Activa+ Op. Bi-Part: Installation Manual
Activa+ Op. Bi-Part: Installation Manual
Installation Step #1
Unpacking
1- BOX #1: DRIVE UNIT & ACCESSORIES
i
Inside this box you will find all the necessary
elements to assemble the drive unit and the
main accessories to operate and control the
door.
sa
fragil
manu
O
PT
Box #1
2 pcs. 2 pcs.
Ref. Description Location Ref. Description Location Ref. Description Location
GV Activa+ motor group Box #1 CACV04 Activa+ leaf trolleys Box #1 BRCB76 Bravo dragging arm BP:780 Box #1
O
O
PT
PT
01 M s1
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S1
O
PT
PT
PT
sa
nu
ma
O
PT
PT
PT
Ref. Description Location Ref. Description Location Ref. Description Location
EDRM05 Manusa planar radar Box# 1 EDRM04 Manusa infrared sensor IR-2 Box #1 EMPA01 Opening push button Box #1
O
O
O
PT
PT
PT
sa
nu
ma
O
PT
....
PT
PT
02 M s1
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S1
i
Inside this box you will find the aluminium profiles
and all necessary accessories to build the
header frame.
O
Box #2
CVPC41
Activa+ header frame: main
profile
O
PT
PT
PT
03 M s1
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S1
CVCC41
O
PT
Activa+ header frame:
cover
04 M s1
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S1
i
Inside this box you will find the aluminium profiles
and all necessary accessories used to fix and
secure the header frame, when required.
O
Box #3
CSPD
O
PT
05 M s1
DTMJGVC201EN - v1 - ENGLISH ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S2
Installation Step #2
Main profile assembly
O
PT
Ref. Description Location
01 M s2
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S2
i
IMPORTANT: All aluminium profiles (main profile, track rail and clear width profile) Tools
must be cut down to size, as per the cutting dimensions shown on point no. 6
of Step S2 in this manual.
Saw
Tools
1.- Only if the operator if fixed frount mounted: Drill 6 holes as per Pic 2.1 / 2.2 25
IMPORTANT: Drill only on the indicated area of the main profile Pic 2.1
Clean and remove all rests of aluminium chips after drilling the holes, preferibly
drill diam 10 a
using an air compressor gun.
0
30
Pic 2.1
Pic 2.2
.5
R5
20
25
32
Pic 2.3
i
1.- Cut the clear width profile as shown on Pic 2.3 Tools
Profile length = Clear width + 100 mm
Saw
00
+1
CW
02 M s2
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S2
i Pic 2.4
1.- Detach the double side tape Pic 2.4
2.- Stick the track rail to the main profile Pic 2.5
IMPORTANT: Stick firmly and avoid air gaps. To stick properly, start fixing
one end of the track rail on point A (at 15 mm from the edge), and continue
fixing slowly in the opposite direction (towards B) until you reach the other
end..
mm
15
Pic 2.5
i Pic 2.6
2.- On Pic 2.7 you will see the right number of rail nuts and square
nuts to slide on the main profile, and its correspondance with all the
elements.
03 M s2
RLIST OF RAIL NUTS TO SLIDE ON THE MAIN PROFILE ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S2
i
List of elements and accessories to be fixed on the main profile:
1- Motor group
2- Cover suspension brackets
3- Fix leaves suspension brackets
4- Clear width profile
5- Central steel stopper (default) or Activa+ automatic lock(optional)
2 3
3
4
04 M s2
1
5
2
Pic 2.7
2
3
3
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S2
i
1.- Fix the clear width profile to the main profile as shown on Pic 2.8 / 2.9
2.- Once the clear width profile has been fixed in place, slide the woolpile seal as shown on Pic 2.10
Pic 2.8
00
+1
CW
Pic 2.9
a
05 M s2
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S2
6- CUTTING DIMENSIONS
aluminium profiles and other elements for a ACTIVA+ bi-parting door. All
dimensions depend on the clear opening width (CW).
CW
06 M s2
DTMJGVC201EN - v1 - ENGLISH ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S3
Installation Step #3
Leaf trolleys assembly and installation
1- WHERE TO FIND THE NECESSARY ELEMENTS
Ref. Description
x2
Location Ref. Description Location
CACV04 Activa+ leaf trolleys Box #1 KSCVPC03 Activa+ pack of accessories Box #2
i Pic 3.1
nº10-11/nº12-13
2.- Put on the screws and nuts, but do not tighten
fully yet. Attach the central bolt as shown on Pic 3.2 / Pic 3.3
01 M s3
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S3
i
Tools
On the 2 meeting trolleys:
1.- Put on the screws, washers and spacers for the dragging arms as shown
on Pic 3.4 / Pic 3.5 / Pic 3.6 / Pic 3.7
2.- On the meeting trolley of the left leaf, assemble these accessories on the nº10-11
top side of the trolley Pic 3.4 / Pic 3.7
3.- On the meeting trolley of the right leaf, assemble on the bottom side. Pic 3.5 / Pic 3.7
IMPORTANT: washers shown on the pictures will be found inside the plastic bag with other
accessories, delivered with each trolley, not with the dragging arms. Screws and spacers are
delivered with the dragging arms. Assemble screws, washers and spacers as close as
possible to the edge to match exactly the holes on the dragging arms. If the holes of the
dragging arms do not match with the spacers, check these are on the correct position.
