0% found this document useful (0 votes)
69 views1 page

Cost Benefit Analysis

The document outlines a 5-year cost-benefit analysis for implementing a new learning management system. It shows the projected costs, benefits, and cost-benefit ratios for each of the 5 years. Costs decrease after the initial implementation years while benefits increase each year as more features are added and adoption grows, resulting in improving cost-benefit ratios over the 5-year period.

Uploaded by

Ohms Branguelo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

Cost Benefit Analysis

The document outlines a 5-year cost-benefit analysis for implementing a new learning management system. It shows the projected costs, benefits, and cost-benefit ratios for each of the 5 years. Costs decrease after the initial implementation years while benefits increase each year as more features are added and adoption grows, resulting in improving cost-benefit ratios over the 5-year period.

Uploaded by

Ohms Branguelo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Cost-Benefit Analysis (CBA)

Project: Learning Management System (LMS) implementation

Time frame: 5 years

  Year

  1 2 3 4 5

Cost  $150,000  $155,000  $110,250  $115762.5  $121,550.625

Benefit  $200,000  $220,000  $242,000  $266,200  $292,820

Ratio  3:4 7:10  9:20  43:100  21:50