Blue Prism

PROCESS DELIVERY METHODOLOGY

For more information please contact:


[email protected] | UK: +44 (0) 870 879 3000 | US: +1 888 7577476
www.blueprism.com
Contents
1. Introduction ..........................................................................................................................................................4
1.1. Blue Prism’s Robotic Automation................................................................................................................4
2. Blue Prism Process Delivery Methodology ............................................................................................................5
3. Set Up....................................................................................................................................................................6
4. Define....................................................................................................................................................................7
4.1. Process Analysis ..........................................................................................................................................7
4.2. PDD Walkthrough .......................................................................................................................................7
4.3. MI Requirement Analysis ............................................................................................................................7
4.4. Functional Requirement Questionnaire ......................................................................................................7
5. Design ...................................................................................................................................................................8
5.1. Solution Design Document..........................................................................................................................8
5.2. Operational Impact Document ...................................................................................................................8
5.3. Process Design Instructions ........................................................................................................................8
5.4. Object Design Instructions ..........................................................................................................................8
5.5. Blue Prism Design Authority........................................................................................................................8
5.6. Blue Prism Object Design Library ................................................................................................................8
6. Test Planning .........................................................................................................................................................9
6.1. Test Requirement Analysis ..........................................................................................................................9
6.2. Scenario & Case Planning ............................................................................................................................9
6.3. Test Schedule & Resources .......................................................................................................................10
6.4. Acceptance Criteria ...................................................................................................................................10
6.5. Test Plans Creation and Approval .............................................................................................................10
7. Configuration ......................................................................................................................................................11
7.1. System Access & Credentials ....................................................................................................................11
7.2. Configuration Schedule .............................................................................................................................11
7.3. Process Configuration ...............................................................................................................................11
7.4. Configuration Testing ................................................................................................................................11
8. Verification ..........................................................................................................................................................12
8.1. Verification ................................................................................................................................................12
8.2. Performance and Resilience Testing .........................................................................................................12
8.3. Verification Sign Off ..................................................................................................................................12
9. User Acceptance Test..........................................................................................................................................13
9.1. Acceptance Environment Migration .........................................................................................................13

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 2 of 16
9.2. UAT Phases ...............................................................................................................................................13
9.3. UAT Sign Off ..............................................................................................................................................13
10. Production Roll-Out ............................................................................................................................................14
10.1. Blue Prism Implementation Plan ...............................................................................................................14
10.2. Production Environment Migration ..........................................................................................................14
10.3. Documentation Update ............................................................................................................................14
10.4. Support Policy ...........................................................................................................................................14
11. Document Map ...................................................................................................................................................15
11.1. Stage Documentation ...............................................................................................................................15

The information contained in this document is the proprietary and confidential information of Blue Prism Limited and should not be
disclosed to a third party without the written consent of an authorised Blue Prism representative. No part of this document may be
reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying without the written
permission of Blue Prism Limited

© Blue Prism Limited, 2001 - 2015

All trademarks are hereby acknowledged and are used to the benefit of their respective owners.
Blue Prism is not responsible for the content of external websites referenced by this document.

Blue Prism Limited, Centrix House, Crow Lane East, Newton-le-Willows, WA12 9UY, United Kingdom
Registered in England: Reg. No. 4260035. Tel: +44 870 879 3000. Web: www.blueprism.com

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 3 of 16
1. Introduction
1.1. Blue Prism’s Robotic Automation
Robotic Automation refers to process automations where computer software drives existing enterprise application
software in the same way that a user does. This means that unlike traditional application software, Robotic
Automation is a tool or platform that operates and orchestrates other application software through the existing
application's user interface and in this sense is not "integrated".

Blue Prism's Robotic Automation software enables business operations to be agile and cost-effective through rapid
automation of manual, rules-based, back office administrative processes, reducing cost and improving accuracy by
creating a "virtual workforce".

The virtual workforce is built by the operational teams or accredited Blue Prism partners using our robotic
automation technology to rapidly build and deploy automations through leveraging the presentation layer of
existing enterprise applications. The automations are configured and managed within an IT-governed framework
and operating model which has been iteratively developed through numerous large scale and complex
deployments.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 4 of 16
2. Blue Prism Process Delivery Methodology
The Blue Prism Process Delivery Methodology is a proven means of delivering ongoing business benefit through
process automation using a controlled and structured Automation Framework.

