COAL HANDELING PLANT
03/27/2021 GYANENDRA SHARMA 1
ADVANTAGES OF COAL:
RAW COAL -ABUNDANTLY AVAILABLE
-CHEAP
-TRANSPORTABLE
PULVERISED COAL
-MAX. C %USE
-EFFICIENT USE OF LOW GRADE
COALS
-PROVIDES COAL/AIR FUEL CONTROL
-GIVES FLAME STABILITY
03/27/2021 GYANENDRA SHARMA 2
COAL ANALYSIS
Proximate Ultimate C . V . Test
By Bomb
analysis
MOISTURES analysisC % Calorimeter
V . M. % H%
Ash % N%
F.C.% =
O%
[100-(M+VM + A)]
M.M. % = Ash *1.1
Gross C.V. from proximate analysis :
= [154*{100-(1.1*A+M)}]-108 Moist.
Gross C.V. from Ultimate analysis :
= 145.44*C+[62028(H - O )] + 40.50 * S
03/27/2021 800 SHARMA
GYANENDRA 3
ULTIMATE ANALYSIS FROM PROXIMATE
V.M., Ash & Moist. From proximate analysis
Ash , Moist. Free V.M. % = V.M. *100 / 100-(A-M)
(1) H % = V (7.35 - 0.013) (A. , M. free)
V+10
= ,, * 100-(A+M)
100
= “ As Recd `` H %
(2) N % = 2.10 - 0.012V (A , M free)
= ,, * 100-(A+M)
100
=As recd N %
(3) C % = F.C. + 0.9 (V - 14) (A , M. Free)
( A , M. free)
,, * 100 - (A+M)
100
= As Recd C %
03/27/2021 GYANENDRA SHARMA 4
(4) O % = [100 - (H+N+C]
COAL TYPE
C O A L
P E A T A N T H R A C IT E B IT U M IN IO U S L IG N IT E
C o a l n a m e a s p e r s iz e
N a m e N o m in a l s iz e
R .O .M . 2 3 to 0 c m .
(R u n o f m in e )
L a rg e c o a l 1 5 to 5 c m
(S te a m C o a l)
S m a ll C o a l 5 to 0 c m
( S la k C o a l)
Peat Lignite Bitum. Anth
Carbon % 50-55 65-75 76-90 >93
Hydrogen % # 6.2 # 5.5 5.5-6.0 <2.8
GYANENDRA SHARMA 5
Oxygen03/27/2021
% # 35 #20 8-18 <3
COAL GRADES
U.H.V. = 8900-138 (ASH % + MOIST . % )
Grade A :- U.H.V. Exceeding 6200 K.Cal/Kg.
Grade B :- U.H.V. 5601 - 6200
Grade C :- U.H.V. 4941 - 5600
Grade D :- U.H.V. 4201 - 4940
Grade E :- U.H.V. 3361 - 4200
Grade F :- U,H.V. 2401 - 3360
Grade G :- U.H.V. 1600 - 2400
03/27/2021 GYANENDRA SHARMA 6
Source of coal
C. I. L. (Coal India Limited)
Different Coal Fields
(A subsidiaries of Goal India Ltd.)
S.E.C.L. W.C.L. N.C.L. B.C.C L. C.C.L.
UGM OCM
03/27/2021 GYANENDRA SHARMA 7
Name of Area Name of Colliery
BAIKUNTHPUR --Churcha
-- Katora
-- Katkona
-- Jhilimili
CIRIMIRI --Duman Hill
-- Korea
-- Kurasia
-- Chirimiri
-- N.C.P.H.
HASDEO West JKD.
--Rajnagar R.O.
-- Bijuri
-- New Rajnagar O.C.M.
J & K (JAMUNA -- Govinda
& KOTMA) -- Jamuna
-- Kotma
03/27/2021 GYANENDRA SHARMA 8
The choice of fuel for any industries or organization for industrial process is
depended upon a number of factors. The most important are being availability,
suitability, safety and price.
Looking to the availability , coal is more suitable for power plant . But when we
use coal as fuel , there are two type of problems .
