CS615 Final Term Solved MCQs
CS615 Final Term Solved MCQs
If you are given a Software Project to manage, what steps you will consider for
planning of the project. During the Implementation phase the software modules are
coded and initial unit tests are performed.
• True
• False
The final activity for a project manager is___________
All given below are the problems that affect software projects except:
Cost, effort, risks, and resources are the factors included in--------
Extent to which the program can be used in more than one program or system is
called -------
Which of the items listed below is not one of the software engineering layers?
► Process
► Manufacturing
► Methods
► Tools
► True
► False
Question No: 11 ( Marks: 2 ) - Please choose one
► True
► False
Which one the following components are purchased from a third party, are
ready for use on the current project and have been fully validated?
Software
Hardware
Microsoft
Schedule
Effort
Size
Resource
development effort.
True
False
Question No. 4 Marks : 1
Adding more people to a project that is already behind schedule is a good way
to catch up.
True
False
Discrete portions of the project that can be charged to a single organization are
called -----------------
Work packages
Deliverables
Tasks
Activities
system into its operational components as they are seen by the user.
Design
Functional
Project
planning
Configurability
Reusability
Interoperability
pertability
Flexibility
Testability
Maintainability
Reusability
www.vustudents.ning.com
Question No. 1 Marks : 2
True
False
During the Implementation phase the software modules are coded and initial
unit tests are performed.
True
False
True
False
Both the software engineer and customer take an active role in software
requirements
Managing
Recognition
Analysis
Modeling
called :
Portability
Reusability
Configurability
Interoperability
Cost, effort, risks, and resources are the factors included in--------
► Estimation
► Testing
► Development
► Maintenance
Extent to which the program can be used in more than one program or system is
called -------
► Portability
► Reusability
►Interoperability
►Configurability
►complexity
►content
►determinacy
►Inspection
►Walkthrough
►Auditing
Which of the items listed below is not one of the software engineering layers?
►Process
►Manufacturing
►Methods
►Tools
www.vustudents.ning.com
►True
►False
►True
►False
________ identifying which quality standards are relevant to the project and
determining how to satisfy them.
► Quality Planning
► Communications Planning
► Organization Planning
► Staff Acquisition
► Constraints
► Selection Criteria
► Assumptions
► Four
► Five
► Six
► Seven
► Software requirements
► Development standards
► Implicit requirements
► All of given
► Design P 107
► Implementation
► Requirements analysis
► Testing
Mode of specification has a great impact on quality of solution. Forcing SWE to work
with incomplete, inconsistence, or misleading specifications result in frustration and
confusion affecting:
► Quality
► Timeliness and
► Completeness of SW product
► Bibliography
► Appendix
► Reference
► Developer
► Manager
www.vustudents.ning.com
Question No: 9 ( Marks: 1 ) - Please choose one
► Software developer
► Customer
► Customer site
► Company site
The model serves as the basis for the creation of ________ for the Software.
► Design
► Maintenance
► Testing
► Specifications P 95
► Model
► Specification
Question No: 13 ( Marks: 1 ) - Please choose one
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new system and
what data will be provided to the system.
► Analyst P 97
► Designer
► Coder
► Manager
► Correctness
► Consistency P 93
► Concurrency
► None of given
A software project that meets all the stated objectives is a success of _________
► Project quality
► Project fundamental purpose
► Project requirement
Software project are carried out sequentially and that each phase is completed before
the next is taken up.
► Process
► Concept
► Practice
► None of given
► Output Design
► Input Design
► Software Selection
C. Design Phase
1. General System Review
2. Processing Requirements Identification
3. Data Base Design
4. Control Requirements
5. Output Design
6. Input Design
7. Software Selection
8. Equipment Selection/Acquisition
9. People
10. Reference Manual Identification
11. Plans
12. Design Specifications Preparation
13. Design Phase Report Preparation
Which organization has set the de facto standards for project management techniques?
► PMBOK
► PMI
► PMA
► PMO
Question No: 1 ( Marks: 1 ) - Please choose one
________ identifying which quality standards are relevant to the project and
determining how to satisfy them.
