ITP-01
ITP No. ITP-01
Inspection and Test Plan (ITP) for Construction of Embankment
P: Perform (As per Contract conditions) E: Ensure Performance C: Ensure Compliance
T: Test Check (As Specified) M: Monitor Compliance
Reporting Role / Responsibility of
Action in
Reference Standard Format/ Contr./
SN Description of Check / Test Frequency case of non- AXEN/
and Requirement Check Consul./ SSE Dy.CE
conformance XEN
List Lab.
(A) Design, Drawing and Approval Processes
Ensure
Required Design, Drawing and
RDSO/2020/ Compliance
Approval processes have been For entire
A.1 GE: IRS-0004, CHLST-01 before P E, C E, C E
completed, before commencing length
Sept’2020 commencing
construction of embankment
the work
(B) Preliminary Works
Ensure
All preliminary works have been RDSO/2020/ Compliance
For entire
B.1 completed, before commencing GE: IRS-0004, CHLST-02 before P E, C E, C T, M
length
construction of embankment Sept’2020 commencing
the work
(C) Checks on all the Fill Materials (Except Blanket), at site before laying
It is not Organic Clay or IS:2720 (Pt-22) Reject or
C.1 P E, C T, C T, M
Organic Silt IS:1498 decide
At least
Special
It is not Poorly Graded Sand one check
C.2 IS:2720 (Pt-4) Investigation P E, C T, C T, M
and Gravel every
Test Lab and other
change of
Format measured to
material
and Form formulate
Cl. 3.7(a)(ii) of subject to
No. suitable
C.3 It is not Liquefiable Soil RDSO/2020/GE:IRS- Min. one P E, C T, C T, M
CHFRM- scheme of
0004 test for
01 construction
every
5000 m3
material Do not use
C.5 It is not CH & MH Type IS:1498 in top 3m of P E, C T, C T, M
Embankment
1
ITP-01
Reporting Role / Responsibility of
Action in
Reference Standard Format/ Contr./
SN Description of Check / Test Frequency case of non- AXEN/
and Requirement Check Consul./ SSE Dy.CE
conformance XEN
List Lab.
(D) Checks on material of Lower Layer (Fill) of Subgrade, at site before laying
Para 1.0 of
Every Form No.
Appendix-H of
D.1 CBR (at 97% of MDD) ≥ 3 5000 m3 CHFRM- Reject P E, C T, C T, M
RDSO/2020/GE:IRS-
or change 01
0004
of
Test Lab
D.2 OMC and MDD in Lab IS:2720 (Pt-8) material - P E, C T, C T, M
Format
(E) Checks on material of Top Layer of Subgrade, at site before laying
Para 3.9 of Use SQ1
Soil Quality Class to be SQ2 or Appendix-H of Test Lab only with
E.1 P E, C T, C T, M
SQ3 RDSO/2020/GE:IRS- Format dispensation
0004 of CAO/C.
Single Layer System
CBR (at 98% of MDD) ≥ 6 Every
CBR (at 98% of MDD) ≥ 4 (If 5000 m3
Para 1.0 of
SQ1 Soil is used) or change Form No.
Appendix-H of
E.2 of CHFRM- Reject P E, C T, C T, M
RDSO/2020/GE:IRS-
Two Layer System material 01
0004
CBR (at 98% of MDD) ≥ 5
CBR (at 98% of MDD) ≥ 4 (If
SQ1 Soil is used)
Test Lab
E.3 OMC and MDD in Lab IS:2720 (Pt-8) - P E, C T, C T, M
Format
(F) Checks on Prepared Subgrade material (Only for Double Layer System of construction), at site before laying
Para 3.9 of
Soil Quality Class to be SQ2 or Appendix-H of Test Lab
F.1 Every Reject P E, C T, C T, M
SQ3 RDSO/2020/GE:IRS- Format
5000 m3
0004
or change
Para 1.0 of
of Form No.
