Output of 2016
Sl. No. Description of Machine Activity Output Unit
Machine Rate
P&M-001 Air Compressor General Purpose capacity in cfm 170/250 hour 699.00
Batching and Mixing Plant (a) 30 cum
P&M-002 Concrete Mixing cum/hour 20 hour 4401.00
capacity
Batching and Mixing Plant (b) 15 - 20
P&M-003 Concrete Mixing cum/hour 13 hour 3658.00
cum capacity
P&M-004 Bitumen Pressure Distributor Applying bitumen tack coat sqm/hour 1750 hour 2606.00
P&M-005 Bitumen Boiler oil fired Bitumen Spraying capacity in litre 1500 hour 934.00
Concrete Paver Finisher with 40 HP
P&M-006 Paving of concrete surface cum / hour 20 hour 5546.00
Motor
Concrete Pump of 45 & 30 cum
P&M-007 Pumping of concrete cum / hour 33 / 22 hour 429.00
capacity
P&M-008 Concrete Bucket For Pouring concrete capacity in cum 1 hour 30.00
P&M-009 Concrete Mixer (a) 0.4/0.28cum Concrete Mixing cum/hour 2.5 hour 374.00
P&M-010 Concrete Mixer (b) 1 cum Concrete Mixing cum/hour 7.5 hour 367.00
P&M-011 Crane (a) 80 tonnes Lifting Purpose hour 2897.00
P&M-012 Cranes b) 35 tonnes Lifting Purpose hour 1939.00
P&M-013 Cranes c) 3 tonnes Lifting Purpose hour 802.00
300/
P&M-014 Dozer D - 80 - A 12 Spreading/Cutting/ Clearing cum/hour hour 5700.00
150/250
200/
P&M-015 Dozer D - 50 - A 15 Spreading/Cutting/ Clearing cum/hour hour 3500.00
120/150
P&M-016 Emulsion Pressure Distributor Applying emulsion tack coat sqm/hour 1750 hour 1834.00
Front End loader 1 cum bucket
P&M-017 Soil loading / Aggregate loading cum/hour 60 /25 hour 2000.00
capacity
P&M-018 Generator (a) 125 KVA Generation of electric Energy KVA 100 hour 1366.00
P&M-019 Generator( b) 63 KVA Generation of electric Energy KVA 50 hour 838.00
P&M-020 GSB Plant 50 cum Producing GSB cum/hour 40 hour 2054.00
P&M-021 Hotmix Plant - 120 TPH capacity DBM/BM/SDC/ Premix cum/hour 40 hour 53839.00
P&M-022 Hotmix Plant - 100 TPH capacity DBM/BM/SDC/ Premix cum/hour 30 hour 39816.00
P&M-023 Hotmix Plant - 60 to 90 TPH capacity DBM/BM/SDC/ Premix cum/hour 25 hour 31844.00
P&M-024 Hotmix Plant - 40 to 60 TPH capacity DBM/BM/SDC/ Premix cum/hour 17 hour 34248.00
P&M-025 Hydraulic Chip Spreader Surface Dressing sqm/hour 1500 hour 5046.00
P&M-026 Hydraulic Excavator of 1 cum bucket Soil Ordinary/ Soil Marshy/ Soil Unsuitable cum/hour 60 /60 /60 hour 3000.00
P&M-027 Integrated Stone Crusher 100THP Crushing of Spalls TPH 100 hour 17078.00
P&M-028 Integrated Stone Crusher 200THP Crushing of Spalls TPH 200 hour 33890.00
Basic Rate - 1
Output of 2016
Sl. No. Description of Machine Activity Output Unit
Machine Rate
P&M-029 Kerb Casting Machine Kerb Making Rm/hour 80 hour 684.00
P&M-030 Mastic Cooker Mastic Wearing coat capacity in tonne 1 hour 133.00
P&M-031 Mechanical Broom Hydraulic Surface Cleaning sqm/hour 1250 hour 729.00
200/200/5
P&M-032 Motor Grader 3.35 m blade Clearing /Spreading /GSB /WBM cum/hour hour 4643.00
0/50
P&M-033 Mobile slurry seal equipment Mixing and laying slurry seal sqm/hour 2700 hour 3782.00
Paver Finisher Hydrostatic with
P&M-034 Paving of DBM/ BM/SDC/ Premix cum/hour 40 hour 5514.00
sensor control 100 TPH
P&M-035 Paver Finisher Mechanical 100 TPH Paving of WMM /Paving of DLC cum/hour 40/30 hour 1915.00
P&M-036 Piling Rig with Bantonite Pump 0.75 m dia to 1.2 m dia Boring attachment Rm/hour 2 to 3 hour 10715.00
P&M-037 Pneumatic Road Roller Rolling of Asphalt Surface cum/hour 25 hour 2496.00
P&M-038 Pneumatic Sinking Plant Pneumatic Sinking of wells cum/hour 1.5 to 2.00 hour 8375.00
P&M-039 Pot Hole Repair Machine Repair of potholes cum/hour 4 hour 1829.00
Prestressing Jack with Pump &
P&M-040 Stressing of steel wires/stands hour 209.00
access
P&M-041 Ripper Scarifying cum/hour 60 hour 55.00
P&M-042 Rotavator Scarifying cum/hour 25 hour 31.00
P&M-043 Road marking machine Road marking Sqm/hour 100 hour 333.00
P&M-044 Smooth Wheeled Roller 8 tonne Soil Compaction /BM Compaction cum/hour 70/25 hour 953.00
P&M-045 Tandem Road Roller Rolling of Asphalt Surface cum/hour 30 hour 2236.00
Transportation of soil, GSB, WMM, Hotmix
P&M-046 Tipper - 5 cum etc.
