CHECK LIST FOR INSTALLATION &
TESTING OF CHILLED WATER PIPE WORK
S.No. Description Yes No Remarks
Check that the materials are in accordance
1.
with the approved material submittal
Check the type, size and routing of Chilled water
2. pipes.
Check hangers and supports are provided at
3. specified intervals and as per approved drawing.
Check the joints & flanges are correctly made,
4. joined and sealed with approved method and as
per manufacturer's instructions as applicable.
Check whether the installation is coordinated with
5. other services
Check the Valves, gauges & strainers etc. are
6. installed as per approved drawing.
Check the sleeves are installed at wall crossing
7. and fire stopping provided where required.
8. Check all insulation joints are sealed properly.
Ensure adequate space is available for
9. maintenance and removal of valves, gauges,
strainers as applicable.
Check Flexible connections are installed at
10. equipment section as per approved drawing.
Check Identification labels, valve tags, flow
11. direction are provided as per specification.
Comments:
ARABIAN MEP
AMC AEB
ENGINEER QA/QC
Name
Signature
Date