0% found this document useful (0 votes)
191 views49 pages

Month: Target Amount Booking Amount Booking CTR % Amount % Ytd Amount

The document appears to be a leasing achievement report for a company. It shows target and actual booking amounts for leasing by month as well as year-to-date percentages. It also includes tables showing product performance by quarter, details of customer cases and approved leasing amounts. Overall, it provides key leasing metrics and performance summaries for management oversight.

Uploaded by

Satyo Agususilo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views49 pages

Month: Target Amount Booking Amount Booking CTR % Amount % Ytd Amount

The document appears to be a leasing achievement report for a company. It shows target and actual booking amounts for leasing by month as well as year-to-date percentages. It also includes tables showing product performance by quarter, details of customer cases and approved leasing amounts. Overall, it provides key leasing metrics and performance summaries for management oversight.

Uploaded by

Satyo Agususilo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
You are on page 1/ 49

ACHIEVEMENT

LEASING
% YTD
MONTH TARGET AMOUNT BOOKING AMOUNT BOOKING CTR % AMOUNT AMOUNT
October-19 12,563,000,000 8,017,584,000 12 63.8% 46.95%
### 11,468,000,000 9,397,896,000 13 81.9% 50.04%
### 9,963,500,000 6,974,855,500 29 70.0% 51.46%
January-20 6,500,000,000 3,427,602,500 4 52.7% 52.73%
February-20 7,000,000,000 2,513,399,000 4 35.9% 44.01%
March-20 7,500,000,000 2,228,313,250 4 29.7% 38.90%
April-20 0 0 0 0.0% 38.90%
May-20 0 0 0 0.0% 38.90%
June-20 0 0 0 0.0% 38.90%
July-20 1,500,000,000 0 0 0.0% 36.31%
August-20 3,000,000,000 566,725,500 1 18.9% 34.26%
### 4,000,000,000 5,348,512,500 6 133.7% 47.74%
October-20 4,500,000,000 22,030,965,909 16 489.6% 106.22%
### 4,500,000,000
December-19 4,500,000,000
43,000,000,000.00 36,115,518,658.80 35 83.99%

GAP -6,884,481,341.20
2 Bln -3,442,240,670.60

Page 1
ACHIEVEMENT

PRODUCT BY LEASING
RUN OFF % GROWTH
MONTH QUARTAL Σ CTR OSP AMOUNT
AMOUNT AMOUNT
October-19 Q4 246 124,348,123,745 9,831,204,718 -25.77%▼
November-19 Q4 247 124,864,558,523 8,881,461,222 -25.46%▼
December-19 Q4 272 122,357,975,307 9,481,438,716 -26.95%▼
January-20 Q1 268 117,380,535,944 8,405,041,863 -4.07%▼
February-20 Q1 262 110,581,434,147 9,312,500,798 -9.62%▼
March-20 Q1 255 104,090,518,259 8,719,229,138 -14.93%▼
April-20 Q2 245 95,791,421,299 8,299,096,959 -21.71%▼
May-20 Q2 230 87,377,044,305 8,414,376,995 -28.59%▼
June-20 Q2 224 80,994,600,861 6,382,443,444 -33.81%▼
July-20 Q3 212 74,738,203,727 6,256,397,134 -38.92%▼
August-20 Q3 202 68,946,572,250 6,358,356,977 -43.65%▼
September-20 Q3 201 69,924,111,755 4,370,972,995 -42.85%▼
October-20 Q4 210 86,986,268,967 4,968,808,697 -28.91%▼
81,986,268,966.59 5,000,000,000
76,986,268,966.59 5,000,000,000

Page 2
DOC TYPE MCE NAME CUST NAME INDUSTRY

CR ERLAN RANNISA DELAPAN TIGA SATU PT TRANSPORTASI


CR ERLAN RANNISA DELAPAN TIGA SATU PT TRANSPORTASI

CR GAVIN GUNUNG DILAM PT TAMBANG BATUBARA

APPEAL ERLAN BENTENG ANUGERAH JAYA ABADI PT PERKEBUNAN KELAPA SAWIT


CR ERLAN ELBANA ABADI JAYA PT PERHUTANAN
CR GAVIN BUANA KARYA MANDIRI SEJAHTERA PT PERKEBUNAN KELAPA SAWIT
CR GAVIN BUANA KARYA MANDIRI SEJAHTERA PT PERKEBUNAN KELAPA SAWIT
CR ERLAN CIPTA SARANA MAKMUR PT TAMBANG BATUBARA
CR ERLAN CIPTA SARANA MAKMUR PT TAMBANG BATUBARA
CR ERLAN CIPTA SARANA MAKMUR PT TAMBANG BATUBARA
CR ERLAN CIPTA SARANA MAKMUR PT TAMBANG BATUBARA
LEADS ERLAN BARAINDO TUNAS PERKASA PT TAMBANG BATUBARA
LEADS ERLAN SITA CV TAMBANG BATU GUNUNG
LEADS LEVINE LATERASIA BARATAMA PT ANGKUTAN BATUBARA
ERLAN
LEADS LEVINE LATERASIA BARATAMA PT
PROSPEK GAVIN TIGA DAUN KAPUAS

PROSPEK GAVIN SUJARWO

LEADS GAVIN CITRA INDAH LESTARI MANDIRI PT

AMMANDMENT GAVIN FELIX HARIANTO

PROSPEK GAVIN ATIKA JAYA ABADI CV PERKEBUNAN KELAPA SAWIT

PROSPEK ERLAN TAUFIK RAHMAN


PROSPEK ERLAN NUGRAHA WAHYU TRI UTAMA CV
PROSPEK ERLAN NUGRAHA WAHYU TRI UTAMA CV
PROSPEK ERLAN ARI EKA WIJAYA

LEADS GAVIN BAYU DUTA PRATAMA PT KONTRUKSI

LEADS GAVIN RAFIKA JAYA PERSADA NUSANTARA PT KONTRUKSI

APPEAL GAVIN NURKALIZA MAJU BERSAMA PT

MCE NAME OSP


ERLAN 3,187,258,390
GAVIN 4,310,125,000
TOTAL 7,497,383,390
UNIT YEAR SUPPLIER TYPE PEMBIAYAAN

KOBELCO EXCAVATOR SK200-10 2020 OWNER LEASING SLB


KOBELCO EXCAVATOR SK200-10 2020 OWNER LEASING SLB

HINO 500 SERIES FM 260JD NEW RANGER 2020 PT MITRA PROFITAMAS MOTOR DF NEW

KOMATSU EXCAVATOR PC210-10 MO 2020 PT UNITED TRACTORS TBK DF NEW


TOYOTA FORKLIFT 62-8FD30 2020 PT TRAKTOR NUSANTARA DF NEW
HITACHI EXCAVATOR ZX210F-5G 2020 PT HEXINDO ADIPERKASA TBK DF NEW
HITACHI EXCAVATOR ZX70-5G 2020 PT HEXINDO ADIPERKASA TBK DF NEW
KOMATSU EXCAVATOR PC 210-10 MO 2020 PT UNITED TRACTORS TBK DF NEW
SCANIA P 360 CB OB VESSEL 2020 PT UNITED TRACTORS TBK DF NEW
SCANIA P 360 CB OB VESSEL 2020 PT UNITED TRACTORS TBK DF NEW
SCANIA P 360 CB OB VESSEL 2020 PT UNITED TRACTORS TBK DF NEW
SUMITOMO EXCAVATOR SH350-LHD-6 2020 DF NEW
CATERPILLAR EXCAVATOR CAT320GC 2020 DF NEW
FAW DUMP TRUCK FD336FT 2020 DF NEW
FAW DUMP TRUCK FD336FT 2020 DF NEW
JCB BACKHOE LOADER CX3DT 2020 DF NEW

HITACHI EXCAVATOR ZX2200F -5G 2020 DF NEW

HITACHI EXCAVATOR ZX2200F -5G 2020 DF NEW

KOBELCO EXCAVATOR SK200-10XDL 2020 DF NEW

CATERPILLAR EXCAVATOR CAT 305.5E2 2020 DF NEW

FAW TRACTOR HEAD FD420 2020 DF NEW


KOMATSU EXCAVATOR PC210-10 MO 2020 DF NEW
KOMATSU EXCAVATOR PC210-10 MO 2020 DF NEW
LIUGONG EXCAVATOR 920E 2020 DF NEW

KUBOTA EXCAVATOR U50 SS 2020 DF NEW

CATERPILLAR EXCAVATOR 320D2GC 2017 SLB

CATERPILLAR BULLDOZER D6R 2019 DF USED


APPROVAL
POT STATUS DATE EXPIRED NTF

HEAVY EQUIPMENT USED LEASEBACK APPROVE 15-Sep-20 14-Dec-20 960,000,000


HEAVY EQUIPMENT USED LEASEBACK APPROVE 15-Sep-20 14-Dec-20 960,000,000

NEW TRUCK (BPKB) APPROVE 18-Aug-20 16-Nov-20 855,050,000

HEAVY EQUIPMENT NEW - PAKET UT MTN APPROVE 12-Aug-20 10-Nov-20 825,000,000


HEAVY EQUIPMENT NEW APPROVE 9-Sep-20 8-Dec-20 281,600,000
HEAVY EQUIPMENT NEW APPROVE 21-Sep-20 20-Dec-20 1,544,400,000
HEAVY EQUIPMENT NEW APPROVE 21-Sep-20 20-Dec-20 840,400,000
HEAVY EQUIPMENT NEW - PAKET UT MTN APPROVE 22-Jul-20 20-Oct-20 1,278,750,000
PAKET UT SCANIA - INVOICE APPROVE 22-Jul-20 20-Oct-20 1,337,549,500
PAKET UT SCANIA - INVOICE APPROVE 22-Jul-20 20-Oct-20 1,337,549,500
PAKET UT SCANIA - INVOICE APPROVE 22-Jul-20 20-Oct-20 1,337,549,500
HEAVY EQUIPMENT NEW 1,743,225,000
HEAVY EQUIPMENT NEW 1,153,285,000
HEAVY EQUIPMENT NEW 796,600,000
HEAVY EQUIPMENT NEW 796,600,000
HEAVY EQUIPMENT NEW 692,000,000