Capacity in cum 5.5 km 728.00
Transportation of soil, GSB, WMM, Hotmix tonne.
P&M-047 Tipper - 5 cum etc.
Capacity in cum 5.5 12.00
km
Transportation of soil, GSB, WMM, Hotmix
P&M-048 Tipper - 5 cum etc.
Capacity in cum 5.5 hour 1017.00
P&M-049 Transit Mixer 4.0/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5 hour 1686.00
Transportation of Concrete Mix to site
tonne.
P&M-050 Transit Mixer 4/4.5 cum cum/hour 4.5 62.00
km
P&M-051 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3 hour 1557.00
Transportation of Concrete Mix to site
tonne.
P&M-052 Transit Mixer 3.0 cum cum/hour 3 71.00
km
P&M-053 Tractor Pulling capacity in HP 50 hour 776.00
P&M-054 Tractor with Rotavator Rate of Tractor + Rotavator hour 746.00
P&M-055 Tractor with Ripper Rate of Tractor + Ripper hour 771.00
P&M-056 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 km 728.00
P&M-057 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 hour 1023.00
P&M-058 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 tonne.k 12.00
m
Basic Rate - 2
Output of 2016
Sl. No. Description of Machine Activity Output Unit
Machine Rate
P&M-059 Vibratory Roller 8 tonne Earth or soil / GSB / WBM cum/hour 100/60/60 hour 2949.00
P&M-060 Water Tanker Water Transport capacity in KL 6 hour 997.00
P&M-061 Water Tanker Water Transport capacity in KL 6 km 67.00
P&M-062 Wet Mix Plant 60 TPH Wet Mix cum/hour 25 hour 2376.00
2016
Sl. No. Description of Machine Unit
Rate
P&M-063 Air compressor with pneumatic chisel attachment for cutting hard clay. hour 1044.00
P&M-064 Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne/hour hour 15850.00
P&M-065 Belt conveyor system hour 3454.00
P&M-066 Boat to carry at least 20 persons hour 399.00
P&M-067 Cement concrete batch mix plant @ 175 cum per hour (effective output) hour 8574.00
P&M-068 Cement concrete batch mix plant @ 75 cum per hour hour 14231.00
P&M-069 Cold milling machine @ 20 cum per hour hour 3005.00
P&M-070 Crane 5 tonne capacity hour 1184.00
P&M-071 Crane 10 tonne capacity hour 1233.00
P&M-072 Crane 15 tonne capacity hour 1261.00
P&M-073 Crane 20 tonne capacity hour 1565.00
P&M-074 Crane 40 T capacity hour 1815.00
P&M-075 Crane with grab 0.75 cum capacity hour 1953.00
P&M-076 Compressor with guniting equipment along with accessories hour 1056.00
P&M-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes/hour. hour 14846.00
P&M-078 Epoxy Injection gun hour 494.00
P&M-079 Generator 33 KVA hour 799.00
P&M-080 Generator 100 KVA hour 1475.00
P&M-081 Generator 250 KVA hour 2711.00
P&M-082 Induction, de-induction and erection of plant and equipment including all components and accessories for hour
P&M-083 Joint Cutting Machine with 2-3 blades (for rigid pavement) hour 435.00
P&M-084 Jack for Lifting 40 tonne lifting capacity. day 780.00
P&M-085 Piling rig Including double acting pile driving hammer (Hydraulic rig) hrs 7483.00
P&M-086 Plate compactor hour 356.00
P&M-087 Snow blower equipment 140 HP @ 600 cum per hour hour 1747.00
P&M-088 Texturing machine (for rigid pavement) hour 1308.00
P&M-089 Truck Trailor 30 tonne capacity hour 2184.00
P&M-090 Truck Trailor 30 tonne capacity t.km 10.00
P&M-091 Tunnel Boring machine hour 4022.00
P&M-092 Vibrating Pile driving hammer complete with power unit and accessories. hour 1405.00
P&M-093 Wet Mix Plant 100 TPH hour 2687.00
P&M-094 Wet Mix Plant 75 TPH hour 2579.00
Basic Rate - 3
(B) Labour
2016
Sl. No. Description of Labour Unit Rate
L-01 Blacksmith (IInd class) day 550.00
L-02 Blacksmith (Ist class)/ Welder/ Plumber/ Electrician day 750.00
L-03 Blaster (Stone cutter) day 550.00
L-04 Carpenter I Class day 750.00
L-05 Chiseller (Head Mazdoor) day 550.00
L-06 Driller (Jumper) day 550.00
L-07 Diver day 750.00
L-08 Fitter (II class) day 550.00
L-09 Mali day 500.00
L-10 Mason (IInd class) day 550.00
L-11 Mason (Ist class) day 750.00
L-12 Mate / Supervisor day 750.00
L-13 Mazdoor day 500.00
L-14 Mazdoor/Dresser (Semi Skilled) day 550.00
L-15 Mazdoor/Dresser/Sinker (Skilled-II) day 550.00
L-16 Medical Officer day 900.00
L-17 Operator (grouting) day 550.00
L-18 Painter (II class) day 550.00
L-19 Para medical personnel day 650.00
Basic Rate - 4
(C) Materials
2016
Sl. No. Description Unit
Rate
M-001 Stone Boulder of size 150 mm and below at Crusher Plant cum 1151.00
