1. The document provides a high level load list for the AHP area of the 4x270 MW Bhadradri Thermal Power Plant project in Telangana, India. 2. The loads are fed from the 6.6kV HT Switchboard located near the ESP area of the second unit. Each switchboard has two bus sections that can be coupled via a bus coupler during maintenance. 3. An excel sheet provides details of 22 loads in the AHP area including transport air compressors, water pumps, and ash slurry disposal pumps. It lists the number of each equipment, their individual ratings, efficiency, duty category and total load demand.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
373 views4 pages

Ahp HT Load List Is-4-Dc-691-300-E002

1. The document provides a high level load list for the AHP area of the 4x270 MW Bhadradri Thermal Power Plant project in Telangana, India. 2. The loads are fed from the 6.6kV HT Switchboard located near the ESP area of the second unit. Each switchboard has two bus sections that can be coupled via a bus coupler during maintenance. 3. An excel sheet provides details of 22 loads in the AHP area including transport air compressors, water pumps, and ash slurry disposal pumps. It lists the number of each equipment, their individual ratings, efficiency, duty category and total load demand.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

0 10-Jun-15 FIRST SUBMISSION FOR APPROVAL VDL NGN LB

Rev. DATE DESCRIPTION BY CHKD. APPD.

CUSTOMER : TELANGANA STATE POWER GENERATION CORPORATION LTD

PROJECT : 4 X270 MW BHADRADRI TPS, MANUGURU, KHAMMAM DIST.,


TELANGANA

CUSTOMER'S CONSULTANT : DESEIN PRIVATE LIMITED

EPC CONTRACTOR : BHARAT HEAVY ELECTRICALS LIMTED


Industrial Systems Groups
Bangalore

DOCUMENT TITLE : HT LOAD LIST: AHP

BHEL DOCUMENT NO. : IS-4-DC-691-300-E002

PREPARED VIDYADHARI DATE 10-Jun-15


CHECKED NANDITHA REV. No 0
APPROVED L BINDU no of sheets 3
AHP area(HT LOADS) - 4X270 MW BHADRADRI project

The load rating and number are based on the tentative mechanical inputs/calculations and subject
1 to revision during detailed engg, depending upon the final mechanical and electrical loads

The loads are fed from the 6.6kV HT Switchboard: #OCF located near ESP area of second Unit
2 for AHP HT loads
Each Switchboard shall have 2 bus sections, coupled by a bus-coupler (OPEN under normal
operation). Each bus section is fed by its respective incomer under normal operation. During fault/
3 maintenance of one of the incomer/upstream, the corresponding incomer is OPEN and the bus-
coupler is in CLOSE condition, thus one incomer/stream feeding both the bus sections.
6.6/0.433 kV transformers of AHP area are also fed from the same board. (Ref: LT load list IS-4-
4 DC-691-300-E001)

Excel sheet of HT load list attached

Page 1 of 3
4X270MW BHADRADRI THERMAL POWER PLANT
6.6kV LOAD LIST for AHP

No.of Equipment Rating of each equipment

(MCCB/Starter/
Consumer Type

Duty Category
(Continious or
DOL/RDOL)

Intermittent)
Efficiency of
Utilization/

equipment
Electrical
Worki Stand Voltage Load Net KVA

(%)
Total KW PF KVA A - Running factor
Sl.No.