HEAVY EQUIPMENT NEW 1,054,500,000

HEAVY EQUIPMENT NEW 1,210,000,000

HEAVY EQUIPMENT NEW 6-Nov-20 4-Feb-21 1,010,625,000

HEAVY EQUIPMENT NEW 513,150,000

HEAVY EQUIPMENT NEW 787,258,390


HEAVY EQUIPMENT NEW 1,200,000,000
HEAVY EQUIPMENT NEW 1,200,000,000
HEAVY EQUIPMENT NEW 960,000,000

HEAVY EQUIPMENT NEW 440,000,000

HEAVY EQUIPMENT USED LEASEBACK 530,000,000

HEAVY EQUIPMENT USED 1,637,500,000


AMMOUNT PLAN TGL PLAN
FUNDING FUNDING UPDATE

V SLB 1 FM260JD 2013. OSP 290.500.000,- Senin tanggal


09 November 2020 akan dilakukan re-visit

Akan dilakukan FU ke Pak Syarif dan akan coba


dilakukan FU juga ke Pak Haji Yamani
Sudah ambil 3 unit cash tempo
Sudah ambil credit dari Maybank
Akan dilakukan Re-Visit ke debitur dan Fight dengan
ACC

Project banyak yang tidak jalan. Project ada di


Bulungan karena Covid. Sekarang pekerjaan ada di
Global Makara Teknik. Ada info dapat plafond dari
ACC 3M

Akan coba dilakukan FU lagi di awal tahun, yang


dibiayai di MPM reshcedule 1 unit. Terlambat bayar.
Masih melengkapi data

Debitur hanya mau cash tempo

692,000,000 16-Nov-20 Sudah ada approval cabang


Akan dilakukan visit ke lokasi proyek. Di ACC sudah di
approve dengan DP 50%
Konstruksi di Kapuas dari PU. Sedang proses collect
data
AMM sudah keluar dari HO dan plan funding dalam
1,010,625,000 minggu depan
Kerjaan ada di DWK (Genting Grup). Kantor di
Purukcahu. Akan coba dilakukan FU dan Checking
Collect Data. Debitur masih belum bisa kasih data
787,258,390 karena debitur juga memiliki pekerjaan sebagai supir
1,200,000,000 Proses pembuatan MM maksimal naik tanggal 07
1,200,000,000 November 2020
Collect data
Data sudah lengkap. MM naik hari selasa tanggal 10
440,000,000
November 2020. Supplier dari Traknus Sampit

530,000,000 Lokasi ada di Kapuas, pekerjaan Konstruksi. Sekarang


ini sedang mengerjakan project jalan.

Pertemuan dengan orang trakinfo untuk memastikan


1,637,500,000 perhitungan rent to buy
Aging DEBITUR MCE AGREEMENT NO DPD (Agst)
OD1-30 6191700065 #N/A
6191700066 #N/A
6191700067 #N/A
ADELIAN KARYA PUTRI PT GAVIN
6191700068 #N/A

6191700069 #N/A

#N/A
6191800161
ADELIAN KARYA PUTRI PT GAVIN
#N/A
6191800162
6191900114 #N/A
6191900115 #N/A
6191900116 #N/A
6191900117 #N/A
6191900118 #N/A
6191900119 #N/A
6191900120 #N/A
6191900121 #N/A
6191900122 #N/A
6191900123 #N/A
ADELIAN KARYA PUTRI PT GAVIN
6191900124 #N/A
6191900125 #N/A
6191900126 #N/A
6191900127 #N/A
6191900128 #N/A
6191900129 #N/A
6191900130 #N/A
6191900131 #N/A
6191900132 #N/A
6191900133 #N/A
6192000067 #N/A
BOSTON CV ERLAN 6192000068 #N/A
6192000069 #N/A

CV TAMBUN BUNGAI MANDIRI GAVIN 6191900138 9

DODI GAVIN 6191900043 42


DWI SUKSES CV GAVIN 6191800154 7

HENDRA LIEMANTARA GAVIN 6191800173 17

6191800087 12
6191800088 12
6191800089 12
6191800090 12
JAYA PERTIWI CV GAVIN 6191800091 12
6191800092 12
6191800093 12
6191800094 12
6191800095 12

MAWARDI (New) GAVIN 6191900094 #N/A

MULYO (New) ERLAN 6192000030 #N/A

PUTERA PRIMA PERKASA PT GAVIN 6191900015 12

6191900044 26
PUTERA PRIMA PERKASA PT GAVIN
6191900045 26
6191800166 14
6191800167 14
6191800168 14
REZEKI KELUARGA BERSAMA PT GAVIN
6191800169 14
6191800170 14
6191800171 14
JAYA PERTIWI CV GAVIN 6191800142 38

JAYA PERTIWI CV (New Comer 30+) GAVIN 6191900029 7

OD31-90
6191900145 38
MUNIRUL IKHSAN GAVIN 6191900146 38
6191900147 38

PERKASA MENTAYA ABADI CV GAVIN 6191900085 22

CHANDRA JAYA MANDIRI CV ROBERT ? 6191800139 38

Pre NPL

SINAR ALAM TRAKSINDO CV GAVIN 6191900065 7

HATI SALJU CV GAVIN 6191800181 170

PA CV (New Comer 90+) ROBERT ? 6191800057 99

PELAIHARI SUKSES MANDIRI BETON PT ROBERT ? 6191700117 129


PERKASA MENTAYA ABADI CV GAVIN 6191800198 189

PERKASA MENTAYA ABADI CV GAVIN 6191900007 160

NPL

PERNANDO UTAMA CV GAVIN 6191900076 68

RU SINAR ARJUNA CV (New Comer 90+) GAVIN 6191900012 73

SURYA MEKAR KARYA PT (New Comer 90+) ROBERT ? 6191800046 83

SURYA PRIMATAMA CV GAVIN 6191900009 68

6191700042 185
USAHA BARATAMA JESINDO, PT ROBERT ? 6191700043 185
6191700044 185

Pre WO YEREMIA 17 7 PD GAVIN 6191700032 216


DPD (Sept) DPD (Okt) Status Okt / Sept SUM - O/S PRINCIPLE SUM - PD AMOUNT JT
2 3 298,758,040.67 21,872,500.00
2 3 298,758,040.67 21,872,500.00
2 3 299,047,212.44 21,872,500.00
Same Aging 29
2 3 345,259,758.78 21,872,500.00
2 3 345,259,758.78 21,872,500.00
2 3
794,111,134.38 23,607,250.00
Same Aging 29
2 3
794,111,134.38 23,607,250.00
2 3 190,415,268.51 6,626,000.00
2 3 190,415,268.51 6,626,000.00
2 3 190,415,268.51 6,626,000.00
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
Same Aging 29
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
2 3 100,295,684.01 3,919,750.00
2 3 143,837,500.20 5,226,000.00
2 3 143,837,500.20 5,226,000.00
2 3 153,112,792.92 5,226,000.00
2 3 153,112,792.92 5,226,000.00
2 3 153,112,792.92 5,226,000.00
2 3 85,737,504.81 3,320,500.00
2 3 124,834,484.61 4,642,750.00
#N/A 4 1,062,210,000.00 48,527,000.00
#N/A 4 New Comer 1,062,210,000.00 48,527,000.00 28
#N/A 4 1,062,210,000.00 48,527,000.00

8 9 Same Aging 350,371,474.02 15,877,500.00 23

10 11 Same Aging 137,050,119.31 16,657,500.00 21


6 7 Same Aging 171,104,086.80 15,687,000.00 25

16 17 Same Aging 32,119,883.34 16,483,000.00 15

11 12 76,821,531.30 10,225,000.00
11 12 76,821,321.30 10,224,790.00
11 12 76,821,241.30 10,224,710.00
11 12 76,821,531.30 10,225,000.00
11 12 Same Aging 76,821,531.30 10,225,000.00 20
11 12 76,821,531.30 10,225,000.00
11 12 76,821,531.30 10,225,000.00
11 12 76,821,531.30 10,225,000.00
11 12 76,821,531.30 10,225,000.00

#N/A 10 New Comer 479,703,610.26 8,794,505.22 22

#N/A 22 New Comer 106,232,510.51 18,858,000.00 10

11 12 Same Aging 500,090,421.37 64,639,500.00 20

25 26 580,571,323.12 53,227,000.00
Same Aging 6
25 26 501,782,312.65 46,003,500.00
13 14 427,863,504.73 28,202,500.00
13 14 427,863,504.73 28,202,500.00
13 14 427,863,504.73 28,202,500.00
Same Aging 18
13 14 468,685,957.14 27,993,500.00
13 14 468,685,957.14 27,993,500.00
13 14 468,658,957.14 27,966,500.00
37 37 Same Aging 112,649,425.32 12,474,580.00 25