M-002 Supply of quarried stone 150 - 200 mm size for Hand Broken at site cum 1070.00
M-003 Boulder with minimum size of 300 mm for Pitching at Site cum 1021.00
M-004 Coarse sand at Mixing Plant cum 1344.00
M-005 Coarse sand at Quarry Site cum 1344.00
M-006 Fine sand at Quarry Site cum 1192.00
M-007 Binding Material for WBM at Work Site cum 536.00
M-008 Gravel/Quarry spoil at Site Cum 1183.00
M-009 Granular Material for GSB works at Quarry Cum 1183.00
M-010 Granular Material for GSB works at Mixing Plant Cum 1183.00
M-011
M-012 Filter media/Filter Material as per Table 300-3 (MoRT&H Specification) Cum 1183.00
Sub-Base
M-015 Close graded Granular sub-base Material 26.5 mm to 9.5 mm Cum 2195.00
course
Sub-Base
M-016 Close graded Granular sub-base Material 9.5 mm to 4.75 mm Cum 1875.00
course
Sub-Base
M-017 Close graded Granular sub-base Material 9.5 mm to 2.36 mm Cum 1748.00
course
Sub-Base
M-018 Close graded Granular sub-base Material 4.75mm to 2.36 mm Cum 1932.00
course
Sub-Base
M-019 Close graded Granular sub-base Material 4.75mm to 75 micron mm Cum 1748.00
course
Sub-Base
M-020 Close graded Granular sub-base Material 2.36 mm Cum 1344.00
course
Wearing
M-021 Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. Cum 1068.00
course
Sub-
M-022 Coarse graded Granular sub-base Material 2.36 mm & below Base/Base Cum 1081.00
course
Sub-Base
M-023 Coarse graded Granular sub-base Material 4.75mm to 75 micron Cum 1375.00
course
Sub-
M-024 Coarse graded Granular sub-base Material 2.36 mm to 75 micron Base/Base Cum 1512.00
course
Sub-Base
M-025 Coarse graded Granular sub-base Material 9.5 mm to 4.75 mm Cum 1875.00
course
Sub-
M-026 Coarse graded Granular sub-base Material 26.5 mm to 4.75 mm Base/Base Cum 1705.00
course
Sub-Base
M-027 Coarse graded Granular sub-base Material 26.5 mm to 9.5 mm Cum 1953.00
course
Sub-Base
M-028 Coarse graded Granular sub-base Material 37.5 mm to 9.5 mm Cum 1882.00
course
Sub-Base
M-029 Coarse graded Granular sub-base Material 53 mm to 26 .5mm Cum 1882.00
course
Base
M-030 Aggregates below 5.6 mm Cum 2136.00
course
Basic Rate - 5
Sl. No Description Usage Unit Rate at Plant
Base
M-031 Aggregates 22.4 mm to 2.36 mm Cum 1932.00
course
Base
M-032 Aggregates 22.4 mm to 5.6 mm Cum 2074.00
course
Base
M-033 Aggregates 45 mm to 2.8 mm Cum 2074.00
course
Base
M-034 Aggregates 45 mm to 22.4 mm Cum 2124.00
course
Base
M-035 Aggregates 53 mm to 2.8 mm Cum 2074.00
course
Base
M-036 Aggregates 53 mm to 22.4 mm Cum 2074.00
course
Base
M-037 Aggregates 63 mm to 2.8 mm Cum 2074.00
course
Base
M-038 Aggregates 63 mm to 45 mm Cum 2074.00
course
Base
M-039 Aggregates 90 mm to 45 mm Cum 2074.00
course
Base
M-040 Aggregates 10 mm to 5 mm Cum 2420.00
course
Wearing
M-041a Aggregates 11.2 mm to 0.09 mm Cum 2586.00
course
Base
M-041b Aggregates 11.2 mm to 0.09 mm Cum 2303.00
course
Wearing
M-042 Aggregates 13.2 mm to 0.09 mm Cum 2560.00
course
Wearing
M-043 Aggregates 13.2 mm to 5.6 mm Cum 2586.00
course
Base
M-044 Aggregates 13.2 mm to 10 mm Cum 2253.00
course
Base
M-045 Aggregates 20 mm to 10 mm Cum 2124.00
course
Base
M-046 Aggregates 25 mm to 10 mm Cum 2124.00
course
Base
M-047 Aggregates 19 mm to 6 mm Cum 2124.00
course
Base
M-048 Aggregates 37.5 mm to 19 mm Cum 2074.00
course
Base
M-049 Aggregates 37.5 mm to 25 mm Cum 2074.00
course
Wearing
M-050 Aggregates 6 mm nominal size Cum 2586.00
course
Cement
M-051 Aggregates 10 mm nominal size Cum 2465.00
concrete
Wearing
M-052a Aggregates 13.2/12.5 mm nominal size Cum 2537.00
course
Base
M-052b Aggregates 13.2/12.5 mm nominal size Cum 2303.00
course
Wearing
M-053 Aggregates 20 mm nominal size course/Co Cum 2465.00
ncrete
Cement
M-054 Aggregates 25 mm nominal size Cum 2348.00
concrete
Cement
M-055 Aggregates 40 mm nominal size Cum 2253.00
concrete
Basic Rate - 6
2016
Sl. No Description Unit
Rate
M-056 GI pipe 100 mm dia metre 1050.00
M-057 Acrylic polymer bonding coat litre 333.00
M-058 Alluminium Paint litre 398.00
M-059 Alluminium alloy plate 2mm Thick sqm 20400.00
M-060 Alluminium alloy/galvanized steel tonne 74745.00
M-061 Alluminium sheeting fixed with encapsulated lens type reflective sheeting including 2% towards lettering, cost of sqm 20368.00
M-062 Alluminium studs 100 x 100 mm fitted with lens reflectors nos 1232.00
M-063 Barbed wire kg 117.00
