0% found this document useful (0 votes)
81 views1 page

DTS 340 Rev.01

Approved DTS

Uploaded by

Gavriel Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
81 views1 page

DTS 340 Rev.01

Approved DTS

Uploaded by

Gavriel Ng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1
Cx, wtapest apagautt apts ) Saudi Electricity Company Syke dala Internal Correspondence | 4281s chal ja eens a ee EHV ENGINEERING & DESIGN DEPARTMENT SUBSTATIONS ENGINEERING & DESIGN DIVISION 4th Floor, Platinum Plaza, Al-Andalus St., Jeddah Our Reference # 12024101 / 0428-J 1 18 Dated + 29/08/2018 1711211439 H To + Manager, EHV Projects Department - WOA/SOA AAttontion : FAISAL A BANAKHAR Project Manager Tol.#: 0126537315 Pee cieesontye| Contract # + 440008620100 Project Title: JEDDAH PRINCE FAWAZ HOUSING Subject, Foundation and Column Structural Details - ee eee oe ‘STATUS OF THIS SUBMITTAL: X_] A Acceptabie B Acceptable with Comments © Acceptable, Except as noted (Resubmit) D Rejected (Resubmit) E Clarification / For Information See Attached Comments ( 00 Pago ) Ifyou have any questions, please contact Engineer Fahad S. Aljaghthami on Tel, # 012-263-7063 ext. 111 or Engineer OSAIS L. CORPORAL Jr. on ext. 151 Regards, ¢ | __ oLeri Co: JHJANG HUNDAI ENGINEERING & CON NS ) dag "en approtl doesnot relieve the Contractor rom bis controtuel responsibilty &ablipation to meet the requirements of PP te project contact scope of work and eenical speciation: (SOW/PTS).

You might also like