.60
Skewness 0.05 0.08 -0.02 0.05 0.03 -0.02 0.05 0.01 -0.04 0.05 -0.05
Kurtosis -0.11 -0.63 -0.17 -0.11 -0.78 -0.17 -0.11 -0.44 -0.16 -0.11 -0.54

Number of Peaks 80 253 275 70 295 275 82 253 267 66 294

Av Of 1/3 Highest 1.93 7.55 -3.74 2.00 7.40 4.79 65.93 7.34 -4.34 66.01 7.20
Av Of 1/3 Lowest 1.28 5.48 -4.68 1.34 5.54 3.86 65.28 5.30 -5.09 65.33 5.37
Av Of 1/100 Highest 2.22 7.99 -3.49 2.29 7.89 5.04 66.22 7.77 -4.16 66.29 7.78
Av Of 1/100 Lowest 1.01 4.95 -4.95 1.07 5.03 3.58 65.01 4.61 -5.29 65.08 4.69
Av Of 1/1000 Highest 2.22 8.00 -3.47 2.29 7.92 5.06 66.22 7.82 -4.16 66.29 7.81
Av Of 1/1000 Lowest 1.01 4.87 -4.96 1.07 5.03 3.57 65.01 4.53 -5.30 65.08 4.69
Maximum 2.22 8.00 -3.47 2.29 7.92 5.06 66.22 7.82 -4.16 66.29 7.81
Minimum 1.01 4.87 -4.96 1.07 5.03 3.57 65.01 4.53 -5.30 65.08 4.69
Pred. Max 2.37 8.30 -3.33 2.45 8.20 5.21 66.38 8.12 -4.05 66.46 8.10
Pred. Min 0.87 4.56 -5.11 0.93 4.75 3.43 64.88 4.19 -5.41 64.93 4.38

Av Of 1/3 H-Mean 0.36 1.08 0.46 0.37 0.93 0.46 0.37 1.05 0.37 0.38 0.91
Av Of 1/3 L-Mean -0.29 -0.99 -0.47 -0.29 -0.93 -0.47 -0.29 -0.99 -0.39 -0.31 -0.92
Av Of 1/100 H-Mean 0.65 1.52 0.71 0.66 1.42 0.71 0.65 1.48 0.54 0.66 1.49
Av Of 1/100 L-Mean -0.56 -1.52 -0.75 -0.56 -1.44 -0.75 -0.56 -1.68 -0.58 -0.56 -1.60
Av Of 1/1000 H-Mean 0.65 1.53 0.73 0.66 1.45 0.73 0.65 1.53 0.55 0.66 1.52
Av Of 1/1000 L-Mean -0.56 -1.60 -0.76 -0.56 -1.45 -0.76 -0.56 -1.75 -0.59 -0.56 -1.60
Maximum - Mean 0.65 1.53 0.73 0.66 1.45 0.73 0.65 1.53 0.55 0.66 1.52
Minimum - Mean -0.56 -1.60 -0.76 -0.56 -1.45 -0.76 -0.56 -1.75 -0.59 -0.56 -1.60
Pred. Max-Mean 0.81 1.83 0.87 0.82 1.73 0.88 0.81 1.83 0.66 0.82 1.81
Pred. Min-Mean -0.69 -1.91 -0.91 -0.70 -1.72 -0.90 -0.69 -2.10 -0.70 -0.70 -1.91

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 19 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 129.57 6.11 -5.21 129.64 6.11 3.32


Variance 0.03 0.05 0.40 0.02 0.05 0.37 0.02
Root Mean Square 3.83 129.58 6.14 5.22 129.64 6.14 3.32
Std. Deviation 0.19 0.22 0.64 0.16 0.22 0.61 0.16
Skewness -0.04 0.05 -0.08 -0.06 0.05 -0.15 -0.06
Kurtosis -0.17 -0.11 -0.13 -0.08 -0.11 -0.15 -0.08

Number of Peaks 267 83 253 257 66 291 259

Av Of 1/3 Highest 4.20 129.94 7.15 -4.90 130.02 7.02 3.63


Av Of 1/3 Lowest 3.44 129.32 5.10 -5.54 129.34 5.17 2.99
Av Of 1/100 Highest 4.37 130.23 7.64 -4.74 130.30 7.67 3.79
Av Of 1/100 Lowest 3.25 129.15 4.27 -5.72 129.08 4.35 2.82
Av Of 1/1000 Highest 4.38 130.23 7.66 -4.74 130.30 7.69 3.80
Av Of 1/1000 Lowest 3.24 129.15 4.19 -5.72 129.08 4.35 2.81
Maximum 4.38 130.23 7.66 -4.74 130.30 7.69 3.80
Minimum 3.24 129.02 4.19 -5.72 129.08 4.35 2.81
Pred. Max 4.48 130.39 7.96 -4.64 130.46 8.00 3.89
Pred. Min 3.12 128.88 3.82 -5.82 128.94 4.02 2.71

Av Of 1/3 H-Mean 0.37 0.37 1.04 0.32 0.38 0.92 0.31


Av Of 1/3 L-Mean -0.38 -0.26 -1.01 -0.33 -0.31 -0.94 -0.32
Av Of 1/100 H-Mean 0.54 0.65 1.54 0.47 0.66 1.56 0.47
Av Of 1/100 L-Mean -0.58 -0.43 -1.83 -0.50 -0.56 -1.75 -0.50
Av Of 1/1000 H-Mean 0.55 0.65 1.55 0.48 0.66 1.59 0.48
Av Of 1/1000 L-Mean -0.59 -0.43 -1.91 -0.51 -0.56 -1.76 -0.50
Maximum - Mean 0.55 0.65 1.55 0.48 0.66 1.59 0.48
Minimum - Mean -0.59 -0.56 -1.91 -0.51 -0.56 -1.76 -0.50
Pred. Max-Mean 0.66 0.81 1.86 0.57 0.82 1.89 0.57
Pred. Min-Mean -0.70 -0.69 -2.29 -0.60 -0.70 -2.09 -0.60
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 270 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA270

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 270.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 270.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 270.0


22.8 0.60 270.0
45.6 0.20 270.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -87 -30 -11 0 0 0 94


BM2S DB30 -32 10 -6 0 0 0 35
BM3S DB30 -3 7 -2 0 0 0 9
BM4P DB30 55 -95 -11 0 0 0 111
BM4S DB30 3 4 -2 0 0 0 6
BM5P DB30 57 -44 -8 0 0 0 73
BM5S DB30 12 3 -3 0 0 0 13
MAINLN DB30 9 8 -1113 0 0 0 1115
SL115A WHPBJKT -105 86 274 0 0 0 307
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 194.7 -1.7 -24740.5 15 1663760 -114


Buoyancy -203.8 1.8 25904.9 -83 -1834429 126
Wind 0.0 34.2 0.0 -582 0 2312
Drag 0.0 51.3 0.0 -212 1 3487
Wave 0.0 53.8 0.3 188 -30 3533
Flex. Connectors 9.1 -139.4 -1164.7 676 170694 -13896
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 -5 -4553

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight -0.4 -8.1 -1114.2 15 166273 -1206


Wind 0.5 8.2 -0.3 -18 46 1229
Flex. Connectors -0.1 -0.1 1114.5 5 -166312 -17
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.0 0 6 3
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 1003.80 1001.58 196.26 94.43 0.3528 92.11 0.00


BM2S 999.86 1001.58 513.05 34.96 0.1288 29.97 0.00
BM3S 995.36 1001.57 760.20 8.82 0.0338 1.74 0.00
BM4P 1004.65 1001.50 137.42 110.82 0.4004 109.01 0.00
BM4S 993.53 1001.50 811.66 5.64 0.0214 0.00 0.00
BM5P 1002.51 1001.47 300.68 72.89 0.2773 69.70 0.00
BM5S 996.67 1001.46 713.11 12.58 0.0457 5.91 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM3P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location 1.64 6.41 -4.21 0.00 0.45 0.00


N Force 0.00 0.00 0.04 0 -5 -4553

WHPBJKT Location 2.60 -0.74 21.87 0.42 -0.02 2.94


N Force 0.00 0.00 -0.04 0 6 3
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (MOORING TENSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 98.24 34.80 0.00 8.34 115.42 5.48 75.33 12.15


Variance 59.64 2.19 0.00 0.94 84.11 0.60 21.90 2.00
Root Mean Square 98.54 34.83 0.00 8.39 115.79 5.53 75.48 12.23
Std. Deviation 7.72 1.48 0.00 0.97 9.17 0.77 4.68 1.41
Skewness -0.36 -0.06 0.00 1.04 -0.28 1.25 -0.17 0.84
Kurtosis 0.20 -0.26 0.00 1.14 0.13 2.07 0.04 1.00

Number of Peaks 242 242 0 246 233 270 237 250

Av Of 1/3 Highest 109.65 37.25 0.00 10.07 130.39 6.85 83.37 14.67
Av Of 1/3 Lowest 86.65 32.41 0.00 7.06 100.67 4.53 67.72 10.15
Av Of 1/100 Highest 115.06 38.68 0.00 11.89 140.20 8.55 89.00 16.94
Av Of 1/100 Lowest 76.45 30.64 0.00 6.34 87.94 3.92 62.44 9.04
Av Of 1/1000 Highest 115.58 38.80 0.00 12.17 141.09 8.77 89.27 17.14
Av Of 1/1000 Lowest 75.02 30.49 0.00 6.28 86.32 3.89 62.29 9.04
Maximum 115.58 38.80 0.00 12.17 141.09 8.77 89.27 17.14
Minimum 75.02 30.49 0.00 6.28 86.32 3.89 62.29 9.04
Pred. Max 119.00 39.58 0.00 12.93 146.18 9.41 92.03 18.13
Pred. Min 70.44 29.64 0.00 5.88 80.54 3.59 59.71 8.43