? Quality Planning
? Communications Planning
? Organization Planning
? Staff Acquisition
Question No: 2 ( Marks: 1 ) - Please choose one
These all are outputs of Initiating Process except
? Project Manager Assignments
? Constraints
? Selection Criteria
? Assumptions
Question No: 3 ( Marks: 1 ) - Please choose one
Project management processes can be organized into _____________ groups
? Four
? Five
? Six
? Seven
www.vustudents.ning.com
Question No: 4 ( Marks: 1 ) - Please choose one
Product quality depends on its conformance to ______
? Software requirements
? Development standards
? Implicit requirements
? All of given
Question No: 5 ( Marks: 1 ) - Please choose one
_______is the technical kernel of software engineering
? Design
? Implementation
? Requirements analysis
? Testing
page 107
Question No: 6 ( Marks: 1 ) - Please choose one
Mode of specification has a great impact on quality of solution. Forcing SWE to
work with incomplete, inconsistence, or misleading specifications result in frustration
and confusion affecting:
? Quality
? Timeliness and
? Completeness of SW product
? All of given
page 103
Question No: 7 ( Marks: 1 ) - Please choose one
Finally, the specification includes a ________
? Bibliography
? Appendix
? Both Bibliography and Appendix
? Reference
page 105
Question No: 8 ( Marks: 1 ) - Please choose one
Cognitive model describes a system as perceived by its _________
? User community
? Developer
? Top level management
? Manager
page 103
Question No: 9 ( Marks: 1 ) - Please choose one
A review of the Software Requirements Specification is conducted by ________
? Software developer
? Customer
? Both the software developer and the customer
page 106
Question No: 10 ( Marks: 1 ) - Please choose one
A meeting is conducted at a _________ and attended by both software engineers and
customers.
? Customer site
? Company site
page 100
Question No: 11 ( Marks: 1 ) - Please choose one
The model serves as the basis for the creation of ________ for the Software.
? Design
? Maintenance
? Testing
? Specifications
page 95
Question No: 12 ( Marks: 1 ) - Please choose one
Throughout evaluation and solution synthesis, the analyst's primary focus is on
? "What, not "how."
? Model
? Evaluation and Synthesis
? Specification
page 95
Question No: 13 ( Marks: 1 ) - Please choose one
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new system and
what data will be provided to the system.
? Analyst
? Designer
? Coder
? Manager
page 97
Question No: 14 ( Marks: 1 ) - Please choose one
Requirements are refined and analyzed to assess their clarity, completeness,
and_______
? Correctness
? Consistency
? Concurrency
? None of given
page 93
Question No: 15 ( Marks: 1 ) - Please choose one
A software project that meets all the stated objectives is a success of _________
? Project quality
? Project fundamental purpose
? Project management myth
? Project requirement
page 82
Question No: 16 ( Marks: 1 ) - Please choose one
All of the following describe the activity list except:
? It’s an extension of the WBS
? It include all activities of the project
? It describe the WBS update
page 274
Question No: 17 ( Marks: 1 ) - Please choose one
Software project are carried out sequentially and that each phase is completed before
the next is taken up.
? The Prototyping Model
? The Incremental Model
? The Waterfall model
? The Spiral model
page 67
Question No: 18 ( Marks: 1 ) - Please choose one
Project management is a _________of constant communication and negotiation.
? Process I am not sure about it
? Concept
? Practice
? None of given
Question No: 19 ( Marks: 1 ) - Please choose one
These all are design phase activities except
? Output Design
? Input Design
? The software test plan P 16
? Software Selection
Question No: 20 ( Marks: 1 ) - Please choose one
Which organization has set the de facto standards for project management
techniques?
? PMB
? PMI
? PMA
? PMO
Which one the following components are purchased from a third party, are ready for
use on the current project and have been fully validated?
Software
Off – the – shelf
Hardware
Microsoft
False
Discrete portions of the project that can be charged to a single organization are called
-----------------
Work packages
Deliverables
Tasks
Activities
Marks : 1
Functional
Project
planning
________ identifying which quality standards are relevant to the project and
determining
how to satisfy them.
► Constraints
► Assumptions
► Four
► Five
► Six
► Seven
► Design
► Implementation
► Testing
► Quality
► Bibliography
► Appendix
► Reference
► Developer
► Manager
► Customer
The model serves as the basis for the creation of ________ for the Software.
► Design
► Maintenance
► Testing
► Specifications
► Model
► Evaluation and Synthesis
► Specification
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new system and
what data will be provided to the system.
► Analyst
► Designer
► Coder
► Manager
► Correctness
► Consistency
► Concurrency
A software project that meets all the stated objectives is a success of _________
► Process
► Concept
► Practice
Question No: 20 ( Marks: 1 ) - Please choose one
Which organization has set the de facto standards for project management
techniques?
