This document is an index for the compilation project dossiers for the construction of 7 service hubs at Manateq Logistic Parks. It lists 27 sections for general/multidiscipline documents, architectural, civil, structural, and electrical/ELV documents. Each section includes subsections for materials approvals, submittals, data sheets, manuals, drawings, specifications, calculations, procedures, reports, as-built drawings, certifications, approvals, and close-out data. The index provides a comprehensive listing of all documentation required to be submitted for the project handover.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
971 views11 pages
Project Dossier: Main Index
This document is an index for the compilation project dossiers for the construction of 7 service hubs at Manateq Logistic Parks. It lists 27 sections for general/multidiscipline documents, architectural, civil, structural, and electrical/ELV documents. Each section includes subsections for materials approvals, submittals, data sheets, manuals, drawings, specifications, calculations, procedures, reports, as-built drawings, certifications, approvals, and close-out data. The index provides a comprehensive listing of all documentation required to be submitted for the project handover.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11
Compilation Project Dossiers
Contract Number: MNTQ-CW03-CON-18
Project Name: Construction of 7 Service Hubs at Manateq Logistic Parks
Project Dossier
Main Index Compilation Project Dossiers
Manateq Economics Zone Company
Construction of 7 Service Hubs, Handover Dossier- Main Index The Dossier Contains ( ) Volumes
Project : Construction of 7 Service Hubs at Manateq Logistic Parks Project No:
Contract No. : MNTQ-CW03-CON-18
Contractor : Al-Muntasser Contracting & Trading
Sec & S/S/Sec Description Vol. No. CD Ref.
S/Sec 1 Dossier User Guide 1.1 Dossier Content 1.1.1 Main Index 1.1.2 Section Index 1.1.3 Volume Index 1.2 Major Equipment Data- Traceability Guide 1.3 Traceability Guide 2 01. General & Multidiscipline Color Code: R0, G72, B58 2.1 Index 2.1.1 Materials Approvals 2.1.2 Copies of all approved Materials Submittals 2.1.3 Pre-Qualification Data 2.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 2.1.5 Spare Parts List 2.1.6 Copies of any relevant Spares Lists supplied for the Project. 2.1.7 Data Sheets 2.1.8 Copies of any relevant Data Sheets supplied for the Project. 2.1.9 Purchase Orders 2.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 2.1.11 Installation/ Operation/ Maintenance Manuals 2.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 2.1.13 Drawings 2.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 2.1.15 Specifications 2.1.16 Copies of any Specifications issued on the Project. 2.1.17 Calculations 2.1.18 Copies of all Approved Calculations issued on the Project. 2.1.19 Procedures/ Method Statements 2.1.20 Copies of all approved Procedures and Method Statement produced for the project. 2.1.21 Reports/ Philosophies 2.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. Compilation Project Dossiers
2.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced
from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 2.1.24 Certification 2.1.25 All relevant Certification issued for the Project. 2.1.26 Authority approvals/permits 2.1.27 Close-out Data 3 02. Architectural Color Code: R121, G73, B106 3.1 Index 3.1.1 Materials Approvals 3.1.2 Copies of all approved Materials Submittals 3.1.3 Pre-Qualification Data 3.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 3.1.5 Spare Parts List 3.1.6 Copies of any relevant Spares Lists supplied for the Project. 3.1.7 Data Sheets 3.1.8 Copies of any relevant Data Sheets supplied for the Project. 3.1.9 Purchase Orders 3.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 3.1.11 Installation/ Operation/ Maintenance Manuals 3.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 3.1.13 Drawings 3.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 3.1.15 Specifications 3.1.16 Copies of any Specifications issued on the Project. 3.1.17 Calculations 3.1.18 Copies of all Approved Calculations issued on the Project. 3.1.19 Procedures/ Method Statements 3.1.20 Copies of all approved Procedures and Method Statement produced for the project. 3.1.21 Reports/ Philosophies 3.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 3.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 3.1.24 Certification 3.1.25 All relevant Certification issued for the Project. 3.1.26 Authority approvals/permits 3.1.27 Close-out Data 4 03. Civil Color Code: R0, G115, B174 4.1 Index 4.1.1 Materials Approvals 4.1.2 Copies of all approved Materials Submittals 4.1.3 Pre-Qualification Data 4.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 4.1.5 Spare Parts List 4.1.6 Copies of any relevant Spares Lists supplied for the Project. 4.1.7 Data Sheets 4.1.8 Copies of any relevant Data Sheets supplied for the Project. Compilation Project Dossiers
4.1.9 Purchase Orders
