Shop Drawing Water Ways-Tunneling Drawing Code: TH-NL2-SD-WW-MT-DG-01
Shop Drawing Water Ways-Tunneling Drawing Code: TH-NL2-SD-WW-MT-DG-01
,LTD
NAM LONG 2 HYDROPOWER PROJECT
LONG DISTRICT, LUANG NAMTHA PROVINCE, LAO PDR
SHOP DRAWING
WATER WAYS- TUNNELING
Drawing Code: TH-NL2-SD-WW-MT-DG-01
No Drawing name Drawing code Pages Revision No Drawing name Drawing code Pages Revision No Drawing name Drawing code Pages Revision
1 Cover page TH-NL2-SD-WW-MT-DG-01 00 0 34 Plan: Km1+870.00-Km1+940.00 TH-NL2-SD-WW-MT-DG-01 Pl-32/36 0 67 Profile: Km1+940.00-Km1+970.00 TH-NL2-SD-WW-MT-DG-01 Pr-29/33 0
2 List of drawing TH-NL2-SD-WW-MT-DG-01 Gr-02/02 0 35 Plan: Km1+950.00-Km2+020.00 TH-NL2-SD-WW-MT-DG-01 Pl-33/36 0 68 Profile: Km1+980.00-Km2+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-30/33 0
3 Plan: Km0+000.00-Km0+033.46 TH-NL2-SD-WW-MT-DG-01 Pl-01/36 0 36 Plan: Km2+030.00-Km2+100.00 TH-NL2-SD-WW-MT-DG-01 Pl-34/36 0 69 Profile: Km2+050.00-Km2+110.00 TH-NL2-SD-WW-MT-DG-01 Pr-31/33 0
4 Plan: Km0+040.00-Km0+090.00 TH-NL2-SD-WW-MT-DG-01 Pl-02/36 0 37 Plan: Km2+110.00-Km2+180.00 TH-NL2-SD-WW-MT-DG-01 Pl-35/36 0 70 Profile: Km2+120.00-Km2+180.00 TH-NL2-SD-WW-MT-DG-01 Pr-32/33 0
5 Plan: Km0+100.00-Km0+150.00 TH-NL2-SD-WW-MT-DG-01 Pl-03/36 0 38 Plan: Km2+190.00-Km2+219.63 TH-NL2-SD-WW-MT-DG-01 Pl-36/36 0 71 Profile: Km2+190.00-Km2+219.33 TH-NL2-SD-WW-MT-DG-01 Pr-33/33 0
6 Plan: Km0+160.00-Km0+210.00 TH-NL2-SD-WW-MT-DG-01 Pl-04/36 0 39 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-01/33 0 72 Typical Cross Section: Type 1 TH-NL2-SD-WW-MT-DG-01 Cs-01/06 0
7 Plan: Km0+220.00-Km0+270.00 TH-NL2-SD-WW-MT-DG-01 Pl-05/36 0 40 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-02/33 0 73 Typical Cross Section: Type 2 TH-NL2-SD-WW-MT-DG-01 Cs-02/06 0
8 Plan: Km0+280.00-Km0+330.00 TH-NL2-SD-WW-MT-DG-01 Pl-06/36 0 41 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-03/33 0 74 Typical Cross Section: Type 3 TH-NL2-SD-WW-MT-DG-01 Cs-03/06 0
9 Plan: Km0+340.00-Km0+390.00 TH-NL2-SD-WW-MT-DG-01 Pl-07/36 0 42 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-04/33 0 75 Typical Cross Section: Type 4 TH-NL2-SD-WW-MT-DG-01 Cs-04/06 0
10 Plan: Km0+400.00-Km0+450.00 TH-NL2-SD-WW-MT-DG-01 Pl-08/36 0 43 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-05/33 0 76 Typical Cross Section: Type 4A TH-NL2-SD-WW-MT-DG-01 Cs-05/06 0
11 Plan: Km0+460.00-Km0+510.00 TH-NL2-SD-WW-MT-DG-01 Pl-09/36 0 44 Profile: Km0+000.00-Km0+040.00 TH-NL2-SD-WW-MT-DG-01 Pr-06/33 0 77 Typical Cross Section: Type 5 TH-NL2-SD-WW-MT-DG-01 Cs-06/06 0
.0
0
Km
Km
0+
1AT
33
0+7
EP
7
.4
1
6
0.0
Km
0
0+
29
.3
IP
7
Km
1
0+
25
BP .2
1 8
Km
K
1AT
m
0+
0+6
0
7
HT 20
.0
0.7
02 0
2
Km
0+
0
HT 10.