1. Before combustion problems &
2. After combustion problems.
1. In before combustion problem :
(a) Storage problem(Required more space, more land (room)
(b) Unloading problem (When over size coal, big size stone pieces,lumpy coal
and sticky coal from O.C.Mine is coming that times these over size materials not
pass through the tippler grill & they required break & it takes more times.
(c) Pollution problem : (During the unloading of coal wagons & during high
speed wind , the fine coal particles & dust flying in the atmosphere&mixed with
air.When we inhaled this polluted air, respiratory problem will occur.
(2) After combustion problems :
When coal burnt in boiler S.P.M. , SO2 ,NOX mix with air and air becomes
polluted
03/27/2021 GYANENDRA SHARMA 9
COAL - VARIATIONS
5 - 30 %
MOISTURE
ASH 1 - 60 %
VOLATILE MATTER 2 - 70 %
ABRASION INDEX 5 - 100 %
Mg/Kg
HGI 30 - 85 %
03/27/2021 GYANENDRA SHARMA 10
EFFECT OF COAL ON MILL CAPACITY-
MOISTURE % HIGH CAPACITY
FINENESS HIGH CAPACITY
HIGH CAPACITY
HGI
03/27/2021 GYANENDRA SHARMA 11
INDIAN HIGH ASH
COAL HIGH SILICA
HIGH ALPHA QUARTZ
GRINDED
RE CIRCULATED
RE GRINDED
HIGH WEAR
03/27/2021 GYANENDRA SHARMA 12
COAL CHARACTERISTICS.
NTPC - RECENT TENDERS.
Sl. Description Sipat Rihand Ramagundam Talcher Simhadri
Best Worst Best Worst Best Worst Best Worst Best Worst
no
1. G.C.V 3300 3000 4000 3200 3400 3000 3300 3000 3300 2800
(kcal/kg)
2. H G I 50 47 55 50 50 47 55 54 55 53
3. Total 12 15 20 22 12 15 15 16.5 14 15
Moisture %
4. Volatile 21 20 22 18 22 20 21 19.5 21 19
matter %
5. Ash % 43 45 30 41 42 45 42 44 40 46
6. Fixed 24 20 26 19 24 20 22 20 24 20
carbon %
03/27/2021 GYANENDRA SHARMA 13
GRINDING PROCESS IN THE MILL
P.F. TO BOILER
RAW COAL
HEAVY
PARTICLES CLASSIFIER
P.F.+AIR
HOT AIR GRINDING ZONE
DRYING & GRINDING
REJECTS
03/27/2021 GYANENDRA SHARMA 14
EFFECTS OF COAL CHARACTERISTICS ON MILL
DESIGN
MOISTURE DRYING REQUIREMENTS
MILL OUTLET
DETERMINE
VOLATILE TEMP
MILL INLET
ASH GRINDING ELEMENTS
HGI GRINDABILITY
CALORIFIC VALUE MILL SIZING
03/27/2021 GYANENDRA SHARMA 15
03/27/2021 GYANENDRA SHARMA 16
03/27/2021 GYANENDRA SHARMA 17
03/27/2021 GYANENDRA SHARMA 18
03/27/2021 GYANENDRA SHARMA 19
03/27/2021 GYANENDRA SHARMA 20
03/27/2021 GYANENDRA SHARMA 21
03/27/2021 GYANENDRA SHARMA 22
03/27/2021 GYANENDRA SHARMA 23
03/27/2021 GYANENDRA SHARMA 24
03/27/2021 GYANENDRA SHARMA 25
03/27/2021 GYANENDRA SHARMA 26
03/27/2021 GYANENDRA SHARMA 27
03/27/2021 GYANENDRA SHARMA 28
03/27/2021 GYANENDRA SHARMA 29
03/27/2021 GYANENDRA SHARMA 30
03/27/2021 GYANENDRA SHARMA 31
HIGH SPEED 900-1000 RPM
HAMMER MILL