► PMBOK
► PMI
► PMA
► PMO
Spring 2009
► Four
► Five
► Six
► Seven
Question No: 4 ( Marks: 1 ) - Please choose one
Product quality depends on its conformance to ______
► Design
► Implementation
► Requirements analysis
► Testing
Question No: 6 ( Marks: 1 ) - Please choose one
Mode of specification has a great impact on quality of solution. Forcing SWE
to work with incomplete, inconsistence, or misleading specifications result in
frustration and confusion affecting:
► Quality
► Timeliness and
► Completeness of SW product
► All of given
► Bibliography
► Appendix
► Both Bibliography and Appendix
► Reference
Question No: 8 ( Marks: 1 ) - Please choose one
Cognitive model describes a system as perceived by its _________
► User community
► Developer
► Top level management
► Manager
Question No: 9 ( Marks: 1 ) - Please choose one
A review of the Software Requirements Specification is conducted by
________
► Software developer
► Customer
► Both the software developer and the customer
► Top level management
Question No: 10 ( Marks: 1 ) - Please choose one
A meeting is conducted at a _________ and attended by both software
engineers and customers.
► Software engineer site
► Neutral site
► Customer site
► Company site
Question No: 11 ( Marks: 1 ) - Please choose one
The model serves as the basis for the creation of ________ for the Software.
► Design
► Maintenance
► Testing
► Specifications
Question No: 12 ( Marks: 1 ) - Please choose one
Throughout evaluation and solution synthesis, the analyst's primary focus is
on
► Analyst
► Designer
► Coder
► Manager
Question No: 14 ( Marks: 1 ) - Please choose one
Requirements are refined and analyzed to assess their clarity, completeness,
and_______
► Correctness
► Consistency
► Concurrency
► None of given
Question No: 15 ( Marks: 1 ) - Please choose one
A software project that meets all the stated objectives is a success of
_________
► Project quality
► Project fundamental purpose
► Project management myth
► Project requirement
Question No: 16 ( Marks: 1 ) - Please choose one
All of the following describe the activity list except:
► Process
► Concept
► Practice
► None of given
Question No:19 ( Marks: 1 ) - Please choose one
These all are design phase activities except
www.vustudents.ning.com
► Output Design
► Input Design
► The software test plan
► Software Selection
Question No: 20 ( Marks: 1 ) - Please choose one
Which organization has set the de facto standards for project management
techniques?
► PMBOK
► PMI
► PMA
► PMO
Both the software engineer and customer take an active role in software
requirements engineering-a set of activities that is often referred to as
Requirement
Managing
Recognition
Analysis
Modeling
Portability
Reusability
Configurability
Interoperability
Spring 2009
________ identifying which quality standards are relevant to the project and
determining how to satisfy them.
Quality Planning
Communications Planning
Organization Planning
Staff Acquisition
Four
Five
Six
Seven
Software requirements
Development standards
Implicit requirements
All of given
Design
Implementation
Requirements analysis
Testing
Quality
Timeliness and
Completeness of SW product
All of given
Bibliography
Appendix
Both Bibliography and Appendix
Reference
User community
Developer
Top level management
Manager
Software developer
Customer
Both the software developer and the customer
Top level management
The model serves as the basis for the creation of ________ for the Software.
Design
Maintenance
Testing
Specifications
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new
system and what data will be provided to the system.
Analyst
Designer
Coder
Manager
Correctness
Consistency
Concurrency
None of given
Software project are carried out sequentially and that each phase is
completed before the next is taken up.
Process
Concept
Practice
None of given
Which organization has set the de facto standards for project management
techniques?
PMBOK
PMI
PMA
PMO
PMA
h1. Basit is the project manager working on the Resource Planning process. He
should consider all of the following when developing the resource
requirements output except:
WBS
Supply purchase policies
Resource rates
Special knowledge and talents
2. All of the following are true regarding the tools and techniques of activity
sequencing except:
GERT uses analogous methods
GERT allows for loops
GERT is a conditional diagramming method
GERT allows for conditional branches
3. Pervaiz Elahi is a project manager for Changing Tides Video games. He has
produced a project network diagram and has updated the activity list. Which
process have he just finished?
The Activity Sequencing process, which identifies all the specific
activities of the project
The Activity Sequencing process, which identifies all the activities
dependences
The activity duration Estimating process, which diagram project
network time estimates
The activity duration Estimating process, which identifies all the
dependent activities of the project
4. Pervaiz Elahi is a project manager for Changing Tides Video games. He has
gathered the inputs of for the Activity Duration Estimation process. He will
employ which tools and techniques to produce the outputs for this process?
Activity list, analogous estimating, quality based durations, and
alternatives identification
Activity list, analogous estimating, expert judgment, and quality based
durations
Expert judgment, analogous estimating, quality based durations,
and reserve time
Expert judgment, alternative identification, quality based durations, and
reserve time
5. As a project manager, you know that all of the following are true
concerning analogous estimating techniques except:
It’s a qualitatively based estimating technique
It’s a Top-down estimating technique
It’s a tool and technique of Activity Duration Estimating and Cost
Estimating
It’s a form of expert judgment
6. All of the following are true regarding parametric modeling except:
It’s a form of Top-down estimating
It’s a mathematical model
It’s a tool used to estimate project costs
It’s a tool used to estimate project time
D. Parametric modeling is a Cost Estimating technique.
Cost, effort, risks, and resources are the factors included in--------
► Estimation
► Testing
► Development
► Maintenance
Page No. 222
► complexity
► content
► determinacy
► content and determinacy
The software quality assurance activity which is performed to check errors in logic,
function, or implementation for any representation of the software is called:
► Inspection
► Formal technical review(s)
► Walkthrough
► Auditing
Question No: 8 ( Marks: 2 ) - Please choose one
Which of the items listed below is not one of the software engineering layers?