Km0+50.92
01 00
1AT5
Km
0+
00
N2 0.
00
Km
0+4
1AT
1.13
4
50
7.
67
Km
0+3
1AT
0.00
69 N1
3
0.
00
Km HT0
0+ 6
80
.0
0
Km
0+
70
HT
.0
05
Km
0+
60
HT
.0
04
Km
0+
49
G1
.36 K
1AT
m 0
8
+81
.04
Km
0+
40
HT
.0
03
0
NAM LONG 2 HYDROPOWER
Km
PROJECT
0+
Position Name Sign Date Position Name Sign Date
33
HEADRACE TUNNEL
.4
6
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+040.00-Km0+090.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-02/36 TH-NL2-SD-WW-MT-01 0
Km
0+
15
HT
0.
13
00
Km
0+
14
HT
0.
12
00
Km
0+
13
HT
0.
11
00
Km
0+
12
HT
0.
10
00
Km HT0
0+
11
0.
00
9
Km
0+
10
HT
0.
08
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+100.00-Km0+150.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-03/36 TH-NL2-SD-WW-MT-01 0
Km
0+
21
HT
0.
19
00
Km HT1
0+
20
0.
00
8
Km
0+
19
HT
0.
17
00
Km
0+
18
HT
0.
1
00
6
Km HT1
0+
17
0.
00
5
Km
0+
16
HT
0.
14
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+160.00-Km0+210.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-04/36 TH-NL2-SD-WW-MT-01 0
Km
0+
27
HT
0.
25
00
Km
0+
26
HT
0.
24
00
Km
0+
25
HT
0.
23
00
Km
0+
24
HT
0.
22
00
Km
0+
23
HT
0.
21
00
Km
0+
22
HT
0.
20
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+220.00-Km0+270.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-05/36 TH-NL2-SD-WW-MT-01 0
Km HT3
0+
33
0.
00
1
Km HT3
0+
32
0.
00
0
Km
0+
31
HT
0.
29
00
Km
0+
30
HT
0.
28
00
Km
0+
29
HT
0.
27
00
Km
0+
28
HT
0.
26
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+280.00-Km0+330.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-06/36 TH-NL2-SD-WW-MT-01 0
Km
0+
39
HT
0.
37
00
Km
0+
38
HT
0.
36
00
Km
0+
37
HT
0.
35
00
Km HT3
0+
36
0.
00
4
Km
0+
35
HT
0.
33
00
Km
0+
34
HT
0.
32
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+340.00-Km0+390.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-07/36 TH-NL2-SD-WW-MT-01 0
Km
0+
45
HT
0.
43
00
Km
0+
44
HT
0.
42
00
Km HT4
0+
43
0.
00
1
Km
0+
42
HT
0.
40
00
Km
0+
41
HT
0.
39
00
Km
0+
40
HT
0.
38
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+400.00-Km0+450.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-08/36 TH-NL2-SD-WW-MT-01 0
Km HT4
0+
51
0.
00
9
Km
0+
50
HT
0.
48
00
Km
0+
49
HT
0.
4
00
7
Km
0+
48
HT
0.
46
00
Km
0+
47
HT
0.
45
00
Km HT4
0+
46
0.