Blue Prism Process Delivery Methodology has been designed to:

 Provide the most appropriate technique for delivering Blue Prism processes.

 Mitigate risk by providing earliest possible visibility to potential issues.

 Allow multiple processes to be delivered in parallel.

 Ensure comprehensive control is maintained throughout the delivery

 Realise the process benefits at the earliest opportunity

This document provides an overview of the recommended methodology through the key phases of the delivery
cycle and its content and chronology deliberately mirror the Process Delivery Tracking Sheet.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 5 of 16
3. Set Up
Once process delivery has been authorised to commence, the Automation Manager appoints the Delivery
Manager, Process Modeller(s) and Test Analyst(s). Business and process contacts are engaged and costs
authorised.

The Process Delivery Tracking Sheet is periodically updated by the Delivery Manager. On setup, the following
details can be captured in the Summary section:

 Business Contact – This is the process owner. The primary business contact could be a business unit
manager, team manager, project manager etc.

 Secondary Business Contact – If required a secondary contact can be listed.

 Process Contact – Names of Subject Matter Experts (SMEs). These will be the first point of call for any
process-related queries.

 Cost Centre – Cost centre that the delivery costs are allocated to.

 Cost Centre Authoriser – Name(s) of contacts that will authorise any delivery costs.

 Quality Centre Project Name – Name of Quality Centre project name that all test plans and evidence is
captured to.

 Catalogue Request Numbers – List of any catalogue requests made during the delivery.

 Risk Assessment – Risk assessment approval details and dates.

 Delivery Manager – Name of Delivery Manager

 Subject Matter Expert (SME) – Names of SME’s

 Process Analyst – Names of Process Analysts

 Process Modeller – Names of Process Modellers

 Test Analyst – Names of Test Analysts

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 6 of 16
4. Define
The define stage will examine the process prior to a solution design and the commencement of the configuration
stage. In addition to allowing all risks to be identified, a thorough analysis will expose the scope of the complete
process resulting in a comprehensive design and more economic configuration phase.

4.1. Process Analysis


The Process Analyst, working with the business subject matter expert (SME), will provide a detailed process map
and description (Process Definition Document). This will define the entire scope of the process but the granularity
will need to be sufficient to provide enough detail for the process to be followed by a user during a PDD
Walkthrough. The Process Modeller will confirm the detail and be present during the PDD Walkthrough.

4.2. PDD Walkthrough


There is a risk that a completed Blue Prism process running as per design will result in an unsatisfactory level of
business exceptions. This is due to inadequate process definition. To mitigate the risk of this a PDD walkthrough is
performed. A business SME will perform the process manually by following the prescribed process in the PDD. The
process must be followed exactly and a sufficient number of cases must be processed to provide a rough estimate
of what level of exceptions can be expected when the process is automated. It is imperative that cases processed
during the PDD walkthrough are a random yet representative sample. The Process Modeller and Delivery Manager
will agree the walkthrough volume.

4.3. MI Requirement Analysis


During processing there is an opportunity to harvest data for the purposes of MI. Building this into the initial
solution usually requires no additional development effort. An analysis must be made by the Process Analyst to
ascertain the MI requirement.

4.4. Functional Requirement Questionnaire


The Functional Requirements Questionnaire (FRQ) captures all the metrics, controls, execution and data
management requirements as part of the current operational process today. These are extremely important and
useful when designing your automated process, i.e.

 Does your process need to be scheduled at applicable hours when the applications are available?

 Does the process require an “input trigger” to start?

 Is it best to create separate “automated” processes to utilise the robots and share the workload?

The FRQ captures the operational requirements of how the process is manually operated today and will help design
how the process can be automated.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 7 of 16
5. Design
5.1. Solution Design Document
Following completion of the define phase, the solution can be designed and documented. The Solution Design
Document (SDD) will complement the PDD and describe how the Blue Prism process will be designed to
successfully automate the process described in the PDD. The SDD is a comprehensive document containing, not
only high level details of how the Blue Prism product will deliver the solution, but also includes details of other
deliverables that are required for the solution (i.e. web services, database tables, web forms etc.) and on other
details such as security, scheduling, alerting, management information, and exception handling.

For full details of the information captured in the SDD, please refer to the Solution Design Document Template.

5.2. Operational Impact Document


This document describes in detail the impact on the Operation from the delivery of the automated solution.

