This document is a response letter from OWNER regarding a request for clarification on a material approval request submitted by CONTRACTOR. The OWNER provides explanations on 5 points regarding the request, emphasizing that the proposed material cannot be accepted until a required warranty or compliance letter fulfilling the project's design lifetime requirement of 30 years can be submitted by CONTRACTOR.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views5 pages

448 KPB1000 2021-S5 - Response To Letter No.26071-JO-KPB-LT-01958 Clarif...

This document is a response letter from OWNER regarding a request for clarification on a material approval request submitted by CONTRACTOR. The OWNER provides explanations on 5 points regarding the request, emphasizing that the proposed material cannot be accepted until a required warranty or compliance letter fulfilling the project's design lifetime requirement of 30 years can be submitted by CONTRACTOR.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

PERTAMINA

KILANG PERTAMINA
BALIKPAPAN

Balikpapan, February(S)2021
No.<^^b /KPB1000/2021-S5
Attachment 1 (one) bundle
Subject Response to Letter No.26071-JO-KPB-LT-01958: Clarification of Material
Approval Request for BItuthene Membrane(MAR-H-ETI-AR-00134 Rev.1)zyxwvutsrqponm
Reply Request □ Yes No

RDMP Balikpapan JO,


Project Manager EPC ISBL-OSBL
Attn. Mr. Yun Dong Kim
JO Office Menara Jamsostek Level 7
Jl. Gatot Subroto No. 33 Kav 71-73
Jakarta Selatan 12710, Indonesia

Dear Mr. Kim,

In response to CONTRACTOR'S Letter No.26071-JO-KPB-LT-01958 dated 22"^ January 2021


regarding Ciarirication of Material Approval Request for Bituthene Membrane (MAR-H-ETI-AR-00134
Rev.1). herewith OWNER Response for the indicated request for approval:
1. CONTRACTOR have already provided a formal statement letter from Vendor regarding to the
quality standard compliance which not limited by country of origin for manufacturing location since
the product will be tested through quality assurance process based on vendor's applicable
international standard. According to this letter, OWNER confirm that this letter can be accepted as
the basis for the change of country of origin of the product as specified in ABVL document.
2. According to this clarification letter, OWNER understanding that the proposed material will be used
to fulfill project's requirement as mentioned in section 2.7, Document No. 26070-100-3SS-DB02-
J0001, Engineering Specification for Concrete Work, where it used to specify protection of concrete
underground surfaces. Application of this material has also been presented in attached drawing of
the letter by CONTRACTOR.

Figure 1. Applfcatlon of Proposed BItuthene Membrane Material


in CONTRACTOR'S letter No. 26071-JO-KPB-LT-01958

Hence, CONTRACTOR shall ensure that applied product will compatible to current soil conditions
considering the sulphate and/or chloride content where foundations to be located. Moreover, care
shall be taken to avoid damaging the applied product when back filling process.

3. Related to Vendor's warranty letter which attached in the clarification letter, OWNER understanding
that the letter is not related to warranty purpose because it only explains the product life expectancy
PT. KILANG PERTAMINA BALIKPAPAN
JL Yos Sudarso No 01 Balikpapan
Kalimantan Timur - Indonesia -76111
Mi PERTAMINA
^ KILANG PERTAMINA
-2- BALIKPAPAN

No. /KPB1000/2021-S5

which are maximum 10 years. OWNER consider that CONTRACTOR need to evaluate required
compliance of the product and ensure that the expected design lifetime can be fulfill project specific
requirements for design lifetime as mentioned in section 8.3.2, Document No.26070-203-G80-
GAX-J0001, Scope of Work and Execution Requirements, where it used to specify general
engineering and execution requirements.

In case of vendor could not be available to release the warranty or compliance letter based on
requirement of project design lifetime, CONTRACTOR as the applicator of the product shall mitigate
and investigate how to ensure and prove that the applied product can fulfill the specific project
requirements which is 30 years. OWNER understanding that vendor may available to release
warranty or compliance letter based on project design lifetime in such case where there will be any
required arrangement in terms and conditions for the applicator. OWNER would like to recommend
CONTRACTOR to solve this issue by discussing with the Vendor.

4. CONTRACTOR to understand that in case of material approval request will be submitted to


OWNER for review and approval, the specific method statement for application of the product shall
be submitted separately based on project execution procedure. OWNER will not proceed approval
process for method statement which attached in a document for material approval request. In case
of document for material approval request has been accepted by OWNER, CONTRACTOR to
understand that it will not relieve CONTRACTOR'S responsibility to submit document for method
statement for OWNER'S review and approval based on applicable procedure in this project.

5. OWNER would like to remind again that in case of any clarification which required by adding some
information, clarification and additional data for material approval request while the request was
rejected by OWNER previously, CONTRACTOR shall re-submit the revised material approval
request instead of sending clarification letter, in order to provide better recorded correspondences
of documents for material approval request. OWNER have reminded the same in the latest
OWNER'S letter subjected to response for material approval request for bituthene membrane.

Based on OWNER'S explanations above, CONTRACTOR shall inform to OWNER the required warranty
or compliance letter from vendor to fulfill project requirement for design lifetime, rather than confirmation
letter related to lifetime expectancy as attached in the clarification letter, OWNER would like to emphasize
that the proposed material currently can not be accepted until required warranty or compliance letter to
fulfill project requirement for design lifetime can be completed by CONTRACTOR. Hence, it shall be
understood that prior to procure and apply the proposed material, CONTRACTOR shall get approval from
OWNER.

Thank you for your attention and cooperation.

