33kV CT Test Report Page 1 of 2
Customer Bangladesh Power Development Board (BPDB)
Project DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
33/11KV NEW 2X10/13.33MVA AT SANTAHAR AT BOGRA AIS SUB
STATION, RAJSHAHI ZONE. (PACKAGE NO-AIS-3)
Contract Contract No-10349,DTD-28.12 2017
Substation Shantahar 33/11kV Substation
Location/Feeder 33kV Grid Incoming Feeder (L1)
Equipment Data
Manufacturer Mehru Electrical & Mechanical
Serials
Engineers (P) Ltd., India
Type Live Tank R OC-8879/11/1/19
Standard IEC 61869 Y OC-8879/5/2/19
Rated Current 600-300/5-5A B OC-8879/11/5/19
Insulation Level 70/170kV
Short Time Current 25kA 3s
Core 1 Core 2
Ratio 600-300/5A 600-300/5A
Burden VA 30 30
Output Class 0.2 5P20
Primary injection Test
1S1 – 1S3 = 600/5A
2S1 – 2S3 = 600/5A
Primary Current Secondary Actual
Core CT Ratio Error
Phase Current Current Current
R 450 A 3.61 3.75 0.14
1S1 – 1S3 Y 450 A 3.62 3.75 0.13
B 450 A 3.59 3.75 0.16
120
R 450 A 3.57 3.75 0.18
2S1 – 2S3 Y 450 A 3.60 3.75 0.15
B 450 A 3.58 3.75 0.17
Core Allocation Test
Core Allocation Setting core Star point
Core
Phase Status
R OK 1S1-1S3 1S1
1S1 – 1S3 Y OK For
B OK METERING
R OK 2S1-2S3 2S1
2S1 – 2S3 Y OK For CT winding resistance
B OK Protection
For SEA/AKES For SWPL For BPDB/NESCO Date:
30/12/2020
33kV CT Test Report Page 2 of 2
Customer Bangladesh Power Development Board (BPDB)
Project DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
33/11KV NEW 2X10/13.33MVA AT SANTAHAR AT BOGRA AIS SUB
STATION, RAJSHAHI ZONE. (PACKAGE NO-AIS-3)
Contract Contract No-10349,DTD-28.12 2017
Substation Shantahar 33/11kV Substation
Location/Feeder 33kV Grid Incoming Feeder (L1)
test
Core Ratio Phase Resistance(Ω)
R .24
1S1 – 1S2 300 Y .25
B .26
R .5
1S1 – 1S3 600 Y .5
B .5
R .26
2S1 – 2S2 300 Y .25
B .24
R .70
2S1 – 2S3 600 Y .70
B .70
For SEA/AKES For SWPL For BPDB/NESCO Date:
30/12/2020