Av Of 1/3 H-Mean 11.41 2.45 0.00 1.73 14.96 1.37 8.04 2.52
Av Of 1/3 L-Mean -11.59 -2.40 0.00 -1.27 -14.75 -0.95 -7.61 -1.99
Av Of 1/100 H-Mean 16.81 3.87 0.00 3.55 24.77 3.07 13.67 4.79
Av Of 1/100 L-Mean -21.79 -4.16 0.00 -2.00 -27.48 -1.56 -12.89 -3.10
Av Of 1/1000 H-Mean 17.34 3.99 0.00 3.84 25.66 3.29 13.93 5.00
Av Of 1/1000 L-Mean -23.22 -4.31 0.00 -2.05 -29.10 -1.59 -13.04 -3.11
Maximum - Mean 17.34 3.99 0.00 3.84 25.66 3.29 13.93 5.00
Minimum - Mean -23.22 -4.31 0.00 -2.05 -29.10 -1.59 -13.04 -3.11
Pred. Max-Mean 20.76 4.78 0.00 4.59 30.76 3.93 16.69 5.98
Pred. Min-Mean -27.80 -5.16 0.00 -2.46 -34.88 -1.89 -15.62 -3.72

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean 1.72 6.83 -4.20


Variance 0.06 0.55 0.16
Root Mean Square 1.74 6.87 4.22
Std. Deviation 0.24 0.74 0.40
Skewness -0.43 -0.17 -0.03
Kurtosis 0.29 -0.10 -0.10

Number of Peaks 78 237 239

Av Of 1/3 Highest 2.12 8.10 -3.40


Av Of 1/3 Lowest 1.39 5.55 -5.03
Av Of 1/100 Highest 2.26 8.81 -2.98
Av Of 1/100 Lowest 1.04 4.69 -5.44
Av Of 1/1000 Highest 2.26 8.84 -2.92
Av Of 1/1000 Lowest 1.04 4.45 -5.46
Maximum 2.26 8.84 -2.92
Minimum 1.04 4.45 -5.46
Pred. Max 2.40 9.24 -2.67
Pred. Min 0.87 3.98 -5.71

Av Of 1/3 H-Mean 0.40 1.27 0.80


Av Of 1/3 L-Mean -0.33 -1.28 -0.82
Av Of 1/100 H-Mean 0.54 1.98 1.22
Av Of 1/100 L-Mean -0.68 -2.15 -1.24
Av Of 1/1000 H-Mean 0.54 2.01 1.28
Av Of 1/1000 L-Mean -0.68 -2.38 -1.26
Maximum - Mean 0.54 2.01 1.28
Minimum - Mean -0.68 -2.38 -1.26
Pred. Max-Mean 0.67 2.41 1.53
Pred. Min-Mean -0.85 -2.85 -1.51
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 1.72 6.83 -4.20 1.79 6.83 4.33 65.73 6.77 -4.71 65.80 6.77
Variance 0.06 0.55 0.16 0.06 0.43 0.16 0.06 0.55 0.14 0.06 0.44
Root Mean Square 1.74 6.87 4.22 1.81 6.86 4.35 65.73 6.81 4.72 65.80 6.80
Std. Deviation 0.24 0.74 0.40 0.24 0.66 0.40 0.24 0.74 0.37 0.24 0.66
Skewness -0.43 -0.17 -0.03 -0.43 -0.36 -0.03 -0.43 -0.17 -0.07 -0.43 -0.37
Kurtosis 0.29 -0.10 -0.10 0.29 0.09 -0.10 0.29 -0.04 -0.10 0.29 0.18

Number of Peaks 78 237 239 76 233 239 84 237 235 68 231

Av Of 1/3 Highest 2.12 8.10 -3.40 2.16 7.86 5.13 66.12 8.03 -3.98 66.17 7.79
Av Of 1/3 Lowest 1.39 5.55 -5.03 1.43 5.75 3.51 65.41 5.48 -5.48 65.48 5.73
Av Of 1/100 Highest 2.26 8.81 -2.98 2.33 8.37 5.55 66.27 8.77 -3.64 66.34 8.38
Av Of 1/100 Lowest 1.04 4.69 -5.44 1.11 4.87 3.09 65.04 4.56 -5.88 65.12 4.79
Av Of 1/1000 Highest 2.26 8.84 -2.92 2.33 8.41 5.61 66.27 8.86 -3.60 66.34 8.43
Av Of 1/1000 Lowest 1.04 4.45 -5.46 1.11 4.70 3.07 65.04 4.33 -5.89 65.12 4.57
Maximum 2.26 8.84 -2.92 2.33 8.41 5.61 66.27 8.86 -3.60 66.34 8.43
Minimum 1.04 4.45 -5.46 1.11 4.70 3.07 65.04 4.33 -5.89 65.12 4.57
Pred. Max 2.40 9.24 -2.67 2.47 8.73 5.86 66.40 9.27 -3.38 66.47 8.76
Pred. Min 0.87 3.98 -5.71 0.95 4.28 2.82 64.88 3.85 -6.13 64.95 4.14

Av Of 1/3 H-Mean 0.40 1.27 0.80 0.37 1.03 0.80 0.39 1.26 0.73 0.38 1.02
Av Of 1/3 L-Mean -0.33 -1.28 -0.82 -0.36 -1.08 -0.82 -0.32 -1.29 -0.77 -0.32 -1.04
Av Of 1/100 H-Mean 0.54 1.98 1.22 0.54 1.53 1.22 0.54 2.00 1.07 0.54 1.61
Av Of 1/100 L-Mean -0.68 -2.15 -1.24 -0.68 -1.96 -1.24 -0.69 -2.21 -1.17 -0.68 -1.98
Av Of 1/1000 H-Mean 0.54 2.01 1.28 0.54 1.58 1.28 0.54 2.09 1.11 0.54 1.66
Av Of 1/1000 L-Mean -0.68 -2.38 -1.26 -0.68 -2.13 -1.26 -0.69 -2.44 -1.18 -0.68 -2.20
Maximum - Mean 0.54 2.01 1.28 0.54 1.58 1.28 0.54 2.09 1.11 0.54 1.66
Minimum - Mean -0.68 -2.38 -1.26 -0.68 -2.13 -1.26 -0.69 -2.44 -1.18 -0.68 -2.20
Pred. Max-Mean 0.67 2.41 1.53 0.67 1.90 1.53 0.67 2.50 1.33 0.67 1.99
Pred. Min-Mean -0.85 -2.85 -1.51 -0.85 -2.56 -1.51 -0.85 -2.92 -1.42 -0.85 -2.63

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 22 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=270deg (BARGE EXCURSION-BM3P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.82 129.74 6.71 -5.22 129.80 6.71 3.31


Variance 0.14 0.06 0.56 0.13 0.06 0.44 0.13
Root Mean Square 3.84 129.74 6.75 5.23 129.80 6.74 3.33
Std. Deviation 0.37 0.24 0.75 0.36 0.24 0.66 0.36
Skewness -0.07 -0.43 -0.18 -0.09 -0.43 -0.38 -0.09
Kurtosis -0.10 0.29 0.03 -0.09 0.29 0.28 -0.09

Number of Peaks 235 88 237 231 56 231 231

Av Of 1/3 Highest 4.56 130.11 7.97 -4.50 130.17 7.73 4.03


Av Of 1/3 Lowest 3.06 129.42 5.42 -5.98 129.45 5.64 2.56
Av Of 1/100 Highest 4.89 130.28 8.73 -4.18 130.34 8.39 4.35
Av Of 1/100 Lowest 2.65 129.05 4.43 -6.33 129.12 4.62 2.20
Av Of 1/1000 Highest 4.93 130.28 8.87 -4.15 130.34 8.44 4.38
Av Of 1/1000 Lowest 2.64 129.05 4.20 -6.34 129.12 4.45 2.20
Maximum 4.93 130.28 8.87 -4.15 130.34 8.44 4.38
Minimum 2.64 129.05 4.20 -6.34 129.12 4.45 2.20
Pred. Max 5.15 130.41 9.30 -3.94 130.48 8.79 4.59
Pred. Min 2.41 128.89 3.71 -6.56 128.95 4.00 1.97

Av Of 1/3 H-Mean 0.74 0.38 1.26 0.72 0.36 1.02 0.72


Av Of 1/3 L-Mean -0.77 -0.32 -1.29 -0.76 -0.35 -1.07 -0.76
Av Of 1/100 H-Mean 1.07 0.54 2.02 1.04 0.54 1.68 1.04
Av Of 1/100 L-Mean -1.17 -0.69 -2.28 -1.11 -0.68 -2.09 -1.11
Av Of 1/1000 H-Mean 1.11 0.54 2.16 1.07 0.54 1.73 1.07
Av Of 1/1000 L-Mean -1.18 -0.69 -2.51 -1.12 -0.68 -2.26 -1.12
Maximum - Mean 1.11 0.54 2.16 1.07 0.54 1.73 1.07
Minimum - Mean -1.18 -0.69 -2.51 -1.12 -0.68 -2.26 -1.12
Pred. Max-Mean 1.33 0.67 2.59 1.28 0.68 2.08 1.28
Pred. Min-Mean -1.41 -0.85 -3.00 -1.34 -0.86 -2.71 -1.34
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 4.31 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.31 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -20 -6 -5 0 0 0 23