4.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 4.1.11 Installation/ Operation/ Maintenance Manuals 4.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 4.1.13 Drawings 4.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 4.1.15 Specifications 4.1.16 Copies of any Specifications issued on the Project. 4.1.17 Calculations 4.1.18 Copies of all Approved Calculations issued on the Project. 4.1.19 Procedures/ Method Statements 4.1.20 Copies of all approved Procedures and Method Statement produced for the project. 4.1.21 Reports/ Philosophies 4.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 4.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 4.1.24 Certification 4.1.25 All relevant Certification issued for the Project. 4.1.26 Authority approvals/permits 4.1.27 Close-out Data 5 04. Structural Color Code: R0, G58, B99 5.1 Index 5.1.1 Materials Approvals 5.1.2 Copies of all approved Materials Submittals 5.1.3 Pre-Qualification Data 5.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 5.1.5 Spare Parts List 5.1.6 Copies of any relevant Spares Lists supplied for the Project. 5.1.7 Data Sheets 5.1.8 Copies of any relevant Data Sheets supplied for the Project. 5.1.9 Purchase Orders 5.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 5.1.11 Installation/ Operation/ Maintenance Manuals 5.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 5.1.13 Drawings 5.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 5.1.15 Specifications 5.1.16 Copies of any Specifications issued on the Project. 5.1.17 Calculations 5.1.18 Copies of all Approved Calculations issued on the Project. 5.1.19 Procedures/ Method Statements 5.1.20 Copies of all approved Procedures and Method Statement produced for the project. 5.1.21 Reports/ Philosophies 5.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. Compilation Project Dossiers
5.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced
from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 5.1.24 Certification 5.1.25 All relevant Certification issued for the Project. 5.1.26 Authority approvals/permits 5.1.27 Close-out Data 6 05. Electrical (ELE) & Extra Low Voltage (ELV) Color Code: R255, G221, B0 6.1 Index 6.1.1 Materials Approvals 6.1.2 Copies of all approved Materials Submittals 6.1.3 Pre-Qualification Data 6.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 6.1.5 Spare Parts List 6.1.6 Copies of any relevant Spares Lists supplied for the Project. 6.1.7 Data Sheets 6.1.8 Copies of any relevant Data Sheets supplied for the Project. 6.1.9 Purchase Orders 6.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 6.1.11 Installation/ Operation/ Maintenance Manuals 6.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 6.1.13 Drawings 6.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 6.1.15 Specifications 6.1.16 Copies of any Specifications issued on the Project. 6.1.17 Calculations 6.1.18 Copies of all Approved Calculations issued on the Project. 6.1.19 Procedures/ Method Statements 6.1.20 Copies of all approved Procedures and Method Statement produced for the project. 6.1.21 Reports/ Philosophies 6.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 6.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 6.1.24 Certification 6.1.25 All relevant Certification issued for the Project. 6.1.26 Authority approvals/permits 6.1.27 Close-out Data 7 06. Heating Ventilation & Air Conditioning (HVC) Color Code: R0, G140, B153 7.1 Index 7.1.1 Materials Approvals 7.1.2 Copies of all approved Materials Submittals 7.1.3 Pre-Qualification Data 7.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 7.1.5 Spare Parts List 7.1.6 Copies of any relevant Spares Lists supplied for the Project. 7.1.7 Data Sheets 7.1.8 Copies of any relevant Data Sheets supplied for the Project. Compilation Project Dossiers
7.1.9 Purchase Orders
7.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 7.1.11 Installation/ Operation/ Maintenance Manuals 7.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 7.1.13 Drawings 7.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 7.1.15 Specifications 7.1.16 Copies of any Specifications issued on the Project. 7.1.17 Calculations 7.1.18 Copies of all Approved Calculations issued on the Project. 7.1.19 Procedures/ Method Statements 7.1.20 Copies of all approved Procedures and Method Statement produced for the project. 7.1.21 Reports/ Philosophies 7.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 7.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 7.1.24 Certification 7.1.25 All relevant Certification issued for the Project. 7.1.26 Authority approvals/permits 7.1.27 Close-out Data 8 07. Mechanical- Potable Water Network (UPW) Color Code: R108, G173, B223 8.1 Index 8.1.1 Materials Approvals 8.1.2 Copies of all approved Materials Submittals 8.1.3 Pre-Qualification Data 8.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 8.1.5 Spare Parts List 8.1.6 Copies of any relevant Spares Lists supplied for the Project. 8.1.7 Data Sheets 8.1.8 Copies of any relevant Data Sheets supplied for the Project. 8.1.9 Purchase Orders 8.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 8.1.11 Installation/ Operation/ Maintenance Manuals 8.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 8.1.13 Drawings 8.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 8.1.15 Specifications 8.1.16 Copies of any Specifications issued on the Project. 8.1.17 Calculations 8.1.18 Copies of all Approved Calculations issued on the Project. 8.1.19 Procedures/ Method Statements 8.1.20 Copies of all approved Procedures and Method Statement produced for the project. 8.1.21 Reports/ Philosophies 8.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. Compilation Project Dossiers