M-064 Bearing (Cost of parts) nos
M-065 Bearing (Cast steel rocker bearing assembly of 250 tonne ) nos
M-066 Bearing (Elastomeric bearing assembly consisting of 7 internal layers of elastomer bonded to 6 nos. internal nos 23116.00
M-067 Bearing (Forged steel roller bearing of 250 tonne) nos
M-068 Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads providing nos
M-069 Bearing (PTFE sliding plate bearing assembly of 80 tonnes ) nos
M-070 Bearing (Supply of sliding plate bearing of 80 tonne) nos
M-071 Bentonite kg 828.00
M-072 Binding wire kg 110.00
M-073 Bitumen ( Cationic Emulsion ) (Ex-Aizawl) tonne 60000.00
M-074 Bitumen (60-70 grade) (Ex-Aizawl) tonne 64935.00
M-075 Bitumen (80-100 grade ) (Ex-Aizawl) tonne 52137.00
M-076 Bitumen (Cutback ) (Ex-Aizawl) tonne 72350.00
M-077 Bitumen (emulsion) (Ex-Aizawl) tonne 60000.00
M-078 Bitumen (modified graded) (Ex-Aizawl) tonne 87122.00
M-079 Brick (Ex Aizawl) each 12.00
M-080 C.I. shoes for the pile kg 117.00
M-081 Cement tonne 10000.00
M-082 Cold twisted bars (HYSD Fe 500 Bars) tonne 72359.00
M-083 Collar for joints 300 mm dia nos 859.00
M-084 Compressible Fibre Board(20mm thick) sqm 1021.00
M-085 Connectors/ Staples each 1301.00
M-086 Copper Plate(12m long x 250mmwide) kg 1276.00
M-087 Corrosion resistant Structural steel tonne 72753.00
M-088 Corrugated sheet, 3 mm thick, "Thrie" beam section railing kg 76.00
M-089 Credit for excavated rock found suitable for use cum 87.00
M-090 Curing compound liter 853.00
M-091 Delineators from ISI certified firm as per the standard drawing given in IRC - 79 each 4061.00
M-092 Earth Cost or compensation for earth taken from private land cum 38.00
M-093 Elastomeric slab seal expansion joint assembly manufactured by using chloroprene, elastomer for elastomeric metre 11563.00
Basic Rate - 7
2016
Sl. No Description Unit
Rate
M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each 100 nos 3690.00
M-095 Epoxy compound with accessories for preparing epoxy mortar (available at Dr. Fixit kg 821.00
M-096 Epoxy mortar kg 773.00
M-097 Epoxy primer kg 1052.00
M-098 Epoxy resin-hardener mix for prime coat kg 1024.00
M-099 Flag of red color cloth 600 x 600 mm each 103.00
M-100 Flowering Plants each 215.00
M-101 Galvanized MS flat clamp nos 241.00
M-102 Galvanized steel wire crates of mesh size 100 mm x 100 mm woven with 3mm dia. GI wire in rolls of required sqm 333.00
M-103 Galvanized structural steel plate 200 mm wide, 6 mm thick, 24 m long kg 85.00
M-104 Gelatin 80% (with accessories) kg 313.00
M-105 Geo grids sqm 340.00
M-106 Geomembrane sqm 591.00
M-107 Geonets sqm 314.00
M-108 Geotextile sqm 414.00
M-109 Geotextile filter fabric sqm 414.00
M-110 GI bolt 10 mm Dia nos 67.00
M-111 Grouting pump with agitator hour 466.00
M-112 Grass (Doob) kg 28.00
M-113 Grass (Fine) kg 21.00
M-114 HDPE pipes 75mm dia metre 338.00
M-115 HDPE pipes 90mm dia metre 333.00
M-116 Hedge plants each 333.00
M-117 Helical pipes 600mm diameter metre 44094.00
M-118 Hot applied thermoplastic compound litre 466.00
M-119 HTS strand tonne 163314.00
M-120 Joint Sealant Compound kg 1637.00
M-121 Jute netting, open weave, 2.5 cm square opening for seeding and Mulching sqm 30.00
M-122 LDO for steam curing litre 58.00
M-123 M.S. Clamps nos 94.00
M-124 M.S. Clamps kg 94.00
M-125 M.S. shoes @ 35 Kg per pile of 15 m kg 117.00
M-126 Mild Steel bars (ISI) tonne 60770.00
M-127 Modular strip/box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm metre 15497.00
M-128 Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and up to 210mm metre 31020.00
M-129 Nipples 12mm nos 83.00
Basic Rate - 8
2016
Sl. No Description Unit
Rate
M-130 Nuts and bolts kg 294.00
M-131 Paint litre 375.00
M-132 Pavement Marking Paint litre 1052.00
M-133 Paving Fabric sqm 117.00
M-134 Perforated geosynthetic pipe 150 mm dia metre 525.00
M-135 Perforated pipe of cement concrete, internal dia 100 mm metre 535.00
M-136 Pesticide kg 111.00
M-137 Pipes 200 mm dia, 2.5 m long for drainage metre 1021.00
M-138 Plastic sheath, 1.25 mm thick for dowel bars sqm 35.00
M-139 Plastic tubes 50 cm dia, 1.2 m high nos 1637.00
M-140 Polymer braids metre 67.00
M-141 Pre molded Joint filler,25 mm thick for expansion joint. sqm 688.00
M-142 Pre-coated stone chips of 13.2 mm nominal size cum 2658.00