► Process
► Manufacturing
► Methods
► Tools
► True
► False
► True
► False
1. Which organization has set the de facto standards for project management
techniques?
A. PMBOK
B. PMO
C. PMI
D. PMA
Answer: C
The Project Management Institute (PMI) is the industry-recognized standard
for project management practices.
2. The VP of marketing approaches you and requests that you change the
visitor logon screen on the company's website to include a username with at
least six characters. This is considered:
A. Project initiation
B. Ongoing operations
C. A project
D. Project execution
Answer: B
Projects exist to create a unique product or service. The logon screen in this
question is not a unique product. A minor change has been requested,
indicating this is an ongoing operation function. Some of the criteria for
projects are that they are unique, temporary with definitive start and end
dates, and considered complete when the project goals are achieved.
3. Your company manufactures small kitchen appliances. They are
introducing a new product line of appliances in designer colors with distinctive
features for kitchens in small spaces. These new products will be offered
indefinitely starting with the spring catalog release. Which of the following is
true?
A. This is a project because this new product line has never been
manufactured and sold by this company before.
B. This is an ongoing operation because the company is in the business of
manufacturing kitchen appliances. Introducing designer colors and features is
simply a new twist on an existing process.
C. This is an ongoing operation because the new product line will be sold
indefinitely. It's not temporary.
D. This is not a project or an ongoing operation. This is a new product
introduction not affecting ongoing operations.
Answer: A
This is a project. The product line is new, which implies this is a unique
product-it hasn't been done before. We can discern a definite start and end
date by the fact that the new appliances must be ready by the spring catalog
release.
4. Your company manufactures small kitchen appliances. They are
introducing a new product line of appliances in designer colors with distinctive
features for kitchens in small spaces. These new products will be offered
indefinitely starting with the spring catalog release. In order to determine the
characteristics and features of the new product line, you will have to perform
which of the following?
A. Fast tracking
B. Consulting with the stakeholders
C. Planning the project life cycle
D. Progressive elaboration
Answer: D
Progressive elaboration is the process of determining the characteristics and
features of the product of the project. Progressive elaboration is carried out in
steps in detailed fashion.
5. A project is considered successful when:
A. The product of the project has been manufactured.
B. The project sponsor announces the completion of the project.
C. The product of the project is turned over to the operations area to handle
the ongoing aspects of the project.
D. The project meets or exceeds the expectations of the stakeholders.
Answer: D
A project is considered successful when stakeholder needs and expectations
are met or exceeded.
6. The VP of customer service has expressed concern over a project you're
involved in. His specific concern is that if the project is implemented as
planned, he'll have to purchase additional equipment to staff his customer
service center. The cost is substantial and was not taken into consideration in
the project budget. The project sponsor insists that the project must go
forward as originally planned or the customer will suffer. Which of the
following is true?
A. The VP of customer service is correct. Since the cost was not taken into
account at the beginning of the project, the project should not go forward as
planned. Project initiation should be revisited to examine the project plan and
determine how changes can be made to accommodate customer service.
B. The conflict should be resolved in favor of the customer.
C. The conflict should be resolved in favor of the project sponsor.
D. The conflict should be resolved in favor of the VP of customer service.
Answer: B
Conflicts between stakeholders should always be resolved in favor of the
customer. This question emphasizes the importance of identifying your
stakeholders and their needs as early as possible in the project. We'll discuss
this more in later chapters.
7. Which of the following brings together a set of tools and techniques used to
describe, organize, and monitor the work of project activities?
A. Project managers
B. Guide to the PMBOK
C. Project management
D. Stakeholders
Answer: C
Project management brings together a set of tools and techniques to organize
project activities. Project managers are the ones responsible for managing the
project processes.
8. What are the triple constraints?
A. Time, schedules, and quality
B. Time, availability, and quality
C. Time, money, and schedules
D. Time, money, and quality
Answer: D
The triple constraints that drive all projects are time, money, and quality.
9. You are the project manager for a large construction project. The project
objective is to construct a set of outbuildings to house the Olympic support
team that will be arriving in your city 18 months from the project start date.