03/27/2021 GYANENDRA SHARMA 32
MEDIUM SPEED 40-70 RPM
BOWL MILL MPS MILL
03/27/2021 GYANENDRA SHARMA 33
SLOW SPEED MILLS
(15-18 RPM)
TUBE MILL
03/27/2021 GYANENDRA SHARMA 34
HAMMER MILLS:
HINGED OR FIXED HAMMER IN ENCLOSED
CHAMBER
IMPACT
GRINDING
ATTRITION
FAN ON MAIN SHAFT
APPLICATION LIGNITE
DEMERITS HIGH MAINTENANCE DUE TO HIGH
SPEED
HIGH POWER CONSUMPTION
REDUCTION IN CAPACITY WITH WEAR
REDUCTION IN FINENESS WITH WEAR
03/27/2021 GYANENDRA SHARMA 35
MEDIUM SPEED MILLS
1. BOWL MILLS
-COLLABORATION WITH COMBUSTON ENGG. USA,
CALLED RAYMOND MILLS, TYPE RP,XRPNGG. USA
-BHEL SUPPLIED MORE THAN 1200 MILLS
-75% OF THE MILLS IN OPERATION ARE
BOWL MILLS
-COAL FEED THRU’ CENTRAL FEED PIPE
-GRINDING IN THE BOWL WITH ROLLERS
UNDER SPRING COMPRESSION
-ROTARY VANES FOR UNIFORM
CIRCULATION OF AIR OVER THE BOWL
-CLASSIFIER FOR SENDING BACK
HEAVIER PARTICLES
03/27/2021 FOR REGRINDING
GYANENDRA SHARMA 36
BOWL MILL (PULVERISERS)
THE SYSTEM OF DIRECT FIRING OF
PULVERIZED COAL UTILIZES BOWL MILL
TO PULVERIZE THE COAL.
CRUSHED COAL IS FED TO EACH
PULVERISER BY ITS FEEDER. PRIMARY
AIR IS SUPPLIED BY PRIMARY AIR FANS.
PRIMARY AIR DRIES THE COAL AS IT IS
BEING PULVERISED AND TRANSPORTS
THE PULVERISED COAL THROUGH PIPING
SYSTEM TO THE COAL NOZZLES
LOCATED IN THE WIND BOXES.
03/27/2021 GYANENDRA SHARMA 37
BOWL MILL (PULVERISERS)
THE PORTION OF PRIMARY AIR IS PRE-
HEATED IN AIR HEATER. THE HOT &
COLD PRIMARY AIR S ARE
PROPORTIONALLY MIXED, PRIOR TO
ADMISSION TO THE PULVERISER SUCH
THAT PULVERISER OUTLET TEMP.
SHOULD 77 DEG C.
THE SAFE OPERATING TEMP. MAY BE AS
LOW AS 65 DEG C AND AS HIGH AS 95
DEG C.
03/27/2021 GYANENDRA SHARMA 38
MILL START UP PROCEDURE
TAKE CLEARANCE FROM BOILER
MAINTENANCE SECTION.
CHECK MILL PERMISSIVE.
OPEN ALL COAL LINE V/V’S AND COLD AIR
SHUT OFF GATES
ENSURE PULV. READY.
ENSURE AVAILABILITY OF IGNITION ENERGY.
START THE MILL.
OPEN HOT AIR GATE.
INCREASE MILL OUT LET TEMP. TO 65 DEGC TO
75 DEG C.
START FEEDER.
03/27/2021 GYANENDRA SHARMA 39
RAW COAL FEEDER
RAW COAL FEEDER IS UTILISED TO FEED
COAL OR OTHER MATERIALS TO THE
PULVERISES AT A UNIFORM CONTROLLED
RATE.
POSITIVE INFINITE VARIABLE (PIV) SPEED
DRIVE IS USED FOR DRIVING THE FEEDER.
03/27/2021 GYANENDRA SHARMA 40
S.A.D.C. SYSTEM
TO BURN MORE EFFECTIVELY EACH
PARTICLE OF COAL SHOULD GATE
SUFFICIENT AIR. JUST BY PROVIDING SAY
25 % EXCESS AIR DOES NOT IMPLY THAT
ALL PARTICLES GATE THE CORRECT AIR.
AIR SHOULD BE PROVIDED WHERE THE
COAL BURNS. FOR THIS THE AIR DAMPERS
SHOULD BE SO ADJUSTED THAT
ELEVATIONS WHICH ARE IN SERVICE GETS
THE AIR. AIR SHOULD NOT BE SEND
THROUGH THE NON WORKING
ELEVATIONS.
