0% found this document useful (0 votes)
50 views77 pages

Shop Drawing Water Ways-Tunneling Drawing Code: TH-NL2-SD-WW-MT-DG-01

The document appears to be a list of drawings for the water ways tunneling of the Nam Long 2 Hydropower Project in Laos. It includes 77 drawings related to plans and profiles of the tunnel from km 0+000 to km 2+219.63, as well as typical cross sections. The drawings were prepared by Trung Hieu Construction JSC in January 2021 for the Nam Long 2 Electric Co., Ltd and the Nam Long 2 Hydropower Project in Luang Namtha Province, Laos.

Uploaded by

Joseph Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views77 pages

Shop Drawing Water Ways-Tunneling Drawing Code: TH-NL2-SD-WW-MT-DG-01

The document appears to be a list of drawings for the water ways tunneling of the Nam Long 2 Hydropower Project in Laos. It includes 77 drawings related to plans and profiles of the tunnel from km 0+000 to km 2+219.63, as well as typical cross sections. The drawings were prepared by Trung Hieu Construction JSC in January 2021 for the Nam Long 2 Electric Co., Ltd and the Nam Long 2 Hydropower Project in Luang Namtha Province, Laos.

Uploaded by

Joseph Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 77

NAM LONG 2 ELECTRIC CO.

,LTD
NAM LONG 2 HYDROPOWER PROJECT
LONG DISTRICT, LUANG NAMTHA PROVINCE, LAO PDR

SHOP DRAWING
WATER WAYS- TUNNELING
Drawing Code: TH-NL2-SD-WW-MT-DG-01

PREPARED BY: TRUNG HIEU CONSTRUCTION JSC


LUANG NAMTHA, JANUARY, 2021
List of Drawing

No Drawing name Drawing code Pages Revision No Drawing name Drawing code Pages Revision No Drawing name Drawing code Pages Revision

1 Cover page TH-NL2-SD-WW-MT-DG-01 00 0 34 Plan: Km1+870.00-Km1+940.00 TH-NL2-SD-WW-MT-DG-01 Pl-32/36 0 67 Profile: Km1+940.00-Km1+970.00 TH-NL2-SD-WW-MT-DG-01 Pr-29/33 0

2 List of drawing TH-NL2-SD-WW-MT-DG-01 Gr-02/02 0 35 Plan: Km1+950.00-Km2+020.00 TH-NL2-SD-WW-MT-DG-01 Pl-33/36 0 68 Profile: Km1+980.00-Km2+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-30/33 0

3 Plan: Km0+000.00-Km0+033.46 TH-NL2-SD-WW-MT-DG-01 Pl-01/36 0 36 Plan: Km2+030.00-Km2+100.00 TH-NL2-SD-WW-MT-DG-01 Pl-34/36 0 69 Profile: Km2+050.00-Km2+110.00 TH-NL2-SD-WW-MT-DG-01 Pr-31/33 0

4 Plan: Km0+040.00-Km0+090.00 TH-NL2-SD-WW-MT-DG-01 Pl-02/36 0 37 Plan: Km2+110.00-Km2+180.00 TH-NL2-SD-WW-MT-DG-01 Pl-35/36 0 70 Profile: Km2+120.00-Km2+180.00 TH-NL2-SD-WW-MT-DG-01 Pr-32/33 0

5 Plan: Km0+100.00-Km0+150.00 TH-NL2-SD-WW-MT-DG-01 Pl-03/36 0 38 Plan: Km2+190.00-Km2+219.63 TH-NL2-SD-WW-MT-DG-01 Pl-36/36 0 71 Profile: Km2+190.00-Km2+219.33 TH-NL2-SD-WW-MT-DG-01 Pr-33/33 0

6 Plan: Km0+160.00-Km0+210.00 TH-NL2-SD-WW-MT-DG-01 Pl-04/36 0 39 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-01/33 0 72 Typical Cross Section: Type 1 TH-NL2-SD-WW-MT-DG-01 Cs-01/06 0

7 Plan: Km0+220.00-Km0+270.00 TH-NL2-SD-WW-MT-DG-01 Pl-05/36 0 40 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-02/33 0 73 Typical Cross Section: Type 2 TH-NL2-SD-WW-MT-DG-01 Cs-02/06 0

8 Plan: Km0+280.00-Km0+330.00 TH-NL2-SD-WW-MT-DG-01 Pl-06/36 0 41 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-03/33 0 74 Typical Cross Section: Type 3 TH-NL2-SD-WW-MT-DG-01 Cs-03/06 0

9 Plan: Km0+340.00-Km0+390.00 TH-NL2-SD-WW-MT-DG-01 Pl-07/36 0 42 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-04/33 0 75 Typical Cross Section: Type 4 TH-NL2-SD-WW-MT-DG-01 Cs-04/06 0

10 Plan: Km0+400.00-Km0+450.00 TH-NL2-SD-WW-MT-DG-01 Pl-08/36 0 43 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-05/33 0 76 Typical Cross Section: Type 4A TH-NL2-SD-WW-MT-DG-01 Cs-05/06 0

11 Plan: Km0+460.00-Km0+510.00 TH-NL2-SD-WW-MT-DG-01 Pl-09/36 0 44 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-06/33 0 77 Typical Cross Section: Type 5 TH-NL2-SD-WW-MT-DG-01 Cs-06/06 0

12 Plan: Km0+520.00-Km0+570.00 TH-NL2-SD-WW-MT-DG-01 Pl-10/36 0 45 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-07/33 0