BM2S DB30 -11 4 -3 0 0 0 13
BM3P DB30 -25 -43 -8 0 0 0 52
BM3S DB30 -4 9 -3 0 0 0 11
BM4P DB30 47 -80 -10 0 0 0 94
BM4S DB30 12 20 -4 0 0 0 24
BM5S DB30 57 14 -7 0 0 0 59
MAINLN DB30 4 6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.0 13.6 -24740.5 -121 1663745 911


Buoyancy -201.8 -14.2 25875.1 666 -1831893 -998
Wind -12.7 24.2 0.0 -411 -246 1612
Drag -12.9 36.2 -3.3 -149 33 2463
Wave -20.2 20.0 30.6 -38 -1880 930
Flex. Connectors 54.6 -79.7 -1161.7 57 170231 -6134
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -14 -1217

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.5 -5.9 -1114.3 11 166282 -881


Wind -4.6 6.0 -0.2 -13 20 909
Flex. Connectors 0.1 -0.1 1114.4 3 -166287 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 14 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.61 1001.58 602.83 23.43 0.0875 17.67 0.00


BM2S 996.76 1001.58 704.50 13.14 0.0485 6.53 0.00
BM3P 1001.24 1001.57 404.25 52.33 0.1974 48.24 0.00
BM3S 996.23 1001.57 728.68 11.19 0.0429 4.38 0.00
BM4P 1003.76 1001.50 204.51 94.32 0.3407 91.92 0.00
BM4S 998.69 1001.50 602.56 23.88 0.0906 18.15 0.00
BM5S 1001.66 1001.46 369.58 59.33 0.2156 55.57 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.64 2.92 -4.21 -0.03 0.45 0.00


N Force -0.01 0.00 0.09 0 -14 -1217

WHPBJKT Location -2.04 -3.27 22.55 0.30 0.23 2.54


N Force 0.00 0.00 -0.09 0 14 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 23.15 12.66 53.64 10.64 98.19 23.13 0.00 60.44


Variance 5.62 1.86 6.27 0.63 27.74 1.74 0.00 26.76
Root Mean Square 23.28 12.74 53.70 10.67 98.33 23.16 0.00 60.66
Std. Deviation 2.37 1.36 2.50 0.80 5.27 1.32 0.00 5.17
Skewness 0.11 0.24 0.27 -0.08 0.21 -0.15 0.00 0.19
Kurtosis -0.66 -0.54 -0.45 -0.32 -0.45 -0.45 0.00 -0.57

Number of Peaks 139 103 185 107 81 167 0 133

Av Of 1/3 Highest 26.85 14.76 58.07 11.91 108.41 25.15 0.00 68.60
Av Of 1/3 Lowest 19.69 10.44 49.98 9.12 90.51 20.81 0.00 52.92
Av Of 1/100 Highest 29.13 16.35 59.93 12.73 110.23 26.72 0.00 74.48
Av Of 1/100 Lowest 17.56 9.94 47.31 8.89 86.17 20.04 0.00 49.00
Av Of 1/1000 Highest 29.13 16.35 59.93 12.73 110.23 26.72 0.00 74.48
Av Of 1/1000 Lowest 17.56 9.94 47.31 8.89 86.17 20.04 0.00 49.00
Maximum 29.13 16.35 59.93 12.73 110.23 26.72 0.00 74.48
Minimum 17.56 9.94 47.31 8.89 86.17 20.04 0.00 49.00
Pred. Max 30.43 17.20 61.22 13.21 113.14 27.48 0.00 77.55
Pred. Min 16.35 9.31 46.00 8.49 83.27 19.39 0.00 46.49

Av Of 1/3 H-Mean 3.70 2.10 4.43 1.27 10.22 2.02 0.00 8.16
Av Of 1/3 L-Mean -3.47 -2.22 -3.65 -1.51 -7.69 -2.31 0.00 -7.52
Av Of 1/100 H-Mean 5.98 3.69 6.29 2.09 12.04 3.60 0.00 14.03
Av Of 1/100 L-Mean -5.59 -2.73 -6.33 -1.75 -12.02 -3.09 0.00 -11.44
Av Of 1/1000 H-Mean 5.98 3.69 6.29 2.09 12.04 3.60 0.00 14.03
Av Of 1/1000 L-Mean -5.59 -2.73 -6.33 -1.75 -12.02 -3.09 0.00 -11.44
Maximum - Mean 5.98 3.69 6.29 2.09 12.04 3.60 0.00 14.03
Minimum - Mean -5.59 -2.73 -6.33 -1.75 -12.02 -3.09 0.00 -11.44
Pred. Max-Mean 7.28 4.53 7.59 2.57 14.95 4.35 0.00 17.11
Pred. Min-Mean -6.81 -3.35 -7.64 -2.14 -14.92 -3.74 0.00 -13.95

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.75 3.09 -4.21


Variance 0.13 0.03 0.00
Root Mean Square 2.78 3.10 4.21
Std. Deviation 0.36 0.17 0.02
Skewness -0.12 0.31 0.02
Kurtosis -0.59 -0.54 -0.16

Number of Peaks 167 139 341

Av Of 1/3 Highest -2.23 3.39 -4.17


Av Of 1/3 Lowest -3.36 2.86 -4.24
Av Of 1/100 Highest -1.89 3.56 -4.14
Av Of 1/100 Lowest -3.65 2.75 -4.26
Av Of 1/1000 Highest -1.89 3.56 -4.14
Av Of 1/1000 Lowest -3.65 2.75 -4.27
Maximum -1.89 3.56 -4.14
Minimum -3.65 2.75 -4.27
Pred. Max -1.71 3.67 -4.13
Pred. Min -3.84 2.67 -4.28

Av Of 1/3 H-Mean 0.52 0.30 0.04


Av Of 1/3 L-Mean -0.61 -0.23 -0.04
Av Of 1/100 H-Mean 0.86 0.47 0.06
Av Of 1/100 L-Mean -0.90 -0.34 -0.06
Av Of 1/1000 H-Mean 0.86 0.47 0.07
Av Of 1/1000 L-Mean -0.90 -0.34 -0.06
Maximum - Mean 0.86 0.47 0.07
Minimum - Mean -0.90 -0.34 -0.06
Pred. Max-Mean 1.05 0.58 0.08
Pred. Min-Mean -1.09 -0.42 -0.07
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.75 3.09 -4.21 -2.69 3.10 4.33 61.25 3.10 -4.71 61.32 3.10
Variance 0.13 0.03 0.00 0.13 0.03 0.00 0.13 0.03 0.00 0.13 0.03
Root Mean Square 2.78 3.10 4.21 2.71 3.10 4.33 61.25 3.10 4.71 61.32 3.11
Std. Deviation 0.36 0.17 0.02 0.36 0.17 0.02 0.36 0.17 0.01 0.36 0.17
Skewness -0.12 0.31 0.02 -0.12 0.31 0.02 -0.12 0.31 0.03 -0.12 0.31
Kurtosis -0.59 -0.54 -0.16 -0.59 -0.54 -0.16 -0.59 -0.55 0.02 -0.59 -0.55

Number of Peaks 167 139 341 143 126 341 168 139 325 143 127

Av Of 1/3 Highest -2.23 3.39 -4.17 -2.16 3.35 4.37 61.78 3.40 -4.69 61.85 3.36
Av Of 1/3 Lowest -3.36 2.86 -4.24 -3.27 2.84 4.29 60.65 2.87 -4.72 60.74 2.84
Av Of 1/100 Highest -1.89 3.56 -4.14 -1.82 3.55 4.39 62.12 3.57 -4.67 62.18 3.56
Av Of 1/100 Lowest -3.65 2.75 -4.26 -3.59 2.76 4.27 60.35 2.75 -4.73 60.42 2.76
Av Of 1/1000 Highest -1.89 3.56 -4.14 -1.82 3.55 4.39 62.12 3.57 -4.67 62.18 3.56
Av Of 1/1000 Lowest -3.65 2.75 -4.27 -3.59 2.76 4.26 60.35 2.75 -4.73 60.42 2.76
Maximum -1.89 3.56 -4.14 -1.82 3.55 4.39 62.12 3.57 -4.67 62.18 3.56
Minimum -3.65 2.75 -4.27 -3.59 2.76 4.26 60.35 2.75 -4.73 60.42 2.76
Pred. Max -1.71 3.67 -4.13 -1.64 3.65 4.40 62.30 3.67 -4.67 62.37 3.66
Pred. Min -3.84 2.67 -4.28 -3.78 2.69 4.25 60.17 2.67 -4.74 60.22 2.69

