WM User Requirements Gathering Questionnaire
WM User Requirements Gathering Questionnaire
4) Are you using external Warehouse control systems / subsystems? Do you plan
to connect this system with the R/3?
5) Which system should determine the storage bins for stock placement /
movement?
6) For removals and batch management, which system should determine the
batch?
8) How does your automated storage and retrieval system communicate to the
legacy system? Explain or provide a design drawing.
1) How do you handle stock differences that are noticed either at the time of
transfer order confirmation or continuous inventory based on bin-to-bin transfer?
4) Do you want to confirm the quantities involved in when stock is placed into or
taken out of storage manually or automatically?
1) How do you handle stock differences that are noticed either at the time of
transfer order confirmation or continuous inventory based on bin-to-bin transfer?
1) Do you want to confirm the quantities involved in when stock is placed into or
taken out of storage manually or automatically?
A: [ ] Yes
[ ] No
2) Are materials posted to quality inspection after goods receipt, or are they in
unrestricted-use stock?
A: [ ] Yes
[ ] No
A: [ ] Yes
[ ] No
5) Do you post your materials to return delivery stock?
A: [ ] Yes
[ ] No
6) Describe the individual steps from external goods receipt to final placement in
storage (putaway).
7) Do you have capacity limits for your storage bins, for example, weight,
volume...?
Explanation: Index for storage bin structure Index for storage bin structure
A: [ ] Yes
[ ] No
10) What kind of form (printout) do you need for stock putaways (GR slip,
transfer order form, sticker, etc.)?
13) Do you print the stock placement (putaway) document when the transfer
order is created?
A: [ ] Yes
[ ] No
14) Are transfer orders confirmed manually or automatically?
15) Please list the storage types that will have placement confirmation.
16) Does your legacy system automatically determine the storage bin in which to
place the materials? Is this done manually?
18) Will you maintain placement strategies (for example, storage types, storage
sections, storage bins) for your stock materials?
19) How many storage bins do you have per storage type?
20) How many stock putaways (items) do you have per day?
A: [ ] Yes
[ ] No
22) Do you receive articles that have batch or serial numbers from vendors?
A: [ ] Yes
[ ] No
24) Do you group together your pick list for multiple processing for a particular
shipping point, route, pick date, stock placement, stock removal?
25) Do you receive materials with batch or serial numbers from vendors?
2) Do you have storage locations, which are not relevant for Warehouse
Management?
3) Will you use storage locations for more than one plant? What are these storage
locations and the relevant plants.
4) Are you using external Warehouse control systems / subsystems? Do you plan
to connect this system with the SAP ?
5) Which system should determine the storage bins for stock placement /
removal?
6) For removals and batch management, which system should determine the
batch?
8) How does your automated storage and retrieval system communicate to the
legacy system? Explain or provide a design drawing.
10) Do you want to control whether goods in the goods receipt zone are
displayed in the availability check?
12) Are materials posted to quality inspection after goods receipt, or are they in
unrestricted-use stock?
13) Describe the individual steps from external goods receipt to final placement
in storage (put away).
14) Do you have capacity limits for your storage bins, for example, weight,
volume...?
15) Is a transfer requirement to be generated automatically at the time of a goods
receipt with reference?
16) For which goods movements are transfer orders to be created automatically?
17) What kind of form (printout) do you need for stock put away (GR slip,
transfer order form, sticker, etc.)?
19) Do you print the stock placement (put away) document when the transfer
order is created?
21) Please list the storage types that will have placement confirmation.
22) Who is notified of a stock put away? How is this person notified?
23) Will you maintain placement strategies (for example, storage types, storage
sections, storage bins) for your stock materials?
24) How many storage bins do you have per storage type?
25) How many stock put away (items) do you have per day?