03/27/2021 GYANENDRA SHARMA 41
S.A.D.C. SETTINGS
LOAD < 30% WIND BOX DIFF. PRESSURE WILL BE 40
mmwc
LOAD > 30% WIND BOX DIFF. PRESSURE WILL BE
100 mmwc
IN E AND F STATION
– AUXILIARY AIR DAMPERS ARE AA, BC, DE AND EF
– OIL AIR DAMPERS ARE AB, CD AND EF.
– FUEL AIR DAMPERS ARE A,B,C,D,E, AND F.
– OIL DAMPERS OPEN BY 30 % IF OIL FIRED IN
PARTICULAR ELEVATION.
– FUEL AIR DAMPERS OPEN BY 20 % IF FEEDER SPEED
IS > 50%.
03/27/2021 GYANENDRA SHARMA 42
OIL BURNERS
RFO GUNS :
IN D STATION : AB,DE ELEVATION
IN E AND F STATION AB,CD,AND EF ELEVATION.
APPLICATION:
– STABILISING COAL FLAME AND DURING START
UP AND SHUT DOWN
ATOMISING:
– STEAM ATOMISING.
HSD GUN:
– IN D STN.-8 NO. GUNS AB AND DE ELEVATION
4 NO. GUNS IN C ELEVATION.
ATOMISING : AIR ATOMISING.
IN E AND F STATION: IN AB ELEVATION.
03/27/2021 GYANENDRA SHARMA 43
BOWL MILL CONSTRUCTION-
GEAR BOX AND BOWL ASSEMBLY WITH
ROTARY VANE WHEEL
AIR INLET HOUSING & AIR DIR. VANES
SEPARATOR BODY WITH JOURNAL ASSLY
CLASSIFIER ASSEMBLY WITH MILL PORT &
MDV
MILL REJECT HANDLING SYSTEM
03/27/2021 GYANENDRA SHARMA 44
03/27/2021 GYANENDRA SHARMA 45
03/27/2021 GYANENDRA SHARMA 46
03/27/2021 GYANENDRA SHARMA 47
03/27/2021 GYANENDRA SHARMA 48
03/27/2021 GYANENDRA SHARMA 49
03/27/2021 GYANENDRA SHARMA 50
03/27/2021 GYANENDRA SHARMA 51
MERITS
-LOW INITIAL INVESTMENT
-LOW SPARES COST
-LOW MAINTENANCE COST
-ON LINE ADJUSTMENT
-QUIET OPERATION
- LOW POWER CONSUMPTION
03/27/2021 GYANENDRA SHARMA 52
DEMERITS:
-LOW GRINDING ELEMENT LIFE
-FREQUENT ROLL ADJUSTMENT
-FREQUENT GRINDING ELEMENT CHANGES
-HIGH REJECTS
-CAPACITY REDUCTION WITH ROLL WEAR
-FINENESS REDUCTION WITH ROLL WEAR
-HIGH CARBON LOSS IN BOTTOM ASH
03/27/2021 GYANENDRA SHARMA 53
2. BALL & RACE MILLS (E-MILLS)
GRINDING BY BALLS ROLLING OVER RACE
TOP RACE FIXED BOTTOM RACE ROTATING
GRINDING PRESURE APPLIED THRU’ TOP RACE
CRUSHING & ATTRITION
8.5 E9 TO 13 E 10
GRINDING ELEMENTS
NI-HARD
HI-CHROME
GRINDING ELEMENT LIFE - 12,000 HRS
03/27/2021 GYANENDRA SHARMA 54
03/27/2021 GYANENDRA SHARMA 55
03/27/2021 GYANENDRA SHARMA 56
SIZES.AVL 8 E 9 TO 13 E 10
DESIGNATION
8 E 9
80 “(TRACK DIA NO ON BALLS
IN INCHES ( 9 NOS)
MERITS:
• HIGHER CAPACITY MILLS AVAILABLE.
• HIGHER WEAR LIFE OF BALLS.
• CAN HANDLE ABRASIVE COALS -YGP 90-100.
• HYDRAULIC LOADING SYSTEM CAPABLE
ON ADJUSTMENT OF GRINDING FORCES.