ng by demand
Description of Loads
(f) =
(c) =
(KW/(1.732*
(a) (b) (a)+(b (d) (p) (i) (e) (g)
6.6*(p)*i))*1
)
00
1 Transport air compressor-1 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
2 Transport air compressor-2 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
3 Transport air compressor-3 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
4 Transport air compressor-4 ( for unit 1&2) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
5 Transport air compressor-5 ( for unit 1&2) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
6 Transport air compressor-6 ( for unit 1&2) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
7 Transport air compressor-7 ( for unit 1&2) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
8 Transport air compressor-1 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
9 Transport air compressor-2 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
10 Transport air compressor-3 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
11 Transport air compressor-4 ( for unit 3&4) 1 0 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 478.7
12 Transport air compressor-5 ( for unit 3&4) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
13 Transport air compressor-6 ( for unit 3&4) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
14 Transport air compressor-7 ( for unit 3&4) 0 1 1 450 0.85 0.94 563.20 49.27 6600 DOL Continous 0.85 0.0
15 HP Water Pump-1( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
16 HP Water Pump-2 ( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
17 HP Water Pump-3 ( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
18 HP Water Pump-4 ( for all units) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
19 HP Water Pump-5 ( for all units) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
20 HP Water Pump-6 ( for all units) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
21 Ash Slurry Disposal Pump-1 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
22 Ash Slurry Disposal Pump-2 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
23 Ash Slurry Disposal Pump-3 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
24 Ash Slurry Disposal Pump-4 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
25 Ash Slurry Disposal Pump-5 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
26 Ash Slurry Disposal Pump-6 ( for unit 1&2) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
27 Ash Slurry Disposal Pump-7 ( for unit 1&2) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
28 Ash Slurry Disposal Pump-8 ( for unit 1&2) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
29 Ash Slurry Disposal Pump-9 ( for unit 1&2) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
30 Ash Slurry Disposal Pump-1 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
31 Ash Slurry Disposal Pump-2 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
32 Ash Slurry Disposal Pump-3 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
33 Ash Slurry Disposal Pump-4 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
34 Ash Slurry Disposal Pump-5 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
35 Ash Slurry Disposal Pump-6 ( for unit 3&4) 1 0 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 216.9
36 Ash Slurry Disposal Pump-7 ( for unit 3&4) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
page 2 of 3
4X270MW BHADRADRI THERMAL POWER PLANT
6.6kV LOAD LIST for AHP

No.of Equipment Rating of each equipment

(MCCB/Starter/
Consumer Type

Duty Category
(Continious or
DOL/RDOL)

Intermittent)
Efficiency of
Utilization/

equipment
Electrical
Worki Stand Voltage Load Net KVA

(%)
Total KW PF KVA A - Running factor
Sl.No.

ng by demand
Description of Loads
(f) =
(c) =
(KW/(1.732*
(a) (b) (a)+(b (d) (p) (i) (e) (g)
6.6*(p)*i))*1
)
00
37 Ash Slurry Disposal Pump-8 ( for unit 3&4) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
38 Ash Slurry Disposal Pump-9 ( for unit 3&4) 0 1 1 200 0.84 0.933 255.19 22.32 6600 DOL Continous 0.85 0.0
TRANSFORMER FEEDER-1 FOR MCC-1 FOR 1 0 1 1600.00 139.97 6600 0.85
39 UNIT 1&2 (6.6/0.433 kV) Continous 1360.0

TRANSFORMER FEEDER-2 FOR MCC-1 FOR 0 1 1 1600.00 139.97 6600 0.85


40 UNIT 1&2 (6.6/0.433 kV) Continous 0.0

TRANSFORMER FEEDER-1 FOR MCC-2 FOR 1 0 1 1600.00 139.97 6600 0.85


41 UNIT 1&2 (6.6/0.433 kV) Continous 1360.0

TRANSFORMER FEEDER-2 FOR MCC-2 FOR 0 1 1 1600.00 139.97 6600 0.85


42 UNIT 1&2 (6.6/0.433 kV) Continous 0.0

TRANSFORMER FEEDER-1 FOR MCC-3 FOR 1 0 1 1600.00 139.97 6600 0.85


43 UNIT 3&4(6.6/0.433 kV) Continous 1360.0

TRANSFORMER FEEDER-2 FOR MCC-3 FOR 0 1 1 1600.00 139.97 6600 0.85


44 UNIT 3&4 (6.6/0.433 kV) Continous 0.0

TRANSFORMER FEEDER-1 FOR MCC-4 FOR 1 0 1 1600.00 139.97 6600 0.85


45 UNIT 3&4 and SILO (6.6/0.433 kV) Continous 1360.0

TRANSFORMER FEEDER-2 FOR MCC-4 FOR 0 1 1 1600.00 139.97 6600 0.85


46 UNIT 3&4 and SILO (6.6/0.433 kV) Continous 0.0

TRANSFORMER FEEDER-1 FOR MCC-5 FOR 1 0 1 1000.00 87.48 6600 0.85


47 AWRS (6.6/0.433 kV) Continous 850.0

TRANSFORMER FEEDER-2 FOR MCC-5 FOR 0 1 1 1000.00 87.48 6600 0.85


48 AWRS(6.6/0.433 kV) Continous 0.0