M-143 Preformed continuous chloroprene elastomer or closed cell foam sealing element with high tear strength, metre 1304.00
M-144 Pre-molded asphalt filler board sqm 1304.00
M-145 Pre-packed cement based polymer concrete of strength 45 Mpa at 28 days kg 333.00
M-146 Primer kg 343.00
M-147 Quick setting compound kg 496.00
M-148 Random Rubble Stone (for masonry works) cum 837.00
M-149 RCC Pipe NP 4 heavy duty non pressure pipe 1000 mm dia metre 13034.00
M-150 RCC Pipe NP 4 heavy duty non pressure pipe 1200 mm dia metre 16560.00
M-151 RCC Pipe NP 4 heavy duty non pressure pipe 300 mm dia metre 2767.00
M-152 Reflectorising glass beads kg 200.00
M-153 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Copper Strips) metre 67.00
M-154 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanized carbon steel strips) metre 57.00
M-155 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced polymer/fibre reinforced metre 43.00
M-156 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips) metre 62.00
M-157 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. Alluminium strips) metre 43.00
M-158 Rivets each 76.00
M-159 Sand bags (Cost of sand and Empty cement bag) nos 28.00
M-160 Sapling 2 m high 25 mm dia each 57.00
M-161 Scrap tyres of size 900 x 20 nos 828.00
M-162 Seeds kg 34.00
M-163 Selected earth cum 283.00
M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick sqm 79.00
M-165 Sheathing duct metre 249.00
M-166 Shrubs each 399.00
M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing cum 333.00
M-168 Sodium vapour lamp each 11963.00
M-169 Square Rubble Coursed Stone cum 837.00
Basic Rate - 9
2016
Sl. No Description Unit
Rate
M-170 Steel circular hollow pole of standard specification for street lighting to mount light at 5 m height above deck level each 34666.00
M-171 Steel circular hollow pole of standard specification for street lighting to mount light at 9 m height above road level each 50842.00
M-172 Steel drum 300 mm dia 1.2 m high/empty bitumen drum nos 200.00
M-173 Steel helmet and cushion block on top of pile head during driving. kg 705.00
M-174 Steel pipe 25 mm external dia as per IS:1239 metre 103.00
M-175 Steel pipe 50 mm external dia as per IS:1239 metre 233.00
M-176 Steel wire rope 20 mm kg 212.00
M-177 Steel wire rope 40 mm kg 212.00
M-178 Strip seal expansion join metre 13388.00
M-179 Structural Steel tonne 90850.00
M-180 Super plasticizer admixture IS marked as per 9103-1999 kg 297.00
M-181 Synthetic Geogrids as per clause 3102.8 and approved design and specifications. sqm 283.00
M-182 Through and bond stone {Size (0.24x0.24x0.39)m or 0.0224 Cu.m} each 59.00
M-183 Tie rods 20mm diameter nos 333.00
M-184 Tiles size 300 x 300 mm and 25 mm thick each 133.00
M-185 Timber cum 23998.00
M-186 Traffic cones with 150 mm reflective sleeve nos 414.00
M-187 Tube anchorage set complete with bearing plate, permanent wedges etc nos 4758.00
M-188 Unslaked lime tonne 10792.00
M-189 Water KL 323.00
M-190 Water based cement paint litre 410.00
M-191 Welded steel wire fabric kg 74.00
M-192 Wire mesh 50mm x 50mm size of 3mm wire kg 105.00
M-193 Wooden ballies 2" Dia for bracing each 343.00
M-194 Wooden ballies 8" Dia and 9 m long each 991.00
M-195 Wooden packing cum 16326.00
M-196 Wooden staff for fastening of flag 25 mm dia, one m long each 76.00
M-197 RCC Pipe NP 3 heavy duty non pressure pipe 1000 mm dia metre 10015.00
M-198 RCC Pipe NP 3 heavy duty non pressure pipe 1200 mm dia metre 13834.00
Basic Rate - 10
CHAPTER-1
CARRIAGE OF MATERIALS
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-1
Item
Descriptions Unit SOR 2016
No.
Loading and unloading of stone boulder/stone aggregates/sand/
1.1 kanker/moorum. (Placing tipper at loading point, loading with front end loader, cum 219.00
dumping, turning for return trip, excluding time for haulage and return trip)
1.2 Loading and Unloading of Boulders by Manual Means cum 268.00
1.3 Loading and Unloading of Cement or Steel by Manual Means and stacking. tonne 376.00
1.4 Loading and Unloading of Bitumen by Manual Means Mt 160.00
1.5 Loading and Unloading of NP2/NP3/NP4 Hume Pipe of all diameter. No 657.00
1.6 Cost of Haulage Excluding Loading and Unloading
For Short Haul for a distance upto 100 km
tonne.
(i) Surfaced Road 13.20
km
tonne.
(ii) Unsurfaced Gravelled Road 15.10
km
tonne.