• NEGLIGIBLE REJECTS.
• FINENESS WITH STATIC CLASSIFIER 80% TO
90%.
• CONSISTENT OUT PUT.
03/27/2021 GYANENDRA SHARMA 57
DEMERITS
- HIGHER INITIAL COST
- HIGHER GRINDING ELEMENT COST
- HIGHER REPLACEMENT TIME
- METAL TO METAL CONTACT
- HIGHER NOISE LEVEL
- HIGH VIBRATIONS
- NEEDS VIBRATION ISOLATION
- PRONE TO BREAKING OF BALLS
- HIGHER PRESSURE DROP
- HIGHER POWER CONSUMPTION
- LARGER STATIC CLASSIFIER TO IMPROVE FINENESS
03/27/2021 GYANENDRA SHARMA 58
3. MPS MILLS
(MULHE PENDEL SCHUSSEL= MILL PANDULAM BOWL)
2000 UNITS WORLD OVER
ROTATING GRINDING RING
3 WHEEL SHAPED LARGE ROLLERS
ROLLERS FREE TO RUN IN TROUGH SHAPED
GRINDING RING.
GRINDING ROLLERS MOUNTED ON
LOADING FRAME
LARGEST ROLL DEVELOPED 3520 mm
03/27/2021 GYANENDRA SHARMA 59
HYDRO PNEUMATIC ADJUSTMENT
COUNTER PRESSURE CONTROL SYSTEM
GRIND FORCES TRANSFERRED DIRECTLY
• PLANETARY GEAR BOX
• MILLS AVAILABLE FROM 10 T/HR - 200 T/HR
• LICENSE AGREEMENTS IN USA, JAPAN, CHINA,
ITALY, RUSSIA
03/27/2021 GYANENDRA SHARMA 60
03/27/2021 GYANENDRA SHARMA 61
03/27/2021 GYANENDRA SHARMA 62
03/27/2021 GYANENDRA SHARMA 63
03/27/2021 GYANENDRA SHARMA 64
03/27/2021 GYANENDRA SHARMA 65
03/27/2021 GYANENDRA SHARMA 66
MERITS
• DEVELOPMENT FOR LOW NOX FIRING SYSTEMS
• OPTIMUM GRINDING PRESSURE
• QUICK HYDRAULIC LOAD ADJUSTMENT
• ELECTRONIC CONTROL FOR OPERATING PRESSURE
• PNEUMATIC ACCUMULATOR SURGE
• EASY ROLL REMOVAL
03/27/2021 GYANENDRA SHARMA 67
DEMERITS
• LITTLE EXPERIENCE WITH INDIAN COAL
• ONLY UNIT 500MW FURRAKKA
• COULD NOT PROVE MILL OUT PUT
• CUSTOMER APPREHENSION
- DIFFICULT TO MAINTAIN HYDRAULICS
- RATED CAPACITIES HIGH
- HIGH GRINDING PRESSURE WILL CAUSE
REDUCTION IN GRINDING ELEMENT LIFE
03/27/2021 GYANENDRA SHARMA 68
• HIGHER MILL DP
• HIGHER POWER CONSUMPTION
• TALLER IN SIZE
• HIGHER INITIAL RESISTANCE
• SPARE PARTS COST HIGH DUE TO IMPORT
03/27/2021 GYANENDRA SHARMA 69
SLOW SPEED MILLS
BALL TUBE MILLS
ø COLLABORATOR ALSTOM POWER (S.I.)
