SUNRISE BUILDER CONSTRUCTION
DEVELOPMENT And TRADING
CORPORATION
10TH Floor ROYAL PLAZA TOWER Bldg. B.
Remedios St. Malate Manila
SOFT CORPORATE OFFER (SCO)
ARMOR ROCK
DATE: DEC. 29, 2020
ATTN: MR. SETH M. MERCADO
President
SWPM Construction and Aggregates Trading
SUBJ: ARMOUR ROCK SUPPLY
Various Source
WE, SUNRISE BUILDER CONSTRUCTION DEVELOPMENT and TRADING CORP, with full
legal and corporate responsibility, and with full knowledge of the act of fraud and as “AUTHORIZED
SELLER MANDATE”, declare with full corporate responsibility and authority, that we are ready,
willing and able to provide the following product as stated below to the “BUYER”
, following local and/or international procedures.
A. ITEM/DESCRIPTION: ARMOR ROCK
ITEM
NAME AMOUNT (PER METRIC TONS) SOURCE
Armour PHP 750 ALBAY
Rock
PHP 850 MINDORO
PHP 900 BATAAN
PHP 870 BATANGAS
PHP 850 ZAMBALES
UNIT COST PER MT PHP(as per agreed by both parties)
TOTAL PRICE: PHP(as per agreed by both parties)
PAYMENT TERMS: MANAGERS CHECK/ONLINE CASH ADVANCE
DEPOSIT (as per agreed by both parties)
30% mobilization
70% UPON LOADING
DELIVERY TERMS : F.O.B.
ORIGIN: ALBAY, MINDORO, BATAAN, BATANGAS, ZAMBALES
With Full authority:
Mr. Ronnie Jimenez
President / C.E.O
All costs at unloading port are on Buyers expense
PROCEDURES:
1. BUYER issues LOI or ICPO along with full banking coordinates and BCL. SELLER reviews the LOI
and other documents and upon acceptance issues the Draft Contract for the BUYER to review and
accept.
2. After the BUYER signs and seals, the Draft Contract and agrees with the terms returns the contract to
the Seller and adds their full banking coordinates confirming all information needed.
3. After all negotiations and discussions between parties have reached a common arrangement the
SELLER issues a final copy of the Main Contract Agreement for final signing and sealing by the
BUYER.
4. After the Contract is signed and sealed by both parties and all banking procedures are ready, the
SELLER issues a Performance Bond toward the BUYER to activate the LC and other necessary
documents.
5. Finally, the delivery and shipment begin after all the procedures between parties are authorized by
finalizing the contract with specified terms and conditions.
SELLER: SUNRISE BUILDER CONSTRUCTION DEVELOPMENT and
TRADING CORPORATION
REPRESENTATIVE: MR. Ronnie O. Jimenez
Engr. Jesusimo Navarro Jr.
POSITION: C.E.O. / President
Executive Vice-President / General Manager
DATE: December 29, 2020