00
4
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+460.00-Km0+510.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-09/36 TH-NL2-SD-WW-MT-01 0
Km HT5
0+
57
0.
00
5
Km
0+
56
HT
0.
54
00
Km
0+
55
HT
0.
53
00
Km
0+
54
HT
0.
52
00
Km
0+
53
HT
0.
51
00
Km
0+
52
HT
0.
50
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+520.00-Km0+570.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-10/36 TH-NL2-SD-WW-MT-01 0
Km HT6
0+
63
0.
00
1
Km HT6
0+
62
0.
00
0
Km
0+
61
HT
0.
59
00
Km
0+
60
HT
0.
58
00
Km
0+
59
HT
0.
57
00
Km HT5
0+
58
0.
00
6
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+580.00-Km0+630.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-11/36 TH-NL2-SD-WW-MT-01 0
Km HT6
0+
69
0.
00
7
Km HT6
0+
68
0.
00
6
Km
0+
67
HT
0.
65
00
Km
0+
66
HT
0.
64
00
Km
0+
65
HT
0.
63
00
Km
0+
64
HT
0.
62
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+640.00-Km0+690.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-12/36 TH-NL2-SD-WW-MT-01 0
Km
0+
75
HT
0.
73
00
Km
0+
74
HT
0.
72
00
Km
0+
73
HT
0.
71
00
Km
0+
72
HT
0.
7
00
0
Km HT6
0+
71
0.
00
9
Km HT6
0+
70
0.
00
8
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+700.00-Km0+750.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-13/36 TH-NL2-SD-WW-MT-01 0
Km
0+
81
HT
0.
79
00
Km HT7
0+
80
0.
00
8
Km HT7
0+
79
0.
00
7
Km
0+
78
HT
0.
76
00
Km
0+
77
HT
0.
75
00
Km
0+
76
HT
0.
74
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+760.00-Km0+810.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-14/36 TH-NL2-SD-WW-MT-01 0
Km
0+
87
HT
0.
85
00
Km
0+
86
HT
0.
84
00
Km
0+
85
HT
0.
83
00
Km HT8
0+
84
0.
00
2
Km
0+
83
HT
0.
81
00
Km HT8
0+
82
0.
00
0
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+820.00-Km0+870.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-15/36 TH-NL2-SD-WW-MT-01 0
Km
0+ 91
93
HT
0.
00
Km
0+
92
HT
0.
90
00
Km
0+
91
HT
0.
89
00
Km
0+
90
HT
0.
88
00
Km
0+
89
HT
0.
87
00
Km
0+
88
HT
0.
86
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+880.00-Km0+930.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-16/36 TH-NL2-SD-WW-MT-01 0
Km HT9
0+
99
0.
00
7
Km
0+
98
HT
0.
96
00
Km
0+
97
HT
0.
95
00
Km
0+
96
HT
0.
94
00
Km
0+
95
HT
0.
93
00
Km
0+
94
HT
0.
92
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km0+940.00-Km0+990.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-17/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 03
05
HT
0.
1
00
Km HT1
1+ 02
04
0.
00
Km
1+
03
HT
0
10
.0
1
Km
1+ 00
02
HT
0.
1
00
Km
1+
01
HT
0.
99
00
Km HT9
1+
00
0.
00
8
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+000.00-Km1+050.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-18/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 09
11
0.
00
Km HT1
1+ 08
10
0.
00
Km
1+ 07
09
HT
0.
1
00
Km
1+
08
HT
0.
10
00
6
Km
1+ 05
07
HT
0.
1
00
Km HT1
1+ 04
06
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+060.00-Km1+110.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-19/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 15
17
HT
0.
1
00
Km
1+ 14
16
HT
0.
1
00
Km HT1
1+ 13
15
0.
00
Km
1+
14
HT
0.
11
00
2
Km
1+
13
HT
0.
11
0
1
Km
1+
12
HT
0.
11
00
0
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+120.00-Km1+170.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-20/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 21
23
HT
0.
