4th QTR FY 2020-21 Long Tender Notice Advert
4th QTR FY 2020-21 Long Tender Notice Advert
The Kenya National Highways Authority (KeNHA) is a State Corporation established under the Kenya
Roads Act, 2007 with the responsibility for Management, Development, Rehabilitation and Maintenance of
National Trunk Roads.
The Authority hereby invites bids from eligible bidders for provision of 4th Quarter Financial Year 2020-
2021 Maintenance of various roads to be funded through the Road Maintenance Levy Fund as listed below: -
Inspection
& Purchase
NCA of Tender
Registr Engineers’ Documents
Eligibil
No. Tender No. Tender Description ation Region Estimate and Email
ity
Requir (Kshs.) & telephone
ed Contacts of
Regional
Directors
KeNHA
Nairobi
Region
Boardroom;
Ministry of
Public
KeNHA/R5 Purchase of 1. No. Nairobi 50,000,000.00 Works
/156/2021 Falling Weight Offices,
Deflectometer P.O Box
200-00507
1.
Nairobi.
Machakos
Road
020-
2632237/
020-
2642475
Email:rm.nai
robi@kenha.
co.ke
Performance Based KeNHA,
Contract for Nyanza
KeNHA/R1
2. Maintenance of Kisii - 4,5 or 6 All Nyanza 92,455,760.81 Regional
/215/2021
Ogembo –Kilgoris Office, P.O.
(B4/B3) Road Box 317 –
Performance Based 40100,
KeNHA/R1
3. Contract for 4,5 or 6 All Nyanza 123,612,257.37 MoPW
/216/2021
Maintenance Nyaramba Building,
1
– Chemosit (B4) Road Busia Road,
Kisumu
061-
Performance Based
2300098/07
Contract for
KeNHA/R1 33283167/0
4. Maintenance of 3,4 or 5 All Nyanza 184,929,606.61
/217/2021 708711137
Masara -
Email:rm.ny
Kehancha(B1)Road
anza@kenha
Performance Based
.co.ke
KeNHA/R1 Contract for
5. 1,2 or 3 All Nyanza 216,911,871.30
/218/2021 Maintenance of Katito
- Kendu Bay (B2) Road
Performance Based
Contract for
KeNHA/R1
6. Maintenance of Bondo 3,4 or 5 All Nyanza 190,925,300.16
/219/2021
- Siaya – Rangala
(B9)Road
Performance Based
KeNHA/R1 Contract for
7. 3,4 or 5 All Nyanza 104,649,712.02
/220/2021 Maintenance of Kisii –
Nyaramba (B4) Road
Performance Based
Contract for
KeNHA/R1
8. Maintenance of 4,5 or 6 All Nyanza 58,242,792.56
/221/2021
Chepilat – Ikonge
(B133) Road
Performance Based
KeNHA/R1 Contract for
9. 4,5 or 6 All Nyanza 61,860,125.82
/222/2021 Maintenance of Ikonge
- Chabera (B133) Road
Performance Based
Contract for
KeNHA/R1 Maintenance of Fort
10. 4,5 or 6 All Nyanza 86,651,018.64
/223/2021 Tenan Bridge -
Muhoroni Junction –
Awasi (B132)Road
Performance Based
KeNHA/R1 Contract for
11. 5,6 or 7 All Nyanza 49,738,911.23
/224/2021 Maintenance of Siaya -
Ruambwa(B136) Road
Routine Maintenance
KeNHA/R1
12. of Masara - Muhuru 5,6 or 7 All Nyanza 20,407,438.27
/225/2021
Bay (B1) Road
Routine Maintenance
of Ranen -
KeNHA/R1
13. Chamgiwadu - 5,6 or 7 All Nyanza 39,990,971.16
/226/2021
Nyamaiya – Magenche
(B144) Road
Routine Maintenance
KeNHA/R1 and Spot Improvement
14. 4,5 or 6 All Nyanza 99,211,814.16
/227/2021 of Luanda – Siaya
(B127) Road
2
