1) This document provides inputs and calculations for analyzing the penetration of a sheet pile wall into sandy or clayey soil. It includes inputs like soil properties, water level, sheet pile material properties, and calculations for soil pressure, penetration depth, maximum bending moment, and required sheet pile section. 2) Key outputs include the penetration depth into sand (2.23m), penetration depth into clay (-1m), maximum bending moment (20.96 t-m), and required wall thickness (1249 cm3). 3) The document uses equations related to lateral earth pressure coefficients and soil mechanics to calculate the penetration depth, bending moment, and required sheet pile properties for supporting an excavation in sand and clay soils

Uploaded by

SES DESIGN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
287 views2 pages

Sheet Pile Analysis Sheet v1.07-18.1

1) This document provides inputs and calculations for analyzing the penetration of a sheet pile wall into sandy or clayey soil. It includes inputs like soil properties, water level, sheet pile material properties, and calculations for soil pressure, penetration depth, maximum bending moment, and required sheet pile section. 2) Key outputs include the penetration depth into sand (2.23m), penetration depth into clay (-1m), maximum bending moment (20.96 t-m), and required wall thickness (1249 cm3). 3) The document uses equations related to lateral earth pressure coefficients and soil mechanics to calculate the penetration depth, bending moment, and required sheet pile properties for supporting an excavation in sand and clay soils

Uploaded by

SES DESIGN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SSE SHEET PILE ANALYSIS, PENETRATION INTO SANDY OR CLAYEY SOIL SSE-EXCEL-SECTION

Ref: Principle Foundation Engineering by Braja M. Das 9ed The author will not be responsible for the uses of this program
v1.07
1. Inputs -14.5 -9.5 -4.5 0.5 5.5 10.5
Soil: -5 m level for excavated soil Job: Braja M das 18.1 0 A
w e 0
2 Sand
w= -2 -2 m water level
c= MPa BMD= 1 1) shown 0) No
-2 water table C
>> CAL -1.13
j= 32 32 deg. scale= 0.5 scale to BMD 0.98 -2.66
3 P=5.84t
Sand Sand -4 -5.16
-8.84 2.23
g= 1.59 1.59 t/m3 Material for sheet pile: >> PDF D
gsat= 1.93 1.93 t/m3 fs= 172 Mpa -6 E 1.85 -12.56
12.02
0 -16.75
gw= 0.98 t/m3 -19.42
-8 D=5.4 F -20.68
FoS= 1 safety factor for Kp, (=1.5 to 2)
-6.59 -18.49
-13.3 -13.68
2. Design -10 Sand B -11.36
w e 8.19t/m2
Ka= 0.31 0.31 =tg^2(45-j/2) -12 B
Kp= 3.25 3.25 =(1/Ka)/FoS LEGENDS:
-14 BMD in Curve (t.m)
yE=yD-pD/(g'*(Kp-Ka)) ztrapez=(2*a+b)/(a+b)*L/3 Soil Pressure (t/m2)
Table: wall pi=intergral of (K*g*hi) t/m2 t m t.m clay Results:
Pos. x y hi gs g' Ki pi. Pi zi/O Mi Kp y hi pi. pf. pi pf. z= 2.23 m =M/P from E downward
A 0 0 0 1.59 1.59 0.31 0.00 0 0 3.25 0 0 0 0 0 0 p5= 21.5 p5=intergral of (K*g*hi) till E
C 0 -2 2 1.59 1.59 0.31 0.98 0.977 4.33 4.23 3.25 -2 2 0.98 0.98 0.98 0.98 A1= 7.662 =p5/(g*(Kp-Ka))
D 0 -5 3 1.93 0.95 0.31 1.85 4.248 2.01 8.52 3.25 -5 3 1.85 1.85 1.85 1.85 A2= 16.64 =8*P/(g*Kp-Ka)
E 0 -5.7 0.66 1.93 0.95 -2.95 0.00 0.613 0.44 0.27 2.95 -5.66 0.661 0 0 0 0 A3= 151.3 =6*P*[2*z*g*(Kp-Ka)+p5]/(g^2*(Kp-Ka)^2)
F 0 -6.2 0.57 1.93 0.95 -2.95 -1.59 0 0 2.95 -8.01 2.35 -6.59 -6.59 -6.59 -6.59 A4= 230.6 =P*(6*z*p5+4*P)/(g^2*(Kp-Ka)^2)
B 0 -10 4.18 1.93 0.95 -2.95 -13.3 0 0 2.95 -10.4 2.391 -13.3 8.19 -13.3 8.19t/m2 L4= 4.742=yE-yB
0 25 2 5.838 13 -12 xmax= 14.5 equ0= 3E-07=L4^4+A1*L4^3-A2*L4&2-A3*L4-A4
6 hF=L4-L5 xmin= -13.3 p4= 8.195t/m2 =p5-g*L4*(Kp-Ka)
yc=max(BL,we) hB=L5 L5= 2.391m =(p3*L4+2*P/(p3-p4)
D= 5.403m =deep to anchore L3+L4, L3=hE
Penetration into clay: L= 12.02m =total length of sheet pile =BL+fct*D
D= -1 m goalseek fct=1.3 for sandy clay, 1.5 for clay soil
equ1= -0 z0= 2.04 m =sqrt(2P/(g*(Kp-Ka)) where shear is zero
L4= 0 m =(D*(4c-(ghi+gh2))-P)/(4c) Mmax= 20.96 t.m =P*(z+z0)-(1/2*g*z^2*(Kp-Ka)))*z0/3
p6= 6.04 t/m2 =-(4c-(gh1+gh2)) Wpl= 1218 cm3 =Mmax/(fs)
p7= 6.04 t/m2 =(4c+(gh1+gh2)) Select Sheet Pile Type in table 18.1