(iii) Katcha Track and Track in river bed / nallah bed and choe bed. 20.60
km
1.7 Cost of Haulage Excluding Loading and Unloading
For Long Haul for a distance beyond 100 km
tonne.
(i) Surfaced Road 11.30
km
tonne.
(ii) Unsurfaced Gravelled Road 13.29
km
tonne.
(iii) Katcha Track and Track in river bed / nallah bed and choe bed. 18.10
km
~~oOo~~
Chapter 1 - 1
CHAPTER-12
FOUNDATIONS
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-12
Item No. Descriptions Unit SOR 2016
Chapter 12 - 1
CHAPTER-13
SUB-STRUCTURE
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-13
Item
Descriptions Unit SOR 2016
No.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and
13.1 cum 12594.00
plastering, as per drawing and technical specifications
Pointing with cement mortar (1:3 ) on brick work in substructure as per
13.2 sqm 118.90
Technical specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per
13.3 sqm 228.50
Technical specifications
Stone masonry work in cement mortar for substructure complete as per
13.4
drawing and Technical Specifications
A Random Rubble Masonry in cement mortar 1:3 cum 7409.00
B Coursed rubble masonry (first sort ) in cement mortar 1:3 cum 7790.00
C Ashlar masonry ( first sort ) in cement mortar 1:3 cum 9997.00
D Random Rubble Masonry in cement mortar 1:4 cum 6930.00
E Coursed rubble masonry (first sort ) in cement mortar 1:4 cum 7355.00
F Ashlar masonry ( first sort ) in cement mortar 1:4 cum 9517.00
G Random Rubble Masonry in cement mortar 1:6 cum 6547.00
H Coursed rubble masonry (first sort ) in cement mortar 1:6 cum 7007.00
I Ashlar masonry ( first sort ) in cement mortar 1:6 cum 9134.00
Plain/Reinforced cement concrete in sub-structure complete as per drawing
13.5
and technical specifications
A PCC Grade M15
(p) Height upto 5m cum 10182.00
B PCC Grade M20
(p) Height upto 5m cum 11255.00
C PCC Grade M25
(p) Height upto 5m
Case-I : Using concrete Mixer cum 12092.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 15984.00
(q) Height 5m to 10m
Case-I : Using concrete Mixer cum 12532.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 16565.00
(r) Height above 10m
Case - I : Using concrete Mixer cum 13082.00
Case - II : With Batching Plant, Transit Mixer and Concrete Pump cum 17292.00
D PCC Grade M30
(p) Height upto 5m
Case-I : Using concrete Mixer cum 12183.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 16066.00
(q) Height 5m to 10m
Case-I : Using concrete Mixer cum 12626.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 16650.00
(r) Height above 10m
Case-I : Using concrete Mixer cum 13180.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 17380.00
E RCC Grade M20
(p) Height upto 5m
Case-I : Using concrete Mixer cum 11421.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 15307.00
(q) Height 5m to 10m
Case-I : Using concrete Mixer cum 11836.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 15863.00
(r) Height above 10m
Case-I : Using concrete Mixer cum 12355.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 16559.00
Chapter 13 - 1
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-13
Item
Descriptions Unit SOR 2016
No.
F RCC Grade M25
(p) Height upto 5m
Case-I : Using concrete Mixer cum 12268.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 16878.00
(q) Height 5m to 10m
Case-I : Using concrete Mixer cum 12669.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 17430.00
(r) Height above 10m
Case-I : Using concrete Mixer cum 13272.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 18259.00
G RCC Grade M30
(p) Height upto 5m
Case-I : Using concrete Mixer cum 12318.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 16206.00
(q) Height 5m to 10m
Case-I : Using concrete Mixer cum 12665.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 16663.00
(r) Height above 10m
Case-I : Using concrete Mixer cum 13158.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 17311.00
H RCC Grade M35
(p) Height upto 5m
Case-I : Using concrete Mixer cum 12551.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 17197.00
(q) Height 5m to 10m
Case-I : Using concrete Mixer cum 12825.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 17572.00
(r) Height above 10m
Case-I : Using concrete Mixer cum 13235.00
Case-II : With Batching Plant, Transit Mixer and Concrete Pump cum 18135.00
Supplying, fitting and placing HYSD bar reinforcement in sub-structure
13.6 tonne 112258.00
complete as per drawing and technical specifications
Supplying, fitting and placing Mild steel reinforcement complete in sub-
13.7 tonne 94261.00
structure as per drawing and technical specification
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,
wing wall/return wall with 100 mm dia AC pipe, extending through the full width of
13.8 each 1733.00
the structure with slope of 1V :20H towards drawing foce. Complete as per drawing
and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per
13.9
drawing and Technical specification
A Granular material cum 2591.00
B Sandy material cum 2608.00
Providing and laying of Filter media with granular materials/stone crushed
aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH
specifications to a thickness of not less than 600 mm with smaller size towards the
13.10 cum 2550.00
soil and bigger size towards the wall and provided over the entire surface behind
abutment, wing wall and return wall to the full height compacted to a firm condition
complete as per drawing and technical specification.