6 37 Roll Rate 460,916,060.56 51,942,000.00 25

37 37 475,311,742.09 41,829,000.00
37 37 Same Aging 475,311,742.09 41,829,000.00 25
37 37 475,311,742.09 41,829,000.00

21 52 Roll Rate 363,177,404.33 42,656,000.00 10

37 68 Roll Rate 26,480,037.33 27,442,500.00 25

37 68 Roll Rate 169,494,497.63 47,586,225.00 25

200 170 Roll Back 133,236,550.96 48,511,500.64 15

68 99 Roll Rate 307,223,134.46 116,063,000.00 25

159 190 Roll Rate 181,317,756.56 193,286,000.00 25


190 190 Same Aging 179,899,793.80 137,635,000.00 25

190 221 Roll Rate 180,434,293.80 139,713,000.00 25

98 129 Roll Rate 412,978,501.37 82,027,157.66 25

73 104 Roll Rate 476,040,351.70 106,378,000.00 20

83 114 Roll Rate 343,146,702.63 108,082,500.00 10

98 99 Same Aging 492,739,322.11 114,800,000.00 25

215 186 83,914,078.89 86,202,500.00


215 186 Roll Back 83,914,078.89 86,202,500.00 29
215 186 83,914,078.89 86,202,500.00

246 246 Same Aging 52,662,705.18 54,250,500.00 29

20,703,837,503.68 2,579,082,218.52
LPD KETERANGAN
Normal. Pekerjaan di Adaro, Pama, dan SIS

Tenor awal 36 bulan (JT tgl 15). Reschedule covid angs ke-
13/10/2020 29. Bulan Mei 2020 (29 Mei 2020) 6 bulan angsuran stepup
total tenor menjadi 42 (num of Inst 43). Bulan September
2020 angsuran dibayar tanggal 10 Oktober 2020. Angsuran
Oktober belum dibayar. Pembayaran via Transfer?
Normal. Tenor awal 36 bulan (JT tgl 25). Reschedule covid
angs ke-17 bulan Mei 2020 (29 Mei 2020) 6 bulan angsuran
13/10/2020 stepup + 2 Bulan tambah tenor. total tenor menjadi 45
(num of Inst 45). Bulan September 2020 angsuran dibayar
tanggal 10 Oktober 2020. Pembayaran via Transfer?

Normal. Tenor awal 24 bulan (JT tgl 13). Reschedule covid


angs ke-6 bulan Mei 2020 (29 Mei 2020) 6 bulan angsuran
stepup. Total tenor menjadi 30 (num of Inst 31). Bulan
September 2020 angsuran dibayar tanggal 10 Oktober
2020. Pembayaran via Transfer?

13/10/2020

Pekerjaan rental Alat Berat Tambang Batubara di BIB,


Sinarmas Group.
JT ke-1
Giro Deposit, Kliring Danamon ke BCA. 2-3 hari proses
Kliring
Warning. Pekerjaan Kontruksi di dinas PU & Perikanan
Palangkaraya.

19/10/2020 Tenor 9/36. PD pertama bulan Mei 2020 (Masa Covid),


setiap bulan PD lewat bulan diatas tanggal 11 sebelum JT
Giro ke-2. Sebelum masuk 2 bulan bayar 1. Maintain 1-30.
Angsuran bulan Oktober belum dibayar.
Bad. Pekerjaan Rental Perkebunan Sawit di PT. Mirza
Pratama dan BGA Group.

Tenor 15/24. PD pertama bulan September 2019 (3 hari).


30/10/2020
Sejak Januari 2020 rutin PD, PD bertambah sejak Mei 2020.
Bulan September 2020 masuk 2 angsuran untuk Juli-
Agustus 2020. Angsuran bulan Oktober 2020 belum
dibayar. 2 angsuran bayar 1.
Normal. Pekerjaan Kontraktor Kebun Sawit di Sampoerna
Group.

28/10/2020 Tenor 24/36. PD pertama Agst 2020 (10 hari) rutin hingga
sekarang. PD mulai semakin berat sejak Januari 2020 (mulai
lewat bulan). PD terlama 39 hari bulan Juni 2020. Agustus
masuk pembayaran 2 angsuran. Angsuran bulan Oktober
2020 belum dibayar. 2 angsuran bayar 1.
Normal. Rental alat berat ke perorangan di Palangkaraya.

16/10/2020 Tenor 23/24. PD pertama Mei 2020, rutin hingga sekarang.


Max DD 35 hari bulan Mei 2020. 2 maintain 1. Sisa
Angsuran terakhir bulan Oktober 2020 (Belum terbayar)
Normal. Pekerjaan Rental Alat Berat di tambang
batubara BIB, Hutan Rindang Banua (HRB), Conbloc.
Sinarmas Group.

Tenor 28/36. PD Pertama angs pertama (Jun 2018, 6


24/10/2020 hari). Mulai rutin kembali PD sejak April 2020. Max DD
35 hari Agst 2020.
2 angsuran bayar 1. Angsuran Oktober 2020 belum
dibayar.

22/10/2020 Good. Fokus pembangunan kontruksi di Pelaihari dan sewa


ruang di Pelaihari Mall.
(hanya
untuk 1 Tenor 11/25. Reschedule Bulan Mei 2020. Baru pastdue
kontrak 180) bulan Oktober.
Good. Rental Angkutan dan Transportasi kebun sawit
(Borneo Trengginas Mandiri PT & Putra Nangamua
Mandiri PT)
30/09/2020
Tenor 6/12. Keterlambatan rutin sejak funding di bulan
April 2020. Biasanya pembayaran tidak lewat bulan
diakhir bulan berjalan, sedangkan bulan Oktober
belum ada pembayaran.
Normal. Kontraktor kebun sawit di TAL (Golden Land
Berhad), SGM (Anglo Eastern Plantation Group),
Menteng Kencana Mas (Citra Borneo Indah CBI Group
(SSMS)), dan Kharisma Inti Usaha (KIU) Genting
22/10/2020 Plantation Group.

Tenor 16/24. Rutin PD sejak Desember 2019. Max DD


36 hari. Rutin keterlambatan semakin memburuk 3
bulan terakhir. 2 angsuran bayar 1 setelah JT.
Normal. Tenor 12/24. Rutin PD sejak Februari 2020. Max
22/10/2020 DD 50 hari. Rutin keterlambatan memburuk 3 bulan
terakhir. 2 maintaintambang
Good. Kontraktor 1 batubara. Bowheer Magma
Sigma Utama PT (Hasnur), KPP, dan AGM (Baramulti
Group)

16/10/2020 Tenor 21/40. Rutin PD sejak Februari 2020.


Reschedule di angsuran ke-19, 3 bulan GP. Saat ini
keterlambatan ketika masuk angsuran Normal. Bulan
lalu pembayaran hanya 1 angsuran sebelum masuk 2
angsuran.
Normal. Pekerjaan Rental Alat Berat di tambang
batubara BIB (Sinarmas), Hutan Rindang Banua
(HRB, Sinarmas Group), AKS, dan Conbloc site BIB.
01/11/20
Tenor 24/36. Rutin PD sejak Sept 2019. Rata PD 2
bayar 1 (lewat bulan). Angsuran 25 September baru
dibayar 1 November.
Normal. Pekerjaan Rental Alat Berat di tambang batubara
BIB, Hutan Rindang Banua (HRB), Conbloc. Sinarmas Group.
01/11/20
Tenor 16/36. Rata PD 2 bayar 1 (lewat bulan). Angsuran 25
September baru dibayar 1 November. Sepertinya terpotong
OD Insurance.
Ayam Potong dan Petelur. Kontraktor tambang
batubara di SSDK (Kintap).
20/10/2020
Tenor 7/36 (act 9/36). Kontrak aktif Jan 2020. Rutin
terlambat sejak Juni 2020. 3 payment terakhir pernah
Bad. Pekerjaan rental alat berat di KLK Group
(Menteng Jaya Sawit Perdana MJSP & Karya Makmur
Abadi KMA) dan Minamas Group dan (Teguh
21/9/2020 Samperna PT)

Tenor 10/36. Rutin PD sejak angs ke-4. Max DD 52


hari 2 bulan terakhir. 2 kontrak lainnya PD sudah NPL.
Warning. Rental alat berat kebun sawit di Minamas
Group (Sajang Heulang kebun KKPA dan
26/10/2020 Ladangrumpun Suburabadi).

Tenor 23/24. Sisa 1 angsuran terakhir.