Av Of 1/3 H-Mean 0.52 0.30 0.04 0.53 0.26 0.04 0.52 0.30 0.02 0.53 0.26
Av Of 1/3 L-Mean -0.61 -0.23 -0.04 -0.58 -0.26 -0.04 -0.61 -0.23 -0.02 -0.58 -0.26
Av Of 1/100 H-Mean 0.86 0.47 0.06 0.86 0.46 0.06 0.86 0.47 0.03 0.86 0.45
Av Of 1/100 L-Mean -0.90 -0.34 -0.06 -0.90 -0.33 -0.06 -0.90 -0.35 -0.03 -0.90 -0.34
Av Of 1/1000 H-Mean 0.86 0.47 0.07 0.86 0.46 0.06 0.86 0.47 0.03 0.86 0.45
Av Of 1/1000 L-Mean -0.90 -0.34 -0.06 -0.90 -0.33 -0.06 -0.90 -0.35 -0.03 -0.90 -0.34
Maximum - Mean 0.86 0.47 0.07 0.86 0.46 0.06 0.86 0.47 0.03 0.86 0.45
Minimum - Mean -0.90 -0.34 -0.06 -0.90 -0.33 -0.06 -0.90 -0.35 -0.03 -0.90 -0.34
Pred. Max-Mean 1.05 0.58 0.08 1.05 0.56 0.08 1.05 0.57 0.04 1.05 0.55
Pred. Min-Mean -1.09 -0.42 -0.07 -1.10 -0.41 -0.07 -1.09 -0.43 -0.04 -1.10 -0.42

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.31sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 125.26 3.10 -5.20 125.33 3.11 3.33


Variance 0.00 0.13 0.03 0.00 0.13 0.03 0.00
Root Mean Square 3.83 125.26 3.11 5.20 125.33 3.11 3.33
Std. Deviation 0.01 0.36 0.17 0.03 0.36 0.17 0.03
Skewness 0.03 -0.12 0.31 0.01 -0.12 0.31 0.01
Kurtosis 0.02 -0.59 -0.55 -0.21 -0.59 -0.55 -0.21

Number of Peaks 325 169 139 329 144 129 329

Av Of 1/3 Highest 3.85 125.78 3.41 -5.13 125.86 3.37 3.40


Av Of 1/3 Lowest 3.81 124.66 2.88 -5.27 124.74 2.85 3.26
Av Of 1/100 Highest 3.86 126.13 3.57 -5.10 126.19 3.56 3.43
Av Of 1/100 Lowest 3.80 124.36 2.75 -5.30 124.43 2.76 3.23
Av Of 1/1000 Highest 3.86 126.13 3.57 -5.10 126.19 3.56 3.43
Av Of 1/1000 Lowest 3.80 124.36 2.75 -5.30 124.43 2.76 3.23
Maximum 3.86 126.13 3.57 -5.10 126.19 3.56 3.43
Minimum 3.80 124.36 2.75 -5.30 124.43 2.76 3.23
Pred. Max 3.87 126.31 3.67 -5.08 126.37 3.66 3.45
Pred. Min 3.79 124.17 2.67 -5.32 124.23 2.69 3.21

Av Of 1/3 H-Mean 0.02 0.52 0.30 0.07 0.53 0.26 0.07


Av Of 1/3 L-Mean -0.02 -0.60 -0.22 -0.07 -0.58 -0.26 -0.07
Av Of 1/100 H-Mean 0.03 0.87 0.47 0.10 0.86 0.45 0.10
Av Of 1/100 L-Mean -0.03 -0.90 -0.35 -0.10 -0.90 -0.35 -0.10
Av Of 1/1000 H-Mean 0.03 0.87 0.47 0.10 0.86 0.45 0.10
Av Of 1/1000 L-Mean -0.03 -0.90 -0.35 -0.10 -0.90 -0.35 -0.10
Maximum - Mean 0.03 0.87 0.47 0.10 0.86 0.45 0.10
Minimum - Mean -0.03 -0.90 -0.35 -0.10 -0.90 -0.35 -0.10
Pred. Max-Mean 0.04 1.05 0.57 0.12 1.05 0.55 0.12
Pred. Min-Mean -0.04 -1.09 -0.43 -0.12 -1.10 -0.42 -0.12
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 4.86 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 4.86 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -20 -6 -5 0 0 0 23


BM2S DB30 -10 3 -3 0 0 0 12
BM3P DB30 -26 -44 -8 0 0 0 53
BM3S DB30 -4 9 -3 0 0 0 11
BM4P DB30 49 -83 -10 0 0 0 98
BM4S DB30 12 20 -4 0 0 0 23
BM5S DB30 58 14 -8 0 0 0 61
MAINLN DB30 4 6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.0 9.4 -24740.5 -83 1663745 631


Buoyancy -201.7 -9.8 25872.1 461 -1831690 -691
Wind -12.7 24.2 0.0 -411 -246 1612
Drag -12.9 36.2 -3.3 -149 34 2462
Wave -24.4 24.1 33.5 73 -2144 1109
Flex. Connectors 58.8 -84.1 -1161.7 112 170289 -6545
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -15 -1423

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.6 -5.9 -1114.3 11 166282 -879


Wind -4.6 6.0 -0.2 -13 20 907
Flex. Connectors 0.1 -0.1 1114.4 3 -166286 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 15 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.53 1001.58 608.11 22.82 0.0852 17.01 0.00


BM2S 996.59 1001.58 712.71 12.40 0.0457 5.72 0.00
BM3P 1001.29 1001.57 399.81 53.08 0.2002 49.03 0.00
BM3S 996.04 1001.57 735.64 10.66 0.0409 3.79 0.00
BM4P 1003.95 1001.50 189.83 97.82 0.3534 95.55 0.00
BM4S 998.64 1001.50 606.28 23.45 0.0889 17.68 0.00
BM5S 1001.75 1001.46 361.66 60.83 0.2210 57.13 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.78 3.07 -4.21 -0.02 0.45 0.00


N Force -0.01 0.00 0.10 0 -15 -1423

WHPBJKT Location -2.19 -2.85 22.55 0.30 0.23 2.43


N Force 0.00 0.00 -0.10 0 15 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 22.68 12.12 54.70 10.06 101.98 22.69 0.00 62.08


Variance 10.76 3.10 12.73 1.02 49.94 3.27 0.00 54.40
Root Mean Square 22.92 12.24 54.81 10.11 102.23 22.76 0.00 62.51
Std. Deviation 3.28 1.76 3.57 1.01 7.07 1.81 0.00 7.38
Skewness 0.21 0.17 0.21 -0.25 0.37 -0.07 0.00 0.10
Kurtosis -1.03 -0.96 -0.97 -0.91 -0.75 -1.08 0.00 -1.09

Number of Peaks 227 163 235 133 155 245 0 205

Av Of 1/3 Highest 27.96 15.03 60.46 11.53 113.85 25.39 0.00 73.55
Av Of 1/3 Lowest 18.07 9.61 49.48 8.28 91.59 19.89 0.00 51.28
Av Of 1/100 Highest 30.96 16.54 63.07 12.25 118.68 26.72 0.00 77.63
Av Of 1/100 Lowest 16.72 8.78 47.40 7.99 88.18 18.94 0.00 46.60
Av Of 1/1000 Highest 31.03 16.54 63.47 12.25 118.68 26.83 0.00 78.32
Av Of 1/1000 Lowest 16.43 8.78 47.27 7.99 88.18 18.76 0.00 46.56
Maximum 31.03 16.54 63.47 12.25 118.68 26.83 0.00 78.32
Minimum 16.43 8.78 47.27 7.99 88.18 18.76 0.00 46.56
Pred. Max 32.70 17.47 65.21 12.73 122.23 27.64 0.00 81.62
Pred. Min 15.19 8.08 45.80 7.54 85.24 17.99 0.00 43.41

Av Of 1/3 H-Mean 5.28 2.91 5.76 1.47 11.86 2.70 0.00 11.47
Av Of 1/3 L-Mean -4.61 -2.51 -5.22 -1.78 -10.39 -2.80 0.00 -10.79
Av Of 1/100 H-Mean 8.28 4.42 8.37 2.19 16.69 4.03 0.00 15.55
Av Of 1/100 L-Mean -5.96 -3.34 -7.30 -2.07 -13.80 -3.76 0.00 -15.47
Av Of 1/1000 H-Mean 8.35 4.42 8.77 2.19 16.69 4.14 0.00 16.24
Av Of 1/1000 L-Mean -6.25 -3.34 -7.42 -2.07 -13.80 -3.93 0.00 -15.52
Maximum - Mean 8.35 4.42 8.77 2.19 16.69 4.14 0.00 16.24
Minimum - Mean -6.25 -3.34 -7.42 -2.07 -13.80 -3.93 0.00 -15.52
Pred. Max-Mean 10.02 5.36 10.51 2.68 20.25 4.95 0.00 19.54
Pred. Min-Mean -7.49 -4.04 -8.89 -2.52 -16.75 -4.70 0.00 -18.66

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -2.89 3.26 -4.21


Variance 0.26 0.05 0.00
Root Mean Square 2.94 3.27 4.21
Std. Deviation 0.51 0.22 0.03
Skewness -0.07 0.58 -0.06
Kurtosis -1.07 -0.46 -0.14

Number of Peaks 197 255 289

Av Of 1/3 Highest -2.13 3.65 -4.15


Av Of 1/3 Lowest -3.68 2.97 -4.27
Av Of 1/100 Highest -1.77 3.87 -4.12
Av Of 1/100 Lowest -3.97 2.88 -4.31
Av Of 1/1000 Highest -1.77 3.88 -4.12
Av Of 1/1000 Lowest -3.97 2.87 -4.32
Maximum -1.77 3.88 -4.12
Minimum -3.97 2.87 -4.32
Pred. Max -1.55 4.00 -4.11
Pred. Min -4.18 2.80 -4.34