This document is intended for the client’s project delivery team to ensure that all components of the required
operational architecture are in place. In signing off this document, the business will be acknowledging and
agreeing to the retention of some resource to support the solution.

5.3. Process Design Instructions


This document describes in detail a single Blue Prism process, and the components, business objects, work queues
and credentials it uses to support the Blue Prism solution.

The document is intended for those developing and supporting the Blue Prism solution. It is a dynamic document
that will continually be revised as changes are applied. Its accuracy is essential if different personnel are to
successfully develop or support the process.

5.4. Object Design Instructions


This document describes in detail a single Blue Prism Business Object, including all the actions in the object and all
the inputs and outputs to those actions.

This document is intended for those developing the Blue Prism solution, instructing them on what needs to be
developed, and may be used without knowledge of the wider solution.

5.5. Blue Prism Design Authority


For designs which include any bespoke solution features such as Code Stages or Custom Controls, the SDD must be
approved by the Blue Prism Design Authority. A requirement for a Design Authority review is triggered by any
information being documented in the Bespoke Solution Features section of the SDD.

5.6. Blue Prism Object Design Library


This library is a mechanism of collating all the processes, objects and actions into an internal library which in turns
acts as source for documenting all processes and objects within a client environment. It helps to further support
the tracking capability of new actions required to be built, assign objects to delegates across various processes /
business areas to build and to ensure reusability of actions that have been built. It allows for quicker analysis of
actions required against those that are built for speed to deliver estimates for new processes and a formal method
of an impact analysis of amending actions on the processes (Regression Testing). During the ODI phase, this can be
seen as a requirement by the Lead Developer that feeds into the Design Authority meetings to progress and update
accordingly.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 8 of 16
6. Test Planning
The Test Planning stage will outline and communicate the intent of the testing effort for a given process. It is to be
performed by the Test Analyst and should be performed in conjunction with the configuration and verification
phase.

The three key test phases are:

 Configuration Testing

 Verification testing

 UAT Testing

For more details on the testing within each of these phases please reference the Test overview documents.

6.1. Test Requirement Analysis


Many factors need to be considered when analysing the test requirement. These include:

 Elapsed time to work a case

 Number of target systems

 Test environment availability

 Size of process

 New Blue Prism actions

 New systems

 Number of write stages

 Number of business areas

 SLA’s

 Process risk

 Scope of manual processing in the end-to-end process

These factors will determine the expected length of each test phase, test windows, the number of UAT phases and
the required volume of test cases.

6.2. Scenario & Case Planning


For each test phase, scenarios and test cases will need to be identified and prepared.

6.2.1.1. Configuration Testing


Tests will be largely functional tests targeted at the Blue Prism component level. Specific cases will be required to
prove each test.

6.2.1.2. Verification Testing


Tests will be business or process scenarios and specific cases will be required to prove each scenario. In addition,
performance and resilience tests will prepare the process for UAT and ensure that cases and systems can be
recovered in the event of process failure, system timeouts etc. Tests will need to be devised that will demonstrate

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 9 of 16
that when restarted part way through a case the process can identify its previous position and successfully
conclude the case.

6.2.1.3. User Acceptance Testing


As the Blue Prism process will have been proved by specific test cases in Verification Testing, the object of UAT is to
prove the process against the end-to-end business process by carefully building up the volume of random cases.
The test plan should specify how these cases will be supplied to the Blue Prism work queue in a controlled manner.

UAT tests will typically be measured against specific exception rates and case volumes over a period before the
volumes can be increased. This is to mitigate the unlikely event of excessive case exceptions resulting from
scenarios that are not identified in verification.

6.3. Test Schedule & Resources


A test schedule will need to be defined so that target start dates can be provided and resources secured. Subject
Matter Experts will be required during the Verification phase and for spot checking during UAT.

6.4. Acceptance Criteria


The Delivery Manager and Test Analyst must define and document the acceptance criteria for each delivery stage.
Qualitative and or quantitative criteria will act as control gates for quality and triggers for stage sign off. The
following stages will require clear and unambiguous acceptance criteria:

 Configuration Phase

 Verification Phase

 Test Analyst Verification (Process Studio)

 Test Analyst Verification (Control Room)

 Each Phase within UAT

6.5. Test Plans Creation and Approval


Finally, the test plan is published by the Test Analyst for review and approval. No test phase can begin until its
relevant section within the Test Plan has been approved.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 10 of 16
7. Configuration
The configuration stage will configure and test all new objects, actions and processes. Because of the extensive
reuse of Blue Prism components, regression test harnesses will be configured so that components can be safely
amended.

