0% found this document useful (0 votes)
90 views1 page

CBD Bp18a C127D2 SDW Co Co NL 07025 01

Uploaded by

rakeshamech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views1 page

CBD Bp18a C127D2 SDW Co Co NL 07025 01

Uploaded by

rakeshamech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

SHAFT KEY PLAN

Station
1 2 3 4 4' 5 6 7 8 9 10 11 12 13 14' 14 15 16 17 CP-2 ROAD WORK LIMIT
ROAD G11 STA 0+031.300

ROAD AA2

ANGLE BRACING
75x40x6 mm 14 G

TRAM (Qatar Rail)


Road Road Road Road

BC

BC
1300x500 KSAD 5810 L/s
GL 14-15/B-C

.C

.C
BC.B-01 BC.C1/01-02 BC.C1/03-04 BC.C1/05A - 05B BC.C1/06 - 07 BC.C1/08 - 09 BC.C1 - 11 BC.D-01

1
-1

-1
2

3
BOD 3425 mm 1 2
.4 4
6
9

LRT(Qatar Rail)
1 2
.4 3
4
7

Station
1 2
.4 4
6
9 1 2

LRT(Qatar Rail)
.4 5
0 1 2
.4 5
0 .6 0
1 2

Station 1 03 +5 00
.5 9
1 2 5

LRT(Qatar Rail)
.6 0
1 2

F
LRT(Qatar Rail)
ROAD A4
FIRST FLOOR
LRT(Qatar Rail)

LRT(Qatar Rail) Station LRT(Qatar Rail) Station LRT(Qatar Rail)


1 2
.4 5
0 1 2
.4 4
6
7 1 2
.4 4
0
6 .6 0
1 2 .6 0
1 2 3 .4 5
1 2 7

4
BC.C1-26
+12.300 m BC.C1 - 14

-2
BC.C1 - 27
BC.B-02 BC.C1/16 - 17 BC.C1/18 - 19 BC.C1/20 - 21 BC.C1/22 - 23 BC.C1-25

1
BC.C1 - 15 BC.D-2

TRAM (Qatar Rail)

.C
BC
UP

ANGLE BRACING STAIRCASE 06A


GF.S.06A

574

574
50X50X6mm
SAFE ROOM

250x250 EAD E
ELECTRICAL ROOM
GF.F.16 GF.M.12

PL1 PL2 PL3

831
LOADING/UNLOADING STAIRCASE 03B ? ? ?

F/B T/A DOCK GF.S.03B


GF.F.01
ROAD AA1 ROAD AA1
ROAD AA1
UP
GOODS CORRIDOR ROAD G1 0+030.800
CP-2 ROAD WORK LIMIT
UP GF.C.01
HOTEL LIFT LOBBY
GF.L.02

300x250 GT-EAD TX ROOM


GF.M.03

UP UP

F/B T/A UP

NOTES:
UP PL6 PL5 PL4
? ? ?

1300X500 KSAD F/A T/B


V UP
GENERAL STORE
GF.F.02
RWDP
?
D
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE NOTED.
2. ALL LEVELS ARE REFERENCED TO QATAR NATIONAL HEIGHT DATUM (QNHD).
CHWS/R M-20 & 21
-
MV ROOM
GF.M.02

3. THIS SHOP DRAWING IS BASED ON IFC TRANSMITTAL NO. 434, ANY CHANGES IN
380 222
APPROVED IFC WILL BE SUBMITTED IN REVISION DRAWING.
250x250 EAD 220 L/s 300x250 GT-EAD 240 L/s CLEAN AGENT FOR MV
GF.M.17
UP

BOD 6250 mm BOD 6300 mm UP


UP
ELECTRICAL ROOM
GF.M.11
C

KSAD M-16 UP

P ANGLE BRACING LEGENDS & ABBREVATION


GROUND FLOOR RISER M-40
UP

50X50X6 B

- 313

BOD: 5335
SAD SUPPLY AIR DUCT
SCALE - 1 : 25 LEFT TO RIGHT
EAD M-40 RAD RETURN AIR DUCT
GREASE TRAP & EJECTOR ROOM GL 7-8/C-D
SECOND FLOOR RISER M-16
LOADING / UNLOADING