13 Plan: Km0+580.00-Km0+630.00 TH-NL2-SD-WW-MT-DG-01 Pl-11/36 0 46 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-08/33 0

14 Plan: Km0+640.00-Km0+690.00 TH-NL2-SD-WW-MT-DG-01 Pl-12/36 0 47 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-09/33 0

15 Plan: Km0+700.00-Km0+750.00 TH-NL2-SD-WW-MT-DG-01 Pl-13/36 0 48 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-10/33 0

16 Plan: Km0+760.00-Km0+810.00 TH-NL2-SD-WW-MT-DG-01 Pl-14/36 0 49 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-11/33 0

17 Plan: Km0+820.00-Km0+870.00 TH-NL2-SD-WW-MT-DG-01 Pl-15/36 0 50 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-12/33 0

18 Plan: Km0+880.00-Km0+930.00 TH-NL2-SD-WW-MT-DG-01 Pl-16/36 0 51 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-13/33 0

19 Plan: Km0+940.00-Km0+990.00 TH-NL2-SD-WW-MT-DG-01 Pl-17/36 0 52 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-14/33 0

20 Plan: Km1+000.00-Km1+050.00 TH-NL2-SD-WW-MT-DG-01 Pl-18/36 0 53 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-15/33 0

21 Plan: Km1+060.00-Km1+110.00 TH-NL2-SD-WW-MT-DG-01 Pl-19/36 0 54 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-16/33 0

22 Plan: Km1+120.00-Km1+170.00 TH-NL2-SD-WW-MT-DG-01 Pl-20/36 0 55 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-17/33 0

23 Plan: Km1+180.00-Km1+230.00 TH-NL2-SD-WW-MT-DG-01 Pl-21/36 0 56 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-18/33 0

24 Plan: Km1+240.00-Km1+290.00 TH-NL2-SD-WW-MT-DG-01 Pl-22/36 0 57 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-19/33 0

25 Plan: Km1+300.00-Km1+350.00 TH-NL2-SD-WW-MT-DG-01 Pl-23/36 0 58 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-20/33 0

26 Plan: Km1+360.00-Km1+410.00 TH-NL2-SD-WW-MT-DG-01 Pl-24/36 0 59 Profile: Km1+380.00-Km1+440.00 TH-NL2-SD-WW-MT-DG-01 Pr-21/33 0

27 Plan: Km1+420.00-Km1+470.00 TH-NL2-SD-WW-MT-DG-01 Pl-25/36 0 60 Profile: Km1+450.00-Km1+510.00 TH-NL2-SD-WW-MT-DG-01 Pr-22/33 0

28 Plan: Km1+480.00-Km1+530.00 TH-NL2-SD-WW-MT-DG-01 Pl-26/36 0 61 Profile: Km1+520.00-Km1+580.00 TH-NL2-SD-WW-MT-DG-01 Pr-23/33 0

29 Plan: Km1+540.00-Km1+590.00 TH-NL2-SD-WW-MT-DG-01 Pl-27/36 0 62 Profile: Km1+590.00-Km1+650.00 TH-NL2-SD-WW-MT-DG-01 Pr-24/33 0

30 Plan: Km1+600.00-Km1+650.00 TH-NL2-SD-WW-MT-DG-01 Pl-28/36 0 63 Profile: Km1+660.00-Km1+720.00 TH-NL2-SD-WW-MT-DG-01 Pr-25/33 0

31 Plan: Km1+660.00-Km1+710.00 TH-NL2-SD-WW-MT-DG-01 Pl-29/36 0 64 Profile: Km1+730.00-Km1+792.13 TH-NL2-SD-WW-MT-DG-01 Pr-26/33 0

32 Plan: Km1+720.00-Km1+770.00 TH-NL2-SD-WW-MT-DG-01 Pl-30/36 0 65 Profile: Km1+800.00-Km1+860.00 TH-NL2-SD-WW-MT-DG-01 Pr-27/33 0

33 Plan: Km1+780.00-Km1+860.00 TH-NL2-SD-WW-MT-DG-01 Pl-31/36 0 66 Profile: Km1+870.00-Km1+933.18 TH-NL2-SD-WW-MT-DG-01 Pr-28/33 0

NAM LONG 2 HYDROPOWER PROJECT


Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU
NAM LONG 2 List of drawing
CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/500 Drawing code: Rev.
Page:Gr-01/02 TH-NL2-SD-WW-MT-DG-01 0
Km
0+ 3
40
HT

.0
0

Km
Km

0+
1AT

33
0+7

EP
7

.4
1

6
0.0

Km
0

0+
29
.3
IP

7
Km

1
0+
25
BP .2
1 8
Km

K
1AT

m
0+

0+6
0

7
HT 20
.0

0.7
02 0

2
Km
0+
0
HT 10.
Km0+50.92

01 00
1AT5

Km
0+
00
N2 0.
00
Km
0+4
1AT

1.13
4

50
7.
67
Km
0+3
1AT

0.00

69 N1
3

0.
00

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+000.00-Km0+033.46
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-01/36 TH-NL2-SD-WW-MT-01 0
Km HT07
0+
90
.0
0

Km HT0
0+ 6
80
.0
0

Km
0+
70
HT

.0
05

Km
0+
60
HT

.0
04

Km
0+
49
G1

.36 K
1AT

m 0
8

+81
.04

Km
0+
40
HT

.0
03

0
NAM LONG 2 HYDROPOWER

Km
PROJECT

0+
Position Name Sign Date Position Name Sign Date

33
HEADRACE TUNNEL

.4
6
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+040.00-Km0+090.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-02/36 TH-NL2-SD-WW-MT-01 0
Km
0+
15
HT