1
00
Km
1+ 20
22
HT
0.
1
00
Km
1+
21
HT
0.
11
00
9
Km
1+ 18
20
HT
0.
1
00
Km
1+ 17
19
HT
0.
1
00
Km
1+
18
HT
0.
1 16
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+180.00-Km1+230.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-21/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 27
29
HT
0.
1
00
Km
1+ 26
28
HT
0.
1
00
Km
1+
27
HT
0.
1
25
00
Km HT1
1+ 24
26
0.
00
Km HT1
1+ 23
25
0.
00
Km
1+ 22
24
HT
0.
1
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+240.00-Km1+290.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-22/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1 + 33
35
0.
00
Km
1+ 32
34
HT
0.
1
00
Km HT1
1+ 31
33
0.
00
Km
1+
32
HT
0.
13
00
0
Km
1+ 29
31
HT
0.
1
00
Km HT1
1+ 28
30
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+300.00-Km1+350.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-23/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 39
41
HT
0.
1
00
Km
1+ 38
40
HT
0.
1
00
Km
1+
39
HT
0.
13
00
7
Km
1+ 36
38
HT
0.
1
00
Km
1+ 35
37
HT
0.
1
00
Km
1+
36
HT
0.
1 34
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+360.00-Km1+410.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-24/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 45
47
HT
0.
1
00
Km HT1
1+ 44
46
0.
00
Km
1+
45
HT
0.
14
00
3
Km
1+
44
HT
0.
14
00
2
Km
1+ 41
43
HT
0.
1
00
Km
1+ 40
42
HT
0.
1
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+420.00-Km1+470.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-25/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 51
53
HT
0.
1
00
Km
1+ 50
52
HT
0.
1
00
Km HT1
1+ 49
51
0.
00
Km
1+
50
HT
0.
14
00
8
Km HT1
1+ 47
49
0.
00
Km
1+ 46
48
HT
0.
1
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+480.00-Km1+530.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-26/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 57
59
0.
00
Km HT1
1+ 56
58
0.
00
Km
1+
57
HT
0.
15
00
5
Km
1+
56
HT
0.
15
00
4
Km
1+
55
HT
0.
1 53
00
Km
1+ 52
54
HT
0.
1
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+540.00-Km1+590.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-27/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 6 3
65
0.
00
Km HT1
1 + 62
64
0.
00
Km
1+
63
HT
0.
16
00
1
Km
1+ 60
62
HT
0.
1
00
Km HT1
1+ 59
61
0.
00
Km
1+ 58
60
HT
0.
1
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+600.00-Km1+650.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-28/36 TH-NL2-SD-WW-MT-01 0
Km HT1
1+ 69
71
0.
00
Km
1 + 68
70
HT
0.
1
00
Km
1+
69
HT
0.
1 67
00
Km
1+
68
HT
0.
16
00
6
Km
1+ 65
67
HT
0.
1
00
Km HT1
1+ 64
66
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+660.00-Km1+710.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-29/36 TH-NL2-SD-WW-MT-01 0
Km
1+ 75
77
HT
0.
1
00
Km
1+ 74
76
HT
0.
1
00
Km
1+
75
HT
0.
17
00
3
Km
1+
74
HT
0
17
.0
2
Km HT1
1+ 71
73
0.
00
Km
1+ 70
72
HT
0.
1
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+720.00-Km1+770.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-30/36 TH-NL2-SD-WW-MT-01 0
Km1+860.00
Km1+850.00
HT181 Km1+840.00
HT180 Km1+834.42
HT179
EP2
Km
1+8
20.0
HT1 0
78
Km
1+
81
3.2
IP2 8
Km
1+
HT 800
17 .0
7 0
Km
1+
79
BP
2.
2
13
48
.46
°
Km HT1
1+ 76
78
0.
