Question Bank
Question Bank
25 July 11,
Explain with diagrams the procedural steps of systematic layout planning
(SLP).
26 What is SLP technique? Explain with sketch, Jan 12
i) Activity relationship chart, ii) Activity relationship diagram
27 Explain the procedures needed to solve playout problem using SLP Jan 14
technique
28 July 15
Explain the following plat layout procedures
i) Nadler s plant Layout procedure.
ii) Apple James, Reeds approaches.
iii) Muther's systematic layout planning approach.
30 July 11,Jan
Explain the procedure, scope and limitations of the following 12,July 14
computerized layout
programs:
a. CRAFT
b. PLANET
c. CORELAP
d. ALDEP.
31 Jan 14
Differentiate between PLANET and CRAFT
32 July 15
What are the procedural steps involved in the following computer
Aided layout design planning? Mention the Input requirements
clearly.
i) CRAFT
ii) CORE LAP
39
Clearly explain any three methods of visualizing plant layout
40 Explain the following efficiency indicies:
i)Index of indirect material handling.
ii) Index of gravity utilization
41 With sketches explain briefly the different ways of expanding a plant. July 11
42 What is plot plan? List and explain objectives of the plot plan Jan 12
43 Explain the applications of below said techniques with respect to Jan 14
computerized layout planning:
i) Activity relationship chart.
ii) Travel chart.
44 With example explain how space determination is obtained for Jan 14
"STORAGE".
45 List and explain the factors to be considered for area allocation Jan 14
46 Briefly explain Activity Relationship chart July 15
47 What are the various factors to be considered in space planning for July 15
Receiving and shipping
48 Explain the various activities in space determination for the storage July 14
61 List and explain any five efficiency indices used to evaluate plant layout Jan 12
64 What are the methods of constructing the layout? Explain any two of July 15
them briefly.
65 How do you make the total presentation and layout to the management? July 15
84 There exists five potential sites for a new warehouse A, B, C, D and July 10
E. Firm's major customers are located in five cities 1, 2, 3, 4 and 5.
The annual cost of meeting customer demand in a city from each site
are given in the following table. The annual fixed cost of providing a
new warehouse is also given for each site.
Customer Ware house sites
location A B C D E
1 100 500 1800 1300 1700
2 1500 200 2600 1400j 1800
3 2500 1200 1700 300 1900
4 2800 1800 700 800 800
5 10000 12000 800 8000 900
Fixed cost 3000 2000 2000 3000 4000
90 Jan 14
Explain with suitable examples: i) Block stacking; ii) FIFO and FILO.