Routine Maintenance
KeNHA/R1 and Spot Improvement
15. 3,4 or 5 All Nyanza 123,321,258.57
/228/2021 of Sondu - Sosiot -
Kapsoit(B135) Road
Routine Maintenance
KeNHA/R1
16. of Awendo - Mariwa - 4,6 or 6 All Nyanza 52,785,858.51
/229/2021
Kilgoris(B130) Road
Routine Mintenance
KeNHA/R1 and Spot Improvement
17. 4,5 or 6 All Nyanza 80,024,201.96
/230/2021 of Owimbi - Ndori –
Ngiya (B142) Road
Performance Based
Contract for the
KeNHA/R2
18. Maintenance of 3,4 or 5 All Western 194,025,010.40
/65/2021
Kakamega- Ekero
(B12) Road
Performance Based
Contract for the
KeNHA/R2
19. Maintenance of Junc. 3,4 or 5 All Western 171,557,975.54
/66/2021
A12 (Ebuyangu)-
Ekero (B140) Road
Performance Based
Contract for the
KeNHA/R2
20. Maintenance of 3,4 or 5 All Western 180,291,335.40
/67/2021
Webuye- Kitale (A1)
Road
Performance Based KeNHA
Contract for the Western
KeNHA/R2 Region
21. Maintenance of 2,3 or 4 All Western 226,485,764.26
/68/2021 495-50100
Mayoni- Bungoma
(Kanduyi) (B139) Road Kakamega.
Performance Based 056-
Contract for the 2030089 /
KeNHA/R2
22. Maintenance of 2,3 or 4 All Western 207,165,247.26 0712305770
/69/2021 Email:
Luanda- Majengo
(B127) Road rm.western
Performance Based @kenha.co.k
Contract for the e
KeNHA/R2
23. Maintenance of 3,4 or 5 All Western 111,978,512.00
/70/2021
Bungoma- Chwele
(B139) Road
Performance Based
Contract for the
KeNHA/R2
24. Maintenance of 4,5 or 6 PWD Western 57,883,768.00
/71/2021
Sabatia- Sigalagala
(B136) Road
Performance Based
KeNHA/R2 Contract for the
25. 4,5 or 6 All Western 65,836,532.25
/72/2021 Maintenance of Ugunja
- Sabatia (B136) Road
KeNHA/R2 Performance Based
26. 1,2 or 3 All Western
/73/2021 Contract for the 269,687,124.00
3
Maintenance of Junc.
A1(Chavakali) – Junc.
B12 (Chepsonoi)
(B128) Road
Performance Based
Contract for the
KeNHA/R2
27. Maintenance of Junc. 5,6 or 7 Women Western 41,956,083.50
/74/2021
B8(Chepterit) -
Kimondi (B123) Road
Performance Based
Contract for the
KeNHA/R2 Maintenance of
28. 1,2 or 3 All Western 307,301,455.30
/75/2021 Namwela -
Kamukuywa (B142)
Road
Performance Based
Contract for the
KeNHA/R2
29. Maintenance of 4,5 or 6 Youth Western 74,957,095.12
/76/2021
Bumala- Ejinja (B138)
Road
Routine Maintenance
KeNHA/R2 and Spot Improvement
30. 5,6 or 7 PWD Western 32,411,910.90
/77/2021 of Kimondi- Kaiboi
(B123) Road
Routine Maintenance
KeNHA/R2 and Spot Improvement
31. 5,6 or 7 All Western 40,897,348.60
/78/2021 of Kaiboi- Turbo
(B123) Road
Routine Maintenance
and Spot Improvement
KeNHA/R2
32. of Junc. A104 (Turbo) - 5,6 or 7 Youth Western 44,580,656.00
/79/2021
Junc.A1 (Shikhendu)
(B123) Road
Routine Maintenance
KeNHA/R2 and Spot Improvement
33. 5,6 or 7 Youth Western 41,821,997.65
/80/2021 of Junc. A1(Papaton)-
Endebes (B123) Road
Routine Maintenance
KeNHA/R2 and Spot Improvement
34. 5,6 or 7 Youth Western 29,822,570.50
/81/2021 of Mungatsi- Kimaeti
(B141) Road
