TARGET MEP GROUP
[Talal Al Mathana Con. Co.]
[Team Experience Documentations]
1
Eng. Mohamed R. Abou El Hassan
BSC of Science.. Chemistry/Biochemistry Degree (Alex.Univ.)
BSC of Computer & Electrical Eng...(6 Oct.Univ.)
Eng. Mohamed R. Abou
Eng. Mohamed Working as a Senior Low Current & Network Engineer in Target El Hassan
MEP Group. Email:
13 years of experience in All Low Current Systems, Telecommunication and
Network consulting and systems implementation
[email protected] Tel: +966560222013
Education Current Address: KSA
BSC of Science.. Chemistry/Biochemistry Degree (Alex.Univ.)
Nationality: Egyptian
BSC of Computer & Electrical Eng...(6 Oct.Univ.)
Date of Birth: 1970
Summary of Qualifications
13 years of experience in All Low Current Systems, Telecommunication and
[Talal Al Mathana Con. Co].
Network consulting and systems implementation
Full Design and Installation of Low Current systems (Public address, BMS,
Fire Alarm System, Conference Rooms, Data Center, Nurse Call System),
Telecommunications and Data Networks for buildings (Enterprise &
Industrial).
Preparing the Low Current systems, Telecommunications and Data
Networks shop drawings for buildings (residential & Industrial buildings).
Test and commission, control, program, supervise and monitor all project
activities independently. Prepare tender documents as per the
specification for the projects.
Plan and implement research methodology and procedures to apply
principles of electrical theory to engineering projects. Make compliance
statements for specification of Low Current and Networking items.
Design for all Infrastructure of DATA CENTER (Tier1 …. Tier4) & All MEP
Works Advice.
Check and preparing the Low Current Systems material submittals.
Aware by TIA 942, IEC and NEC.
Professional Profile
Organization: Successfully managed large & small multiple projects,
handling many details simultaneously
Interpersonal Communications: easily developed strong report with
clients, management and co workers
Team Leadership: Built cohesive teams, motivated members to produce
quality work and used tenacity to complete the job
1
Engineering Experience
Target Group “KSA, Dubai, Qatar.” From 2011 – now
Job Title:
Senior Low Current & Networking engineer (management & supervision) For All Company Branches
(Dubai – Qatar –Saudi Arabia)
Responsibilities and tasks
Review designs of all Low Current Systems and Networking as per International standards.
Supervision of all Low Current Systems and Networking work for all the Company branches.
Review time schedules and project plans.
Value engineering for all Low Current Systems activities.
Monitor the implementation of Low Current Systems and Networking.
Review shop drawings for all of Low Current Systems and Networking.
Projects
Student Accommodation Tabouk University ( KSA – Tabouk 2011 - 2015)
Stella Hotel...”3B+G+30Typical+MF+R” (Dubai – UAE 2014 – 2015)
Power Saving Technology “Postech” From 2008 - 2011
[Talal Al Mathana Con. Co].
Job Title:
Senior Low Current & Networking engineer (management & supervision) …. KSA
Responsibilities and tasks
Designs of all Low Current Systems and Networking.
Prevision for the installation of all Low Current Systems and Networking work for all the Company
Projects.
Review time schedules and project plans.
Projects
Nomura Project … KSA (Faisalia tour – Riyadh 2008)
Establishing the new Telephony System ……….. (Design & installation)
Merrill Lynch (Bank of America)… KSA ( Kingdom tour – Riyadh 2008-2009)
Design, and installation of all low current systems & Elect mechanics
- Data Network System ( Design & Install )
- IP Servulance System ( Design & Install )
- IP Telephony ( Design & Install )
- IP Access Control ( Design & Install )
- Data Center (Tier 2) ( Design & Install )
- Fire Alarm System
2 - BMS
Nomura Project … KSA (Faisalia tour – Riyadh 2008)
Establishing the new Telephony System ……….. (Design & installation)
Merrill Lynch (Bank of America)… KSA ( Kingdom tour – Riyadh 2008-2009)
Design, and installation of all low current systems & Elect mechanics
- Data Network System ( Design & Install )
- IP Servulance System ( Design & Install )
- IP Telephony ( Design & Install )
- IP Access Control ( Design & Install )
- Data Center (Tier 2) ( Design & Install )
- Fire Alarm System
- BMS
KSU Project … KSA (Quiea - 2009)
Design, and installation of all low current systems
- Data Network System ( Design & Install )
- CCTV system ( Design & Install )
- IP Telephony ( Design & Install )
KSU Project … KSA (Thadiq - 2009)
[Talal Al Mathana Con. Co].
Design, and installation of all low current systems
- Data Network System (Design & Install )
- CCTV system ( Design & Install )
- IP Telephony ( Design & Install )
PNU …. KSA (Riyadh 2010-2011)
Infrastructure works for all low current systems (1st fix & 2nd Fix with tested & Comm.)