You've been given a budget of $12 million to complete this project. Resources
are easily attained. Which of the triple constraints is the primary constraint for
this project?
A. Time, because the date cannot be moved
B. Money, because the budget is set at $12 million
C. Resources, because they're not fixed
D. Quality, because the buildings have to be functional and safe
Answer: A
The primary constraint on this project is time because the date absolutely
cannot move. The Olympics are scheduled to begin on a certain date, and this
can't be changed. The budget is also a constraint because it's set at $12
million, but in this example, it would be a secondary constraint. It's important
that the project manager understands the priority of the constraints and
manages to them.
10. You are the project manager for a large construction project. The project
objective is to construct a set of outbuildings to house the Olympic support
team that will be arriving in your city 18 months from the project start date.
Resources are not readily available as they are currently assigned to other
projects. Jack, an expert crane operator, is needed for this project two months
from today. Which of the following skills will you use to get Jack assigned to
your project?
A. Negotiation and influencing skills
B. Communication and organizational skills
C. Communication skills
D. Problem-solving skills
Answer: A
Negotiation and influencing skills are needed to convince Jack's boss and
come to agreement concerning his assignment.
11. You are a project manager with technical expertise in the pharmaceutical
industry. You've decided to try your hand at project management in the
entertainment industry. Which of the following is true?
A. You will likely be successful because communication skills are your
strong suit. You anticipate having technical experts on your project
team to address industry specifics that you're not familiar with.
B. You will likely be successful because your organizational skills are
excellent. You anticipate having technical experts on your project team to
address industry specifics that you're not familiar with.
C. You will probably be successful because you have a friend in the
entertainment industry that has briefed you on all the important aspects of this
project that you'll need to know. You anticipate having technical experts on
your project team to address industry specifics that you're not familiar with.
D. You will probably not be successful because you have little knowledge of
the entertainment industry even though you anticipate having technical
experts on your project team to address industry specifics that you're not
familiar with.
Answer: A
Project management processes span industries. A project manager can take
these skills across industries and apply them successfully. Technical
experience in the industry doesn't hurt, but it's not required. The most
important skill any project manager can have is communication skills. Poor
communication skills might lead to an unsuccessful conclusion no matter how
strong the project manager's other skills are.
12. You are managing a project to install a new postage software system that
will automatically print labels and administer postage for certified mailings,
overnight packages, and other special mailing needs. You've attempted to
gain the cooperation of the business analyst working on this project and need
some answers. She is elusive and tells you that this project is not her top
priority. To avoid situations like this in the future, you should:
A. Establish the business analyst's duties well ahead of due dates and tell her
you'll be reporting on her performance to her functional manager.
B. Establish the business analyst's duties well ahead of due dates and tell her
you are expecting her to meet these expectations because the customer is
counting on the project meeting due dates to save significant costs on their
annual mailings.
C. Negotiate with the business analyst's functional manager during the
planning process to establish expectations and request to participate in
the business analyst's annual performance review.
D. Negotiate with the business analyst's functional manager during the
planning process to establish expectations and inform the functional manager
of the requirements of the project. Agreement from the functional manager will
assure the cooperation of the business analyst.
Answer: C
Negotiate with the functional manager to participate in the business analyst's
annual performance review.
13. The amount of authority a project manager possesses can be related to:
A. The project manager's communication skills
B. The organizational structure
C. The amount of authority the manager of the project manager possesses
D. The project manager's influencing skills
Answer: B
The level of authority the project manager has is determined by the
organizational structure. For instance, in a functional organization, the project
manager has little to no authority, but in a projectized structure, the project
manager has full authority.
14. What is one of the advantages of a functional structure?
A. All employees report to one manager and have a clear chain of
command.
B. All employees report to two or more managers, but project team members
show loyalty to functional managers.
C. The organization is focused on projects and project work.
D. Teams are collocated.
Answer: A
An advantage for employees in a functional organization is that they have only
one supervisor and a clear chain of command exists.
15. You have been assigned to a project in which the objectives are to direct
customer calls to an Interactive Voice Response system before being
connected to a live agent. You are in charge of the media communications for
this project. You report to the project manager in charge of this project and the
VP of marketing, who share responsibility for this project. Which
organizational structure do you work in?
A. Functional organization
B. Weak matrix organization
C. Projectized organization
D. Balanced matrix organization
Answer: D
Employees in a balanced matrix often report to two or more managers.
Functional managers and project managers share authority and responsibility
for projects. There is a balance of power between the functional managers
and project managers.
16. You have been assigned to a project in which the objectives are to expand
three miles of the north-south highway through your city by two lanes in each
direction. You are in charge of the demolition phase of this project, and you
report to the project manager in charge of this project. You have been hired
on contract and will be released at the completion of the demolition phase.