Routine Maintenance
KeNHA/R2 and Spot Improvement
35. 5,6 or 7 Women Western 26,660,169.80
/82/2021 of Kimaeti- Lwakhakha
(B141) Road
Construction of a box
KeNHA/R2 culvert and enhanced
36. 6,7 or 8 Women Western 14,147,094.65
/83/2021 protection at Endebess
(B123) Road
Construction of a box
KeNHA/R2
37. culvert and enhanced 6,7 or 8 PWD Western 14,803,055.80
/84/2021
protection at Turbo
4
(B123) Road
Construction of a box
KeNHA/R2 culvert and enhanced
38. 6,7 or 8 Youth Western 14,639,806.10
/85/2021 protection at Musikoma
(B141) Road
Construction of a box
KeNHA/R2 culvert and enhanced
39. 6,7 or 8 Women Western 14,002,632.60
/86/20211 protection at Kimaeti
(B141) Road
Performance Based
Contract for the
KeNHA/R2 Maintenance of
40. 2,3 or 4 Women Western 230,000,000.00
/87/2021 Kaptama -
Kapsokwony (B13)
Road
Performance Based
Contract for the
KeNHA/R3 North
41. Maintenance of 2,3 or 4 All 205,141,362.94
/316/2021 Rift
Lodwar-Lokitaung
Junction(A1) Road
Routine Maintenance
KeNHA/R3 and Spot Improvement North
42. 6,7 or 8 Youth 18,530,550.00
/317/2021 of Makutano- Rift
Kalem(B117) Road
Routine Maintenance KeNHA,
and Spot Improvement North Rift
KeNHA/R3 North
43. of Lokwamosing- 6,7 or 8 Women 15,740,176.00 Regional
/318/2021 Rift
Amaler-Lomut (B118) Office
Road P.O.BOX
Routine Maintenance 2708
and Spot Improvement ELDORET.
KeNHA/R3 North
44. of Lowereng- 6,7 or 8 PWD 12,950,376.00 0777-
/319/2021 Rift
Todonyang (B119) 127531
Road Email:
Routine Maintenance rm.northrift
and Spot Improvement @kenha.co.k
KeNHA/R3 North
45. of Kapcherop-Naiberi- 6,7 or 8 Youth 8,035,456.00 e or
/320/2021 Rift
Kapchorua- rd.northrift
Torongo(B122) Road @kenha.co.k
Routine Maintenance e
and Spot Improvement
KeNHA/R3 North
46. of Eldoret-Nyaru- 5,6 or 7 Women 50,173,036.00
/321/2021 Rift
Kapkayo-
Tenges(B124) Road
Routine Maintenance
and Spot Improvement
KeNHA/R3 North
47. of Kondoo-Ainabkoi- 6,7 or 8 PWD 10,872,816.00
/322/2021 Rift
Kamwosor-Flourspar
(B125) Road
5
Routine Maintenance
KeNHA/R3 and Spot Improvement North
48. 6,7 or 8 Women 15,335,336.00
/323/2021 of Biretwo-Arror-Tot Rift
(B126) Road
Construction Of
KeNHA/R4 Narusura Box Culvert South
49. 5,6 or 7 Women
/245/2021 along Ewaso Nyiro - Rift 29,042,667.70
Morijo (B19) Road
Performance Based
Contract for
KeNHA/R4 Maintenance of South
50. 2,3 or 4 All 258,624,305.21
/246/2021 Junction A4 Maili Rift
Saba- Kinamba (B16)
Road
Performance Based
Contract for
KeNHA/R4 South
51. Maintenance of 2,3 or 4 Women 258,710,201.08
/247/2021 Rift
KCC(Sotik)-Ndanai -
Gorgor (B133) Road
Performance Based
KeNHA/R4 Contract for South KeNHA
52. 3,4 or 5 PWD 180,716,816.44
/248/2021 Maintenance of Lanet- Rift South Rift
Ndundori (B20) Road Region
Performance Based Ministry of
Contract for Works
KeNHA/R4 South
53. Maintenance of 1,2 or 3 All 410,445,774.24 Building,
/249/2021 Rift
Londiani – Fort Tenan Nakuru.
