Lifting Station Pump Checklist
Lifting Station Pump Checklist
PUMPS
Project :
System : Lifting Station Date :
a- General :
NOTES :
Name Signature
1 - Check valve & gate valve installation at discharge side found not found
2 - Pipes connection good bad
3 - Pipes identifications found not found
4 - Supporting system good bad
5 - Valves tagging found not found
6 - Pressure gauge installation at discharge side found not found
7 - Control panel installation ok not ok
8 - Float switches installation (4 Nos) found not found
9 - Wires installation inside liquid tight conduits ok not ok
### - Connection to BMS done not done
### - Alternation unit installation inside control panel found not found
### - Changeover unit installation inside control panel found not found
### - Connection to MCC panel done not done
NOTES :
d- Control Checklist
NOTES :