Lifting Station Pump Checklist

This document provides checklists for testing and commissioning pumps at a lifting station project. It includes sections for general information about the pumps, a checklist to check installation and components, an electrical checklist, and a control checklist. The checklists include items to check valves, pipes, tags, gauges, switches, wiring, connections to control panels and more. Signatures are included for the name and date of the person performing the checks.

Uploaded by

Kareem Rasmy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
332 views3 pages

Lifting Station Pump Checklist

This document provides checklists for testing and commissioning pumps at a lifting station project. It includes sections for general information about the pumps, a checklist to check installation and components, an electrical checklist, and a control checklist. The checklists include items to check valves, pipes, tags, gauges, switches, wiring, connections to control panels and more. Signatures are included for the name and date of the person performing the checks.

Uploaded by

Kareem Rasmy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Testing and Commissioning

PUMPS
Project :
System : Lifting Station Date :

a- General :

1- System : Lifting Station


2- Location :
3- Serial Number :
4- Model Number :
5- Type :
6- Voltage :
7- Amperage :
Pump No. 1
8- Suction Pressure, psi :
9- Discharge pressure, psi :
Design Actual
10- Head ,ft : 0
11- Water flow, gpm :
Pump No. 2
12- Suction Pressure, psi :
13- Discharge pressure, psi :
Design Actual
14- Head ,ft : 0
15- Water flow, gpm :

NOTES :
Name Signature

RED SEA MALL - JEDDAH General 1


b- Check List :

1 - Check valve & gate valve installation at discharge side found not found
2 - Pipes connection good bad
3 - Pipes identifications found not found
4 - Supporting system good bad
5 - Valves tagging found not found
6 - Pressure gauge installation at discharge side found not found
7 - Control panel installation ok not ok
8 - Float switches installation (4 Nos) found not found
9 - Wires installation inside liquid tight conduits ok not ok
### - Connection to BMS done not done
### - Alternation unit installation inside control panel found not found
### - Changeover unit installation inside control panel found not found
### - Connection to MCC panel done not done

NOTES :

Name Signature Date

RED SEA MALL - JEDDAH Checklist 2


c- Electrical Checklist

Pumps are connected to MCC No. :


Voltage :
Amperage :

1 - Control panel installation good bad


2 - Indication lamps found not found
3 - Phase failure unit protection found not found
4 - Overload protection found not found
5 - Wires are tightly connected good bad
6 - Aternation unit installation found not found
7 - Changeover unit installation found not found

d- Control Checklist

Pumps are connected to DDC No. :

1 - System pressure connection to DDC panel ok not ok


2 - Flow switch connection to DDC panel ok not ok
3 - Signal status ok not ok
4 - High level alarm ok not ok

NOTES :

Name Signature Date

RED SEA MALL - JEDDAH Electrical&Control 3