0.
13

00

Km
0+
14
HT

0.
12

00

Km
0+
13
HT

0.
11

00

Km
0+
12
HT

0.
10

00

Km HT0
0+
11
0.
00
9

Km
0+
10
HT

0.
08

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+100.00-Km0+150.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-03/36 TH-NL2-SD-WW-MT-01 0
Km
0+
21
HT

0.
19

00

Km HT1
0+
20
0.
00
8

Km
0+
19
HT

0.
17

00

Km
0+
18
HT

0.
1

00
6

Km HT1
0+
17
0.
00
5

Km
0+
16
HT

0.
14

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+160.00-Km0+210.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-04/36 TH-NL2-SD-WW-MT-01 0
Km
0+
27
HT

0.
25

00

Km
0+
26
HT

0.
24

00

Km
0+
25
HT

0.
23

00

Km
0+
24
HT

0.
22

00

Km
0+
23
HT

0.
21

00

Km
0+
22
HT

0.
20

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+220.00-Km0+270.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-05/36 TH-NL2-SD-WW-MT-01 0
Km HT3
0+
33
0.
00
1

Km HT3
0+
32
0.
00
0

Km
0+
31
HT

0.
29

00

Km
0+
30
HT

0.
28

00

Km
0+
29
HT

0.
27

00

Km
0+
28
HT

0.
26

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+280.00-Km0+330.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-06/36 TH-NL2-SD-WW-MT-01 0
Km
0+
39
HT

0.
37

00

Km
0+
38
HT

0.
36

00

Km
0+
37
HT

0.
35

00

Km HT3
0+
36
0.
00
4

Km
0+
35
HT

0.
33

00

Km
0+
34
HT

0.
32

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+340.00-Km0+390.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-07/36 TH-NL2-SD-WW-MT-01 0
Km
0+
45
HT

0.
43

00

Km
0+
44
HT

0.
42

00

Km HT4
0+
43
0.
00
1

Km
0+
42
HT

0.
40

00

Km
0+
41
HT

0.
39

00

Km
0+
40
HT

0.
38

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+400.00-Km0+450.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-08/36 TH-NL2-SD-WW-MT-01 0
Km HT4
0+
51
0.
00
9

Km
0+
50
HT

0.
48

00

Km
0+
49
HT

0.
4

00
7

Km
0+
48
HT

0.
46

00

Km
0+
47
HT

0.
45

00

Km HT4
0+
46
0.
00
4
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+460.00-Km0+510.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-09/36 TH-NL2-SD-WW-MT-01 0
Km HT5
0+
57
0.
00
5

Km
0+
56
HT

0.
54

00

Km
0+
55
HT

0.
53

00

Km
0+
54
HT

0.
52

00

Km
0+
53
HT

0.
51

00

Km
0+
52
HT

0.
50

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+520.00-Km0+570.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-10/36 TH-NL2-SD-WW-MT-01 0
Km HT6
0+
63
0.
00
1

Km HT6
0+
62
0.
00
0

Km
0+
61
HT

0.
59

00

Km
0+
60
HT

0.
58

00

Km
0+
59
HT

0.
57

00

Km HT5
0+
58
0.
00
6
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+580.00-Km0+630.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-11/36 TH-NL2-SD-WW-MT-01 0
Km HT6
0+
69
0.
00
7

Km HT6
0+
68
0.
00
6

Km
0+
67
HT

0.
65

00

Km
0+
66
HT

0.
64

00

Km
0+
65
HT

0.
63

00

Km
0+
64
HT

0.
62

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+640.00-Km0+690.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-12/36 TH-NL2-SD-WW-MT-01 0
Km
0+
75
HT

0.
73

00

Km
0+
74
HT

0.
72

00

Km
0+
73
HT

0.
71

00

Km
0+
72
HT

0.
7

00
0

Km HT6
0+
71
0.
00
9

Km HT6
0+
70
0.
00
8
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+700.00-Km0+750.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-13/36 TH-NL2-SD-WW-MT-01 0
Km
0+
81
HT

0.
79

00

Km HT7
0+
80
0.
00
8

Km HT7
0+
79
0.
00
7

Km
0+
78
HT

0.
76

00

Km
0+
77
HT

0.
75

00

Km
0+
76
HT

0.
74

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+760.00-Km0+810.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-14/36 TH-NL2-SD-WW-MT-01 0
Km
0+
87
HT

0.
85

00

Km
0+
86
HT

0.
84

00

Km
0+
85
HT

0.
83

00

Km HT8
0+
84
0.
00
2

Km
0+
83
HT

0.
81

00

Km HT8
0+
82
0.
00
0
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+820.00-Km0+870.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-15/36 TH-NL2-SD-WW-MT-01 0
Km
0+ 91
93
HT

0.
00

Km
0+
92
HT

0.
90

00

Km
0+
91
HT

0.
89

00

Km
0+
90
HT

0.
88

00

Km
0+
89
HT

0.
87

00

Km
0+
88
HT

0.
86

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+880.00-Km0+930.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-16/36 TH-NL2-SD-WW-MT-01 0
Km HT9
0+
99
0.
00
7

Km
0+
98
HT

0.
96

00

Km
0+
97
HT

0.
95

00

Km
0+
96
HT

0.
94

00

Km
0+
95
HT

0.
93

00

Km
0+
94
HT

0.
92

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+940.00-Km0+990.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-17/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 03
05
HT