Warning. Pekerjaan di Busur Cahaya Persada PT
(Kontraktor Indocement Tunggal Perkasa). Berhubungan
dengan Kontruksi.
19/8/2020
Tenor 12/24. Keterlambatan sejak bulan Agustus 2020
masih sama seperti bulan lalu.
Bad. Pekerjaan Transportasi di Sinar Alam Duta
Perdana PT (SADP, Duta Bahari Menara Line
Dockyard RO BFI Group Sinar Alam.
26/10/2020
JT 15 Mar 2020 dibayarkan 2x bulan Oktober (2+
Angsuran).
Warning. Pekerjaan kontruksi di Palangkaraya dana APBN
proyek kontraktor ke Perorangan di Dinas PU dan
Pertahanan, Sawah, Yonif, dan Reboisasi hutan.
24/10/2020
Tenor 26/36. Rutin PD sejak Januari 2019. Sejak awal tahun
rutin ada pembayaran min. 1 angsuran. Sept 2020 ada
masuk 2 angsuran. Pernah NPL. Max DD April 2020 125
hari. Bulan Oktober masuk partial 20jt.
Warning. Proyek Kontruksi dengan PP Persero Tbk.
Pemegang saham DBR H. Mawardi.
15/10/2020
(15jt) Seharusnya sudah lunas 25 Oktober 2020. Masih
gantung dari bulan Maret. Angsuran bulan 6,8,10
setiap bulan masuk 15jt.
Bad. Pekerjaan rental alat berat di KLK Group
(Menteng Jaya Sawit Perdana MJSP & Karya Makmur
Abadi KMA) dan Minamas Group dan (Teguh
27/10/2020 Samperna PT)

Angsuran 25 Maret 2020 dibayarkan 27 Oktober 2020


(1 angsuran).
Bad. Pekerjaan rental alat berat di KLK Group
(Menteng Jaya Sawit Perdana MJSP & Karya Makmur
Abadi KMA) dan Minamas Group dan (Teguh
30/09/2020
Samperna PT)
(17jt)
Angsuran 25 Maret dibayarkan 30 September 2020
Rp. 17jt (tidak full)
Warning. Kontraktor kontruksi PU, Pekerjaan di Dinas
PKPP Kal-Teng, Sumber Bangun Sentosa (SBS) dan
30/07/2020 Angkutan LCT di BUMA (KTC Coal Mining & Energy).
(10jt)
Tenor 8/36 (act 13/36). Rutin PD sejak 2020.
Pembayaran 30 Juli 2020 Rp. 10jt.
Warning. Pekerjaan Rental Water Truck di BIB dan Putra
Perkasa Abadi di BIB (Sinarmas Group). Unit this request
untuk pekerjaan penebangan kayu akasia di Hutan
Rindang Banua (HRB) Sinarmas Group.
23/09/2020
Tenor 15/36 (act. 19/36). Rutin PD sejak awal angsuran.
Semakin rutin mulai Jan 2020. Bulan 1,2,5,7 pernah tidak
ada pembayaran angsuran. Max DD 103 hari. Angsuran Juni
2020 dibayarkan Sept 2020.
18/09/2020 Normal. Kontraktor kebun sawit di Bisma Dharma Kencana
(Rp 18.3jt) (BDK Katingan) dan Putra Katingan Pratama (PK, Kirana
Megantara, Triputra Group)
1 Angsuran
full dibayar Ada 2 kontrak (1 kontrak lancar). This acc. rutin PD sejak
untuk kontrak awal kontrak. Max DD. 100 hari di bulan Juni 2020. Tahun
045 (No Past ini bulan 4,5,7 pernah 0 payment. Pemby bulan september
Due) untuk angsuran bulan Juni 2020 dan partial Juli 2020.
Bad. Pekerjaan rental alat berat di Nagabuana Aneka
Piranti PT (NAP, Naga Group) Exportir Furniture,
WIKA, dan Tiga Daun Kapuas (TDK).
19/10/2020
Tenor 16/36 (Actual 20/36). Angsuran bulan Juni baru
terbayar 19 Okt 2020.
yang sudah bisa produksi, sisanya masih IUP
Explorasi. Penjualan batubara untuk PLN (Rizky
27/10/2020
Anugrah Pratama (RAP)).

Warning. Jasa Printing di Pontianak. Seharusnya


sudah lunas bulan April 2020.
31/10/2020
Tenor 33/36 (Actual 36/36). Kontrak ICP, seharusnya
lunas April 2020. Sisa 3 angsuran.
LOC 6 November 2020
Report Collection Corporate 9A Cut Off 06 November 2020

BANJARMASIN
OD 1-30
Nama No_CFA Jml Angsuran Ang ke- Due Days

ARIRON JAYA TEHNIK CV 6191900057 50,463,500.00 15 2

ADELIAN KARYA PUTRI PT 6191900127 5,226,000.00 11 8


ADELIAN KARYA PUTRI PT 6191900128 5,226,000.00 11 8
ADELIAN KARYA PUTRI PT 6191900129 5,226,000.00 11 8
ADELIAN KARYA PUTRI PT 6191900130 5,226,000.00 11 8
ADELIAN KARYA PUTRI PT 6191900131 5,226,000.00 11 8
ADELIAN KARYA PUTRI PT 6191900132 3,320,500.00 11 8
ADELIAN KARYA PUTRI PT 6191900133 4,642,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900114 6,626,000.00 11 8
ADELIAN KARYA PUTRI PT 6191900115 6,626,000.00 11 8
ADELIAN KARYA PUTRI PT 6191900116 6,626,000.00 11 8
ADELIAN KARYA PUTRI PT 6191900117 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900118 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900119 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900120 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900121 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900122 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900123 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900124 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900125 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191900126 3,919,750.00 11 8
ADELIAN KARYA PUTRI PT 6191800161 23,607,250.00 22 8
ADELIAN KARYA PUTRI PT 6191800162 23,607,250.00 22 8
ADELIAN KARYA PUTRI PT 6191700065 21,872,500.00 34 8
ADELIAN KARYA PUTRI PT 6191700066 21,872,500.00 34 8
ADELIAN KARYA PUTRI PT 6191700067 21,872,500.00 34 8
ADELIAN KARYA PUTRI PT 6191700068 21,872,500.00 34 8
ADELIAN KARYA PUTRI PT 6191700069 21,872,500.00 34 8

DWI SUKSES CV 6191800154 15,687,000.00 25 12

JAYA PERTIWI CV 6191900029 25,971,000.00 17 12


JAYA PERTIWI CV 6191800142 10,224,580.00 25 12

CV TAMBUN BUNGAI MANDIRI 6191900138 15,877,500.00 10 14

MAWARDI 6191900094 8,794,505.22 12 15

Page 19
LOC 6 November 2020

DODI 6191900043 16,657,500.00 16 16

JAYA PERTIWI CV 6191800087 10,225,000.00 29 17


JAYA PERTIWI CV 6191800089 10,224,710.00 29 17
JAYA PERTIWI CV 6191800090 10,225,000.00 29 17
JAYA PERTIWI CV 6191800091 10,225,000.00 29 17
JAYA PERTIWI CV 6191800092 10,225,000.00 29 17
JAYA PERTIWI CV 6191800093 10,225,000.00 29 17
JAYA PERTIWI CV 6191800094 10,225,000.00 29 17
JAYA PERTIWI CV 6191800095 10,225,000.00 29 17
JAYA PERTIWI CV 6191800088 10,224,790.00 29 17

PUTERA PRIMA PERKASA PT 6191900015 64,639,500.00 17 17

HENDRA LIEMANTARA 6191800173 16,483,000.00 24 22

MULYO 6192000030 18,858,000.00 7 27

OD 31-90
Nama No_CFA Jml Angsuran Ang ke- Due Days

PUTERA PRIMA PERKASA PT 6191900044 106,454,000.00 13 31

PUTERA PRIMA PERKASA PT 6191900045 92,007,000.00 13 31

SINAR ALAM TRAKSINDO CV 6191900065 31,721,725.00 14 42

MUNIRUL IKHSAN 6191900145 41,829,000.00 9 42

MUNIRUL IKHSAN 6191900146 41,829,000.00 9 42

MUNIRUL IKHSAN 6191900147 41,829,000.00 9 42

PERKASA MENTAYA ABADI CV 6191900085 42,656,000.00 11 57

CHANDRA JAYA MANDIRI CV 6191800139 27,442,500.00 23 73

Page 20
LOC 6 November 2020

OD 90+
Nama No_CFA Jml Angsuran Ang ke- Due Days

PA CV 6191800057 116,063,000.00 27 104

SURYA PRIMATAMA CV 6191900009 114,800,000.00 17 104

RU SINAR ARJUNA CV 6191900012 106,378,000.00 16 109

SURYA MEKAR KARYA PT 6191800046 108,082,500.00 25 119

PERNANDO UTAMA CV 6191900076 82,027,157.66 9 134

HATI SALJU CV 6191800181 48,511,500.64 18 175

USAHA BARATAMA JESINDO, PT 6191700042 86,202,500.00 34 191

USAHA BARATAMA JESINDO, PT 6191700043 86,202,500.00 34 191

USAHA BARATAMA JESINDO, PT 6191700044 86,202,500.00 34 191

PELAIHARI SUKSES MANDIRI BETON PT 6191700117 193,286,000.00 30 195

PERKASA MENTAYA ABADI CV 6191800198 137,635,000.00 15 195

PERKASA MENTAYA ABADI CV 6191900007 139,713,000.00 14 226

YEREMIA 17 7 PD 6191700032 54,250,500.00 34 251

PONTIANAK
OD 31-90
Nama No_CFA Jml Angsuran Ang ke- Due Days

RASI CV 6191900051 41,431,000.00 9 55

RASI CV 6191900052 52,277,000.00 9 55

Page 21
LOC 6 November 2020

OD 1-30
Nama No_CFA Jml Angsuran Ang ke- Due Days

ROBI CANDRA 6191900108 35,768,000.00 11 12

Page 22
LOC 6 November 2020
Collection Corporate 9A Cut Off 06 November 2020

Unit Surveyor Outstanding Principal Tgl Jatuh Tempo

KOMATSU-HYDRAULIC EXCAVATOR-PC21010M0 Erlan Sanvik Pasaribu 1,019,913,765.44 04-November-2020