^ Development Director

Djoko Keen Soewlto

CC:
1. President Director PT Kilang Pertamina Balikpapan
2. PMC Project Manager

Attachment 1: CONTRACTOR'S Letter No.26071-JO-KPB-LT-01958 dated 22"^ January 2021 regarding


Clarification of Material Approval Request for Bituthene Membrane(MAR-H-ETI-AR-00134
Rev.1)
Attachment 2: Standard Specification No.26070-100-3SS-DB02-J0001 Rev.BOO
ATTACHMENT 1

Ref. No. 26071-JO-KPB-LT-01958


Your Ref. No. 040/KPB 1000/2021-SS
Date: 22 January 2021

Reply request ■ Yes □ No

PT. Kilang Pertamina Balikpapan ,


JI. Yos Sudarso No.1
Balikpapan, Kalimantan Timur, Indonesia

ATTENTION : Mr. Djoko Koen Soewito / Director of Development


cc : Mr. Narendra Widjajanto / President Director
Mr. Gerry Baker I Project Manager, OWNER's Representative
PROJECT : EPC ISBL AND OSBL FOR RDMP PROJECT RU V BALIKPAPAN
CONTRACT : NO.25/C00000/2018-50
SUBJECT : CLARIFICATION OF MATERIAL APPROVAL REQUEST FOR BITUTHENE
MEMBRANE (MAR-H-ETI-AR-00134, REV.1)

With regards of Owner letter No. 040/KPB 1000/2021-SS dated 06th January 2021 , hereby Contractor would like
to subm it the additional data as shown below as per Owner's comments.

1. Statement Letter form manufacturer headquarters.


2. Vendor's warranty letter for product life expectancy.

Futher considering on above information, Contractor is confident that the mentioned bituthene membrane can
be used in order to pretect building foundations .

Hence, Contractor sincerely requests Owner consideration to accept on this material.

Your kind confirmation and cooperation are highly appreciated.

Thank you.

Sincerely yours,

Yun Dong Kim


Project Manager
ROMP Balikpapan JO

Attachment:
#1 Owner Letter 040/KPB1000/2021-S5 and MAR IPMT Comment & Contractor Clarification .
#2 MAR and Attachments for PT. FOSROC Indonesia (MAR-H-ETI-AR-00134, REV.1)

ROMP Balikpapan JO
7th floo r of Menara Jamsostek bd.R W.1, Ku nlngan Ba r., Mampang Prpt.,
Kata Jakarta Se Iatan, Daer ah Khusus lbukota Ja karta 12710, Indonesia
ATTACHMENT 2

~
, ~ PERTAMINA
JOB NO. DOCUMENT NO. REV.
ENGINEERING CENTER
26070-100 3SS-DB02-J0001 BOO
REFINING DIRECTORATE DATE: 10 A PRIL2017 I SHEET Page 1 of 18

STANDARD SPECIFICATION

ENGINEERING SPECIFICATION
FOR CONCRETE WORK

This document was developed by using Bechtel standards modified as required


to include Perlamina specific provisions.

PT PERTAMINA (PERSERO)
2017

-
Ll <Ml ~ -J~ y 3/
l::!00 ·1 0-APRIL-201 / Issued For BIO
FN/HYA •
ABS/rJw AAA SM TB El
/ NDG
ENG
REV . DATE DESCRIPTION PREP'D CHK'D REWv"D CONCUR APP'D CLIENT
MGMT

Electronic documents, once printed, are uncontrolled and may become outdated.

Confidential © 2017 Bechtel International, Inc. and PT Pertamina (Persero). This document, prepared under a
Master SeNice Agreement between Bechtel and Pertamina, contains infonnation confidential and/or proprietary
to Bechtel and/or Pertamina that is not to be used, disclosed, or reproduced in any form, by any person or entity
other than Bechtel or Pertamina without appropriate written permission. All rights reseNed.
26070-100-3SS-DB02-J000 1

Page 8 OF 16

2.6 Concrete Curing

2.6.1 Waterproof Paper or Plastic Membrane shall conform to ASTM C171 or SNI
2847.2013.

2.6.2 Liquid Membrane Curing Compound shall conform to ASTM C309.

2.7 Protection of Concrete Underground Surfaces

2. 7.1 Where required by soil conditions, concrete underground surfaces shall be


protected.

2. 7.2 The underside of foundations, concrete tanks pits etc,. shall be protected by a
bituminous self adhesive membrane with mineral finish "Bitushield" by
Servicised or approved equal.
The membrane shall be laid mineral face upwards, over the blinding concrete,
which shall be dry. The backing paper shall be left attached to the membrane
to ensure no adhesion to the blinding. The backing paper shall be removed
only at laps, which shall be 75 mm minimum in width. Laps shall be made by
pressing the bitumen face of membrane in position, making sure that no ridges
or ripples are formed. Depending on the actual membrane used, a fillet of
bituminous "mastic" may be rerquired to be run on the mineral side of the lap
before making contact to ensure that the lap is watertight.
The membrane shall be trimmed neatly and closely around pile heads. A fillet
of bituminous mastic shall be gunned or troweled around each pile head to
ensure a watertight seal.

2.7.3 The top i.e. the mineral face, of the membrane shall be hosed clean with a high
pressure water jet before structural concrete is placed.

2. 7.4 The vertical and upper horizontal surfaces of concrete against which soil is to
be placed shall be painted with coats of an approved bitumen - latex emulsion,
applied in accordance with the manufacturer's instructions.

2.7.5 The coating shall be kept dry until properly cured.

2. 7.6 Care shall be taken to avoid damaging the coating when back filling .