0.
1

00

Km HT1
1+ 02
04
0.
00

Km
1+
03
HT

0
10

.0
1

Km
1+ 00
02
HT

0.
1

00

Km
1+
01
HT

0.
99

00

Km HT9
1+
00
0.
00
8
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+000.00-Km1+050.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-18/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 09
11
0.
00

Km HT1
1+ 08
10
0.
00

Km
1+ 07
09
HT

0.
1

00

Km
1+
08
HT

0.
10

00
6

Km
1+ 05
07
HT

0.
1

00

Km HT1
1+ 04
06
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+060.00-Km1+110.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-19/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 15
17
HT

0.
1

00

Km
1+ 14
16
HT

0.
1

00

Km HT1
1+ 13
15
0.
00

Km
1+
14
HT

0.
11

00
2

Km
1+
13
HT

0.
11

0
1

Km
1+
12
HT

0.
11

00
0
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+120.00-Km1+170.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-20/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 21
23
HT

0.
1

00

Km
1+ 20
22
HT

0.
1

00

Km
1+
21
HT

0.
11

00
9

Km
1+ 18
20
HT

0.
1

00

Km
1+ 17
19
HT

0.
1

00

Km
1+
18
HT

0.
1 16

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+180.00-Km1+230.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-21/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 27
29
HT

0.
1

00

Km
1+ 26
28
HT

0.
1

00

Km
1+
27
HT

0.
1
25

00

Km HT1
1+ 24
26
0.
00

Km HT1
1+ 23
25
0.
00

Km
1+ 22
24
HT

0.
1

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+240.00-Km1+290.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-22/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1 + 33
35
0.
00

Km
1+ 32
34
HT

0.
1

00

Km HT1
1+ 31
33
0.
00

Km
1+
32
HT

0.
13

00
0

Km
1+ 29
31
HT

0.
1

00

Km HT1
1+ 28
30
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+300.00-Km1+350.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-23/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 39
41
HT

0.
1

00

Km
1+ 38
40
HT

0.
1

00

Km
1+
39
HT

0.
13

00
7

Km
1+ 36
38
HT

0.
1

00

Km
1+ 35
37
HT

0.
1

00

Km
1+
36
HT

0.
1 34

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+360.00-Km1+410.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-24/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 45
47
HT

0.
1

00

Km HT1
1+ 44
46
0.
00

Km
1+
45
HT

0.
14

00
3

Km
1+
44
HT

0.
14

00
2

Km
1+ 41
43
HT

0.
1

00

Km
1+ 40
42
HT

0.
1

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+420.00-Km1+470.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-25/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 51
53
HT

0.
1

00

Km
1+ 50
52
HT

0.
1

00

Km HT1
1+ 49
51
0.
00

Km
1+
50
HT

0.
14

00
8

Km HT1
1+ 47
49
0.
00

Km
1+ 46
48
HT

0.
1

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+480.00-Km1+530.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-26/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 57
59
0.
00

Km HT1
1+ 56
58
0.
00

Km
1+
57
HT

0.
15

00
5

Km
1+
56
HT

0.
15

00
4

Km
1+
55
HT

0.
1 53

00

Km
1+ 52
54
HT

0.
1

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+540.00-Km1+590.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-27/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 6 3
65
0.
00

Km HT1
1 + 62
64
0.
00

Km
1+
63
HT

0.
16

00
1

Km
1+ 60
62
HT

0.
1

00

Km HT1
1+ 59
61
0.
00

Km
1+ 58
60
HT

0.
1

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+600.00-Km1+650.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-28/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 69
71
0.
00

Km
1 + 68
70
HT

0.
1

00

Km
1+
69
HT

0.
1 67

00

Km
1+
68
HT

0.
16

00
6

Km
1+ 65
67
HT

0.
1

00

Km HT1
1+ 64
66
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+660.00-Km1+710.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-29/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 75
77
HT

0.
1

00

Km
1+ 74
76
HT

0.
1

00

Km
1+
75
HT

0.
17

00
3

Km
1+
74
HT

0
17

.0
2

Km HT1
1+ 71
73
0.
00

Km
1+ 70
72
HT

0.
1

00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+720.00-Km1+770.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-30/36 TH-NL2-SD-WW-MT-01 0
Km1+860.00
Km1+850.00
HT181 Km1+840.00
HT180 Km1+834.42
HT179
EP2
Km
1+8
20.0
HT1 0
78
Km
1+
81
3.2
IP2 8

Km
1+
HT 800
17 .0
7 0

Km
1+
79
BP

2.
2

13
48
.46
°

Km HT1
1+ 76
78
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+780.00-Km1+860.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-31/36 TH-NL2-SD-WW-MT-01 0
Z1

Km1+940.00
Km1+933.18
HT187 Km1+925.00
N3 Km1+918.17
HT186 Km1+911.37
I3 Km1+900.00
I2 Km1+890.00
HT185 Km1+880.00
HT184 Km1+870.00
HT183
HT182

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+870.00-Km1+940.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-32/36 TH-NL2-SD-WW-MT-01 0
.30
646

Km2+020.00
Km2+010.00
HT195 Km2+000.00
HT194 Km1+990.00
HT193 Km1+980.00
HT192 Km1+970.00
HT191 Km1+960.00
HT190 Km1+950.00
HT189
HT188

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+950.00-Km2+020.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-33/36 TH-NL2-SD-WW-MT-01 0
0-0
MC
Km2+100.00
Km2+090.00
HT203 Km2+080.00
HT202 Km2+070.00
HT201 Km2+060.00
HT200 Km2+050.00
HT199 Km2+040.00
HT198 Km2+030.00
HT197
HT196