7.1. System Access & Credentials


If the process is required to interface with new systems, access will need to be granted and possible applications
installed. Consideration here must be given to all environments where the process will be executed (configuration,
UAT and production) and installation SLA’s.

User access credentials will need to be secured for each process for each system.

7.2. Configuration Schedule


Where multiple processes are to be delivered concurrently a configuration schedule is produced into which
configuration items are assigned to Process Modellers in line with the defined delivery plan.

7.3. Process Configuration


Processes are configured.

7.4. Configuration Testing


In line with the Configuration Test Plan, all configuration acceptance criteria must be satisfied before progression
to the Verification Stage. Where a system test environment exists, functional testing of the write stages can be
performed here.

Tests can be performed as soon as the relevant components have been developed. Please note that where the
process is being configured against production data, not all the configuration will have necessarily been completed
at this stage – the remaining configuration will be completed during Verification. For read stages a test harness can
be developed to consume large numbers or random cases. The more random cases utilised by a test harness, the
more system responses that are uncovered during the configuration phase. Where a system test environment
exists test harnesses can be created for both read and write stages.

Tests will be coordinated, documented and executed by the Process Modeller. Sign off will be provided by the Test
Analyst.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 11 of 16
8. Verification
The Verification Stage will prove the process logic and allow the process to be configured for optimal performance
prior to UAT.

8.1. Verification
The Verification Stage requires the Test Analyst to be present to witness and approve each stage of the process as
a case is worked.

If a test environment has not been available during configuration, the first step in Verification is to complete and
test any new write stages. On successful completion of this, cases are slowly stepped though in Process Studio to
test the process flow under the authorisation of the Process Analyst and/or SME.

In order to satisfy the verification test scenarios, cases will be specifically selected and added to the process work
queue to test certain routes through the Blue Prism process. Acceptance criteria within the test plan will identify
when testing in Process Studio is complete.

When accepted in process studio, the process can be run in the Blue Prism Control Room. Here the process will run
at full speed before the Test Analyst analyses and confirms the results.

8.2. Performance and Resilience Testing


Once in Control Room the process will be operating at full speed. Average processing times for cases will enable
estimates to be provided for total processing time for peak work load. This will affect resource planning and may
impact SLAs. The process may need to be adjusted to improve performance.

A series of resilience tests will test how the process accommodates specific conditions that could cause its failure
e.g. system exceptions, timeout or unavailability. In addition to being able to recover the system, the process must
demonstrate the ability to recover a case. In the event of a process failure and restart it is essential that the
process can recognise its previous point of failure and successfully recommence case processing from that point.

8.3. Verification Sign Off


Acceptance Criteria within the test plan will identify when verification testing is complete and the process can be
promoted to UAT. In the event of test scenarios proving difficult to prove because of a scarcity of valid cases,
breaks and alerts can be added to the process to provide notification if these scenarios materialise in UAT or
alternatively these cases can be set as business referral.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 12 of 16
9. User Acceptance Test
UAT will be the process’s introduction to the complete end-to-end business process.

9.1. Acceptance Environment Migration


A Blue Prism deployment request is made to export the process and its dependent objects, work queues etc to the
Blue Prism UAT environment.

9.2. UAT Phases


In line with the test plan more than one UAT Phase may have been prescribed. The test plan will describe the
number of cases to be processed during each phase and what acceptance criteria have to be satisfied before the
process can be progressed to the next phase.

In the event of process alerts or breaks identifying dormant scenarios, delivery temporarily returns to the
verification stage to test under authorisation of the Test Analyst before restarting the current UAT phase.

The test plan will also specify the rate of case spot checking (if any) by the SME for each phase of the process.

9.3. UAT Sign Off


Acceptance Criteria within the test plan will identify when UAT testing is complete and the process can be
promoted to the Blue Prism Production Environment. . The Delivery Manager will complete the Process Sign Off
document which will be provided to the requesting business area. The Process Sign Off document will contain the
following information.

Business Requirements Summary

A brief summary of the initial business requirements and any requests for change

9.3.1.1. Process Delivery Summary


A brief summary of what has been delivered including any changes in process scope. The latest PDD version must
be documented here.

