100% found this document useful (2 votes)
738 views4 pages

Proposed Intervention Projects

This document outlines proposed intervention projects for the 2020-2021 school year at Hulo National High School in the Philippines. It includes projects to reduce absenteeism, improve reading skills, increase numeracy, provide teacher training, develop curriculum materials, and obtain sports/TLE/lab equipment. Strategies include incentives, monitoring, remediation, workshops, preparing materials, and identifying needed supplies. The projects aim to benefit students, teachers, and the school through outcomes like decreased dropout rates, improved literacy and math skills, well-trained educators, and resources for hands-on learning. Personnel, timelines, funding sources, and expected outputs are specified for each initiative.

Uploaded by

Hellen Dea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
738 views4 pages

Proposed Intervention Projects

This document outlines proposed intervention projects for the 2020-2021 school year at Hulo National High School in the Philippines. It includes projects to reduce absenteeism, improve reading skills, increase numeracy, provide teacher training, develop curriculum materials, and obtain sports/TLE/lab equipment. Strategies include incentives, monitoring, remediation, workshops, preparing materials, and identifying needed supplies. The projects aim to benefit students, teachers, and the school through outcomes like decreased dropout rates, improved literacy and math skills, well-trained educators, and resources for hands-on learning. Personnel, timelines, funding sources, and expected outputs are specified for each initiative.

Uploaded by

Hellen Dea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Republic of the Philippines

DEPARTMENT OF EDUCATION
Region IV-A CALABARZON
Division of Rizal
HULO NATIONAL HIGH SCHOOL

Proposed Intervention Projects


SY: 2020- 2021

Program/ Objectives Strategies/ Activities Personnel Time Frame Source of Expected


Project Title Involve Fund Output
Accomplishment
Student Development
Project SERA Reduce the  Giving of rewards and School Head All October 2020- SEF/ SOF/ Observe a 95% zero
(Strategies absenteeism rate from incentives to reduce Teachers June 2021 MOOE drop out.
Employed to 22. 47 % percent to absenteeism (includes Parents and
Reduce 10 percent for the awarding of certificates for the Students
Absenteeism) best in attendance every
school year 2019-
grading period) and updating
2020.
records of students.
 3.Close monitoring of
attendance through regular
communication between the
Parent and the
Teacher/Adviser
( involves home visitation and
Parent-Teacher Dialogue/
Meeting)
BREED (Basic To improve the  Identify learners from Grade 7 School Head All October 2020- SEF/ SOF/ 100 % frustrated to to
Reading current learners who who belong to the frustration Teachers June 2021 MOOE become promoted to
Engagement and belong to frustration level in the Phil IRI. Parents and instructional and 85%
Enhancement Deal) level by 50% or 25%  Conducting after class Students instructional readers
remediation and interactive to become
to become
activities independent readers.
independent level.
 Assign teachers to handle
Intensive Reading
Remediation of selected
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region IV-A CALABARZON
Division of Rizal
HULO NATIONAL HIGH SCHOOL
learners
Project MDAS To attain at least 50%  Identifying and profiling of School Head All October 2020- SEF/ SOF/ Decreased umber of
(Mastering and of identified non- Grade 7 non- numerates Teachers June 2021 MOOE non- numerates at
Developing numerates grade 7  Conducting and Monitoring Parents and least 75%.
Arithmetic Skills) students to become remediation programs after Students
numerates from class
beginning to
Developing/Advance
d Proficient/Proficient
per operation by the
end of the school year
Staff Development
Pre Implementation
Project: TraiT Improve teachers’  Determine the training needs School Head August 2020- SEF/ SOF/
(Training for competencies and of teachers based from the Teachers September 2020 MOOE
Teachers) inspire the SHS result of IPPD
students to be career  Organize staff development
motivated and team
encourage them to  Draft training design and
take up their college matrix Teachers should
degrees since Hulo Implementation attend seminars/
NHS offers General  Prepare memo for the planned School Head October 2020- SEF/ SOF/ INSET and 100% of
INSET. Teachers June 2021 MOOE
Academic Strand. the teacher observe
 Provide materials for the
training of teachers and engage in feed
 Conduct INSET with focus on backing.
the following:
- Slide deck
- Excel
- Strategic Intervention
Material
- Others
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region IV-A CALABARZON
Division of Rizal
HULO NATIONAL HIGH SCHOOL
Post Implementation
 Close monitoring of School Head May 2021 SEF/ SOF/
attendance of teachers Teachers MOOE
 Classroom
observation applying
the knowledge
learned.
Curriculum Development
Prepare appropriate  Conduct workshop/ INSET on Teachers prepare
teaching and the preparation of low-cost appropriate
evaluation materials. instructional materials/ School Head October 2020- SEF/ MOOE teaching/
learning plan. Teachers June 2021 instructional
 Construct test item which are Property materials.
based on the table of Custodian
specification.
Parents and
 Prepare item bank on the
LGUs
different learning area based
on the not mastered skills
identified.
Provide sports  Identify the priority equipment School Head October 2020- SEF/ MOOE Purchase and
equipment, TLE and request for the provision Teachers June 2021 provide needed
tools, and laboratory of the identified needed Property equipment/ tools use
equipment’s as equipment. Custodian for class instruction
instructional  Organize rules on the Parents and
materials. barrowing of tools. LGUs
 Utilization of tools in
instruction/ teaching learning
process.
 Monitor and evaluate the use
of tools as instructional
materials.
Physical Facilities Development
Improve school site  Inform the stakeholders School Head October 2020- SEF/ SOF/ At least 75% of the
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region IV-A CALABARZON
Division of Rizal
HULO NATIONAL HIGH SCHOOL
through beautification regarding the problems Teachers June 2021 MOOE objectives attain and
of the surroundings, concerning physical facilities Internal and materialize through
put electrical wiring such as electrical wiring, External the help of the
in some buildings school fence etc. Stakeholders stakeholders.
which need it and  Ask the help of the
stakeholders to answer the
maintain the
problems.
cleanliness of the
 Evaluate and monitor the
surroundings maintenance of the physical
facilities.

Prepared by:

CARMELITA T. BELLIDO
Head Teacher

You might also like