ø HORIZONTAL CYLINDRICAL TUBE
ø LOW SPEED ROTATION 15 TO 18 RPM
ø MODELS BBD 3048, 4148, 4760, 4772, 5178
(BOUYER BOULLETS DIRECT=TUBE,BALLS)
ø DRIVE SYSTEM
& HIGH SPEED A/C MOTOR
& POWER GEAR BOX
& GIRTH GEAR & PINION
& SPEED REDUCTION 1/100
03/27/2021 GYANENDRA SHARMA 70
ø 2 SYMMETRICAL GRINDING CIRCUITS
& GRINDING
& IMPACT
& ATTRITION
& CRUSHING DUE BALL ROLLING
& CRUSHING BALL ROLLING OVER
LINERS
ø GRINDING MEDIA
& Mn STEEL LINER & FORGED BALLS
& HI-CHROME LINERS & HIGH CHROME
BALLS
03/27/2021 GYANENDRA SHARMA 71
03/27/2021 GYANENDRA SHARMA 72
03/27/2021 GYANENDRA SHARMA 73
03/27/2021 GYANENDRA SHARMA 74
03/27/2021 GYANENDRA SHARMA 75
03/27/2021 GYANENDRA SHARMA 76
03/27/2021 GYANENDRA SHARMA 77
MERRITS
• MAINTENANCE FREE
• HIGH WEAR PART LIFE
• LINERS LIFE 30000 HRS PLUS
• CONSISTENT FINENESS
• CONSISTENT OUTPUT
• RIGHT FOR POOR GRADE COALS.
• ZERO REJECTS
03/27/2021 GYANENDRA SHARMA 78
DEMERITS
• HIGH POWER CONSUMPTION
• HIGH GREASE CONSUMPTION
• MILL EXPLOSIONS
• HIGH INITIAL INVESTMENT
03/27/2021 GYANENDRA SHARMA 79
MILLS SUPPLIED FOR 500 MW
STATION UNITS TYPE OF MILLS NO. GR.EL.
MW OF MILLS
NTPC 2X500 XRP 1003 8/UNIT WOL
SINGRAULI 8000HR
NTPC 3X500 XRP 1003 9/UNIT WOL
KORBA 8000HR
NTPC 3X500 XRP 1003 8/UNIT WOL
RAMAGUNDAM 12000HR
NTPC 2X500 BBD 4772 5/UNIT HI-CR
VINDHYANCHAL
03/27/2021 30000HR
GYANENDRA SHARMA 80
MILLS SUPPLIED FOR 500 MW
STATION UNITS TYPE OF MILLS NOS. GR.EL.
MW OF MILLS
MSEB 2X500 XRP 1043 6/UNIT WOL
CHANDRAPUR 8000HR
MSEB 1X500 BBD 4772 5/UNIT HI CR
CHANDRAPUR 30000HR
03/27/2021 GYANENDRA SHARMA 81
MILLS BEING SUPPLIED FOR 500 MW
STATION UNITS TYPE OF MILLS NOS. GR.EL.
MW OF MILLS
NTPC 2X500 XRP 1003 9/UNIT MPSP
SIMHADRI 3500HR
NTPC 4X500 XRP 1003 10/UNIT MPSP
TALCHER 4000HR
MILLS UNDER FINALISATION
NTPC 1X500 XRP 1003 10/UNIT MPSP
RAMAGUNDAM MPS 235 6000HR
NTPC 2X500 XRP1003 9/UNIT HICR
RIHAND
03/27/2021
MPS 225
GYANENDRA SHARMA
6000HR 82
DUOCAST ROLL
03/27/2021 GYANENDRA SHARMA 83
SECTIONAL VIEW OF CARBIDE INSERTS
S G IRON
INSERTS
MADE OF
FMU 18
03/27/2021 GYANENDRA SHARMA 84
660 MW SIPAT TENDER
REQUIREMENTS:
1) 9 MILLS
2) MILL LOADING 90%,
4) DESIGN COAL 2 MILLS STAND BY
5) WORST COAL 1 MILL STAND BY
6) VERY WORST COAL NO STAND BY MILL, 100%
LOADING
03/27/2021 GYANENDRA SHARMA 85
7) ONLY VERTICAL SPINDLE MILLS
8) REQD. GRINDING ELEMENT LIFE = 8,000 HRS.
9) MIN. QUALIFYING GR. EL.LIFE= 5,500 HRS.
10) OPERATIONAL EXPERIENCE = 2 YRS. AT 2
STATIONS.