9.3.1.2. BAU – Business Area


As part of the wider end-to-end process this section will confirm the responsibilities of the business. This will
include processing business referrals, operational contingency requirements etc

9.3.1.3. BAU – Automation Team


A summary of the Automation Teams responsibilities will include process running times and scheduling, process
support hours, operational contingency, Blue Prism process or supporting process failure procedure.

9.3.1.4. Risks and Issues


Any remaining process-related risks and issues must be documented. Particular attention must be paid to unseen
test scenarios and business referrals outside of the original PDD

9.3.1.5. Benefits and Savings


Although an estimate of benefits and savings will have been made during the process assessment stage, changes in
process scope, performance etc may have changed the actual process benefits.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 13 of 16
10. Production Roll-Out
Once the UAT stage has been accepted the process is ready to be roll out in the production environment. From this
point the process will work 100% of cases and cannot be amended without a formal request for change.

10.1. Blue Prism Implementation Plan


The Blue Prism Implementation Plan details the plan to be followed during the implementation of the project. It
defines the tasks to be covered before, during and after the implementation events, including those tasks
performed by the Automation Team, IT and Operational Departments.

The purpose of the document is to:

 Communicate and gain agreement for the detailed implementation approach and schedule.

 Aid planning and resourcing of the implementation events.

 Provide a means of recording and managing implementation dependencies.

It is intended for all members of the project team and stakeholders.

Please refer to the Blue Prism Implementation Plan template for details of the information captured within the
plan.

10.2. Production Environment Migration


A request is made to export the process and its dependent objects and work queues to the Blue Prism Production
environment. On successful migration a final check is performed to ensure that all required objects, systems, and
work queues can be accessed by the process.

10.3. Documentation Update


10.3.1.1. Operational Contingency Document
The Operational Contingency Document is updated with details of what action should be taken and when in the
event of the processing being unable to run.

10.3.1.2. Operational Process Control Document


The Operational Process Control Document is updated with details of what actions should be taken by the
operations team to successfully complete a case that where a Business Referral or System Exception is generated.

10.3.1.3. Environment Description Document


An update to the Environment Description Document may be required if new systems/resources have been
installed or any other change to the configuration was required to facilitate the process.

10.3.1.4. Operational Handbook


The Operational Handbook is updated to describe how a process is to be started or restarted.

10.4. Support Policy


It is essential that a Service Wrapper is implemented for the live Blue Prism processes to ensure smooth day to day
running of the automated processes and to prevent the processes from decaying as systems/business processes
evolve.

The support policy provides the guidelines on the optimum Service Wrapper for Blue Prism.

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 14 of 16
11. Document Map
11.1. Stage Documentation

11.1.1.1. Define
Output Documents Action

Process Definition Document (approved) Signed Off


Functional Requirement Questionnaire (approved) Signed Off

11.1.1.2. Design
Input Documents Action

Process Definition Document (approved) Used


Functional Requirement Questionnaire (approved) Signed Off

Output Documents Action

Solution Design Document Sign Off


Object Design Instructions Sign Off
Process Design Instructions Sign Off
Operational Impact Document Sign Off
Object Design Library Updated
Configuration Test Plan Draft
Verification Test Plan Draft
User Acceptance Test Plan Draft

11.1.1.3. Configuration
Input Documents Action

Process Definition Document (approved) Used


Object Design Instructions Used
Process Design Instructions Used
Solution Design Document (approved) Used
Configuration Test Plan (approved) Used

Output Documents Action

Configuration Test Plan Sign-Off

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 15 of 16
11.1.1.4. Verification
Input Documents Action

Process Definition Document (approved) Used


Solution Design Document (approved) Used
Verification Test Plan (approved) Used

Output Documents Action

Verification Test Plan Sign-Off

11.1.1.5. User Acceptance Test


Input Documents Action

UAT Deployment Request Created


User Acceptance Test Plan (approved) Used

Output Documents Action

User Acceptance Test Plan Sign-Off


Process Sign Off document Created

11.1.1.6. Production Roll-Out


Output Documents Action

Implementation Plan Signed Off


Production Deployment Request Approved
Operational Contingency Document Updated
Operational Process Control Document Created
Environment Description Document Updated
Operational Handbook Created
Support Policy Created

Commercial in Confidence
®Blue Prism is a registered trademark of Blue Prism Limited Page 16 of 16