What type of organizational structure does this represent?
A. Functional organization
B. Weak matrix organization
C. Projectized organization
D. Balanced matrix organization
Answer: C
Projectized organizations are focused on the project itself. One issue with this
type of structure is determining what to do with project team members when
they are not actively involved on the project. One alternative is to release
them when they are no longer needed.
17. What are the five project management process groups, in order?
A. Initiation, Executing, Planning, Controlling, and Closing
B. Initiation, Controlling, Planning, Executing, and Closing
C. Initiation, Planning, Controlling, Executing, and Closing
D. Initiation, Planning, Executing, Controlling, and Closing
Answer: D
Remember the acronym that sounds like syrup of ipecac: IPECC.
18. You have been assigned to a project in which the objectives are to expand
three miles of the north-south highway through your city by two lanes in each
direction. You are interested in implementing a new project process called
design-build in order to speed up the project schedule. The idea is that the
construction team will work on the first mile of the highway reconstruction at
the same time the design team is coming up with plans for the third mile of the
reconstruction rather than completing all design before any construction
begins. This is an example of:
A. Managing the projects as a program
B. Fast tracking
C. Progressive elaboration
D. Collocation
Answer: B
Fast tracking is starting a new phase before the phase you're working on is
completed. This compresses the project schedule, and the project is
completed sooner as a result.
19. During which project management process are risk and stakeholder's
ability to influence project outcomes the highest at the beginning of the
process?
A. Planning
B. Executing
C. Initiation
D. Controlling
Answer: C
The Initiation process is where stakeholders have the greatest ability to
influence outcomes of the project. Risk is highest during this stage because of
the high degree of unknown factors.
20. You are a project manager working on gathering requirements and
establishing estimates for the project. Which process group are you in?
A. Planning
B. Executing
C. Initiation
D. Controlling
Answer: A
The Planning process is where requirements are fleshed out, stakeholders
are identified, and estimates on project costs and time are made.
Question # 5 of 10
These all are Product Transition Factors except
Select correct option:
Interoperability
Configurability
Expandability
Testability
Question # 6 of 10
Inefficient project management style is a
Select correct option:
Product-related problems
Technology-related problems
Process-related problems
People-related problems
Inefficient project management style: the project manager needs to lead by
example. The team members absorb the work culture, work ethic, and attitude
of the project manager and implement it in their work style. If you display a
lack of leadership qualities and weak ideals, the motivation levels decrease
across software team.
Question # 7 of 10
Finally, the specification includes a ________
Select correct option:
Bibliography
Appendix
Both Bibliography and Appendix
Reference
Finally, the specification includes a Bibliography and Appendix.
Question # 8 of 10
Software design is actually a multi step process that focuses on distinct
attributes of a program, these are
Select correct option:
Data structure, and Software architecture
Interface representations, and procedural detail
Both of given
None of given
Software design is actually a multi step process that focuses on four distinct
attributes of a program:
– Data structure,
– Software architecture,
– Interface representations, and procedural (algorithmic) detail.
Question # 9 of 10
Software requirements analysis may be divided into______ areas of effort
Select correct option:
4
5
6
7
Software requirements analysis may be divided into five areas of effort:
(1) Problem recognition,
(2) Evaluation and synthesis,
(3) Modeling
(4) Specification, and
(5) Review
Question # 10 of 10
McCall (MCC77) and his colleagues proposed some software quality factors
based on _________ most important aspects of a software product:
Select correct option:
4
3
6
5
There are a number of factors that determine the quality of a software product. These
factors can be measured either directly or indirectly. McCall (MCC77) and his
colleagues proposed some software quality factors based on three most important
aspects of a software product:
1. Product operation
2. Product revision and
3. Product transition
Question # 1 of __________contains an analysis of what went wrong, what went
right, and what you could have done better in the software project.
Select correct option:
Prepare closedown report
Identify learning
Identify reusable software components
Create reference material:
Prepare closedown report: The project closedown report contains the results of
the causal analysis that you do for the project. This contains an analysis of what went
wrong, what went right, and what you could have done better in the software
project. contains an analysis of what went wrong, what went right, and what
Question # 2 of 10
Project Quality Management includes the --------------- required to ensure
that the project will satisfy the needs for which it was undertaken
Select correct option:
Time
Cost
Processes
None of the given
Project Quality Management includes the processes required to ensure that the project
will satisfy the needs for which it was undertaken. It includes “all activities of the
overall management function that determine the quality policy, objectives, and
responsibilities and implements them by means such as quality planning, quality
assurance, quality control, and quality improvement, within the quality system.
Question # 3 of 10
-------------- completion and settlement of the contract, including resolution
of any open items.