8.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced
from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 8.1.24 Certification 8.1.25 All relevant Certification issued for the Project. 8.1.26 Authority approvals/permits 8.1.27 Close-out Data 9 08. Mechanical- Foul Water Network (UFW) Color Code: R1200, G177, B139 9.1 Index 9.1.1 Materials Approvals 9.1.2 Copies of all approved Materials Submittals 9.1.3 Pre-Qualification Data 9.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 9.1.5 Spare Parts List 9.1.6 Copies of any relevant Spares Lists supplied for the Project. 9.1.7 Data Sheets 9.1.8 Copies of any relevant Data Sheets supplied for the Project. 9.1.9 Purchase Orders 9.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 9.1.11 Installation/ Operation/ Maintenance Manuals 9.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 9.1.13 Drawings 9.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 9.1.15 Specifications 9.1.16 Copies of any Specifications issued on the Project. 9.1.17 Calculations 9.1.18 Copies of all Approved Calculations issued on the Project. 9.1.19 Procedures/ Method Statements 9.1.20 Copies of all approved Procedures and Method Statement produced for the project. 9.1.21 Reports/ Philosophies 9.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 9.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 9.1.24 Certification 9.1.25 All relevant Certification issued for the Project. 9.1.26 Authority approvals/permits 9.1.27 Close-out Data 10 09. Utilities Fire Fighting Water (UFF) Color Code: R253, G187, B48 10.1 Index 10.1.1 Materials Approvals 10.1.2 Copies of all approved Materials Submittals 10.1.3 Pre-Qualification Data 10.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 10.1.5 Spare Parts List 10.1.6 Copies of any relevant Spares Lists supplied for the Project. 10.1.7 Data Sheets 10.1.8 Copies of any relevant Data Sheets supplied for the Project. Compilation Project Dossiers
10.1.9 Purchase Orders
10.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 10.1.11 Installation/ Operation/ Maintenance Manuals 10.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 10.1.13 Drawings 10.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 10.1.15 Specifications 10.1.16 Copies of any Specifications issued on the Project. 10.1.17 Calculations 10.1.18 Copies of all Approved Calculations issued on the Project. 10.1.19 Procedures/ Method Statements 10.1.20 Copies of all approved Procedures and Method Statement produced for the project. 10.1.21 Reports/ Philosophies 10.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 10.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 10.1.24 Certification 10.1.25 All relevant Certification issued for the Project. 10.1.26 Authority approvals/permits 10.1.27 Close-out Data 11 10. Telecommunication (TEL) Color Code: R73, G169, B66 11.1 Index 11.1.1 Materials Approvals 11.1.2 Copies of all approved Materials Submittals 11.1.3 Pre-Qualification Data 11.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 11.1.5 Spare Parts List 11.1.6 Copies of any relevant Spares Lists supplied for the Project. 11.1.7 Data Sheets 11.1.8 Copies of any relevant Data Sheets supplied for the Project. 11.1.9 Purchase Orders 11.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 11.1.11 Installation/ Operation/ Maintenance Manuals 11.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 11.1.13 Drawings 11.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 11.1.15 Specifications 11.1.16 Copies of any Specifications issued on the Project. 11.1.17 Calculations 11.1.18 Copies of all Approved Calculations issued on the Project. 11.1.19 Procedures/ Method Statements 11.1.20 Copies of all approved Procedures and Method Statement produced for the project. 11.1.21 Reports/ Philosophies 11.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. Compilation Project Dossiers
14.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced
