STOPPLE / HOT TAPPING Method of Statement
STOPPLE / HOT TAPPING Method of Statement
1
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company
Upstream site
Step # 1 2” hot tap for
vent drain &
equal pressure
Sandwich
valve 36”600
Flow
2
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company
Downstream site
Step # 1
Flow
3
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company
Upstream site
Upstream
Step # 2 Stopple Machine
Position S2
24” temporary Bypass connected to Sandwich valve after hot tapping operation
Flow
Downstream site
Step # 2 Upstream
Stopple Machine
Position S2
24” temporary Bypass connected to Sandwich valve after hot tapping operation
Sandwich
valve 36”600
Flow
Upstream site
Step # 3
Flow
Plugging Head in
the live line
Removing of
Defected Tees No. Operations to be performed Quantity
1 Cold cut & removal of the isolated portion of line 2
36”
6
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company
Upstream site
Step # 3
Flow
Plugging Head in
the live line
Replacing of
Defected Tees with
Spools
7
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company
Upstream site
Step # 3
-Remove Stopple Machine & Sandwich
Valve.
-Install 36” LOR completion Plug with
coupon attached and then Blind Flange
Flow
Replaced Pipe
No. Operations to be performed Quantity
1 Installing 36”, 24”, 2” LOR completion plug 2
2 Removing stopple machines and valves then install the 2
Blind flanges 36”,24”,2”
8
Kurdistan Pipeline Company Loaloat Shatt Al-Arab Company
Flow
Thank You …