00
NAM LONG 2 HYDROPOWER
PROJECT
Position Name Sign Date Position Name Sign Date
HEADRACE TUNNEL
Approve by Project Manager Mr. Kien Nguyen Van 05-May-2021
TRUNG HIEU Plan: Km1+780.00-Km1+860.00
NAM LONG 2 CONSTRUCTION
ELECTRIC CO.,Ltd J-S COMPANY Shop Drawing Ref. doc: TH-NL2-DD-WW-01
Review by Prepared by Mr.Luelao S. 05-May-2021
SC:1/200 Drawing code: Rev.
Page:Pl-31/36 TH-NL2-SD-WW-MT-01 0
Z1
Km1+940.00
Km1+933.18
HT187 Km1+925.00
N3 Km1+918.17
HT186 Km1+911.37
I3 Km1+900.00
I2 Km1+890.00
HT185 Km1+880.00
HT184 Km1+870.00
HT183
HT182
Km2+020.00
Km2+010.00
HT195 Km2+000.00
HT194 Km1+990.00
HT193 Km1+980.00
HT192 Km1+970.00
HT191 Km1+960.00
HT190 Km1+950.00
HT189
HT188
599.70
1:1.0
599
.70
1:0.5
1:1.0
1:
0.5
1:1.0
1:1.0 Km2+219.63
Km2+210.00
Y-BRANCH Km2+200.00
HT214 Km2+190.00
559.70 HT213 Km2+180.00
569.70
1:0.5 HT212 Km2+170.00
HT211
HT210
1:1.0
1:0.
1:0.5
1:1.0
579.70
5
589.70
1:1.0
579
.70
599.70
1:1.0
NWL=684.0
702.41
696.74
723.83
678.95
698.45
708.68
712.45
714.60
716.28
Original surface(m)
Distance (m) 15.80 5.00 5.00 10.00 5.28 4.09 4.09 6.54 9.36
677.424
677.500
677.485
677.470
677.440
677.412
677.400
677.380
677.50
Km0+25.28
Km0+33.46
Km0+29.37
Km0+00
Km0+05
Km0+10
Km0+20
Km0+40
Station (m)
811.08
820.90
825.79
740.03
758.63
776.12
Original surface(m)
677.320
677.290
677.260
677.230
677.200
677.170
Design elevation (m)
Km0+100
Km0+110
Km0+60
Km0+70
Km0+80
Km0+90
Station (m)
845.33
850.22
853.36
840.45
830.67
856.51
Original surface(m)
677.110
677.080
677.050
677.020
676.990
676.960
Design elevation (m)
Km0+130
Km0+140
Km0+150
Km0+160
Km0+170
Km0+180
Station (m)
878.53
859.66
862.80
865.95
869.10
875.39
Original surface(m)
676.900
676.870
676.840
676.810
676.780
676.750
Design elevation (m)
Km0+200
Km0+210
Km0+220
Km0+230
Km0+240
Km0+250
Station (m)
889.73
881.46
893.92
898.12
901.39
886.97
Original surface(m)
676.690
676.660
676.630
676.600
676.570
676.540
Design elevation (m)
Km0+270
Km0+280
Km0+290
Km0+300
Km0+310
Km0+320
Station (m)
906.43
908.94
911.46
913.98
918.82
Original surface(m)
676.480
676.450
676.420
676.390
676.360
676.330
Design elevation (m)
Km0+340
Km0+350
Km0+360
Km0+370
Km0+380
Km0+390
Station (m)
923.20
925.40
927.59
929.78
931.97
934.17
Original surface(m)
676.270
676.240
676.210
676.180
676.150
676.120
Design elevation (m)
Km0+410
Km0+420
Km0+430
Km0+440
Km0+450
Km0+460
Station (m)
942.93
936.36
938.55
944.78
946.42
950.00
Original surface(m)
676.060
676.030
676.000
675.970
675.940
675.910
Design elevation (m)
Km0+480
Km0+490
Km0+500
Km0+510
Km0+520
Km0+530
Station (m)
950.00
950.00
950.00
950.00
950.00
950.00
Original surface(m)
675.850
675.820
675.790
675.760
675.730
675.700
Design elevation (m)
Km0+550
Km0+560
Km0+570
Km0+580
Km0+590
Km0+600
Station (m)
950.00
950.00
950.00
950.00
950.00
950.00
Original surface(m)
675.640
675.610
675.580