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km2+030.00-Km2+100.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-34/36 TH-NL2-SD-WW-MT-01 0
Km2+180.00
Km2+170.00
HT211 Km2+160.00
HT210 Km2+150.00
HT209 Km2+140.00
HT208 Km2+130.00
HT207 Km2+120.00
HT206 Km2+110.00
HT205
HT204
589.70

599.70

1:1.0

599
.70

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km2+110.00-Km2+180.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-35/36 TH-NL2-SD-WW-MT-01 0
569.7

1:0.5
1:1.0

1:
0.5
1:1.0
1:1.0 Km2+219.63
Km2+210.00
Y-BRANCH Km2+200.00
HT214 Km2+190.00
559.70 HT213 Km2+180.00

569.70
1:0.5 HT212 Km2+170.00
HT211
HT210

1:1.0

1:0.
1:0.5

1:1.0

579.70
5

589.70
1:1.0

579
.70

599.70
1:1.0

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km2+190.00-Km2+219.63
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-36/36 TH-NL2-SD-WW-MT-01 0
690.00

NWL=684.0

702.41
696.74

723.83
678.95

698.45

708.68

712.45

714.60

716.28
Original surface(m)

Distance (m) 15.80 5.00 5.00 10.00 5.28 4.09 4.09 6.54 9.36

677.424
677.500

677.485

677.470

677.440

677.412

677.400

677.380
677.50

Design elevation (m)

0% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair Fair Fair
Section type Drawing Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2

Km0+25.28

Km0+33.46
Km0+29.37
Km0+00

Km0+05

Km0+10

Km0+20

Km0+40
Station (m)

Point HT01 HT02 BC1 IP1 EC1 HT03


N1 N2

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+000.00-Km0+040.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-01/33 TH-NL2-SD-WW-MT-01 0
793.60

811.08

820.90

825.79
740.03

758.63

776.12
Original surface(m)

Distance (m) 10.64 10.00 10.00 10.00 10.00 10.00 10.00


677.352

677.320

677.290

677.260

677.230

677.200

677.170
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+49.36

Km0+100

Km0+110
Km0+60

Km0+70

Km0+80

Km0+90
Station (m)

Point G1 HT04 HT05 HT06 HT07 HT08 HT09

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+049.36-Km0+110.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-02/33 TH-NL2-SD-WW-MT-01 0
835.56

845.33

850.22

853.36
840.45
830.67

856.51
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


677.140

677.110

677.080

677.050

677.020

676.990

676.960
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+120

Km0+130

Km0+140

Km0+150

Km0+160

Km0+170

Km0+180
Station (m)

Point HT10 HT11 HT12 HT13 HT14 HT15 HT16

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+120.00-Km0+180.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-03/33 TH-NL2-SD-WW-MT-01 0
872.24

878.53
859.66

862.80

865.95

869.10

875.39
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


676.930

676.900

676.870

676.840

676.810

676.780

676.750
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+190

Km0+200

Km0+210

Km0+220

Km0+230

Km0+240

Km0+250
Station (m)

Point HT17 HT18 HT19 HT20 HT21 HT22 HT23

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+190.00-Km0+250.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-04/33 TH-NL2-SD-WW-MT-01 0
884.21

889.73
881.46

893.92

898.12

901.39
886.97
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


676.720

676.690

676.660

676.630

676.600

676.570

676.540
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+260

Km0+270

Km0+280

Km0+290

Km0+300

Km0+310

Km0+320
Station (m)

Point HT24 HT25 HT26 HT27 HT28 HT29 HT30

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+260.00-Km0+320.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-05/33 TH-NL2-SD-WW-MT-01 0
916.50
903.91

906.43

908.94

911.46

913.98

918.82
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


676.510

676.480

676.450

676.420

676.390

676.360

676.330
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+330

Km0+340

Km0+350

Km0+360

Km0+370

Km0+380

Km0+390
Station (m)

Point HT31 HT32 HT33 HT34 HT35 HT36 HT37

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+330.00-Km0+390.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-06/33 TH-NL2-SD-WW-MT-01 0
921.01

923.20

925.40

927.59

929.78

931.97

934.17
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


676.300

676.270

676.240

676.210

676.180

676.150

676.120
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+400

Km0+410

Km0+420

Km0+430

Km0+440

Km0+450

Km0+460
Station (m)

Point HT38 HT39 HT40 HT41 HT42 HT43 HT44

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+400.00-Km0+460.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-07/33 TH-NL2-SD-WW-MT-01 0
940.74

942.93
936.36

938.55

944.78

946.42

950.00
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


676.090

676.060

676.030

676.000

675.970

675.940

675.910
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+470

Km0+480

Km0+490

Km0+500

Km0+510

Km0+520

Km0+530
Station (m)

Point HT45 HT46 HT47 HT48 HT49 HT50 HT51

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+470.00-Km0+530.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-08/33 TH-NL2-SD-WW-MT-01 0
950.00

950.00

950.00

950.00

950.00

950.00

950.00
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


675.880

675.850

675.820

675.790

675.760

675.730

675.700
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+540

Km0+550

Km0+560

Km0+570

Km0+580

Km0+590

Km0+600
Station (m)

Point HT52 HT53 HT54 HT55 HT56 HT57 HT58

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+540.00-Km0+600.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-09/33 TH-NL2-SD-WW-MT-01 0
950.00

