Selco T Line Web
Selco T Line Web
The units are for DIN rail mounting or screw mounting in switchboards. Since the units are working on identical principles
and have similar design and adjustment schemes, they are easily installed or replaced. All units are available in a number of
versions varying in supply voltage and other functions, hence meeting specific customer requirements to a large extend.
Two solutions are available: One for synchronizing and load sharing on generators with conventional governors (and electronic
speed controllers via an intermediate motorized potentiometer). The other for connection directly to all types of electronic speed
controllers. For synchronizing SELCO also supplies Synchroscopes for illuminated indication of the phase difference.
Also available is a VAr Load Sharer for automatic load sharing of the reactive power or for power factor control on generators
running in parallel with the grid (utility).
Cogeneration Application
Grid
T4500
M8100
Busbar
T4500 B9300 T4500
T4800 T4800
G G
The T4000 performs automatic synchro- The T4500 performs automatic synchro-
nizing of an incoming generator with elec- nization of an incoming generator in a
tronic speed controllers in a minimum of minimum of time by controlling the fre-
time, by controlling the generator speed quency via the electric servomotor on a
and the phase between the generator speed governor or via the E7800 Moto-
and the busbar. rized Potentiometer, or T7900 Electronic
The T4900 provides automatic reactive
Potentiometer.
load sharing (VAr) and system voltage
The unit has fixed and variable output for
control for parallel running generators.
adaptation to a wide range of electronic Among the features it can control the
speed controllers. T4800 Load Sharer to e.g. transfer a load
The reactive load and voltage are mea-
from one or several diesel generators
sured on each generator, compared with
operating in parallel with the grid, or on
T4400 Load Sharer board a ship, to a shaft generator.
the other generators and corrected via
the E7800 Motorized Potentiometer or
The frequency will be aligned by the syn-
T7900 Electronic Potentiometer, until
chronizer through the load sharers. The
balance is obtained. The T4900 can also
unit has voltage matching output with
be used for power factor (Cos Φ) control
adjustable voltage window.
in parallel operation with the grid. One
unit is required for each generator.
T4800 Load Sharer
T5000 Paralleling Relay
The T4400 is a load sharer for generators
with electronic speed controllers. It in-
cludes a built-in frequency control and an
integration function, providing a very high
overall stability and compensate for any
drift within the engine speed controller.
A soft load/unload function is also pro- The T4800 provides automatic load
The T5000 can be used as a synchro
vided. When activated, the T4400 will sharing and system frequency control of
nizing aid or as a check synchronizer. It
slowly increase or decrease speed to generators running in parallel. The load
will give a closing signal to the generator
transfer load to or from the generator. on each generator is compared with the
circuit breaker when voltage difference,
A built-in relay can automatically trip the load of the other generators and adjusted
phase difference and frequency differ-
circuit breaker when unload is completed. via the electric servomotor on the speed
ence are within safe limits, thus prevent-
governor or a motorized potentiometer
ing da-mage or disturbance to the power
The T4400 has a built-in reverse power until balance is obtained.
plant.
protection with selectable limit and time
delay. One load sharing unit T4400 is An unloading function is built into the
required for each diesel generator in par- unit to facilitate smooth transfer of the E7800 Motorized Potentiometer
allel operation. The load sharers are inter- load from a generator before being taken
connected with a 2-wire cable. out of service, by an automatic tripping MOTORIZED
POTENTIOMETER
signal to the breaker. E 7800
can be operated in parallel with the grid. tion. One T4800 unit is required for each 30 70
TOO TOO
SLOW FAST
SYNC SHORT CIRCUIT SHORT CIRCUIT
ENGINE ENGINE
BUS GEN LOAD SHARING LOAD SHARING
CONTROLLER CONTROLLER
ALARM ALARM
INDICATION INDICATION
ENGINE
LOAD SHARING
CONTROLLER
MOTOR MOTOR
GOVERNOR
POTENTIOMETER POTENTIOMETER
AVR AVR
The T2100 protects against partial or
complete excitation loss on the syn-
chronous generator. If a generator under
parallel operation has a low excitation, a
high inductive current is running into the
generator.
This current is detected and the faulty
generator breaker is tripped, thus avoid-
ing overload on the other generators
with a possible blackout of the system.
The trip levels and the delays before trip are easily adjustable using dials at the front
cover. Some units also furnish an adjustable hysteresis setting.
The T2200 has a broad application,
where all 3 phases or any single phase
current detection will function as protec-
tion, control or monitoring.
The relay detects the highest of the 3
input currents and, when the preset val-
ue is exceeded, an output relay will be
activated after a preset time delay.
The relay detects the highest of the 3
Complete Protection of Generators
input currents and, when the preset
values are exceeded the output relays
will be activated after preset time delays.
Power Relay measures I x Cos Φ, and when it becomes too high, the relay will trip,
T2600 Dual Current Relay
indicated by the upper horizontal red line.
The Reverse Power relay measures -I x Cos Φ, representing the active power in the
negative direction, and it will trip for reverse power. The T2100 Excitation Loss
Relay measures -I x Sin Φ, representing the reactive power in negative direction,
and it will trip when exceeding the level represented by the red vertical line.
The T2700 is intended for detection of The T3000 is intended for effective The T3200 is intended for continuous
power level for protection, control and frequency monitoring on generators, insulation monitoring on 3 phase in-
monitoring purposes. The relay detects the busbars or other distribution systems. sulated networks on board ships. The
magnitude of the power and, when the pre- The relay contains the functions “under relay continuously monitors two systems
set value is exceeded, an output relay will be frequency” and “over frequency”, time galvanically separated from each other,
activated after a preset time delay. delayed, and 2 individual output relays, e.g. the busbar and the lighting system or
one relay for each function. two busbar systems.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
With headquarter and manufacturing mainly in Denmark, our product portfolio is known to be of high
quality, extremely reliable and easy to use. Our partners and distributor network worldwide are vital,
in supporting our sales to more than 60 countries.
Every day, SELCO products are on a mission, in operation, around the world, to help control, protect
and enhance the safety of electrical equipment, engine and generator applications, within markets
like marine, oil & gas, power generation, and general industry.
SELCO
Betonvej 11 Tel.: + 45 - 70 26 11 22
DK- 4000 Roskilde Fax: + 45 - 70 26 25 22
Denmark e-mail: [email protected] selco.com