(B132) Road P.O.BOX
Performance Based 17752-
KeNHA/R4 Contract for South 20100
54. 1,2 or 3 All 446,829,910.06
/250/2021 Maintenance of Narok- Rift NAKURU.
Ngoswani (B131) Road 0785663508
Performance Based Email:rd.sou
Contract for thrift@kenh
KeNHA/R4 South
55. Maintenance of 2,3 or 4 All 236,907,170.23 a.co.ke
/251/2021 Rift
Ngoswani-Sekenani
(B131) Road
Performance Based
Contract for
KeNHA/R4 Maintenance of South
56. 1,2 or 3 All 482,460,362.29
/252/2021 Junction A8 Ngata- Rift
Njoro-End of Tarmac
(B18) Road
Periodic Maintenance
KeNHA/R4 South
57. of Njoro – Mau 1 or 2 All 685,287,516.17
/253/2021 Rift
Summit (B129) Road
Periodic Maintenance
KeNHA/R4 of Sotik (Tea Factory) - South
58. 1,2 or 3 All 476,577,175.33
/254/2021 Litein – Bomet (B134) Rift
Road
KeNHA/R4 Framework Contract South
59. 5,6 or 7 Youth 25,547,690.00
/255/2021 For Handling Rift
6
Emergencies in South
Rift Region
Performance Based
Contract for
KeNHA/R5
60. Maintenance of 3,4 & 5 All Nairobi 199,999,529.85
/152/2021
Kiambu-Ngewa-Thuita
(B30) Road.
Routine Maintenance
and Spot Improvement
KeNHA/R5
61. of Ruiru-Tatu City- 6,7 & 8 Women Nairobi 19,999,761.84
/153/2021
Kiambu-Raini-Karura-
Kikuyu (B115) Road.
Routine Maintenance
KeNHA/R5 and Spot Improvement
62. 5,6 & 7 Youth Nairobi 39,957,701.04
/154/2021 of Magumu-Njabini
(B110) Road.
Performance Based
KeNHA/R6 Contract for the
63. 4,5 or 6 Youth Central 54,000,000.00
/189/2021 Maintenance of Nyeri -
Marua (B21) Road
Routine Maintenance
and Spot Improvement
KeNHA/R6
64. of Dundori – Charagita 5,6 or 7 Central 23,064,419.20
/190/2021 Women
- Oljoro Orok (B108)
Road
Routine Maintenance &
KeNHA/R6 Spot Improvement of
65. 6,7 or 8 Youth Central 8,779,460.00 KeNHA
/191/2021 Aberdare Forest Gate –
Njoguini (B111) Road Central
Region
Routine Maintenance
Boardroom;
KeNHA/R6 and Spot Improvement 16,044,540.00
66. 6,7 or 8 Youth Central Ministry of
/192/2021 of Ihururu - King'ong'o
Public
- Kiganjo (B111) Road
Works
Routine Maintenance
Offices,
KeNHA/R6 and Spot Improvement
67. 6,7 or 8 PWD Central 9,528,240.00 Nyeri
/193/2021 of Gathera - Kiriaini
061-
(B112) Road
2034419/07
Routine Maintenance &
04000 133
KeNHA/R6 Spot Improvement of
68. 6,7 or 8 Women Central 15,729,310.00 Email:rd.cen
/194/2021 Kiriaini - Mugeka
tral@kenha.