Appendix-H of
F.2 CBR (at 98% of MDD) ≥ 8 material CHFRM- Reject P E, C T, C T, M
RDSO/2020/GE:IRS-
01
0004
2
ITP-01
Reporting Role / Responsibility of
Action in
Reference Standard Format/ Contr./
SN Description of Check / Test Frequency case of non- AXEN/
and Requirement Check Consul./ SSE Dy.CE
conformance XEN
List Lab.
Every Form No.
F.3 Plasticity Index ≤ 12 IS:2720 (Pt-5) 5000 m3 CHFRM- Reject P E, C T, C T, M
or change 01
of Test Lab
F.4 OMC and MDD in Lab IS:2720 (Pt-8) - P E, C T, C T, M
material Format
(G) Checks on Blanket material, at site before laying
Cu > 7 and CC between 1 and
G.1 IS:2720 (Pt-4) Reject P E, C T, C T, M
3
Fines (passing 75 Micron): 3 to
G.2 IS:2720 (Pt-4) Reject P E, C T, C T, M
10%
Para 5.0 of
Los Angeles Abrasion Value < Appendix-H of
G.3 Reject P E, C T, C T, M
40% RDSO/2020/GE:IRS-
0004
Size Gradation Curve- More or Table 3.7 or Fig. 3.8
G.4 less within the specified of RDSO/2020/ Minimum Reject P E, C T, C T, M
Enveloping Curves GE:IRS-0004 one test
for every Test Lab
500 m3 or Format
Filter Criteria should be
part and Form
satisfied (if non-woven Tables 3.3 to 3.6 of
thereof No.
G.5 geotextile is not used as a RDSO/2020/GE: Reject P E, C T, C T, M
or CHFRM-
separator layer below the IRS-0004
on change 02
blanket layer)
of
Para 1.0 of material
Appendix-H of
G.6 CBR (at 100% of MDD) ≥ 25 Reject P E, C T, C T, M
RDSO/2020/GE:IRS-
0004
G.7 OMC and MDD in Lab IS:2720 (Pt-8) - P E, C T, C T, M
γmax and γmax
G.8 IS:2720 (Pt-14) - P E, C T, C T, M
(If Fines are ≤5%)
3
ITP-01
Reporting Role / Responsibility of
Action in
Reference Standard Format/ Contr./
SN Description of Check / Test Frequency case of non- AXEN/
and Requirement Check Consul./ SSE Dy.CE
conformance XEN
List Lab.
(H) Checking Compaction for Compacted Layers
Degree of Compaction for Tables 3.3 to 3.6 of
H.1 Subgrade Lower Layer (Fill) ≥ RDSO/2020/GE: P E, C T, C T, M
97% (*) ($) IRS-0004
Degree of Compaction for
Subgrade Top Layer:
Tables 3.3 to 3.6 of
(a) Single Layer System
H.2 RDSO/2020/GE: P E, C T, C T, M
≥ 98% (*) ($)
IRS-0004 Test Lab
(b) Double Layer System
Formats
≥ 97% (*) ($) Compact the
and
layer again
As per Form No.
Degree of Compaction for till the
Tables 3.4 & 3.6 of Note CHFRM-
Prepared Subgrade Top Layer required
H.3 RDSO/2020/GE: below (#) 03 P E, C T, C T, M
(Double Layer System only): compaction
IRS-0004 and/or
≥ 98% (*) ($) is achieved
CHFRM-
04
Tables 3.3 to 3.6 of
Degree of Compaction for
H.4 RDSO/2020/GE: P E, C T, C T, M
Blanket Layer = 100% (*) ($)
IRS-0004
Density Index (Relative
Density) for Subgrade/Prepared
H.5 IS:2720 (Pt-14) P E, C T, C T, M
Subgrade/ Blanket Layer
(If fines are ≤ 5%) ($)
(*) The Degree of compaction achieved in the Field is as a % of Maximum Dry Density achieved in the “Field Compaction Trials”.
(#) Density check for each compacted layer would be done as per following minimum frequency:
(i) At least one density check for every 30m length for blanket layers and top one metre of prepared subgrade/subgrade along the
alignment in staggered manner of each compacted layer, as per Fig. 7.1 of Specification No. RDSO/2020/GE:IRS-0004.