FAD M-41
GF.CP.01

A
EAD EXTRACT AIR DUCT
SCALE - 1 : 25
SEAD SMOKE EXTRACT AIR DUCT
UP

BANQUET PREPARATION LEFT TO RIGHT LEFT TO RIGHT


SFAD SMOKE FRESH AIR DUCT
FRP-FAD M-12 KSAD M-38
KITCHEN 14 AV AV THIRD FLOOR FRP-EAD M-13 EAD M-37 TED TOILET EXTRACT AIR DUCT
GROUND FLOOR EAD M-36
+22.300 m
+4.300 m FAD FRESH AIR DUCT
300x250 GT-FAD 240 L/s 950x600 FAD MAIN SUPPORT CHANNEL
Q BOD 5385 mm
ø150mm CHWS/R
FIRE RATED DUCT
440 295
- 250x250 FAD 220 L/s W 300x250 GT-FAD
240 L/s F/A T/B
16.66 L/s
DUCT SUPPORT DETAILS
KEAD KITCHEN EXHAUST DUCT (BS DUCT)
BOD 5335 mm
CP-FAD CAR PARK FRESH AIR DUCT
- S.NO DUCT SIZE
MAIN SUPPORT ANGLE
450x450 FRP-FAD 1040 L/s CHANNEL BRACING CP-EAD CAR PARK EXHAUST AIR DUCT
BOD 6045 mm 250x250 FAD 250x250 FAD
F/A T/B 220 L/s F/A T/B BRACING ANGLE 40x100x40 mm SAT SOUND ATTENAUTOR
ø150mm CHWR 1 LENGTH = 150 UPTO 300 mm 50x50x6 mm
(6 mm THK)
28.06 L/s F/A T/B

276
SAD SUPPLY AIR DIFFUSER

226
B 300x250 GT-FAD 50x100x50 mm
450x450 FRP-FAD F/A T/B ANGLE BRACING 2 LENGTH = 350 UPTO 650 mm
(6 mm THK)
50x50x6 mm
50X50X6mm F/A T/B
ø150mm CHWS
RAD RETURN AIR DIFFUSER
28.06 L/s F/B T/A 50x150x50 mm
277

BOP: 3666
3 LENGTH = 700 UPTO 1200 mm 65x65x6 mm
BASEMENT 1 SUPPORT ANGLE / CHANNEL (6 mm THK)
ANGLE BRACING
451 297 SLD SUPPLY LINEAR DIFFUSER
50X50X6 mm -0.200 m 50x150x50 mm
276 4 LENGTH = 1200 UPTO 1600 mm
(6 mm THK)
75x40x6 mm
RLD RETURN LINEAR DIFFUSER
GROUND FLOOR RISER M-41 CHANNEL 50x150x50mm. RISER DUCT INSTALLATION INSIDE SHAFT SG SUPPLY GRILLE

GROUND FLOOR RISER M-12 SCALE - 1 : 25


RG RETURN GRILLE

BOD: 2560

BOD: 2510
SCALE - 1 : 25 GREASE TRAP & EJECTOR ROOM
VCD VOLUME CONTROL DAMPER
FIRE WATER PUMP ROOM ø150mm CHWS/R
SECOND FLOOR
MOTORISED SMOKE FIRE DAMPER
+17.300 m FIXING ON SLAB DUCT SUPPORT DETAILS MSFD
BASEMENT 2 GL 14'-14/B-C ANGLE SUPPORT
ANGLE FD FIRE DAMPER
-3.700 m S.NO DUCT SIZE
BRACING
FIRST FLOOR
X DUCT