11) WEAR PART LIFE AT 80 YGP
12) OUTPUT REDUCTION ALLOWED ON ROLL WEAR
= 90 %
03/27/2021 GYANENDRA SHARMA 86
BOWL MILL CAPACITIES
MILL TYPE NOMINAL NO OF MILLS
CAPACITY REQD. FOR
50% HGI, SIPAT
10 % MOISTURE TENDER
XRP -1003 62.8 T/ HR. 11
XRP-1043 71.6 T/ HR. 10
XRP-1103 84.4 T/ HR. 9
XRP-1203 105.2T/ HR. 8
03/27/2021 GYANENDRA SHARMA 87
CONSTRAINTS WITH BOWL MILLS FOR
SIPAT TENDER
FOR 663 MW WE REQ. 11 NOS. XRP 1003 MILLS,
CUSTOMER WANTS 9 MILLS ONLY
9 NOS. XRP 1103 SUIT TO CUST. REQUIREMENT
DOC. AVL. BUT EXPERIENCE NOT AVAILABLE AS
WILL BE MANUFACTURED FIRST TIME IN BHEL
XRP 1203 MILLS DOC. NOT AVAILABLE
03/27/2021 GYANENDRA SHARMA 88
CONSTRAINTS WITH TUBE MILLS FOR
SIPAT TENDER
6 NOS. BBD 4772 MILLS CAN MEET 660 MW
BHEL BBD 4772 MILLS ARE WELL QUALIFIED IF
ACCEPTED BY THE CUSTOMER
CUSTOMER HAS SPECIFIED ONLY VERTICAL
SPINDLE MILLS
ALSTOM POWR HAS TAKEN UP WITH NTPC FOR
ACCEPTANCE OF TUBE MILLS
03/27/2021 GYANENDRA SHARMA 89
MILLS FOR
660 MW SIPAT SUPER CRITICAL
TUBE MILLS 6 x BBD 4772
BOWL MILLS 9 x XRP 1103
E MILLS 9 x 12 E 10
MPS MILLS 9 x MPS 255 ( BBP)
9 x B& W 118 K
03/27/2021 GYANENDRA SHARMA 90
CONCLUSION
ONLY MPS MILLS OR E MILLS WILL
QUALIFY NTPC REQUIREMENTS
ENTER IN TO TECHNICAL COLLAB.
FOR MPS OR E MILLS
MITSUI BABCOCK NOT READY TO
PART THE E MILLS TECHNOLOGY
NEGOTATIONS ARE ON WITH BBP
GERMANY FOR TECHNICAL TIE UP.
03/27/2021 GYANENDRA SHARMA 91
03/27/2021 GYANENDRA SHARMA 92
RETROFITS IN BOWL MILLS
VANE WHEEL ASSEMBLY
STATIONARY INTER MEDIATE LINERS
ABOVE BOWL
JOURNAL HEAD LINED W/ NI-HARD
NI-HARD CLASSIFIER VANES 20,000 HRS LIFE
CERAMIC LINING CONES - 50,000 HRS LIFE
FLAP TYPE DISCHARGE VALVE
VENTURY VANE CERAMIC LINING
03/27/2021 GYANENDRA SHARMA 93
IMPROVEMENTS
1) METALLURGY
2) AERODYNAMICS
3) ROLL SIZE OPTIMISATION
4) STATIC LOADING - SPRING PRESSURE
03/27/2021 GYANENDRA SHARMA 94
WEAR LIFE IMPROVEMENT
MILL BOTTOM INSU. COVER A514 GRB
M.S.L.ASSLY A 514 GR B
VANE WHEEL ASSLY NI-HARD ASSLY
SEP BODY NI HARD LINERS
JOURNAL ASSLY NI HARD LINERS
CLASSIFIER VANES NI HARD 15,000 HRS
INNER CONE CERAMIC TILES 25,000 HRS
MPO ,MDV CERAMIC TILES
MILL DISCHARGE VALVE A-514 GRB
FUEL PIPE BENDS CERAMIC LINING
GRINDING ELEMENTS HI-CHROME
03/27/2021 GYANENDRA SHARMA 95
NI HARD - IV
COMPOSITION
C Si Ni Cr Mo Mn
3.0-3.6 0.3-0.9 3.3-4.0 1.5-2.3 0.2-1.5 0.3-0.8
WANAKBORI
LIFE 5000 HRS
PROBLEM
MANURACTURING CRACKING DURING COOLING
03/27/2021 GYANENDRA SHARMA 96
NI HARD - II
COMPOSITION
C Si Ni Cr Mo Mn
3.0-3.6 0.32-0.9 3.3-4.0 1.8-2.2 1.5 MAX 0.4-0.9
LIFE
2500 HRS. TO 3500
XRP 623 TO XRP 883
HRS
XRP 1003 1000 HRS TO 2500 HRS.
