1/31/2021 IDDOV in DFSS (Design for Six Sigma) - The Framework for Product Development - BrightHub Project Management
IDDOV in DFSS (Design for Six Sigma) -
The Framework for Product
Development
2010-09-29 Six Sigma
report this ad
RECENT POSTS
Writing a Test Plan: Test Strategy,
Schedule, and Deliverables
Writing a Test Plan: De ne Test
Criteria
Writing a Test Plan: Plan Test
Resources
Writing a Test Plan: Product
Analysis and Test Objectives
Innovate to Increase Personal
E ectiveness
TAGS
PROJECT MANAGEMENT (2590)
x
PAGE CONTENT
https://www.brighthubpm.com/six-sigma/89186-the-iddov-lifecycle-in-design-for-six-sigma-dfss/ 1/4
1/31/2021 IDDOV in DFSS (Design for Six Sigma) - The Framework for Product Development - BrightHub Project Management
x
Design for Six Sigma (DFSS) is used by businesses to design a quality
product from scratch. Design for Six Sigma is fundamentally di erent
from Six Sigma itself. The focus of Six Sigma is on improving the
existing designs whereas the focus of DFSS is on creating new and
better products. IDDOV in DFSS provides the necessary framework for
product development and emphasizes the step-by-step phases to
achieve Six Sigma, including Identify, De ne, Develop, Optimize and
Verify. It is described in detail here.
Ad
MindManager Mind Map Software
Plan and Manage Projects Better With the Help of
MindManager. Start Your Free Trial Now.
MindManager
OPEN
report this ad
CATEGORIES
Agile & Scrum Project
1. Identify the Opportunity -This is the phase where you identify the Management
customer requirements, prioritize their needs, and translate those
Change Management
needs into design requirements. It is the most important phase of
DFSS since all of the future activities of the projects depends on this Monitoring and Controlling the
phase. Once the requirements are identi ed, the complete project plan Project
can be made. Ideally, the project plan consists of the scope of the Project Management Certi cation
project, project objectives, project milestones and the budget. & Careers
2. De ne the Requirements - This is the phase where you clearly Project Management Methods &
de ne the product requirements. In this phase, the customer needs Ideologies
and wants are translated into veri able requirements. The primary tool
Project Management Software
used for this purpose is Quality Function Deployment (QFD). QFD is a
Reviews, Tips, & Tutorials
method by which the customer needs or wants are converted into
speci c corporate goals so that product designers are aware of what Project Management Templates &
exactly they should do. Forms
Project Planning for PMs
3. Develop the Concept - This is the phase where you develop a
feasible concept which will meet the customer requirements. If the Project Risk Management
concept developed is found to be unreasonable, then assess other Resource Management
alternatives. In this phase, any potential product failure is identi ed
Six Sigma
and thus, eliminated. The usual tools used during this phase are TRIZ
(the theory for inventive problem solving), Pugh (a technique for Uncategorized
evaluating and developing concepts), and FMEA (Failure Mode and
E ective Analysis).
x
4. Optimize the Design - This is the phase where you optimize the
design in such a way that the maximum output is obtained from the
developed concept. In this phase, the critical design variables and
https://www.brighthubpm.com/six-sigma/89186-the-iddov-lifecycle-in-design-for-six-sigma-dfss/ 2/4