Av Of 1/3 H-Mean 0.76 0.39 0.06


Av Of 1/3 L-Mean -0.79 -0.29 -0.06
Av Of 1/100 H-Mean 1.12 0.61 0.08
Av Of 1/100 L-Mean -1.07 -0.38 -0.10
Av Of 1/1000 H-Mean 1.12 0.62 0.08
Av Of 1/1000 L-Mean -1.07 -0.39 -0.11
Maximum - Mean 1.12 0.62 0.08
Minimum - Mean -1.07 -0.39 -0.11
Pred. Max-Mean 1.35 0.74 0.10
Pred. Min-Mean -1.29 -0.46 -0.13
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -2.89 3.26 -4.21 -2.83 3.26 4.33 61.11 3.26 -4.70 61.18 3.26
Variance 0.26 0.05 0.00 0.26 0.05 0.00 0.26 0.05 0.00 0.26 0.05
Root Mean Square 2.94 3.27 4.21 2.87 3.27 4.33 61.11 3.27 4.70 61.18 3.27
Std. Deviation 0.51 0.22 0.03 0.51 0.22 0.03 0.51 0.22 0.03 0.51 0.22
Skewness -0.07 0.58 -0.06 -0.07 0.58 -0.06 -0.07 0.57 -0.05 -0.07 0.57
Kurtosis -1.07 -0.46 -0.14 -1.07 -0.47 -0.14 -1.07 -0.45 -0.22 -1.07 -0.47

Number of Peaks 197 255 289 196 222 289 197 255 287 196 221

Av Of 1/3 Highest -2.13 3.65 -4.15 -2.07 3.65 4.39 61.87 3.64 -4.65 61.94 3.65
Av Of 1/3 Lowest -3.68 2.97 -4.27 -3.61 2.96 4.27 60.32 2.97 -4.76 60.40 2.96
Av Of 1/100 Highest -1.77 3.87 -4.12 -1.71 3.84 4.41 62.23 3.87 -4.63 62.30 3.84
Av Of 1/100 Lowest -3.97 2.88 -4.31 -3.90 2.88 4.23 60.04 2.87 -4.79 60.11 2.87
Av Of 1/1000 Highest -1.77 3.88 -4.12 -1.71 3.85 4.41 62.23 3.88 -4.63 62.30 3.85
Av Of 1/1000 Lowest -3.97 2.87 -4.32 -3.90 2.87 4.21 60.04 2.87 -4.80 60.11 2.87
Maximum -1.77 3.88 -4.12 -1.71 3.85 4.41 62.23 3.88 -4.63 62.30 3.85
Minimum -3.97 2.87 -4.32 -3.90 2.87 4.21 60.04 2.87 -4.80 60.11 2.87
Pred. Max -1.55 4.00 -4.11 -1.48 3.96 4.43 62.46 4.00 -4.61 62.53 3.96
Pred. Min -4.18 2.80 -4.34 -4.12 2.80 4.19 59.82 2.79 -4.82 59.89 2.79

Av Of 1/3 H-Mean 0.76 0.39 0.06 0.76 0.39 0.06 0.76 0.39 0.05 0.76 0.39
Av Of 1/3 L-Mean -0.79 -0.29 -0.06 -0.78 -0.30 -0.06 -0.79 -0.29 -0.05 -0.78 -0.30
Av Of 1/100 H-Mean 1.12 0.61 0.08 1.12 0.58 0.08 1.12 0.61 0.07 1.12 0.58
Av Of 1/100 L-Mean -1.07 -0.38 -0.10 -1.07 -0.39 -0.10 -1.07 -0.39 -0.09 -1.07 -0.39
Av Of 1/1000 H-Mean 1.12 0.62 0.08 1.12 0.58 0.08 1.12 0.62 0.08 1.12 0.58
Av Of 1/1000 L-Mean -1.07 -0.39 -0.11 -1.07 -0.39 -0.11 -1.07 -0.39 -0.09 -1.07 -0.39
Maximum - Mean 1.12 0.62 0.08 1.12 0.58 0.08 1.12 0.62 0.08 1.12 0.58
Minimum - Mean -1.07 -0.39 -0.11 -1.07 -0.39 -0.11 -1.07 -0.39 -0.09 -1.07 -0.39
Pred. Max-Mean 1.35 0.74 0.10 1.35 0.70 0.10 1.35 0.74 0.09 1.35 0.70
Pred. Min-Mean -1.29 -0.46 -0.13 -1.29 -0.47 -0.13 -1.29 -0.47 -0.11 -1.29 -0.47

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=4.86sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 125.12 3.26 -5.20 125.18 3.26 3.33


Variance 0.00 0.26 0.05 0.00 0.26 0.05 0.00
Root Mean Square 3.83 125.12 3.26 5.20 125.19 3.27 3.33
Std. Deviation 0.03 0.51 0.22 0.02 0.51 0.22 0.02
Skewness -0.05 -0.07 0.57 -0.03 -0.07 0.57 -0.03
Kurtosis -0.22 -1.07 -0.44 -0.15 -1.07 -0.46 -0.15

Number of Peaks 287 197 254 277 196 222 275

Av Of 1/3 Highest 3.88 125.88 3.64 -5.15 125.94 3.65 3.38


Av Of 1/3 Lowest 3.78 124.33 2.96 -5.25 124.40 2.96 3.28
Av Of 1/100 Highest 3.90 126.24 3.86 -5.13 126.30 3.84 3.41
Av Of 1/100 Lowest 3.74 124.05 2.87 -5.28 124.11 2.86 3.25
Av Of 1/1000 Highest 3.91 126.24 3.88 -5.13 126.30 3.84 3.41
Av Of 1/1000 Lowest 3.74 124.05 2.86 -5.28 124.11 2.86 3.25
Maximum 3.91 126.24 3.88 -5.13 126.30 3.84 3.41
Minimum 3.74 124.05 2.86 -5.28 124.11 2.86 3.25
Pred. Max 3.92 126.47 4.00 -5.11 126.53 3.96 3.42
Pred. Min 3.72 123.83 2.78 -5.30 123.89 2.78 3.24

Av Of 1/3 H-Mean 0.05 0.76 0.38 0.05 0.76 0.39 0.05


Av Of 1/3 L-Mean -0.05 -0.79 -0.29 -0.05 -0.78 -0.30 -0.05
Av Of 1/100 H-Mean 0.07 1.12 0.61 0.08 1.12 0.58 0.08
Av Of 1/100 L-Mean -0.09 -1.07 -0.39 -0.08 -1.07 -0.39 -0.08
Av Of 1/1000 H-Mean 0.08 1.12 0.62 0.08 1.12 0.59 0.08
Av Of 1/1000 L-Mean -0.09 -1.07 -0.39 -0.08 -1.07 -0.40 -0.08
Maximum - Mean 0.08 1.12 0.62 0.08 1.12 0.59 0.08
Minimum - Mean -0.09 -1.07 -0.39 -0.08 -1.07 -0.40 -0.08
Pred. Max-Mean 0.09 1.35 0.75 0.09 1.35 0.70 0.09
Pred. Min-Mean -0.11 -1.29 -0.47 -0.09 -1.29 -0.48 -0.09
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 5.43 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 5.43 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -19 -6 -5 0 0 0 22


BM2S DB30 -10 3 -3 0 0 0 12
BM3P DB30 -26 -45 -8 0 0 0 54
BM3S DB30 -4 8 -3 0 0 0 10
BM4P DB30 51 -87 -10 0 0 0 103
BM4S DB30 11 19 -4 0 0 0 23
BM5S DB30 61 15 -8 0 0 0 63
MAINLN DB30 4 6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 329
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.0 5.4 -24740.5 -47 1663745 361


Buoyancy -201.8 -5.6 25873.7 264 -1831808 -394
Wind -12.7 24.2 0.0 -411 -246 1612
Drag -12.9 36.2 -3.4 -149 35 2462
Wave -30.0 29.7 32.0 168 -2109 1463
Flex. Connectors 64.4 -89.9 -1161.8 179 170371 -7092
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -14 -1591

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.5 -5.9 -1114.3 11 166282 -880


Wind -4.6 6.0 -0.2 -13 20 908
Flex. Connectors 0.1 -0.1 1114.4 3 -166287 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 15 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.41 1001.58 615.65 21.94 0.0820 16.07 0.00


BM2S 996.36 1001.58 721.83 11.69 0.0431 4.93 0.00
BM3P 1001.36 1001.57 394.05 54.06 0.2039 50.07 0.00
BM3S 995.77 1001.57 745.19 9.95 0.0381 2.99 0.00
BM4P 1004.21 1001.50 169.95 102.68 0.3710 100.58 0.00
BM4S 998.57 1001.50 611.10 22.89 0.0868 17.08 0.00
BM5S 1001.89 1001.46 350.44 62.95 0.2287 59.34 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -2.97 3.26 -4.21 -0.01 0.45 0.00


N Force -0.01 0.00 0.10 0 -14 -1591

WHPBJKT Location -2.37 -2.89 22.55 0.30 0.23 2.51


N Force 0.00 0.00 -0.10 0 15 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 21.88 11.48 54.93 9.62 106.22 22.34 0.00 64.30