-
SECTION-W M-41 583
+12.300 m INSULATION
1 LENGTH = 150 UPTO 300 mm 50x50x6 mm
MSD MOTORISED SMOKE DAMPER

SCALE -1 : 75 FIXED TO DUCT C-AD CEILING ACCESS DOOR


R 203 ANGLE 2 LENGTH = 350 UPTO 650 mm 50x50x6 mm

- GREASE TRAP & EJECTOR ROOM D-AD DUCT ACCESS DOOR


3 LENGTH = 700 UPTO 1200 mm 65x65x6 mm
ø150mm CHWS/R AHU AIR HANDLING UNIT

4 LENGTH = 1200 UPTO 1600 mm 75x40x6 mm


FCU FAN COIL UNIT
GL 14-15/B-C
ø200mm CHWR
FIG.76 IU INDOOR UNIT
304 FIRST FLOOR 28.06 L/s F/A T/B RISER DUCT INSTALLATION INSIDE SHAFT
ANGLE BRACING
DW 144

BOP: 4082
BOP: 3366
50x50x6 mm +12.300 m CU CONDENSER UNIT
ø200mm CHWS
242

359
450x450 FRP-EAD F/B B 28.06 L/s F/B T/A
EAF/FAF EXTRACT / FRESH AIR FAN
ø150 mm CHWS/R

BOD: 6250
BOP 3061 JF JET FAN
500
U-BOLT 28.06 L/s
450x450 FRP-EAD 1040 L/s
BOD 6550 mm F/A FROM BELOW
Ø150mm. CHWS
0.00 L/s F/A T/B T/A TO ABOVE
FIRST FLOOR
GROUND FLOOR RISER M-13
300x250 GT-EAD
+12.300 m DETAIL-A
451

240 F/B T/A F/B FROM BELOW


Ø150mm. CHWR
SCALE - 1 : 25 0.00 L/s F/B-T/A T/B TO BELOW

FIRE WATER PUMP ROOM CHANNEL 50x150x50mm. GROUND FLOOR


CHILLED WATER PIPE
MAIN SUPPORT CHANNEL
215 CONSULTANT'S REVIEW & APPROVAL:
+4.300 m

BOD: 5135
850x1350 KSAD DOCUMENT REVIEW STATUS DRAWING REVIEW STAMP
11170 L/s F/A T/B
ANGLE BRACING STATUS A: APPROVED
S 50X50X6
ø80mm CHWS/R
STATUS B: APPROVED WITH COMMENTS
- STATUS C: REVISE & RESUBMIT

ANGLE BRACING STATUS D: REJECTED


75X40X6 250x250 EAD

ANGLE BRACING BASEMENT-1 FLOOR RISER M-20 & 21 220 L/s F/B T/A

451 502 150 100 150


50X50X6mm
SCALE - 1 : 25 GROUND FLOOR
455

+4.300 m BASEMENT LEVEL 2 FLOOR PLAN


01 CBD-BP18A-C127D2- IFC-ME-HVAC-B2-01002 00
OVERALL- AC AND VENT LAYOUT
02 CBD-BP18A-C127D2- IFC-ME-HVAC-B1-01003 BASEMENT LEVEL 1 FLOOR PLAN 00
300x300 EAD BASEMENT 1 OVERALL- AC AND VENT LAYOUT
F/B T/A -0.200 m CBD-BP18A-C127D2- IFC-ME-HVAC-GF-01004 GROUND FLOOR PLAN - OVERALL
00
CHILLED WATER PIPE INSTALLATION DETAIL INSIDE SHAFT 03
AC AND VENT LAYOUT
CBD-BP18A-C127D2- IFC-ME-HVAC-L2-03011 SECOND FLOOR PLAN PART-1
04 00
300x300 EAD 400 L/s AC AND VENT LAYOUT
BOD 6250 mm X 05 CBD-BP18A-C127D2- IFC-ME-HVAC-B3-03101,03103 BASEMENT LEVEL-3 TO SECOND 00