(B112) Road
co.ke
Routine Maintenance &
KeNHA/R6 Spot Improvement of
69. 6,7 or 8 Youth Central 13,160,814.80
/195/2021 Gituya - Kabati (B113)
Road
Routine Maintenance &
KeNHA/R6 Spot Improvement of
70. 6,7 or 8 All Central 8,338,135.68
/196/2021 Kabati - Ndula (B113)
Road
Routine Maintenance &
KeNHA/R6
71. Spot Improvement of 5,6 or 7 All Central 40,069,663.31
/197/2021
Kangema - Karuri -
7
Murang'a (B114) Road
Routine Maintenance
KeNHA/R6 and Spot Improvement
72. 6,7 or 8 Women Central 9,022,132.00
/198/2021 of Igoji – Gaturi -
Kionyo (B147) Road
Routine Maintenance
KeNHA/R6 and Spot Improvement
73. 6,7 or 8 Youth Central 11,028,120.00
/199/2021 of Kionyo - Nkubu
(B147) Road
Routine Maintenance
KeNHA/R7 and Spot Improvement Upper
74. 6,7 or 8 PWD 10,000,000.00
/472/2021 of Ruiri - Kienderu- Eastern
Meru(B103)Road
Routine Maintenance
KeNHA/R7 and Spot Improvement Upper
75. 5,6 or7 ALL 34,570,262.00
/473/2021 of JN B22 - Naibor- Eastern
Doldol (B101) Road
Routine Maintenance KeNHA,
and Spot Improvement Upper
KeNHA/R7
of Doldol – Ethi - 5,6 or 7 Upper Eastern
76. /474/2021 ALL 38,679,202.00
Engare Ndare - Eastern regional
Lewa(B101)Road Offices,
P.O.BOX
Routine Maintenance 325 -60300
KeNHA/R7 and Spot Improvement ISIOLO
6,7 or 8 Youth Upper
77. /475/2021 of Lareta - 15,741,432.00 Isiolo Town
Eastern
Wamba(B121) Road Email:
rd.uppereast
Routine Maintenance ern@kenha.
KeNHA/R7 and Spot Improvement co.ke
5,6 or 7 Women Upper
78. /476/2021 of Wamba- 25,559,347.00
Eastern
Kisima(B120) Road
Routine Maintenance
KeNHA/R7 and Spot Improvement Upper
5,6 or 7 ALL
79. /477/2021 of Wamba-Sereolipi Eastern 40,530,562.00
(B120) Road
8
Routine Maintenance & 2020287
KeNHA/R8 Spot Improvement of Lower Email:
83. 6,7 or 8 PWD 18,386,939.60
/236/2021 Wikililye - Kabumbuni Eastern rd.lowereast
(B61) Road ern@kenha.
Performance Based co.ke
Contract for
KeNHA/R8 Lower
84. Maintenance of 5,6 or 7 Youth 48,463,663.20
/237/2021 Eastern
Machakos - Kangundo
(B105) Road
Performance Based
Contract for
KeNHA/R9
85. Maintenance of 5,6 or 7 Women Coast 37,033,346.84
/75 /2021
Mazeras – Ribe – KeNHA,
Kaloleni (B97) Road Coast
Routine Maintenance Region, 2nd
KeNHA/R9 and Spot Improvement Floor,
86. 5,6 or 7 All Coast 34,962,353.60
/76/2021 of Old A109 Magongo MOR&PW
(B147/8/9) Road Main
Routine Maintenance Building,
KeNHA/R9 and Spot Improvement Mahindi
87. 5,6 or 7 Youth Coast 24,999,983.60
/77/2021 of Dzitsoni – Jaribuni – Road off
Tezo (B99) Road Shimanzi
Routine Maintenance Road P.O.
