0% found this document useful (0 votes)
865 views3 pages

Methodology For ATT

Uploaded by

Abir Sengupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
865 views3 pages

Methodology For ATT

Uploaded by

Abir Sengupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
Methodology for Anti Termite Treatment 7 a Substructure & Super Structures At Sunshine | Doc. No. SIL / C3367 / SIMPLEX One, Uttarpara, Hooghly QAQC / MS/ ATT INFRASTRUCTURES Revision No. RO | LIMITED | TABLE OF CONTENTS 1.0 PURPOSE, 2.0 REFERENCES 3.0 | WORK PROCEDURE 4.0 SAFETY PRECAUTION 5.0 INSPECTION EX Seine wi = Ni Ne {ys 3) py ete of: ey Methodology for Anti Termite Treatment a& Substructure & Super Structures At Sunshine | Doc. No. SIL / C3367 / SIMPLEX One, Uttarpara, Hooghly QAQC / MS/ ATT INFRASTRUCTURES Revision No. RO { LIMITED - - ans I. Purpose Prevention of the termite from reaching the super-structure of the building and its contents can be achieved by creating a chemical barrier between the ground, from where the termites come and other contents of the building which may form food for the termites. This is achieved by treating the soil beneath the building and around the foundation with a suitable insecticide, I. References i) Approved GFC drawing. li) Technical Specifications & BOQ ili) National Building Code of India - 2016 'v) IS: 8944, IS 6316 - Part-1& Part-2 (With all amendments in force as on date and future ones till completion of job) v) CPWD Specification - 2019 Product technical Data sheet & MSDS of Chemical Find enclosed the procedure to be followed for pre- construction Anti Termite treatment. I. Chemical to be used: Chloropyrifos 20 % EC @ 50 ml per litte of water respectively and the dilution shall he 4:19. For achieving 1% concentration. Or Equivalents (subjected to prior approval) II. Work Procedure ‘Treatment of Top Surface of Plinth illing ‘The top surface of the consolidated earth within plinth walls shall be treated with chemical at the rate of 5 lit,/Sqm ot as per manufacturer specification, of the surface before the sand bed or sub-grade is laid. If the filled earth has been well rammed and the surface does not allow the emulsion to Seep through, holes up to 50 mm to 75 mi deep at 150 mm centzes both ways may be ‘made with 12 mm diameter mild steel fod or other suitable means on the surface to facilitate saturation of the soil with the emulsion. ‘Treatment at junctions of the walls and the floors : Special care shall be taken to establish continuity of the vertical soil and barrier on inner wall surfaces from ground level up to the level of the filled earth surfaces, To achieve this, a small channel 30mm x 30mm, shall be made at all the junctions of wall and column with the floor(before laying the sub grade) the rod holes made in the channel up to the ground level, 150 mm apart and the iron rod of 12mm diameter shall be moved back ward and forward to break up the earth and chemical emulsion poured along the wall @ 755 litre/sqm or as pet manufacturer specification of vertical walls or coluran - Methodology for Anti Termite Treatment a Substructure & Super Structures At Sunshine Doc. No. SIL / C3367 / SIMPLEX One, Uttarpara, Hooghly QAQC / MS/ ATT INFRASTRUCTURES Revision No. RO LIMITED ‘Treatment of Soil Along External Perimeter of Building After the building is complete, the earth along the external perimeter of the building will be rodded at intervals of 150 mm and to a depth of 300 mm from top. The rods will be moved backward and forward parallel to the wall to break up the earth and emulsion poured along the wall at the rate of 7.5/Sqm or as per manufacturer specification of the vertical surface. After the treatment, the earth will be tamped back into place ‘Treatment of Soil Surrounding Pipes, Wastes and Conduits When pipes, wastes and conduits enter the soil inside area of the foundations, soil surrounding the point of entry will be loosened around each such pipe, waste or conduit for a distance of 150 mm and to a depth of 150 mm before treatment is commenced. ‘Treatment for Expansion Joints ‘The soil beneath expansion joints will be treated through the expansion joints after the sub-grade has been laid, at the rate of 2 Lit,/linear metre ot as pet manufacturer specification. aia 2 IV. _ Safety Precautions Chemical used for ant termite treatment are insecticides with a persistent action and are highly poisonous. This chemical can have an adverse effect upon health when absorbed through the skin, inhaled as vapours or spray mists or swallowed, MSDS should be followed during activity to avoid the hazards, Ensure the personnel are provided with appropriate PPE (Safety shoe, Helmet with chin strap, Nose musk, Hand Gloves etc.). * HIRA’ to be maintained regularly. Covid-19 protocol shall be maintained as per latest directives/guidelines of Central/State Government. Any other relevant precautions as may be necessary as per provisions of approved Project ESG & HSE Plan. INSPECTION Inspection shall be carried out as per the approved Inspection & Test Plan (SIL/C- 3367/QAQC/GITP/RO) and recorded as per the Inspection Checklist: Note: In case of any discrepancies in between this Work Method Statement and Contract Agreement, the later shall take pre

You might also like