1. Design Concept
2. Seismic Design
3. Wind Effects
4. Foundation System
5. Deep Excavation
6. Use of BIM Technology
7. Construction Aspects
Engineering makes creative and efficient use of structural elements and materials
to build tall buildings
FLOOR SYSTEM
LATERAL
SINGLE SYSTEM
RC coupled wall + outrigger
- Mix design
- Apply on actual site condition
- Take samples
- Analyze and resume
1. Core wall
2. Steel frame
3. RC column
3. Erection column
2. Steel frame
4. RC column
Tremie pipe
Erection Column
Dominant
high mode effect
Non-linearity
considered
Analysis method:
Modal Push-over
+ NLTHA
SNI 1726:2012
ASCE 7-10 PEER-TBI MCEr Target spectra
FEMA 440 ATC 72-1
DAVYSUKAMTA & PARTNERS
CONSULTING ENGINEERS
Performance-Based Seismic Design
Nonlinear modeling
Scaling to Sa_maxDir
GERAK TANAH
DITERAPKAN PADA
LEVEL MUKA FUNDASI
(DASAR BESMEN JIKA Pemodelan harus mengikut-sertakan struktur besmen
ADA BESMEN)
PASANGAN GROUND
MOTION (2KOMPONEN
HORISONTAL)
DITERAPKAN SECARA
BERSAMAAN
UNTUK SITUS DEKAT
PATAHAN, ORIENTASI
KOMPONEN GM HARUS
KONSISTEN DENGAN
ORIENTASI PATAHAN
MAXIMUM DIRECTION
(SNI 1726:2019, clause 11)
1.Target Spectrum
MAXIMUM
2.GMSM DIRECTION
(SNI 1726:2019
PASAL 11)
MEAN
S P E C T RU M
M AT C H I N G
METODE
TIME-DOMAIN
(RSPMatch 2009 –
Abrahamson)
KARAKTER NON-
STATIONARY
HARUS
DIPERTAHANKAN
INTENSITAS ARIAS
HARUS
DIPERTAHANKAN
Force
n0
log(n)
2
H(n)
1
2z
Diameter 1500 mm
Effective length 65 meters
Total boring depth 90 meters
Allowable capacity: 1400 tons
SF = 2.5
DAVYSUKAMTA & PARTNERS
CONSULTING ENGINEERS
Scheme for bored-pile with post-grout
EGL
Ltotal = 90m
Leff = 65m
Base grout
Grout pipe
Piles behaves
elastically
blind
boring
grouted
BASEMENT STRUCTURE
Jl.Thamrin
Designing for Construction Tolerance
Embassy of Japan
Plaza Indonesia
DAVYSUKAMTA & PARTNERS
CONSULTING ENGINEERS
Designing for Construction Tolerance
Basement Plan
Core-wall
zone
Excavation Method
Stability of Excavation
Removal of Soil
Strutting System
Work Sequence
MRT Connection Surrounding Condition
DAVYSUKAMTA & PARTNERS
CONSULTING ENGINEERS
Use of RC slab as strut gives the required
rigid support for the diaphragm wall
Start at B-1
FW for slab
Ramp opening
Corner Ramp
Steel Strut
No clash
No clash
Local Axis
Ramp
1
Local Axis
2 Wall
1
115
ton-f
257
145
ton-f
ton-f
263
ton-f
100.4
468.5 ton.m
350 ton.m
ton.m
6.2 1.5 Momen 2-2 pada Kolom
ton.m ton.m bagian Ramp
Momen 2-2 pada Balok Ramp
428
ton.m
1271
ton.m
1030
897
ton.m
ton.m
No clash
Working Space
No clash
CONSTRUCTION ASPECTS
Crane capacity:
32 tons @ 4 meters,
5.4 tons @ 50 meters
Pumping up to 300 M
Characteristic
Passing Segregation
Ability Resistance
L-box
Segregation Resistance
Test (Sieve Test)
Special Mix for High Performance Concrete
Pumping up to 300 M
20-27M
Horisontal brace
Top-down construction
Composite construction
Post-grout Boredpile
Post-grouted bored-pile Top-Down Construction
Indonesia Bisa!
DAVYSUKAMTA & PARTNERS