MITSUBISHI-TRITON-2.5L DC HDX Solar Erlan Sanvik Pasaribu 143,837,500.20 29-October-2020


MITSUBISHI-TRITON-2.5L DC HDX Solar Erlan Sanvik Pasaribu 143,837,500.20 29-October-2020
MITSUBISHI-TRITON-2.5L DC HDX Solar Erlan Sanvik Pasaribu 153,112,792.92 29-October-2020
MITSUBISHI-TRITON-2.5L DC HDX Solar Erlan Sanvik Pasaribu 153,112,792.92 29-October-2020
MITSUBISHI-TRITON-2.5L DC HDX Solar Erlan Sanvik Pasaribu 153,112,792.92 29-October-2020
MITSUBISHI-LC300-BCR (4X2) Erlan Sanvik Pasaribu 85,737,504.81 29-October-2020
MITSUBISHI-COLT DIESEL-FE74HDV4X2MT Erlan Sanvik Pasaribu 124,834,484.61 29-October-2020
MITSUBISHI-PAJERO SPORT-2.5L GLX Solar Erlan Sanvik Pasaribu 190,415,268.51 29-October-2020
MITSUBISHI-PAJERO SPORT-2.5L GLX Solar Erlan Sanvik Pasaribu 190,415,268.51 29-October-2020
MITSUBISHI-PAJERO SPORT-2.5L GLX Solar Erlan Sanvik Pasaribu 190,415,268.51 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
MITSUBISHI-TRITON-2.5L DC GLS Solar Erlan Sanvik Pasaribu 100,295,684.01 29-October-2020
ISUZU ELF-NPS 75 MANHAUL Erlan Sanvik Pasaribu 794,111,134.38 29-October-2020
ISUZU ELF-NPS 75 MANHAUL Erlan Sanvik Pasaribu 794,111,134.38 29-October-2020
ISUZU-MANHAUL-NPS 75 PS 23 SEAT + DRIVER Erlan Sanvik Pasaribu 298,758,040.67 29-October-2020
ISUZU-MANHAUL-NPS 75 PS 23 SEAT + DRIVER Erlan Sanvik Pasaribu 298,758,040.67 29-October-2020
ISUZU-MANHAUL-NPS 75 PS 23 SEAT + DRIVER Erlan Sanvik Pasaribu 299,047,212.44 29-October-2020
ISUZU-MANHAUL-NPS 75 PS 23 SEAT + DRIVER Erlan Sanvik Pasaribu 345,259,758.78 29-October-2020
ISUZU-MANHAUL-NPS 75 PS 23 SEAT + DRIVER Erlan Sanvik Pasaribu 345,259,758.78 29-October-2020

JCB-HYDRAULIC MINI EXCAVATOR-51R Erlan Sanvik Pasaribu 171,104,086.80 25-October-2020

VOLVO-SINGLE DRUM COMPACTORS-SD110 GAVIN HERWICAKSONO 442,243,122.88 25-October-2020


MITSUBISHI-TRITON-HDX DC 4X4 MT GAVIN HERWICAKSONO 112,108,524.78 25-October-2020

KUBOTA-MINI EXCAVATOR-U505S GAVIN HERWICAKSONO 350,371,474.02 23-October-2020

KOMATSU BULLDOZER D85ESS2 GAVIN HERWICAKSONO 479,703,610.26 22-October-2020

Page 23
LOC 6 November 2020

KOBELCO EXCAVATOR SK 200-8 GAVIN HERWICAKSONO 137,050,119.31 21-October-2020

MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,531.30 20-October-2020


MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,241.30 20-October-2020
MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,531.30 20-October-2020
MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,531.30 20-October-2020
MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,531.30 20-October-2020
MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,531.30 20-October-2020
MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,531.30 20-October-2020
MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,531.30 20-October-2020
MITSUBISHI STRADA TRITON-HDX DC ROBERT PAULUS SIMATUPANG 76,821,321.30 20-October-2020

KOMATSU-EXCAVATOR-PC2008MO GAVIN HERWICAKSONO 500,090,421.37 20-October-2020

HYUNDAI EXCAVATOR-R2209S GAVIN HERWICAKSONO 32,119,883.34 15-October-2020

HINO-TRUCK TRONTON-FM8JNKDMGJW/FM260JW Erlan Sanvik Pasaribu 106,232,510.51 10-October-2020

Unit Surveyor Outstanding Principal Tgl Jatuh Tempo

SUMITOMO-CRAWLER EXCAVATOR-SH210F6 GAVIN HERWICAKSONO 580,571,323.12 06-October-2020

SUMITOMO-CRAWLER EXCAVATOR-SH130LF6 GAVIN HERWICAKSONO 501,782,312.65 06-October-2020

KOBELCO-HYDRAULIC EXCAVATOR-SK2008 GAVIN HERWICAKSONO 156,737,680.00 25-September-2020

KOMATSU-EXCAVATOR-PC2008MO GAVIN HERWICAKSONO 475,311,742.09 25-September-2020

KOMATSU-EXCAVATOR-PC2008MO GAVIN HERWICAKSONO 475,311,742.09 25-September-2020

KOMATSU-EXCAVATOR-PC2008MO GAVIN HERWICAKSONO 475,311,742.09 25-September-2020

KOMATSU-EXCAVATOR-PC130 F7 GAVIN HERWICAKSONO 363,177,404.33 10-September-2020

KUBOTA-MINI EXCAVATOR-U505S ROBERT PAULUS SIMATUPANG 26,480,037.33 25-August-2020

Page 24
LOC 6 November 2020

Unit Surveyor Outstanding Principal Tgl Jatuh Tempo

KOMATSU EXCAVATOR-PC2008M0 ROBERT PAULUS SIMATUPANG 307,223,134.46 25-July-2020

SAKAI-VIBRATING ROLLER-SV525D GAVIN HERWICAKSONO 492,739,322.11 25-July-2020

KOBELCO EXCAVATOR-SK75 8 GAVIN HERWICAKSONO 476,040,351.70 20-July-2020

KOMATSU-HYDRAULIC EXCAVATOR-PC195LC8 ROBERT PAULUS SIMATUPANG 343,146,702.63 10-July-2020

SDLG-WHEEL LOADER-LG933L GAVIN HERWICAKSONO 412,978,501.37 25-June-2020

CATERPILLAR FORKLIFT-DP30NDC GAVIN HERWICAKSONO 133,236,550.96 15-May-2020

TATA DAEWOO-NOVUS-6x4 ROBERT PAULUS SIMATUPANG 83,914,078.89 29-April-2020

TATA DAEWOO-NOVUS-6x4 ROBERT PAULUS SIMATUPANG 83,914,078.89 29-April-2020

TATA DAEWOO-NOVUS-6x4 ROBERT PAULUS SIMATUPANG 83,914,078.89 29-April-2020

UD-TRUCKS-CWE28064R/S51 ROBERT PAULUS SIMATUPANG 181,317,756.56 25-April-2020

BOBCAT-COMPACT EXCAVATOR-E45 GAVIN HERWICAKSONO 179,899,793.80 25-April-2020

BOBCAT-COMPACT EXCAVATOR-E45 GAVIN HERWICAKSONO 180,434,293.80 25-March-2020

KONICA MINOLTA-DIGITAL PRINTING-A3+C1060 GAVIN HERWICAKSONO 52,662,705.18 29-February-2020

Unit Surveyor Tgl Jatuh Tempo Outstanding Principal

VOLVO-SOIL COMPACTORS-SD110 ROBERT PAULUS SIMATUPANG 12-September-2020 470,792,072.82

SDLG-MOTORGRADER-G9138 ROBERT PAULUS SIMATUPANG 12-September-2020 594,036,494.01

Page 25
LOC 6 November 2020

Unit Surveyor Outstanding Principal Tgl Jatuh Tempo

SUMITOMO-CRAWLER EXCAVATOR-SH210F6 ROBERT PAULUS SIMATUPANG 25-October-2020 770,406,065.71

Page 26
LOC 6 November 2020

Last Paid Date Okt JB / PLAN Keterangan

12-October-2020 12-November-2020 Masih dilakukan FU terkait janji bayar debitur untuk angsuran bulan
November 2020
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
13-October-2020 06-November-2020 Sudah melakukan pembayaran angsuran
Kendala debitur saat ada pekerjaan di Sampoerna Agro dan pencairannya
28-October-2020 30-November-2020 terkendala. Pada saat ini debitur fokus pekerjaan Maintenance Kebun.
Debitur juga punya kontrak di CF
#N/A Pekerjaan LV di BIB. Trend bayar 2 bayar 1
25-November-2020
08-October-2020 Pekerjaan LV di BIB. Trend bayar 2 bayar 1
Debitur janji bayar pada tanggal 23 November 2020 untuk angsuran
20-October-2020 23-November-2020 bulan Oktober 2020. Debitur saat ini melakukan pekerjaan rental ke
perorangan selama pekerjaan konstruksi masih belum ada
Debitur janji bayar pada tanggal 06 November 2020 untuk angsuran
#N/A 06-November-2020 bulan Oktober 2020. Pada saat ini debitur melakukan pekerjaan
Konstruksi di daerah Pelaihari