Variance 11.64 3.85 15.45 1.72 95.49 3.79 0.00 66.34
Root Mean Square 22.14 11.65 55.07 9.71 106.67 22.42 0.00 64.81
Std. Deviation 3.41 1.96 3.93 1.31 9.77 1.95 0.00 8.15
Skewness 0.35 0.40 0.27 0.30 0.18 0.00 0.00 0.08
Kurtosis -0.63 -0.38 -0.61 -0.42 -0.53 -0.76 0.00 -0.72

Number of Peaks 106 118 87 146 154 69 0 140

Av Of 1/3 Highest 27.94 15.04 61.99 11.84 123.47 25.59 0.00 76.09
Av Of 1/3 Lowest 16.91 8.43 49.01 7.66 91.25 19.17 0.00 52.09
Av Of 1/100 Highest 31.21 16.32 64.16 13.20 128.49 26.67 0.00 84.97
Av Of 1/100 Lowest 15.03 7.76 47.31 7.16 85.12 18.46 0.00 46.29
Av Of 1/1000 Highest 31.21 16.32 64.16 13.20 128.49 26.67 0.00 84.97
Av Of 1/1000 Lowest 15.03 7.76 47.31 7.16 85.12 18.46 0.00 46.29
Maximum 31.21 16.32 64.16 13.20 128.49 26.67 0.00 84.97
Minimum 15.03 7.76 47.31 7.16 85.12 18.46 0.00 46.29
Pred. Max 33.35 17.40 66.36 13.97 133.24 27.75 0.00 89.47
Pred. Min 13.46 6.93 45.50 6.63 80.62 17.49 0.00 42.38

Av Of 1/3 H-Mean 6.06 3.56 7.06 2.22 17.25 3.25 0.00 11.79
Av Of 1/3 L-Mean -4.97 -3.05 -5.91 -1.96 -14.97 -3.17 0.00 -12.21
Av Of 1/100 H-Mean 9.34 4.83 9.23 3.58 22.27 4.33 0.00 20.68
Av Of 1/100 L-Mean -6.85 -3.72 -7.62 -2.46 -21.10 -3.88 0.00 -18.01
Av Of 1/1000 H-Mean 9.34 4.83 9.23 3.58 22.27 4.33 0.00 20.68
Av Of 1/1000 L-Mean -6.85 -3.72 -7.62 -2.46 -21.10 -3.88 0.00 -18.01
Maximum - Mean 9.34 4.83 9.23 3.58 22.27 4.33 0.00 20.68
Minimum - Mean -6.85 -3.72 -7.62 -2.46 -21.10 -3.88 0.00 -18.01
Pred. Max-Mean 11.47 5.92 11.43 4.35 27.02 5.41 0.00 25.17
Pred. Min-Mean -8.42 -4.55 -9.43 -2.99 -25.60 -4.85 0.00 -21.92

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -3.07 3.38 -4.21


Variance 0.33 0.12 0.02
Root Mean Square 3.12 3.39 4.21
Std. Deviation 0.57 0.35 0.13
Skewness -0.03 0.06 0.00
Kurtosis -0.64 -0.53 -0.24

Number of Peaks 198 247 265

Av Of 1/3 Highest -2.16 3.91 -3.94


Av Of 1/3 Lowest -3.98 2.89 -4.47
Av Of 1/100 Highest -1.76 4.23 -3.83
Av Of 1/100 Lowest -4.52 2.58 -4.59
Av Of 1/1000 Highest -1.76 4.25 -3.82
Av Of 1/1000 Lowest -4.52 2.56 -4.61
Maximum -1.76 4.25 -3.82
Minimum -4.52 2.56 -4.61
Pred. Max -1.49 4.42 -3.74
Pred. Min -4.82 2.40 -4.69

Av Of 1/3 H-Mean 0.90 0.53 0.26


Av Of 1/3 L-Mean -0.91 -0.49 -0.26
Av Of 1/100 H-Mean 1.31 0.85 0.37
Av Of 1/100 L-Mean -1.46 -0.80 -0.39
Av Of 1/1000 H-Mean 1.31 0.87 0.39
Av Of 1/1000 L-Mean -1.46 -0.81 -0.41
Maximum - Mean 1.31 0.87 0.39
Minimum - Mean -1.46 -0.81 -0.41
Pred. Max-Mean 1.58 1.04 0.46
Pred. Min-Mean -1.75 -0.97 -0.48
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -3.07 3.38 -4.21 -3.00 3.38 4.33 60.94 3.40 -4.70 61.00 3.40
Variance 0.33 0.12 0.02 0.33 0.12 0.02 0.33 0.12 0.00 0.33 0.12
Root Mean Square 3.12 3.39 4.21 3.06 3.40 4.33 60.94 3.42 4.70 61.01 3.42
Std. Deviation 0.57 0.35 0.13 0.57 0.34 0.13 0.58 0.35 0.02 0.57 0.34
Skewness -0.03 0.06 0.00 -0.03 0.06 0.00 -0.03 0.09 -0.03 -0.03 0.09
Kurtosis -0.64 -0.53 -0.24 -0.64 -0.54 -0.24 -0.63 -0.60 0.12 -0.64 -0.61

Number of Peaks 198 247 265 154 180 265 197 246 252 158 181

Av Of 1/3 Highest -2.16 3.91 -3.94 -2.10 3.92 4.59 61.84 3.94 -4.67 61.90 3.94
Av Of 1/3 Lowest -3.98 2.89 -4.47 -3.85 2.85 4.07 60.03 2.91 -4.74 60.16 2.89
Av Of 1/100 Highest -1.76 4.23 -3.83 -1.71 4.22 4.70 62.25 4.24 -4.66 62.30 4.22
Av Of 1/100 Lowest -4.52 2.58 -4.59 -4.41 2.59 3.94 59.48 2.62 -4.76 59.59 2.63
Av Of 1/1000 Highest -1.76 4.25 -3.82 -1.71 4.22 4.71 62.25 4.26 -4.66 62.30 4.22
Av Of 1/1000 Lowest -4.52 2.56 -4.61 -4.41 2.59 3.92 59.48 2.61 -4.76 59.59 2.63
Maximum -1.76 4.25 -3.82 -1.71 4.22 4.71 62.25 4.26 -4.66 62.30 4.22
Minimum -4.52 2.56 -4.61 -4.41 2.59 3.92 59.48 2.61 -4.76 59.59 2.63
Pred. Max -1.49 4.42 -3.74 -1.43 4.39 4.79 62.52 4.42 -4.65 62.58 4.39
Pred. Min -4.82 2.40 -4.69 -4.71 2.42 3.84 59.18 2.45 -4.78 59.29 2.48

Av Of 1/3 H-Mean 0.90 0.53 0.26 0.90 0.54 0.26 0.90 0.54 0.03 0.89 0.54
Av Of 1/3 L-Mean -0.91 -0.49 -0.26 -0.85 -0.53 -0.26 -0.91 -0.49 -0.03 -0.84 -0.52
Av Of 1/100 H-Mean 1.31 0.85 0.37 1.29 0.84 0.37 1.31 0.84 0.05 1.30 0.82
Av Of 1/100 L-Mean -1.46 -0.80 -0.39 -1.41 -0.79 -0.39 -1.46 -0.78 -0.06 -1.41 -0.77
Av Of 1/1000 H-Mean 1.31 0.87 0.39 1.29 0.84 0.39 1.31 0.86 0.05 1.30 0.82
Av Of 1/1000 L-Mean -1.46 -0.81 -0.41 -1.41 -0.79 -0.41 -1.46 -0.79 -0.06 -1.41 -0.77
Maximum - Mean 1.31 0.87 0.39 1.29 0.84 0.39 1.31 0.86 0.05 1.30 0.82
Minimum - Mean -1.46 -0.81 -0.41 -1.41 -0.79 -0.41 -1.46 -0.79 -0.06 -1.41 -0.77
Pred. Max-Mean 1.58 1.04 0.46 1.57 1.01 0.46 1.58 1.02 0.06 1.57 0.99
Pred. Min-Mean -1.75 -0.97 -0.48 -1.71 -0.95 -0.48 -1.76 -0.95 -0.07 -1.71 -0.93

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=5.43sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 124.94 3.42 -5.20 125.01 3.43 3.33


Variance 0.00 0.33 0.12 0.01 0.33 0.12 0.01
Root Mean Square 3.83 124.95 3.44 5.21 125.01 3.44 3.33
Std. Deviation 0.02 0.58 0.35 0.12 0.57 0.34 0.12
Skewness -0.03 -0.03 0.11 -0.01 -0.03 0.11 -0.01
Kurtosis 0.12 -0.63 -0.66 -0.13 -0.64 -0.67 -0.13

Number of Peaks 251 200 247 263 165 180 263

Av Of 1/3 Highest 3.86 125.84 3.96 -4.96 125.92 3.97 3.58


Av Of 1/3 Lowest 3.80 124.04 2.94 -5.45 124.11 2.91 3.08
Av Of 1/100 Highest 3.88 126.26 4.25 -4.83 126.31 4.23 3.71
Av Of 1/100 Lowest 3.77 123.48 2.67 -5.57 123.59 2.68 2.96
Av Of 1/1000 Highest 3.88 126.26 4.26 -4.82 126.31 4.23 3.71
Av Of 1/1000 Lowest 3.77 123.48 2.66 -5.57 123.59 2.68 2.96
Maximum 3.88 126.26 4.26 -4.82 126.31 4.23 3.71
Minimum 3.77 123.48 2.66 -5.57 123.59 2.68 2.96
Pred. Max 3.89 126.52 4.43 -4.75 126.58 4.40 3.79
Pred. Min 3.76 123.18 2.50 -5.64 123.30 2.53 2.89