950.00

950.00

950.00

950.00

950.00

950.00
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


675.670

675.640

675.610

675.580

675.550

675.520

675.490
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+610

Km0+620

Km0+630

Km0+640

Km0+650

Km0+660

Km0+670
Station (m)

Point HT59 HT60 HT61 HT62 HT63 HT64 HT65

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+610.00-Km0+670.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-10/33 TH-NL2-SD-WW-MT-01 0
931.31
950.00

950.00

950.00

950.00

943.65

937.48
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


675.460

675.430

675.400

675.370

675.340

675.310

675.280
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+680

Km0+690

Km0+700

Km0+710

Km0+720

Km0+730

Km0+740
Station (m)

Point HT66 HT67 HT68 HT69 HT70 HT71 HT72

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+680.00-Km0+740.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-11/33 TH-NL2-SD-WW-MT-01 0
914.01

899.23
925.15

908.95

903.90
919.07

896.77
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


675.250

675.220

675.190

675.160

675.130

675.100

675.070
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+750

Km0+760

Km0+770

Km0+780

Km0+790

Km0+800

Km0+810
Station (m)

Point HT73 HT74 HT75 HT76 HT77 HT78 HT79

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+750.00-Km0+810.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-12/33 TH-NL2-SD-WW-MT-01 0
894.31

882.01
886.94
891.86

889.40

884.46

879.57
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00

674.854
675.040

675.010

674.980

674.950

674.919

674.739
Design elevation (m)

0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%


Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+820

Km0+830

Km0+840

Km0+850

Km0+860

Km0+870

Km0+880
Station (m)

Point HT80 HT81 HT82 HT83 HT84 HT85 HT86

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+820.00-Km0+880.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-13/33 TH-NL2-SD-WW-MT-01 0
877.52

867.63

865.24
876.19

873.19

870.19

862.89
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00


674.575

674.360

674.095

673.780

673.415

673.000

672.535
Design elevation (m)

0.3% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+890

Km0+900

Km0+910

Km0+920

Km0+930

Km0+940

Km0+950
Station (m)

Point HT87 HT88 HT89 HT90 HT91 HT92 HT93

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+890.00-Km0+950.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-14/33 TH-NL2-SD-WW-MT-01 0
855.98
857.31
860.54

859.03

858.40

855.60

855.23
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


672.035

671.535

671.035

670.535

670.035

669.535

669.035
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km0+960

Km0+970

Km0+980

Km0+990

Km1+000

Km1+010

Km1+020
Station (m)

Point HT94 HT95 HT96 HT97 HT98 HT99 HT100

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km0+960.00-Km1+020.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-15/33 TH-NL2-SD-WW-MT-01 0
854.11

853.74
854.86

854.49

852.99

852.63
853.37
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


668.535

668.035

667.535

667.035

666.535

666.035

665.535
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+030

Km1+040

Km1+050

Km1+060

Km1+070

Km1+080

Km1+090
Station (m)

Point HT101 HT102 HT103 HT104 HT105 HT106 HT107

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+030.00-Km1+090.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-16/33 TH-NL2-SD-WW-MT-01 0
851.51

851.14
851.88

850.76

850.39

850.02
852.25

Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


665.035

664.535

664.035

663.535

663.035

662.535

662.035
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+100

Km1+110

Km1+120

Km1+130

Km1+140

Km1+150

Km1+160
Station (m)

Point HT108 HT109 HT110 HT111 HT112 HT113 HT114

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+100.00-Km1+160.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-17/33 TH-NL2-SD-WW-MT-01 0
850.02

850.02

850.02

850.02

850.02

850.02

850.02
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


661.535

661.035

660.535

660.035

659.535

659.035

658.535
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+170

Km1+180

Km1+190

Km1+200

Km1+210

Km1+220

Km1+230
Station (m)

Point HT115 HT116 HT117 HT118 HT119 HT120 HT121

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+170.00-Km1+230.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-18/33 TH-NL2-SD-WW-MT-01 0
850.02

850.02

850.02

850.02

850.02

850.02

850.02
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


658.035

657.535

657.035

656.535

656.035

655.535

655.035
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+240

Km1+250

Km1+260

Km1+270

Km1+280

Km1+290

Km1+300
Station (m)

Point HT122 HT123 HT124 HT125 HT126 HT127 HT128

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+240.00-Km1+300.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-19/33 TH-NL2-SD-WW-MT-01 0
847.56

840.71
845.85

844.13

842.42

839.00
849.27

Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


654.535

654.035

653.535

653.035

652.535

652.035

651.535
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+310

Km1+320

Km1+330

Km1+340

Km1+350

Km1+360

Km1+370
Station (m)

Point HT129 HT130 HT131 HT132 HT133 HT134 HT135

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+310.00-Km1+370.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-20/33 TH-NL2-SD-WW-MT-01 0
838.16
651.035
Km1+380

HT136
838.16

838.73

838.73

838.73

838.73

836.40
836.37
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


651.035

650.535

640.035

649.535

649.035

648.535

648.035
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+380

Km1+390

Km1+400

Km1+410

Km1+420

Km1+430

Km1+440
Station (m)

Point HT136 HT137 HT138 HT139 HT140 HT141 HT142

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+380.00-Km1+440.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-21/33 TH-NL2-SD-WW-MT-01 0
824.24

816.54
835.80

831.95

828.10

820.39

812.65
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


647.535

647.035

646.535

646.035

645.535

645.035

644.535
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+450

Km1+460

Km1+470

Km1+480

Km1+490

Km1+500

Km1+510
Station (m)