BOP: 5440
FLOOR PLAN PART-1 CHWS/R LAYOUT
-
BOD: 2475

230 CHILLED WATER PIPE SUPPORT DETAILS 03105,03107,03109,03111

BOD: 2570
BOD: 2520
B CHANNEL 50x150x50mm.
06 CBD-BP18A-C127D2- IFC-ME-HVAC-NL-97003 CHILLED WATER SYSTEM
SCHEMATIC DIAGRAM (PART 1)
00
S.NO PIPE SIZE CHANNEL SIZE U-BOLT SPACING
07 AIR CONDITIONING & VENTILATILON
CBD-BP18A-C127D2- IFC-ME-HVAC-NL-97002 to 011 00
SCHEMATIC DIAGRAM
Ø200mm CHWS/R ø50 mm CHWS/R BASEMENT 1 40x100x40 mm
GROUND FLOOR RISER M-36 0.00 L/s F/B-T/A BOP 3420 BASEMENT 2 1 ø20 UPTO 50 mm U-BOLT 2.5 mm S.NO. DRAWING/DOC. NUMBER TITLE REV

135°
-0.200 m (6 mm THK)
1.68 L/s -3.700 m
277

REFERENCE DWG / DOC


SCALE - 1 : 25 2 ø65 UPTO 100 mm
50x100x50 mm
U-BOLT 2.5 mm
(6 mm THK)

STAFF CANTEEN CHANNEL 50x150x50mm. SECTION-U M-38 SECTION-V M-40 3 ø125 UPTO 250 mm
50x150x50 mm
U-BOLT 2.5 mm
(6 mm THK)
451

SCALE -1 : 75 SCALE -1 : 75

ø65 mm CHWS/R ø50 mm CHWS/R


HOTEL MAIN KITCHEN GREASE TRAP & EJECTOR ROOM GROUND FLOOR
+4.300 m
T BOP 4120
4.21 L/s
BOP 3420
1.68 L/s
386
- U-BOLT
ø150mm CHWS/R 00 ISSUED FOR APPORVAL GEC VK VP 12-08-2020
REV. DESCRIPTION DRWN CHKD APRD DATE

DRAWING HISTORY
ANGLE BRACING
50X50X6mm
GROUND FLOOR RISER M-21 CLIENT:

SCALE - 1 : 25
455

Lusail Real Estate Development Co


B ø150mm CHWS/R P.O. Box 26060 Doha, State of Qatar
350x350 EAD
F/B T/A B 0.00 L/s F/A T/B
GL 14-15/B-C
TEL: +974 4497 4444 FAX: +974 4497 7563

GL 14-15/B-C

BOP: 3059
PROJECT MANAGER:
350x350 EAD 500 L/s
GL 6-7/B-C GL 6-7/B-C FIRST FLOOR FIRST FLOOR
BOD 6250 mm FIRST FLOOR FIRST FLOOR +12.300 m
CHANNEL 40x100x40mm. +12.300 m
260
+12.300 m +12.300 m
OFFICE NO.203 FLOOR 2, ARAFAT BUSINESS CENTER P.O.BOX:
B 242
ø32mm CHWR
1.1 L/s F/B T/A
55734, DOHA, QATAR TEL. +974 4423 1278 FAX. +971 4515 3401
SUPERVISION CONSULTANT:
BASEMENT 1
ø32mm CHWS
-0.200 m
GROUND FLOOR RISER M-37 GL 6-7/B-C 1.1 L/s F/AT/B

SCALE - 1 : 25 AL SALAM TOWER, SHERATON ROUNDABOUT P.O.BOX 23593, DOHA - QATAR


THIRD FLOOR TEL. +974 4480 2097 FAX. +974 4480 2128
ø32mm CHWS
CHEMICAL ROOM +22.300 m 0.74 L/s DESIGN GUARDIAN:
300
CHANNEL 40x100x40mm.
300x300 EAD