Av Of 1/3 H-Mean 0.03 0.90 0.54 0.25 0.91 0.54 0.25


Av Of 1/3 L-Mean -0.03 -0.90 -0.49 -0.25 -0.90 -0.51 -0.25
Av Of 1/100 H-Mean 0.05 1.31 0.82 0.38 1.30 0.81 0.38
Av Of 1/100 L-Mean -0.06 -1.46 -0.75 -0.37 -1.42 -0.75 -0.37
Av Of 1/1000 H-Mean 0.05 1.31 0.84 0.38 1.30 0.81 0.38
Av Of 1/1000 L-Mean -0.06 -1.46 -0.77 -0.37 -1.42 -0.75 -0.37
Maximum - Mean 0.05 1.31 0.84 0.38 1.30 0.81 0.38
Minimum - Mean -0.06 -1.46 -0.77 -0.37 -1.42 -0.75 -0.37
Pred. Max-Mean 0.06 1.58 1.00 0.46 1.57 0.97 0.46
Pred. Min-Mean -0.07 -1.76 -0.92 -0.44 -1.72 -0.90 -0.44
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

HEADING 315 DEG., MEAN PERIOD 6.55 SEC.

Page 40 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T E N V I R O N M E N T +++
=============================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Environment Name SEA315

Observation Time = 1000.0 Time Increment = 0.800


Time Offset = 0.0 Time Reinforce = 12000.0

S E A C O N D I T I O N
--------------------------

Type = JONSWAP Hs = 2.40 Mean Period = 6.55 Gamma = 3.3 Dir = 315.0
S.Coe = 200

W I N D D A T A
-----------------

1 Hr. Wind Speed = 27.2 Knots, Direction = 315.0


Design Wind Based On ABS Rules
Wind Height Variation Based on ABS Rules
Wind is Static

C U R R E N T D A T A
-----------------------

DEPTH SPEED DIRECTION


------- ----- ---------

0.0 1.00 315.0


22.8 0.60 315.0
45.6 0.20 315.0

Page 41 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C O N N E C T O R F O R C E S +++
=======================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Forces in Body System at Attachment - Magnitude is Sqrt( X**2 + Y**2 + Z**2 )

Conn. Body FX FY FZ MX MY MZ MAG.


-------- -------- ------- ------- ------- ------- ------- ------- -------

BM2P DB30 -18 -6 -4 0 0 0 21


BM2S DB30 -9 3 -3 0 0 0 11
BM3P DB30 -27 -46 -8 0 0 0 55
BM3S DB30 -3 7 -2 0 0 0 9
BM4P DB30 54 -93 -11 0 0 0 109
BM4S DB30 11 19 -4 0 0 0 22
BM5S DB30 63 16 -8 0 0 0 66
MAINLN DB30 4 6 -1113 0 0 0 1114
SL115A WHPBJKT -105 86 274 0 0 0 306
SL115B WHPBJKT 111 85 298 0 0 0 330
SL280A WHPBJKT -126 -76 257 0 0 0 297
SL280B WHPBJKT 123 -94 285 0 0 0 324
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 42 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N D B 3 0 +++
=================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 193.0 2.8 -24740.5 -24 1663746 185


Buoyancy -202.0 -2.9 25892.3 135 -1833053 -202
Wind -12.7 24.2 0.0 -411 -246 1611
Drag -12.9 36.3 -3.4 -149 35 2464
Wave -37.4 37.3 13.4 196 -972 2121
Flex. Connectors 71.9 -97.5 -1161.8 256 170480 -7808
======= ======= ======= ======= ======= =======
Total 0.0 0.0 0.1 0 -13 -1630

Page 43 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ F O R C E S A C T I N G O N W H P B J K T +++
=======================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Results Are Reported In Body System

Type of Force X Y Z MX MY MZ
------------------ --------- --------- --------- --------- --------- ---------

Weight 4.5 -5.9 -1114.3 11 166282 -884


Wind -4.6 6.0 -0.2 -13 21 912
Flex. Connectors 0.1 -0.1 1114.4 3 -166288 -12
======= ======= ======= ======= ======= =======
Total 0.0 0.0 -0.1 0 13 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 44 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ M O O R I N G L I N E S +++
=================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Horiz. Length of Line on /----- Top ------/ /---- Anchor -----/


Name Distance First Seg Bottom Tension Ratio Hori Pull Vert Pull
-------- --------- --------- --------- --------- --------- --------- ---------

BM2P 998.26 1001.58 625.59 20.81 0.0777 14.86 0.00


BM2S 996.04 1001.58 733.75 10.78 0.0397 3.92 0.00
BM3P 1001.46 1001.57 386.55 55.43 0.2091 51.51 0.00
BM3S 995.42 1001.57 757.95 8.99 0.0344 1.92 0.00
BM4P 1004.56 1001.50 143.60 109.23 0.3946 107.36 0.00
BM4S 998.47 1001.50 617.36 22.16 0.0840 16.30 0.00
BM5S 1002.08 1001.46 335.21 65.90 0.2394 62.42 0.00

Page 45 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* DAMAGED CONDITION (LINE BM5P DAMAGED) *
* *
***************************************************************************************************************

+++ C U R R E N T S Y S T E M C O N F I G U R A T I O N +++
===============================================================

Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified

Location and Net Force at Body Origin

Body X Y Z RX RY RZ
-------- --------- --------- --------- --------- --------- ---------

DB30 Location -3.22 3.52 -4.21 -0.01 0.45 0.00


N Force -0.01 0.00 0.09 0 -13 -1630

WHPBJKT Location -2.59 -3.37 22.54 0.30 0.23 2.79


N Force 0.00 0.00 -0.09 0 13 14
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 46 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (MOORING TENSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

MAG MAG MAG MAG MAG MAG MAG MAG


Description BM2P BM2S BM3P BM3S BM4P BM4S BM5P BM5S
-------------------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean 20.97 10.52 57.04 8.73 113.53 21.31 0.00 66.87


Variance 10.46 3.42 16.00 1.67 119.51 3.43 0.00 63.10
Root Mean Square 21.22 10.69 57.18 8.82 114.06 21.39 0.00 67.34
Std. Deviation 3.23 1.85 4.00 1.29 10.93 1.85 0.00 7.94
Skewness 0.87 0.81 0.35 0.85 -0.11 0.14 0.00 -0.16
Kurtosis 1.14 0.62 0.48 0.58 -0.18 0.31 0.00 -0.08

Number of Peaks 231 206 219 207 214 220 0 227

Av Of 1/3 Highest 26.64 13.59 63.37 10.85 129.82 24.01 0.00 79.46
Av Of 1/3 Lowest 16.57 8.11 51.92 7.17 97.09 18.70 0.00 54.37
Av Of 1/100 Highest 33.22 16.36 69.31 13.01 139.94 26.25 0.00 85.60
Av Of 1/100 Lowest 14.90 7.32 47.61 6.35 85.85 16.50 0.00 44.52
Av Of 1/1000 Highest 34.36 16.67 69.75 13.09 140.04 26.73 0.00 86.43
Av Of 1/1000 Lowest 14.57 7.28 47.35 6.33 85.44 16.44 0.00 42.88
Maximum 34.36 16.67 69.75 13.09 140.04 26.73 0.00 86.43
Minimum 14.57 7.28 47.35 6.33 85.44 16.44 0.00 42.88
Pred. Max 37.02 17.92 72.30 13.97 145.38 27.81 0.00 90.33
Pred. Min 13.30 6.63 45.40 5.85 79.78 15.46 0.00 38.10

Av Of 1/3 H-Mean 5.67 3.07 6.33 2.13 16.29 2.70 0.00 12.59
Av Of 1/3 L-Mean -4.40 -2.42 -5.12 -1.55 -16.44 -2.61 0.00 -12.51
Av Of 1/100 H-Mean 12.25 5.84 12.27 4.28 26.41 4.94 0.00 18.73
Av Of 1/100 L-Mean -6.07 -3.21 -9.43 -2.38 -27.68 -4.81 0.00 -22.35
Av Of 1/1000 H-Mean 13.39 6.15 12.71 4.36 26.51 5.42 0.00 19.56
Av Of 1/1000 L-Mean -6.40 -3.24 -9.69 -2.39 -28.09 -4.87 0.00 -23.99
Maximum - Mean 13.39 6.15 12.71 4.36 26.51 5.42 0.00 19.56
Minimum - Mean -6.40 -3.24 -9.69 -2.39 -28.09 -4.87 0.00 -23.99
Pred. Max-Mean 16.05 7.39 15.26 5.24 31.85 6.50 0.00 23.46
Pred. Min-Mean -7.67 -3.90 -11.64 -2.88 -33.75 -5.85 0.00 -28.77

Page 47 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

X Y Z
Description DB30 DB30 DB30
-------------------- --------- --------- ---------

