Heat Exchangers 304 SS: CEPCI (2010) 532.9 CEPCI (2020) 599.5

The document contains cost information for heat exchangers and compressors used in an industrial plant. It lists the capacity, cost in 2010 and 2020 for 8 heat exchangers totaling $48,943,712. It also provides power requirements and costs for 6 compressors in 2020 totaling $1,432,659. The document outlines the direct and indirect costs for the equipment broken into categories and percentages of the total purchased equipment cost of $48,943,712. It concludes with a total project cost estimate of $124,317,028.

Uploaded by

BINOD BINOD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views6 pages

Heat Exchangers 304 SS: CEPCI (2010) 532.9 CEPCI (2020) 599.5

The document contains cost information for heat exchangers and compressors used in an industrial plant. It lists the capacity, cost in 2010 and 2020 for 8 heat exchangers totaling $48,943,712. It also provides power requirements and costs for 6 compressors in 2020 totaling $1,432,659. The document outlines the direct and indirect costs for the equipment broken into categories and percentages of the total purchased equipment cost of $48,943,712. It concludes with a total project cost estimate of $124,317,028.

Uploaded by

BINOD BINOD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

HEAT EXCHANGERS

304 SS
COST CONSTANTS Stream Number Capacity(m2) Cost in 2010 ($)
E-301 3.57 10825
a 1900 E-302 8.37 22825
b 2500 E-303 0.62 3450
n 1 E-304 0.5 3150
E-305 0.21 2425
CEPCI(2010) 532.9 E-306 6.97 19325
CEPCI(2020) 599.5 E-307 9.62 25950
E-308 12.4 32900

Total

COMPRESSER

Carbon Steel
Equipment Pin (kW) hp
CEPCI(2014) 576 C-301 129 172.99
CEPCI(2020) 599.5 C-302 105 140.8
C-303 95.9 128
C-304 47.9 64.23
C-305 20.6 27.61
C-306 639 3537

TOTAL COST OF
EQUIPMENT 48943712

DIRECT COST Sr No item


1 Equipment cost
2 Installation
Instrumentation
3 and control
4 piping
5 Electrical System
6 Buildings
7 Service Facilities
8 Land Requisition
INDIRECT COST SR No item
Engineering &
1 Supervision
2 Construction
3 Contractor
4 Contigency
Cost in 2020 ($) in Rs
$ 12,178 ₹ 892,394
$ 25,678 ₹ 1,881,654
$ 3,881 ₹ 284,412
$ 3,544 ₹ 259,681
$ 2,728 ₹ 199,913
$ 21,740 ₹ 1,593,120
$ 29,193 ₹ 2,139,273
$ 37,012 ₹ 2,712,219

$ 135,953 ₹ 9,962,666

cost in 2014 ($) cost in 2020 ($) cost in 2020 (Rs)


115100 $ 119,796 ₹ 8,778,645
99500 $ 103,559 ₹ 7,588,837
92900 $ 96,690 ₹ 7,085,457
57000 $ 59,326 ₹ 4,347,374
31300 $ 32,577 ₹ 2,387,242
980700 $ 1,020,711 ₹ 74,797,717

TOTAL $ 1,432,659.29 ₹ 104,985,273

% purchased Equipment Cost TOTAL COST (Rs)


100 ₹ 48,943,712
25 ₹ 12,235,928

10 ₹ 4,894,371
25 ₹ 12,235,928
20 ₹ 9,788,742
30 ₹ 14,683,114
40 ₹ 19,577,485
4 ₹ 1,957,748
total ₹ 124,317,028
% purchased Equipment Cost TOTAL COST (Rs)

10 ₹ 4,894,371
10 ₹ 4,894,371
5 ₹ 2,447,186
5 ₹ 2,447,186

total ₹ 14,683,114
E T1 T2 t1 t2 T1 T2 t1
E-201 219 18 5 10 492.5 291.5 278.5
E-301 448.7 150 20.06 162 722.2 423.5 293.56
E-302 449.6 170 157.2
E-303
E-304
E-305
E-306
E-307
E-308
t2 ∆T1 ∆T2 ∆Tlm
283.5 214 8 62.68001
435.5 286.7 129.94 198.0885