0% found this document useful (0 votes)
930 views

STOPPLE / HOT TAPPING Method of Statement

The document provides steps for plugging a 36" pipeline using stopple machines. The key steps include: 1. Performing hot taps and installing tapping valves and split tee fittings upstream and downstream. 2. Positioning stopple machines and installing temporary bypass lines to isolate the targeted section. 3. Cutting out and replacing the isolated section, then inserting plugs and welding. 4. Removing the stopple machines and valves and installing blind flanges and completion plugs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
930 views

STOPPLE / HOT TAPPING Method of Statement

The document provides steps for plugging a 36" pipeline using stopple machines. The key steps include: 1. Performing hot taps and installing tapping valves and split tee fittings upstream and downstream. 2. Positioning stopple machines and installing temporary bypass lines to isolate the targeted section. 3. Cutting out and replacing the isolated section, then inserting plugs and welding. 4. Removing the stopple machines and valves and installing blind flanges and completion plugs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Procedure for 36”


plugging by stopple
4 Hot tapping operation
2 positions stopple plug

1
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Upstream site
Step # 1 2” hot tap for
vent drain &
equal pressure

Sandwich
valve 36”600

Flow

LOR Split Tee LOR Split Tee


36” × 24” 600 36” × 36” 600
for Bypass for Stopple
No. Operations to be performed Quantity
1 Install the Taping valves on the Fittings 2
2 Perform the 2” Hot Tap for pressure balance 2
3 Perform 36” Hot Tap for Stopple 2
4 Perform 24” Hot Tap for Bypass 2

2
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Downstream site
Step # 1

2” hot tap for Sandwich


vent drain & valve 36”600
equal pressure

Flow

LOR Split Tee LOR Split Tee


36” × 24” 600 36” × 36” 600
for Bypass for Stopple

No. Operations to be performed Quantity


1 Install the Taping valves on the Fittings 2
2 Perform the 2” Hot Tap for pressure balance 2
3 Perform 36” Hot Tap for Stopple 2
4 Perform 24” Hot Tap for Stopple 2

3
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Upstream site
Upstream
Step # 2 Stopple Machine
Position S2

24” temporary Bypass connected to Sandwich valve after hot tapping operation

Sandwich 2” hot tap for


valve 36” 600 vent drain &
equal pressure

Flow

LOR Split Tee LOR Split Tee


36” × 24” 600 36” × 36” 600
for Bypass for Stopple Plugging Head in
the live line
No. Operations to be performed Quantity
1 Install 36” Stopple Machine 2
2 Install 24” temporary Bypass line between 24” valves 1
3 Balance the pressure on Stopple Machines 2
4 Run 24” Bypass line & stop 36” main line 1
5 Depressurize & drain the isolated portion of the line 1
4
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Downstream site
Step # 2 Upstream
Stopple Machine
Position S2

24” temporary Bypass connected to Sandwich valve after hot tapping operation

Sandwich
valve 36”600

Flow

LOR Split Tee


36× 24” 600
2” hot tap for for Bypass
vent drain &
equal pressure
Plugging Head in LOR Split Tee
No. Operations to be performed Quantity the live line 36× 36” 600 for
1 Install 36” Stopple Machine 2 Stopple

2 Install 24” temporary Bypass line between valves 1


3 Balance the pressure on Stopple Machines 2
4 Run 24” Bypass line & stop 36” main line 1
5 Depressurize & drain the isolated portion of line 1
5
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Upstream site
Step # 3

Flow

Plugging Head in
the live line

Removing of
Defected Tees No. Operations to be performed Quantity
1 Cold cut & removal of the isolated portion of line 2
36”

6
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Upstream site
Step # 3

Insert the plugs inside the


36” pipeline for more safe
welding.

Flow

Plugging Head in
the live line
Replacing of
Defected Tees with
Spools

No. Operations to be performed Quantity


1 Replacing of defected tees with new spools 2
2 Insert the plugs inside the 36” pipeline for more safe welding. 2
3 Welding of replaced spools to main pipeline 36” 2

7
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Upstream site
Step # 3
-Remove Stopple Machine & Sandwich
Valve.
-Install 36” LOR completion Plug with
coupon attached and then Blind Flange

Flow

Replaced Pipe
No. Operations to be performed Quantity
1 Installing 36”, 24”, 2” LOR completion plug 2
2 Removing stopple machines and valves then install the 2
Blind flanges 36”,24”,2”

8
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company

Flow
Thank You …