0% found this document useful (0 votes)
97 views1 page

GWP 2504-17-00 2445-15-00 2128-18-00 - Hwy 400 Annesunnidaledunlop Nosc Ogn

The Ministry of Transportation of Ontario has retained a consulting firm to complete the design and environmental assessment for replacing three bridges and reconstructing an interchange on Highway 400 in Barrie, Ontario. The project includes replacing the Dunlop Street, Anne Street, and Sunnidale Road bridges to accommodate future highway widening, reconstructing the Dunlop Street interchange, resurfacing highway sections, installing noise walls, and upgrading lighting. The design process will assess environmental impacts and mitigation measures. Public comments on the project are invited.

Uploaded by

api-522640398
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views1 page

GWP 2504-17-00 2445-15-00 2128-18-00 - Hwy 400 Annesunnidaledunlop Nosc Ogn

The Ministry of Transportation of Ontario has retained a consulting firm to complete the design and environmental assessment for replacing three bridges and reconstructing an interchange on Highway 400 in Barrie, Ontario. The project includes replacing the Dunlop Street, Anne Street, and Sunnidale Road bridges to accommodate future highway widening, reconstructing the Dunlop Street interchange, resurfacing highway sections, installing noise walls, and upgrading lighting. The design process will assess environmental impacts and mitigation measures. Public comments on the project are invited.

Uploaded by

api-522640398
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTICE OF STUDY COMMENCEMENT

Detail Design Study and Class Environmental Assessment


Reconstruction of Dunlop Street and Highway 400 Interchange
Replacement of Anne Street and Sunnidale Road Bridges, and Noise Walls
Barrie, Ontario - GWP 2445-15-00 & GWP 2504-17-00
THE PROJECT
The Ministry of Transportation of Ontario (MTO) has retained McIntosh Perry Consulting Engineers (McIntosh Perry) to
complete the detail design and class environmental assessment study for the replacement of three bridges on Highway 400 at
Dunlop Street, Anne Street and Sunnidale Road in the City of Barrie, Simcoe County. The new bridges will accommodate the
future ultimate widening of Highway 400. Also included in the project is the reconstruction of the Dunlop Street and Highway
400 interchange, Highway 400 pavement resurfacing from Dunlop Street to north of St. Vincent Street, Bayfield Street ramp
resurfacing, Highway 400 median barrier replacement, drainage improvements within the resurfacing limits, design of noise
walls and provision for Highway 400 future full illumination. The key map below shows the location of the study area including
the bridge structures.

THE PROCESS
The detailed design is following an approved planning process under the Class Environmental Assessment for Provincial
Transportation Facilities (2000) for a Group “B” project. This will include an assessment of potential impacts of the project
works on the study area environment, and the mitigation measures developed to address environmental concerns. A Design
and Construction Report will be prepared describing the existing environmental conditions, design features, detours and
construction staging, impacts, and mitigation measures. A project website is being maintained for the duration of this project.
For more information and updates, please visit Highway400DunlopAnneSunnidale.com.
COMMENTS
We would appreciate receiving any comments that you may have for this project. Your comments should be directed to the
following Project Team members:
Steve Pilgrim, P.Eng. Salia Kalali, P.Eng., M.Eng.
Project Manager Senior Project Engineer
McIntosh Perry Consulting Engineers Ltd. Ministry of Transportation
1-1329 Gardiners Road 159 Sir William Hearst Avenue, Building D, 4th Flr.
Kingston, ON K7P 0L8 Downsview, ON M3M 0B7
tel: 613-542-3788 tel: 416-235-6570
fax: 613-542-7583 fax: 416-235-3576
e-mail: [email protected] e-mail: [email protected]
If you have accessibility requirements in order to participate in this project, please contact one of the Project Team members
listed above. Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act.
With the exception of personal information, all comments become part of the public record.

You might also like