- Data Network ( SCS Passive Works Only )
- CCTV System (SCS 1st fix & 2nd Fix )
- Public Address (SCS 1st fix & 2nd Fix )
- MATV System (SCS 1st fix & 2nd Fix )
- Telephony System (SCS 1st fix & 2nd Fix )
- Fire Alarm System (SCS 1st fix & 2nd Fix )
- BMS (SCS 1st fix & 2nd Fix )
ITCC … KSA (King Abdullah Economical City – Riyadh 2011)
Infrastructure for all Fiber Optics for temp. Data Center (Tier4)
- Pulling &Termination & testing & Comm.
- Reassign ODF Cabinets for nexus system
- Assist in the Design of permanent new Tier 4 Data
Center (Passive only)
3
Al Rawaaf Contracting Co. From 2007 - 2008
Job Title:
Project Manager …. KSA
Responsibilities and tasks
Finding out what the client wants to achieve
Agreeing the timescales, costs and resources needed
Drawing up a detailed plan for how to achieve each stage of the project
Selecting and leading a Project Team
Negotiating with Subcontractors and suppliers for materials and services
Making sure that each stage of the project is progressing on time and on budget
Reporting regularly on progress to the client or to senior managers
Revise All the Designs and Redesign for the Networking Systems and Datacenter
Projects
National Guard …. KSA (Qassim & Riyadh)
Establishing, Design and Installation
- Data Network System ( Design & Install )
[Talal Al Mathana Con. Co].
- IP Servulance System ( Design & Install )
- IP Telephony ( Design & Install )
- Data Center (Tier 1) ( Design & Install )
- Fire Alarm System ( Design & Install )
Integration Technology Co. From 2005 – 2007
Job Title:
Low Current & Data Networking Engineer
Responsibilities and tasks
Site Engineer
Design & Installation
Projects
IPS (Investigation & prosecution committee) … KSA (Qassim)
Supply and install CCTV security System in 6 locations in Qassim Cities
Ministry of health …. KSA (Qassim)
- Establishing the new Data Network System….….(Design , Supply & installation )
- Establishing the new Telephony System ………..(Design , Supply & installation )
- Establishing the new Security CCTV System …. (Design, Supply & installation )
4
Ministry of Education …. KSA (Qassim)
Establishing the new Telephony System ……….. (Design , Supply & installation )
Royal Commission….. KSA ( Jubail)
Substitute and Upgrade the Old Data Network System ……….. (5000 Data node )
Ministry of tourism … KSA (Al Ghatt)
Design, Supply & installation of all low current systems for King Abdul Aziz Palace
- Data Network ( Design & Install )
- CCTV System ( Design & Install )
- Public Address ( Design & Install )
- Telephony System ( Design & Install )
- Fire Alarm System ( Design & Install )
Qassim University… KSA (Qassim)
- Most Of Fiber Optics Works ( Supply & Install )
- Preparation the infrastructure of telephony system
Qassim Cement Company …. KSA (Qassim)
- Fiber Optics Works (Supply & Install)
[Talal Al Mathana Con. Co].
- CCTV System installation
Certificates & Skills
Cisco Certification (CCNA, CCDA, CCDP)
Cisco Certification (CCIE "R&S" & CCDE …. Under Studying)
CompTIA N+
Network system development & Configuration (2003 – 2004 )
Certified Internet Webmaster – CIW (2001)
Green Datacenter Preparation (Schneider Datacenter University still Studying)
Cisco Datacenter infrastructure Preparation ( Reading Prepare for Certificate)
3M Certificate Passive works , Fiber works & FTTH
Leviton Certificate Passive works for networking and Datacenter , Fiber works & FTTH
Networking system & Complete Civil Works and Full Design and Installation
for data network , public address , telephony, BMS , Fire Alarm System , conference Rooms , Data
Center Room, Nurse Call System ( Des. And installation)
Cable Wiring Works (Telephone, Data, Fire Alarm System & Sound &
Video) with complete Documentation
5
Training and Seminars Attended
National Institute of Standards (N.I.S.), practical training as a student...
- Comparing the application of information technology standards in
Egypt and abroad.
- Evaluation of the working and application of neural networks
Ministry of electricity, practical training as a student
- Application of computers to control transmission of electricity.
- Industrial Data Communication Technologies (Industrial Automation.
- Using SCADA systems.
National Institute of Standards (N.I.S.)... Attending course in ITIL
- ITIL v3 foundation for IT service management
Computer Skills
Hardware (System Assembler, Configuration, Repairing … Full Technical Support
Networking (LAN, WAN Configuration ... “Routing & Bridging”)
Software (Installing, Repairing, Programming " Ass embly. Delphi. c Builder .. And visual basic “, Testing,
Interface design, software development).. Using Microsoft Office "access. Excel. …etc.
Internet (web design, searching, development)..CIW in internet fundamentals, HTML, Authoring and
Networking fundamentals
[Talal Al Mathana Con. Co].
Computer Language
Assembly
Visual Basic (4, 5, 6, dot net).
Visual Pascal (Delphi 1, up to Delphi 7)
C Lang. (C++, Builder, #)
Computer Database
Paradox
Inter Base
Access
SQL (2000, 2005)
Language
Arabic: mother tongue
English: fluent
French: fair