0% found this document useful (0 votes)
257 views1 page

Inspection Notice (LV Installation)

The inspection notice summarizes the following: 1. An inspection of the electrical installation at a villa project found several issues that need to be addressed before power can be supplied. 2. The contractor was asked to submit documentation and make corrections to fuse boxes, meter cabinets, circuit breakers and wiring. 3. Once the installation has been completed and rectified, the contractor should apply for a reinspection and final inspection before power can be released to the project.

Uploaded by

Ahmed Mamdoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
257 views1 page

Inspection Notice (LV Installation)

The inspection notice summarizes the following: 1. An inspection of the electrical installation at a villa project found several issues that need to be addressed before power can be supplied. 2. The contractor was asked to submit documentation and make corrections to fuse boxes, meter cabinets, circuit breakers and wiring. 3. Once the installation has been completed and rectified, the contractor should apply for a reinspection and final inspection before power can be released to the project.

Uploaded by

Ahmed Mamdoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Application No : E-030866

Date Of Inspection : 06.02.2020

Inspection Notice
(LV Installation)

Project Type : G+1 VILLA


Plot No, Area : 0729 , 352-JUMEIRA THIRD
Owner : HESHAM MIR HASHEM KHOORY

Contractor Details :
Name : KHOORY HILL GENERAL MAINTENANCE
PO Box, City : 11944 , 128-AL KHABAISI
Email : [email protected]
Fax : 042665460 Phone : 042691755

Following comments were noted by our Engineer during inspection of the Electrical Installation at the
above Project.
1 . Submit the Terms & Conditions Document for Supply Release of Electricity & Water duly
acknowledged by Owner / Landlord.
2 . Submit a Shut Down Request letter from the client for the power interruption .
3 . Provide sealable fuse box cover and remove the neutral disconnecting link in the meter cabinet.
4 . Provide extended safety barrier/blanking shields to protect the live parts in the in Meter cabinet
.
5 . Provide ELCBs , MCBs,UV Relay +Timer and wires as per DEWA approved load schedule or
submit ASBUILT load schedule incorporating the changes and additional circuits .
6 . Install 63 A MCB for AC in DB AC .
7 . For A/Cs incorporating the VRV / VRF (Variable Refrigerant Flow) Technology, ensure separate
circuits incorporating UV relay timers are provided for each individual A/C VRV/VRF units.
8 . Install MCCBs and cables in MDB as per the revised approval.
9 . Submit the load details of swimming pool ,Oven in the kitchen.
10 . Note:Arrange key for Service block old during reinspection.

You are requested to complete the installation/rectification and submit application for re-inspection
/ final inspection of your works.

Further, please coordinate with our Inspection Engineer to release electric supply to the project.

Contact Name : Mr. MANU GOPI LATHIKA


Telephone No : 043229288

Yours faithfully,

For DUBAI ELECTRICITY AND WATER AUTHORITY