clay:
z0= 0.97 m =P/p6
Mmax= 21.5 t.m =P*(z+z0)-p6*z^0^2/2
Wpl= 1249 cm3 =Mmax/(fs)
y= 7.7 m if y=z0 Data Table My=f(y)
p2y= 0 t/m no. 0 1 2 3 4 5 6 7 8 9 10 11 12 13
Mp1= 6.24 t.m y 0 0.8 1.6 2.4 3.2 4.001 4.8 5.601 6.4 7.2 8.002 8.8 9.6 10.4
Mp2= 17.2 t.m 20.37 0 0.1 0.42 1.13 2.66 5.16 8.84 12.56 16.8 19.4 20.68 18.5 13.7 11.36 0
Mp3= 1.52 t.m 0 -0.8 -1.6 -2.4 -3.2 -4 -4.8 -5.6 -6.4 -7.2 -8 -8.8 -9.6 -10.4 -10.4
Mp4= -4.6 t.m y hi scale 0 0.05 0.21 0.57 1.33 2.58 4.42 6.28 8.38 9.71 10.34 9.25 6.84 5.68
Mp5= 0 t.m -9.08 1.07 Label -1.13 -2.66 -5.16 -8.84 -12.6 -16.8 -19.4 -20.7 -18.5 -13.7 -11.4
Mp6= 0 t.m -10.4 1.33 54 11 14
My= 20.4 t.m
Data Table Mmax = f(water table level)
w 0 -1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 0
-21 -21 -21 -21 -21 -21 -21 -21 -21 -21 -21 -21 -21 -21 -21 -21

Table 18.1
soil Type: H L f w Wp Wp I
-100 -5 L1 2 P P=6t (mm) (mm) (mm) (mm) (m3/m) (cm3/m) (m4/m)
0 -5 -13.8 0 0 -3.43 PZC-12 318 708.2 8.51 8.51 0.001 1204 2E-04
-13.8 -1 7.25 -3.43 PZC-13 319 708.2 9.53 9.53 0.001 1301 2E-04
0 0 -13.8 -2 PZC-14 320 708.2 10.67 10.67 0.001 1398 2E-04
100 0 PZC-17 386.3 635 8.51 8.51 0.002 1667 3E-04
Sand -7 -9.3 L2 3 D D=5 PZC-18 387.4 635 9.53 9.53 0.002 1801 3E-04
Sand 6.96 -2 -13.8 -2 -13.8 -5 PZC-19 388.6 635 10.67 10.67 0.002 1941 4E-04
-13.8 -3.5 -13.8 -7.7 PZC-26 449.6 708.2 15.24 13.34 0.003 2602 6E-04
water -13.8 -5 -13.8 -10.4 PZ-22 235 558.8 9.53 9.53 0.001 989 1E-04
-100 -2 -13.8 -10.4 PZ-27 307.3 457.2 9.53 9.53 0.002 1667 3E-04
0 -2 z 2.23 0 -10.4 PZ-35 383.5 575.1 15.37 12.7 0.003 2629 5E-04
10.9 -3.43 PZ-40 416.6 499.1 15.24 12.7 0.003 3295 7E-04
0 -2 10.9 -4.55 L 12.02 PS-27.5 — 500 — 10.16 0.000 102 4E-06
100 -2 10.9 -5.66 -2.66 0 PS-31 — 500 — 12.7 0.000 102 4E-06
-7 -2 10.9 -5.66 -2.66 -6.01
0 -5.66 -2.66 -12
-2.66 -12
0 -12

You might also like