The PTB Simulation Report
User: Chahat Preet
User Email:
[email protected] Scenario: Medium Radar Development
Created at: Friday, January 24, 2020 9:18:51 PM
Last simulation run result: Scenario finished
Simulation Time: 15
Target Date: 15
Target Cost: 41000
Simulation Cash: 137900
Total Cost: 32100
Benefit: 83.86
Estimated Cost: 21750
Estimated Finish Period: 15
Scenario Information:
Project Name Number of Target Date Initial Cash Bonus per Penalty per
Tasks Period Period
Project1 5 15 100000 10000 20000
Resource Information:
Name Availa Availa Cost/ Idle Firing Hiring Show Firing Hiring Minim Maxim
ble ble Period Cost/ Cost Cost Up Lead Lead um um
Units Units Period Proba Time Time Units Units
in bility
Lead (%)
Time
Engin 6 6 100 50 50 50 80 1 1 1 30
eers
Techni 6 6 50 10 40 20 85 1 1 2 50
cians
Quality Requirements:
The PTB Simulation Report
Name Formula Importanc Minimum Desired Maximum Best Mode Evaluation
e Value Value Value
Range Pow([TP]* 7 10 12 40 Maximum 11.07
[RS]*[AG],
0.25)
Quality [SEQ]*[QT 8 0 75 100 Maximum 73.74
]*[QR]*[Q
A]*[QI]*1
00
Reliability [AR]*[IR]* 6 0 65 100 Maximum 65.61
[TR]*[RR]
*100
Task Information:
The PTB Simulation Report
Project Task Name Cost of Actual Actual Income Current Selected
Name Split Start Finish Status Mode
Project1 Systems 20 0 4 50000 Finished Large
Engineerin Team
g
Mode Optimisti Most Pessimist Fixed Engineers Technicia System Reliabilit
Name c Likely ic Cost Needed ns Engineeri y of
Duration Duration Duration Needed ng System
Quality Design
(SEQ) (DR)
(SEQ) (DR)
Small 5 7 10 2000 1 0 0.8 0.8
Team
Large 3 4 5 4000 3 1 0.99 0.9
Team
The PTB Simulation Report
Project Task Name Cost of Actual Actual Income Current Selected
Name Split Start Finish Status Mode
Project1 Transmitte 20 4 9 0 Finished Reengineer
r Design
Mode Optimist Most Pessimi Fixed Enginee Technici Transmi Transmi Transmi
Name ic Likely stic Cost rs ans tter tter tter
Duratio Duratio Duratio Needed Needed Quality Power Reliabili
n n n (QT) (TP) ty (TR)
(QT) (TP) (TR)
Reengin 3 5 8 5000 2 1 0.99 50 0.9
eer
New 7 9 11 10000 4 2 0.95 100 0.8
Design
The PTB Simulation Report
Project Task Name Cost of Actual Actual Income Current Selected
Name Split Start Finish Status Mode
Project1 Receiver 20 4 11 0 Finished Reengineer
Design
Mode Optimist Most Pessimi Fixed Enginee Technici Receive Receive Receive
Name ic Likely stic Cost rs ans r Quality r r
Duratio Duratio Duratio Needed Needed (QR) Sensitivi Reliabili
n n n (QR) ty (RS) ty (RR)
(RS) (RR)
Reengin 3 5 9 2000 2 1 0.95 30 0.9
eer
New 8 10 11 15000 3 1 0.8 200 0.99
Design
The PTB Simulation Report
Project Task Name Cost of Actual Actual Income Current Selected
Name Split Start Finish Status Mode
Project1 Antenna 20 4 11 0 Finished Reengineer
Design
Mode Optimist Most Pessimi Fixed Enginee Technici Antenna Antenna Antenna
Name ic Likely stic Cost rs ans Quality Gain
Duratio Duratio Duratio Needed Needed (QA) (AG) Reliabili
n n n (QA) (AG) ty (AR)
(AR)
Reengin 3 7 9 3000 3 2 0.8 10 0.9
eer
New 6 7 9 7000 5 2 0.99 30 0.9
Design
The PTB Simulation Report
Project Task Name Cost of Actual Actual Income Current Selected
Name Split Start Finish Status Mode
Project1 Integratio 10 11 15 20000 Finished In-House
n and
Testing
Mode Optimisti Most Pessimist Fixed Engineers Technicia Integrati Reliabilit
Name c Likely ic Cost Needed ns on y of
Duration Duration Duration Needed Quality Integrati
(QI) (QI) on (IR)
(IR)
In-House 3 4 5 4000 3 3 0.99 0.9
Subcontr 2 4 6 6000 1 0 0.9 0.99
act