Distance between them is 20 cm, as shown on Pic 3.6
Pic 3.6
200
02 M s3
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S3
i
1.- Fix the trolleys on the track rail Pic 3.7 / 3.8 Tools
2.- Slide the central wheel to the top until the trolley is well
adjusted to the main profile. Pic 3.9
3.- Tighten the central wheel firmly and check that trolleys slide
nº4
smoothly and securely (without bouncing) on the track rail .
Pic 3.7 / 3.11
4.- Insert the rubber stops in the outer edge of the side trolleys as shown on
Pic 3.7 / 3.10
5.- Insert the steel bumps in the inner edge of the meeting trolleys as shown on
Pic 3.7 / 3.11
Pic 3.10
Pic 3.11
Pic 3.7
03 M s3
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S3
i
1.- Insert the two end stops on both ends of the main profile. Tools
Do not tighten the screws yet. Tighten only at the end of the
installation process, once the door leaves have been centred
and placed in the correct position. Pic 3.12 / 3.13
nº10
2.- Fix the central steel stopper to the short hand rail on the main
profile.Pic 3.12 / 3.14
IMPORTANT: the central steel stopper is supplied with every Activa+ motor
group. If the door is equipped with an Automatic Lock (optional), the
central steel stopper must NOT be installed. Please refer to step S6 for
installation instructions of the automatic lock.
Pic 3.14
04 M s3
DTMJGVC201EN - v1 - ENGLISH ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S4
Installation Step #4
Assembly of the motor group
GV Activa+ motor group Box #1 BRCB76 Bravo dragging arm BP:780 Box #1 CACV04 Activa+ leaf trolleys Box #1
i
1.- Fix the dragging arm to the belt on the motor Tools
group as shown on Pic 4.1 / 4.2
Pic 4.1
Pic 4.2
01 M s4
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S4
i
IMPORTANT:
1) DO NOT use the spacers supplied with the dragging arm.
These are used only on the Bravo operator.
i
Tools
1.- Mount the Activa+ motor group onto the main profile as shown on Pic. 4.3 leaving the
screws still loose to allow the motor group slide on the main profile to find the centre position
(this is done only when the door leaves are already fixed to the trolleys).
nº10
Pic 4.3
02 M s4
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S4
i
1.- Attach and fix firmly the dragging arms to the hexagonal spacers using Tools
the screws supplied Pic 4.4 / 4.5 / 4.6
nº10 nº4
Pic 4.6
03 M s4
DTMJGVC201EN - v1 - ENGLISH ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S5
Installation Step #5
Cover assembly
1- WHERE TO FIND THE NECESSARY ELEMENTS
i
IMPORTANTE: All aluminium profiles must be cut to size, Tools
following the formulas shown in Annex A1
Saw
01 M s5
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S5
Pic 5.1
i Pic 5.3
1.- Slide 7 nuts through the rail on the bottom Tools
cover. 4 nuts are used to fix the suspension
brackets. The middle one to fix the central
steel stopper or the automatic lock (optional).
Pic 5.1. The 2 nuts on both ends are used to nº10
fix the plastic end caps. Pic 5.13
Pic 5.2
Pic 5.3
02 M s5
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S5
i Pic 5.4
1.- Place a M6x10 screw on each of the 6 cover clips. Pic 5.4 Tools
nº10
Pic 5.6
Pic 5.5
Pic 5.6
03 M s5
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S5
i
Tools
1.- Mount the bottom cover onto the main profile
using the suspension brakets as shown on
Pic 5.7 / 5.8
nº10
2.- Screw the central steel stopper or the
automatic lock to the bottom cover.
Pic 5.7 / 5.9
Pic 5.8
Pic 5.9
Pic 5.7
04 M s5
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S5
i Pic 5.10
1.- Slide the rubber hinge into the bottom cover. Pic 5.10 Tools
2.- Fix the plastic end caps as shown on Pic 5.11 / 5.12
3.- Use the 2 clips on both ends to attach the plastic end nº10 star
caps to the header frame Pic 5.11 / 5.12
Pic 5.11
Pic 5.12
05 M s5
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S5
i
1.- Assemble the front cover to the header frame, sliding the rubber hinge
into the front cover.
