0 ratings0% found this document useful (0 votes) 81 views1 pageDTS 340 Rev.01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
Cx, wtapest apagautt apts
) Saudi Electricity Company
Syke dala
Internal Correspondence | 4281s chal ja eens
a ee
EHV ENGINEERING & DESIGN DEPARTMENT
SUBSTATIONS ENGINEERING & DESIGN DIVISION
4th Floor, Platinum Plaza, Al-Andalus St., Jeddah
Our Reference # 12024101 / 0428-J 1 18
Dated + 29/08/2018
1711211439 H
To + Manager, EHV Projects Department - WOA/SOA
AAttontion : FAISAL A BANAKHAR
Project Manager
Tol.#: 0126537315
Pee cieesontye| Contract # + 440008620100
Project Title: JEDDAH PRINCE FAWAZ HOUSING
Subject, Foundation and Column Structural Details -
ee eee
oe
‘STATUS OF THIS SUBMITTAL:
X_] A Acceptabie B Acceptable with Comments
© Acceptable, Except as noted (Resubmit) D Rejected (Resubmit)
E Clarification / For Information See Attached Comments ( 00 Pago )
Ifyou have any questions, please contact Engineer Fahad S. Aljaghthami on Tel, # 012-263-7063 ext. 111 or
Engineer OSAIS L. CORPORAL Jr. on ext. 151
Regards,
¢
| __ oLeri
Co: JHJANG
HUNDAI ENGINEERING & CON
NS )
dag "en approtl doesnot relieve the Contractor rom bis controtuel responsibilty &ablipation to meet the requirements of
PP te project contact scope of work and eenical speciation: (SOW/PTS).