675.550
675.520
675.490
Design elevation (m)
Km0+620
Km0+630
Km0+640
Km0+650
Km0+660
Km0+670
Station (m)
950.00
950.00
950.00
943.65
937.48
Original surface(m)
675.430
675.400
675.370
675.340
675.310
675.280
Design elevation (m)
Km0+690
Km0+700
Km0+710
Km0+720
Km0+730
Km0+740
Station (m)
899.23
925.15
908.95
903.90
919.07
896.77
Original surface(m)
675.220
675.190
675.160
675.130
675.100
675.070
Design elevation (m)
Km0+760
Km0+770
Km0+780
Km0+790
Km0+800
Km0+810
Station (m)
882.01
886.94
891.86
889.40
884.46
879.57
Original surface(m)
674.854
675.040
675.010
674.980
674.950
674.919
674.739
Design elevation (m)
Km0+830
Km0+840
Km0+850
Km0+860
Km0+870
Km0+880
Station (m)
867.63
865.24
876.19
873.19
870.19
862.89
Original surface(m)
674.360
674.095
673.780
673.415
673.000
672.535
Design elevation (m)
0.3% 5% 5% 5% 5% 5%
Grade, i%
Km0+900
Km0+910
Km0+920
Km0+930
Km0+940
Km0+950
Station (m)
859.03
858.40
855.60
855.23
Original surface(m)
671.535
671.035
670.535
670.035
669.535
669.035
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km0+970
Km0+980
Km0+990
Km1+000
Km1+010
Km1+020
Station (m)
853.74
854.86
854.49
852.99
852.63
853.37
Original surface(m)
668.035
667.535
667.035
666.535
666.035
665.535
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+040
Km1+050
Km1+060
Km1+070
Km1+080
Km1+090
Station (m)
851.14
851.88
850.76
850.39
850.02
852.25
Original surface(m)
664.535
664.035
663.535
663.035
662.535
662.035
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+110
Km1+120
Km1+130
Km1+140
Km1+150
Km1+160
Station (m)
850.02
850.02
850.02
850.02
850.02
850.02
Original surface(m)
661.035
660.535
660.035
659.535
659.035
658.535
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+180
Km1+190
Km1+200
Km1+210
Km1+220
Km1+230
Station (m)
850.02
850.02
850.02
850.02
850.02
850.02
Original surface(m)
657.535
657.035
656.535
656.035
655.535
655.035
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+250
Km1+260
Km1+270
Km1+280
Km1+290
Km1+300
Station (m)
840.71
845.85
844.13
842.42
839.00
849.27
Original surface(m)
654.035
653.535
653.035
652.535
652.035
651.535
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+320
Km1+330
Km1+340
Km1+350
Km1+360
Km1+370
Station (m)
HT136
838.16
838.73
838.73
838.73
838.73
836.40
836.37
Original surface(m)
650.535
640.035
649.535
649.035
648.535
648.035
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+390
Km1+400
Km1+410
Km1+420
Km1+430
Km1+440
Station (m)
816.54
835.80
831.95
828.10
820.39
812.65
Original surface(m)
647.035
646.535
646.035
645.535
645.035
644.535
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+460
Km1+470
Km1+480
Km1+490
Km1+500
Km1+510
Station (m)
804.94
801.13
800.02
800.02
800.02
798.75
Original surface(m)
643.535
643.035
642.535
642.035
641.535
641.035
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+530