Page 27
LOC 6 November 2020
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 03
28-October-2020 21-November-2020 September 2020 untuk angsuran bulan Juli 2020 dan Debitur sudah
melakukan transfer 1 angsuran pada tanggal 30 September 2020 untuk
angsuran bulan Agustus 2020. Debitur juga punya kontrak di CF
27-October-2020
27-October-2020
27-October-2020
27-October-2020
Debitur sudah melakukan pembayaran angsuran pada tanggal 27 Oktober
27-October-2020 25-November-2020 2020 untuk angsuran bulan September 2020. Masih dilakukan FU terkait
janji bayar debitur untuk angsuran bulan Oktober 2020
28-October-2020
28-October-2020
28-October-2020
28-October-2020
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 22
Oktober 2020 untuk angsuran bulan September 2020. Tagihan debitur
23-October-2020 22-November-2020 pada PT KIU dan kebun Marahan tertunda karena ada persetujuan direksi,
Pusat kebun sawit yang ada di Malaysia agak terhambat ka
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 16
19-October-2020 16-November-2020 Oktober 2020 untuk angsuran bulan September 2020. Debitur janji bayar
pada tanggal 16 November 2020 untuk angsuran bulan Oktober 2020
Debitur janji bayar pada tanggal 09 November 2020 untuk angsuran
#N/A 06-November-2020 Oktober 2020. Pada saat ini debitur kerja di Korindo dan terkendala
terkait pencairan dari Korindo. Debitur juga punya kontrak di CF

Last Paid Date Okt JB / PLAN Keterangan


Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 22
22-November-2020 Oktober
2020 untuk angsuran bulan September 2020. Tagihan debitur
23-October-2020
pada PT KIU dan kebun Marahan tertunda karena ada persetujuan direksi,
Pusat kebun sawit yang ada di Malaysia agak terhambat ka
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 22
22-November-2020 Oktober
2020 untuk angsuran bulan September 2020. Tagihan debitur
23-October-2020 pada PT KIU dan kebun Marahan tertunda karena ada persetujuan direksi,
Pusat kebun sawit yang ada di Malaysia agak terhambat ka
Debitur terakhir melakukan pembayaran 1 angsuran pada tanggal 03
12-November-2020 November
2020 untuk angsuran bulan Agustus 2020. Pada saat ini
#N/A
debitur sedang melakukan pekerjaan didaerah Petangis, untuk pekerjaan
Sawit. Masih dilakuakn FU terkait janji bayar debitur unt
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 20
20-October-2020 20-November-2020 Oktober 2020 untuk angsuran bulan Agustus 2020. Masih dilakukan FU
terkait janji bayar debitur untuk angsuran bulan September 2020 dan
sambil ditawarkan untuk mengajukan reschedule. Debitur mas
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 20
20-October-2020 20-November-2020 Oktober 2020 untuk angsuran bulan Agustus 2020. Masih dilakukan FU
terkait janji bayar debitur untuk angsuran bulan September 2020 dan
sambil ditawarkan untuk mengajukan reschedule. Debitur mas
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 20
20-October-2020 20-November-2020 Oktober 2020 untuk angsuran bulan Agustus 2020. Masih dilakukan FU
terkait janji bayar debitur untuk angsuran bulan September 2020 dan
sambil ditawarkan untuk mengajukan reschedule. Debitur mas
Debitur melakukan pembayaran 1 angsuran pada tanggal 03 November
2020 untuk angsuran bulan Agustus 2020. Pada saat ini debitur tidak
#N/A 20-November-2020 bekerja lagi pada Wilmar. Sebelumnya debitur ada kerja pada lahan sawit
milik orang akan tetapi untuk pekerjaan sendiri. Saat ini sedang proses
penjualan unit debitur milik pemilik bowheer.
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 30
26-October-2020 25-November-2020 September 2020 untuk angsuran bulan Juli 2020. Debitur melakukan
transfer sebesar Rp 10.000.000,- pada tanggal 26 Oktober 2020. Debitur
janji bayar pada tanggal 25 November 2020 sebesar Rp 8.00

Page 28
LOC 6 November 2020

Last Paid Date Okt JB / PLAN Keterangan


Debitur masih menunggu pencairan dari bowheer, saat ini debitur
27-October-2020 25-November-2020 melakukan pekerjaan sawit akan tetapi tidak dijelaskan detail terkait
pekerjaan debitur. Debitur melakukan transfer sebesar Rp 20.000.000,-
pada tanggal 26 Oktober 2020. Debitur janji bayar l
Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 19
20-October-2020 25-November-2020 Oktober 2020 untuk angsuran bulan Juni 2020. Debitur mengatakan
pembayaran dari PT Nagabhuana Aneka Piranti dan PT Tiga Daun Kapuas
sedang terhenti sampai batas waktu yang tidak bisa ditentukan
Masih bertanya ke bagian asuransi dan akan dilakukan FU lagi secara
#N/A
teknisnya mau bagaimana ke HO pada hari senin
Debitur sudah melakukan pembayaran sebesar Rp. 31.616.500,- pada
#N/A 20-November-2020 tanggal 18 September 2020 untuk angsuran Juni 2020. Unit di pegang
Haji Munirul Iksan, karena ada pandemi covid karyawan tidak bisa masuk
ke Lokasi, dan debitur masih terkendala dalam proses
Sebelumnya unit kerja untuk Loading pasir di Muara Teweh dan saat ini
unit sudah tidak bekerja lagi dan unit saat ini ada di dalam gudang
#N/A 16/11/2020 debitur. Debitur terakhir melakukan pembayaran pada tangal 30 Juli
2020. Bulan lalu debitur ada mendapatkan tender
Unit forklift debitur saat ini melakukan pekerjaan di Adaro Indonesia.
12-October-2020 FU Sebelumnya debitur memiliki target pekerjaan 200 ton untuk angkutan
kapur dan saat ini target pekerjaan debitur hanya sebesar 10 ton
sehingga hanya cukup untuk operasional debitur. De
Bulan Juli debitur tidak melakukan pembayaran angsuran. Tambang tidak
beroperasi yang disebabkan oleh curah hujan yang tinggi dan tambang
27-October-2020 FU
masih banjir. Sudah dilakukan visit pada tanggal 05 agustus 2020, sudah
dilakukan tagging unit. Debitur sudah melakuk
Bulan Juli debitur tidak melakukan pembayaran angsuran. Tambang tidak
27-October-2020 FU beroperasi yang disebabkan oleh curah hujan yang tinggi dan tambang
masih banjir. Sudah dilakukan visit pada tanggal 05 agustus 2020, sudah
dilakukan tagging unit. Debitur sudah melakuk
Bulan Juli debitur tidak melakukan pembayaran angsuran. Tambang tidak
beroperasi yang disebabkan oleh curah hujan yang tinggi dan tambang
27-October-2020 FU
masih banjir. Sudah dilakukan visit pada tanggal 05 agustus 2020, sudah
dilakukan tagging unit. Debitur sudah melakuk
Debitur melakukan pembayaran 1 angsuran pada tanggal 27 Agustus
25-November-2020 2020
untuk angsuran bulan Maret 2020. Ada dana masuk sebesar Rp
19-October-2020 15.219.500,- pada tanggal 15 Oktober 2020 untuk angsuran bulan April
2020. Indikasi sudah pindah tangan, dan pemegang unit saat H iyan
Debitur melakukan pembayaran 1 angsuran pada tanggal 27 Oktober
2020 untuk angsuran bulan Maret 2020. Pada saat ini debitur tidak
27-October-2020 20/11/2020
bekerja lagi pada Wilmar. Sebelumnya debitur ada kerja pada lahan sawit
milik orang akan tetapi untuk pekerjaan sendiri tida
Debitur terakhir melakukan pembayaran 1 angsuran pada tanggal 14
#N/A 20/11/2020 Agustus 2020 untuk angsuran bulan Februari 2020 dan pada tanggal 30
September 2020 ada dana masuk sebesar Rp 18,195,000.- untuk
angsuran bulan Maret 2020. Pada saat ini debitur tidak bekerj
Usaha debitur masih belum beroperasi secara maksimal sehingga income
debitur masih belum maksimal. Pada saat ini debitur memiliki rencana
28-October-2020 27/11/2020 untuk menggadaikan tanah miliknya untuk melakukan peluanasan
kontrak miliknya. SPPU sudah dikirimkan. Debitur ada me

Last Paid Date Okt JB / PLAN Keterangan


Debitur sudah melakukan pembayaran pada tanggal 27 Oktober 2020
27-October-2010 untuk angsuran bulan Agustus 2020. Akan dilakukan zoom meeting pada
hari selasa tanggal 10 November 2020 jam 15.00 WITA
Debitur sudah melakukan pembayaran pada tanggal 27 Oktober 2020
27-October-2010 untuk angsuran bulan Agustus 2020. Akan dilakukan zoom meeting pada
hari selasa tanggal 10 November 2020 jam 15.00 WITA

Page 29
LOC 6 November 2020

Last Paid Date Okt JB / PLAN Keterangan


Debitur sudah melakukan pembayaran 1 angsuran pada tanggal 21
43,901.00 September 2020 untuk angsuran bulan Juli 2020. Debitur janji bayar lagi
tanggal 04 November 2020 dan tanggal 23 November 2020 sesuai surat
yang dilampirkan debitur

Page 30
LOC 6 November 2020

PERKEBUNAN KELAPA SAWIT

PERTAMBANGAN TAMBANG BATUBARA


PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA

PERKEBUNAN KELAPA SAWIT

PERTAMBANGAN BATUBARA
PERTAMBANGAN TAMBANG BATUBARA

KONTRUKSI JASA KONSTRUKSI

KONTRUKSI JASA KONSTRUKSI

Page 31
LOC 6 November 2020

PERDAGANGAN & DISTRIBUSI SPAREPARTS MOBIL/MOTOR

PERTAMBANGAN TAMBANG BATUBARA


PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA
PERTAMBANGAN TAMBANG BATUBARA