and Spot Improvement Box 84254-
KeNHA/R9
88. of Mrima – Shimba 5,6 or 7 Women Coast 20,203,251.36 80100
/78/2021
hills – Mwabungu Mombasa
(B98) Road 020-
Routine Maintenance 2653702/30
KeNHA/R9 and Spot Improvement 700344891
89. 5,6 or 7 Youth Coast 22,960,657.20
/79/2021 of Kinango – Mazeras Email:rd.coa
(B97) Road [email protected]
Framework Contract .ke
KeNHA/R9 for Handling
90. 5,6 or 7 All Coast 50,000,000.00
/80/2021 Emergencies in Coast
Region
Routine Maintenance
North KeNHA,
KeNHA/R1 and Spot Improvement
91. 4,5 or 6 All Eastern 54,352,093.48 North
0/186/2021 of Lagbogol - Harret –
Region Eastern
Daadab (B100) Road
Regional
Routine Maintenance
North Office,
KeNHA/R1 and Spot Improvement
92. 5,6 or 7 Youth Eastern 37,515,046.12 P.O.BOX 41
0/187/2021 of Buna - Eldas (Junct
Region – 70100
UE 50008) (A14) Road
GARISSA.,
Routine Maintenance
North Garissa
KeNHA/R1 and Spot Improvement
93. 5,6 or 7 PWD Eastern 26,223,784.76 Public
0/188/2021 of Kotulo - Khorof
Region Garissa
Harar (B93) Road
0727461040
Routine Maintenance
North rm.northeast
KeNHA/R1 and Spot Improvement
94. 5,6 or 7 PWD Eastern 38,170,949.56 ern@kenha.
0/189/2021 of Khorof Harar - co.ke
Region
Konton (B93) Road
9
Performance Based
North
KeNHA/R1 Contract for
95. 4,5 or 6 Youth Eastern 95,754,787.96
0/190/2021 Maintenance of Modika
Region
– Nuno (A10) Road
Framework Contract
for Handling North
KeNHA/R1
96. Emergencies in North 5,6 or 7 All Eastern 25,000,000.00
0/191/2021
Eastern Region (Wajir Region
and Mandera)
Framework Contract
for Handling North
KeNHA/R1
97. Emergencies in North 5,6 or 7 All Eastern 25,000,000.00
0/192/2021
Eatern Region (Garisa Region
and Tana River)
Periodic Maintenance North
KeNHA/R1
98. of Elwak -Wargadud 1,2 or 3 All Eastern 306,093,426.29
0/193/2021
(A13) Road Region
KeNHA
Nairobi
Region
Boardroom;
Performance Based
Ministry of
Contract for
KeNHA/R5 CORR. Public
99. Maintenance of 1 or 2 532,324,338.19
/155/2021 A Works
Kyumvi – Sultan All
Offices,
Hamud (A8) Road
P.O Box
200-00507
Nairobi.Mac
hakos Road
KeNHA,
Coast
Region, 2nd
Floor,
MOR&PW
Main
Building,
Mahindi
Performance Based Road off
Contract for Shimanzi
KeNHA/R9 CORR.
100. Maintenance of Kwa 6 or 7 Youth 21,080,990.88 Road P.O.
/81/2021 A
Jomvu - Mombasa (A8) Box 84254-
Road 80100
Mombasa
020-
2653702/30
700344891
Email:rd.coa
[email protected]
.ke
10
Maintenance of Region
Nanyuki - Lewa (A2) Boardroom;
Road Ministry of
Public
Works
Offices,
Performance Based Nyeri
KeNHA/
Contract for 061-
102. R6/200/202 2,3 or 4 Women Corr. C 302,723,890.20
Maintenance of Marua 2034419/07
1
- Nanyuki (A2) Road 04000133
Email:rd.cen
tral@kenha.