Select correct option:
Contract Administration
Source Selection
None of the given
Contract Closeout
Contract Closeout—completion and settlement of the contract, including resolution
of any open items
Question # 4 of 10 ( Start time: 11:31:37 PM ) Total Marks: 1
---------------managing the relationship with the seller.
Select correct option:
Source Selection
None of the given
Contract Closeout
Contract Administration
Contract Administration—managing the relationship with the seller.
Question # 5 of 10
Decisions also have a --------------------- element to them—the “right”
decision may not be the “best” decision if it is made too early or too late.
Select correct option:
Cost
Quality
Time
None of the given
Decisions also have a time element to them—the “right” decision may not be the
“best” decision if it is made too early or too late.
Question # 6 of 10
-----------is the ability to encourage by "push or pull" technical people to
produce to their best ability.
Select correct option:
Evaluating
Motivation
None of the given
Monitoring
Motivation: The ability to encourage (by "push or pull") technical people to produce
to their best ability.
Question # 7 of 10
Unproductive work environment is a
Select correct option:
Technology-related problems
Process-related problems
People-related problems
Product-related problems
Unproductive work environment: The work environment is a major factor that
affects the productivity of the development team. For example, a noisy or cramped
workspace decreases the motivation levels of the employees. Similarly, unfriendly
organizational policies also lower the motivation of the team members. As the project
manager, you need to ensure that the team is protected from harmful external make
the workspace friendly to work in.
Question # 8 of 10
Most software project manager’s practice a lot of management techniques
that are of doubtful authenticity are called
Select correct option:
Project management tools
Project management myths
Project management thumb rules
Project management fundamentals
Project Management Myths
In most cases, you learn the skills required to manage a software project while on the
job. As a result, most software project managers practice a lot of management
techniques that are of doubtful authenticity. Many software project managers learn
about the so-called management skills and concepts that are actually myths.
Question # 9 of 10
Strong leadership motivation may sound an obvious trait for a
---------------------.
Select correct option:
Leader
Manager
Specialist
None of the given
Strong leadership motivation may sound an obvious trait for a leader. After all,
only those who want the weighty responsibilities and grueling pressures of leadership
are likely to strive for it.
Question # 10 of
We can classify the problems that affect software projects into _________
categories
Select correct option:
3
4
5
6
You can classify the problems that affect software projects into the following four
categories:
• People-related problems
• Process-related problems
• Product-related problems
• Technology-related problems
Question # 1 of 10
Insufficient identification is a
Select correct option:
Technology-related problems
Process-related problems
People-related problems
Product-related problems
Question # 2 of 10
Technology-related problems include _______
Select correct option:
Overestimated savings from reusable components and new tools and
methods
Switching tools in mid way
Integrating different software products in cross-platform implementation
All of given
Question # 3 of 10
What is one of the problems with project management software?
Select correct option:
The project manager manages the software instead of the project
Project duration calculations are sometimes approximate
You can not override the project management software decisions regarding
schedules
It’s expensive and difficult to use
Question # 4 of 10
The check-in and checkout facilities provide___________
Select correct option:
Best control
Component control
SCI control
Synchronization control
Question # 5 of 10
McCall (MCC77) and his colleagues proposed some software quality factors
based on most important aspects of a software product:
Select correct option:
Product operation
Product revision and
Product transition
All of the given
Synchronization control helps to ensure that parallel changes performed by
two different people do ___________.
Select correct option:
Not overwrite one another
Overwrite one another
May overwrite one another
None of given
The code generation step performs the task
Select correct option:
Translated specification into a machine-readable form
Translated design into a machine-readable form
Translated requirements into a machine-readable form
Translated user data into a machine-readable form
Question # 8 of 10
Before requirements can be analyzed, modeled, or specified they must be
gathered through a/an _________
Select correct option:
Elicitation process
Interviewing
Meeting
None of given
Question # 9 of 10
The quality of software is said to be high if it meets the
Select correct option:
Standards, defined for the product
Procedures, defined for the product
Standards and procedures, defined for the product
Design defined for product
Question # 10 of 10
A review of the Software Requirements Specification is conducted by ________
Select correct option:
Software developer
Customer
Both the software developer and the customer
Top level management
Question # 1 of 10
Question # 2 of 10
Question # 4 of 10
You can use the Item Traceability Matrix to identify _______ at the end of each phase
• SCIs
• SCM
• Design
• Construction
You can use the Item Traceability Matrix to identify SCIs at the end of each phase
Question # 5 of 10
Defined scope is a
Select correct option:
• Technology-related problems
• Product-related problems
• Process-related problems
• People-related problems
Question # 6 of 10 ( Start time: 09:33:13 AM ) Total Marks: 1
• Discovery
• Refinement
• Design
• Specification
Software requirements engineering is a process of discovery, refinement,
modeling and specification.
