JOB SAFETY ANALYSIS FOR INTERNAL WORK OF REACTOR
Page 1 of 13
1.2.1 All persons involved in the job
must discuss and understand the
work permit & JSA by concerned
Engineer/Supervisor.
1.2.2 All the persons who working
inside the confined space shall
trained & shall identified specially
with trade sticker(Confined space
trained).
Page 2 of 13
3. accessibility accessibility is available.
2.
Unauthorize 3.2.1 Ensure proper hard barricading
d personnel is done in the work area and proper
movement type of sign boards are in place.
3. Oxygen
deficiency / 3.3.1 Ensure gas testing should be
enrichment done and maintained periodically &
4. continuous monitoring.
Accumulate
d toxic/
3.3.2 Oxygen level shall be 19.5%
flammable
to 23.5 %.
gases
5.
Hand tools, Inadequate
Preparation of works Competent illumination 3.4.1 Ensure that all Personnel’s are Site
person 6. Lack of aware of the hazards and takes engineer/RCM
trained appropriate precautions.
employees
7. Lack of 3.5.1 Ensure adequate lighting is
proper provided in the area and inside the
communicat column.
ion
8. Lack of 3.5.2 Illumination level shall be 100
watch man lux.
9. Lack of
ventilation 3.5.3 Electrical tools shall be
maximum 24V capacity.
Page 3 of 13
3.8.2 Watchman also maintain the in
out log-sheet.
Page 4 of 13
the trained scaffolders and same
shall be bearing with green tags
after ensuring to make the same as
per standard.
4.1.8 FBH with detachable lanyard /
shock absorber/ double lanyard and
snap hook shall be used and
anchored to a hand rail / rigid
structure while working at scaffold.
Small material to be secured
properly at height.
4.1.9 Heavy material shall not be
stored in scaffolding platform.
4.1.10 Engage trained &
experienced personnel.
4.1.11 Area barricading to be
ensured.
4.1.12 Ensure Materials /tools to be
properly secured
4.1.13 All openings should be
covered or fenced properly
4.1.14 Ensure Certified Tools &
tackles and equipment’s and safe
working load prior to their use.
4.1.15 Ensure proper material
handling.
Page 5 of 13
from safe for use identification marks
platform. shall be used identified the
3. Fall of condition of the scaffolding after
person from
inspected by concerned scaffolding
ladder
4. Fall of supervisor.
material 5.1.4 Certified scaffolding materials
Hand tools, during shall be used.
Scaffolder, shifting H 5.1.5 All damaged pipes and clamps L Site
5. Scaffolding Erection Fitter, Rigger activity. shall not be used. engineer/RCM
5. Fall of 5.2.1 No loose materials shall be
spanner or
kept on the platform leaving it
bolt during
bolting unsecured, toe board shall be
activity for ensured along with tools tied off to
scaffolding the tool lanyard.
work. 5.2.2 The spanners should be
secured to the harness to prevent it
from falling.
5.3.1 The ladder should be in good
condition and having non-slip
rubber shoes.
5.3.2 The ladder shall be inspected
weekly and monthly along with the
checklist
5.3.3 The ladder shall be secured
with ladder clamps in a position of
75 degree (1:4 ratio)
5.3.4 The person climbing on the
ladder should climb with three-point
contact and secured properly.
5.3.5 Holding of materials and
climbing the ladder is not allowed.
5.3.6 The safety shoes shall be free
of mud /Greece /oil.
5.4.1 Rope pulley with PP rope shall
be used for shifting the materials.
5.4.2 Rope pulley/PP rope with tool
kit bag shall be used for shifting the
Page 6 of 13
tools at height.
5.5.1 Trained & experience person
will perform the task.
5.5.2 Tool box talk should be
conducted, prior to work.
5.5.3 Position fingers away from
pinch point.
5.5.4 Secure spanner with tagline to
avoid fall of spanner.
5.5.5 Ensure fully tied of bolt.
Page 7 of 13
2. Falling of 7.2.1Ensure, proper lifting tools and
Hand tools, load due to tackles used.
Lifting tools & improper 7.2.2 Ensure only inspected &
Lifting & shifting of centre pipe tackles and lifting tools. certified lifting tools & tackles to be
inside reactor by crawler competent 3 Falling of used.
crane/Winch Machine. Rigger loose 7.3.1Ensure the material secured
materials properly before lifting the material.
while 7.3.2 Ensure both side of tagline
lifting. while shifting of material.
4. Critical 7.4.1Lifting plan should be provided
lift. for all critical lifts & above 10TON.
5. Injury due 7.4.2 Only qualified Rigger must be
to pinching deployed.
or crushing 7.4.3All lifting gears must be
inside the inspected and certified. Prior to use
reactor. any lifting gear, a pre inspection to
6. be conducted.
Moving
part hazard. 7.5.1Communicate the pinching
hazards through daily JSTI.
7.5.2 Ensure area should be
barricaded as required distance.
7.6.1 Keep hands clear of wire
rope, hook and fairlead opening
during operation and when
spooling. Stand clear of wire
rope and load during operation.
7.6.2 Keep others away. Inspect
winch operate and wire rope
condition before operating
winch.
7.6.3.Do not exceed winch’s
rated capacity.
7.6.4.Take your time, sloppy
rigging causes accidents. Know
your winch, take the time to fully
understand your winch and the
winching operation.
7.6.5 Do not use winch to secure
a load during transport. Do not
Page 8 of 13
submerse in water. Wear heavy
leather gloves when handling the
wire rope. Never winch with less
than five
7.6.6 wraps of wire rope around
the drum.
7.6.7Check manual - seek
manufacturer’s advice. Check oil
level regularly. Grease
frequently, more is best. Check -
fill and grease regularly.
Page 9 of 13
Site
engineer/RCM
Page 10 of 13
Spark platform for work at height.
particles. 9.2.1 Ensure all person should have
4. Welding Safety harness belt with 100% hook
flash. up.
5. Burn 9.2.2 Ensure all person should use
injury due to safety harness with shock observer
welding. after 6m.
6. Electric 9.3.1 Wear eye protection.
shock. 9.3.2 Welding activity should be
Hand tools, 7. Fire perform in welding booth which
power tools, Hazard. should be covered by fire blanket.
welder, fitter & 8. Health 9.3.3 Ensure area should be also Site
Welding activity inside reactor Helper Hazard. H barricade at ground level & safety L engineer/RCM
9. Use of signage to be displayed.
damage 9.4.1Ensure availability of Running
tools. water hose during welding activity.
9.5.1 Ensure no loose connection of
welding cable/cable lugs.
9.5.2Use certified & inspected
welding machine.
9.5.3 Only authorized person
perform their job.
9.5.4Welding helmet, leather hand
gloves, leather leg guard & leather
apron need to be used with
mandatory PPE's.
9.6.1 Distribution boards fitted with
RCCB with rating of 30ma.
9.6.2 Ensure proper grounding
/earthing of equipment.
9.6.3 Maintain standard connections
in electrical wires & no joint cable
allowed inside confined space.
9.6.4 Only authorized person
perform electrical connection.
9.7.1Charged Fire Hose shall be
kept ready along with firewatcher.
9.7.2 Work Area to be cleaned for
any combustible material.
9.7.3 Proper fire blanket/welding
booth to be prepared before the hot
work.
9.7.4 Ensure fire extinguisher to be
Page 11 of 13
placed at work location.
9.8.1 Appropriate PPE's shall be
used by all
9.9.1 Always select right tools for
job.
Page 12 of 13
General precaution for Demolition:
Page 13 of 13