Copyright © 2013 Agility APAC HSSE Team
Inventory of Work Activities
(Safety & Health)
No. Process/Location Work Activities
Drilling
1 Construction Cutting of Columns
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Inventory of Work Activities
(Safety & Health)
No. Process/Location Work Activities
31
32
33
34
35
Copyright © 2013 Agility APAC HSSE Team
Hazards & Risk Assessment (Safety & Health)
Company : Crescent Constraction Company Conducted/Reviewed by (Names, Hasham uddin/Rafiuddin
designations) (Date) :
Process/Location/Scop Conducted date/Reviewed date : 24 april, 2019
e Functions
1. Hazard :
Identification 2. Risk Evaluation 3. Risk Control
Plan additional control
measure
Consequences -- a)
Possible Accident Existing Risk Control Elimination/Substitutio Specify the additional control Residual Status
No. Work Activity Hazard Risk n
/ Measure Likeli-hood Level b) Engineering control (Mandatory for High / Likeli-hood Severity Risk (Open/
Ill Health & (if any) Extreme Risk Level) Level Closed)
Persons-at-Risk c)
Administrative/Manage
ment Program
d) PPE
1 Drilling Electric wire Electric shock Insulation of electric wire 2 3 c) Administrative/ 3 Likely 2 Minor/ LOW closed
Cutting of Columns Management Program Near Miss
Injury
Open moving parts of 3 2 d) PPE 2 Unlikely 1 Insignifican LOW open
machine t
Heat related
illness 1) Provide plenty of cold
1) Heat stroke c) Administrative/ Minor/
Exposure to heat 2)Low Blood water with ORS 3 2 Management Program 2 Unlikely 2 Near Miss LOW open
2) Rest
pressure
3)unconsciousnes
1) Respiratory
Dust disorder Dust mask c) Administrative/ 2 Unlikely 3 Injury/ Loss LOW open
2) Dust illergey Management Program Time
Small sharps objects Injury of eye by Goggles 3 2 c) Administrative/ 2 Unlikely 3 Injury/ Loss LOW open
concrete particles Management Program Time
Lose cloth Cause injury by Coverall 2 2 a) 3 Likely 3 Injury/ Loss
entagalment Elimination/Substitution Time MEDIUM open
6 Vibration Lower back pain
Rev.: 02 Page 3 of 14 518196607.xlsx
Hazards & Risk Assessment (Safety & Health)
Company : Crescent Constraction Company Conducted/Reviewed by (Names, Hasham uddin/Rafiuddin
designations) (Date) :
Process/Location/Scop Conducted date/Reviewed date : 24 april, 2019
e Functions
1. Hazard :
Identification 2. Risk Evaluation 3. Risk Control
Plan additional control
measure
Consequences -- a)
Possible Accident Existing Risk Control Elimination/Substitutio Specify the additional control Residual Status
No. Work Activity Hazard / Measure Likeli-hood Risk n (Mandatory for High / Likeli-hood Severity Risk (Open/
Level b) Engineering control
Ill Health & (if any) c) Extreme Risk Level) Level Closed)
Persons-at-Risk
Administrative/Manage
ment Program
d) PPE
Rev.: 02 Page 4 of 14 518196607.xlsx
Hazards & Risk Assessment (Safety & Health)
Company : Crescent Constraction Company Conducted/Reviewed by (Names, Hasham uddin/Rafiuddin
designations) (Date) :
Process/Location/Scop Conducted date/Reviewed date : 24 april, 2019
e Functions
1. Hazard :
Identification 2. Risk Evaluation 3. Risk Control
Plan additional control
measure
Consequences -- a)
Possible Accident Existing Risk Control Elimination/Substitutio Specify the additional control Residual Status
No. Work Activity Hazard / Measure Likeli-hood Risk n (Mandatory for High / Likeli-hood Severity Risk (Open/
Level b) Engineering control
Ill Health & (if any) c) Extreme Risk Level) Level Closed)
Persons-at-Risk
Administrative/Manage
ment Program
d) PPE
Rev.: 02 Page 5 of 14 518196607.xlsx
Copyright © 2013 Agility APAC HSSE Team
Risk Control Action Plan (Safety & Health)
No. Work Activity Hazard Risk Control Actions Responsible Due on Status
Drilling
Cutting of Columns Electric wire Insulation of electric wire Rafi Uddin
Open moving parts of Rafi Uddin
machine
1) Provide plenty of cold water with ORS
Exposure to heat Hasham Uddin
2) Rest
Dust Dust mask Rafi Uddin
Small sharps objects Goggles Rafi Uddin
Lose cloth Coverall Hasham Uddin
Vibration Hasham Uddin
Hasham Uddin
10
11
12
Rev.: 02 Page : 6 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 7 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Err:509
0
0
0
0
0
Err:509
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 8 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 9 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 10 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 11 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 12 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 13 of 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rev.: 02 Page : 14 of 14