Point HT143 HT144 HT145 HT146 HT147 HT148 HT149

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+450.00-Km1+510.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-22/33 TH-NL2-SD-WW-MT-01 0
808.83

804.94

801.13

800.02

800.02

800.02

798.75
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


644.035

643.535

643.035

642.535

642.035

641.535

641.035
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+520

Km1+530

Km1+540

Km1+550

Km1+560

Km1+570

Km1+580
Station (m)

Point HT150 HT151 HT152 HT153 HT154 HT155 HT156

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+520.00-Km1+580.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-23/33 TH-NL2-SD-WW-MT-01 0
781.24

776.93
789.99

785.62

772.65
794.37

768.07
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


640.535

640.035

639.535

639.035

638.535

638.035

637.535
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+590

Km1+600

Km1+610

Km1+620

Km1+630

Km1+640

Km1+650
Station (m)

Point HT157 HT158 HT159 HT160 HT161 HT162 HT163

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+590.00-Km1+650.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-24/33 TH-NL2-SD-WW-MT-01 0
763.34

758.60

750.02

750.02

750.02

750.02
753.87
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


637.035

636.535

636.035

635.585

635.035

634.535

634.035
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+660

Km1+670

Km1+680

Km1+690

Km1+700

Km1+710

Km1+720
Station (m)

Point HT164 HT165 HT166 HT167 HT168 HT169 HT170

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+660.00-Km1+720.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-25/33 TH-NL2-SD-WW-MT-01 0
735.31
750.02

750.02

748.20

743.88

739.57

730.17
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 12.13


633.535

633.035

632.535

632.035

631.535

631.035

630.429
Design elevation (m)

5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2

Km1+792.13
Km1+730

Km1+740

Km1+750

Km1+760

Km1+770

Km1+780
Station (m)

Point HT171 HT172 HT173 HT174 HT175 HT176 BP2

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+730.00-Km1+792.13
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-26/33 TH-NL2-SD-WW-MT-01 0
721.11
726.84

717.64
720.42

716.89
719.05

719.05
Original surface(m)

Distance (m) 13.28 6.72 14.42 5.58 10.00 10.00 10.00


629.371

628.314
630.035

629.035

628.035

627.535

627.035
Design elevation (m)

5% 5% 5% 5% 5% 5% 5%
Grade, i%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Type 2 Type 2 Type 2 Type 2 Type 2
Km1+813.28

Km1+834.42
Km1+800

Km1+820

Km1+840

Km1+850

Km1+860
Station (m)

Point HT177 IP2 HT178 EP2 HT179 HT180 HT181

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+800.00-Km1+860.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-27/33 TH-NL2-SD-WW-MT-01 0
Datum: 610m

705.21

702.04
713.43

708.00

703.59

699.89

698.48
716.87

Original surface(m)

Distance (m) 10.00 10.00 10.00 11.370 6.800 6.830 8.180 6.820

624.001
623.798

622.180

622.180

624.210
626.535

626.035

625.535
Design elevation (m)

5% 5% 26.2% 0%
Grade, i% 0%

Surrounding rock (T)


III III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair Fair
Section type Type 2 Type 2 Drawing Drawing Drawing Drawing Drawing Drawing

Km1+933.18
Km1+911.37

Km1+918.17
Km1+870

Km1+880

Km1+890

Km1+900

Km1+925
Station (m)

Point HT182 HT183 HT184 HT185 I2 I3 HT186 N3

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+870.00-Km1+933.18
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-28/33 TH-NL2-SD-WW-MT-01 0
689.56
616.125
100%

Km1+950
HT188

Datum: 610m Datum: 590m


698.48

689.56

689.56

684.36

679.86
695.27

Original surface(m) Original surface(m)

Distance (m) 6.820 10.00 Distance (m) 10.00 10.00


624.210

624.022

616.125

616.125

606.125

596.125
Design elevation (m) Design elevation (m)

R10m 100% 100% 100%


Grade, i% Grade, i%

Surrounding rock (T) Surrounding rock (T)


III III III III

Q Q = (4~10) Q = (4~10) Q Q = (4~10) Q = (4~10)


Fair Fair Fair Fair
Section type Drawing Drawing Section type Type 4A Type 4A
Km1+933.18

Km1+940

Km1+950

Km1+950

Km1+960

Km1+970
Station (m) Station (m)

Point N3 HT187 HT188 Point HT188 HT189 HT190

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+940.00-Km1+970.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-29/33 TH-NL2-SD-WW-MT-01 0
663.60
574.766
5%

Type 4

Km2+000
HT193

Datum: 570m Datum: 550m

663.60
674.34

668.43

663.60

659.13

653.77

649.17
Original surface(m) Original surface(m)

Distance (m) 10.00 10.00 Distance (m) 10.00 10.00 10.00


576.575

574.766

574.766

574.266

573.766

573.266
586.125

Design elevation (m) Design elevation (m)

100% 5% 5% 5% 5%
Grade, i% R10m Grade, i%

Surrounding rock (T) Surrounding rock (T)


III III III III III

Q Q = (4~10) Q = (4~10) Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair
Section type Type 4A Drawing Type 4 Section type Type 4 Type 4 Type 4 Type 4
Km1+980

Km1+990

Km2+000

Km2+000

Km2+020

Km2+030

Km2+040
Station (m) Station (m)

Point HT191 HT192 HT193 Point HT193 HT195 HT196 HT197

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km1+980.00-Km2+040.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-30/33 TH-NL2-SD-WW-MT-01 0
645.22