03/27/2021 GYANENDRA SHARMA 97
SUPER NIHARD
DEVELOPED BY B.H.E.L. CORP. R&D
W,Ti, Mo, V, Cu & B ADDED
Ni, Cr, Si, PROPORTION CHANGED
TRIALS AT RAICHUR LIFE
BRS 7000 HRS
GR 5000 HRS
03/27/2021 GYANENDRA SHARMA 98
VALVE BODY CERAMIC LINING
MPO CERAMIC LINING
VENTURY
SIZE OPTIMIZATION
COLLAR
INVERTED CONE
GAP OPTIMIZATION
GAP
AIR
RESTRICTION GAP OPTIMIZATION
RING
EXTERNAL LUB OIL SYSTEM
MECHANICAL FACE SEAL
JOURNAL SHAFT WEAR SLEEVE
03/27/2021 GYANENDRA SHARMA 99
HIGH CHROME GRINDING ELEMENTS
BABCOCK & WILCOX
MEGATTOEAUX INT.
FIRTH & RIXON U.K
TO THEIR METALLURGIES FOR INDIAN
COAL. LIFE ASKED 8000 HRS
RAICHUR
INSTALLED AT: ROPAR
TUTICORIN
LIFE ACHIEVED 4000 - 4700 HRS
03/27/2021 GYANENDRA SHARMA 100
WELD OVER LAY ROLLS
BUILDING IRON CORE BY WELD
ELECTRODE STOODY 103
TUKKER USA
LIFE 9,394 HRS
ELECTRODE COMBUST
ALLOY
MML - USA
LIFE 18,000 HRS
BULL RING HIGH
SEGMENTS CHROME
03/27/2021 GYANENDRA SHARMA 101
03/27/2021 GYANENDRA SHARMA 102
03/27/2021 GYANENDRA SHARMA 103
03/27/2021 GYANENDRA SHARMA 104
03/27/2021 GYANENDRA SHARMA 105
03/27/2021 GYANENDRA SHARMA 106
03/27/2021 GYANENDRA SHARMA 107
03/27/2021 GYANENDRA SHARMA 108
03/27/2021 GYANENDRA SHARMA 109
03/27/2021 GYANENDRA SHARMA 110
1890 ø USED IN CEMENT MILLS
ø FULLER LEIGH & CO. USA E-TYPE
MILLS.
ø RESEARCH IN ONEIDA STREET STN. EFFECTS
1919-1921
STUDIED
ø EFFECT OF FINENESS IN COMBUSTION.
ø DRYING COAL IN PULVERISER.
ø TEMP. & HEAT ABSROPTION IN FURNACE
ø DISTRIBUTION OF HEAT & ASH FROM COAL
ø ELIMINATION OF DUST FROM FUEL GASES
03/27/2021 GYANENDRA SHARMA 111
1919 ø CE-USA DEVELOPED RAYMOND
MILLS FOR METALLURGICAL
FURNACE, SMALLER SIZES( 6t/hr.)
1945 ø CE ESTABLISHED MILLS FOR TPP (25
T/hr.)
1965 ø 60s HIGHER RANGE MILLS PUT INTO OPRN.
ø 80s BHEL ENTERED FOR
COLLABORATION
03/27/2021 GYANENDRA SHARMA 112
ø MPS Mills DEVELOPED BY PFEEFFER COMPANY
1958
FOR PULVERISING CEMENT.
1960s ø MODIFIED BY BABCOCK BORSIG FOR PULV. &
DRYING BITUMINOUS COAL.
ø COMMERCIALLY USED IN GERMANY FOR 300
1966 MW PLANT.
03/27/2021 GYANENDRA SHARMA 113
03/27/2021 GYANENDRA SHARMA 114
03/27/2021 GYANENDRA SHARMA 115
03/27/2021 GYANENDRA SHARMA 116
03/27/2021 GYANENDRA SHARMA 117