Km1+540
Km1+550
Km1+560
Km1+570
Km1+580
Station (m)
776.93
789.99
785.62
772.65
794.37
768.07
Original surface(m)
640.035
639.535
639.035
638.535
638.035
637.535
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+600
Km1+610
Km1+620
Km1+630
Km1+640
Km1+650
Station (m)
758.60
750.02
750.02
750.02
750.02
753.87
Original surface(m)
636.535
636.035
635.585
635.035
634.535
634.035
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+670
Km1+680
Km1+690
Km1+700
Km1+710
Km1+720
Station (m)
750.02
748.20
743.88
739.57
730.17
Original surface(m)
633.035
632.535
632.035
631.535
631.035
630.429
Design elevation (m)
5% 5% 5% 5% 5% 5%
Grade, i%
Km1+792.13
Km1+730
Km1+740
Km1+750
Km1+760
Km1+770
Km1+780
Station (m)
717.64
720.42
716.89
719.05
719.05
Original surface(m)
628.314
630.035
629.035
628.035
627.535
627.035
Design elevation (m)
5% 5% 5% 5% 5% 5% 5%
Grade, i%
Km1+834.42
Km1+800
Km1+820
Km1+840
Km1+850
Km1+860
Station (m)
705.21
702.04
713.43
708.00
703.59
699.89
698.48
716.87
Original surface(m)
Distance (m) 10.00 10.00 10.00 11.370 6.800 6.830 8.180 6.820
624.001
623.798
622.180
622.180
624.210
626.535
626.035
625.535
Design elevation (m)
5% 5% 26.2% 0%
Grade, i% 0%
Km1+933.18
Km1+911.37
Km1+918.17
Km1+870
Km1+880
Km1+890
Km1+900
Km1+925
Station (m)
Km1+950
HT188
689.56
689.56
684.36
679.86
695.27
624.022
616.125
616.125
606.125
596.125
Design elevation (m) Design elevation (m)
Km1+940
Km1+950
Km1+950
Km1+960
Km1+970
Station (m) Station (m)
Type 4
Km2+000
HT193
663.60
674.34
668.43
663.60
659.13
653.77
649.17
Original surface(m) Original surface(m)
574.766
574.766
574.266
573.766
573.266
586.125
100% 5% 5% 5% 5%
Grade, i% R10m Grade, i%
Km1+990
Km2+000
Km2+000
Km2+020
Km2+030
Km2+040
Station (m) Station (m)
640.96
634.79
630.12
626.75
623.09
619.35
Original surface(m)
572.266
571.766
571.266
570.766
570.266
569.766
Design elevation (m)
Grade, i% 5% 5% 5% 5% 5% 5% 5%
Km2+060
Km2+070
Km2+080
Km2+090
Km2+100
Km2+110
Station (m)
613.76
610.22
606.83
604.26
601.04
596.98
Original surface(m)
568.766
568.266
567.766
567.266
566.766
566.266
Design elevation (m)
Grade, i% 5% 5% 5% 5% 5% 5% 5%
Km2+130
Km2+140
Km2+150
Km2+160
Km2+170
Km2+180
Station (m)
584.74
579.10
576.93
Original surface(m)
565.266
564.766
564.380
Design elevation (m)
Grade, i% 5% 5% 5%
Km2+219.63
Km2+190
Km2+200
Km2+210
Station (m)
25
25
93
43
74
R1
30° 30°
276
326
202
233
RC M250
25
25
25 250 25
300
30
30
97
74
30° 30°
276
336
202
239
RC M250
30
30
30 250 30
310
10
40
30
104
74
30° 30°
346
276
202
242
RC M250
30
30
10 30 250 30 10
330
R1
55
86
93
5
R9
Steel lining
95
300
M200 concrete backfill
207
95
Pipe rack
45
t=10cm
10
52 98 98 52
300
Rock foundation
Arc steel H150, a=1.0m
Concrete M200 fill up steel ribs
Steel grid Þ1, a=4x4
Steel grid Þ12xÞ10, a=200x200
(Þ10 on perimeter,
Þ12 on longitudinal direction)
5
R9
Pipe rack