0% found this document useful (0 votes)
59 views2 pages

ANNEX 5.12.1 EUW-MOE I02 Rev11 Secondary Procedures 20190315

This document lists 15 secondary procedures used by an Approved Maintenance Organization (AMO) and provides approval signatures from the Maintenance Manager and Quality Manager. The procedures cover topics such as managing parts, consumable materials, tools, maintenance data, personnel, and customer work requests. Approval is pending from the regulatory authority ENAC.

Uploaded by

Essam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views2 pages

ANNEX 5.12.1 EUW-MOE I02 Rev11 Secondary Procedures 20190315

This document lists 15 secondary procedures used by an Approved Maintenance Organization (AMO) and provides approval signatures from the Maintenance Manager and Quality Manager. The procedures cover topics such as managing parts, consumable materials, tools, maintenance data, personnel, and customer work requests. Approval is pending from the regulatory authority ENAC.

Uploaded by

Essam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MAINTENANCE ORGANIZATION EXPOSITION

APPENDICES AND SAMPLES

ANNEX 5.12.1 – SECONDARY PROCEDURES


On the following table is the list of Secondary Procedures in use by the AMO.

MOE-SP-01 Preparation of Secondary Procedures


MOE-SP-02 Serviceable / Unserviceable Parts Tag
MOE-SP-03 Task training for Certifying Staff
MOE-SP-04 Acceptance of aeronautical material at store
MOE-SP-05 Management of aeronautical material out of the store
MOE-SP-06 Shelf life control over consumable material
MOE-SP-07 Management of discarded aeronautical material and components
MOE-SP-08 Unapproved or suspected unapproved aeronautical material
MOE-SP-09 Acceptance of tools and equipment after calibration
MOE-SP-10 Acceptance of tools and equipment after repair
MOE-SP-11 Making of tools
MOE-SP-12 Management of maintenance data
MOE-SP-13 Personnel roster planning, management and check
MOE-SP-14 De-icing/Anti-icing local procedures
MOE-SP-15 Customer WR and verification

Approvved Maintenance Organization Approval ENAC Approval

MMgr QMgr N/A


Marco Mistai G. Grassini

Part 5 Sect. 5.12 Page 1 Rev. 11 15/03/2019 Issue: 2


EUW-MOE ANNEX 5.12.1 – SECONDARY PROCEDURES
MAINTENANCE ORGANIZATION EXPOSITION
APPENDICES AND SAMPLES

THIS PAGE INTENTIONALLY LEFT BLANK

Approvved Maintenance Organization Approval ENAC Approval

MMgr QMgr N/A


Marco Mistai G. Grassini

Part 5 Sect. 5.12 Page 2 Rev. 11 15/03/2019 Issue: 2


EUW-MOE ANNEX 5.12.1 – SECONDARY PROCEDURES

You might also like