~~oOo~~
Chapter 13 - 2
CHAPTER-14
SUPER-STRUCTURE
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-14
Item
Descriptions Unit SOR 2016
No.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-
14.1
structure as per drawing and Technical Specification
A RCC Grade M20
Case-I : Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 12359.00
(q) Height 5m to 10m cum 12874.00
(r) Height above 10m cum 13389.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 12874.00
(q) Height 5m to 10m cum 13389.00
(r) Height above 10m cum 13904.00
Case-II : Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 16596.00
(q) Height 5m to 10m cum 17288.00
(r) Height above 10m cum 17979.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 17288.00
(q) Height 5m to 10m cum 17979.00
(r) Height above 10m cum 18671.00
B RCC Grade M25
Case-I : Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 13316.00
(q) Height 5m to 10m cum 13871.00
(r) Height above 10m cum 14426.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 13871.00
(q) Height 5m to 10m cum 14426.00
(r) Height above 10m cum 14981.00
Case-II : Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 17567.00
(q) Height 5m to 10m cum 18298.00
(r) Height above 10m cum 19030.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 18298.00
(q) Height 5m to 10m cum 19030.00
(r) Height above 10m cum 19762.00
C RCC Grade M 30
Case-I : Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 13496.00
(q) Height 5m to 10m cum 14058.00
(r) Height above 10m cum 14620.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 14058.00
(q) Height 5m to 10m cum 14620.00
(r) Height above 10m cum 15183.00
Chapter 14 - 1
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-14
Item
Descriptions Unit SOR 2016
No.
Case-II : Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 17697.00
(q) Height 5m to 10m cum 18434.00
(r) Height above 10m cum 19171.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 18434.00
(q) Height 5m to 10m cum 19171.00
(r) Height above 10m cum 19909.00
D RCC/PSC Grade M35
Case-I : Using Concrete Mixer
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 13520.00
(q) Height 5m to 10m cum 14092.00
(r) Height above 10m cum 14665.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 14092.00
(q) Height 5m to 10m cum 14665.00
(r) Height above 10m cum 15238.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 15811.00
(q) Height 5m to 10m cum 16957.00
(r) Height above 10m cum 18102.00
Case-II : Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 17641.00
(q) Height 5m to 10m cum 18388.00
(r) Height above 10m cum 19136.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 18388.00
(q) Height 5m to 10m cum 19136.00
(r) Height above 10m cum 19883.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 20631.00
(q) Height 5m to 10m cum 22126.00
(r) Height above 10m cum 23621.00
E PSC Grade M-40
Case-I : Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 14825.00
(q) Height 5m to 10m cum 15443.00
(r) Height above 10m cum 16060.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 15443.00
(q) Height 5m to 10m cum 16060.00
(r) Height above 10m cum 16678.00
Case-II : Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 18612.00
(q) Height 5m to 10m cum 19401.00
(r) Height above 10m cum 20189.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 19401.00
(q) Height 5m to 10m cum 20189.00
(r) Height above 10m cum 20978.00
Chapter 14 - 2
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-14
Item
Descriptions Unit SOR 2016
No.
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 21767.00
(q) Height 5m to 10m cum 23344.00
(r) Height above 10m cum 24921.00
F PSC Grade M-45
For solid slab/voided slab super-structure, 16-26% of cost of concrete
(i)
(a+b+c)
(p) Height upto 5m cum 18921.00
(q) Height 5m to 10m cum 19737.00
(r) Height above 10m cum 20552.00
For I-beam & slab including launching of precast girders by launching truss
(ii)
upto 40 m span, 21-31% of cost of concrete.
(p) Height upto 5m cum 19737.00
(q) Height 5m to 10m cum 20552.00
(r) Height above 10m cum 21368.00
For cast-in-situ box girder, segmental construction and balanced cantilever,
(iii)
36-56% of cost of concrete.
(p) Height upto 5m cum 22183.00
(q) Height 5m to 10m cum 23815.00
(r) Height above 10m cum 25446.00
G PSC Grade M-50
For cast-in-situ box girder, segmental construction and balanced cantilever,
(i)
35-55% of cost of concrete
(p) Height upto 5m cum 22540.00
(q) Height 5m to 10m cum 24209.00
(r) Height above 10m cum 25879.00
H PSC Grade M- 55
For cast-in-situ box girder, segmental construction and balanced cantilever,
(i)
35-55% of cost of concrete
(p) Height upto 5m cum 23353.00
(q) Height 5m to 10m cum 25083.00
(r) Height above 10m cum 26812.62
a) Supplying, fitting and placing HYSD bar reinforcement in super-structure
14.2 tonne 114726.00
complete as per drawing and technical specifications
High tensile steel wires/strands including all accessories for stressing,
14.3 stressing operations and grouting complete as per drawing and Technical tonne 264059.00
Specifications
Providing and laying Cement concrete wearing coat M-30 grade including
14.4 cum 23454.00
reinforcement complete as per drawing and Technical Specifications
Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course
on top of deck slab excluding prime coat with paving grade bitumen meeting the
requirements given in table 500-29, prepared by using mastic cooker and laid to
required level and slope after cleaning the surface, including providing antiskid
14.5 surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal sqm 624.00
size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm
center to center in both directions, pressed into surface when the temperature of
surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface,
all complete as per clause 515.)
Construction of precast RCC railing of M30 Grade, aggregate size not
exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to
14.6 exceed 1 in 500, centre to centre spacing between vertical post not to exceed metre 3569.00
2000 mm, leaving adequate space between vertical post for expansion, complete
as per approved drawings and technical specifications.
Chapter 14 - 3
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-14
Item
Descriptions Unit SOR 2016
No.
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size
aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1
14.7 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, metre 3487.00
leaving adequate space between vertical post for expansion, complete as per
approved drawings and technical specifications.