from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 14.1.24 Certification 14.1.25 All relevant Certification issued for the Project. 14.1.26 Authority approvals/permits 14.1.27 Close-out Data 12 11. Finishes Color Code: R104, G200, B198 12.1 Index 12.1.1 Materials Approvals 12.1.2 Copies of all approved Materials Submittals 12.1.3 Pre-Qualification Data 12.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 12.1.5 Spare Parts List 12.1.6 Copies of any relevant Spares Lists supplied for the Project. 12.1.7 Data Sheets 12.1.8 Copies of any relevant Data Sheets supplied for the Project. 12.1.9 Purchase Orders 12.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 12.1.11 Installation/ Operation/ Maintenance Manuals 12.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 12.1.13 Drawings 12.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 12.1.15 Specifications 12.1.16 Copies of any Specifications issued on the Project. 12.1.17 Calculations 12.1.18 Copies of all Approved Calculations issued on the Project. 12.1.19 Procedures/ Method Statements 12.1.20 Copies of all approved Procedures and Method Statement produced for the project. 12.1.21 Reports/ Philosophies 12.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 12.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 12.1.24 Certification 12.1.25 All relevant Certification issued for the Project. 12.1.26 Authority approvals/permits 12.1.27 Close-out Data 13 12. Landscaping Color Code: R176, G188, B34 13.1 Index 13.1.1 Materials Approvals 13.1.2 Copies of all approved Materials Submittals 13.1.3 Pre-Qualification Data 13.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 13.1.5 Spare Parts List 13.1.6 Copies of any relevant Spares Lists supplied for the Project. 13.1.7 Data Sheets 13.1.8 Copies of any relevant Data Sheets supplied for the Project. Compilation Project Dossiers
13.1.9 Purchase Orders
13.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 13.1.11 Installation/ Operation/ Maintenance Manuals 13.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 13.1.13 Drawings 13.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 13.1.15 Specifications 13.1.16 Copies of any Specifications issued on the Project. 13.1.17 Calculations 13.1.18 Copies of all Approved Calculations issued on the Project. 13.1.19 Procedures/ Method Statements 13.1.20 Copies of all approved Procedures and Method Statement produced for the project. 13.1.21 Reports/ Philosophies 13.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 13.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 13.1.24 Certification 13.1.25 All relevant Certification issued for the Project. 13.1.26 Authority approvals/permits 13.1.27 Close-out Data 14 13. Furniture Color Code: R198, G6, B81 14.1 Index 14.1.1 Materials Approvals 14.1.2 Copies of all approved Materials Submittals 14.1.3 Pre-Qualification Data 14.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 14.1.5 Spare Parts List 14.1.6 Copies of any relevant Spares Lists supplied for the Project. 14.1.7 Data Sheets 14.1.8 Copies of any relevant Data Sheets supplied for the Project. 14.1.9 Purchase Orders 14.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 14.1.11 Installation/ Operation/ Maintenance Manuals 14.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 14.1.13 Drawings 14.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 14.1.15 Specifications 14.1.16 Copies of any Specifications issued on the Project. 14.1.17 Calculations 14.1.18 Copies of all Approved Calculations issued on the Project. 14.1.19 Procedures/ Method Statements 14.1.20 Copies of all approved Procedures and Method Statement produced for the project. 14.1.21 Reports/ Philosophies 14.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. Compilation Project Dossiers
14.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced
from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 14.1.24 Certification 14.1.25 All relevant Certification issued for the Project. 14.1.26 Authority approvals/permits 14.1.27 Close-out Data 15 14. Other/ Miscellaneous Color Code: R0, G135, B82 15.1 Index 15.1.1 Materials Approvals 15.1.2 Copies of all approved Materials Submittals 15.1.3 Pre-Qualification Data 15.1.4 Copies of all approved Pre-Qualification Submittals including approved PVL Deviation Forms. 15.1.5 Spare Parts List 15.1.6 Copies of any relevant Spares Lists supplied for the Project. 15.1.7 Data Sheets 15.1.8 Copies of any relevant Data Sheets supplied for the Project. 15.1.9 Purchase Orders 15.1.10 Copies of all purchase orders placed for Major Equipment(un-priced) 15.1.11 Installation/ Operation/ Maintenance Manuals 15.1.12 Copies of relevant Manuals supplied for all Equipment on the Project 15.1.13 Drawings 15.1.14 Copies of all Shop Drawings and Sketches produced for the project at latest revision or Red-Lined Mark-Up. 15.1.15 Specifications 15.1.16 Copies of any Specifications issued on the Project. 15.1.17 Calculations 15.1.18 Copies of all Approved Calculations issued on the Project. 15.1.19 Procedures/ Method Statements 15.1.20 Copies of all approved Procedures and Method Statement produced for the project. 15.1.21 Reports/ Philosophies 15.1.22 Copies of all Reports/ Philosophies produced by the Contractor for the project. 15.1.23 As-Built Drawings- all original wet-signed As-Built Drawings produced from the Red-Lined Marked-up Shop Drawings (Sketches are not required to be made As-Built) 15.1.24 Certification 15.1.25 All relevant Certification issued for the Project. 15.1.26 Authority approvals/permits 15.1.27 Close-out Data