0% found this document useful (0 votes)
903 views2 pages

Samakhusi - Tokha - Chhahare Road Up-Gradation Project: Salient Features

This document provides details on the Samakhusi - Tokha - Chhahare Road Up-gradation Project in Nepal. The key points are: 1) The project involves upgrading 34.2 km of road linking Kathmandu to northern areas through a public-private partnership model. 2) It includes constructing a 4.175 km tunnel and upgrading the road to allow for a 40 km/h design speed and 8.5 m carriageway. 3) The total estimated cost of the project is USD 265 million and it will be developed over 36 months of construction through a concession period of up to 30 years.

Uploaded by

marab12
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
903 views2 pages

Samakhusi - Tokha - Chhahare Road Up-Gradation Project: Salient Features

This document provides details on the Samakhusi - Tokha - Chhahare Road Up-gradation Project in Nepal. The key points are: 1) The project involves upgrading 34.2 km of road linking Kathmandu to northern areas through a public-private partnership model. 2) It includes constructing a 4.175 km tunnel and upgrading the road to allow for a 40 km/h design speed and 8.5 m carriageway. 3) The total estimated cost of the project is USD 265 million and it will be developed over 36 months of construction through a concession period of up to 30 years.

Uploaded by

marab12
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SAMAKHUSI – TOKHA – CHHAHARE

ROAD UP-GRADATION PROJECT

SALIENT FEATURES
SN FEATURES CHARACTERISTICS
GENERAL
1 Name of Project Samakhusi – Tokha – Chhahare Road Up-gradation Project
2 Type Road
3 Project Concept Linking Capital Kathmandu with northern area and forming
the Strategic Material Transport Channel between Tibet and
Kathmandu

PROJECT LOCATION
1 Province Province – 3 (Samkhushi – Tokha – Samgla – Thana
Bhanjyang – Hattigauda – Salyantar – Thapagaon – Thasing –
Dhikure – Chhahare)

PROJECT COMPONENT/DESIGN PARAMETER


1 Total Length 34.2 Km, including 4.175 km tunnel
2 Design Speed 40 km per hour
3 Cross Section 8.5 m ( 7 m carriageway + 0.75 m shoulder on either side )
4 Pavement Structure 5 cm Asphalt Concrete -13 fine graded asphalt mortar +
Sealer + 20cm graded gravel + 20cm gravel soil
5 Tunneling 4.175 km tunnel on Sangla - Salyantar Section of 10 m width
6 Cross Drainage Structure One major bridge, 15 medium and small bridges, 152 culverts
SN FEATURES CHARACTERISTICS

DEVELOPMENT MODALITY
1 Development modality Public Private Partnership (BOT)
2 Role of Government of Nepal n Facilitation of legal approvals
n Government permits and approvals
n Provides Right-of-Way (ROW)
3 Role of the Private Sector n Plan, design, finance, construct and operate the project
n Toll collection
4 Development Period 1. Feasibility Study : 6 Months
2. Business Negotiation: 6 month
3. Financial close - 6 Months
4. Investigation and Detail Design – 6 month
5. Construction: 36 month
5 Concession Period Upto 30 years

INDICATIVE FINANCIALS
1 Total Project Cost USD 265 million