Question # 7 of 10
The model serves as the basis for the creation of ________ for the Software.
• Design
• Maintenance
• Testing
• Specifications
The model serves as a foundation for software design and as the basis for the creation
of specifications for the Software.
Question # 8 of 10
Most software project manager’s practice a lot of management techniques that are of
doubtful authenticity are called
Question # 9 of 10
• Goals
• Objective
• Design
• Goals and objectives of the software
Question # 1
Using PERT and CPM, -----------------------, helps you complete a
project on time. By using these techniques, you can determine the
latest time by when an activity should start to be completed on time
Individually
Combine
Individually and combine
None of the above
Using PERT and CPM, individually or in combination, helps you
complete a project on time. By using these techniques, you can
determine the latest time by when an activity should start to be
completed on time. (P# 296)
Question # 2
Each …………. can be subdivided into sub tasks.
Program
Task
Project
None of the above
Each task can be subdivided into sub tasks. Fro example, in a
general software project, a task is to perform project analysis. You
may also consider studying the organizational objectives and
preparing a project proposal to present to the client. (P# 275)
Question # 3
Predecessor activities need to ------------ before the next can begin.
After a predecessor activity is completed, the successor activity
becomes the predecessor for another activity
Both start and end
End
Start
None
Predecessor activities need to end before the next can begin. After a
predecessor activity is completed, the successor activity becomes
the predecessor for another activity (P# 297)
Question # 4
Question # 5
Method
Tools
Question # 6
► Leadership, Management
► Leader, Leadership
► Management, Leadership
► Manager, Management
1. All of the following are types of project closures or endings except:
1. Addition
2. Integration
3. Verification
4. Extinction
4 Formal types of project ending:
- Addition
- Starvation
- Integration
- Extinction
Q 2. The primary focus of _______________ is to ensure that the final software
product offers all the functionality and performance that the customer wanted
1. Training test
2. User acceptance test
3. Implementation test
4. Support test
The primary focus of user acceptance test is to ensure that the final software product
offers all the functionality and performance that the customer wanted. Therefore, the
customer tests the software product for issues such as aesthetics, user friendless, and
scalability.
Q 3. Technology-related problems include _______
1. Overestimated savings from reusable components and new tools and
methods
2. Switching tools in mid way
3. Integrating different software products in cross-platform
implementation
4. All of given
Technology-related problems
1. Overestimated savings from reusable components and new tools and methods:
2. Switching tools in mid way
3. Integrating different software products in cross-platform implementation
Q 4. Most software project manager’s practice a lot of management techniques that
are of doubtful authenticity are called
1. Project management tools
2. Project management myths
3. Project management thumb rules
4. Project management fundamentals
Project Management Myths
In most cases, you learn the skills required to manage a software project while on the
job. As a result, most software project managers practice a lot of management
techniques that are of doubtful authenticity. Many software project managers learn
about the so-called management skills and concepts that are actually myths.
Q 5. Ineffective project sponsorship by management is a
1. Technology-related problems
2. Process-related problems
3. People-related problems
4. Product-related problems
People-related problems are
• Low motivation
• Problem employees
• Unproductive work environment
• Inefficient project management style:
• Lack of stakeholder interest
Ineffective project sponsorship by management
Q 6. Unproductive work environment is a
1. Technology-related problems
2. Process-related problems
3. People-related problems
o Product-related problems
People-related problems are
• Low motivation
• Problem employees
• Unproductive work environment
• Inefficient project management style:
• Lack of stakeholder interest
Ineffective project sponsorship by management
Q 7. Before requirements can be analyzed, modeled, or specified they must be
gathered through a/an _________
1. Elicitation process
o Interviewing
o Meeting
o None of given
Requirements Elicitation for Software
Before requirements can be analyzed, modeled, or specified they must be gathered
through an elicitation process. A customer has a problem that may be amenable to a
computer-based solution. A developer responds to the customer's request for help.
Q 8 . ________of the system is an effort to better understand data and control flow,
functional processing, operational behavior, and information content
1. Specifications
2. Design
3. Model
4. Evaluation and Synthesis
During the evaluation and solution synthesis activity, the analyst creates models of the
system in an effort to better understand data and control flow, functional processing,
operational behavior, and information content.
Q 9 Both the software engineer and customer take an active role in software
requirements engineering-a set of activities that is often referred to as
1. Analysis
o Specification
o Design
o System acceptance
Both the software engineer and customer take an active role in software requirements
engineering-a set of activities that is often referred to as analysis.
Q 10. A review of the Software Requirements Specification is conducted by
________
1. Software developer
2. Customer
3. Both the software developer and the customer
o Top level management