PERKEBUNAN KELAPA SAWIT

KONTRUKSI KONTRAKTOR

PERKEBUNAN KELAPA SAWIT

PERKEBUNAN KELAPA SAWIT

PERKEBUNAN KELAPA SAWIT

KONTRUKSI KONTRAKTOR

PERTAMBANGAN TAMBANG BATUBARA

PERTAMBANGAN TAMBANG BATUBARA

PERTAMBANGAN TAMBANG BATUBARA

PERKEBUNAN KELAPA SAWIT

PERKEBUNAN KELAPA SAWIT

Page 32
LOC 6 November 2020

KONTRUKSI KONTRAKTOR

KONTRUKSI JALAN, JEMBATAN & BANGUNAN SIPIL LAINNYA

PERHUTANAN HTI

PERKEBUNAN KELAPA SAWIT

KONTRUKSI JASA KONSTRUKSI

TRANSPORTASI EKSPEDISI

PERTAMBANGAN TAMBANG BATUBARA

PERTAMBANGAN TAMBANG BATUBARA

PERTAMBANGAN TAMBANG BATUBARA

INDUSTRI/MANUFACTURING BAHAN BANGUNAN/MATERIA

PERKEBUNAN KELAPA SAWIT

PERKEBUNAN KELAPA SAWIT

JASA PERCETAKAN / PRINTING

PERKEBUNAN KELAPA SAWIT

PERKEBUNAN KELAPA SAWIT

Page 33
LOC 6 November 2020

KONTRUKSI JASA KONSTRUKSI

Page 34
WO
Nama No_CFA Jml Angsuran Ang ke- Tgl Jatuh Tempo Due Days
GUNUNG MERANTI PT 9840544002 2,274,828,116.00 13 10-September-2004 5,897
EDI M ALI 4981100266 82,270,500.00 24 16-June-2013 2,696
KASPUL ANWAR SE 4981200119 91,881,500.00 19 02-October-2013 2,588
PUTRA BATULICIN MEMBANGUN PT 4981200223 199,061,000.00 23 16-March-2014 2,423
SRI UTAMI 4981200217 85,165,500.00 24 22-May-2014 2,356
CV CAHAYA MULYA ABADI 4981200208 121,330,373.37 32 25-December-2014 2,139
RIDUAN 4981200092 96,459,000.00 34 25-January-2015 2,108
CV CAHAYA MULYA ABADI 4981200756 292,295,500.00 26 30-January-2015 2,103
MUHAMMAD ZAKI 4981300879 103,023,000.00 18 06-March-2015 2,068
H MUHAMMAD ARSYAD 4981200777 431,915,949.86 37 26-November-2015 1,803
SUHAINOOR H 6191400021 224,807,000.00 17 05-February-2016 1,732
BANGUN TATA BANUA PT 4981100361 92,334,000.00 58 19-August-2016 1,536
MULYA PRATAMA PERKASA CV 6191800137 599,170,000.00 7 25-May-2019 527

DARMA SEKAR MAKMUR CV 6191800187 155,435,647.00 9 25-December-2019 313

DIFA CV 6191700024 224,474,000.00 31 30-December-2019 308

Nama No_CFA Jml Angsuran Ang ke- Tgl Jatuh Tempo Due Days
PRIMATAMA MANDIRI CV 4981200671 449,849,500.00 10 17-July-2013 2,669
SURYA SENTOSA CV 4981200752 37,316,500.00 24 28-November-2014 2,170
BORNEO BARUNA WASA CV 6491500020 842,919,000.00 15 21-July-2016 1,569
BERKAT INTI PERKASA CV 6191400047 493,972,320.00 24 02-December-2016 1,435
NURKHOLIS HIDAYAT 6491600004 139,822,512.00 27 20-July-2018 840

Page 35
WO
Unit Surveyor Net Investment Outstanding Principal
PLYWOOD-MACHINERIES STANLY DARISANG 2,090,044,566.42 2,018,095,117.00
HITACHI-ZX 330 Bima Widhy Atmaja 93,020,362.93 73,416,362.93
KOMATSU-PC200-7 Nicko Yamal 84,759,847.37 85,206,421.45
KOMATSU-PC200-7 Nicko Yamal 164,723,677.46 177,992,623.97
HITACHI-ZX 330 Nicko Yamal 94,703,539.57 76,338,346.26
SUMITOMO-NEW SH2105 EXCAVATOR ROBERT PAULUS SIMATUPANG 123,887,383.53 115,429,813.53
HITACHI-ZX 210F ROBERT PAULUS SIMATUPANG 103,752,104.81 93,633,949.52
SUMITOMO-NEW SH2105 EXCAVATOR ROBERT PAULUS SIMATUPANG 283,990,639.93 266,460,239.05
CATERPILLAR-D 3G ROBERT PAULUS SIMATUPANG 89,081,550.56 95,093,692.15
CATERPILLAR-336 DL ROBERT PAULUS SIMATUPANG 475,162,861.01 414,678,361.01
SHANTUI BULLDOZER-SD08U3 ROBERT PAULUS SIMATUPANG 193,602,593.49 208,863,422.47
SHAN BAO-CAP. 7090 T/H ROBERT PAULUS SIMATUPANG 76,120,190.50 89,037,766.96
HYUNDAI EXCAVATOR-HX 210 S GAVIN HERWICAKSONO 800,443,519.19 800,443,519.19

BOBCAT-COMPACT EXCAVATOR-E45 GAVIN HERWICAKSONO 319,921,552.69 319,921,552.69

KOMATSU EXCAVATOR PC2008MO GAVIN HERWICAKSONO 216,421,148.19 218,419,425.38

Unit Surveyor Net Investment Outstanding Principal


HITACHI-ZX 210F RENDY SUTIKNO 392,456,598.16 392,456,598.16
HYUNDAI-ROBEX 220-9SH JANUARD GABRIEL KINDANGEN 29,612,626.55 33,863,755.30
KOBELCO EXCAVATOR-SK200 8 SUPER X Adrian Prasetyo 713,443,533.91 713,443,533.91
KOMATSU EXCAVATOR PC2008MO JANUARD GABRIEL KINDANGEN 460,837,950.80 445,772,950.80
FUJI XEROX-DIGITAL PRINTING-C75 ADRIAN PRASETYO SIA 128,368,444.84 128,368,444.84

Page 36
WO
Keterangan Industry

Unit sudah dilelang negara


Pembayaran terakhir debitur pada tanggal 7 Januari 2020. SPPU
sudah dikirimkan dan akan dilakukan penarikan unit. Belum bisa
berangkat dikarenakan Corona. Janji bayar lepas, proses pelacakan
PERKEBUNAN
unit agar dapat dilakukan penindakan. Pada bulan September
masuk Bucket WO. Berdasarkan info yang diperoleh Unit sudah tidak
ada di pool lagi dan saat ini ada melakukan pekerjaan
Pada saat ini unit sudah tidak kerja lagi.
Surat somasi 2 sudah diterima leasee, setelah bertemu dengan
management BFI BJM. Debitur sudah melakukan transfer sebesar Rp.
10.000.000,- pada tanggal 23 Oktober 2020 untuk angsuran bulan INDUSTRI/MANUFACTURING
November 2019. Masih dilakukan FU terkait pembayaran angsuran
bulan Desember 2020 dan debitur sudah masuk bucket WO pada
bulan Agustus 2020

Keterangan

Page 37
WO
Sub-Industry

KELAPA SAWIT

RENTAL ALAT BERAT/ ALAT PENUNJANG INDUSTRI

Page 38
PENDING DOK
NOMOR
NO CABANG AREA PRODUCT NAMA DEBITUR
KONTRAK
1 BANJARMASIN 6191900138 9A HEAVY EQUIPMENT CV TAMBUN BUNGAI MANDIRI
2 BANJARMASIN 6191900145 9A HEAVY EQUIPMENT MUNIRUL IKHSAN
3 BANJARMASIN 6191900146 9A HEAVY EQUIPMENT MUNIRUL IKHSAN
4 BANJARMASIN 6191900147 9A HEAVY EQUIPMENT MUNIRUL IKHSAN
5 BANJARMASIN 6191900012 9A HEAVY EQUIPMENT RU SINAR ARJUNA CV
6 BANJARMASIN 6192000030 9A HEAVY EQUIPMENT MULYO
7 BANJARMASIN 6192000020 9A New Trucks (BPKB) NURKALIZA MAJU BERSAUDARA PT
8 BANJARMASIN 6192000054 9A New Trucks (BPKB) RANNISA DELAPAN TIGA SATU PT

Page 39
PENDING DOK
TANGGAL PEND KATEGORI PROMISE
FUNDING OK PENDINGAN DATE KETERANGAN

20-Dec-19 GIRO low risk 30-Nov-20 GIRO KURANG 11 ANGSURAN


24-Dec-19 GIRO low risk 20-Jan-20 GIRO KURANG 9 ANGSURAN
24-Dec-19 GIRO low risk 20-Jan-20 GIRO KURANG 9 ANGSURAN
24-Dec-19 GIRO low risk 20-Jan-20 GIRO KURANG 9 ANGSURAN
20-Mar-19 GIRO low risk 24-Apr-19 GIRO KURANG 16 ANGSURAN
Mar 10, 20 GIRO low risk Mar 20, 20 GIRO KURANG 2 ANGSURAN
Feb 28, 20 GIRO low risk Nov 30, 20 GIRO KURANG 24 ANGSURAN
Aug 21, 20 BPKB high risk Nov 17, 20 BPKB

