Rubric For Final Project Management Plan

This rubric details the criteria and point values for evaluating a final project management plan. It will assess 10 areas including the project scope, work breakdown structure, network diagram, schedule, costs, quality plan, human resources plan, communications plan, risk management plan, and procurement plan. For each area, points will be awarded based on the submission being missing information, needing improvement, or meeting expectations.

Uploaded by

Chahat Jaura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views1 page

Rubric For Final Project Management Plan

This rubric details the criteria and point values for evaluating a final project management plan. It will assess 10 areas including the project scope, work breakdown structure, network diagram, schedule, costs, quality plan, human resources plan, communications plan, risk management plan, and procurement plan. For each area, points will be awarded based on the submission being missing information, needing improvement, or meeting expectations.

Uploaded by

Chahat Jaura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Rubric Detail for Final Project Management Plan

 

  Missing Information Needs Improvement Meets Expectations

Project Scope Defined Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

WBS Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

Network Diagram Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

Project Schedule Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

Project Costs Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

Quality Plan Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

HR Management Plan Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

Communications Plan Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

Risk Management Plan Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)

Procurement Plan Points: Points: Points:


0 (0.00%) 0.5 (5.00%) 1 (10.00%)
Name:06 CS Project Plan
Description:Case Study Project Management Plan Evaluation