0% found this document useful (0 votes)
114 views2 pages

Placing Boom Pumping Unit Driven by Chassis 3 Axles: Truck-Mounted Concrete Boom Pump

This document provides specifications for the K2-X truck-mounted concrete boom pump. The pump has a maximum reach of 31.73 meters and can pump concrete up to 150 cubic meters per hour. It features a four-section boom and proportional radio controls. Standard equipment includes outriggers, a concrete hopper, and a placing boom for delivering concrete. Optional equipment includes double-walled pipes and cleaning accessories.

Uploaded by

abo omr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
114 views2 pages

Placing Boom Pumping Unit Driven by Chassis 3 Axles: Truck-Mounted Concrete Boom Pump

This document provides specifications for the K2-X truck-mounted concrete boom pump. The pump has a maximum reach of 31.73 meters and can pump concrete up to 150 cubic meters per hour. It features a four-section boom and proportional radio controls. Standard equipment includes outriggers, a concrete hopper, and a placing boom for delivering concrete. Optional equipment includes double-walled pipes and cleaning accessories.

Uploaded by

abo omr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

K2-X TRUCK-MOUNTED

CONCRETE BOOM PUMP


B5R 32/28
Placing boom
PA 907 D/F8
Pumping unit PA 1506/909 F8
Driven by PTO
Chassis 3 axles

DIMENSIONS

10150 (*)
35 m

30 m
max 4000

25 m
1450 (*)

20 m
31730

15 m

4100 10 m

Dimensions varying according to truck assembly


(*) dimensione variabile in funzione dell'autotelaio
5m

-5 m
27900
21270

-10 m
5210
6200

-15 m

-20 m

-25 m
35 m 30 m 25 m 20 m 15 m 10 m 5m 0 - 5m -10 m -15 m

7000
K2-X TRUCK-MOUNTED
CONCRETE BOOM PUMP
B5R 32/28
Placing boom
PA 907 D/F8
MAIN FEATURES Pumping unit PA 1506/909 F8
Driven by PTO
• Advantageous assembling on standard 3 axles chassis
Chassis 3 axles
• Self-supporting frame, torsion free, FEM designed
• Placing boom B5R 32/28, 4 sections, pipeline diameter
125 mm, “R” folding system

• Fully hydraulic outrigger controls on both sides of the truck


Pumping unit technical data
• Front outriggers “X” style for a quick set-up and easy pump placement in
narrow areas MODEL PA 907 D/F8 PA 1506/909F8
• Proportional boom control allowing the operator to control more placing Max. theorical output m³/h 87 150/90
boom sections simultaneously

• The “BFC” Best-Flex Cifa supporting system allowing just one Max. pressure on concrete bar 73 53/95
man to change delivery pipeline easily, quickly and safely
Max. numbers of
• Concrete flow rate regulator cycles per min. nr. 31 30/17

• Quiet pumping with high performances: smooth, continuous and easy Conc. cylinders
mm 200x1500 230x2000
movements (diam. x stroke)

• Safety device on opening inspection hatch Concrete hopper capacity l 550 550

STANDARD EQUIPMENT

• 2 Proportional radio control with two boom movement speed, synthesiser Placing boom technical data
for automatic frequency search, 8 position joy stick and concrete flow rate
MODEL B5R 32/28
regulator. 20 mt cable

• Remote controlled vibrator on the concrete hopper grid Pipeline diameter mm 125

• Centralized lubrification system for pumping unit Max. vertical reach m 31,73
• Additional manual lubrification system for pumping unit
Max. horizontal distance m 27,90
• Hard plastic outrigger support plates with relative housing
Min. unfolding height m 7,7
• Rear light on hopper
• Level readers for stabilization control Section numbers nr. 4
• Accessories for cleaning and pipes washing
1st section opening angle 90°

2nd section opening angle 180°


OPTIONALS
3rd section opening angle 180°
• Double thickness concrete pipes, in high resistant steel
• High pressure water pump 4th section opening angle 265°

• Air compressor for pipeline cleaning Rotating angle 370°


• Centralized lubrification system for placing boom
End hose lenght m 4
• Air pipeline for placing boom
• Hopper covering Technical data and characteristics subject to modifications without notice

• Separated emergency engine kit for independent control of the hopper


mixer, concrete pumping unit, boom and water pump
05/07

CIFA S.p.A.
ENG

via Stati Uniti d’America,26


20030 Senago (Milano) - Italia
tel.: +39.02.990131 - fax: +39.02.9981157
K2

www.cifa.com

You might also like