co.ke
Construction of Box
KeNHA/R5 Culvert at Km 56+000
103. 3 or 4 Women Corr. C 109,458,638.90
/150/2021 (Kwa Majini) Along
(A3) Road
Installation of Retro KeNHA
Reflective Delineators Nairobi
KeNHA/R5
104. (Cat Eyes) Along 4,5 or 6 Youth Corr. C 103,909,098.34 Region
/146/2021
Nairobi – Thika (A2S) Boardroom;
Road Ministry of
Performance Based Public
Contract for The Works
KeNHA/R5 Maintenance of Offices,
105. 5,6 or 7 PWD Corr. C 51,917,365.06
/148/2021 Kanyonyo – Mwingi P.O Box
(A3) Road (Off 200-00507
Carriageway Works) Nairobi.
Performance Based Machakos
Contract for The Road
Maintenance of 020-
KeNHA/R5
106. Kilimambogo – 5,6 or 7 Women Corr. C 53,842,605.75 2632237/
/147/2021
Kanyonyo (A3) Road 020-
(Off Carriageway 2642475
Works)
Performance Based Email:
Contract for The rd.nairobi@
Maintenance of Thika - kenha.co.ke
KeNHA/R5
107. Kilimambogo (A3) 1 All Corr. C 878,571,766.58
/149/2021
Road and De-
Congestion of Thika
Town
KeNHA,
Upper
Eastern
Performance Based regional
KeNHA/R7 Contract for Offices,
108. 2,3 or 4 All Corr. C 224,813,400.62
/470/2021 Maintenance of Lewa - P.O.BOX
Isiolo (A2) Road 325 -60300
ISIOLO
Isiolo Town
Email:
11
rd.uppereast
ern@kenha.
co.ke
QUALIFICATION FOR TENDERING
Mandatory Requirements
Other Requirements
Procurement shall be based on the post qualification method and the above details will be submitted with the
priced bid.
Due to the COVID -19 pandemic and consequently the Presidential Directives issued, there shall be NO Pre-
Tender Site Visits. However, bidders are encouraged to make personal arrangements to acquaint themselves
12
with the site before submissions of their bids, a Form on declaration of Knowledge of Site has been provided.
Every bidder shall make their own arrangements to familiarize themselves with the site conditions and
the Road and its features.
The detailed tender notice is available in the KeNHA website and Public Procurement Information Portal
(PPIP). Clarifications and Questions may be sent to [email protected] to be received on or before
25th February, 2021.
Registration/Pre-Qualification
The Registration Process for Suppliers and Contractors for KeNHA is a continuous Process and details of the
same can be obtained in all our Regional Offices and at the KeNHA Website www.kenha.co.ke.
Interested eligible candidates may obtain further information and inspect tender documents from the
Procurement Office, Kenya National Highways Authority (KeNHA), Respective Regional Office as
detailed in the detailed Advert, from 9th February, 2021 during normal working hours.
A complete set of tender documents may be obtained by interested tenderers from the Kenya National
Highways Authority (KeNHA) website: www.kenha.co.ke or Public Procurement Information Portal (PPIP)
website www.tenders.go.ke free of charge.
Bidders are encouraged to download tender documents to minimise physical visits to the respective KeNHA
Regional Offices.
Completed tender documents are to be enclosed in plain sealed envelope clearly marked with tender name,
reference number and submitted to:-
Regional Director
Kenya National Highways Authority,
Respective Regional Offices,
and deposited in the Tender Box located at KeNHA’s Regional Offices, in Ground floor, so as to be
received on or before, Thursday, 4th March, 2021 at 11.00AM.
All interested bidders are required to continually check the Kenya National Highways Authority
website: www.kenha.co.ke for any tender addendums or clarifications that may arise before
submission date.
Tenders will be opened immediately thereafter in the presence of Tenderers/Representatives who wish to
attend at the Respective KeNHA Regional Office Boardrooms as listed above.
13
For: DIRECTOR GENERAL
14