Providing, fitting and fixing mild steel railing complete as per drawing and
14.8 metre 6713.00
Technical Specification
14.9 Drainage Spouts complete as per drawing and Technical specification nos. 1836.00
PCC M15 Grade leveling course below approach slab complete as per drawing and
14.10 cum 9257.00
Technical specification
Reinforced cement concrete approach slab including reinforcement and formwork
14.11 cum 20764.00
complete as per drawing and Technical specification
Providing anti-corrosive treatment to HYSD reinforcement with Fusion
14.12 Bonded Epoxy Coating (FBEC) (To be taken as per the prevailing market tonne
rates.)
Precast - pretensioned Girders (Providing, precasting, transportation and
14.13 placing in position precast pretensioned concrete girders as per drawing and cum 48137.00
technical specifications)
14.14 Providing and fixing Helical pipes in voided concrete slabs metre 64327.00
Crash Barriers (The rate analysis for rigid crash barrier in reinforced cement
concrete, semi-rigid crash barrier with metal beam and flexible crash barrier with
14.15
wire ropes have been made and included in chapter-8 on Traffic and
Transportation.)
Painting on concrete surface (Providing and applying 2 coats of water based
14.16 cement paint to unplastered concrete surface after cleaning the surface of dirt, metre 321.00
dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )
Burried Joint (Providing and laying a burried expansion joint, expansion gap
being 20 mm, covered with 12 mm thick, 200 mm wide galvanised wieldable
structural steel plate as per IS: 2062, placed symmetrical to centre line of the joint,
14.17 metre 2092.00
resting freely over the top surface of the deck concrete, welding of 8 mm dia. 100
mm long galvanised nails spaced 300 mm c/c along the centre line of the plate, all
as specified in clause 2604.)
14.18 Filler joint
Providing & fixing 2 mm thick corrugated copper plate in expansion joint complete
(i) metre 8105.00
as per drawing & Technical Specification.
Providing & fixing 20 mm thick compressible fibre board in expansion joint
(ii) metre 364.00
complete as per drawing & Technical Specification.
Providing and fixing in position 20 mm thick premoulded joint filler in expansion
joint for fixed ends of simply supported spans not exceeding 10 m to cater for a
(iii) metre 302.00
horizontal movement upto 20 mm, covered with sealant complete as per drawing
and technical specifications.
Providing and filling joint sealing compound as per drawings and technical
(iv) metre 46.00
specifications with coarse sand and 6% bitumen by weight
Asphaltic Plug joint (Providing and laying of asphaltic plug joint to provide for
horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint
varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic
direction), covered with a closure plate of 200mm x 6mm of wieldable structural
14.19 metre 2264.00
steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen
binder, carefully selected single size aggregate of 12.5 mm nominal size and a
heat resistant foam caulking/backer rod, all as per approved drawings and
specifications.)
Chapter 14 - 4
CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
SCHEDULE OF RATES 2015 FOR NATIONAL HIGHWAYS AND STATE ROADS IN MIZORAM Chapter-15
Item
Descriptions Unit SOR 2016
No.
Providing and laying boulders apron on river bed for protection against scour
15.1 with stone boulders weighing not less than 40 kg each complete as per
drawing and Technical specification.
A Boulder laid dry without wire crates. cum 2647.00
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in
wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x
15.2 cum 4120.00
100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with
stone boulders weighing less not less than 40 kgs each.
Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and laying of apron
with cement concrete blocks of size 0.5x0.5x0.5 m cast in-situ and made with
15.3 cum 9819.00
nominal mix of M-15 grade cement concrete with a minimum cement content of 250
kg/cum as per IRC: 21-2000.
Providing and laying Pitching on slopes laid over prepared filter media including
15.4 boulder apron laid dry in front of toe of embankment complete as per drawing and
Technical specifications
A Stone/Boulder cum 2647.00
Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in cement concrete of Grade
B cum 9819.00
M15
Providing and laying Filter material underneath pitching in slopes complete as per
15.5 cum 2880.00
drawing and Technical specification
Geotextile Filter (Laying of a geotextile filter between pitching and embankment
slopes on which pitching is laid to prevent escape of the embankment material
15.6 sqm 458.00
through the voids of the stone pitching/cement concrete blocks as well as to allow
free movement of water without creating any uplift head on the pitching.
Toe protection (A toe wall for toe protection can either be in dry rubble masonry in
case of dry rubble pitching or pitching with stones in wire crates or it can be in PCC
M15 nominal mix if cement concrete block have been used for pitching . Rates for
15.7
toe wall can be adopted from respective clauses depending upon approved design.
The rate for excavation for foundation, dry rubble masonry and PCC M-15 have been
analysed and given in respective chapters.
Providing and laying Flooring complete as per drawing and Technical
15.8
specifications laid over cement concrete bedding.
A Rubble stone laid in cement mortar 1:3 cum 8798.00
B Cement Concrete blocks Grade M15 cum 12931.00
15.9 Dry rubble Flooring cum 3396.00
15.10 Curtain wall complete as per drawing and Technical specification
A Stone masonry in cement mortar (1:3) cum 7638.00
B Cement concrete Grade M15 cum 9626.00
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose
15.11 cum 2753.00
stone boulders weighing not less than 40 kg beyond curtain wall.
Gabian Structure for Retaining Earth (Providing and construction of a gabain
structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m
each divided into 1.5 m compartments by cross netting, made from 4 mm
galvanised steel wire @ 32 kg per 10sqm having minimum tensile strength of 300
15.12 cum 3695.00
Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into
mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders
with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel
wire
Chapter 15 - 1