Mean -3.31 3.69 -4.21


Variance 0.32 0.16 0.01
Root Mean Square 3.36 3.71 4.21
Std. Deviation 0.57 0.41 0.11
Skewness 0.22 -0.42 -0.01
Kurtosis -0.04 0.05 -0.12

Number of Peaks 217 235 240

Av Of 1/3 Highest -2.41 4.28 -3.99


Av Of 1/3 Lowest -4.20 3.04 -4.42
Av Of 1/100 Highest -1.71 4.57 -3.89
Av Of 1/100 Lowest -4.60 2.56 -4.53
Av Of 1/1000 Highest -1.62 4.57 -3.88
Av Of 1/1000 Lowest -4.61 2.51 -4.54
Maximum -1.62 4.57 -3.88
Minimum -4.61 2.51 -4.54
Pred. Max -1.28 4.75 -3.81
Pred. Min -4.87 2.27 -4.61

Av Of 1/3 H-Mean 0.90 0.59 0.21


Av Of 1/3 L-Mean -0.89 -0.65 -0.22
Av Of 1/100 H-Mean 1.60 0.88 0.32
Av Of 1/100 L-Mean -1.29 -1.13 -0.32
Av Of 1/1000 H-Mean 1.69 0.88 0.33
Av Of 1/1000 L-Mean -1.30 -1.18 -0.33
Maximum - Mean 1.69 0.88 0.33
Minimum - Mean -1.30 -1.18 -0.33
Pred. Max-Mean 2.03 1.06 0.40
Pred. Min-Mean -1.56 -1.42 -0.40
DB30 MOORING ANALYSIS FOR WHP-B JACKET INSTALLATION PAGE : APPENDIX
Su Tu Den Northeast Project REVISION : B
J. Ray McDermott Far East, Inc. DATE : 19 May 09

Page 48 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-X L-Y L-Z L-X L-Y L-Z L-X L-Y L-Z L-X L-Y
Description *BOWBOT *BOWBOT *BOWBOT *BOWTOP *BOWTOP *BOWTOP *MIDBOT *MIDBOT *MIDBOT *MIDTOP *MIDTOP
-------------------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------

Mean -3.31 3.69 -4.21 -3.24 3.69 4.33 60.70 3.71 -4.71 60.76 3.71
Variance 0.32 0.16 0.01 0.33 0.16 0.01 0.32 0.16 0.01 0.33 0.16
Root Mean Square 3.36 3.71 4.21 3.29 3.71 4.33 60.70 3.73 4.71 60.76 3.73
Std. Deviation 0.57 0.41 0.11 0.57 0.40 0.11 0.57 0.41 0.08 0.57 0.40
Skewness 0.22 -0.42 -0.01 0.21 -0.44 -0.01 0.22 -0.38 -0.03 0.21 -0.40
Kurtosis -0.04 0.05 -0.12 -0.04 0.07 -0.12 -0.04 0.02 -0.11 -0.04 0.05

Number of Peaks 217 235 240 225 207 240 217 234 234 225 207

Av Of 1/3 Highest -2.41 4.28 -3.99 -2.34 4.25 4.54 61.60 4.31 -4.55 61.66 4.27
Av Of 1/3 Lowest -4.20 3.04 -4.42 -4.13 3.09 4.11 59.81 3.05 -4.87 59.88 3.11
Av Of 1/100 Highest -1.71 4.57 -3.89 -1.64 4.55 4.64 62.29 4.60 -4.47 62.37 4.59
Av Of 1/100 Lowest -4.60 2.56 -4.53 -4.54 2.61 4.00 59.41 2.60 -4.95 59.47 2.65
Av Of 1/1000 Highest -1.62 4.57 -3.88 -1.54 4.56 4.66 62.39 4.60 -4.46 62.47 4.59
Av Of 1/1000 Lowest -4.61 2.51 -4.54 -4.55 2.56 3.99 59.40 2.55 -4.95 59.45 2.60
Maximum -1.62 4.57 -3.88 -1.54 4.56 4.66 62.39 4.60 -4.46 62.47 4.59
Minimum -4.61 2.51 -4.54 -4.55 2.56 3.99 59.40 2.55 -4.95 59.45 2.60
Pred. Max -1.28 4.75 -3.81 -1.19 4.73 4.72 62.73 4.78 -4.41 62.81 4.77
Pred. Min -4.87 2.27 -4.61 -4.82 2.33 3.93 59.14 2.31 -5.00 59.19 2.37

Av Of 1/3 H-Mean 0.90 0.59 0.21 0.90 0.56 0.21 0.90 0.60 0.16 0.90 0.56
Av Of 1/3 L-Mean -0.89 -0.65 -0.22 -0.89 -0.60 -0.22 -0.89 -0.66 -0.16 -0.88 -0.60
Av Of 1/100 H-Mean 1.60 0.88 0.32 1.61 0.86 0.32 1.59 0.89 0.24 1.61 0.88
Av Of 1/100 L-Mean -1.29 -1.13 -0.32 -1.29 -1.08 -0.32 -1.29 -1.11 -0.24 -1.29 -1.07
Av Of 1/1000 H-Mean 1.69 0.88 0.33 1.71 0.87 0.33 1.69 0.89 0.25 1.71 0.88
Av Of 1/1000 L-Mean -1.30 -1.18 -0.33 -1.31 -1.13 -0.33 -1.30 -1.16 -0.25 -1.31 -1.11
Maximum - Mean 1.69 0.88 0.33 1.71 0.87 0.33 1.69 0.89 0.25 1.71 0.88
Minimum - Mean -1.30 -1.18 -0.33 -1.31 -1.13 -0.33 -1.30 -1.16 -0.25 -1.31 -1.11
Pred. Max-Mean 2.03 1.06 0.40 2.05 1.04 0.40 2.03 1.07 0.30 2.05 1.06
Pred. Min-Mean -1.56 -1.42 -0.40 -1.57 -1.36 -0.40 -1.56 -1.40 -0.29 -1.57 -1.34

Page 49 Licensee - J. Ray McDermott Rev 7.03.024 Ser529


***************************************************************************************************************
* *** MOSES *** *
* ---------------- 20 May, 2009 *
* SU TU DEN DEVELOPMENT PROJECT *
* Hs=2.40m, Period=6.55sec, Vwind=27.21kt, VCurr=1.0m/s, Heading=315deg (BARGE EXCURSION-BM5P DAMAGED*
* *
***************************************************************************************************************

+++ T I M E S T A T I S T I C S +++
=====================================

L-Z L-X L-Y L-Z L-X L-Y L-Z


Description *MIDTOP *STRNBOT *STRNBOT *STRNBOT *STRNTOP *STRNTOP *STRNTOP
-------------------- --------- --------- --------- --------- --------- --------- ---------

Mean 3.83 124.70 3.73 -5.21 124.77 3.73 3.33


Variance 0.01 0.32 0.16 0.01 0.33 0.16 0.01
Root Mean Square 3.83 124.70 3.75 5.21 124.77 3.75 3.33
Std. Deviation 0.08 0.57 0.41 0.10 0.57 0.40 0.10
Skewness -0.03 0.22 -0.34 -0.02 0.21 -0.36 -0.02
Kurtosis -0.11 -0.04 0.01 -0.14 -0.04 0.03 -0.14

Number of Peaks 234 215 233 231 225 205 231

Av Of 1/3 Highest 3.99 125.62 4.34 -5.00 125.67 4.30 3.54


Av Of 1/3 Lowest 3.66 123.81 3.07 -5.41 123.88 3.14 3.12
Av Of 1/100 Highest 4.07 126.30 4.64 -4.90 126.37 4.62 3.63
Av Of 1/100 Lowest 3.58 123.42 2.64 -5.52 123.47 2.68 3.02
Av Of 1/1000 Highest 4.08 126.39 4.64 -4.90 126.47 4.62 3.63
Av Of 1/1000 Lowest 3.58 123.40 2.58 -5.52 123.46 2.64 3.01
Maximum 4.08 126.39 4.64 -4.90 126.47 4.62 3.63
Minimum 3.58 123.40 2.58 -5.52 123.46 2.64 3.01
Pred. Max 4.13 126.74 4.82 -4.84 126.82 4.80 3.70
Pred. Min 3.53 123.14 2.36 -5.59 123.20 2.41 2.95

Av Of 1/3 H-Mean 0.16 0.91 0.61 0.21 0.90 0.57 0.21


Av Of 1/3 L-Mean -0.16 -0.90 -0.66 -0.21 -0.88 -0.59 -0.21
Av Of 1/100 H-Mean 0.24 1.59 0.91 0.30 1.61 0.89 0.30
Av Of 1/100 L-Mean -0.24 -1.29 -1.09 -0.31 -1.29 -1.05 -0.31
Av Of 1/1000 H-Mean 0.25 1.69 0.91 0.31 1.71 0.89 0.31
Av Of 1/1000 L-Mean -0.25 -1.30 -1.15 -0.32 -1.31 -1.10 -0.32
Maximum - Mean 0.25 1.69 0.91 0.31 1.71 0.89 0.31
Minimum - Mean -0.25 -1.30 -1.15 -0.32 -1.31 -1.10 -0.32
Pred. Max-Mean 0.30 2.03 1.09 0.37 2.05 1.07 0.37
Pred. Min-Mean -0.29 -1.56 -1.38 -0.38 -1.57 -1.32 -0.38

You might also like