(ii) At least one density check for layers other than as specified in (i) above, every 500 m 2 or 75m c/c whichever occurs earlier, along
the alignment in staggered manner of each compacted layer, as per Fig. 7.1 of Specification No. RDSO/2020/GE:IRS-0004.
(iii) In case of important bridge approaches (100m length on each side), at least one density check for every 25m length shall be
adopted.
4
ITP-01
Reporting Role / Responsibility of
Action in
Reference Standard Format/ Contr./
SN Description of Check / Test Frequency case of non- AXEN/
and Requirement Check Consul./ SSE Dy.CE
conformance XEN
List Lab.
($) During widening of bank in case of gauge conversion, compaction of earthwork should be minimum 95% of MDD as
obtained by Laboratory test as per Heavy Compaction Test (IS:2720 Part 8) or 70% Relative Density for cohesionless soil
(IS: 2720 Part 14).
Ev2 Value, on Top of Final
Finished Surface of Subgrade:
Table 3.3 to 3.6 and
(a) Single Layer System
Para 2.0 of
≥ 45 MPa (for SQ1) Test Lab
H.6 Appendix-H of P E, C T, C T, M
≥ 60 MPa (for SQ2 & SQ3) Format
RDSO/2020/GE:
(b) Double Layer System
IRS-0004
≥ 30 MPa (for SQ1)
≥ 45 MPa (for SQ2 & SQ3) Compact the
layer again
Table 3.4 & 3.6 and
Ev2 Value, on Top of Final One Test till the
Para 2.0 of
Finished Surface of Prepared per km Test Lab required
H.7 Appendix-H of P E, C T, C T, M
Subgrade (in Double Layer Format compaction
RDSO/2020/GE:
System only) ≥ 60 MPa is achieved
IRS-0004
Ev2 Value, on Top of Final
Table 3.3 to 3.6 and
Finished Surface of Blanket:
Para 2.0 of
(a) For 25T Axle Load Test Lab
H.8 Appendix-H of P E, C T, C T, M
≥ 100 MPa Format
RDSO/2020/GE:
(b) For 32.5T Axle Load
IRS-0004
≥ 120 MPa
(I) Dimensional Checks on Finished Formation
Finished Top of subgrade layer Para 7.6 of At
Level
I.1 is within ± 25mm of Design RDSO/2020/GE: suitable P E, C T, C T, M
Book Correct the
Level IRS-0004 intervals
level of
finished
Finished Top of blanket layer is Para 7.6 of At
Level layer
I.2 within + 25mm of Design RDSO/2020/GE: suitable P E, C T, C T, M
book
Level IRS-0004 intervals
Para 7.7 of At Format
Cross Slope: Within 1 in 28 to 1 Correct the
I.3 RDSO/2020/GE: suitable used in P E, C T, C T, M
in 30 Cross Slope
IRS-0004 intervals Field
5
ITP-01
Reporting Role / Responsibility of
Action in
Reference Standard Format/ Contr./
SN Description of Check / Test Frequency case of non- AXEN/
and Requirement Check Consul./ SSE Dy.CE
conformance XEN
List Lab.
Para 7.7 of At Format
Side Slopes: 2H:1V or Flatter Correct the
I.4 RDSO/2020/GE: suitable used in P E, C T, C T, M
as per design Side Slopes
IRS-0004 intervals Field
Para 7.9 of At Format Correct the
Formation Width ≥ Specified
I.5 RDSO/2020/GE: suitable used in Formation P E, C T, C T, M
Width.
IRS-0004 intervals Field Width
(J) Execution of Earthwork
Ensure
Adherence to specified compliance
RDSO/2020/GE: For entire
J.1 processes for execution of CHLST-03 during P E, C E, C E
IRS-0004 length
Earthwork execution of
the work
(K) Widening of Formation and Raising of Embankment
Ensure
Adherence to specified
Para 9.1 of compliance
processes for widening of For entire
K.1 RDSO/2020/GE: CHLST-04 during P E, C E, C E
Embankment and/or raising of length
IRS-0004 execution of
embankment (as applicable)
the work