Page 40
RELEASE DOKUMEN

No. AGREEMENT NO CUSTOMER NAME


1 6191400030 KARYA DEWIPUTRA PT
2 6191600068 ZAROFIK
3 6191700005 KALIMANTAN MITRA PERSADA PT
4 6191700052 JAWARA MITRA SAKTI CV
5 6191700061 PUTRA SANDAGA KARYA UTAMA PT
6 6191700111 PANDJI PRATAMA INDONESIA. PT
7 6191700138 PANDJI PRATAMA INDONESIA. PT
8 6191800006 PT Barito Investama Global
9 6191800174 DEWO PUTRO MAJU JAYA PT
10 6191800087
JAYA PERTIWI CV
11 6191800095
12 6191700042
13 6191700043 USAHA BARATAMA JESINDO, PT
14 6191700044

Page 41
RELEASE DOKUMEN
ASSET DESCRIPTION LICENSE PLATE DOC STATUS STATUS DATE
CASE-BACKHOELOADER-MODEL 580 SUPER N - 10/3/17 On Hand
HP LATEX PRINTING-330 - 6/14/19 On Hand
KOMATSU BULLDOZER-D85ESS2/S1 - 4/3/20 On Hand
VOLVO-TRACKTOR HEAD-FM 370 6X4 T B9128PEI 8/18/20 On Hand
HINO-500 SERIES-FL235JN NEW RANGER + TANGKI DA8395DB 1/20/20 On Hand
DOOSAN-PRTBLE AIR CMPRSR-PTBL DOOSAN AIRCMPRSR7/53 - 11/5/19 On Hand
HYUNDAI-WHEEL LOADER-SL765 - 12/30/19 On Hand
KOMATSU EXCAVATOR-PC2008M0 - 5/4/20 On Hand
VOLVO-EXCAVATOR-EC200D - 2/10/20 On Hand
BOBCAT-MINI EXCAVATOR-E45 B3NM11019
- On Hand
VOLVO EXCAVATOR EC210B PRIME FULL LOG 79793
KOMATSU MOTOR GRADER 13215
HITACHI ZX330 HYDRAULIC EXCAVATOR 538414 - On Hand
DSN-HYDRAULIC EXCAVATOR DX225LCA 7538

Page 42
RELEASE DOKUMEN
KETERANGAN
RACK CORP9A-BANJARMASIN
Rack Pangkalan Bun
RACK CORP9A-BANJARMASIN
RACK CORP9A-BANJARMASIN
RACK CORP9A-BANJARMASIN
RACK CORP9A-BANJARMASIN
RACK CORP9A-BANJARMASIN
RACK Serpong-Tangerang Selatan
RACK CORP9A-BANJARMASIN

ADD COLL

ADD COLL

Page 43
KLAIM ASURANSI

PT BFI FINANCE INDONESIA Tbk.


Cabang Corporate 9A

Cut Off 31 Oktober 2020

Daftar Klaim Asuransi

Product Tanggal Tgl. Lapor


No. Nama Konsumen No. Kontrak Jenis Klaim
Leasing Klaim ke HO
Rezeki Keluarga
1 6191800166 Truck Kerusakan 17-Jun-19 17-Jun-19
Bersama
Nugraha Wahyu Tri
2 6191700106 HE Kecurian 18-Nov-19 18-Nov-19
Utama
3 Joloy Mosak 6191900008 Truck Kerusakan 12-Mar-20 12-Mar-20
4 Robi Candra 6191900108 HE Kerusakan 12-Jun-20 15-Jun-20
5 Ahmad Subakti Yakob 6191900074 HE Tenggelam 28-Jul-20 28-Jul-20
6 RU SINAR ARJUNA CV 6191900012 HE Tenggelam 22-Sep-20 23-Sep-20

Page 44
KLAIM ASURANSI

Lampiran 6

Keterangan
(Status Klaim)
Approved, Customer akan mencicil Deductible ke
Bengkel
Approved, Menunggu pencairan dari Asuransi
Approved, Menunggu Kelengkapan dari Customer
Approved, Menunggu Kelengkapan dari Customer
Approved, Menunggu Kelengkapan dari Customer
Proses approval klaim dari insco

Page 45
REPO SELLING UNIT BARTAR

PT BFI FINANCE INDONESIA Tbk.


Cabang Corporate 9A
Cut Off 31 Oktober 2020

Daftar REPO & SELLING BARTAR

ASSET REPO

Agreement No Reposess Date No RAL Customer Category


Name
JAWARA
202005619RAL MITRA SAKTI Light Truck < 5
6191800071 05/15/2020
00005 Ton
CV
ODAYAS
6191900097 08/29/2020 202008619RAL NUSANTARA Excavator
00011
CV

ASSET SELLING

Agreement No Posting Date Category Customer Asset Description


Name
DUA PUTRA
6191900104 06/29/2020 TRUCK KAPUAS PT SINO-TRUCK-HOWO TIPPER 8X4 371HP

6191900105 06/29/2020 TRUCK DUA PUTRA SINO-TRUCK-HOWO TIPPER 8X4 371HP


KAPUAS PT
DUA PUTRA
6191900106 06/29/2020 TRUCK KAPUAS PT SINO-TRUCK-HOWO TIPPER 8X4 371HP

6191900141 08/14/2020 LIGHT TRUCK HATI SALJU CV HINO DUTRO-110 HD BOX


1-5 TON
LIGHT TRUCK
6191900140 08/14/2020 1-5 TON HATI SALJU CV HINO DUTRO-110 HD BOX

6191900142 08/14/2020 LIGHT TRUCK HATI SALJU CV HINO DUTRO-110 HD BOX


1-5 TON
BORNEO
6191900070 08/29/2020 BULDOZER ALAM RAYA KOMATSU BULLDOZER D68ESS12E0
SEMESTA PT
6191900096 09/30/2020 EXCAVATOR FATKHUROKH BOBCAT-COMPACT EXCAVATOR-E45
MAN

Page 46
REPO SELLING UNIT BARTAR

Lampiran 5

Asset Description Year Color License Plate Serial No 1

SINOTRUK-C5B BRAND 2016 PUTIH DA8607PO LZZMCCMD8FC192945


TRACTOR-4X2 GCW 40000

CASE-CRAWLER EXCAVATOR 2019 KUNING DCH130P6NKVFD1107


FORESTRY-CX130CLF

Asset Description Year License Plate Serial No1 Serial No2


LZZ5EXSA4KN5
INO-TRUCK-HOWO TIPPER 8X4 371HP 2019 - 73933 LZZ5EXSA4KN573933

INO-TRUCK-HOWO TIPPER 8X4 371HP 2019 - LZZ5EXSA6KN5 LZZ5EXSA6KN573934


73934
LZZ5EXSA8KN5
INO-TRUCK-HOWO TIPPER 8X4 371HP 2019 - 73935 LZZ5EXSA8KN573935

INO DUTRO-110 HD BOX 2013 B9841BXR MJEC1JG41D5 W04DTPJ39282


081868
MJEC1JG41C5
INO DUTRO-110 HD BOX 2012 B9409BXR 056940 W04DTPJ29729

INO DUTRO-110 HD BOX 2013 B9889BXR MJEC1JG41D5 W04DTPJ43421


094542

OMATSU BULLDOZER D68ESS12E0 2016 - J20656 J20656

OBCAT-COMPACT EXCAVATOR-E45 2019 - B3NM12044 B3NM12044

Page 47
REPO SELLING UNIT BARTAR

Serial No 2 Location Asset Status Outstanding AR Asset Condition Inventory


Expected Date

41016E30750 BANJARMASIN INV 318,087,000.00 KONDISI UNIT 06/29/2020


SEDANG

DCH130P6NKV BANJARMASIN INV 295,204,500.00 sedang 10/13/2020


FD1107

Reposses Date Aging Repo Inventory Aging Inventory Inventory Selling Amount
Date Amount
05/11/2020 49 05/26/2020 34 932,713,641.93 600,000,000.00

05/11/2020 49 05/26/2020 34 943,740,633.10 600,000,000.00

05/11/2020 49 05/26/2020 34 943,740,633.10 600,000,000.00

07/10/2020 35 07/18/2020 27 106,015,338.30 35,000,000.00

07/10/2020 35 07/18/2020 27 102,707,207.47 65,000,000.00

07/10/2020 35 07/18/2020 27 106,015,338.30 65,000,000.00

07/29/2020 31 07/30/2020 30 787,582,023.95 460,000,000.00

07/09/2020 83 07/18/2020 74 355,766,919.25 285,000,000.00

Page 48
REPO SELLING UNIT BARTAR

Gain Loss Buyer


ALEX
-332,713,641.93 SUMARTO

-343,740,633.10 ALEX
SUMARTO
ALEX
-343,740,633.10 SUMARTO

-71,015,338.30 SUWANDI

-37,707,207.47 SUWANDI

-41,015,338.30 SUWANDI

-327,582,023.95 BAMBANG
SUPRAPTO

-70,766,919.25 HERMANSYAH

Page 49

You might also like