BOD: 6250
DP ARCHITECTS PTE LTD

BOD: 6250
400 L/s F/B T/A
BOD: 6550

450x450 FRP-EAD

BOP: 2899
455 455
BOD: 6047

1040 L/s F/B T/A 6 RAFFLES BOULEVARD, #04-100 MARINA SQUARE, SINGAPORE 039594
U 350x350 EAD TEL. +65 6338 3988 FAX. +65 6337 9989
500 L/s F/B T/A
- 500x1300 KSAD
5810 L/s F/A T/B
450x450 FRP-FAD
451 373
MAIN CONTRACTOR:
1040 L/s F/A T/B
BOD: 3425

1350x850 KSAD 11170 L/s ø25mm CHWR


NO SUFFICIENT SPACE FOR
BOD 9635 mm 0.36 L/s F/B T/A
DUCT SUPPORT ANGLE BRACING
ANGLE BRACING 50X50X6
BASEMENT 2 50X50X6
ANGLE BRACING ANGLE BRACING ø25mm CHWS
50x50x6 mm 0.00 L/s F/A T/B -3.700 m
75x40x6 mm
DESIGN CONSULTANT:
GROUND FLOOR GROUND FLOOR C-Ring Road at Al Mana Intersection
750 SECOND FLOOR GROUND FLOOR GROUND FLOOR +4.300 m P.O. Box 18108
ANGLE BRACING +4.300 m
+17.300 m 50x50x6 mm +4.300 m +4.300 m Doha, Qatar
1350x850 KSAD T: + 974 4462 6400, F: +974 4462 6500
F/A T/B web: http://www.keoic.com
500

email: [email protected]

STRUCTURAL CONSULTANT:
ANGLE BRACING
75X40X6mm
BOP: 2903

BOD: 2950

BOD: 2425
BOD: 3300

BOD: 1760

BOD: 1760

SUB CONTRACTOR:
GROUND FLOOR RISER M-38 BIN DIRHAM PLAZA BUILDING
SCALE - 1 : 25 BASEMENT 1 BASEMENT 1 OFFICE NO. 3 & 4, THIRD FLOOR
B-RING ROAD,
BASEMENT 1 BASEMENT 1 BASEMENT 3 -0.200 m -0.200 m P.O. BOX 23458 DOHA, QATAR
-0.200 m -0.200 m -7.400 m TEL: +974-44238444; FAX: +974-44551268
HOTEL MAIN KITCHEN FIRST FLOOR WEBSITE: www.voltas.com
+12.300 m
SECTION-S M-36 SECTION-T M-37 PROJECT:

SCALE -1 : 75 SCALE -1 : 75 BP 18A-DESIGN AND BUILD OF MIXED USE BUILDINGS


SECTION P M-16 SECTION Q M-12 SECTION R M-13 SECTION-B CHWR M.20 & 21 COMMERCIAL BOULEVARD
SCALE -1 : 75 SCALE -1 : 75 SCALE -1 : 75 SCALE - 1 : 50 STAFF CANTEEN CHEMICAL ROOM DWG. TITLE:
COORDINATION CHECK
BANQUET PREPARATION FIRE WATER PUMP ROOM FIRE WATER PUMP ROOM DISCIPLINE INITIALS SIGNATURE DATE
SHAFT COORDINATION DETAILS
KITCHEN HVAC
M-12,13,16,20,21,36,37,38,40,41
PLUMBING/DRAINAGE
FIRE FIGHTING
BUILDING
ELECTRICAL
BC.C1/27 & D2 - 5 STAR HOTEL
ELV
THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
STRUCTURAL DRAWING NUMBER: SCALE: As indicated ORIG. DWG SIZE: A0 Rev.
ARCHITECTURAL CBD-BP18A-C127D2-SDW-CO-CO-NL-07025-01 Sht. Con't. on 00
1 OF 1

You might also like