640.96

634.79

630.12

626.75

623.09

619.35
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


572.766

572.266

571.766

571.266

570.766

570.266

569.766
Design elevation (m)

Grade, i% 5% 5% 5% 5% 5% 5% 5%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 4 Type 4 Type 4 Type 4 Type 4 Type 4 Type 4
Km2+050

Km2+060

Km2+070

Km2+080

Km2+090

Km2+100

Km2+110
Station (m)

Point HT198 HT199 HT200 HT201 HT202 HT203 HT204

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km2+050.00-Km2+110.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-31/33 TH-NL2-SD-WW-MT-01 0
616.48

613.76

610.22

606.83

604.26

601.04

596.98
Original surface(m)

Distance (m) 10.00 10.00 10.00 10.00 10.00 10.00 10.00


569.266

568.766

568.266

567.766

567.266

566.766

566.266
Design elevation (m)

Grade, i% 5% 5% 5% 5% 5% 5% 5%

Surrounding rock (T)


III III III III III III III

Q Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10) Q = (4~10)


Fair Fair Fair Fair Fair Fair Fair
Section type Type 4 Type 4 Type 4 Type 4 Type 4 Type 4 Type 4
Km2+120

Km2+130

Km2+140

Km2+150

Km2+160

Km2+170

Km2+180
Station (m)

Point HT205 HT206 HT207 HT208 HT209 HT210 HT211

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km2+120.00-Km2+110.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-32/33 TH-NL2-SD-WW-MT-01 0
.33
591.52 565.12
1 : 2

584.74

579.10

576.93
Original surface(m)

Distance (m) 10.00 10.00 9.632


565.766

565.266

564.766

564.380
Design elevation (m)

Grade, i% 5% 5% 5%

Surrounding rock (T)


III III V

Q Q = (4~10) Q = (4~10) Q <1


Fair Fair Very Poor
Section type Type 4 Type 4 Type 5

Km2+219.63
Km2+190

Km2+200

Km2+210

Station (m)

Point HT212 HT213 HT214 Y-Branch

NAM LONG 2 HYDROPOWER


PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Profile: Km2+190.00-Km2+219.33
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pr-33/33 TH-NL2-SD-WW-MT-01 0
TYPE 1
(Q=10-40)
Scale: 1/500
Built-in steel pipe Þ50, Axis of tunnel
a=3m, t=2mm; to grout

25
25
93
43

74
R1

30° 30°

276

326
202

233
RC M250

25
25
25 250 25
300

NAM LONG 2 HYDROPOWER PROJECT


Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU
NAM LONG 2 Typical Cross Section: Type 1
CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/500 Drawing code: Rev.
Page:Cs-01/06 TH-NL2-SD-WW-MT-DG-01 0
TYPE 2
(Q=4-10)
Built-in steel pipe Þ50, Scale: 1/500 Axis of tunnel
a=3m, t=2mm; to grout

30
30
97
74
30° 30°

276

336
202

239
RC M250

30
30
30 250 30
310

NAM LONG 2 HYDROPOWER PROJECT


Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU
NAM LONG 2 Typical Cross Section: Type 2
CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/500 Drawing code: Rev.
Page:Cs-02/06 TH-NL2-SD-WW-MT-DG-01 0
TYPE 3
(Q=4-10)
Scale: 1/500
Built-in steel pipe Þ50, Axis of tunnel
a=3m, t=2mm; to grout

10
40
30

104
74
30° 30°

346
276
202

242
RC M250

30
30
10 30 250 30 10
330

NAM LONG 2 HYDROPOWER PROJECT


Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU
NAM LONG 2 Typical Cross Section: Type 3
CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/500 Drawing code: Rev.
Page:Cs-03/06 TH-NL2-SD-WW-MT-DG-01 0
TYPE 4
(Q=4-10)
Scale: 1/500
Axis of tunnel

R1

55
86

93
5
R9
Steel lining

95

300
M200 concrete backfill

207
95
Pipe rack

M200 lining concrete

45
t=10cm

10
52 98 98 52
300

NAM LONG 2 HYDROPOWER PROJECT


Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU
NAM LONG 2 Typical Cross Section: Type 4
CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/500 Drawing code: Rev.
Page:Cs-04/06 TH-NL2-SD-WW-MT-DG-01 0
TYPE 4A
(Q=4-10)
Scale: 1/500
Axis of tunnel
Built-in steel pipe Þ50,
a=3m, t=2mm; to grout 30° 30°

Steel lining t=14mm

M200 concrete backfill

NAM LONG 2 HYDROPOWER PROJECT


Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU
NAM LONG 2 Typical Cross Section: Type 4A
CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/500 Drawing code: Rev.
Page:Cs-05/06 TH-NL2-SD-WW-MT-DG-01 0
TYPE 5
(Q<1,SECTION GOES ACROSS SUPPORTS)
SC: 1/500

Built-in steel pipe Þ50, Axis of tunnel


a=3m, t=2mm; to grout 30° 30°

Rock foundation
Arc steel H150, a=1.0m
Concrete M200 fill up steel ribs
Steel grid Þ1, a=4x4
Steel grid Þ12xÞ10, a=200x200
(Þ10 on perimeter,
Þ12 on longitudinal direction)

5
R9

Sack with asphalt, 2 layers

M200 concrete backfill

Pipe rack

M200 lining concrete


t=10cm

NAM LONG 2 HYDROPOWER PROJECT


Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU
NAM LONG 2 Typical Cross Section: Type 5
CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/500 Drawing code: Rev.
Page:Cs-06/06 TH-NL2-SD-WW-MT-DG-01 0

You might also like