2.- Lift the cover and tighten it using to the 8 clips to close the operator
Pic 5.13 / 5.14
Pic 5.13
Pic 5.14
06 M s5
DTMJGVC201EN - v1 - ENGLISH ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S6
Installation Step #6
O
PT
Automatic lock CJGV03
TECHNICAL FEATURES
i
IMPORTANT:
If a central steel stopper is being used, it must be removed prior to
installing the automatic lock.
i
1.- If the operator is equipped with a cover, remove the bottom cover before Tools
installing the automatic lock Pic 6.1
2.- If the operator is equipped with a central steel stopper, it must be removed
prior to installing the automatic lock. Pic 6.1 nº10
Pic 6.1
01 M s6
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S6
i Pic 6.2
1.- Dettach the manual plastic handle from the lock Pic 6.2
i
Tools
1.- Insert the automatic lock from the back of the motor group, and fix to the main profile. Keep
the fixing screws loose to let the lock slide left and right Pic 6.3 / 6.6 With the sliding leaves fixed
to the trolleys, slide them to close position.
nº10
2.- Centre the lock on the main profile, making sure there is a 3 mm gap left between the lock and
the meeting brackets on both trolleys Pic 6.5 After the lock has been centred you may adjust and
tighten the meeting brackets to the trolleys. Pic 6.4
3.- Tighten the top screws on the main profile to secure the position of the automatic lock and attach
again the plastic manual handle. Pic 6.7
Pic 6.3
Pic 6.6
3 mm 3 mm
CENTRE OF OPERATOR
02 M s6
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S6
i Pic 6.8
Tools CENTRE OF OPERATOR
1.- Before assembling the bottom cover, drill a
12 mm hole on the profile, to let the manual
50
handle pass through. Pic 6.8 / 6.9
Diameter 12
36.25
50
36.25
03 M s6
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S6
5- WIRING
i Pic 6.11
1.- Insert the cable into the cable channel and connect to the
electronic board on the motor group Pic 6.11
2.- Connect the black connector to the automatic lock Pic 6.11
04 M s6
DTMJOVC201EN - v1 - ENGLISH ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S7
Installation Step #7
Fixing the operator to the wall
1- WHERE TO FIND THE NECESSARY ELEMENTS
i
IMPORTANT: It is easier to install the operator in its final position if its front and bottom covers are removed.
Pic 7.1
01 M s7
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S7
Operator
IOR
ER
A vertical reference EXT
line to guide installation
R
IO
R
of the door.
TE
IN
The plumb line shall be used as a reference line throughout the
installation process. Its position corresponds to the rear face of For these doors, the side where the operator is located, which is
the main profile of the operator, whichever type of suspension is also the side where the sliding leaves are placed, is considered to
used (front or side suspension). be the interior side.
3- FRONT SUSPENSION
i
1.- Drill 6 holes at the positions indicated in Fig. 7.2, in the surface Tools
on which the operator is to be suspended.
OW (min) = (2xCW)+100
25 = = 300 = = 25
50 100
CH + 93 OH
CH
FW left CW FW right
HW
Pic 7.2
02 M s7
ACTIVA+ BI-PART OPERATOR - INSTALLATION MANUAL S7
4 4
50 50
OH=CH+100 OH=CH+100
CH + 50 CH + 50
20
CH CH
The drawing shows the basic measurements required to attach the The drawing shows the basic measurements required to attach the
operator frontally to the wall. operator frontally to the 80 mm C-beam.
IMPORTANT: Mark the reference line shown both vertically and on IMPORTANT: Mark the reference line shown both vertically and on
the floor. To determine the position of the reference line, consult the the floor. To determine the position of the reference line, consult the
door-leaf installation manual, since the position will vary, depending door-leaf installation manual, since the position will vary, depending
on which type of profile is used. on which type of profile is used.
03 M s7
NOTE: The technical specifications described in this manual are given for information purposes HEAD OFFICE FACTORY
only, and do not represent any contractual obligation for Manusa. Edif. TESTA-10, 4º Polígono Industrial Km. 1,2
Avda. Vía augusta, 71-73 43800 Valls - Tarragona (España)
Manusa reserves the right to modify in any moment and without prior notice the technical
08174 Sant Gugat del Vallés Tel.+34 902 321 700
specifications displayed in this manual, whenever it is considered to improve the product.
Barcelona - España Fax+34 902 321 750
Last revision: May 2006 Tel. +34 902 321 400 www.manusa.com
Fax +34 902 321 450